An open-pit mine production output wage calculation system and method
By installing on-board equipment in open-pit mines and establishing a production output wage calculation system, the problem of inaccurate calculation of output and wages for truck and electric shovel drivers is solved, and the accurate calculation and payment of driver output and wages is achieved.
Patent Information
- Application Number
- CN202210182088.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-25
- Publication Date
- 2025-07-01
- Estimated Expiration
- 2042-02-25
AI Technical Summary
The output of trucks and electric shovel drivers in open-pit mines cannot be accurately counted, resulting in inaccurate salary calculations, which has become a core issue for open-pit mine managers.
A system for production and wage calculation of open-pit mines is designed. By installing on-board equipment on trucks and electric shovels, the on-board equipment is connected to the backend server and the web front-end, real-time reporting of transportation information and data calculation are realized. The system sets unit prices and standard capacity by binding trucks and electric shovels, establishes a database, and calculates the actual output and salary of the driver.
The accurate calculation of truck and electric shovel driver output and accurate payment of wages is achieved, and the inaccurate calculation of driver wages in open-pit mines is solved.
Smart Images

Figure CN114549160B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of open-pit mine production, and relates to an open-pit mine production output wage calculation system and method. Background Art
[0002] Statistical calculation of the monthly production output of trucks and electric shovels and the wages of each truck and electric shovel driver in an open-pit mine is an important part of the daily work in an open-pit mine. Due to the special situation of the open-pit mine, the production output of each truck and electric shovel driver cannot be accurately counted, and there is no accurate output basis for calculating the wages of each truck and electric shovel driver. Accurately calculating the production output of each truck and electric shovel driver in an open-pit mine and accurately calculating the wages of each driver are the core issues that concern the management personnel of the open-pit mine. Summary of the Invention
[0003] The purpose of the invention is to overcome the above-mentioned disadvantages of the prior art, and provides an open-pit mine production output wage calculation system and method, which can calculate the wages of truck drivers and electric shovel drivers more accurately.
[0004] To achieve the above purpose, the open-pit mine production output wage calculation system of the invention includes trucks, electric shovels, a background server and a web front-end. Among them, on-vehicle devices are installed on both the trucks and the electric shovels, and the on-vehicle devices and the web front-end are connected to the background server.
[0005] The on-vehicle device is connected to the background server through a public network.
[0006] The open-pit mine production output wage calculation method of the invention includes the following steps:
[0007] 1) Bind the trucks and electric shovels to the on-vehicle devices thereon in the background server, and at the same time set the unit price and the standard capacity of each truck in the Web front-end;
[0008] 2) After the electric shovel driver gets on the vehicle, log in to the on-vehicle device on the electric shovel, and the on-vehicle device reports the information of the electric shovel and the electric shovel driver to the background server to establish a mapping relationship between the electric shovel driver and the electric shovel;
[0009] 3) After each truck finishes loading and unloading a trip, the on-vehicle device is used to report the transportation information to the background server once. The background server establishes a database through the transportation information, the standard capacity of the truck, and the mapping relationship between the electric shovel driver and the electric shovel in step 2), through the truck, the electric shovel, the truck driver, the electric shovel driver and the standard output;
[0010] 4) Measure the excavation output of each electric shovel last month on-site, and input it into the background server through the Web front-end. The background server calculates the standard output of each electric shovel corresponding to each electric shovel driver last month according to the data in the database, and at the same time calculates the virtual volume rate of each electric shovel, and then calculates the monthly actual output of each electric shovel driver according to the virtual volume rate of the electric shovel;
[0011] 5) Calculate the monthly salary of each electric shovel driver according to the actual monthly output of each electric shovel driver and the unit price set in step 2).
[0012] 6) The background server calculates the standard output of each truck driver corresponding to each electric shovel last month based on the data in the database, and then calculates the actual monthly output of each truck driver according to the virtual cubic rate of each electric shovel obtained in step 4).
[0013] 7) Calculate the monthly salary of each truck driver according to the actual monthly output of each truck driver and the unit price set in step 2).
[0014] Standard output = standard capacity * number of vehicles.
[0015] Virtual cubic rate of electric shovel = (actual output of electric shovel - total standard output of each driver corresponding to this electric shovel) / actual output of electric shovel.
[0016] Actual monthly output of a single electric shovel driver = standard output of a single electric shovel driver + standard output of a single electric shovel driver * virtual cubic rate of electric shovel.
[0017] Actual monthly output of a single truck driver = standard output of a single truck driver + standard output of a single truck driver * virtual cubic rate of electric shovel.
[0018] The present invention has the following beneficial effects:
[0019] When the open-pit mine production output salary calculation system and method of the present invention are specifically operated, the transportation information is reported through the on-vehicle device installed on the truck, solving the problem of reporting the truck transportation information. At the same time, the present invention constructs a database based on trucks, electric shovels, truck drivers, electric shovel drivers and standard output, and accurately calculates the actual monthly output of electric shovel drivers and truck drivers through the loading relationship between electric shovels and trucks, and then calculates the monthly salary of electric shovel drivers and truck drivers, solving the problem of accurately calculating the output of each driver of electric shovels and trucks and the monthly salary of each driver in the open-pit mine. Description of the Drawings
[0020] Figure 1 is the system of the present invention;
[0021] Figure 2 is the flow chart of the present invention.
[0022] Among them, 1 is the on-vehicle device, 2 is the background server, and 3 is the web front end. Specific Embodiments
[0023] To enable those skilled in the art to better understand the solution of the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments, and are not intended to limit the scope of the present invention disclosure. In addition, in the following description, the descriptions of well-known structures and technologies are omitted to avoid unnecessarily confusing the concepts disclosed in the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the scope of protection of the present invention.
[0024] The schematic structural diagrams according to the disclosed embodiments of the present invention are shown in the accompanying drawings. These figures are not drawn to scale, where for the purpose of clear expression, some details are enlarged and some details may be omitted. The shapes of various regions and layers shown in the figures and their relative sizes and positional relationships are only exemplary. In practice, there may be deviations due to manufacturing tolerances or technical limitations, and those skilled in the art can design regions / layers with different shapes, sizes, and relative positions according to actual needs.
[0025] Reference Figure 1 , the open-pit mine production output wage calculation system described in the present invention includes trucks, electric shovels, a background server 2, and a web front-end 3. Among them, on-vehicle devices 1 are installed on both the trucks and the electric shovels. Among them, the on-vehicle device 1 and the web front-end 3 are connected to the background server 2. Among them, the on-vehicle device 1 is connected to the background server 2 through a public network.
[0026] Reference Figure 2 , the open-pit mine production output wage calculation method described in the present invention includes the following steps:
[0027] 1) Hardware construction
[0028] Install the on-vehicle device 1 on the trucks and the electric shovels, connect the on-vehicle device 1 to the background server 2 through a public network, and at the same time connect the web front-end 3 to the background server 2;
[0029] 2) Basic information configuration
[0030] Bind the trucks and the electric shovels to the on-vehicle device 1 thereon in the background server 2, and at the same time set the unit price and the standard capacity of each truck in the web front-end 3;
[0031] 3) The driver gets on the vehicle and logs in to the system
[0032] After the electric shovel driver gets on the vehicle, log in to the on-vehicle device 1 on the electric shovel. The on-vehicle device 1 reports the information of the electric shovel and the electric shovel driver to the background server 2, and the background server 2 dynamically establishes the mapping relationship between the electric shovel driver and the electric shovel.
[0033] 4) The on-vehicle system reports transportation information
[0034] After each loading and unloading operation by the truck driver, the on-vehicle device 1 is used to report the transportation information to the background server 2 once. The background server 2 establishes a database through the transportation information, the standard capacity of the truck, and the mapping relationship between the electric shovel driver and the electric shovel in step 3); among them, the standard output is:
[0035] Standard output = Standard capacity * Number of trucks
[0036] 5) Calculate the monthly actual output of each electric shovel driver
[0037] At the beginning of the month, the excavation output of each electric shovel in the previous month is measured on-site and input into the background server 2 through the Web front-end 3; the background server 2 calculates the standard output of each electric shovel corresponding to each electric shovel driver in the previous month according to the data in the database, and at the same time calculates the virtual volume rate of each electric shovel, and then calculates the monthly actual output of each electric shovel driver according to the virtual volume rate of the electric shovel, where
[0038] Virtual volume rate of electric shovel = (Actual output of electric shovel - Total standard output of each driver corresponding to this electric shovel) / Actual output of electric shovel Monthly actual output of a single electric shovel driver = Standard output of a single electric shovel driver + Standard output of a single electric shovel driver * Virtual volume rate of electric shovel
[0039] 6) Calculate the monthly salary of each electric shovel driver
[0040] Calculate the monthly salary of each electric shovel driver according to the monthly actual output of each electric shovel driver and the unit price set in step 2).
[0041] 7) Calculate the monthly actual output of each truck driver
[0042] At the beginning of the month, the background server 2 calculates the standard output of each truck driver corresponding to each electric shovel in the previous month according to the data in the database, and then calculates the monthly actual output of each truck driver according to the virtual volume rate of each electric shovel calculated in step 4), where
[0043] Monthly actual output of a single truck driver = Standard output of a single truck driver + Standard output of a single truck driver * Virtual volume rate of electric shovel
[0044] 8) Calculate the monthly salary of each truck driver
[0045] Calculate the monthly salary of each truck driver according to the monthly actual output of each truck driver and the unit price set in step 2).
Claims
1. A method for calculating production output wages in an open-pit mine, characterized in that, Open-pit mine production output wage calculation system. The open-pit mine production output wage calculation system includes trucks, electric shovels, a background server (2), and a web front-end (3). Among them, on-board devices (1) are installed on both the trucks and the electric shovels. Among them, the on-board devices (1) and the web front-end (3) are connected to the background server (2); It includes the following steps: 1) Bind the trucks and electric shovels to the on-board devices (1) on them in the background server (2), and at the same time set the unit price and the standard capacity of each truck in the Web front-end (3); 2) After the electric shovel driver gets on the vehicle, log in to the on-board device (1) on the electric shovel. The on-board device (1) reports the information of the electric shovel and the electric shovel driver to the background server (2) to establish a mapping relationship between the electric shovel driver and the electric shovel; 3) After each loading and unloading trip of the truck driver, use the on-board device (1) to report the transportation information to the background server (2) once. The background server (2) establishes a database through the transportation information, the standard capacity of the truck, and the mapping relationship between the electric shovel driver and the electric shovel in step 2), through the truck, the electric shovel, the truck driver, the electric shovel driver, and the standard output; 4) Measure the excavation output of each electric shovel last month on-site and input it into the background server (2) through the Web front-end (3). The background server (2) calculates the standard output of each electric shovel corresponding to each electric shovel driver last month according to the data in the database, and at the same time calculates the virtual volume rate of each electric shovel, and then calculates the monthly actual output of each electric shovel driver according to the virtual volume rate of the electric shovel; 5) Calculate the monthly wage of each electric shovel driver according to the monthly actual output of each electric shovel driver and the unit price set in step 2); 6) The background server (2) calculates the standard output of each truck driver corresponding to each electric shovel last month according to the data in the database, and then calculates the monthly actual output of each truck driver according to the virtual volume rate of each electric shovel calculated in step 4); 7) Calculate the monthly wage of each truck driver according to the monthly actual output of each truck driver and the unit price set in step 2).
2. The open-pit mine production output wage calculation method according to claim 1, wherein Standard output = standard capacity * number of vehicles.
3. The open-pit mine production output wage calculation method according to claim 1, characterized in that, The monthly actual output of a single electric shovel driver = the standard output of a single electric shovel driver + the standard output of a single electric shovel driver * the virtual volume rate of the electric shovel.
4. The open-pit mine production output wage calculation method according to claim 1, characterized in that, The monthly actual output of a single truck driver = the standard output of a single truck driver + the standard output of a single truck driver * the virtual volume rate of the electric shovel.
5. The method for calculating the production output wage of an open-pit mine according to claim 1, characterized in that The on-board device (1) is connected to the background server (2) through the public network.