Base station traffic prediction method and device
By generating cumulative quantities and probability distribution models, combined with the LightGBM model for prediction, the problem of insufficient accuracy and robustness in multi-step time series prediction of base station traffic volume in the existing technology is solved, and more accurate and reliable traffic volume forecasting is achieved.
Patent Information
- Application Number
- CN202111605305.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-24
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-12-24
AI Technical Summary
When the existing technology predicts base station traffic volume in multi-step time series, it is difficult to ensure prediction accuracy and robustness at the same time, resulting in reduced model accuracy or insufficient robustness.
By generating a cumulative amount model and a probability distribution model, the cumulative value of the business volume and the probability distribution of the business volume during all energy-saving periods within the target energy-saving cycle of the base station are predicted, and the LightGBM model is used for training to obtain a cumulative amount model and prediction of PRB utilization. Probability distribution model, combining the two for prediction.
It achieves more accurate business volume prediction for each energy-saving period, enhances the robustness of the results, reduces the occurrence of prediction outliers, and improves the accuracy and robustness of the prediction results.
Smart Images

Figure CN114339967B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the field of data mining technology, and in particular to a method and device for predicting base station traffic. Background Art
[0002] In the early stage of 5G business development, the network load is low, and the proportion of lightly loaded or unloaded base stations is very high. 5G base stations using Massive Multiple Input Multiple Output (Massive MIMO) technology will further increase power consumption, bringing higher electricity bill pressure. Currently, implementing deep sleep during lightly loaded or unloaded periods has become a major strategy for base station energy conservation, and data mining algorithms need to be used to accurately predict the business volume indicators of base stations during continuous periods.
[0003] Currently, there are two main solutions for predicting the traffic volume during the energy-saving period of base stations: 1. Based on the key performance indicators (KPIs) of low-latency historical base stations, a statistical analysis method is used to select the energy-saving period of the next energy-saving cycle and predict its traffic volume; 2. Using prediction algorithms such as data mining or deep learning, statistics of low / medium-low / high latency-related KPI indicators are superimposed on external influencing data (for example, weather, holiday information, geographic location information, etc.) as features, and a single-step time series method is used to predict the traffic volume of multiple consecutive periods in the next energy-saving cycle.
[0004] The first method mentioned above has high requirements for latency. It relies on traditional statistical methods and cannot take into account the trend and amplitude of indicator changes, which often deviates greatly from the actual results. The second method can only make multiple predictions for multiple time periods within a cycle, wasting a lot of computing resources and growth prediction time. In addition, there is no correlation between the prediction results of indicators in multiple time periods, resulting in a large difference between the overall and actual trends.
[0005] In related technologies, multi-step time series forecasting problems require forecasting indicators in multiple future time periods. Therefore, there are generally two solutions: setting the time sliding window equal to the step size for modeling and adding the forecast results to the historical series for refitting. The first solution abandons the features of the most recent t-1 period, which may reduce the accuracy of the model but enhance the robustness. The second solution increases the accuracy of the time periods that are closer, introduces a bias in the forecast results, and reduces the robustness of the model. Summary of the invention
[0006] The embodiments of the present invention provide a method and device for predicting base station traffic, so as to at least solve the problem in the related art that when using multi-step time series to predict base station traffic, the prediction accuracy and robustness cannot be guaranteed at the same time.
[0007] According to one embodiment of the present invention, a method for predicting base station traffic is provided, comprising: predicting the cumulative value of the traffic volume of all energy-saving periods within a target energy-saving cycle of the base station and the probability distribution of the traffic volume of all energy-saving periods; predicting the traffic volume of each energy-saving period within the target cycle of the base station based on the cumulative value of the traffic volume of all energy-saving periods within the target energy-saving cycle and the probability distribution of the traffic volume.
[0008] In an exemplary embodiment, before predicting the cumulative value of the traffic volume of all energy-saving periods within the target energy-saving cycle of the base station and the probability distribution of the traffic volume of all energy-saving periods, it also includes: determining the target energy-saving cycle, energy-saving period and traffic volume index to be predicted for the base station, where the traffic volume is PRB utilization.
[0009] In an exemplary embodiment, after determining the target energy-saving cycle, energy-saving period and traffic volume index to be predicted for the base station, it also includes: determining a model input feature data set based on the target energy-saving cycle, energy-saving period and traffic volume index, wherein the model input feature data set includes: traffic time series trend index data, base station KPI trend index data and external index data.
[0010] In an exemplary embodiment, the traffic volume timing trend indicator data include: the average PRB utilization, the minimum PRB utilization and the maximum PRB utilization of each energy-saving period in multiple energy-saving cycles, and the maximum PRB utilization, the average PRB utilization and the minimum PRB utilization of each energy-saving cycle; the base station KPI trend indicator data include: the average number of RRC users, the minimum number of RRC users and the maximum number of RRC users in each energy-saving period in multiple energy-saving cycles, and the maximum number of RRC users, the average number of RRC users and the minimum number of RRC users in each energy-saving cycle; the external indicator data include: time characteristics and regional characteristics, wherein the time characteristics include at least one of the following: the year, month, date, whether it is a weekend, whether it is a holiday, and the hour of the energy-saving period; the regional characteristics include at least one of the following: the province, city, longitude and latitude information, town, suburb, and base station cell ID of the base station.
[0011] In an exemplary embodiment, after determining the model input feature data set according to the target energy-saving cycle, energy-saving period and business volume index, it also includes: taking the energy-saving cycle as a unit, selecting the business volume time series trend index data of the base station, the base station KPI trend index data, and other external index data as the basic feature data set, wherein the field set of the basic feature data set is [X1]; adding the predicted value Y1 to the basic feature data set to generate a cumulative model data set, wherein the predicted value Y1 is the sum of the PRB utilization rates of each energy-saving period in the next energy-saving cycle, wherein the field set of the cumulative model data set is [X1, Y1]; adding the probability distribution W1 of the PRB utilization rate of each energy-saving period of an energy-saving cycle and the number of energy-saving periods to be predicted Y2 to the basic feature data set to generate a probability distribution model data set, wherein the field set of the probability distribution model data set is [X1, W1, Y2].
[0012] In an exemplary embodiment, the cumulative amount model data set and the probability distribution model data set are input into the LightGBM model for training to obtain a cumulative amount model for predicting PRB utilization and a probability distribution model for PRB utilization, respectively.
[0013] In an exemplary embodiment, the cumulative quantity model data set is input into the LightGBM model for training to obtain a cumulative quantity model for predicting PRB utilization, including: taking the field set X1 of the basic feature data set as a feature, and the sum Y1 of the PRB utilization of each energy-saving period in the next energy-saving cycle as a predicted value, and using a regression method to input the cumulative quantity model data set into the lightGBM model for training to obtain a cumulative quantity model for predicting PRB utilization.
[0014] In an exemplary embodiment, a probability distribution model data set is input into a LightGBM model for training to obtain a probability distribution model for predicting PRB utilization, including: taking the field set X1 of the basic feature data set as a feature, the probability distribution W1 of the PRB utilization of each energy-saving period as a weight, and the number of energy-saving periods to be predicted Y2 as a predicted value, and using a multi-classification method to input the probability distribution model data set into the lightGBM model for training to obtain a probability distribution model for predicting PRB utilization.
[0015] In an exemplary embodiment, it also includes: predicting the cumulative value of PRB utilization in all energy-saving periods in the target energy-saving cycle based on the trained cumulative quantity model; and predicting the probability distribution of PRB utilization in all energy-saving periods in the target energy-saving cycle based on the trained probability distribution model.
[0016] In an exemplary embodiment, it also includes: inputting the cumulative value of the PRB utilization of all energy-saving periods in the target energy-saving cycle into the probability distribution model with a weight of 1 / N to obtain the PRB probability distribution matrix of each energy-saving period in the target energy-saving cycle, wherein N is the number of energy-saving periods; factorializing the cumulative value of the PRB utilization of all energy-saving periods in the target energy-saving cycle with the probability distribution of the PRB utilization of each energy-saving period to determine the PRB utilization of each energy-saving period in the target energy-saving cycle.
[0017] According to another embodiment of the present invention, a device for predicting base station traffic volume is provided, comprising: a first prediction module, used to predict the cumulative value of the traffic volume of all energy-saving periods within a target energy-saving period of the base station and the probability distribution of the traffic volume of all energy-saving periods; a second prediction module, used to predict the traffic volume of each energy-saving period within the target period of the base station based on the cumulative value of the traffic volume of all energy-saving periods within the target energy-saving period and the probability distribution of the traffic volume.
[0018] In an exemplary embodiment, the determination module is used to determine the target energy-saving cycle, energy-saving period and traffic volume index to be predicted by the base station, wherein the traffic volume is PRB utilization.
[0019] In an exemplary embodiment, the determination module includes: a determination unit, used to determine a model input feature data set based on a target energy-saving cycle, an energy-saving period, and a business volume indicator, wherein the model input feature data set includes: business volume timing trend indicator data, base station KPI trend indicator data, and external indicator data.
[0020] According to yet another embodiment of the present invention, a computer-readable storage medium is provided, in which a computer program is stored, wherein the computer program is configured to execute the steps of any one of the above method embodiments when run.
[0021] According to yet another embodiment of the present invention, there is provided an electronic device, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.
[0022] Through the present invention, the business volume of each energy-saving period can be predicted more accurately based on the cumulative value of the business volume of all energy-saving periods within the target energy-saving cycle and the probability distribution of the business volume. At the same time, the result prediction is performed based on the probability distribution of the business volume indicators of each period, so that the probability distribution of each period is constrained, more robust, and less likely to have abnormal values in a certain period, thereby improving the accuracy of the prediction results. Therefore, the problem that the prediction accuracy and robustness cannot be guaranteed at the same time when multi-step time series is used to predict the base station business volume in the related technology can be solved, and the effect of simultaneously guaranteeing the prediction accuracy and robustness can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a hardware structure block diagram of a computer terminal for running a base station traffic prediction method;
[0024] Figure 2 is a flow chart of a base station traffic prediction method according to an embodiment of the present invention;
[0025] Figure 3 is a structural block diagram of a base station traffic prediction device according to an embodiment of the present invention;
[0026] Figure 4 is a structural block diagram of a base station traffic prediction device according to another embodiment of the present invention;
[0027] Figure 5 is a flow chart of a method for predicting base station traffic based on multi-step time series probability distribution according to an implementation example of the present invention;
[0028] Figure 6 It is a flow chart of a method for calculating base station traffic in combination with a specific example according to an embodiment of the present invention. DETAILED DESCRIPTION
[0029] Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings and in combination with the embodiments.
[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.
[0031] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a computer terminal as an example, Figure 1 1 is a hardware structure block diagram of a computer terminal for running a base station traffic prediction method according to an embodiment of the present invention. Figure 1 As shown, the computer terminal may include one or more ( Figure 1Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor (Central Processing Unit, MCU) or a programmable logic device (Field Programmable Gate Array, FPGA)) and a memory 104 for storing data, wherein the above-mentioned computer terminal may also include a transmission device 106 and an input and output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the above-mentioned computer terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.
[0032] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the method for predicting the base station traffic volume in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, to implement the above method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the computer terminal via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0033] The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of a computer terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 can be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0034] In this embodiment, a base station traffic prediction method running on the above-mentioned computer terminal is provided. Figure 2 is a flow chart of a base station traffic prediction method according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:
[0035] Step S202, predicting the cumulative value of the traffic volume of all energy-saving periods within the target energy-saving period of the base station and the probability distribution of the traffic volume of all energy-saving periods;
[0036] Step S204: predicting the traffic volume of each energy-saving period in the target cycle of the base station according to the cumulative value of the traffic volume of all energy-saving periods in the target energy-saving cycle and the probability distribution of the traffic volume.
[0037] Before step S202 of this embodiment, the method may further include: determining a target energy-saving cycle, energy-saving period, and traffic volume index to be predicted for the base station, wherein the traffic volume is a PRB utilization rate.
[0038] In an embodiment, after determining the target energy-saving cycle, energy-saving period and traffic volume index to be predicted for the base station, it may also include: determining a model input feature data set based on the target energy-saving cycle, energy-saving period and traffic volume index, wherein the model input feature data set includes: traffic time series trend index data, base station KPI trend index data and external index data.
[0039] In this embodiment, the traffic time series trend indicator data include: the average PRB utilization, the minimum PRB utilization and the maximum PRB utilization of each energy-saving period in multiple energy-saving cycles, and the maximum PRB utilization, the average PRB utilization and the minimum PRB utilization of each energy-saving cycle; the base station KPI trend indicator data include: the average number of RRC users, the minimum number of RRC users and the maximum number of RRC users in each energy-saving period in multiple energy-saving cycles, and the maximum number of RRC users, the average number of RRC users and the minimum number of RRC users in each energy-saving cycle; the external indicator data include: time characteristics and regional characteristics, wherein the time characteristics include at least one of the following: the year, month, date, whether it is a weekend, whether it is a holiday, and the hour of the energy-saving period; the regional characteristics include at least one of the following: the province, city, longitude and latitude information, town, suburb, and base station cell ID of the base station.
[0040] In an exemplary embodiment, after determining the model input feature data set according to the target energy-saving cycle, energy-saving period and business volume index, it can also include: taking the energy-saving cycle as a unit, selecting the business volume time series trend index data of the base station, the base station KPI trend index data, and other external index data as the basic feature data set, wherein the field set of the basic feature data set is [X1]; adding the predicted value Y1 to the basic feature data set to generate a cumulative model data set, wherein the predicted value Y1 is the sum of the PRB utilization rates of each energy-saving period in the next energy-saving cycle, wherein the field set of the cumulative model data set is [X1, Y1]; adding the probability distribution W1 of the PRB utilization rate of each energy-saving period of an energy-saving cycle and the number of energy-saving periods to be predicted Y2 to the basic feature data set to generate a probability distribution model data set, wherein the field set of the probability distribution model data set is [X1, W1, Y2].
[0041] In an exemplary embodiment, the method may further include: inputting the cumulative amount model data set and the probability distribution model data set into a LightGBM model for training, and obtaining a cumulative amount model for predicting PRB utilization and a probability distribution model for PRB utilization, respectively.
[0042] In an exemplary embodiment, the cumulative quantity model data set is input into the LightGBM model for training to obtain a cumulative quantity model for predicting PRB utilization. It can also include: taking the field set X1 of the basic feature data set as a feature, and the sum Y1 of the PRB utilization rates of each energy-saving period in the next energy-saving cycle as a predicted value, and using a regression method to input the cumulative quantity model data set into the lightGBM model for training to obtain a cumulative quantity model for predicting PRB utilization.
[0043] In an exemplary embodiment, the probability distribution model data set is input into the LightGBM model for training to obtain a probability distribution model for predicting PRB utilization. It can also include: taking the field set X1 of the basic feature data set as a feature, the probability distribution W1 of the PRB utilization of each energy-saving period as a weight, and the number of energy-saving periods to be predicted Y2 as a predicted value, and using a multi-classification method to input the probability distribution model data set into the lightGBM model for training to obtain a probability distribution model for predicting PRB utilization.
[0044] In an exemplary embodiment, it may also include: predicting the cumulative value of PRB utilization in all energy-saving periods in the target energy-saving cycle based on the trained cumulative quantity model; and predicting the probability distribution of PRB utilization in all energy-saving periods in the target energy-saving cycle based on the trained probability distribution model.
[0045] In an exemplary embodiment, it may also include: inputting the cumulative value of the PRB utilization rate of all energy-saving periods in the target energy-saving cycle into the probability distribution model with a weight of 1 / N to obtain the PRB probability distribution matrix of each energy-saving period in the target energy-saving cycle, wherein N is the number of energy-saving periods; factorializing the cumulative value of the PRB utilization rate of all energy-saving periods in the target energy-saving cycle with the probability distribution of the PRB utilization rate of each energy-saving period to determine the PRB utilization rate of each energy-saving period in the target energy-saving cycle.
[0046] Through the above steps, in this embodiment, the same data set can be used as the traditional single-step time period model, and only two model training processes are required, while the existing prediction method needs to train 24 times for different time periods, which greatly reduces the resources for model calculation. At the same time, by adding probability distribution constraints between the prediction results of multiple time periods, it is more robust and less likely to have abnormal values in a certain time period. Therefore, the problem that when using multi-step time series to predict base station traffic in related technologies, the prediction accuracy and robustness cannot be guaranteed at the same time can be solved, and the effect of simultaneously guaranteeing prediction accuracy and robustness can be achieved.
[0047] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, in essence or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory / random access memory (ROM / RAM), a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0048] In this embodiment, a prediction device for base station traffic is also provided, which is used to implement the above embodiments and preferred implementation modes, and the descriptions that have been made are not repeated here. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0049] Figure 3 is a structural block diagram of a device for predicting base station traffic according to an embodiment of the present invention. Figure 3 As shown, the device includes: a first prediction module 10 and a second prediction module 20.
[0050] The first prediction module 10 is used to predict the cumulative value of the traffic volume of all energy-saving periods within the target energy-saving period of the base station and the probability distribution of the traffic volume of all energy-saving periods;
[0051] The second prediction module 20 is used to predict the traffic volume of each energy-saving period in the target cycle of the base station according to the cumulative value of the traffic volume of all energy-saving periods in the target energy-saving cycle and the probability distribution of the traffic volume.
[0052] Figure 4 is a structural block diagram of a device for predicting base station traffic according to an embodiment of the present invention. Figure 4 As shown, the device includes Figure 3 In addition to all the modules shown, a determination module 30 is also included.
[0053] The determination module 30 is used to determine the target energy-saving cycle, energy-saving period and traffic volume index to be predicted for the base station, wherein the traffic volume is the PRB utilization rate.
[0054] In this embodiment, the determining module 30 further includes a determining unit 31 .
[0055] The determination unit 31 is used to determine the model input feature data set according to the target energy-saving cycle, energy-saving period and business volume index, wherein the model input feature data set includes: business volume time series trend index data, base station KPI trend index data and external index data.
[0056] It should be noted that the above modules can be implemented by software or hardware. For the latter, it can be implemented in the following ways, but not limited to: the above modules are all located in the same processor; or the above modules are located in different processors in any combination.
[0057] In order to facilitate the understanding of the technical solution provided by the present invention, the following will be described in detail with reference to embodiments of specific scenarios.
[0058] The embodiment of the present invention provides a method for predicting base station traffic based on multi-step time series probability distribution. The method includes: converting the multi-step time series prediction of all time periods of traffic into two combined predictions, predicting the cumulative value of traffic indicators in all time periods within the energy-saving cycle and the traffic distribution probability of all time periods within the cycle.
[0059] The above method provided by the embodiment of the present invention can save the computing resources of the traditional multi-step time series prediction model in model feature generation and model training prediction, shorten the model running time, and improve the correlation constraints between multi-time period prediction results to improve accuracy. At the same time, due to the total amount constraints between multiple time periods, the prediction outliers are reduced to improve the robustness of the model.
[0060] Figure 5 is a flow chart of a method for predicting base station traffic based on multi-step time series probability distribution according to an implementation example of the present invention, such as Figure 5 As shown, the method comprises the following steps:
[0061] Step S501, determining the traffic volume index, energy-saving cycle, and energy-saving period predicted by the base station during the energy-saving period.
[0062] Step S502, determining the indicators of different input features of the model and generating a data set of the model input features.
[0063] Specifically, feature data may include three types of data: generating traffic time series trend indicators, generating other KPI trend indicators related to base stations, and other external data indicators:
[0064] Step S503: Generate a cumulative amount model data set and a probability distribution model data set.
[0065] Specifically, a basic feature data set is generated, and a cumulative model data set DATASET1 is generated based on the basic feature data set, and the field set is [X1, Y1]
[0066] Generate a probability distribution model data set, and repeat each row of the basic feature data set [X1] for the number of times that the prediction period is required to generate the data set DATASET2. Add the corresponding time period Y2 to be predicted for each row of records in DATASET2 as a prediction indicator to generate the probability distribution model data set DATASET3, with the field set [X1, W1, Y2].
[0067] Step S504, using LIGHTGBM to train the model.
[0068] Specifically, LIGHTGBM is used to train the cumulative model, including: the data set DATASET1 uses X1 as a feature and Y1 as a prediction value, and the training set is input into the LIGHTGBM model for training by regression.
[0069] The probability distribution model is trained using LIGHTGBM, including: the data set DATASET2 uses X1 as the feature, W1 as the weight, and Y2 as the prediction value. The training set is input into the LIGHTGBM model for training, and the multi-classification method is used for training. The output result is set as the probability matrix of the category.
[0070] Step S505, integrating the prediction results.
[0071] Specifically, the cumulative amount P_sum of the business indicator value is first predicted through the cumulative amount model; then the weight is set, and the probability distribution matrix P_prb of the predicted value for each time period is generated using the probability distribution model; finally, the cumulative amount of the predicted value is multiplied by the PRB probability distribution matrix P_prb of each time period to obtain the predicted value for all time periods within a day.
[0072] The embodiment of the present invention also provides a method for calculating the base station traffic volume in combination with a specific example. Figure 6 is a flow chart of a method for calculating the base station traffic according to an implementation example of the present invention. Figure 6 As shown, the method comprises the following steps:
[0073] Step S601, determine the energy-saving cycle, energy-saving period and business volume index.
[0074] Specifically, the traffic volume index, energy-saving cycle, and energy-saving period predicted by the base station during the energy-saving period are determined; and the data set of the model input features is determined.
[0075] In this embodiment, PRB utilization is used as the target traffic volume indicator, the energy-saving cycle is one day, and the energy-saving period is 24 hours; the input feature data includes three types of data: traffic time series trend indicators, base station-related KPI trend indicators, and other external data indicators;
[0076] The traffic time series trend indicators include: the average PRB utilization rate, the minimum PRB utilization rate, and the maximum PRB utilization rate for each hour in the past 7 days; the maximum PRB utilization rate, the average PRB utilization rate, and the minimum PRB utilization rate for each day in the past 7 days;
[0077] Base station-related KPI trend indicators include: average number of RRC users, minimum number of RRC users, and maximum number of RRC users per hour in the past 7 days; maximum number of RRC users, average number of RRC users, and minimum number of RRC users per day in the past 7 days;
[0078] Other external data indicators include: time characteristics: the year, month, date, whether it is a weekend, whether it is a holiday, and the hour of the time period; geographical characteristics: the province, city, longitude and latitude information, town, suburb, and ID characteristics of the base station cell.
[0079] Step S602: Generate a basic feature data set DATASET0.
[0080] Specifically, the day is set as the unit, and the traffic time series trend index, base station related KPI trend index, and other external data indexes of each base station cell on that day are calculated as the basic feature set DATASET0, and the basic feature field set is [X1].
[0081] In this embodiment, it also includes: generating a cumulative amount model data set DATASET1:
[0082] Specifically, the sum Y1 of the PRB utilization rate in the next 24 hours is added after each row of the basic feature data set as the prediction value to generate the cumulative model data set DATASET1, and the field set is [X1, Y1].
[0083] In this embodiment, it also includes: generating a probability distribution model data set DATASET3:
[0084] Specifically, the basic feature data set [X1] is repeated 24 times for each row of records, and each row of records corresponds to a 24-hour period in a day to generate the data set DATASET2. The PRB utilization rate of each period / the cumulative sum of the PRB utilization rate of the day is taken as the PRB probability distribution of each period, which is W1. The hour of the day corresponding to each row of records is Y2. DATASET2 adds the PRB probability distribution W1 of each row of records as a weight, and DATASET2 adds the hour of the day corresponding to each row of records Y2 as a prediction indicator to generate the probability distribution model data set DATASET3, and the field set is [X1, W1, Y2].
[0085] Step S603, training the cumulative amount model.
[0086] Specifically, the dataset DATASET1 uses X1 as the feature and Y1 as the prediction value to input the training set into the LIGHTGBM model for training using regression.
[0087] Step S604, training the probability distribution model.
[0088] Specifically, the dataset DATASET2 uses X1 as the feature, W1 as the weight, and Y2 as the prediction value to input the training set into the LIGHTGBM model for training. It uses a multi-classification method to train and sets the output result as the probability matrix of the category.
[0089] Step S605: The cumulative amount model predicts the PRB utilization cumulative amount P_sum.
[0090] Step S606: predict the PRB probability distribution matrix P_prb of each energy-saving period.
[0091] Specifically, 1 / 24 is used as a weight, and a probability distribution model is used to generate a PRB probability distribution matrix P_prb for each time period.
[0092] Step S607: multiply the PRB utilization accumulation P_sum by the PRB probability distribution matrix P_prb of each time period to obtain the PRB utilization of all time periods in a day.
[0093] The original data of the embodiment of the present invention comes from China Telecom's 4G base station load data. Using the base station KPI data within one year, the resource occupancy rate of this solution is reduced by 23% compared with the time period prediction method implemented in the prior art, and the wape index is reduced from 912.5 to 613.4, an increase of 32%, verifying the reliability and practicality of the model.
[0094] An embodiment of the present invention further provides a computer-readable storage medium, in which a computer program is stored, wherein the computer program is configured to execute the steps of any of the above method embodiments when running.
[0095] In an exemplary embodiment, the computer-readable storage medium may include, but is not limited to, various media that can store computer programs, such as a USB flash drive, a read-only memory (ROM), a random access memory (RAM), a mobile hard disk, a magnetic disk or an optical disk.
[0096] An embodiment of the present invention further provides an electronic device, including a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.
[0097] In an exemplary embodiment, the electronic device may further include a transmission device and an input / output device, wherein the transmission device is connected to the processor, and the input / output device is connected to the processor.
[0098] For specific examples in this embodiment, reference may be made to the examples described in the above embodiments and exemplary implementation modes, and this embodiment will not be described in detail herein.
[0099] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0100] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for predicting base station traffic, It is characterized in that include: Predict the cumulative value of the traffic volume in all energy-saving periods within the target energy-saving period of the base station and the probability distribution of the traffic volume in all energy-saving periods; Predicting the traffic volume of each energy-saving period within the target cycle of the base station according to the cumulative value of the traffic volume of all energy-saving periods within the target energy-saving period and the probability distribution of the traffic volume; Before predicting the cumulative value of the traffic volume in all energy-saving periods within the target energy-saving period of the base station and the probability distribution of the traffic volume in all energy-saving periods, it also includes: Determine a target energy-saving period, energy-saving period, and traffic volume index to be predicted for the base station, wherein the traffic volume is a PRB utilization rate; Determine a model input feature data set according to a target energy-saving cycle, an energy-saving period, and a traffic volume index, wherein the model input feature data set includes: traffic volume time series trend index data, base station KPI trend index data, and external index data; Taking energy-saving period as a unit, selecting the traffic time series trend indicator data of the base station, the base station KPI trend indicator data, and other external indicator data as the basic feature data set, wherein the field set of the basic feature data set is [X1]; Add the predicted value Y1 to the basic feature data set to generate a cumulative quantity model data set, wherein the predicted value Y1 is the sum of the PRB utilization rates of each energy-saving period in the next energy-saving cycle, wherein the field set of the cumulative quantity model data set is [X1, Y1]; The probability distribution W1 of the PRB utilization rate of each energy-saving period of an energy-saving cycle and the number of energy-saving periods to be predicted Y2 are added to the basic feature data set to generate a probability distribution model data set, wherein the field set of the probability distribution model data set is [X1, W1, Y2].
2. The method according to claim 1, It is characterized in that in, The traffic time series trend indicator data includes: the average PRB utilization rate, the minimum PRB utilization rate and the maximum PRB utilization rate of each energy-saving period in multiple energy-saving cycles, and the maximum PRB utilization rate, the average PRB utilization rate and the minimum PRB utilization rate of each energy-saving cycle; Base station KPI trend indicator data include: average number of RRC users, minimum number of RRC users and maximum number of RRC users in each energy-saving period within multiple energy-saving cycles, as well as maximum number of RRC users, average number of RRC users and minimum number of RRC users in each energy-saving cycle; The external indicator data include: time characteristics and regional characteristics, wherein the time characteristics include at least one of the following: the year, month, date, whether it is a weekend, whether it is a holiday, and hour of the energy-saving period; the regional characteristics include at least one of the following: the province, city, longitude and latitude information, town, suburb, and base station cell ID of the base station.
3. The method according to claim 1, It is characterized in that Also includes: The cumulative amount model data set and the probability distribution model data set are input into the LightGBM model for training, and a cumulative amount model for predicting PRB utilization and a probability distribution model for PRB utilization are obtained respectively.
4. The method according to claim 3, It is characterized in that The cumulative amount model data set is input into the LightGBM model for training to obtain a cumulative amount model for predicting PRB utilization, including: Taking the field set X1 of the basic feature data set as the feature, the sum Y1 of the PRB utilization rates of each energy-saving period in the next energy-saving cycle as the predicted value, the cumulative model data set is input into the lightGBM model for training using a regression method to obtain a cumulative model for predicting PRB utilization.
5. The method according to claim 3, It is characterized in that The probability distribution model dataset is input into the LightGBM model for training to obtain a probability distribution model for predicting PRB utilization, including: Taking the field set X1 of the basic feature data set as the feature, the probability distribution W1 of the PRB utilization rate in each energy-saving period as the weight, and the number of energy-saving periods to be predicted Y2 as the predicted value, the probability distribution model data set is input into the lightGBM model for training using a multi-classification method to obtain a probability distribution model for predicting PRB utilization.
6. The method according to claim 5, It is characterized in that Also includes: The cumulative value of PRB utilization rate in all energy-saving periods within the target energy-saving period is obtained based on the training cumulative amount model prediction; The probability distribution of PRB utilization in all energy-saving periods within the target energy-saving period is predicted based on the trained probability distribution model.
7. The method according to claim 6, It is characterized in that Also includes: The cumulative value of the PRB utilization rate of all energy-saving periods in the target energy-saving cycle is input into the probability distribution model with a weight of 1 / N to obtain a PRB probability distribution matrix for each energy-saving period in the target energy-saving cycle, where N is the number of energy-saving periods; The PRB utilization rate of each energy-saving period in the target energy-saving period is determined by factorializing the cumulative value of the PRB utilization rates of all energy-saving periods in the target energy-saving period and the probability distribution of the PRB utilization rate of each energy-saving period.
8. A device for predicting base station traffic, It is characterized in that include: The first prediction module is used to predict the cumulative value of the traffic volume of all energy-saving periods within the target energy-saving period of the base station and the probability distribution of the traffic volume of all energy-saving periods; A second prediction module is used to predict the traffic volume of each energy-saving period in the target cycle of the base station according to the cumulative value of the traffic volume of all energy-saving periods in the target energy-saving period and the probability distribution of the traffic volume; The device further comprises: a determination module, configured to determine a target energy-saving period, energy-saving period, and traffic volume index to be predicted by the base station, wherein the traffic volume is a PRB utilization rate; The determination module includes: a determination unit, which is used to determine a model input feature data set according to a target energy-saving cycle, an energy-saving period, and a traffic volume index, wherein the model input feature data set includes: traffic volume time series trend index data, base station KPI trend index data, and external index data; The device is also used to select the business volume time series trend indicator data, base station KPI trend indicator data, and other external indicator data of the base station as a basic feature data set in units of energy-saving cycles, wherein the field set of the basic feature data set is [X1]; add a predicted value Y1 to the basic feature data set to generate a cumulative model data set, wherein the predicted value Y1 is the sum of the PRB utilization rates of each energy-saving period of the next energy-saving cycle, wherein the field set of the cumulative model data set is [X1, Y1]; add the probability distribution W1 of the PRB utilization rate of each energy-saving period of an energy-saving cycle and the number of energy-saving periods to be predicted Y2 to the basic feature data set to generate a probability distribution model data set, wherein the field set of the probability distribution model data set is [X1, W1, Y2].
9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer program, wherein the computer program is configured to execute the method according to any one of claims 1 to 7 when executed.
10. An electronic device comprising a memory and a processor, It is characterized in that A computer program is stored in the memory, and the processor is configured to run the computer program to perform the method according to any one of claims 1 to 7.
