A method and system for assessing the risk of cascading failures in power systems taking into account the impact of secondary systems

Through technical means such as non-sequential Monte Carlo method and Markov chain method, combined with risk value theory and hierarchical analysis method, the comprehensive risk indicators of power system chain failure are evaluated, and the problem of ignoring secondary control measures in the existing technology is solved. , improves the accuracy and efficiency of the evaluation.

CN114186849BActive Publication Date: 2024-11-26STATE GRID JIANGSU ELECTRIC POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111508617.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-10
Publication Date
2024-11-26
Estimated Expiration
2041-12-10

AI Technical Summary

Technical Problem

When evaluating power system chain failures, the prior art usually ignores the impact of power secondary control measures, resulting in increased computational complexity and reduced efficiency. As the system scale expands, probability methods are easily trapped in the contradiction between search breadth and speed. .

Method used

The non-sequential Monte Carlo method is used to extract the fault status of the power line, combine the optimal load reduction algorithm to calculate the execution amount of the load cutting device, establish a power line failure probability model, and use the Markov chain method to determine the complete event chain of the chain failure, and Comprehensive risk indicators are calculated based on risk value theory and hierarchical analysis method.

Benefits of technology

It has achieved a comprehensive and reasonable assessment of chain failures of the power system, can effectively identify the impact of the secondary system on the primary system, help system maintenance personnel find weak links, and improve the accuracy and efficiency of risk assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114186849B_ABST
    Figure CN114186849B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for assessing the risk of cascading failures of a power system taking into account the influence of a secondary system. The method firstly considers the power system flow information and establishes a power line failure probability model. Secondly, the influence of the load shedding device failure in the power secondary system on the power primary system is considered, and based on the Markov chain method, a complete event chain of cascading failures of the power system is found. Finally, based on the risk value theory, a variety of system-level risk indicators are established, and a system comprehensive risk indicator is proposed in combination with the hierarchical analysis method. Furthermore, a method for assessing the risk of cascading failures of a power system taking into account the influence of a secondary system is proposed. The method can comprehensively and reasonably assess the operation risk of the power system taking into account the secondary system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of risk assessment of integrated power primary and secondary systems, and specifically relates to a power system cascading failure risk assessment method and system taking into account the impact of secondary systems. Background Art

[0002] In recent years, many major power outages have occurred around the world, attracting widespread attention from the international community. Cascading failures are the main cause of major power outages. Under a relatively special time and space background, some initial disturbances cause individual components to fail and stop operating. Under the combined effects of incorrect and untimely control measures of the power secondary system, as well as weather, natural disasters and other factors, it will cause a large-scale transfer of power flows within the system, which will lead to abnormal operation of other equipment and their subsequent shutdown, causing the fault to spread rapidly within the power grid, and ultimately causing voltage and frequency collapse, leading to large-scale power outages in the power system.

[0003] Domestic and foreign scholars' research on cascading failures is mainly divided into two categories: deterministic methods and probabilistic methods. The computational complexity of deterministic methods will increase significantly, and the computational efficiency will decrease significantly. As the scale of the system expands, probabilistic methods can easily fall into the contradiction between search breadth and search speed. At present, cascading failures in power systems usually only consider the failure of power primary system components, while ignoring the situation when the power secondary control measures do not act correctly. Summary of the invention

[0004] In order to solve the problems existing in the prior art, the present invention proposes a method and system for assessing the risk of cascading failures of a power system taking into account the influence of a secondary system. The present invention can comprehensively and reasonably assess the operating risk of a power system taking into account the secondary system.

[0005] The method for assessing the risk of cascading failures in a power system taking into account the influence of a secondary system of the present invention comprises the following steps:

[0006] The non-sequential Monte Carlo method is used to extract the fault status of power lines;

[0007] According to the optimal load shedding algorithm, the execution amount of load shedding devices in each node of the power system is calculated;

[0008] The non-sequential Monte Carlo method is used to determine the state of the load shedding device in the power secondary system. If the device fails, the power system flow is calculated based on the current power system state.

[0009] Based on the power system line flow information, establish a power line failure probability model;

[0010] The line with the highest probability of failure is selected as the next level of cascading failure line, and the complete event chain of cascading failure of the power system is determined based on the Markov chain method;

[0011] Based on the risk value theory and the analytic hierarchy process, the comprehensive risk index R of power system cascading failures is calculated. S .

[0012] The above non-sequential Monte Carlo method is used to extract power line faults as follows:

[0013] For power line l, P0 is the historical mean value of the line failure probability, and a random number r is generated from [0,1] l , then the state S of the power line l in one sampling l Determined by the following formula:

[0014]

[0015] The above calculation shows that the execution amount of load shedding devices in each node of the power system is as follows:

[0016] According to the current power system line fault status, the optimal load shedding algorithm is used to calculate the load shedding amount. The optimal load shedding algorithm is as follows:

[0017]

[0018]

[0019]

[0020] L gi -P gi ≤△P gi ≤U gi -P gi

[0021] 0≤L f ≤L M

[0022] Among them, f is the optimization target, the total load shedding of the system; N is the set of power grid nodes; S i is the load shedding capacity of the load shedding device at node i. l is the operating status of the power line; x l is the line impedance; A il is the line adjacency matrix, δ i is the node phase angle; ΔP gi The generator can adjust the power generation. M is the upper limit of the line flow allowable amount; P gi is the output of the i-th generator in the power system; U gi The upper limit of the output of the i-th generator in the power system; L gi The lower limit of the output of the i-th generator in the power system;

[0023] In the above system, the non-sequential Monte Carlo method is used to judge the state of the load shedding device in the power secondary system. The specific steps are as follows:

[0024] For load shedding device i, P w represents the failure probability of the load shedding device, and generates a random number r from [0,1] i , then the state X of the load shedding device q in one sampling k Determined by the following formula:

[0025]

[0026] If the load shedding device i fails, the load S that should be shelved i Without removal, according to the current state of the power system, calculate the power system line flow L f .

[0027] The failure probability model of the above system components is as follows:

[0028]

[0029] Among them, P line is the probability of system component failure; P0 is the historical mean value of line failure probability; L f is the power line flow value; L N is the rated operating power flow value of the power line; L M is the allowable limit value of power line flow; a, b are coefficients in the equation, which are given by L f =L N , P line =P0;L f =L M , P line =1, solve jointly.

[0030] Based on the Markov chain method, the complete event chain of power system cascading failure is determined as follows:

[0031] According to the power system flow after the load shedding device fails and combined with the power line failure probability model, the failure probability of the power line under the current power system state is calculated.

[0032] The line with the highest probability of failure is selected as the next level of cascading failure line.

[0033] Calculate the probability of the current power system state. Based on the preset cascading failure path, there are n system states, which are recorded as state 1 to state n according to the order of occurrence.

[0034] P cas =P(S1)P(S2 / S1)LP(S n / S n-1 )

[0035]

[0036] Among them, P cas is the power system state probability, P(S i / S i-1 ) is the conditional probability of the ith system state experienced by the cascading failure path; P(S i ) is the probability of the ith power system state; m is the number of power line faults; P line.j is the failure probability of the jth power line; h is the number of fault load shedding devices.

[0037] The cut-off condition for the cascading failure event is that the power system power flow does not converge, or the power line fault scale is greater than 4, then stop. Otherwise, cut off the line with the highest probability of failure and return to step 1.

[0038] Based on the risk value theory and the analytic hierarchy process, the method for determining the comprehensive risk index of the system is as follows:

[0039] Load shedding risk index R LOSS Indicates the risk value of load shedding when the system power generation is insufficient or the system flow exceeds the limit;

[0040]

[0041]

[0042] Among them, P cas is the probability of cascading failure; L S is the total load shedding of the power system after a cascading failure occurs; P load is the total load of the system;

[0043] Overload risk index R OL Indicates the risk value of line active power exceeding the safety range due to system status changes;

[0044]

[0045] Where L is the number of lines in the power system; L f.i is the power flow value of the ith line in the power system after the cascading failure occurs; L N is the rated operating power flow value of the power line;

[0046] Voltage over-limit risk index R OV Indicates the risk value of the node voltage exceeding the upper and lower limits due to changes in system status;

[0047]

[0048] Among them, L v.iis the node voltage of the ith bus in the power system after a cascading fault occurs; L v.N is the node rated voltage of the i-th bus in the power system;

[0049] In the risk assessment of power system operation, the risk value reflects the potential maximum loss faced by the system within a future time interval and at a preset confidence level;

[0050]

[0051] Where σ is R VaR The corresponding probability confidence level indicates that we can be sure that the power outage loss of the target system does not exceed R with a probability of σ VaR ; p(x) is the probability density function of the indicator;

[0052] Based on the risk value theory, R LOSS , R OL , R OV The risk indicators are converted into R LOSS_1 , R OL_1 , R OV_1 , calculated according to the following expressions respectively;

[0053]

[0054]

[0055]

[0056] The power outage data is obtained by simulating the large power outage accident model, and then R is obtained by statistical estimation. LOSS , R OL , R OV Probability density function of risk indicator;

[0057] Calculate R using analytic hierarchy process LOSS , R OL , R OV The weights of the risk indicators are ω1, ω2, and ω3 respectively; finally, the comprehensive risk index R of the power system cascading failure is calculated. S for:

[0058] R S =ω1R LOSS_1 +ω2R OL_1 +ω3R OV_1

[0059] R LOSS , R OL , R OV The probability density function of the risk indicator is determined as follows:

[0060] Firstly, the load loss is divided into a finite number of small intervals from the minimum to the maximum value, and the number of power outage events falling into each interval is counted respectively. The number divided by the total number of power outage events is the probability value of the corresponding interval. The probability density function p(x) of each indicator is obtained by fitting with the ksdensity function in MATLAB.

[0061] The power system cascading failure risk assessment system of the present invention taking into account the influence of the secondary system comprises:

[0062] A power line fault probability establishment module is used to establish a power line fault probability model based on power system flow information;

[0063] The load shedding device judgment module is used to extract the faulty load shedding device based on the non-sequential Monte Carlo method and calculate the power system flow according to the current power system state.

[0064] A complete event chain determination module is used to determine the complete event chain of power system cascading failures based on the Markov chain method;

[0065] The comprehensive risk index calculation module is used to calculate the comprehensive risk index R of power system cascading failures based on risk value theory and hierarchical analysis method. S .

[0066] The above power line failure probability model is as follows:

[0067]

[0068] Among them, P line is the probability of system component failure; P0 is the historical mean value of line failure probability; L f is the power line flow value; L N is the rated operating power flow value of the power line; L M is the allowable limit value of power line flow; a, b are coefficients in the equation, which are given by L f =L N , P line =P0;L f =L M , P line =1, solve jointly.

[0069] The load shedding device judgment module is specifically used for:

[0070] For load shedding device i, P w represents the failure probability of the load shedding device, and generates a random number r from [0,1] i , then the state X of the load shedding device q in one sampling k Determined by the following formula:

[0071]

[0072] If the load shedding device i fails, the load S that should be shelved i Without removal, according to the current state of the power system, calculate the power system line flow L f .

[0073] The above complete event chain determination module is specifically used for:

[0074] According to the power line failure probability model, the failure probability of the power line under the current power system state is calculated.

[0075] The line with the highest probability of failure is selected as the next level of cascading failure line.

[0076] Calculate the probability of the current power system state. Based on the preset cascading failure path, there are n system states, which are recorded as state 1 to state n according to the order of occurrence.

[0077] P cas =P(S1)P(S2 / S1)LP(S n / S n-1 )

[0078]

[0079] Among them, P cas is the power system state probability, P(S i / S i-1 ) is the conditional probability of the ith system state experienced by the cascading failure path; P(S i ) is the probability of the ith power system state; m is the number of power line faults; P line.j is the failure probability of the jth power line; h is the number of fault load shedding devices.

[0080] The cut-off condition for the cascading failure event is that the power system power flow does not converge, or the power line fault scale is greater than 4, then stop. Otherwise, cut off the line with the highest probability of failure and return to step 1.

[0081] The above-mentioned comprehensive risk indicator calculation module is specifically used for:

[0082] Load shedding risk index R LOSS Indicates the risk value of load shedding when the system power generation is insufficient or the system flow exceeds the limit;

[0083]

[0084]

[0085] Among them, P cas is the probability of cascading failure; L Sis the total load shedding of the power system after a cascading failure occurs; P load is the total load of the system;

[0086] Overload risk index R OL Indicates the risk value of line active power exceeding the safety range due to system status changes;

[0087]

[0088] Where L is the number of lines in the power system; L f.i is the power flow value of the ith line in the power system after the cascading failure occurs; L N is the rated operating power flow value of the power line;

[0089] Voltage over-limit risk index R OV Indicates the risk value of the node voltage exceeding the upper and lower limits due to changes in system status;

[0090]

[0091] Among them, L v.i is the node voltage of the ith bus in the power system after a cascading fault occurs; L v.N is the node rated voltage of the i-th bus in the power system;

[0092] In the risk assessment of power system operation, the risk value reflects the potential maximum loss faced by the system within a future time interval and at a preset confidence level;

[0093]

[0094] Where σ is R VaR The corresponding probability confidence level indicates that we can be sure that the power outage loss of the target system does not exceed R with a probability of σ VaR ; p(x) is the probability density function of the indicator;

[0095] Based on the risk value theory, R LOSS , R OL , R OV The risk indicators are converted into R LOSS_1 , R OL_1 , R OV_1 , calculated according to the following expressions respectively;

[0096]

[0097]

[0098]

[0099] The power outage data is obtained by simulating the large power outage accident model, and then R is obtained by statistical estimation. LOSS , R OL , R OV Probability density function of risk indicator;

[0100] Calculate R using analytic hierarchy process LOSS , R OL , R OV The weights of the risk indicators are ω1, ω2, and ω3 respectively; finally, the comprehensive risk index R of the power system cascading failure is calculated. S for:

[0101] R S =ω1R LOSS_1 +ω2R OL_1 +ω3R OV_1 .

[0102] R LOSS , R OL , R OV The method for determining the probability density function of the risk indicator is as follows: First, divide the load loss into a finite number of small intervals from the minimum value to the maximum value, and count the number of power outage events falling into each interval. The number divided by the total number of power outage events is the probability value of the corresponding interval. After fitting with the ksdensity function in MATLAB, the probability density function p(x) of each indicator is obtained.

[0103] The present invention considers the power system flow information and establishes a power line failure probability model; secondly, considering the impact of the load shedding device failure in the power secondary system on the power primary system, based on the Markov chain method, finds the complete event chain of the power system cascading failure; finally, based on the risk value theory, establishes a variety of system-level risk indicators, and combines the hierarchical analysis method to propose a system comprehensive risk indicator; then proposes a power system cascading failure risk assessment method considering the impact of the secondary system, which can comprehensively and reasonably assess the power system operation risk taking into account the secondary system, and help system maintenance personnel find the weak links in the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0104] Figure 1 The present invention is a work flow chart of a method for risk assessment of cascading failures in power systems taking into account the impact of secondary systems;

[0105] Figure 2 It is a working flow diagram of an embodiment of the present invention;

[0106] Figure 3 A topological structure diagram of a power system in an embodiment;

[0107] Figure 4 This is the communication network diagram of the power secondary system. Specific implementation plan

[0108] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0109] See also Figure 1 A method for assessing the risk of cascading failures in a power system taking into account the impact of a secondary system of the present invention comprises the following steps:

[0110] The non-sequential Monte Carlo method is used to extract the fault status of power lines;

[0111] According to the optimal load shedding algorithm, the execution amount of load shedding devices in each node of the power system is calculated;

[0112] The non-sequential Monte Carlo method is used to determine the state of the load shedding device in the power secondary system. If the device fails, the power system flow is calculated based on the current power system state.

[0113] Considering the power system flow information, a power line failure probability model is established;

[0114] Based on the Markov chain method, the complete event chain of cascading failures in the power system is found.

[0115] Based on the risk value theory and analytic hierarchy process, a comprehensive risk index of the system is proposed;

[0116] The non-sequential Monte Carlo method is used to extract the power line fault calculation as follows:

[0117] For power line l, P0 is the historical mean value of the line failure probability, and a random number r is generated from [0,1] l , then the state S of the power line l in one sampling l Determined by the following formula:

[0118]

[0119] The execution amount of load shedding devices in each node of the power system is calculated as follows:

[0120] According to the current power system line fault status, the optimal load shedding algorithm is used to calculate the load shedding amount. The optimal load shedding algorithm is as follows:

[0121]

[0122]

[0123]

[0124] L gi -P gi ≤△P gi≤U gi -P gi

[0125] 0≤L f ≤L M

[0126] Among them, f is the optimization target, the total load shedding of the system; N is the set of power grid nodes; S i is the load shedding capacity of the load shedding device at node i. l is the operating status of the power line; x l is the line impedance; A il is the line adjacency matrix, δ i is the node phase angle; ΔP gi The generator can adjust the power generation. M is the upper limit of the line flow allowable amount; P gi is the output of the i-th generator in the power system; U gi The upper limit of the output of the i-th generator in the power system; L gi The lower limit of the output of the i-th generator in the power system;

[0127] The non-sequential Monte Carlo method is used to determine the state of the load shedding device in the power secondary system. The specific steps are:

[0128] For load shedding device i, P w represents the failure probability of the load shedding device, and generates a random number r from [0,1] i , then the state X of the load shedding device i in one sampling k Determined by the following formula:

[0129]

[0130] If the load shedding device i fails, the load S that should be shelved i Without removal, according to the current state of the power system, calculate the power system line flow L f .

[0131] Considering the power system flow information, the power line failure probability model is established as follows:

[0132] Line outage is affected by both internal and external factors. However, in the stage of accident expansion, the internal and external environmental factors and the aging of the equipment itself can be equivalent to constants. Therefore, the impact of power flow changes on the development of cascading failures can be mainly considered. Combined with the operation reliability theory, the line failure probability model is as follows:

[0133]

[0134] Among them, P lineis the failure probability of the power line; P0 is the historical mean value of the line failure probability; L f is the power line flow value; L N is the rated operating power flow value of the power line; L M is the allowable limit value of power line flow; a, b are coefficients in the equation, which can be obtained from L f =L N , P line =P0;L f =L M , P line =1, joint solution;

[0135] Based on the Markov chain method, the complete event chain of cascading failures in the power system is found, which is characterized by the following specific steps:

[0136] According to the power system flow after the load shedding device fails and combined with the power line failure probability model, the failure probability of the power line under the current power system state is calculated.

[0137] The line with the highest probability of failure is selected as the next level of cascading failure line.

[0138] Calculate the probability of the current power system state. Based on the preset cascading failure path, there are n system states, which are recorded as state 1 to state n according to the order of occurrence.

[0139] P cas =P(S1)P(S2 / S1)LP(S n / S n-1 )

[0140]

[0141] Among them, P cas is the power system state probability, P(S i / S i-1 ) is the conditional probability of the ith system state experienced by the cascading failure path; P(S i ) is the probability of the ith power system state; m is the number of power line faults; P line.j is the failure probability of the jth power line; h is the number of fault load shedding devices.

[0142] The cut-off condition for the cascading failure event is that the power system power flow does not converge, or the power line fault scale is greater than 4, then it stops. Otherwise, the line with the highest probability of failure is cut off.

[0143] Based on the risk value theory and analytic hierarchy process, a comprehensive system risk index is proposed. The specific steps are as follows:

[0144] Load shedding risk index R LOSSIndicates the risk value of load shedding when the system power generation is insufficient or the system flow exceeds the limit;

[0145]

[0146] Among them, P cas is the probability of cascading failure; L S is the total load shedding of the power system after a cascading failure occurs; P load is the total load of the system;

[0147] Overload risk index R OL Indicates the risk value of line active power exceeding the safety range due to system status changes;

[0148]

[0149] Where m is the number of lines in the power system; L f.i is the power flow value of the ith line in the power system after the cascading failure occurs; L N is the rated operating power flow value of the power line;

[0150] Voltage over-limit risk index R OV Indicates the risk value of the node voltage exceeding the upper and lower limits due to changes in system status;

[0151]

[0152] Among them, L v.i is the node voltage of the ith bus in the power system after a cascading fault occurs; L v.N is the node rated voltage of the i-th bus in the power system;

[0153] In the risk assessment of power system operation, the risk value reflects the potential maximum loss faced by the system within a future time interval and at a preset confidence level;

[0154]

[0155] Where σ is R VaR The corresponding probability confidence level indicates that we can be sure that the power outage loss of the target system does not exceed R with a probability of σ VaR ; p(x) is the probability density function of the indicator;

[0156] Based on the risk value theory, R LOSS , R OL , R OV The risk indicators are converted into R LOSS_1 , R OL_1 , R OV_1 , calculated according to the following expressions respectively;

[0157]

[0158]

[0159]

[0160] The power outage data is obtained by simulating the large power outage accident model, and then R is obtained by statistical estimation. LOSS , R OL , R OV Probability density function of risk indicator;

[0161] Calculate R using analytic hierarchy process LOSS , R OL , R OV The weights of the risk indicators are ω1, ω2, and ω3 respectively; finally, the comprehensive risk index R of the power system cascading failure is calculated. S for:

[0162] ω1+ω2+ω 3=1

[0163] The comparative judgment matrix of the hierarchical analysis method is:

[0164]

[0165] The calculated ω1, ω2, and ω3 are 0.614, 0.268, and 0.118, respectively.

[0166] ω1>ω2>ω3

[0167] R S =ω1R LOSS_1 +ω2R OL_1 +ω3R OV_1 .

[0168] R LOSS , R OL , R OV The method for determining the probability density function of the risk index is as follows: First, the load loss is divided into a finite number of small intervals from the minimum to the maximum value, and the number of power outage events falling into each interval is counted respectively. The number of times divided by the total number of power outage events is the probability value of the corresponding interval. After fitting with the ksdensity function in MATLAB, the probability density function p(x) of each index is obtained.

[0169] Considering the impact of the secondary system on the primary power system, a risk assessment method for cascading failures of the power system taking into account the impact of the secondary system is proposed. The specific steps are as follows.

[0170] Determine the topology of the power grid and initialize the operating status of the power grid.

[0171] The non-sequential Monte Carlo method is used to extract the state of the power primary system line as the initial system fault.

[0172] According to the current system status, the optimal load shedding algorithm is used to calculate the load shedding amount of each node in the system.

[0173] The non-sequential Monte Carlo method is used to extract the status of load shedding devices in power secondary systems.

[0174] If the load shedding device is not faulty, return to the previous step. If the load shedding device is faulty, recalculate the system flow according to the current state, calculate the failure probability of the line under the current state according to the power line failure probability model, and cut off the line with the highest failure probability.

[0175] Calculate the probability of the current system state. If the power system flow does not converge or the power line fault scale is greater than 4, stop.

[0176] Calculate three risk indicators under the current system status: R LOSS , R OL , R OV At this time, k=k+1

[0177] If the sampling number threshold in step 2 is reached, stop.

[0178] This example provides a method for assessing the risk of cascading failures of a power system taking into account the influence of the secondary system. This method considers the power system flow information and establishes a power line failure probability model. Secondly, the impact of the failure of the load shedding device in the power secondary system on the power primary system is considered, and based on the Markov chain method, the complete event chain of the cascading failure of the power system is found. Finally, based on the risk value theory, a variety of system-level risk indicators are established, and combined with the hierarchical analysis method, a comprehensive system risk indicator is proposed. Furthermore, a method for assessing the risk of cascading failures of a power system taking into account the influence of the secondary system is proposed. This method can comprehensively and reasonably assess the operation risk of the power system taking into account the secondary system.

[0179] See also Figure 2 , including the following steps:

[0180] 1) Determine the topology of the power grid, the initial failure probability of the power line, and the failure probability of the load shedding device, and input the basic system parameters. In this embodiment, the nodes of the IEEE 14 system whose node load is not 0 are equipped with load shedding devices, which are used to execute the load shedding instructions issued by the power secondary system when the power system fails. The communication network topology corresponding to the power secondary system is shown in the figure below: Figure 3 and Figure 4 As shown, it includes a control master station MS, four control stations SS1, SS2 and SS3, and 11 load shedding device execution stations ES1~ES11.

[0181] 2) The non-sequential Monte Carlo method is used to extract the state of the power primary system line as the initial system fault. The simulation number k is set to 0 and the sampling number threshold k is set to 0. max =3000.

[0182] 3) According to the current system status, the optimal load shedding algorithm is used to calculate the load shedding amount of each node in the system.

[0183] 4) The non-sequential Monte Carlo method is used to extract the status of the load shedding device in the power secondary system.

[0184] 5) If the load shedding device is not faulty, return to the previous step. If the load shedding device fails and the load that should have been cut is not cut, recalculate the system flow according to the current state, calculate the failure probability of each power line in the current state according to the line reliability model, and cut off the line with the highest failure probability.

[0185] 6) Calculate the current system state probability, system state probability P cas , which is the product of the probability of each fault line contained in the cascading failure event and the failure probability of each extracted load shedding device. If the power system flow does not converge, or the scale of the power line fault is greater than 4, stop.

[0186] 7) Calculate three risk indicators under the current system status: R LOSS , R OL , R OV . At this time, k=k+1;

[0187] 8) If k reaches the sampling number threshold k in step 2 max , then stop.

[0188] 7) Arrange the data and calculate the comprehensive risk index. First, divide the load loss from the minimum to the maximum into a finite number of small intervals, and count the number of power outage events that fall into each interval. The number divided by the total number of power outage events is the probability value of the corresponding interval. After fitting with the ksdensity function in MATLAB, three risk indicators R LOSS , R OL , R OV The probability density function p(x) is given by: LOSS , R OL , R OV and comprehensive risk index R S .

[0189] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

[0190] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0191] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0192] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0193] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit its protection scope. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the field should understand that after reading the present invention, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the invention, but these changes, modifications or equivalent substitutions are all within the protection scope of the pending claims of the invention.

Claims

1. A method for assessing the risk of cascading failures in a power system taking into account the impact of a secondary system, characterized in that: The steps include: The non-sequential Monte Carlo method is used to extract the fault status of power lines; According to the optimal load shedding algorithm, the execution amount of load shedding devices in each node of the power system is calculated; The non-sequential Monte Carlo method is used to determine the state of the load shedding device in the power secondary system. If the device fails, the power system flow is calculated based on the current power system state. Otherwise, the state of the load shedding device is re-extracted. Based on the power system line flow information, establish a power line failure probability model; The line with the highest probability of failure is selected as the next level of cascading failure line, and the complete event chain of cascading failure of the power system is determined based on the Markov chain method; Based on the risk value theory and the analytic hierarchy process, the comprehensive risk index R of power system cascading failures is calculated. S ; The method of establishing system comprehensive risk index based on risk value theory and hierarchical analysis method is as follows: Load shedding risk index R LOSS Indicates the risk value of load shedding when the system power generation is insufficient or the system flow exceeds the limit; Among them, P cas is the probability of cascading failure; L S is the total load shedding of the power system after a cascading failure occurs; P load is the total load of the system; Overload risk index R OL Indicates the risk value of line active power exceeding the safety range due to system status changes; Where L is the number of lines in the power system; L f.i is the power flow value of the ith line in the power system after the cascading failure occurs; L N is the rated operating power flow value of the power line; Voltage over-limit risk index R OV Indicates the risk value of the node voltage exceeding the upper and lower limits due to changes in system status; Among them, L v.i is the node voltage of the ith bus in the power system after a cascading fault occurs; L v.N is the node rated voltage of the i-th bus in the power system; In the risk assessment of power system operation, the risk value reflects the potential maximum loss faced by the system within a future time interval and at a preset confidence level; Where σ is R VaR The corresponding probability confidence level indicates that we can be sure that the power outage loss of the target system does not exceed R with a probability of σ VaR ; p(x) is the probability density function of the indicator; Based on the risk value theory, R LOSS , R OL , R OV The risk indicators are converted into R LOSS_1 , R OL_1 , R OV_1 , calculated according to the following expressions respectively; The power outage data is obtained by simulating the large power outage accident model, and then R is obtained by statistical estimation. LOSS , R OL , R OV Probability density function of risk indicator; Calculate R using analytic hierarchy process LOSS , R OL , R OV The weights of the risk indicators are ω1, ω2, and ω3 respectively; finally, the comprehensive risk index R of the power system cascading failure is calculated. S for: R S =ω1R LOSS_1 +ω2R OL_1 +ω3R OV_1 。 2. The method for assessing the risk of cascading failures in a power system taking into account the impact of the secondary system according to claim 1 is characterized in that: Using non-sequential Monte Carlo method to extract power line faults: For power line l, P0 is the historical mean value of the line failure probability, and a random number r is generated from [0,1] l , then the state S of the power line l in one sampling l Determined by the following formula:

3. The method for assessing the risk of cascading failures in a power system taking into account the impact of the secondary system according to claim 2 is characterized in that: Calculate the execution amount of load shedding devices in each node of the power system: According to the current power system line fault status, the optimal load shedding algorithm is used to calculate the load shedding amount. The optimal load shedding algorithm is as follows: L gi -P gi ≤△P gi ≤U gi -P gi 0≤L f ≤L M Among them, f is the optimization target, the total load shedding of the system; N is the set of power grid nodes; S i is the load shedding capacity of the load shedding device at node i; S l is the operating status of the power line; x l is the line impedance; A il is the line adjacency matrix, δ i is the node phase angle; ΔP gi The adjustable power generation of the generator; L M is the upper limit of the line flow allowable amount; P gi is the output of the i-th generator in the power system; U gi The upper limit of the output of the i-th generator in the power system; L gi The lower limit of the output of the ith generator in the power system.

4. The method for assessing the risk of cascading failures in a power system taking into account the impact of the secondary system according to claim 3 is characterized in that: The non-sequential Monte Carlo method is used to determine the state of the load shedding device in the power secondary system: For load shedding device i, P w represents the failure probability of the load shedding device, and generates a random number r from [0,1] i , then the state X of the load shedding device q in one sampling k Determined by the following formula: If the load shedding device i fails, the load S that should be shelved i Without removal, according to the current state of the power system, calculate the power system line flow L f .

5. The method for assessing the risk of cascading failures in a power system taking into account the impact of the secondary system according to claim 4 is characterized in that: The power line fault probability model is as follows: Among them, P line is the probability of power line failure; L f is the power line flow value; L N is the rated operating power flow value of the power line; L M is the allowable limit value of power line flow; a, b are coefficients in the equation, which are given by L f =L N , P line =P0;L f =L M , P line =1, solve jointly.

6. The method for assessing the risk of cascading failures in a power system taking into account the impact of the secondary system according to claim 5, characterized in that: Based on the Markov chain method, the complete event chain of power system cascading failures is determined. The specific steps are as follows: According to the power system line flow and the power line fault probability model, the failure probability of the power line under the current power system state is calculated; Select the line with the highest probability of failure as the next level of cascading failure line; Calculate the probability of the current power system state; based on the preset cascading failure path containing n system states, they are recorded as state 1 to state n according to the order of occurrence. P cas =P(S1)P(S2 / S1)L P(S n / S n-1 ) Among them, P cas is the power system state probability, P(S i / S i-1 ) is the conditional probability of the ith system state experienced by the cascading failure path; P(S i ) is the probability of the ith power system state; m is the number of power line faults; P line.j is the fault probability of the jth power line; h is the number of fault load shedding devices; The cut-off condition for the cascading failure event is that the power system power flow does not converge, or the scale of the power line fault is greater than 4, then it stops; otherwise, the line with the highest probability of failure is cut off.

7. The method for assessing the risk of cascading failures in a power system taking into account the impact of the secondary system according to claim 6, characterized in that: R LOSS , R OL , R OV The probability density function of the risk indicator is determined as follows: Firstly, the load loss is divided into a finite number of small intervals from the minimum to the maximum value, and the number of power outage events falling into each interval is counted respectively. The number divided by the total number of power outage events is the probability value of the corresponding interval. The probability density function p(x) of each indicator is obtained by fitting with the ksdensity function in MATLAB.

8. The power system cascading failure risk assessment system of the power system cascading failure risk assessment method taking into account the impact of the secondary system according to claim 1, characterized in that: include A power line fault probability establishment module is used to establish a power line fault probability model based on power system flow information; The load shedding device judgment module is used to extract the faulty load shedding device based on the non-sequential Monte Carlo method and calculate the power system flow according to the current power system state; A complete event chain determination module is used to determine the complete event chain of cascading failures in the power system based on the Markov chain method; The comprehensive risk index calculation module is used to calculate the comprehensive risk index R of power system cascading failures based on risk value theory and hierarchical analysis method. S .

9. The power system cascading failure risk assessment system according to claim 8, characterized in that: The power line fault probability model is as follows: Among them, P line is the probability of system component failure; P0 is the historical mean value of line failure probability; L f is the power line flow value; L N is the rated operating power flow value of the power line; L M is the allowable limit value of power line flow; a, b are coefficients in the equation, which are given by L f =L N , P line =P0;L f =L M , P line =1, solve jointly.

10. The power system cascading failure risk assessment system according to claim 8, characterized in that: The non-sequential Monte Carlo method is used to determine the state of the load shedding device in the power secondary system. The specific steps are as follows: For load shedding device i, P w represents the failure probability of the load shedding device, and generates a random number r from [0,1] i , then the state X of the load shedding device q in one sampling k Determined by the following formula: If the load shedding device i fails, the load S that should be shelved i Without removal, according to the current state of the power system, calculate the power system line flow L f .

11. The power system cascading failure risk assessment system according to claim 10, characterized in that: Based on the Markov chain method, the complete event chain of power system cascading failures is determined. The specific steps are as follows: According to the power system flow after the load shedding device fails, combined with the power line failure probability model, the failure probability of the power line under the current power system state is calculated; Select the line with the highest probability of failure as the next level of cascading failure line; Calculate the probability of the current power system state; The preset cascading failure path contains n system states, which are recorded as state 1 to state n according to the order of occurrence. P cas =P(S1)P(S2 / S1)L P(S n / S n-1 ) Among them, P cas is the power system state probability, P(S i / S i-1 ) is the conditional probability of the ith system state experienced by the cascading failure path; P(S i ) is the probability of the ith power system state; m is the number of power line faults; P line.j is the fault probability of the jth power line; h is the number of fault load shedding devices; The cut-off condition for the cascading failure event is that the power system power flow does not converge, or the scale of the power line fault is greater than 4, then it stops; otherwise, the line with the highest probability of failure is cut off.

12. The power system cascading failure risk assessment system according to claim 11, characterized in that: The comprehensive risk index calculation module is specifically used for: Load shedding risk index R LOSS Indicates the risk value of load shedding when the system power generation is insufficient or the system flow exceeds the limit; Among them, P cas is the probability of cascading failure; L S is the total load shedding of the power system after a cascading failure occurs; P load is the total load of the system; Overload risk index R OL Indicates the risk value of line active power exceeding the safety range due to system status changes; Where L is the number of lines in the power system; L f.i is the power flow value of the ith line in the power system after the cascading failure occurs; L N is the rated operating power flow value of the power line; Voltage over-limit risk index R OV Indicates the risk value of the node voltage exceeding the upper and lower limits due to changes in system status; Among them, L v.i is the node voltage of the ith bus in the power system after a cascading fault occurs; L v.N is the node rated voltage of the i-th bus in the power system; In the risk assessment of power system operation, the risk value reflects the potential maximum loss faced by the system within a future time interval and at a preset confidence level; Where σ is R VaR The corresponding probability confidence level indicates that we can be sure that the power outage loss of the target system does not exceed R with a probability of σ VaR ; p(x) is the probability density function of the indicator; Based on the risk value theory, R LOSS , R OL , R OV The risk indicators are converted into R LOSS_1 , R OL_1 , R OV_1 , calculated according to the following expressions respectively; The power outage data is obtained by simulating the large power outage accident model, and then R is obtained by statistical estimation. LOSS , R OL , R OV Probability density function of risk indicator; Calculate R using analytic hierarchy process LOSS , R OL , R OV The weights of the risk indicators are ω1, ω2, and ω3 respectively; finally, the comprehensive risk index R of the power system cascading failure is calculated. S for: R S =ω1R LOSS_1 +ω2R OL_1 +ω3R OV_1 。 13. The power system cascading failure risk assessment system according to claim 12, characterized in that: R LOSS , R OL , R OV The probability density function of the risk indicator is determined as follows: Firstly, the load loss is divided into a finite number of small intervals from the minimum to the maximum value, and the number of power outage events falling into each interval is counted respectively. The number divided by the total number of power outage events is the probability value of the corresponding interval. The probability density function p(x) of each indicator is obtained by fitting with the ksdensity function in MATLAB.