Equipment status display method, device and equipment based on digital twin substation
By identifying the abnormal working status of the substation equipment and presenting it in the digital twin substation, the problem of difficult to achieve timely alarms and intuitive presentation in the prior art is solved, and the utilization efficiency of power resources is improved.
Patent Information
- Application Number
- CN202111394906.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-23
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2041-11-23
AI Technical Summary
It is difficult for the existing technology to achieve timely and accurate alarms and intuitive presentation of the working status of substation equipment, which affects the full utilization of power resources.
By obtaining the monitoring image of the substation equipment, we can identify whether the equipment is in an abnormal working state, and determine the grid area corresponding to the equipment in the digital twin substation, send the abnormal status information to the user terminal, and present the corresponding prompt effect on the status indicator light of the grid area.
It realizes timely alarm and intuitive presentation of abnormal working status of substation equipment, and improves the efficiency of power resource utilization.
Smart Images

Figure CN114241358B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of digital twin technology, and in particular to a method, device, computer equipment, storage medium and computer program product for displaying the status of substation equipment based on a digital twin substation. Background Art
[0002] In the power system, substations are important nodes and hubs. Substations contain many substation equipment. Timely and accurate warning and intuitive presentation of the working status of substation equipment in the substation are of great significance to ensure that electric energy resources are fully utilized.
[0003] With current technology, although intelligent video surveillance systems can be used to intelligently analyze substation equipment and process image sequences in surveillance videos to achieve detection and analysis of substation equipment, it is still difficult to achieve timely and accurate alarms and intuitive presentation of the working status of substation equipment. Summary of the invention
[0004] Based on this, it is necessary to provide a substation equipment status display method, device, computer equipment, storage medium and computer program product based on a digital twin substation to address the above technical problems.
[0005] In a first aspect, the present application provides a method for displaying substation equipment status based on a digital twin substation. The method comprises:
[0006] Acquire monitoring images obtained by monitoring substation equipment in the substation;
[0007] Identify whether the substation equipment is in an abnormal working state according to the monitoring image;
[0008] If the substation equipment is in an abnormal working state, determining a grid area corresponding to the substation equipment in the digital twin substation;
[0009] Information indicating that the substation equipment is in an abnormal working state is sent to the user terminal corresponding to the grid area, and in the digital twin substation, the status indicator light of the grid area corresponding to the substation equipment is presented with a prompt effect corresponding to the abnormal working state.
[0010] In one embodiment, the abnormal working state includes a test state, a maintenance state or a fault state.
[0011] In one of the embodiments, in the digital twin substation, the status indicator light of the grid area corresponding to the substation equipment is presented with a prompt effect corresponding to the abnormal working state, including: when the abnormal working state is the test state, the status indicator light is presented with an orange prompt effect; when the abnormal working state is the maintenance state, the status indicator light is presented with a yellow prompt effect; when the abnormal working state is the fault state, the status indicator light is presented with a red prompt effect.
[0012] In one of the embodiments, the substation equipment is preset with an edge marking line at the edge of the digital twin device corresponding to the digital twin substation; the initial marking state of the edge marking line is transparent; the method also includes: if the substation equipment is in an abnormal working state, then changing the edge marking line to a target marking state corresponding to the abnormal working state in the digital twin substation.
[0013] In one of the embodiments, before determining the grid area corresponding to the substation equipment in the digital twin substation, the method also includes: dividing the power supply area corresponding to the digital twin substation into multiple plots; generating multiple initial grid area division schemes based on the multiple plots and according to the upper limit of the number of grids determined by the number of plots; obtaining evaluation results corresponding to each initial grid area division scheme according to a preset division target evaluation; determining a target grid area division scheme based on the evaluation results corresponding to each initial grid area division scheme; and using the target grid area division scheme to divide the power supply area corresponding to the digital twin substation into multiple grid areas.
[0014] In one of the embodiments, the obtaining of a monitoring image obtained by monitoring substation equipment in a substation includes: obtaining an image obtained by monitoring the substation equipment in the substation as an original image; graying the original image to obtain a grayscale image; and performing image enhancement and image filtering on the grayscale image to obtain the monitoring image.
[0015] In a second aspect, the present application also provides a substation equipment status display device based on a digital twin substation. The device includes:
[0016] An image acquisition module, used to acquire monitoring images obtained by monitoring substation equipment in the substation;
[0017] A state recognition module, used to recognize whether the substation equipment is in an abnormal working state according to the monitoring image;
[0018] An area determination module, used to determine the grid area corresponding to the substation equipment in the digital twin substation if the substation equipment is in an abnormal working state;
[0019] A status presentation module is used to send information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and to present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0020] In a third aspect, the present application further provides a computer device. The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:
[0021] Acquire a monitoring image obtained by monitoring substation equipment in the substation; identify whether the substation equipment is in an abnormal working state based on the monitoring image; if the substation equipment is in an abnormal working state, determine the grid area corresponding to the substation equipment in the digital twin substation; send information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0022] In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0023] Acquire a monitoring image obtained by monitoring substation equipment in the substation; identify whether the substation equipment is in an abnormal working state based on the monitoring image; if the substation equipment is in an abnormal working state, determine the grid area corresponding to the substation equipment in the digital twin substation; send information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0024] In a fifth aspect, the present application further provides a computer program product. The computer program product includes a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0025] Acquire a monitoring image obtained by monitoring substation equipment in the substation; identify whether the substation equipment is in an abnormal working state based on the monitoring image; if the substation equipment is in an abnormal working state, determine the grid area corresponding to the substation equipment in the digital twin substation; send information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0026] The above-mentioned substation equipment status display method, device, computer equipment, storage medium and computer program product based on the digital twin substation obtain the monitoring image obtained by monitoring the substation equipment in the substation, identify whether the substation equipment is in an abnormal working state according to the monitoring image, and if the substation equipment is in an abnormal working state, determine the grid area corresponding to the substation equipment in the digital twin substation, send the information representing that the substation equipment is in an abnormal working state to the user terminal corresponding to the grid area, and present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with the prompt effect corresponding to the aforementioned abnormal working state. This scheme combines digital twin and image monitoring and recognition technology. When the substation equipment is monitored to be in an abnormal working state, the information representing that the equipment is in an abnormal state is sent to the user terminal corresponding to the grid area of the digital twin substation, so as to timely and accurately transmit the abnormal state alarm information to the corresponding user terminal so as to promptly inform the user to take corresponding processing measures, and present the status indicator light of the grid area corresponding to the equipment in the digital twin substation with the prompt effect corresponding to the abnormal state, so as to intuitively transmit the abnormal state of the equipment and the area where it is located to the user in the digital twin substation. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a flowchart of a method for displaying substation equipment status based on a digital twin substation in one embodiment;
[0028] Figure 2 A schematic flow chart of steps for obtaining a monitoring image obtained by monitoring a substation device in a substation in one embodiment;
[0029] Figure 3 It is a structural block diagram of a substation equipment status display device based on a digital twin substation in one embodiment;
[0030] Figure 4 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0032] The substation equipment status display method based on the digital twin substation provided in the embodiment of the present application can be applied to computer devices such as terminals and servers. Among them, the terminal is but not limited to various personal computers, laptops, smart phones, tablet computers and portable wearable devices, and the portable wearable device can be a head-mounted device, etc. The server can be implemented as an independent server or a server cluster composed of multiple servers.
[0033] In one embodiment, Figure 1 As shown, a method for displaying substation equipment status based on a digital twin substation is provided, and the method may include the following steps:
[0034] Step S101, obtaining a monitoring image obtained by monitoring substation equipment in a substation;
[0035] In this step, real-time video monitoring of the substation equipment in the substation can be performed to obtain monitoring images.
[0036] In some embodiments, such as Figure 2 As shown, step S101 may specifically include:
[0037] Step S201, acquiring an image obtained by monitoring a substation device in a substation as an original image;
[0038] Step S202, graying the original image to obtain a grayscale image;
[0039] Step S203, performing image enhancement and image filtering processing on the grayscale image to obtain a monitoring image.
[0040] This embodiment mainly performs preprocessing on the images obtained by monitoring to obtain a monitoring image. Specifically, in step S201, a color image obtained by monitoring the substation equipment in the substation can be obtained as an original image. Since the color image occupies a large amount of storage space and affects the execution speed, the original image can be grayed in step S202 and converted into a gray image. After the grayscale transformation, the dynamic range of the image pixels is increased, the contrast of the image is expanded, and the image is clearer and easier to identify. On this basis, in step S203, the gray image is enhanced and filtered to obtain a monitoring image. Specifically, for image enhancement processing, the image pixels can be normalized by using the mat2gray function, that is, the pixel value range is changed from [0,255] to [0,1]. By drawing the image grayscale histogram, the pixel grayscale of the desired target is stretched. The grayscale value histogram is used to enhance the image through piecewise linear transformation, in order to improve the image contrast clarity and brightness uniformity. For image filtering processing, the image noise is random and will drown the image features. Specifically, the adaptive median filter can be used to remove the noise. An n×n window filter Y is set and placed in the image. The image is scanned and the size of the central pixel of the window is used to determine whether it is a pixel. When the noise attributes of all pixels in the image are determined, the noise is removed to obtain a filtered image. This embodiment preprocesses the image of the surveillance video through image enhancement and image filtering, completely retains the image information, and improves the image contrast.
[0041] Step S102, identifying whether the substation equipment is in an abnormal working state according to the monitoring image;
[0042] This step uses monitoring images to intelligently analyze whether the monitored substation equipment is in an abnormal working state.
[0043] Step S103: if the substation equipment is in an abnormal working state, determining the grid area corresponding to the substation equipment in the digital twin substation;
[0044] In this step, the digital twin substation can be pre-divided into multiple grid areas, and each substation equipment in the substation can correspond to a digital twin device in the digital twin substation. The grid area where the digital twin device is located in the digital twin substation is the grid area corresponding to its corresponding substation equipment in the digital twin substation, and each grid area corresponds to a user terminal, which is mainly responsible for taking corresponding processing measures when the substation equipment corresponding to the grid area is in an abnormal working state. Specifically, when it is identified that the substation equipment is in an abnormal working state, the grid area corresponding to it in the digital twin substation can be searched and determined according to the equipment identification number corresponding to the substation equipment, or the grid area corresponding to it in the digital twin substation can be determined by image processing technology. As an example, the mean shift segmentation algorithm can be used to quickly identify the equipment area under the monitoring video and effectively locate the grid area where the equipment is located. The specific steps may include:
[0045] 1) Let Xi and Di represent the input and output of the feature space respectively, where i∈[1,n], n represents the total number of pixels of the input image I, and use the pixel coordinates and pixels of the image to initialize X j k=0 .
[0046] 2) Calculate the weighted average position using the following iterative calculation formula:
[0047]
[0048] Where g is h r and h s The Gaussian kernel function is Perform iterative calculations until That is, the mean shift length is lower than the given threshold ε Th until.
[0049] 3) D i As a result of image filtering, let
[0050] 4) In D i In the equation, the spatial distance is less than h. s And the color distance is less than h r points, divide them into a cluster, and form a cluster set of the input image {C P} P=1,2,...,m (m is the number of clusters), each area on the image corresponds to a corresponding cluster.
[0051] 5) Each cluster corresponds to a category label, which is used to mark the image.
[0052] 6) Set the minimum area of the region to Area in advanceTH , then merge the area into the most similar neighborhood. After completing all the above processes, the segmentation result of the mean shift algorithm can be obtained. By segmenting the device outline, the grid area where the device is located is determined.
[0053] Regarding the division of the grid area, in some embodiments, before step S103, the grid area may be divided by the following steps, specifically including:
[0054] The power supply area corresponding to the digital twin substation is divided into multiple plots; based on the multiple plots and in accordance with the upper limit of the number of grids determined by the number of plots, multiple initial grid area division schemes are generated; according to the preset division target evaluation, evaluation results corresponding to each initial grid area division scheme are obtained; according to the evaluation results corresponding to each initial grid area division scheme, a target grid area division scheme is determined; and the power supply area corresponding to the digital twin substation is divided into multiple grid areas using the target grid area division scheme.
[0055] In this embodiment, the power supply area corresponding to the digital twin substation can be divided into multiple plots according to the set size and each plot can be numbered. The basic attributes of all plots, feeders, distribution transformers and interconnection lines in the power supply area can be counted, and then based on the multiple plots and according to the upper limit of the number of grids determined by the number of plots, multiple initial grid area division schemes are generated, that is, the upper limit of the number of grids (the upper limit of the number of grids) is set according to the total number of divided plots, and a certain number of initial grid area division schemes are generated based on the multiple plots and according to the upper limit of the number of grids, thereby further reducing the number of cross-grid lines as much as possible, and ensuring the current interconnection. The preset division target of the grid area is to keep the feeder lines in the same grid as much as possible, and the line distribution transformers in the same grid as much as possible. According to the preset division target, based on the basic attributes of the blocks, feeders, distribution transformers and tie lines counted above, the evaluation results corresponding to each initial grid area division scheme are evaluated, and then the target grid area division scheme can be determined according to the evaluation results. The grid area division scheme can also be further iterated and updated, and finally the best grid division scheme is found as the target grid area division scheme. After obtaining the target grid area division scheme, multiple grid areas can be divided in the power supply area corresponding to the digital twin substation. The scheme of this embodiment can reasonably divide the grid areas that are convenient for each user to manage the relevant substation equipment and handle abnormal conditions in a timely manner.
[0056] Step S104, sending information indicating that the substation equipment is in an abnormal working state to the user terminal corresponding to the grid area, and presenting the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0057] This step is mainly to know that the substation equipment is in an abnormal working state. On the one hand, the information indicating that the substation equipment is in an abnormal working state is sent to the user terminal corresponding to the grid area so as to promptly inform and remind them to take corresponding processing measures. On the other hand, in the digital twin substation, the status indicator light of the grid area corresponding to the substation equipment is presented with the prompt effect corresponding to the abnormal working state, so as to intuitively present the abnormal working state of the substation equipment to the relevant users.
[0058] In some embodiments, the abnormal operating state may include a test state, a maintenance state, or a fault state.
[0059] Based on this, further, in step S104, the status indicator lights of the grid area corresponding to the substation equipment in the digital twin substation are presented with prompt effects corresponding to the abnormal working state, specifically including:
[0060] When the abnormal working state is the test state, the status indicator light is presented in orange; when the abnormal working state is the maintenance state, the status indicator light is presented in yellow; when the abnormal working state is the fault state, the status indicator light is presented in red. That is, if the substation equipment is monitored to be in the test state, the status indicator light of the corresponding grid area in the digital twin substation will be orange, if the equipment is in the maintenance state, the status indicator light will be yellow; if the equipment is in the fault state, the status indicator light will be red. In addition, if the equipment is in a normal state, the status indicator light can be green.
[0061] In some embodiments, the edge of the digital twin device corresponding to the substation device in the digital twin substation is also preset with an edge marking line, and the initial identification state of the edge marking line may be transparent; the above method may also include the following steps:
[0062] If the substation equipment is in an abnormal working state, the edge marking line in the digital twin substation will be changed to the target identification state corresponding to the abnormal working state.
[0063] In this embodiment, the edge of the digital twin device corresponding to the substation equipment in the digital twin substation can be pre-processed by special boundary treatment, an edge marking line is preset at the edge, and its initial marking state is set to invisible transparent, so that it does not affect the presentation of other information in the digital twin substation in the initial state. When it is detected that the substation equipment is in an abnormal working state, the edge marking line is changed to a target marking state corresponding to the abnormal working state in the digital twin substation. For example, the transparent color can be changed to a visible color such as orange, yellow or red (corresponding to the target marking state). As for the specific color and its correspondence with the abnormal working state, it can be set according to the actual situation, or it can be set in the same way as the status indicator light of the aforementioned grid area. After the substation equipment resumes the normal working state, the edge marking line can be changed to transparent. Through the scheme of this embodiment, the abnormal working state of the substation equipment can be further intuitively presented in the digital twin substation with the help of the edge of the corresponding digital twin device.
[0064] In addition, the edge identification of the substation equipment in the monitoring image can be specially processed. Specifically, for boundary processing, the Prewitt operator can be used to use a 3×3 template to perform grayscale difference on the pixel points in the monitoring image to find the edge. The grayscale value of the pixel is mainly for the upper, lower, left and right points of the pixel. Then the grayscale difference is added, which can make the noise smoother to a certain extent, completely extract the edge of the substation equipment in the monitoring image, and set a transparent marking line for the edge of the substation equipment in the monitoring image. The actual steps can include: input monitoring image; Gaussian filter preprocessing; based on the dimension of the Prewitt operator, add templates in the directions of 45° and 135°; OTSU obtains dynamic thresholds; extracts the image edge according to the obtained threshold, and sets an invisible transparent marking line at the edge of the equipment. In this way, the effect of specializing the edge identification of the substation equipment in the monitoring image is achieved.
[0065] The above-mentioned substation equipment status display method based on the digital twin substation provided by the present application obtains the monitoring image obtained by monitoring the substation equipment in the substation, identifies whether the substation equipment is in an abnormal working state according to the monitoring image, and if the substation equipment is in an abnormal working state, determines the grid area corresponding to the substation equipment in the digital twin substation, sends the information representing that the substation equipment is in an abnormal working state to the user terminal corresponding to the grid area, and presents the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with the prompt effect corresponding to the aforementioned abnormal working state. This scheme combines digital twin and image monitoring and recognition technology. When the substation equipment is monitored to be in an abnormal working state, the information representing that the equipment is in an abnormal state is sent to the user terminal corresponding to the grid area of the digital twin substation, so that the abnormal state alarm information is accurately transmitted to the corresponding user terminal in time so as to inform the user to take corresponding processing measures in time, and the status indicator light of the grid area corresponding to the equipment in the digital twin substation is presented with the prompt effect corresponding to the abnormal state in which it is located, and the abnormal state of the equipment and the area where it is located are intuitively transmitted to the user in the digital twin substation.
[0066] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0067] Based on the same inventive concept, the embodiment of the present application also provides a substation equipment status display device based on a digital twin substation for implementing the above-mentioned substation equipment status display method based on a digital twin substation. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above-mentioned method, so the specific limitations in one or more embodiments of the substation equipment status display device based on a digital twin substation provided below can be referred to the limitations of the substation equipment status display method based on a digital twin substation above, and will not be repeated here.
[0068] In one embodiment, Figure 3 As shown, a substation equipment status display device based on a digital twin substation is provided, and the device 300 may include:
[0069] An image acquisition module 301 is used to acquire a monitoring image obtained by monitoring substation equipment in a substation;
[0070] A state recognition module 302 is used to recognize whether the substation equipment is in an abnormal working state according to the monitoring image;
[0071] The area determination module 303 is used to determine the grid area corresponding to the substation equipment in the digital twin substation if the substation equipment is in an abnormal working state;
[0072] The status presentation module 304 is used to send information indicating that the substation equipment is in an abnormal working state to the user terminal corresponding to the grid area, and to present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0073] In one embodiment, the abnormal working state includes a test state, a maintenance state or a fault state.
[0074] In one embodiment, the status presentation module 304 is used to present the status indicator light with an orange prompt effect when the abnormal working state is the test state; to present the status indicator light with a yellow prompt effect when the abnormal working state is the maintenance state; and to present the status indicator light with a red prompt effect when the abnormal working state is the fault state.
[0075] In one embodiment, the substation equipment is preset with an edge marking line at the edge of the digital twin device corresponding to the digital twin substation; the initial marking state of the edge marking line is transparent; the state presentation module 304 is used to change the edge marking line to a target marking state corresponding to the abnormal working state in the digital twin substation if the substation equipment is in an abnormal working state.
[0076] In one embodiment, the device 300 may also include: an area division unit, used to divide the power supply area corresponding to the digital twin substation into multiple plots; based on the multiple plots and according to the upper limit of the number of grids determined by the number of plots, generate multiple initial grid area division schemes; obtain evaluation results corresponding to each initial grid area division scheme according to a preset division target evaluation; determine a target grid area division scheme based on the evaluation results corresponding to each initial grid area division scheme; use the target grid area division scheme to divide the power supply area corresponding to the digital twin substation into multiple grid areas.
[0077] In one embodiment, the image acquisition module 301 is used to acquire an image obtained by monitoring the substation equipment in the substation as an original image; grayscale the original image to obtain a grayscale image; and perform image enhancement and image filtering on the grayscale image to obtain the monitoring image.
[0078] Each module in the above-mentioned substation equipment status display device based on digital twin substation can be implemented in whole or in part by software, hardware and their combination. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0079] In one embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as follows: Figure 4 As shown. The computer device includes a processor, a memory, a communication interface, a display screen and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be achieved through WIFI, a mobile cellular network, NFC (near field communication) or other technologies. When the computer program is executed by the processor, a method for displaying the status of a substation equipment based on a digital twin substation is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a button, a trackball or a touchpad provided on the housing of the computer device, or an external keyboard, touchpad or mouse, etc.
[0080] Those skilled in the art will understand that Figure 4 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0081] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the following steps are implemented:
[0082] Acquire a monitoring image obtained by monitoring substation equipment in the substation; identify whether the substation equipment is in an abnormal working state based on the monitoring image; if the substation equipment is in an abnormal working state, determine the grid area corresponding to the substation equipment in the digital twin substation; send information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0083] In one embodiment, the abnormal working state includes a test state, a maintenance state or a fault state.
[0084] In one embodiment, when the processor executes the computer program, the following steps are also implemented: when the abnormal working state is the test state, the status indicator light is presented with an orange prompt effect; when the abnormal working state is the maintenance state, the status indicator light is presented with a yellow prompt effect; when the abnormal working state is the fault state, the status indicator light is presented with a red prompt effect.
[0085] In one embodiment, the substation equipment is preset with an edge marking line at the edge of the digital twin device corresponding to the digital twin substation; the initial marking state of the edge marking line is transparent; when the processor executes the computer program, the following steps are also implemented: if the substation equipment is in an abnormal working state, then the edge marking line is changed to a target marking state corresponding to the abnormal working state in the digital twin substation.
[0086] In one embodiment, when the processor executes the computer program, the following steps are also implemented: the power supply area corresponding to the digital twin substation is divided into multiple plots; based on the multiple plots and according to the upper limit of the number of grids determined by the number of plots, multiple initial grid area division schemes are generated; according to the preset division target evaluation, an evaluation result corresponding to each initial grid area division scheme is obtained; according to the evaluation results corresponding to each initial grid area division scheme, a target grid area division scheme is determined; and the power supply area corresponding to the digital twin substation is divided into multiple grid areas using the target grid area division scheme.
[0087] In one embodiment, when the processor executes the computer program, the following steps are also implemented: obtaining an image obtained by monitoring the substation equipment in the substation as an original image; graying the original image to obtain a grayscale image; performing image enhancement and image filtering on the grayscale image to obtain the monitoring image.
[0088] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0089] Acquire a monitoring image obtained by monitoring substation equipment in the substation; identify whether the substation equipment is in an abnormal working state based on the monitoring image; if the substation equipment is in an abnormal working state, determine the grid area corresponding to the substation equipment in the digital twin substation; send information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0090] In one embodiment, the abnormal working state includes a test state, a maintenance state or a fault state.
[0091] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: when the abnormal working state is the test state, the status indicator light is presented with an orange prompt effect; when the abnormal working state is the maintenance state, the status indicator light is presented with a yellow prompt effect; when the abnormal working state is the fault state, the status indicator light is presented with a red prompt effect.
[0092] In one embodiment, the substation equipment is preset with an edge marking line at the edge of the digital twin device corresponding to the digital twin substation; the initial marking state of the edge marking line is transparent; when the computer program is executed by the processor, the following steps are also implemented: if the substation equipment is in an abnormal working state, then the edge marking line is changed to a target marking state corresponding to the abnormal working state in the digital twin substation.
[0093] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: dividing the power supply area corresponding to the digital twin substation into multiple plots; generating multiple initial grid area division schemes based on the multiple plots and according to the upper limit of the number of grids determined by the number of plots; obtaining evaluation results corresponding to each initial grid area division scheme according to a preset division target evaluation; determining a target grid area division scheme based on the evaluation results corresponding to each initial grid area division scheme; and using the target grid area division scheme to divide the power supply area corresponding to the digital twin substation into multiple grid areas.
[0094] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: obtaining an image obtained by monitoring the substation equipment in the substation as an original image; graying the original image to obtain a grayscale image; performing image enhancement and image filtering on the grayscale image to obtain the monitoring image.
[0095] In one embodiment, a computer program product is provided, comprising a computer program, which, when executed by a processor, implements the following steps: acquiring a monitoring image obtained by monitoring substation equipment in a substation; identifying whether the substation equipment is in an abnormal working state based on the monitoring image; if the substation equipment is in an abnormal working state, determining a grid area corresponding to the substation equipment in a digital twin substation; sending information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and presenting a status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state.
[0096] In one embodiment, the abnormal working state includes a test state, a maintenance state or a fault state.
[0097] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: when the abnormal working state is the test state, the status indicator light is presented with an orange prompt effect; when the abnormal working state is the maintenance state, the status indicator light is presented with a yellow prompt effect; when the abnormal working state is the fault state, the status indicator light is presented with a red prompt effect.
[0098] In one embodiment, the substation equipment is preset with an edge marking line at the edge of the digital twin device corresponding to the digital twin substation; the initial marking state of the edge marking line is transparent; when the computer program is executed by the processor, the following steps are also implemented: if the substation equipment is in an abnormal working state, then the edge marking line is changed to a target marking state corresponding to the abnormal working state in the digital twin substation.
[0099] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: dividing the power supply area corresponding to the digital twin substation into multiple plots; generating multiple initial grid area division schemes based on the multiple plots and according to the upper limit of the number of grids determined by the number of plots; obtaining evaluation results corresponding to each initial grid area division scheme according to a preset division target evaluation; determining a target grid area division scheme based on the evaluation results corresponding to each initial grid area division scheme; and using the target grid area division scheme to divide the power supply area corresponding to the digital twin substation into multiple grid areas.
[0100] In one embodiment, when the computer program is executed by the processor, the following steps are also implemented: obtaining an image obtained by monitoring the substation equipment in the substation as an original image; graying the original image to obtain a grayscale image; performing image enhancement and image filtering on the grayscale image to obtain the monitoring image.
[0101] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0102] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0103] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for displaying substation equipment status based on a digital twin substation, characterized in that: The method comprises: Acquire monitoring images obtained by monitoring substation equipment in the substation; Identify whether the substation equipment is in an abnormal working state according to the monitoring image; If the substation equipment is in an abnormal working state, determining a grid area corresponding to the substation equipment in the digital twin substation; Sending information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and presenting the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state; Before determining the grid area corresponding to the substation equipment in the digital twin substation, the method further includes: Dividing the power supply area corresponding to the digital twin substation into multiple plots; Based on the plurality of plots and in accordance with an upper limit of the number of grids determined by the number of plots, generating a plurality of initial grid area division schemes; According to the preset division target evaluation, the evaluation results corresponding to each initial grid area division scheme are obtained; Determine a target grid area division scheme according to the evaluation results corresponding to each of the initial grid area division schemes; The target grid area division scheme is used to divide the power supply area corresponding to the digital twin substation into multiple grid areas.
2. The method according to claim 1, characterized in that The abnormal working state includes a test state, a maintenance state or a fault state.
3. The method according to claim 2, characterized in that The presenting, in the digital twin substation, the status indicator light of the grid area corresponding to the substation equipment with a prompt effect corresponding to the abnormal working state includes: When the abnormal working state is the test state, the status indicator light is presented in an orange prompt effect; When the abnormal working state is the maintenance state, the status indicator light is presented in a yellow prompt effect; When the abnormal working state is the fault state, the status indicator light is presented in a red prompt effect.
4. The method according to any one of claims 1 to 3, characterized in that: The substation equipment has an edge marker line preset at the edge of the digital twin equipment corresponding to the digital twin substation; the initial marking state of the edge marker line is transparent; the method further includes: If the substation equipment is in an abnormal working state, the edge marking line is changed to a target identification state corresponding to the abnormal working state in the digital twin substation.
5. The method according to claim 1, characterized in that The obtaining of a monitoring image obtained by monitoring a substation device in the substation includes: Acquire an image obtained by monitoring the substation equipment in the substation as an original image; Gray-scale the original image to obtain a gray-scale image; The grayscale image is subjected to image enhancement and image filtering processing to obtain the monitoring image.
6. A substation equipment status display device based on a digital twin substation, characterized in that: The device comprises: An image acquisition module, used to acquire monitoring images obtained by monitoring substation equipment in the substation; A state recognition module, used to recognize whether the substation equipment is in an abnormal working state according to the monitoring image; An area determination module, used to determine the grid area corresponding to the substation equipment in the digital twin substation if the substation equipment is in an abnormal working state; A status presentation module, used to send information indicating that the substation equipment is in an abnormal working state to a user terminal corresponding to the grid area, and to present the status indicator light of the grid area corresponding to the substation equipment in the digital twin substation with a prompt effect corresponding to the abnormal working state; An area division unit is used to divide the power supply area corresponding to the digital twin substation into multiple plots; generate multiple initial grid area division schemes based on the multiple plots and according to the upper limit of the number of grids determined by the number of plots; obtain evaluation results corresponding to each initial grid area division scheme according to a preset division target evaluation; determine a target grid area division scheme based on the evaluation results corresponding to each initial grid area division scheme; and use the target grid area division scheme to divide the power supply area corresponding to the digital twin substation into multiple grid areas.
7. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.
9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Visual monitoring system of power transmission and transformation equipment
CN106525126A
Intelligent temperature measurement method for transformer substation equipment based on deep learning algorithm