A smart meter management method and device
Through the smart meter management method, the power consumption of the building complex is monitored and analyzed in real time, abnormal situations are identified, and the precise management of power consumption is achieved, which solves the problem of lack of data support for power management and control in the existing technology, and improves the stability and efficiency of power supply. .
Patent Information
- Application Number
- CN202111323198.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-04
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-11-04
AI Technical Summary
The existing power control strategies lack data support, resulting in strong subjectivity and large errors, and the inability to accurately manage the electricity consumption of the building complex, especially when the electricity load is overloaded, it is difficult to timely alleviate the power shortage.
By obtaining the power consumption information of smart electricity meters in the building complex in real time, analyzing the change rate, peak value and fluctuation curve of electricity consumption, determining abnormal conditions, and performing power scheduling and supply allocation, realizing accurate monitoring and management of electricity consumption.
Effectively identify abnormal electricity consumption and deal with it in a timely manner, improving the accuracy and efficiency of power control, reducing errors, and ensuring the stability of power supply.
Smart Images

Figure CN114429261B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy management and control technology, and specifically to a smart meter management method and device. Background Art
[0002] The existing management methods are mostly for the power department to independently formulate control strategies based on the power load of each building. The control is mostly carried out when the power load is overloaded and causes power outages, and then phased restrictions are imposed to alleviate the problem of power shortage.
[0003] Existing management and control strategies are mostly based on subjective judgments by the power department based on power load, without any management and control data as a basis. Therefore, they are highly subjective and lead to large errors.
[0004] Therefore, in order to more accurately control the electricity consumption of the building complex, a smart meter management technology is proposed to meet the current usage needs. Summary of the invention
[0005] The present application provides a smart meter management method and device, which monitors the power consumption of buildings in a building complex, and analyzes the power consumption in conjunction with the corresponding power consumption change rate, peak value, valley value and corresponding time, so that abnormal power consumption can be handled in a timely manner in the future.
[0006] In a first aspect, the present application provides a smart meter management method, the method comprising the following steps:
[0007] Obtain the record information of multiple smart meters in each building in the target building complex in real time to obtain the corresponding power consumption information;
[0008] Analyze the power consumption information within a preset recording time period to obtain the power consumption change rate and the corresponding time point of each building;
[0009] The power consumption change rate is compared with a power consumption change rate threshold. When the power consumption change rate is greater than the power consumption change rate threshold, it is determined that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal.
[0010] In actual operation, the operation process of the technical solution of this application is as follows:
[0011] The first step is to obtain the record information of multiple smart meters in each building in the target building complex in real time to obtain the corresponding power consumption information;
[0012] The specific statistical means can be based on smart meters or the host computer that manages smart meters, to record the power consumption of each building in the target building complex in real time, and to perform statistical analysis based on the corresponding recording time information, and finally obtain the corresponding power consumption information.
[0013] The second step is to analyze the power consumption information within a preset recording time period to obtain the power consumption change rate and the corresponding time point of each building;
[0014] First, set the recording time period and select the power consumption information within the recording time period;
[0015] Obtain the power consumption change rate and corresponding time point of each building;
[0016] Among them, the rate of change of power consumption is used to intuitively reflect the change of power consumption of the building. When the value of the rate of change of power consumption is positive and large, the power consumption of the corresponding building increases sharply. When the value of the rate of change of power consumption is positive and small, the power consumption of the corresponding building increases slowly. When the value of the rate of change of power consumption is negative and large, the power consumption of the corresponding building decreases suddenly. When the value of the rate of change of power consumption is negative and small, the power consumption of the corresponding building decreases slowly.
[0017] The third step is to compare the power consumption change rate with the power consumption change rate threshold, and when the power consumption change rate is greater than the power consumption change rate threshold, determine that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal;
[0018] In specific operations, it is necessary to process the absolute value of the power consumption change rate, that is, to take the absolute value of the power consumption change rate, and then compare the absolute value of the power consumption change rate with the power consumption change rate threshold.
[0019] When the absolute value of the power consumption change rate is greater than the power consumption change rate threshold, it is determined that the building power consumption corresponding to the power consumption change rate whose absolute value is greater than the power consumption change rate threshold is abnormal.
[0020] Furthermore, the method further comprises the following steps:
[0021] Perform statistical analysis based on the power consumption change rate and the corresponding time point to obtain the power consumption pattern of the corresponding building;
[0022] According to the power consumption rules of each building in the target building complex, power dispatch warning is carried out.
[0023] Furthermore, the method further comprises the following steps:
[0024] Analyze the power consumption information within a preset recording time period to obtain the power consumption peak value and the corresponding time period of each building;
[0025] The power consumption peak value is compared with the power consumption threshold value, and when the power consumption peak value is greater than the power consumption threshold value, it is determined that the building power consumption corresponding to the power consumption peak value greater than the power consumption threshold value is excessive.
[0026] Furthermore, the method further comprises the following steps:
[0027] Record the time period when the rate of change of electricity consumption of each building continues to increase, and determine it as the time period of increased energy consumption;
[0028] Based on the energy consumption increase time period, the power supply to the target building complex is adjusted.
[0029] Furthermore, the method further comprises the following steps:
[0030] Within a preset recording time period, the power consumption information is analyzed to obtain a corresponding power consumption fluctuation curve of the building.
[0031] Specifically, the power consumption threshold is adjusted according to the region and season corresponding to the target building complex.
[0032] In a second aspect, the present application provides a smart meter management device, the device comprising:
[0033] The power consumption monitoring module is used to obtain the record information of multiple smart meters of each building in the target building complex in real time to obtain the corresponding power consumption information;
[0034] An electricity consumption analysis module, which is used to analyze the electricity consumption information within a preset recording time period to obtain the electricity consumption change rate and corresponding time point corresponding to each building;
[0035] The consumption abnormality determination module is used to compare the power consumption change rate with the power consumption change rate threshold. When the power consumption change rate is greater than the power consumption change rate threshold, it is determined that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal.
[0036] Furthermore, the power consumption analysis module is also used to analyze the power consumption information within a preset recording time period to obtain the power consumption peak value and the corresponding time period corresponding to each building;
[0037] The consumption abnormality determination module is further used to compare the power consumption peak with the power consumption threshold, and when the power consumption peak is greater than the power consumption threshold, determine that the building power consumption corresponding to the power consumption peak greater than the power consumption threshold is excessive.
[0038] Furthermore, the power consumption analysis module is also used to record the time period when the power consumption change rate corresponding to each building continues to increase, and determine it as the energy consumption increase time period;
[0039] The device also includes a power supply allocation module, which is used to allocate the power supply of the target building complex based on the energy consumption improvement time period.
[0040] Furthermore, the power consumption analysis module is also used to analyze the power consumption information within a preset recording time period to obtain the corresponding power consumption fluctuation curve of the building.
[0041] Specifically, the power consumption threshold is adjusted according to the region and season corresponding to the target building complex.
[0042] The beneficial effects of the technical solution provided by this application include:
[0043] The present application monitors the power consumption of buildings in a complex, and analyzes the power consumption in conjunction with the corresponding power consumption change rate, peak value, valley value and corresponding time, so that abnormal power consumption can be handled in a timely manner in the future. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0045] Figure 1 A flowchart of the steps of the smart meter management method provided in an embodiment of the present application;
[0046] Figure 2 This is a structural block diagram of the smart meter management device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0047] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0048] The embodiments of the present application are further described in detail below in conjunction with the accompanying drawings.
[0049] The embodiments of the present application provide a smart meter management method and device, which monitors the power consumption of buildings in a building complex, and analyzes the power consumption in accordance with the corresponding power consumption change rate, peak value, valley value and corresponding time, so as to promptly handle any abnormal power consumption in the future.
[0050] In order to achieve the above technical effects, the overall idea of this application is as follows:
[0051] A smart meter management method, the method comprising the following steps:
[0052] S1. Obtain the record information of multiple smart meters of each building in the target building complex in real time to obtain the corresponding power consumption information;
[0053] S2. Analyze the power consumption information within a preset recording time period to obtain the power consumption change rate and corresponding time point of each building;
[0054] S3. Compare the power consumption change rate with the power consumption change rate threshold. When the power consumption change rate is greater than the power consumption change rate threshold, determine that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal.
[0055] The embodiments of the present application are further described in detail below in conjunction with the accompanying drawings.
[0056] First, see Figure 1 As shown, the embodiment of the present application provides a smart meter management method, the method comprising the following steps:
[0057] S1. Obtain the record information of multiple smart meters of each building in the target building complex in real time to obtain the corresponding power consumption information;
[0058] S2. Analyze the power consumption information within a preset recording time period to obtain the power consumption change rate and corresponding time point of each building;
[0059] S3. Compare the power consumption change rate with the power consumption change rate threshold. When the power consumption change rate is greater than the power consumption change rate threshold, determine that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal.
[0060] In the embodiment of the present application, the power consumption of the buildings in the building complex is monitored, and the power consumption is analyzed in conjunction with the corresponding power consumption change rate, peak value, valley value and corresponding time, so that abnormal power consumption can be handled in a timely manner in the future.
[0061] In actual operation, the operation process of the technical solution of this application is as follows:
[0062] The first step is to obtain the record information of multiple smart meters in each building in the target building complex in real time to obtain the corresponding power consumption information;
[0063] The specific statistical means can be based on smart meters or the host computer that manages smart meters, to record the power consumption of each building in the target building complex in real time, and to perform statistical analysis based on the corresponding recording time information, and finally obtain the corresponding power consumption information.
[0064] The second step is to analyze the power consumption information within a preset recording time period to obtain the power consumption change rate and the corresponding time point of each building;
[0065] First, set the recording time period and select the power consumption information within the recording time period;
[0066] Obtain the power consumption change rate and corresponding time point of each building;
[0067] Among them, the rate of change of power consumption is used to intuitively reflect the change of power consumption of the building. When the value of the rate of change of power consumption is positive and large, the power consumption of the corresponding building increases sharply. When the value of the rate of change of power consumption is positive and small, the power consumption of the corresponding building increases slowly. When the value of the rate of change of power consumption is negative and large, the power consumption of the corresponding building decreases suddenly. When the value of the rate of change of power consumption is negative and small, the power consumption of the corresponding building decreases slowly.
[0068] The third step is to compare the power consumption change rate with the power consumption change rate threshold, and when the power consumption change rate is greater than the power consumption change rate threshold, determine that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal;
[0069] In specific operations, it is necessary to process the absolute value of the power consumption change rate, that is, to take the absolute value of the power consumption change rate, and then compare the absolute value of the power consumption change rate with the power consumption change rate threshold.
[0070] When the absolute value of the power consumption change rate is greater than the power consumption change rate threshold, it is determined that the building power consumption corresponding to the power consumption change rate whose absolute value is greater than the power consumption change rate threshold is abnormal.
[0071] If necessary, in the embodiment of the present application, when performing data transmission and data statistics, periodic transmission or periodic statistics can be performed according to a preset working interval period, and data transmission and data statistics can also be performed at night to avoid adding workload to the network system during the day.
[0072] Furthermore, the smart meter management method further comprises the following steps:
[0073] Perform statistical analysis based on the power consumption change rate and the corresponding time point to obtain the power consumption pattern of the corresponding building;
[0074] According to the power consumption rules of each building in the target building complex, power dispatch warning is carried out.
[0075] Furthermore, the smart meter management method also includes the following steps:
[0076] Analyze the power consumption information within a preset recording time period to obtain the power consumption peak value and the corresponding time period corresponding to each building;
[0077] The power consumption peak value is compared with the power consumption threshold value, and when the power consumption peak value is greater than the power consumption threshold value, it is determined that the building power consumption corresponding to the power consumption peak value greater than the power consumption threshold value is excessive.
[0078] Specifically, the power consumption threshold is adjusted according to the region and season corresponding to the target building complex.
[0079] Furthermore, the smart meter management method further comprises the following steps:
[0080] Record the time period when the rate of change of electricity consumption of each building continues to increase, and determine it as the time period of increased energy consumption;
[0081] Based on the energy consumption increase time period, the power supply to the target building complex is adjusted.
[0082] Furthermore, the smart meter management method further comprises the following steps:
[0083] Analyze the power consumption information within a preset recording time period to obtain a corresponding power consumption fluctuation curve of the building;
[0084] In actual operation, the actual situation of power consumption can be intuitively understood based on the changes in the power consumption fluctuation curve.
[0085] In actual operation, firstly, a recording time period is set, such as year, month or quarter, and the power consumption fluctuation of the building in the corresponding recording time period is reflected by a power consumption fluctuation curve;
[0086] Then, the power consumption of the building can be compared with itself, so as to know the usage of the building in different seasons, and analyze the corresponding time period with higher power consumption, providing data basis for later energy allocation;
[0087] It is also possible to compare the power consumption of the building with that of other buildings in the complex, and analyze that if the power consumption of a certain building is too large compared to other buildings during the corresponding power consumption time period, the power consumption of the building is judged to be abnormal, and this can be used as a basis for the corresponding staff to carry out reasonable management.
[0088] Specifically, the power consumption threshold is adjusted according to the region and season corresponding to the target building complex.
[0089] Second, see Figure 2 As shown, an embodiment of the present application provides a smart meter management device, the device comprising:
[0090] The power consumption monitoring module is used to obtain the record information of multiple smart meters of each building in the target building complex in real time to obtain the corresponding power consumption information;
[0091] An electricity consumption analysis module, which is used to analyze the electricity consumption information within a preset recording time period to obtain the electricity consumption change rate and corresponding time point corresponding to each building;
[0092] The consumption abnormality determination module is used to compare the power consumption change rate with the power consumption change rate threshold. When the power consumption change rate is greater than the power consumption change rate threshold, it is determined that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal.
[0093] In the embodiment of the present application, the power consumption of the buildings in the building complex is monitored, and the power consumption is analyzed in conjunction with the corresponding power consumption change rate, peak value, valley value and corresponding time, so that abnormal power consumption can be handled in a timely manner in the future.
[0094] In actual operation, the operation process of the technical solution of this application is as follows:
[0095] The first step is to obtain the record information of multiple smart meters in each building in the target building complex in real time to obtain the corresponding power consumption information;
[0096] The specific statistical means can be based on smart meters or the host computer that manages smart meters, to record the power consumption of each building in the target building complex in real time, and to perform statistical analysis based on the corresponding recording time information, and finally obtain the corresponding power consumption information.
[0097] The second step is to analyze the power consumption information within a preset recording time period to obtain the power consumption change rate and the corresponding time point of each building;
[0098] First, set the recording time period and select the power consumption information within the recording time period;
[0099] Obtain the power consumption change rate and corresponding time point of each building;
[0100] Among them, the rate of change of power consumption is used to intuitively reflect the change of power consumption of the building. When the value of the rate of change of power consumption is positive and large, the power consumption of the corresponding building increases sharply. When the value of the rate of change of power consumption is positive and small, the power consumption of the corresponding building increases slowly. When the value of the rate of change of power consumption is negative and large, the power consumption of the corresponding building decreases suddenly. When the value of the rate of change of power consumption is negative and small, the power consumption of the corresponding building decreases slowly.
[0101] The third step is to compare the power consumption change rate with the power consumption change rate threshold, and when the power consumption change rate is greater than the power consumption change rate threshold, determine that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal;
[0102] In specific operations, it is necessary to process the absolute value of the power consumption change rate, that is, to take the absolute value of the power consumption change rate, and then compare the absolute value of the power consumption change rate with the power consumption change rate threshold.
[0103] When the absolute value of the power consumption change rate is greater than the power consumption change rate threshold, it is determined that the building power consumption corresponding to the power consumption change rate whose absolute value is greater than the power consumption change rate threshold is abnormal.
[0104] If necessary, in the embodiment of the present application, when performing data transmission and data statistics, periodic transmission or periodic statistics can be performed according to a preset working interval period, and data transmission and data statistics can also be performed at night to avoid adding workload to the network system during the day.
[0105] Furthermore, the power consumption analysis module is also used to perform statistical analysis according to the power consumption change rate and the corresponding time point to obtain the power consumption law of the corresponding building;
[0106] The power consumption analysis module is also used to perform power dispatch warning according to the power consumption rules of each building in the target building complex.
[0107] Furthermore, the power consumption analysis module is also used to analyze the power consumption information within a preset recording time period to obtain the power consumption peak value and the corresponding time period corresponding to each building;
[0108] The consumption abnormality determination module is further used to compare the power consumption peak with the power consumption threshold, and when the power consumption peak is greater than the power consumption threshold, determine that the building power consumption corresponding to the power consumption peak greater than the power consumption threshold is excessive.
[0109] Furthermore, the power consumption analysis module is also used to record the time period when the power consumption change rate corresponding to each building continues to increase, and determine it as the energy consumption increase time period;
[0110] The device also includes a power supply allocation module, which is used to allocate the power supply of the target building complex based on the energy consumption improvement time period.
[0111] Furthermore, the power consumption analysis module is also used to analyze the power consumption information within a preset recording time period to obtain the corresponding power consumption fluctuation curve of the building.
[0112] In actual operation, firstly, a recording time period is set, such as year, month or quarter, and the power consumption fluctuation of the building in the corresponding recording time period is reflected by a power consumption fluctuation curve;
[0113] Then, the power consumption of the building can be compared with itself, so as to know the usage of the building in different seasons, and analyze the corresponding time period with higher power consumption, providing data basis for later energy allocation;
[0114] It is also possible to compare the power consumption of the building with that of other buildings in the complex, and analyze that if the power consumption of a certain building is too large compared to other buildings during the corresponding power consumption time period, the power consumption of the building is judged to be abnormal, and this can be used as a basis for the corresponding staff to carry out reasonable management.
[0115] Specifically, the power consumption threshold is adjusted according to the region and season corresponding to the target building complex.
[0116] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0117] The above is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A smart meter management method, characterized in that: The method comprises the following steps: Obtain the record information of multiple smart meters in each building in the target building complex in real time to obtain the corresponding power consumption information; Analyze the power consumption information within a preset recording time period to obtain the power consumption change rate and the corresponding time point of each building; The power consumption change rate is compared with a power consumption change rate threshold, and when the power consumption change rate is greater than the power consumption change rate threshold, it is determined that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal; The method further comprises the following steps: Perform statistical analysis based on the power consumption change rate and the corresponding time point to obtain the power consumption pattern of the corresponding building; According to the power consumption rules of each building in the target building complex, power dispatch warning is carried out; The method further comprises the following steps: Analyze the power consumption information within a preset recording time period to obtain the power consumption peak value and the corresponding time period of each building; The power consumption peak value is compared with the power consumption threshold value, and when the power consumption peak value is greater than the power consumption threshold value, it is determined that the power consumption of the building corresponding to the power consumption peak value greater than the power consumption threshold value is excessive; The method further comprises the following steps: Record the time period when the rate of change of electricity consumption of each building continues to increase, and determine it as the time period of increased energy consumption; Based on the energy consumption increase time period, adjusting the power supply of the target building complex; The smart meter management method is based on a smart meter management device, which includes: The power consumption monitoring module is used to obtain the record information of multiple smart meters of each building in the target building complex in real time to obtain the corresponding power consumption information; An electricity consumption analysis module, which is used to analyze the electricity consumption information within a preset recording time period to obtain the electricity consumption change rate and corresponding time point corresponding to each building; a consumption abnormality determination module, which is used to compare the power consumption change rate with the power consumption change rate threshold, and when the power consumption change rate is greater than the power consumption change rate threshold, determine that the building power consumption corresponding to the power consumption change rate greater than the power consumption change rate threshold is abnormal; The power consumption analysis module is also used to perform statistical analysis based on the power consumption change rate and the corresponding time point to obtain the power consumption law of the corresponding building; The power consumption analysis module is also used to perform power dispatch warning according to the power consumption rules of each building in the target building complex; The power consumption analysis module is also used to analyze the power consumption information within a preset recording time period to obtain the power consumption peak value and the corresponding time period corresponding to each building; The consumption abnormality determination module is further used to compare the power consumption peak with the power consumption threshold, and when the power consumption peak is greater than the power consumption threshold, determine that the building power consumption corresponding to the power consumption peak greater than the power consumption threshold is excessive; The power consumption analysis module is also used to record the time period when the power consumption change rate of each building continues to increase, and determine it as the energy consumption increase time period; The device also includes a power supply allocation module, which is used to allocate the power supply of the target building complex based on the energy consumption improvement time period.
2. The smart meter management method according to claim 1, characterized in that: The method further comprises the following steps: Within a preset recording time period, the power consumption information is analyzed to obtain a corresponding power consumption fluctuation curve of the building.
3. The smart meter management method according to claim 1, characterized in that: The power consumption threshold is adjusted according to the region and season corresponding to the target building complex.