By dynamically adjusting the frequency of underground hydrological monitoring, the problem of untimely transmission of underground hydrological monitoring signals is solved, timely detection and early warning of water damage is achieved, and the timeliness and effectiveness of coal mine safety production are improved.

CN114352357BActive Publication Date: 2024-10-11TIANDI SCI & TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111422370.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-26
Publication Date
2024-10-11
Estimated Expiration
2041-11-26

AI Technical Summary

Technical Problem

In the existing technology, it is difficult to transmit underground hydrological monitoring signals to the surface in a timely manner, resulting in untimely water damage monitoring and early warning, which affects the safe production of coal mines.

Method used

By obtaining the current head height data of the aquifer to be measured on the coal mining face, the monitoring frequency is adjusted. When the head height data is significantly different from the historical average, the monitoring frequency is dynamically adjusted to increase the monitoring density, and is issued under the preset ratio condition. Alarm to realize automatic adjustment of monitoring frequency and real-time warning.

Benefits of technology

It improves the timeliness and feasibility of underground hydrological monitoring, detects water damage in time, reduces dependence on the host computer, and enhances the early warning capability of coal mine safety production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114352357B_ABST
    Figure CN114352357B_ABST
Patent Text Reader

Abstract

The present invention provides a hydrological monitoring method and system, the method comprising: obtaining the current water head height data of the aquifer to be tested in the coal mining face; if the average value of the historical water head height data of a preset number of the aquifer to be tested is greater than the current water head height data, adjusting the first monitoring frequency of the aquifer to be tested, obtaining the second monitoring frequency of the aquifer to be tested, and simultaneously adjusting the monitoring frequency of the aquifer adjacent to the aquifer to be tested, and comparing it with its own adjustment data to determine the monitoring frequency of the adjacent aquifer; if the ratio between the second monitoring frequency and the first monitoring frequency meets the preset conditions, an alarm is issued. The present invention realizes that when the ratio between the second monitoring frequency and the first monitoring frequency meets the preset conditions, a real-time alarm is issued through the alarm of the hydrological monitoring substation itself, effectively improving the timeliness of the monitoring alarm, so as to prompt relevant personnel to take emergency measures for hydrological disasters in a timely manner, so as to improve the safe production of coal mines.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal mine water hazard prevention and control, and in particular to a hydrological monitoring method and system. Background Art

[0002] With the increasing attention paid to the safety production situation of coal mines, coal mine monitoring and surveillance equipment has become increasingly perfect, and coal mine water hazard monitoring and early warning systems have been increasingly applied to coal mine safety production. Since the signals sent by underground hydrological monitoring sensors often do not match the signals received by underground communication systems, the monitoring and early warning are inaccurate; therefore, underground hydrological monitoring substations are usually used in the prior art to transmit underground hydrological monitoring signals sent by hydrological monitoring sensors.

[0003] At present, underground hydrological monitoring sensors carry out hydrological monitoring at a fixed monitoring frequency and transmit the hydrological monitoring data in real time through the hydrological monitoring substations. After the upper computer on the well analyzes and processes the hydrological monitoring data, the alarm signal is transmitted to the underground.

[0004] Among them, the underground hydrological monitoring substation of coal mines is mainly used to transmit data. When the underground production and operation environment is poor, the underground communication lines are often damaged, making it difficult to transmit the signals sent by the hydrological monitoring sensors to the ground in time; if the water level changes significantly during this stage, it will cause the problem of untimely hydrological monitoring and early warning, which will have a major impact on the safe production of coal mines. Summary of the invention

[0005] The present invention provides a hydrological monitoring method and system, which are used to solve the defect in the prior art that when the production operation environment underground is poor, the hydrological monitoring substation cannot transmit the signal sent by the hydrological monitoring sensor to the ground in time, resulting in untimely water hazard monitoring and early warning, so as to improve the timeliness and feasibility of underground hydrological monitoring and early warning.

[0006] The present invention provides a hydrological monitoring method, comprising:

[0007] Obtaining current water head height data of the aquifer to be tested at the coal mining face;

[0008] If the average value of a preset number of historical water head height data of the aquifer to be measured is greater than the current water head height data, adjusting the first monitoring frequency of the aquifer to be measured to obtain the second monitoring frequency of the aquifer to be measured;

[0009] If the ratio between the second monitoring frequency and the first monitoring frequency meets a preset condition, an alarm is issued;

[0010] Wherein, the current water head height data and the historical water head height data are both collected and acquired at the first monitoring frequency.

[0011] According to a hydrological monitoring method provided by the present invention, the first monitoring frequency of the aquifer to be monitored is adjusted, including:

[0012] The first monitoring frequency is adjusted according to the current water head height data, the average value and the first monitoring frequency.

[0013] According to a hydrological monitoring method provided by the present invention, adjusting the first monitoring frequency according to the current water head height data, the average value and the first monitoring frequency includes:

[0014] Calculating the difference between the average value and the current water head height data;

[0015] calculating a ratio between the difference and the average value;

[0016] The first monitoring frequency is adjusted according to the ratio and the first monitoring frequency.

[0017] A hydrological monitoring method provided by the present invention also includes:

[0018] Acquire current water head height data of the overlying aquifer of the aquifer to be measured;

[0019] adjusting a third monitoring frequency of the overlying aquifer according to current water head height data of the overlying aquifer and an average value of historical water head height data of the overlying aquifer;

[0020] If the ratio between the third monitoring frequency after adjustment and before adjustment meets the preset condition, an alarm is issued;

[0021] Among them, the current head height data and historical head height data of the overlying aquifer are both collected and acquired at the third monitoring frequency; the historical head height data of the overlying aquifer is the head height data collected within a preset time period before the collection moment of the current head height data of the overlying aquifer.

[0022] According to a hydrological monitoring method provided by the present invention, the third monitoring frequency of the overlying aquifer is adjusted according to the current water head height data of the overlying aquifer and the average value of the historical water head height data of the overlying aquifer, including:

[0023] If the average value of the historical water head height data of the overlying aquifer is less than or equal to the current water head height data of the overlying aquifer, then calculating the fourth monitoring frequency of the overlying aquifer according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof;

[0024] adjusting the third monitoring frequency according to the fourth monitoring frequency;

[0025] If the average value of the historical water head height data of the overlying aquifer is greater than the current water head height data of the overlying aquifer, calculating the fifth monitoring frequency of the overlying aquifer according to the current water head height data of the overlying aquifer, the average value and the third monitoring frequency;

[0026] The third monitoring frequency is adjusted according to the fourth monitoring frequency and the fifth monitoring frequency.

[0027] According to a hydrological monitoring method provided by the present invention, the fourth monitoring frequency of the overlying aquifer is calculated according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof, including:

[0028] calculating a ratio between the first distance and the second distance;

[0029] A product between the ratio and the second monitoring frequency is calculated, and the product is used as the fourth monitoring frequency.

[0030] According to a hydrological monitoring method provided by the present invention, before obtaining the current water head height data of the water-bearing layer to be measured at the coal mining working face, the method further includes:

[0031] Determining the monitoring range of the coal mining face according to the type and damage height of the overburden stratum of the coal mining face;

[0032] According to the water-rich characteristics of each aquifer in the coal mining working face, the aquifer to be tested is selected within the monitoring range;

[0033] The initial monitoring frequency of the aquifer to be tested is determined according to the water-rich characteristics of the aquifer to be tested and the pre-calculated mining impact degree.

[0034] The present invention also provides a hydrological monitoring system, comprising:

[0035] Hydrological monitoring sensor, used to obtain the current water head height data of the aquifer to be tested at the coal mining face;

[0036] A frequency adjustment module, configured to adjust the first monitoring frequency of the aquifer to be measured, if the average value of a preset number of historical water head height data of the aquifer to be measured is greater than the current water head height data, to obtain a second monitoring frequency of the aquifer to be measured;

[0037] an alarm, configured to sound an alarm if the ratio between the second monitoring frequency and the first monitoring frequency satisfies a preset condition;

[0038] Wherein, the current water head height data and the historical water head height data are both collected and acquired at the first monitoring frequency.

[0039] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the steps of any of the above-mentioned hydrological monitoring methods are implemented.

[0040] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of any of the above-mentioned hydrological monitoring methods are implemented.

[0041] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the steps of any of the above-mentioned hydrological monitoring methods are implemented.

[0042] The hydrological monitoring method and system provided by the present invention obtain the current water head height data of the aquifer to be tested in real time through the hydrological monitoring substation, and when the average value of a preset number of historical water head height data of the aquifer to be tested is greater than the current water head height data, it is determined that the water level of the aquifer to be tested changes dramatically. At this time, the current monitoring frequency of the aquifer to be tested is automatically adjusted, and the aquifer to be tested is monitored with a more intensive monitoring frequency, so that mine water hazards can be discovered in time, and the effectiveness and real-time nature of hydrological monitoring can be improved; and when the ratio between the second monitoring frequency and the first monitoring frequency meets the preset conditions, a real-time alarm is issued through the alarm of the hydrological monitoring substation itself, effectively improving the timeliness of the monitoring alarm, so as to prompt relevant personnel to take emergency measures to hydrological disasters in time, so as to improve the safe production of coal mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0044] Figure 1 It is a schematic diagram of the flow of the hydrological monitoring method provided by the present invention;

[0045] Figure 2 It is a structural schematic diagram of the distribution of aquifers and aquicludes in the hydrological monitoring method provided by the present invention;

[0046] Figure 3 It is a structural schematic diagram of the hydrological monitoring system provided by the present invention;

[0047] Figure 4 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] In the prior art, monitoring data is transmitted through a hydrological monitoring substation, and an upper computer on the well analyzes and processes the data before issuing an early warning. On the one hand, this can easily lead to the problem of untimely hydrological monitoring and early warning; on the other hand, the hydrological monitoring substation only has a signal transmission function, and it is difficult to meet the needs of intelligent coal mine construction; in addition, when monitoring hydrology at a fixed monitoring frequency, if the monitoring frequency is set too high, frequent hydrological monitoring is required, which consumes a lot of computing costs; if the monitoring frequency is set too low, the monitoring interval is too large, and it is difficult to accurately obtain mine water hazard precursor information, resulting in the problem of untimely hydrological monitoring and early warning.

[0050] In this embodiment, the water level changes of the aquifer to be tested are monitored by the hydrological monitoring substation, and it is determined whether the aquifer to be tested is affected by mining and whether it is necessary to increase the monitoring frequency of the aquifer to be tested, so as to realize automatic adjustment of the monitoring frequency; and when the ratio between the second monitoring frequency and the first monitoring frequency meets the preset conditions, an alarm is issued; therefore, the acquisition of hydrological monitoring data, analysis of hydrological monitoring data, and hydrological monitoring and early warning functions can be realized through the hydrological monitoring substation, avoiding the problem of untimely hydrological monitoring and early warning caused by transmitting hydrological monitoring data to the well; the monitoring method can realize the function of dynamically adjusting the monitoring frequency at the monitoring substation, reducing the dependence of the hydrological monitoring system on the host computer, and helping to improve the timeliness and feasibility of underground hydrological monitoring and early warning.

[0051] In addition, by monitoring the water level changes of the aquifer to be tested, it is determined whether it is affected by mining and whether the monitoring frequency needs to be increased. At the same time, the monitoring frequency is adjusted in conjunction with the aquifer overlying the aquifer to be tested that poses a threat to the safe production of the working face, thereby achieving automatic adjustment of the monitoring frequency, making the monitoring frequency more reasonable, and thereby improving the timeliness and effectiveness of hydrological monitoring and early warning.

[0052] Combine the following Figure 1The hydrological monitoring method of the present invention is described, and the method comprises: step 101, obtaining current water head height data of the water-bearing layer to be measured in the coal mining working face; wherein the current water head height data and the historical water head height data are both collected and obtained at the first monitoring frequency;

[0053] The hydrological monitoring method in this embodiment can be applied to a hydrological monitoring substation, which has signal analysis, signal transmission and intelligent early warning and forecasting functions.

[0054] The aquifer to be tested is the aquifer to be monitored, and is the monitoring object determined based on the lithology of the coal mining face and the data obtained from the pumping test.

[0055] Optionally, when determining the aquifer to be measured, the water head height data of the aquifer to be measured is monitored and recorded in real time at a first monitoring frequency by a hydrological monitoring sensor to form a water head height data set of the aquifer to be measured.

[0056] It should be noted that the first monitoring frequency may be an initial monitoring frequency or a monitoring frequency after the last update, which is not specifically limited in this embodiment.

[0057] The most recently acquired water head height data in the water head height data set of the aquifer to be measured is used as the current water head height data of the aquifer to be measured.

[0058] Step 102, if the average value of the preset number of historical water head height data of the aquifer to be measured is greater than the current water head height data, the first monitoring frequency of the aquifer to be measured is adjusted to obtain the second monitoring frequency of the aquifer to be measured;

[0059] The preset number of historical head height data is selected from the head height data before the most recently acquired head height data in the head height data set, or a preset number of head height data is sequentially selected from the head height data set starting from the most recently acquired head height data; the preset number can be set according to actual needs, such as 10, and this embodiment does not make any specific limitation on this.

[0060] Optionally, an average value of a preset number of historical water head height data is calculated, the average value is used as the base a1, and then the average value is compared with the current water head height data b1 to determine the change in the water head height of the aquifer to be tested.

[0061] When a1>b1, it indicates that the water head height of the aquifer to be tested changes dramatically, indicating that mining has an impact on the aquifer to be tested, and mine water damage may occur. It is necessary to adjust the current first monitoring frequency of the aquifer to be tested, and conduct hydrological monitoring of the aquifer to be tested at a more intensive monitoring frequency;

[0062] The adjustment method may be to adaptively reduce the current sampling time interval of the aquifer to be tested by a fixed time interval difference to adjust the first monitoring frequency;

[0063] Alternatively, the first monitoring frequency is adaptively adjusted according to changes in the water head height data of the aquifer to be measured; this embodiment does not specifically limit this.

[0064] When a1≤b1, it indicates that mining has not affected the aquifer to be tested, and hydrological monitoring of the aquifer to be tested can continue at the first monitoring frequency.

[0065] Step 103, if the ratio between the second monitoring frequency and the first monitoring frequency meets a preset condition, an alarm is issued;

[0066] Optionally, the ratio between the second monitoring frequency q1′ and the first monitoring frequency q1 is calculated using the following formula: Where p is the ratio.

[0067] Since the second monitoring frequency is related to the degree of change in the water head height of the aquifer to be measured; therefore, the higher the degree of change in the water head height, the greater the second monitoring frequency, and the greater the ratio of the second monitoring frequency to the first monitoring frequency;

[0068] When the ratio of the second monitoring frequency to the first monitoring frequency meets the preset conditions, it indicates that the water head height of the aquifer to be tested changes dramatically, and it is predicted that a mine water disaster will occur at this time. The hydrological monitoring substation can issue an alarm in time through an audible and visual alarm to prompt relevant personnel to take emergency measures to the hydrological disaster in time to improve the safe production of coal mines.

[0069] The preset condition may be set according to actual needs, such as p being greater than 120%, etc., and this embodiment does not specifically limit this.

[0070] This embodiment obtains the current water head height data of the aquifer to be tested in real time through the hydrological monitoring substation, and when the average value of a preset number of historical water head height data of the aquifer to be tested is greater than the current water head height data, it is determined that the water level of the aquifer to be tested changes dramatically. At this time, the current monitoring frequency of the aquifer to be tested is automatically adjusted, and the aquifer to be tested is monitored with a more intensive monitoring frequency, so that hydrological disasters can be discovered in time, and the effectiveness and real-time nature of hydrological monitoring can be improved; and when the ratio between the second monitoring frequency and the first monitoring frequency meets the preset conditions, a real-time alarm is issued through the alarm of the hydrological monitoring substation itself, effectively improving the timeliness of the monitoring alarm, so as to prompt relevant personnel to take emergency measures to hydrological disasters in time, so as to improve the safe production of coal mines.

[0071] On the basis of the above-mentioned embodiment, the adjustment of the first monitoring frequency of the aquifer to be tested in this embodiment includes: adjusting the first monitoring frequency according to the current water head height data, the average value and the first monitoring frequency.

[0072] Optionally, the current monitoring time interval of the aquifer to be tested can be obtained according to the first monitoring frequency; then, the to-be-adjusted monitoring time interval of the aquifer to be tested can be obtained according to the current water head height data, the average value and the monitoring time interval corresponding to the first monitoring frequency, and the first monitoring frequency of the aquifer to be tested can be adjusted according to the to-be-adjusted monitoring time interval;

[0073] Optionally, the degree of change of the head height data of the aquifer to be tested is obtained based on the average value and the current head height data, and the monitoring time interval to be adjusted of the aquifer to be tested is calculated based on the degree of change of the head height data and the monitoring time interval corresponding to the first monitoring frequency.

[0074] Alternatively, the monitoring frequency to be adjusted of the aquifer to be tested is obtained according to the current head height data, the average value and the first monitoring frequency, and the first monitoring frequency of the aquifer to be tested is adjusted according to the monitoring frequency to be adjusted, etc. This embodiment does not specifically limit this.

[0075] This embodiment can adaptively adjust the first monitoring frequency of the aquifer to be tested according to the current water head height data, the average value and the first monitoring frequency to obtain a more reasonable monitoring frequency, thereby ensuring the effectiveness and real-time nature of the monitoring.

[0076] On the basis of the above embodiments, the present embodiment adjusts the first monitoring frequency according to the current head height data, the average value and the first monitoring frequency, including: calculating the difference between the average value and the current head height data; calculating the ratio between the difference and the average value; adjusting the first monitoring frequency according to the ratio and the first monitoring frequency.

[0077] Optionally, the calculation formula for adjusting the first monitoring frequency is:

[0078]

[0079] Among them, q1′ is the second monitoring frequency of the aquifer to be tested, a1 is the average value of a preset number of historical water head height data, b1 is the current water head height data of the aquifer to be tested, and q1 is the first monitoring frequency of the aquifer to be tested.

[0080] This embodiment first calculates the difference between the average value and the current head height data, and calculates the ratio between the difference and the average value, to obtain the degree of change of the head height data of the aquifer to be tested; then, the first monitoring frequency is adjusted in real time according to the degree of change of the head height data and the first monitoring frequency, so that the second monitoring frequency obtained is closely related to the degree of change of the head height data, thereby making the obtained second monitoring frequency more accurate and reasonable.

[0081] On the basis of the above embodiments, the present embodiment also includes: obtaining current head height data of the overlying aquifer of the aquifer to be tested; adjusting the third monitoring frequency of the overlying aquifer according to the current head height data of the overlying aquifer and the average value of historical head height data of the overlying aquifer; if the ratio between the third monitoring frequency before and after adjustment meets the preset condition, issuing an alarm; wherein the current head height data and historical head height data of the overlying aquifer are both acquired at the third monitoring frequency; the historical head height data of the overlying aquifer is the head height data acquired within a preset period of time before the acquisition moment of the current head height data of the overlying aquifer.

[0082] The overlying aquifer is the aquifer distributed above the aquifer to be tested;

[0083] Optionally, since large hydrological fluctuations in the aquifer to be tested will also affect the overlying aquifer, it is also necessary to adaptively adjust the monitoring frequency of the overlying aquifer to more accurately and timely monitor mine water hazards.

[0084] Optionally, the water head height data of the aquifer to be measured is monitored and recorded in real time at a third monitoring frequency q2 by a hydrological monitoring sensor to form a water head height data set of an overlying aquifer.

[0085] The most recently acquired water head height data in the water head height data set of the overlying aquifer is used as the current water head height data b2 of the overlying aquifer.

[0086] Select and obtain a preset number of historical water head height data from the water head height data set after the most recently acquired water head height data;

[0087] Then, the average value a2 of the preset number of historical water head height data of the overlying aquifer is calculated, and the average value a2 of the overlying aquifer is compared with the current water head height data b2 of the overlying aquifer to determine the change of the water head height data of the overlying aquifer.

[0088] The third monitoring frequency of the overlying aquifer is adjusted in linkage according to the change of the water head height data of the overlying aquifer.

[0089] Optionally, the ratio of the adjusted third monitoring frequency q2' to the adjusted third monitoring frequency q2 is calculated using the following formula: Where p' is the ratio.

[0090] The preset condition may be set according to actual needs, such as p' being greater than 120%, etc., which is not specifically limited in this embodiment.

[0091] When the ratio of the third monitoring frequency before and after adjustment meets the preset conditions, it indicates that the head height of the overlying aquifer changes dramatically, and it is predicted that a mine water disaster will occur at this time. The hydrological monitoring substation can issue an alarm in time through an audible and visual alarm to prompt relevant personnel to take emergency measures to the hydrological disaster in time to improve the safe production of coal mines.

[0092] On the one hand, this embodiment synchronously adjusts the monitoring frequency of the aquifer overlying the aquifer to be tested through the hydrological monitoring substation, so as to realize variable frequency linkage monitoring of the aquifer affected by coal seam mining, realize linkage monitoring changes of multiple aquifers, and provide a new method for monitoring and early warning of mine water hazards; on the other hand, the monitoring frequency of the aquifer to be tested is adjusted according to the water level changes of the aquifer to be tested, and the monitoring frequency of the overlying aquifer is adjusted in conjunction with the linkage changes of the water level of the overlying adjacent aquifer, so as to realize variable frequency linkage monitoring of the hydrological monitoring substation, provide early warning and forecast judgment standards, and improve the timeliness of hydrological monitoring and early warning.

[0093] On the basis of the above-mentioned embodiments, the third monitoring frequency of the overlying aquifer is adjusted according to the current head height data of the overlying aquifer and the average value of the historical head height data of the overlying aquifer, including: if the average value of the historical head height data of the overlying aquifer is less than or equal to the current head height data of the overlying aquifer, the fourth monitoring frequency of the overlying aquifer is calculated according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof; the third monitoring frequency is adjusted according to the fourth monitoring frequency; if the average value of the historical head height data of the overlying aquifer is greater than the current head height data of the overlying aquifer, the fifth monitoring frequency of the overlying aquifer is calculated according to the current head height data of the overlying aquifer, the average value and the third monitoring frequency; the third monitoring frequency is adjusted according to the fourth monitoring frequency and the fifth monitoring frequency.

[0094] Optionally, the step of adjusting the third monitoring frequency of the overlying aquifer comprises,

[0095] Compare the average value a2 of the overlying aquifer with the current water head height data b2 of the overlying aquifer;

[0096] When a2≤b2, it indicates that the mining has not affected the overlying aquifer. The fourth monitoring frequency q3 of the overlying aquifer can be calculated according to the second monitoring frequency of the aquifer to be measured, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof, and the third monitoring frequency of the overlying aquifer can be adjusted according to the fourth monitoring frequency.

[0097] When a2>b2, it indicates that mining has affected the overlying aquifer. It is necessary to automatically adjust the third monitoring frequency of the overlying aquifer based on the change in the water head height data of the overlying aquifer itself and the second monitoring frequency of the aquifer to be measured, so as to make the adjusted third monitoring frequency of the overlying aquifer more reasonable.

[0098] Optionally, first, according to the current water head height data, the average value and the third monitoring frequency of the overlying aquifer, the fifth monitoring frequency of the overlying aquifer is calculated, and the calculation formula is:

[0099]

[0100] Among them, q4 is the fifth monitoring frequency of the overlying aquifer, a2 is the average value of a preset number of historical head height data of the overlying aquifer, b2 is the current head height data of the overlying aquifer, and q2 is the third monitoring frequency of the overlying aquifer.

[0101] Then, the fourth monitoring frequency q3 and the fifth monitoring frequency q4 of the overlying aquifer are compared, and the one with the largest monitoring frequency is selected to adjust the third monitoring frequency of the overlying aquifer, that is, the adjusted third monitoring frequency q2′=max{q3,q4}.

[0102] For example, if q3>q4, the fourth monitoring frequency q3 of the overlying aquifer is used to adjust the third monitoring frequency, so that the adjusted third monitoring frequency q2′=q3;

[0103] If q3<q4, the third monitoring frequency is adjusted using the fifth monitoring frequency q4 of the overlying aquifer, so that the adjusted third monitoring frequency q2′=q4.

[0104] This embodiment adjusts the monitoring frequency of the overlying aquifer in a linked manner according to the adjusted monitoring frequency of the aquifer to be tested, the distribution of the aquifer to be tested and the overlying aquifer on the coal seam, and the change in the water head height data of the overlying aquifer, so that the hydrological monitoring substation has the function of variable frequency linkage joint monitoring, thereby improving the timeliness of hydrological monitoring.

[0105] Based on the above embodiments, the fourth monitoring frequency of the overlying aquifer is calculated according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof in this embodiment, including: calculating the ratio between the first distance and the second distance; calculating the product between the ratio and the second monitoring frequency, and using the product as the fourth monitoring frequency.

[0106] Optionally, a calculation formula for calculating the fourth monitoring frequency is:

[0107]

[0108] Among them, q3 is the fourth monitoring frequency, q1′ is the second monitoring frequency, a1 is the average value of a preset number of historical head height data, b1 is the current head height data of the aquifer to be tested, q1 is the first monitoring frequency of the aquifer to be tested, H1 is the first distance between the aquifer to be tested and the coal seam roof, and H2 is the second distance between the overlying aquifer and the coal seam roof.

[0109] According to Figure 2 The schematic diagram of the distribution of the aquiclude overlying coal seam shown in the figure is used to describe the hydrological monitoring method in this embodiment;

[0110] For example, when water-conducting cracks affect the first aquifer, the monitoring frequency of the first aquifer is increased through analysis by the hydrological monitoring substation, and the monitoring frequency of the second aquifer is adjusted at the same time. When there is an interruption in the transmission signal between the monitoring substation and the host computer, the monitoring substation decides whether to issue an early warning signal based on the monitoring frequency.

[0111] The aquifer to be tested is the first aquifer; the aquifer overlying the aquifer to be tested is the second aquifer;

[0112] The first distance between the first aquifer and the coal seam roof is H1=MM+M1, wherein MM is the distance between the first aquifer corresponding to the first aquifer and the coal seam roof, and M1 is the thickness of the first aquifer; the first distance between the second aquifer and the coal seam roof is H2=MM+M1+M2+M3, wherein M2 is the thickness of the first aquifer, and M3 is the thickness of the second aquifer corresponding to the second aquifer.

[0113] Accordingly, the calculation formula of the fourth monitoring frequency q3 is:

[0114]

[0115] This embodiment calculates and obtains the fourth monitoring frequency based on the distribution of the aquifer to be tested and the overlying aquifer above the coal seam, and the adjusted monitoring frequency of the aquifer to be tested, so as to make linkage adjustments to the monitoring frequency of the overlying aquifer, so that the hydrological monitoring substation has the function of variable frequency linkage joint monitoring, thereby improving the timeliness of hydrological monitoring.

[0116] On the basis of the above embodiments, this embodiment further includes, before obtaining the current head height data of the aquifer to be tested of the coal mining face: determining the monitoring range of the coal mining face according to the type and damage height of the overburden layer of the coal mining face; selecting the aquifer to be tested within the monitoring range according to the water-rich characteristics of each aquifer of the coal mining face; and determining the initial monitoring frequency of the aquifer to be tested according to the water-rich characteristics of the aquifer to be tested and the pre-calculated mining impact degree.

[0117] Among them, the mining impact may be other impacts such as water-conducting fractures. The following takes water-conducting fractures as an example to describe the hydrological monitoring method in this embodiment.

[0118] Optionally, when conducting hydrological monitoring, first, it is necessary to determine the aquifer to be tested in the coal mining face and the initial monitoring frequency of the aquifer to be tested; then, hydrological monitoring and early warning are carried out on the aquifer to be tested.

[0119] Among them, the water-rich characteristics refer to the water-rich type of the aquifer, including three types: strong water-rich, moderate water-rich, and weak water-rich.

[0120] Optionally, the lithology of the coal mining face and the surrounding borehole columnar diagrams is counted, the mechanical parameters of the overlying rock strata are analyzed, and the type of overlying rock strata is determined in combination with the relevant parameters given in the specifications for coal pillars left under buildings, water bodies, railways and main shafts and tunnels and compressed coal mining, and the damage height of the water-conducting fracture zone to the overlying rock strata is calculated in advance;

[0121] Then, the monitoring range of the coal mining face is determined according to the type and damage height of the overburden strata of the coal mining face;

[0122] Then, the water-rich characteristics of each aquifer in the coal mining face are determined based on the borehole unit water yield q, permeability coefficient K, and hydrogeology obtained from the pumping test of the aquifer;

[0123] From the monitoring range, select aquifers with strong or moderate water-rich characteristics as the aquifers to be tested.

[0124] Then, the initial monitoring frequency of the aquifer to be tested is determined jointly according to the water-rich characteristics of the aquifer to be tested and the pre-calculated mining impact degree.

[0125] Table 1 shows an example of the initial monitoring frequency of aquifers with different water-rich characteristics and different mining impact levels. Aquifers with different water-rich characteristics and different mining impact levels have different initial monitoring frequencies.

[0126] Table 1 Initial monitoring frequency of aquifers with different water-rich characteristics and mining impact levels

[0127] Aquifer water-rich characteristics In the collapse zone In the water-conducting fracture zone Outside the water-conducting fracture zone Weak rich water 5h 6h 12h Moderately rich water 4h 5h 10h Strong and rich water 3h 4h 8h

[0128] This embodiment combines the type and damage height of the overburden layer of the coal mining working face, as well as the water-rich characteristics of each aquifer at the coal mining working face, to accurately determine the monitoring layer position of the aquifer to be tested, and can accurately determine the initial monitoring frequency of the aquifer to be tested based on the water-rich characteristics and the degree of mining impact.

[0129] The hydrological monitoring system provided by the present invention is described below. The hydrological monitoring system described below and the hydrological monitoring method described above can be referenced to each other.

[0130] like Figure 3 As shown, this embodiment provides a hydrological monitoring system, which includes a hydrological monitoring sensor 301, a frequency adjustment module 302 and an alarm 303, wherein:

[0131] The hydrological monitoring sensor 301 is used to obtain the current water head height data of the aquifer to be tested in the coal mining working face; wherein the current water head height data and the historical water head height data are both collected and obtained at the first monitoring frequency;

[0132] The hydrological monitoring method in this embodiment can be applied to a hydrological monitoring substation, which has signal analysis, signal transmission and intelligent early warning and forecasting functions.

[0133] The aquifer to be tested is the aquifer to be monitored, and is the monitoring object determined based on the lithology of the coal mining face and the data obtained from the pumping test.

[0134] Optionally, when determining the aquifer to be measured, the water head height data of the aquifer to be measured is monitored and recorded in real time at a first monitoring frequency by a hydrological monitoring sensor to form a water head height data set of the aquifer to be measured.

[0135] It should be noted that the first monitoring frequency may be an initial monitoring frequency or a monitoring frequency after the last update, which is not specifically limited in this embodiment.

[0136] The most recently acquired water head height data in the water head height data set of the aquifer to be measured is used as the current water head height data of the aquifer to be measured.

[0137] The frequency adjustment module 302 is used to adjust the first monitoring frequency of the aquifer to be measured to obtain the second monitoring frequency of the aquifer to be measured if the average value of the preset number of historical water head height data of the aquifer to be measured is greater than the current water head height data;

[0138] The preset number of historical head height data is selected from the head height data after the most recently acquired head height data in the head height data set, or is selected from the head height data starting from the most recently acquired head height data; the preset number can be set according to actual needs, such as 10, and this embodiment does not make any specific limitation on this.

[0139] Optionally, an average value of a preset number of historical water head height data is calculated, the average value is used as the base a1, and then the average value is compared with the current water head height data b1 to determine the change in the water head height of the aquifer to be tested.

[0140] When a1>b1, it indicates that the water head height of the aquifer to be tested changes dramatically, indicating that mining has an impact on the aquifer to be tested, and mine water damage may occur. It is necessary to adjust the current first monitoring frequency of the aquifer to be tested, and conduct hydrological monitoring of the aquifer to be tested at a more intensive monitoring frequency;

[0141] The adjustment method may be to adaptively reduce the current sampling time interval of the aquifer to be tested by a fixed time interval difference to adjust the first monitoring frequency;

[0142] Alternatively, the first monitoring frequency is adaptively adjusted according to changes in the water head height data of the aquifer to be measured; this embodiment does not specifically limit this.

[0143] When a1≤b1, it indicates that mining has not affected the aquifer to be tested, and hydrological monitoring of the aquifer to be tested can continue at the first monitoring frequency.

[0144] The alarm 303 is used to issue an alarm if the ratio between the second monitoring frequency and the first monitoring frequency meets a preset condition;

[0145] Optionally, the ratio between the second monitoring frequency q1′ and the first monitoring frequency q1 is calculated using the following formula: Where p is the ratio.

[0146] Since the second monitoring frequency is related to the degree of change in the water head height of the aquifer to be measured; therefore, the higher the degree of change in the water head height, the greater the second monitoring frequency, and the greater the ratio of the second monitoring frequency to the first monitoring frequency;

[0147] When the ratio of the second monitoring frequency to the first monitoring frequency meets the preset conditions, it indicates that the water head height of the aquifer to be tested changes dramatically, and it is predicted that a mine water disaster will occur at this time. The hydrological monitoring substation can issue an alarm in time through an audible and visual alarm to prompt relevant personnel to take emergency measures to the hydrological disaster in time to improve the safe production of coal mines.

[0148] The preset condition may be set according to actual needs, such as p being greater than 120%, etc., and this embodiment does not specifically limit this.

[0149] This embodiment obtains the current water head height data of the aquifer to be tested in real time through the hydrological monitoring substation, and when the average value of a preset number of historical water head height data of the aquifer to be tested is greater than the current water head height data, it is determined that the water level of the aquifer to be tested changes dramatically. At this time, the current monitoring frequency of the aquifer to be tested is automatically adjusted, and the aquifer to be tested is monitored with a more intensive monitoring frequency, so that hydrological disasters can be discovered in time, and the effectiveness and real-time nature of hydrological monitoring can be improved; and when the ratio between the second monitoring frequency and the first monitoring frequency meets the preset conditions, a real-time alarm is issued through the alarm of the hydrological monitoring substation itself, effectively improving the timeliness of the monitoring alarm, so as to prompt relevant personnel to take emergency measures to hydrological disasters in time, so as to improve the safe production of coal mines.

[0150] On the basis of the above-mentioned embodiment, the frequency adjustment module in this embodiment is specifically used to adjust the first monitoring frequency according to the current water head height data, the average value and the first monitoring frequency.

[0151] Based on the above embodiments, the frequency adjustment module in this embodiment is also used to: calculate the difference between the average value and the current head height data; calculate the ratio between the difference and the average value; and adjust the first monitoring frequency according to the ratio and the first monitoring frequency.

[0152] On the basis of the above embodiments, the hydrological monitoring sensor in this embodiment is also used to: obtain the current head height data of the overlying aquifer of the aquifer to be measured; the frequency adjustment module is also used to: adjust the third monitoring frequency of the overlying aquifer according to the current head height data of the overlying aquifer and the average value of the historical head height data of the overlying aquifer; if the ratio between the third monitoring frequency before and after the adjustment meets the preset condition, an alarm is issued; wherein the current head height data and the historical head height data of the overlying aquifer are both acquired by the third monitoring frequency; the historical head height data of the overlying aquifer is the head height data acquired within a preset period of time before the acquisition moment of the current head height data of the overlying aquifer.

[0153] On the basis of the above embodiments, the frequency adjustment module in this embodiment is also used for: if the average value of the historical head height data of the overlying aquifer is less than or equal to the current head height data of the overlying aquifer, then according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof, calculate the fourth monitoring frequency of the overlying aquifer; adjust the third monitoring frequency according to the fourth monitoring frequency; if the average value of the historical head height data of the overlying aquifer is greater than the current head height data of the overlying aquifer, then according to the current head height data of the overlying aquifer, the average value and the third monitoring frequency, calculate the fifth monitoring frequency of the overlying aquifer; adjust the third monitoring frequency according to the fourth monitoring frequency and the fifth monitoring frequency.

[0154] Based on the above embodiment, the frequency adjustment module in this embodiment is further used to: calculate the ratio between the first distance and the second distance; calculate the product between the ratio and the second monitoring frequency, and use the product as the fourth monitoring frequency.

[0155] On the basis of the above embodiments, the present embodiment also includes a determination module, which is used to: determine the monitoring range of the coal mining face according to the type and damage height of the overburden layer of the coal mining face; select the aquifer to be tested within the monitoring range according to the water-rich characteristics of each aquifer in the coal mining face; determine the initial monitoring frequency of the aquifer to be tested according to the water-rich characteristics of the aquifer to be tested and the pre-calculated degree of mining impact.

[0156] Figure 4 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 4 As shown, the electronic device may include: a processor 401, a communication interface 402, a memory 403 and a communication bus 404, wherein the processor 401, the communication interface 402 and the memory 403 communicate with each other through the communication bus 404. The processor 401 may call the logic instructions in the memory 403 to execute the hydrological monitoring method, which includes: obtaining the current water head height data of the aquifer to be measured in the coal mining working face; if the average value of the preset number of historical water head height data of the aquifer to be measured is greater than the current water head height data, adjusting the first monitoring frequency of the aquifer to be measured to obtain the second monitoring frequency of the aquifer to be measured; if the ratio between the second monitoring frequency and the first monitoring frequency meets the preset condition, an alarm is issued; wherein the current water head height data and the historical water head height data are both collected and obtained at the first monitoring frequency.

[0157] In addition, the logic instructions in the above-mentioned memory 403 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0158] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the hydrological monitoring method provided by the above-mentioned methods, which includes: obtaining the current head height data of the aquifer to be tested at the coal mining working face; if the average value of a preset number of historical head height data of the aquifer to be tested is greater than the current head height data, adjusting the first monitoring frequency of the aquifer to be tested to obtain the second monitoring frequency of the aquifer to be tested; if the ratio between the second monitoring frequency and the first monitoring frequency meets the preset conditions, an alarm is issued; wherein the current head height data and the historical head height data are both collected and obtained at the first monitoring frequency.

[0159] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the hydrological monitoring method provided by the above-mentioned methods, the method comprising: obtaining the current head height data of the aquifer to be tested at the coal mining working face; if the average value of a preset number of historical head height data of the aquifer to be tested is greater than the current head height data, adjusting the first monitoring frequency of the aquifer to be tested to obtain the second monitoring frequency of the aquifer to be tested; if the ratio between the second monitoring frequency and the first monitoring frequency meets a preset condition, issuing an alarm; wherein the current head height data and the historical head height data are both collected and acquired at the first monitoring frequency.

[0160] The system embodiment described above is merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.

[0161] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0162] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A hydrological monitoring method, characterized in that: include: Obtaining current water head height data of the aquifer to be tested at the coal mining face; If the average value of a preset number of historical water head height data of the aquifer to be measured is greater than the current water head height data, adjusting the first monitoring frequency of the aquifer to be measured to obtain the second monitoring frequency of the aquifer to be measured; If the ratio between the second monitoring frequency and the first monitoring frequency meets a preset condition, an alarm is issued; Wherein, the current water head height data and the historical water head height data are both collected and acquired at the first monitoring frequency; Also includes: Acquire current water head height data of the overlying aquifer of the aquifer to be measured; adjusting a third monitoring frequency of the overlying aquifer according to current water head height data of the overlying aquifer and an average value of historical water head height data of the overlying aquifer; If the ratio between the third monitoring frequency after adjustment and before adjustment meets the preset condition, an alarm is issued; The current water head height data and the historical water head height data of the overlying aquifer are both collected and acquired at the third monitoring frequency; the historical water head height data of the overlying aquifer is the water head height data collected within a preset period of time before the collection moment of the current water head height data of the overlying aquifer; The adjusting of the third monitoring frequency of the overlying aquifer according to the current water head height data of the overlying aquifer and the average value of the historical water head height data of the overlying aquifer comprises: If the average value of the historical water head height data of the overlying aquifer is less than or equal to the current water head height data of the overlying aquifer, then calculating the fourth monitoring frequency of the overlying aquifer according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof; adjusting the third monitoring frequency according to the fourth monitoring frequency; If the average value of the historical water head height data of the overlying aquifer is greater than the current water head height data of the overlying aquifer, calculating the fifth monitoring frequency of the overlying aquifer according to the current water head height data of the overlying aquifer, the average value and the third monitoring frequency; Adjusting the third monitoring frequency according to the fourth monitoring frequency and the fifth monitoring frequency; The calculating, according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof, a fourth monitoring frequency of the overlying aquifer comprises: calculating a ratio between the first distance and the second distance; A product between the ratio and the second monitoring frequency is calculated, and the product is used as the fourth monitoring frequency.

2. The hydrological monitoring method according to claim 1, characterized in that: The adjusting of the first monitoring frequency of the aquifer to be tested comprises: The first monitoring frequency is adjusted according to the current water head height data, the average value and the first monitoring frequency.

3. The hydrological monitoring method according to claim 2, characterized in that: The adjusting the first monitoring frequency according to the current water head height data, the average value and the first monitoring frequency includes: Calculating the difference between the average value and the current water head height data; calculating a ratio between the difference and the average value; The first monitoring frequency is adjusted according to the ratio and the first monitoring frequency.

4. The hydrological monitoring method according to any one of claims 1 to 3, characterized in that: Before obtaining the current water head height data of the water-bearing layer to be measured at the coal mining face, the method further includes: Determining the monitoring range of the coal mining face according to the type and damage height of the overburden stratum of the coal mining face; According to the water-rich characteristics of each aquifer in the coal mining working face, the aquifer to be tested is selected within the monitoring range; The initial monitoring frequency of the aquifer to be tested is determined according to the water-rich characteristics of the aquifer to be tested and the pre-calculated mining impact degree.

5. A hydrological monitoring system, characterized in that: include: Hydrological monitoring sensor, used to obtain the current water head height data of the aquifer to be tested at the coal mining face; A frequency adjustment module, configured to adjust the first monitoring frequency of the aquifer to be measured, if the average value of a preset number of historical water head height data of the aquifer to be measured is greater than the current water head height data, to obtain a second monitoring frequency of the aquifer to be measured; an alarm, configured to sound an alarm if the ratio between the second monitoring frequency and the first monitoring frequency satisfies a preset condition; Wherein, the current water head height data and the historical water head height data are both collected and acquired at the first monitoring frequency; The hydrological monitoring system is also used for: Acquire current water head height data of the overlying aquifer of the aquifer to be measured; adjusting a third monitoring frequency of the overlying aquifer according to current water head height data of the overlying aquifer and an average value of historical water head height data of the overlying aquifer; If the ratio between the third monitoring frequency after adjustment and before adjustment meets the preset condition, an alarm is issued; The current water head height data and the historical water head height data of the overlying aquifer are both collected and acquired at the third monitoring frequency; the historical water head height data of the overlying aquifer is the water head height data collected within a preset period of time before the collection moment of the current water head height data of the overlying aquifer; The adjusting of the third monitoring frequency of the overlying aquifer according to the current water head height data of the overlying aquifer and the average value of the historical water head height data of the overlying aquifer comprises: If the average value of the historical water head height data of the overlying aquifer is less than or equal to the current water head height data of the overlying aquifer, then calculating the fourth monitoring frequency of the overlying aquifer according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof; adjusting the third monitoring frequency according to the fourth monitoring frequency; If the average value of the historical water head height data of the overlying aquifer is greater than the current water head height data of the overlying aquifer, calculating the fifth monitoring frequency of the overlying aquifer according to the current water head height data of the overlying aquifer, the average value and the third monitoring frequency; Adjusting the third monitoring frequency according to the fourth monitoring frequency and the fifth monitoring frequency; The calculating, according to the second monitoring frequency, the first distance between the aquifer to be measured and the coal seam roof, and the second distance between the overlying aquifer and the coal seam roof, a fourth monitoring frequency of the overlying aquifer comprises: calculating a ratio between the first distance and the second distance; A product between the ratio and the second monitoring frequency is calculated, and the product is used as the fourth monitoring frequency.

6. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the hydrological monitoring method according to any one of claims 1 to 4 are implemented.

7. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the hydrological monitoring method according to any one of claims 1 to 4 are implemented.