A substation lifting equipment for railway construction
By designing a substation lifting equipment for railway construction, the problem in the existing technology that the hanging parts of the lifting equipment have large space for movement and the box loading structure takes up too much space and weight is solved, and the balance of the lifting frame and cargo are achieved. stable improvement.
Patent Information
- Application Number
- CN202111342298.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-12
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2041-11-12
AI Technical Summary
In the prior art, the lifting equipment has problems such as large space for suspension components, large safety hazards, and excessive space and weight of the box loading structure during the construction of the substation.
A substation lifting equipment for railway construction is designed, including a support frame, a lifting frame, a lifting mechanism, a lifting rope and a rope positioning component. The lifting frame adopts an opening and closing structure. The opening and closing of the load-bearing frame plate is adjusted through the transmission inner frame, and a rope positioning component is set on the periphery to tighten the goods.
It effectively avoids the tilt of the lifting frame, reduces the dead weight and space occupation of the lifting equipment, and improves the stability and safety of cargo lifting.
Smart Images

Figure CN114261906B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of railway construction, in particular to a transformer substation hoisting equipment for railway construction. Background Art
[0002] A substation is a place in the power system that transforms voltage and current, receives electric energy and distributes electric energy. The substation in a power plant is a step-up substation, and its function is to step up the voltage of the electric energy generated by the generator and feed it into the high-voltage power grid. During the construction of the substation project, it is usually necessary to move a lot of rotating electrical equipment, and lifting equipment is often used.
[0003] In the prior art, hoisting equipment generally adopts a hoisting suspension mechanism and a box loading structure. For the hoisting suspension mechanism, the activity space of its suspension components is relatively large during operation, and it is very easy to touch equipment such as transformers in substations, which poses a great safety hazard; for the box loading structure, it needs to occupy a fixed box space, and the loading box itself also occupies a large amount of weight load. Therefore, those skilled in the art provide a safe hoisting device for substation engineering construction to solve the problems raised in the above background technology. Summary of the invention
[0004] The object of the present invention is to provide a substation lifting equipment for railway construction to solve the problems raised in the above background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A substation lifting equipment for railway construction, comprising a support frame and a lifting frame installed on the support frame, wherein the support frame comprises a support base, a support frame mounted on the support base, and a lifting frame plate installed on the support frame;
[0007] The hoisting frame plate is provided with a lifting mechanism, the top of the hoisting frame is connected to the lifting mechanism through a lifting rope, and the side of the hoisting frame is provided with a lifting rope, and the other end of the lifting rope slides along the supporting frame;
[0008] The hoisting frame includes a hoisting frame plate connected to the lifting rope, support brackets respectively installed on both sides of the hoisting frame plate, and a bearing frame plate installed at the bottom end of the support bracket. The hoisting frame plates, support brackets and bearing frame plates on both sides are arranged in a mirror image, and the bearing frame plates are butt-jointed and closed with each other;
[0009] A transmission inner frame is arranged between the support bracket and the bearing frame plate, and the transmission inner frame is used for supporting the bearing frame plate and adjusting the opening and closing of the bearing frame plate.
[0010] As a further solution of the present invention: a rope positioning assembly is arranged on the periphery of the lifting frame, and the rope positioning assembly is connected between the lifting frame plate, the supporting bracket and the load-bearing frame plate.
[0011] As a further solution of the present invention: fixed end blocks are installed at both ends of the lifting frame plate, and support brackets are installed on the fixed end blocks through a driving shaft. The support bracket includes a side wing frame plate installed on the driving shaft, and an outer edge end installed at the bottom end of the side wing frame plate, and the outer edge end is installed with an outer edge frame through a movable shaft, and the outer edge frame is respectively connected to the edge of the load-bearing frame plate through sub-bracket rods.
[0012] As a further solution of the present invention: the main body of the transmission inner frame is free of a hydraulic drive rod, one end of the hydraulic drive rod is equipped with a fixed block through a movable shaft, and the fixed block is fixed to the side wing frame plate; the other end of the hydraulic drive rod is connected to the outer edge frame through a telescopic rod.
[0013] As a further solution of the present invention: a loading net bag is arranged on the plate surface of the load-bearing frame plate, and the loading net bag is respectively externally connected to a plurality of first tensioning ropes and a plurality of second tensioning ropes.
[0014] As a further solution of the present invention: the side edges of the plate surface of the load-bearing frame plate are respectively provided with a first rotating wheel and a second rotating wheel; the fixed end block is also provided with a first tensioning wheel; the side wing frame plate is also provided with an inner support rod, and the second tensioning wheel is installed on the inner support rod; the lifting frame plate is provided with a rope collecting assembly, the first tensioning rope passes through the first rotating wheel, changes direction through the first tensioning wheel, and is finally connected to the rope collecting assembly; the second tensioning rope passes through the second rotating wheel, changes direction through the second tensioning wheel, and is finally connected to the rope collecting assembly.
[0015] As a further solution of the present invention: the rope collecting assembly includes a supporting frame installed on the lifting frame plate, a rope collecting drum rotatably installed on the supporting frame block, and a driving frame arranged on the periphery of the rope collecting drum; a plurality of wire collecting pipe openings are arranged on the disk surface of the rope collecting drum, the first tensioning rope and the second tensioning rope are both passed through the wire collecting pipe openings and wound around the rope collecting drum, and a storage motor is installed on the driving frame, and the storage motor is used to drive the rope collecting drum to rotate.
[0016] As a further solution of the present invention: the outer edge of the load-bearing frame plate is provided with a limited outer edge, and the inner edge thereof is provided with a combined inner strip, and the combined inner strips of the load-bearing frame plates on both sides are made of magnetic materials that adsorb to each other.
[0017] As a further solution of the present invention: a pull bolt assembly connected to the sub-bracket rod is arranged on the plate surface of the bearing frame plate, and the pull bolt assembly includes an oblique support fixing block installed on the plate surface of the bearing frame plate, a connecting outer bolt installed on the oblique support fixing block, and a connecting bolt installed on the connecting outer bolt and connected to the rod end of the sub-bracket rod. A buffer outer frame is arranged on the periphery of the connecting outer bolt, and the connecting bolt is installed in the buffer outer frame in a plug-in manner through an inner insert block and then connected to the connecting outer bolt. The buffer outer frame is an arc-shaped elastic structure and is supported between the connecting outer bolt and the connecting bolt.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] 1. In the design of this embodiment, when the lifting frame is lifted, the top of the lifting frame is subjected to a lifting force for pulling its movement, and the other side of the lifting frame is subjected to a pulling force provided by a lifting rope, which is used to maintain the balance of the lifting frame and prevent the lifting frame from tilting.
[0020] 2. As the lifting frame designed in this embodiment, it is an open-closing structure. The load-bearing frame plate is used to load goods, the supporting bracket is used to support the load-bearing frame plate, and the transmission inner frame is used to control the opening and closing of the supporting bracket and the load-bearing frame plate. The lifting frame is designed to be an open-closing assembly structure to ensure the loading of goods while reducing the dead weight of the lifting frame itself, and the lifting frame can be folded for storage. On the one hand, it can reduce the space occupied, and on the other hand, it can appropriately shrink the space, so that the goods can be fixed more tightly when the number of goods is small.
[0021] 3. A rope positioning assembly is provided on the periphery of the lifting frame, and the rope positioning assembly is used to tighten the cargo and fix it again along the peripheral area of the inner space of the lifting frame, so as to further improve the stability of cargo lifting.
[0022] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The drawings herein are incorporated into and constitute a part of the specification to illustrate embodiments consistent with the present application and are used together with the specification to explain the principles of the present application. At the same time, these drawings and text descriptions are not intended to limit the scope of the concept of the present application in any way, but to illustrate the concept of the present application for those skilled in the art by referring to specific embodiments.
[0024] Figure 1 A schematic diagram of the overall structure of a substation lifting equipment for railway construction provided by an embodiment of the present invention.
[0025] Figure 2 A schematic structural diagram of a lifting frame provided in an embodiment of the present invention.
[0026] Figure 3 A schematic structural diagram of a hoisting frame and a supporting bracket provided in an embodiment of the present invention.
[0027] Figure 4 A schematic structural diagram of a carrier plate provided in an embodiment of the present invention.
[0028] Figure 5 A schematic structural diagram of a rope collecting assembly provided in an embodiment of the present invention.
[0029] Figure 6 A schematic structural diagram of a bolt pull assembly provided in an embodiment of the present invention.
[0030] In the figure: 1, support frame; 11, support base; 12, support frame; 13, lifting frame plate; 14, lifting frame; 15, lifting parts; 16, lifting rope; 17, lifting rope; 21, lifting frame plate; 22, support bracket; 23, load-bearing frame plate; 24, transmission inner frame; 25, rope positioning assembly; 31, fixed end block; 32, drive shaft; 33, side wing frame plate; 34, outer edge end; 35, outer edge frame; 36, sub-bracket rod; 37, hydraulic drive rod; 38, fixed block; 41, shaft sleeve; 42, The first tensioning wheel; 43. The first revolving wheel; 44. The second revolving wheel; 45. The inner support rod; 46. The second tensioning wheel; 47. The second tensioning rope; 48. The first tensioning rope; 49. The loading net bag; 51. The rope collecting assembly; 52. The rope collecting drum; 53. The wire collecting pipe mouth; 54. The driving frame; 55. The storage motor; 56. The supporting frame block; 61. The oblique supporting fixed block; 62. The connecting outer bolt; 63. The buffer outer frame; 64. The inner insert block; 65. The connecting bolt; 71. The limiting outer edge; 72. The combined inner strip; 73. The pull bolt assembly. DETAILED DESCRIPTION
[0031] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention, and examples thereof are shown in the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements.
[0032] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] The specific implementation of the present invention is described in detail below in conjunction with specific embodiments.
[0034] In one embodiment;
[0035] See also Figure 1 and Figure 2, a substation lifting equipment for railway construction is provided, comprising a support frame 1, and a lifting frame 14 installed on the support frame 1, wherein the support frame 1 comprises a support base 11, a support frame 12 erected on the support base 11, and a lifting frame plate 13 installed on the support frame 12;
[0036] The lifting frame plate 13 is provided with a lifting member 15, the top of the lifting frame 14 is connected to the lifting member 15 through a lifting rope 17, and the side of the lifting frame 14 is provided with a lifting rope 16, and the other end of the lifting rope 16 slides along the supporting frame 12;
[0037] The lifting frame 14 includes a lifting frame plate 21 connected to the lifting rope 17, support brackets 22 respectively installed on both sides of the lifting frame plate 21, and a load-bearing frame plate 23 installed at the bottom of the support bracket 22. The lifting frame plates 21, support brackets 22 and load-bearing frame plates 23 on both sides are arranged in a mirror image, and the load-bearing frame plates 23 are connected and closed to each other;
[0038] A transmission inner frame 24 is disposed between the support bracket 22 and the carrier plate 23 , and the transmission inner frame 24 is used to support the carrier plate 23 and adjust the opening and closing of the carrier plate 23 .
[0039] A rope positioning assembly 25 is disposed on the periphery of the lifting frame 14 , and the rope positioning assembly 25 is connected between the lifting frame plate 21 , the supporting bracket 22 and the bearing frame plate 23 .
[0040] The support frame 1 designed in this embodiment is the main supporting structure of the lifting equipment, the support base 11 is the basic installation component, which is used to be installed on the foundation or the relevant supporting machine platform, the support frame 12 is the main supporting component, and can also be fixed on the corresponding substation wall; the lifting frame plate 13 is used to lift the lifting frame 14, and the lifting frame 14 is the supporting mechanism for the materials used for the substation construction.
[0041] In this embodiment, the top of the lifting frame 14 is connected to the lifting member 15 through a lifting rope 17, and the lifting and lowering operation of the lifting frame 14 is controlled by the lifting rope 17; and a lifting rope 16 is arranged on the side of the lifting frame 14, and the lifting rope 16 is connected between the lifting frame 14 and the supporting frame 12. A vertical track is arranged on the supporting frame 12, and the other end of the lifting rope 16 is installed in the vertical track through a slider, so that the lifting rope 16 can slide along the supporting frame 12. In this way, when the lifting frame 14 is lifted, the top of the lifting frame 14 is subjected to a lifting force for pulling its movement, and the other side of the lifting frame 14 is subjected to the tension provided by the lifting rope 16, and the tension is used to maintain the balance of the lifting frame 14 to prevent the lifting frame 14 from tilting.
[0042] As the present embodiment, the lifting frame 14 is designed to have an open-and-close structure. The load-bearing frame plate 23 is used to load goods, the supporting bracket 22 is used to support the load-bearing frame plate 23, and the transmission inner frame 24 is used to control the opening and closing of the supporting bracket 22 and the load-bearing frame plate 23. The lifting frame 14 is designed to have an open-and-close assembly structure to ensure the loading of goods while reducing the dead weight of the lifting frame 14 itself, and the lifting frame 14 can be folded for storage. On the one hand, it can reduce the space occupied, and on the other hand, it can appropriately shrink the space, so that the goods can be fixed more tightly when the number of goods is small.
[0043] A rope positioning assembly 25 is provided on the periphery of the lifting frame 14. The rope positioning assembly 25 is used to tighten the cargo and fix it again along the peripheral area of the inner space of the lifting frame 14, so as to further improve the stability of cargo lifting.
[0044] In one embodiment;
[0045] For the lifting frame 14, this embodiment designs the following specific implementation structure:
[0046] See also Figure 2 and Figure 3 Fixed end blocks 31 are installed at both ends of the hanging frame plate 21, and a supporting bracket 22 is installed on the fixed end block 31 through a driving shaft 32. The supporting bracket 22 includes a side wing frame plate 33 installed on the driving shaft 32, and an outer edge end 34 installed at the bottom end of the side wing frame plate 33. The outer edge end 34 is installed with an outer edge frame 35 through a movable shaft, and the outer edge frame 35 is respectively connected to the edge of the bearing frame plate 23 through a branch bracket rod 36.
[0047] The main body of the transmission inner frame 24 is free of a hydraulic drive rod 37, one end of which is provided with a fixed block 38 via a movable shaft, and the fixed block 38 is fixed to the side wing frame plate 33; the other end of the hydraulic drive rod 37 is connected to the outer edge frame 35 via a telescopic rod.
[0048] The lifting frame plate 21 is the top of the lifting frame 14, and the side wing frame plate 33 is the side wing component of the lifting frame 14. The flipping of the lifting frame 14 can be controlled by driving the rotating shaft 32. The outer edge end 34 is then installed with an outer edge frame 35 through a movable shaft. The outer edge frame 35 is further branched into a plurality of branch support rods 36 for fixing the load-bearing frame plate 23.
[0049] When the present embodiment is in operation, the side wing frame plates 33 are first driven to rotate by the driving shaft 32, and then the outer edge frame 35 is pushed to unfold with the outer edge end 34 as the support point by the hydraulic driving rod 37 as the driving end, so that the load-bearing frame plates 23 on both sides are assembled and closed with each other, and the load-bearing frame plates 23 form a load-bearing bottom plate for the goods, and the sub-supporting rods 36 on both sides, the outer edge frame 35, the side wing frame plates 33 and the hydraulic driving rod 37 form an outer frame, and are used to support and fix the load-bearing frame plates 23.
[0050] When folding, the movable end is driven inward by the hydraulic driving rod 37, thereby driving the outer edge frame 35 to fold toward the inner plate surface of the side wing frame plate 33, so that the load-bearing frame plates 23 are separated from each other, and the load-bearing frame plates 23 are converted from horizontal to vertical, and then the driving shaft 32 drives the side wing frame plates 33 to be brought inward, thereby shrinking and folding the side wing frame plates 33, thereby reducing the occupied area of the entire lifting frame plate 21.
[0051] In one embodiment;
[0052] See also Figure 2 and Figure 4 In order to further ensure that the goods are loaded on the load-bearing frame plate 23, a loading net bag 49 is provided on the plate surface of the load-bearing frame plate 23, and the loading net bag 49 is respectively connected to a plurality of first tensioning ropes 48 and a plurality of second tensioning ropes 47; the loading net bag 49 is used to hold the goods.
[0053] See also Figure 3 and Figure 4 The side edges of the plate surface of the carrier plate 23 are respectively provided with a first rotating wheel 43 and a second rotating wheel 44; a first tensioning wheel 42 is also provided at the fixed end block 31, and the first tensioning wheel 42 is installed on the driving shaft 32 through a shaft sleeve 41, and does not move with the driving shaft 32; an inner support rod 45 is also installed at the side wing frame plate 33, and a second tensioning wheel 46 is installed on the inner support rod 45; a rope collecting assembly 51 is provided on the lifting frame plate 21, and the first tensioning rope 48 passes through the first rotating wheel 43, then changes direction through the first tensioning wheel 42, and is finally connected to the rope collecting assembly 51; the second tensioning rope 47 passes through the second rotating wheel 44, then changes direction through the second tensioning wheel 46, and is finally connected to the rope collecting assembly 51.
[0054] As an example, the attached drawings of this embodiment show a mechanism arrangement of the rope positioning assembly 25, and a first rotating wheel 43 and two second rotating wheels 44 are provided on the edge of each supporting frame plate 23, which are arranged equidistantly, and the first tensioning wheel 42 and the second tensioning wheel 46 are used for rotating and redirecting the first tensioning rope 48 and the second tensioning rope 47 respectively; a total of six first tensioning ropes 48 and the second tensioning ropes 47 are subsequently stored and tightened in the rope collection assembly 51.
[0055] Of course, the specific number of tension ropes, revolving wheels and tensioning wheels can be set according to actual needs.
[0056] In one case of this embodiment,
[0057] For the rope collecting assembly 51, the present embodiment designs the following operation implementation structure;
[0058] See also Figure 5The rope collecting assembly 51 includes a supporting frame 56 installed on the lifting frame plate 21, a rope collecting drum 52 rotatably installed on the supporting frame block 56, and a driving frame 54 arranged on the periphery of the rope collecting drum 52; a plurality of wire collecting pipe openings 53 are arranged on the disk surface of the rope collecting drum 52, the first tensioning rope 48 and the second tensioning rope 47 are both passed through the wire collecting pipe openings 53 and wound around the rope collecting drum 52, and a storage motor 55 is installed on the driving frame 54, and the storage motor 55 is used to drive the rope collecting drum 52 to rotate.
[0059] A driving frame 54 is provided on the hoisting frame 21, and a receiving motor 55 is used as a power source to drive the rope collection disc 52 to move, thereby driving the first tension rope 48 and the second tension rope 47 to be wound around the rope collection disc 52, and then used to tighten the first tension rope 48 and the second tension rope 47. A plurality of wire collection openings 53 are provided on the surface of the rope collection disc 52, and each tension rope is independently inserted into the wire collection opening 53, so as to avoid the phenomenon of the tension ropes being entangled with each other, so that each tension rope has a certain space interval, and can be sent and received freely.
[0060] In one case of this embodiment,
[0061] See also Figure 4 The outer edge of the carrier plate 23 is provided with a limited outer edge 71, and the inner edge thereof is provided with a combined inner strip 72. The combined inner strips 72 of the carrier plates 23 on both sides are made of magnetic materials that are attracted to each other. As for the combination of the carrier plates 23, the combined inner strips 72 of the embodiment are designed to be strip-shaped magnetic materials. When the carrier plates 23 on both sides are butted against each other, the combined inner strips 72 that are attracted to each other can realize the rapid connection of the carrier plates 23, thereby avoiding the existence of gaps between the carrier plates 23.
[0062] In one embodiment;
[0063] In view of the lifting process of the lifting frame 14, it is sometimes necessary to unload part of the cargo midway; and the winch used to control the sending and receiving of the lifting rope 17 often does not move at a uniform speed throughout the whole process; such situations will cause fluctuations in the load-bearing frame plate 23.
[0064] See also Figure 4 and Figure 6A pull bolt assembly 73 connected to the sub-bracket rod 36 is provided on the plate surface of the carrier plate 23; the pull bolt assembly 73 includes an oblique support fixing block 61 installed on the plate surface of the carrier plate 23, a connecting outer bolt 62 installed on the oblique support fixing block 61, and a connecting bolt 65 installed on the connecting outer bolt 62 and connected to the rod end of the sub-bracket rod 36. A buffer outer frame 63 is provided on the periphery of the connecting outer bolt 62. The connecting bolt 65 is installed in the buffer outer frame 63 in an insert type through an inner insert block 64 and then connected to the connecting outer bolt 62. The buffer outer frame 63 is an arc-shaped elastic structure and is supported between the connecting outer bolt 62 and the connecting bolt 65.
[0065] In this embodiment, the load-bearing frame plate 23 and the connecting bolt 65 are installed in a foldable combination, and the buffer outer frame 63 is wrapped around the periphery of the inner insert block 64 in an outwardly expanding manner. The buffer outer frame 63 has an arc-shaped elastic structure, thereby forming an elastic buffering effect; it effectively reduces the sub-support rod 36 from fluctuating with the lifting frame plate 21, driving the lifting frame plate 21 to fluctuate together, and at the same time avoids the collision of its connecting end, thereby playing the effect of properly buffering the fluctuation during the lifting process, and further improving the stability of the cargo lifting turnover.
[0066] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
[0067] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A substation lifting equipment for railway construction, comprising a support frame and a lifting frame installed on the support frame, wherein the support frame comprises a support base, a support frame mounted on the support base, and a lifting frame plate installed on the support frame; characterized in that: The hoisting frame plate is provided with a lifting mechanism, the top of the hoisting frame is connected to the lifting mechanism through a lifting rope, and the side of the hoisting frame is provided with a lifting rope, and the other end of the lifting rope slides along the supporting frame; The hoisting frame includes a hoisting frame plate connected to the lifting rope, support brackets respectively installed on both sides of the hoisting frame plate, and a bearing frame plate installed at the bottom end of the support bracket. The hoisting frame plates, support brackets and bearing frame plates on both sides are arranged in a mirror image, and the bearing frame plates are butt-jointed and closed with each other; A transmission inner frame is provided between the support bracket and the carrier plate, and the transmission inner frame is used to support the carrier plate and adjust the opening and closing of the carrier plate; A rope positioning assembly is disposed on the periphery of the hoisting frame, and the rope positioning assembly is connected between the hoisting frame plate, the supporting bracket and the load-bearing frame plate; Fixed end blocks are installed at both ends of the hoisting frame plate, and support brackets are installed on the fixed end blocks through a driving shaft. The support bracket includes a side wing frame plate installed on the driving shaft, and an outer edge end installed at the bottom end of the side wing frame plate. The outer edge end is installed with an outer edge frame through a movable shaft, and the outer edge frame is respectively connected to the edge of the load-bearing frame plate through a branch bracket rod; The main body of the transmission inner frame is a hydraulic drive rod, one end of which is equipped with a fixed block through a movable shaft, and the fixed block is fixed to the side wing frame plate; the other end of the hydraulic drive rod is connected to the outer edge frame through a telescopic rod; A loading net bag is arranged on the plate surface of the carrier plate, and the loading net bag is respectively connected to a plurality of first tension ropes and a plurality of second tension ropes; The side edges of the plate surface of the carrier frame plate are respectively provided with a first rotating wheel and a second rotating wheel; a first tensioning wheel is also provided at the fixed end block; an inner support rod is also installed at the side wing frame plate, and a second tensioning wheel is installed on the inner support rod; a rope collecting assembly is provided on the lifting frame plate, the first tensioning rope passes through the first rotating wheel, changes direction through the first tensioning wheel, and is finally connected to the rope collecting assembly; the second tensioning rope passes through the second rotating wheel, changes direction through the second tensioning wheel, and is finally connected to the rope collecting assembly.
2. The substation lifting equipment for railway construction according to claim 1 is characterized in that: The rope collecting assembly includes a supporting frame installed on the lifting frame plate, a rope collecting drum rotatably installed on the supporting frame block, and a driving frame arranged on the periphery of the rope collecting drum; a plurality of wire collecting pipe openings are arranged on the disk surface of the rope collecting drum, the first tensioning rope and the second tensioning rope are both passed through the wire collecting pipe openings and wound around the rope collecting drum, and a storage motor is installed on the driving frame, and the storage motor is used to drive the rope collecting drum to rotate.
3. The substation lifting equipment for railway construction according to claim 1, characterized in that: The outer edge of the bearing frame plate is provided with a limited outer edge, and the inner edge thereof is provided with a combined inner strip, and the combined inner strips of the bearing frame plates on both sides are made of magnetic materials that are attracted to each other.
4. The substation lifting equipment for railway construction according to claim 3 is characterized in that: A pull bolt assembly connected to the sub-bracket rod is arranged on the plate surface of the bearing frame plate, and the pull bolt assembly includes an oblique support fixing block installed on the plate surface of the bearing frame plate, a connecting outer bolt installed on the oblique support fixing block, and a connecting bolt installed on the connecting outer bolt and connected to the rod end of the sub-bracket rod. A buffer outer frame is arranged on the periphery of the connecting outer bolt, and the connecting bolt is installed in the buffer outer frame in a plug-in manner through an inner insert block and then connected to the connecting outer bolt. The buffer outer frame is an arc-shaped elastic structure and is supported between the connecting outer bolt and the connecting bolt.
Citation Information