Hydropower system

By introducing a control unit into the hydropower system and using the generator drive control method, the problem of flow path management on the inflow side of the turbine is solved, effective management of the flow path state and cost reduction are achieved, and system efficiency and reliability are improved.

CN114555934BActive Publication Date: 2024-11-26DAIKIN INDUSTRIES LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202080071686.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2019-10-17
Filing Date
2020-10-09
Publication Date
2024-11-26
Estimated Expiration
2040-10-09

AI Technical Summary

Technical Problem

Existing hydropower systems are difficult to manage the inflow-side flow path state of the turbine, resulting in inefficiency and increased costs.

Method used

By introducing a control unit in the hydropower system, the flow rate or head of the turbine is controlled by the generator drive, so that the pressure, flow rate and liquid level of the fluid in the flow path are close to the target value, reducing the use of sensors, and improving the need for sensors System management capabilities.

Benefits of technology

Effective management of the flow path status of the inflow and outflow sides of the turbine is realized, reducing the application of pressure on the pipeline, reducing the risk of water leakage, and reducing the cost of the sensor installation, improving the efficiency and reliability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114555934B_ABST
    Figure CN114555934B_ABST
Patent Text Reader

Abstract

A turbine (11) is provided in a flow path (40) for fluid flow. A generator (12) is driven by the turbine (11). A control unit (13) performs a first control. The flow path (40) includes a first flow path (41) located on the inflow side of the turbine (11). In the first control, the control unit (13) controls the flow rate (Qw) or the water head (ΔPw) of the turbine (11) so that any one of the pressure (Pa) of the fluid in the first flow path (41), the flow rate (Qa) of the fluid in the first flow path (41), and the liquid level (Ha) of the fluid in a first storage tank (50) for causing the fluid to flow out of the first flow path (41) approaches a first target value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a hydroelectric power generation system. Background Art

[0002] Patent document 1 discloses a hydroelectric power generation system. The hydroelectric power generation system includes: a turbine disposed in a flow path for fluid flow; a generator driven by the turbine; a head regulating device for regulating the effective water head of the turbine; and a control unit. The control unit coordinates flow control and head regulation control, wherein the generator is controlled in the flow control so that the flow of the turbine approaches the target flow, and the effective water head of the turbine is regulated by the head regulating device in the head regulation control so that the effective water head of the turbine is within a first range.

[0003] Prior art literature

[0004] Patent Literature

[0005] Patent Document 1: Japanese Patent Publication No. 2018-119547 Summary of the invention

[0006] -Technical problem to be solved by the invention-

[0007] However, in the system of Patent Document 1, although the state of the flow passage on the outflow side of the water turbine can be managed, it is difficult to manage the state of the flow passage on the inflow side of the water turbine.

[0008] -Technical solutions to solve technical problems-

[0009] A first aspect of the present disclosure relates to a hydroelectric power generation system, which includes a turbine 11, a generator 12, and a control unit 13, wherein the turbine 11 is arranged in a flow path 40 for fluid flow, the generator 12 is driven by the turbine 11, and the control unit 13 performs a first control, the flow path 40 includes a first flow path 41 located on the inflow side of the turbine 11, and the control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the first control so that any one of the pressure Pa of the fluid in the first flow path 41, the flow rate Qa of the fluid in the first flow path 41, and the liquid level Ha of the fluid in the first storage tank 50 where the fluid flows out of the first flow path 41 approaches a first target value.

[0010] In the first aspect, by performing the first control, the state of the first flow path 41 which is the flow path on the inflow side of the water turbine 11 can be managed.

[0011] A second aspect of the present disclosure is based on the first aspect and is characterized in that the control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 by controlling the torque or the rotation speed of the generator 12 .

[0012] The third aspect of the present disclosure is, based on the first or second aspect, characterized in that: the control unit 13 is capable of executing the first control and the second control, the flow path 40 includes the first flow path 41 and the second flow path 42 located on the outflow side of the turbine 11, and the control unit 13 controls the flow rate Qw or the head ΔPw of the turbine 11 in the second control so that any one of the pressure Pb of the fluid in the second flow path 42, the flow rate Qb of the fluid in the second flow path 42, and the liquid level Hb of the fluid in the second storage tank 51 for the fluid to flow into from the second flow path 42 is close to the second target value.

[0013] In the third aspect, by performing the second control, the state of the second flow path 42 which is the flow path on the outflow side of the water turbine 11 can be managed.

[0014] The fourth aspect of the present disclosure is, based on any one of the first to third aspects, characterized in that: the first flow path 41 includes a turbine flow path 45 and a branch flow path 46, at least a portion of the fluid flowing into the turbine 11 flows in the turbine flow path 45, and the branch flow path 46 branches out from the turbine flow path 45.

[0015] In the fourth aspect, by performing the first control, the state of the turbine flow path 45 or the branch flow path 46 can be managed.

[0016] A fifth aspect of the present disclosure is, based on the fourth aspect, characterized in that: the control unit 13 performs the first control so that the integrated flow rate of the fluid in the branch flow path 46 approaches a target integrated flow rate.

[0017] In the fifth aspect, the accumulated flow rate of the fluid in the branch flow path 46 can be managed.

[0018] A sixth aspect of the present disclosure is, based on the fourth or fifth aspect, characterized in that a regulating mechanism 60 for regulating the flow rate or pressure of the fluid is provided in the branch flow path 46 .

[0019] The seventh aspect of the present disclosure is, based on the sixth aspect, characterized in that: the control unit 13 controls the flow Qw or head ΔPw of the turbine 11 in the first control so that the pressure of the fluid near the inlet of the regulating mechanism 60 is close to the first target value.

[0020] In the seventh aspect, by performing the first control, the controllability of the adjustment mechanism 60 can be improved.

[0021] The eighth aspect of the present disclosure is, based on any one of the first to seventh aspects, characterized in that: the control unit 13 estimates the pressure Pa of the fluid in the first flow path 41 based on the pressure of the fluid at any location included in the flow path 40, the flow path conditions between the arbitrary location and the estimated object location, and the flow rate of the fluid in the flow path between the arbitrary location and the estimated object location, and the estimated object location is a location different from the arbitrary location where the pressure Pa of the fluid in the first flow path 41 should be estimated.

[0022] In the eighth aspect, since it is not necessary to provide a pressure sensor for detecting the pressure Pa of the fluid in the first flow path 41, the installation cost can be reduced.

[0023] A ninth aspect of the present disclosure is, based on any one of the first to seventh aspects, characterized in that: the control unit 13 estimates the liquid level Ha of the fluid in the first storage tank 50 based on the pressure corresponding to the different flow rates of the fluid at an arbitrary location, and the arbitrary location is located between the first storage tank 50 and the turbine 11 in the flow path 40.

[0024] In the ninth aspect, since it is not necessary to provide a liquid level sensor for detecting the liquid level Ha of the fluid in the first storage tank 50, the installation cost can be reduced.

[0025] The tenth aspect of the present disclosure is, based on any one of the fourth to seventh aspects, characterized in that: the control unit 13 estimates the flow rate Qa of the fluid in the first flow path 41 based on the flow rate of the fluid at any location different from the estimated object location, and the estimated object location is the location where the flow rate Qa of the fluid in the first flow path 41 should be estimated.

[0026] The eleventh aspect of the present disclosure is, based on any one of the fourth to seventh aspects, characterized in that: the control unit 13 estimates the flow rate Qa of the fluid in the first flow path 41 based on the pressure of the fluid at the estimated object location where the flow rate Qa of the fluid in the first flow path 41 should be estimated, the pressure of the fluid at any location different from the estimated object location, and the flow path conditions between the estimated object location and the arbitrary location.

[0027] In the tenth and eleventh aspects, since a flow rate sensor for detecting the flow rate Qa of the fluid in the first flow path 41 does not need to be provided, the installation cost can be reduced.

[0028] A twelfth aspect of the present disclosure is, based on any one of the first to eleventh aspects, characterized in that the control unit 13 can operate using the electric power generated by the generator 12 .

[0029] In the twelfth aspect, by operating the control unit 13 using the electric power generated by the generator 12 , the first control can be performed even when the electric power system that supplies electric power to the control unit 13 fails. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 is a diagram illustrating the structure of a flow path of a hydraulic power generation system provided with the first embodiment;

[0031] Figure 2 is a block diagram illustrating the structure of a control unit;

[0032] Figure 3 is a graph illustrating a characteristic diagram of a hydroelectric power generation system;

[0033] Figure 4 is a flowchart illustrating the first control (flow rate control) in the first embodiment;

[0034] Figure 5 is a flowchart illustrating the second control (flow rate control) in the first embodiment;

[0035] Figure 6 is a flowchart illustrating the first control (water head control) in the first embodiment;

[0036] Figure 7 is a flowchart illustrating the second control (water head control) in the first embodiment;

[0037] Figure 8 This is a diagram illustrating the structure of a flow path of a hydraulic power generation system provided with Modification 1 of the first embodiment;

[0038] Fig. 9 This is a diagram illustrating the structure of a flow path of a hydraulic power generation system provided with a second modification of the first embodiment;

[0039] Fig.10 This is a diagram illustrating the structure of a flow path of a hydraulic power generation system provided with a third modification of the first embodiment;

[0040] Fig.11 is a diagram illustrating the structure of a flow path of a hydraulic power generation system provided with a second embodiment;

[0041] Fig.12 is a flowchart illustrating the first control (flow rate control) in the second embodiment;

[0042] Fig.13 is a flowchart illustrating the second control (flow rate control) in the second embodiment;

[0043] Fig.14 is a diagram illustrating the structure of a flow path of a hydraulic power generation system provided with a third embodiment;

[0044] Fig.15 is a flowchart illustrating the first control (flow rate control) in the third embodiment;

[0045] Fig.16 is a flowchart illustrating the second control (flow rate control) in the third embodiment;

[0046] Fig.17 is a graph illustrating the integrated flow rate control of the hydraulic power generation system according to the fourth embodiment;

[0047] Fig.18 is a diagram illustrating a modified example of the adjustment mechanism;

[0048] Fig.19 It is a diagram used to explain the estimation of pressure, flow rate, and liquid level;

[0049] Fig. 20 This is a graph for explaining the estimation of the liquid level. DETAILED DESCRIPTION

[0050] Hereinafter, the embodiments will be described in detail with reference to the accompanying drawings. It should be noted that the same symbols are used to represent the same or corresponding parts in the drawings, and the description thereof will not be repeated.

[0051] (First Embodiment)

[0052] Figure 1 The structure of the flow path 40 provided with the hydraulic power generation system 10 of the first embodiment is exemplified. The hydraulic power generation system 10 includes a water turbine 11, a generator 12, and a control unit 13. The water turbine 11 is provided in the flow path 40.

[0053] [flow path]

[0054] The flow path 40 has a drop. A fluid (e.g., water) flows in the flow path 40. The flow path 40 includes a first flow path 41 and a second flow path 42. For example, the flow path 40 is composed of a plurality of metal pipes (e.g., ductile iron pipes). In this example, a first storage tank 50, a second storage tank 51, and a branch storage tank 52 are provided in the flow path 40. The first storage tank 50 allows the fluid to flow out to the first flow path 41. The fluid flows from the second flow path 42 to the second storage tank 51.

[0055] 〈First flow path〉

[0056] The first flow path 41 is a flow path located on the inflow side of the turbine 11. In this example, the first flow path 41 includes a turbine flow path 45 and a branch flow path 46. The turbine flow path 45 is a flow path connecting the first storage tank 50 and the turbine 11. At least a part of the fluid flowing into the turbine 11 flows in the turbine flow path 45. The branch flow path 46 is a flow path branched from the turbine flow path 45. In this example, the branch flow path 46 is composed of a single flow path. In addition, a branch storage tank 52 is connected to the outlet of the branch flow path 46.

[0057] Second flow path

[0058] The second flow path 42 is a flow path located on the outflow side of the turbine 11. In this example, the second flow path 42 is composed of a single flow path. The outlet of the second flow path 42 is connected to a second storage tank 51.

[0059] 〔Water turbine〕

[0060] The water turbine 11 is disposed in the flow path 40. In this example, the water turbine 11 includes an impeller and a housing that accommodates the impeller. For example, an impeller included in a vortex pump is used as the impeller of the water turbine 11. A rotating shaft is fixed to the center of the impeller. In the water turbine 11, the impeller is rotated by the pressure of the flow of the fluid flowing into the housing from the inlet (inlet) formed in the housing, and the rotating shaft rotates together with the rotation of the impeller. The fluid in the housing is discharged from the outlet (outlet) formed in the housing.

[0061] 〔dynamo〕

[0062] The generator 12 is driven by the turbine 11. Specifically, the generator 12 is connected to the rotating shaft of the turbine 11, and is driven to rotate by the turbine 11. Thus, the generator 12 is driven to rotate, thereby generating electricity. For example, the generator 12 includes a permanent magnet embedded rotor and a stator having a coil.

[0063] 〔Flow meter〕

[0064] In this example, a flow meter 20 is provided in the turbine flow path 45. The flow meter 20 is arranged between the connection point of the turbine flow path 45 and the branch flow path 46 and the turbine 11 in the turbine flow path 45. The flow meter 20 detects the flow rate Qw of the turbine 11 (specifically, the flow rate Qw of the fluid flowing through the turbine 11). And, the flow meter 20 sends a detection signal indicating the detection result (the flow rate Qw of the fluid) to the control unit 13.

[0065] 〔Pressure sensor〕

[0066] In this example, a primary pressure sensor 21 and a secondary pressure sensor 22 are provided. In this example, the primary pressure sensor 21 is arranged at the inlet of the water turbine 11, and the secondary pressure sensor 22 is arranged at the outlet of the water turbine 11.

[0067] 〈Primary pressure sensor〉

[0068] The primary pressure sensor 21 detects the pressure Pw1 of the fluid near the inlet of the turbine 11. In other words, the primary pressure sensor 21 detects the pressure Pw1 of the fluid flowing into the turbine 11. The primary pressure sensor 21 transmits a detection signal indicating the detection result (pressure Pw1 of the fluid) to the control unit 13.

[0069] 〈Secondary side pressure sensor〉

[0070] The secondary side pressure sensor 22 detects the pressure Pw2 of the fluid near the outlet of the turbine 11. In other words, the secondary side pressure sensor 22 detects the pressure Pw2 of the fluid flowing out of the turbine 11. The secondary side pressure sensor 22 sends a detection signal indicating the detection result (pressure Pw2 of the fluid) to the control unit 13.

[0071] 〔First pressure sensor〕

[0072] In this example, a first pressure sensor 31a is provided in the first flow path 41. The first pressure sensor 31a detects the pressure Pa of the fluid in the first flow path 41. The first pressure sensor 31a transmits a detection signal indicating the detection result (the pressure Pa of the fluid in the first flow path 41) to the control unit 13. In this example, the first pressure sensor 31a is provided in a branch flow path 46 which is a part of the first flow path 41.

[0073] [Second pressure sensor]

[0074] In this example, a second pressure sensor 31b is provided in the second flow path 42. The second pressure sensor 31b detects the pressure Pb of the fluid in the second flow path 42. The second pressure sensor 31b transmits a detection signal indicating the detection result (pressure Pb of the fluid in the second flow path 42) to the control unit 13.

[0075] 〔Regulatory Agency〕

[0076] In this example, a regulating mechanism 60 is provided in the branch flow path 46. The regulating mechanism 60 regulates the flow rate or pressure of the fluid. In this example, the regulating mechanism 60 is a manual valve 61. It should be noted that the opening degree of the manual valve 61 can be fixed or variable.

[0077] 〔Control Department〕

[0078] The control unit 13 is connected to various parts of the hydroelectric system 10 using signal lines, and controls various parts of the hydroelectric system 10 based on signals sent from various parts of the hydroelectric system 10 (such as detection signals from various sensors) and instructions from the outside (such as target values).

[0079] The control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11. Specifically, the control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 by controlling the torque or the rotation speed of the generator 12. The control unit 13 can operate using the power generated by the generator 12.

[0080] In this example, the control unit 13 can execute the first control and the second control. For example, the control unit 13 switches between the first control and the second control in response to an instruction from the outside.

[0081] In the first embodiment, the control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the first control so that the fluid pressure Pa in the first flow path 41 approaches the first target value. In addition, the control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the second control so that the fluid pressure Pb in the second flow path 42 approaches the second target value. The first control and the second control will be described in detail later.

[0082] 〔Control Unit Structure〕

[0083] Figure 2 The structure of the control unit 13 is exemplified. Figure 2 The structure of the control unit 13 that controls the flow rate Qw of the water turbine 11 by controlling the torque of the generator 12 is exemplified. The control unit 13 includes an AC / DC converter 100 , a generator control unit 101 , and a power storage unit 102 .

[0084] 〈AC / DC Converter〉

[0085] AC / DC converter 100 has a plurality of switching elements, and converts the power (AC) generated by generator 12 into DC by opening and closing operations. The output of AC / DC converter 100 is smoothed by a smoothing capacitor and output to grid-connected inverter 201 .

[0086] 〈Grid-connected inverter〉

[0087] The grid-connected inverter 201 has a plurality of switching elements constituting an inverter unit. The direct current from the AC / DC converter 100 is input to the grid-connected inverter 201. In the grid-connected inverter 201, the direct current is converted into alternating current by the opening and closing actions of the plurality of switching elements. The alternating current generated by the grid-connected inverter 201 is supplied to the power system 200. For example, the power system 200 is a so-called commercial power system, and in the hydroelectric power generation system 10, the so-called power selling is performed by supplying power to the commercial power system (so-called reverse flow).

[0088] 〈Generator control unit〉

[0089] The generator control unit 101 is composed of, for example, a processor and a memory storing a program and information for operating the processor. In this example, the generator control unit 101 includes a target derivation unit 110 , a torque calculation unit 111 , a voltage calculation unit 112 , and a converter control unit 113 .

[0090] 《Target Export Department》

[0091] In the first control, the pressure Pa of the fluid in the first flow path 41 and the first target pressure Pa* (an example of the first target value), which corresponds to the target value of the pressure Pa in the first control, are input to the target deriving unit 110. The target deriving unit 110 derives a flow rate command value Qw* corresponding to the target value of the flow rate Qw of the turbine 11 so that the pressure Pa of the fluid in the first flow path 41 approaches the first target pressure Pa*.

[0092] In the second control, the pressure Pb of the fluid in the second flow path 42 and the second target pressure Pb*, which corresponds to the target value of the pressure Pb in the second control, are input to the target deriving unit 110. The target deriving unit 110 derives the flow rate command value Qw* so that the pressure Pb of the fluid in the second flow path 42 approaches the second target pressure Pb*.

[0093] 《Torque calculation department》

[0094] The flow rate Qw of the turbine 11 and the flow rate command value Qw* derived by the target deriving unit 110 are input to the torque calculating unit 111. The torque calculating unit 111 derives a torque command value T* corresponding to the target value of the torque of the generator 12 so that the flow rate Qw of the turbine 11 approaches the flow rate command value Qw*.

[0095] 《Voltage calculation department》

[0096] The torque command value T* derived by the torque calculation unit 111 is input to the voltage calculation unit 112. The voltage calculation unit 112 derives a voltage command value V* based on the torque command value T*.

[0097] 《Converter Control Department》

[0098] The converter control unit 113 performs PWM control on the switching element of the AC / DC converter 100 based on the voltage command value V* derived by the voltage calculation unit 112. In this way, the flow rate Qw of the water turbine 11 can be brought close to the flow rate command value Qw*.

[0099] 〈Electricity Storage Unit〉

[0100] The power storage unit 102 stores the electric power generated by the generator 12. In this example, the direct current from the AC / DC converter 100 is input to the power storage unit 102. The generator control unit 101 can operate using the electric power stored in the power storage unit 102.

[0101] [Operation parameters of hydroelectric power generation system]

[0102] Next, refer to Figure 3 The operating parameters of the hydroelectric power generation system 10 and the relationship between them are described in detail. Figure 3 In the graph (also referred to as a characteristic diagram M), the vertical axis represents the effective water head H of the turbine 11, and the horizontal axis represents the flow rate Q flowing through the turbine 11. Here, the effective water head H of the turbine 11 is obtained by subtracting the water head corresponding to the pipe resistance from the first storage tank 50 to the second storage tank 51 through the flow path 40 from the total water head Ho between the liquid level of the first storage tank 50 and the liquid level of the second storage tank 51.

[0103] Can be used Figure 3 The flow resistance characteristic line (system loss curve S) shown in the figure shows the relationship between the effective water head H and the flow rate Q. The system loss curve S has the following characteristics: when the flow rate Q = 0, the effective water head H is the total water head Ho; as the flow rate Q increases, the effective water head H decreases in a quadratic curve. The curvature of the system loss curve S is Figure 1 The flow rate Q in the flow path 40 including the hydroelectric system 10 and the effective water head H at that time correspond to a point on the system loss curve S. That is, the point corresponding to the flow rate Q and the effective water head H of the turbine 11 (the operating point of the turbine 11) is always located on the system loss curve S.

[0104] exist Figure 3 The characteristic diagram M shows the torque value T of the generator 12, the rotation speed (rotation speed) N of the generator 12, and the generated power P of the generator 12 as characteristics related to the flow rate Q and the effective water head H in the turbine 11.

[0105] In the characteristic diagram M, between the curve where the torque value T of the generator 12 is 0 (called the runaway characteristic curve (T=0)) and the curve where the rotation speed N of the generator 12 is 0 or reaches the prescribed minimum rotation speed (called the action limit curve), there is a region where the turbine 11 can rotate (called the turbine region or the operable region). Figure 3 In FIG. 1 , the area on the left side of the runaway characteristic curve is the turbine braking area (traction area).

[0106] In the turbine area, multiple equal torque curves extend along the runaway characteristic curve. On the characteristic diagram M, as the flow rate Q increases, the torque value T also increases. In addition, multiple equal speed curves extend along the action limit curve. The larger the effective head H, the higher the speed N. On the system loss curve S, the torque value T decreases as the flow rate Q decreases. In addition, on the system loss curve S, the speed N decreases as the flow rate Q increases. The equal power generation curve shown by the dotted line is a curve that protrudes downward. As the effective head H and the flow rate Q increase, the power generation P also increases.

[0107] The relationship between the parameters of the characteristic map M described above can be stored in a storage device in the form of a table or a mathematical formula (function) in a program. Therefore, the control unit 13 can perform various calculations and controls by using the relationship between the parameters represented by the characteristic map M.

[0108] 〔First control (flow control)〕

[0109] Next, refer to Figure 4 The first control of the control unit 13 in the first embodiment will be described. Hereinafter, the case where flow rate control (control of the flow rate Qw of the turbine 11) is performed in the first control will be described as an example.

[0110] <Step ST11>

[0111] The control unit 13 determines whether the pressure Pa of the fluid in the first flow path 41 exceeds the first target pressure Pa*. For example, the target derivation unit 110 performs this determination. If the pressure Pa of the fluid in the first flow path 41 exceeds the first target pressure Pa*, the process of step ST13 is performed, otherwise the process of step ST12 is performed.

[0112] <Step ST12>

[0113] The control unit 13 determines whether the pressure Pa of the fluid in the first flow path 41 is lower than the first target pressure Pa*. For example, the target derivation unit 110 performs this determination. If the pressure Pa of the fluid in the first flow path 41 is lower than the first target pressure Pa*, the process of step ST14 is performed, otherwise, the process of step ST15 is performed.

[0114] <Step ST13>

[0115] When the pressure Pa of the fluid in the first flow path 41 exceeds the first target pressure Pa*, the control unit 13 increases the flow rate Qw of the turbine 11. For example, the target derivation unit 110 increases the flow rate instruction value Qw*. In this way, the flow rate Qw of the turbine 11 increases, thereby reducing the pressure Pa of the fluid in the first flow path 41, and the pressure Pa of the fluid in the first flow path 41 approaches the first target pressure Pa*.

[0116] <Step ST14>

[0117] When the pressure Pa of the fluid in the first flow path 41 is lower than the first target pressure Pa*, the control unit 13 reduces the flow rate Qw of the turbine 11. For example, the target derivation unit 110 reduces the flow rate instruction value Qw*. In this way, the flow rate Qw of the turbine 11 is reduced, thereby increasing the pressure Pa of the fluid in the first flow path 41 and bringing the pressure Pa of the fluid in the first flow path 41 close to the first target pressure Pa*.

[0118] <Step ST15>

[0119] When the pressure Pa of the fluid in the first flow path 41 is consistent with the first target pressure Pa*, the control unit 13 maintains the flow rate Qw of the turbine 11. For example, the target derivation unit 110 does not change the flow rate command value Qw* but maintains the flow rate command value Qw*. In this way, by maintaining the flow rate Qw of the turbine 11, the pressure Pa of the fluid in the first flow path 41 is maintained.

[0120] 〔Second control (flow control)〕

[0121] Next, refer to Figure 5 The second control of the control unit 13 in the first embodiment will be described. Next, a case where flow rate control (control of the flow rate Qw of the turbine 11) is performed in the second control will be described as an example.

[0122] <Step ST21>

[0123] The control unit 13 determines whether the pressure Pb of the fluid in the second flow path 42 exceeds the second target pressure Pb*. For example, the target derivation unit 110 performs this determination. If the pressure Pb of the fluid in the second flow path 42 exceeds the second target pressure Pb*, the process of step ST23 is performed, and otherwise, the process of step ST22 is performed.

[0124] <Step ST22>

[0125] The control unit 13 determines whether the pressure Pb of the fluid in the second flow path 42 is lower than the second target pressure Pb*. For example, the target derivation unit 110 performs this determination. If the pressure Pb of the fluid in the second flow path 42 is lower than the second target pressure Pb*, the process of step ST24 is performed, and otherwise, the process of step ST25 is performed.

[0126] <Step ST23>

[0127] When the pressure Pb of the fluid in the second flow path 42 exceeds the second target pressure Pb*, the control unit 13 reduces the flow rate Qw of the turbine 11. For example, the target derivation unit 110 reduces the flow rate command value Qw*. In this way, the flow rate Qw of the turbine 11 is reduced, thereby reducing the pressure Pb of the fluid in the second flow path 42, and the pressure Pb of the fluid in the second flow path 42 approaches the second target pressure Pb*.

[0128] <Step ST24>

[0129] When the pressure Pb of the fluid in the second flow path 42 is lower than the second target pressure Pb*, the control unit 13 increases the flow rate Qw of the turbine 11. For example, the target derivation unit 110 increases the flow rate command value Qw*. In this way, the flow rate Qw of the turbine 11 increases, thereby increasing the pressure Pb of the fluid in the second flow path 42, and the pressure Pb of the fluid in the second flow path 42 approaches the second target pressure Pb*.

[0130] <Step ST25>

[0131] When the pressure Pb of the fluid in the second flow path 42 is consistent with the second target pressure Pb*, the control unit 13 maintains the flow rate Qw of the turbine 11. For example, the target derivation unit 110 does not change the flow rate command value Qw* but maintains the flow rate command value Qw*. In this way, by maintaining the flow rate Qw of the turbine 11, the pressure Pb of the fluid in the second flow path 42 is maintained.

[0132] 〔Head control〕

[0133] It should be noted that the control unit 13 may also be configured to control the water head ΔPw of the turbine 11 (specifically, the pressure difference of the fluid between the inlet and the outlet of the turbine 11) by controlling the torque of the generator 12. For example, the target deriving unit 110 may derive a water head command value corresponding to the target value of the water head ΔPw of the turbine 11 so that the pressure Pa of the fluid in the first flow path 41 approaches the first target pressure Pa*. The torque calculation unit 111 may also derive a torque command value T* so that the water head ΔPw of the turbine 11 approaches the water head command value.

[0134] 〔First control (water head control)〕

[0135] Next, refer to Figure 6 The case where the water head control (control of the water head ΔPw of the turbine 11) is performed in the first control of the control unit 13 of the first embodiment is described. Hereinafter, the case where the water head ΔPw of the turbine 11 is controlled by controlling the pressure Pw2 of the fluid near the outlet of the turbine 11 is described as an example. Specifically, the target derivation unit 110 derives a target value of the pressure Pw2 of the fluid near the outlet of the turbine 11, that is, a pressure command value, so that the pressure Pa of the fluid in the first flow path 41 approaches the first target pressure Pa*. The torque calculation unit 111 derives a torque command value T* so that the pressure Pw2 of the fluid near the outlet of the turbine 11 approaches the pressure command value.

[0136] <Step ST11>

[0137] and Figure 4 The same as the first control shown, the process of step ST11 is performed. If the pressure Pa of the fluid in the first flow path 41 exceeds the first target pressure Pa*, the process of step ST16 is performed, otherwise the process of step ST12 is performed.

[0138] <Step ST12>

[0139] and Figure 4 The same as the first control shown, the process of step ST12 is performed. If the pressure Pa of the fluid in the first flow path 41 is lower than the first target pressure Pa*, the process of step ST17 is performed, otherwise the process of step ST18 is performed.

[0140] <Step ST16>

[0141] When the pressure Pa of the fluid in the first flow path 41 exceeds the first target pressure Pa*, the control unit 13 increases the pressure Pw2 of the fluid near the outlet of the turbine 11. For example, the target derivation unit 110 increases the pressure command value. In this way, the pressure Pw2 of the fluid near the outlet of the turbine 11 increases (the water head ΔPw of the turbine 11 decreases), thereby reducing the pressure Pa of the fluid in the first flow path 41 and bringing the pressure Pa of the fluid in the first flow path 41 close to the first target pressure Pa*.

[0142] <Step ST17>

[0143] When the pressure Pa of the fluid in the first flow path 41 is lower than the first target pressure Pa*, the control unit 13 reduces the pressure Pw2 of the fluid near the outlet of the turbine 11. For example, the target derivation unit 110 reduces the pressure command value. In this way, the pressure Pw2 of the fluid near the outlet of the turbine 11 is reduced (the water head ΔPw of the turbine 11 increases), thereby increasing the pressure Pa of the fluid in the first flow path 41 and bringing the pressure Pa of the fluid in the first flow path 41 close to the first target pressure Pa*.

[0144] <Step ST18>

[0145] When the pressure Pa of the fluid in the first flow path 41 is consistent with the first target pressure Pa*, the control unit 13 maintains the pressure Pw2 of the fluid near the outlet of the turbine 11. For example, the target derivation unit 110 does not change the pressure command value but maintains the pressure command value. In this way, by maintaining the pressure Pw2 of the fluid near the outlet of the turbine 11 (the water head ΔPw of the turbine 11), the pressure Pa of the fluid in the first flow path 41 is maintained.

[0146] 〔Second control (water head control)〕

[0147] Next, refer to Figure 7 The case where the hydraulic head control (control of the hydraulic head ΔPw of the hydraulic turbine 11) is performed in the second control of the control unit 13 of the first embodiment will be described. Hereinafter, the case where the hydraulic head ΔPw of the hydraulic turbine 11 is controlled by controlling the pressure Pw2 of the fluid near the outlet of the hydraulic turbine 11 will be described as an example.

[0148] <Step ST21>

[0149] and Figure 5 The second control shown is the same, and the process of step ST21 is performed. If the pressure Pb of the fluid in the second flow path 42 exceeds the second target pressure Pb*, the process of step ST26 is performed, otherwise the process of step ST22 is performed.

[0150] <Step ST22>

[0151] and Figure 5 The second control shown is the same, and the process of step ST22 is performed. If the pressure Pb of the fluid in the second flow path 42 is lower than the second target pressure Pb*, the process of step ST27 is performed, otherwise, the process of step ST28 is performed.

[0152] <Step ST26>

[0153] When the pressure Pb of the fluid in the second flow path 42 exceeds the second target pressure Pb*, the control unit 13 reduces the pressure Pw2 of the fluid near the outlet of the turbine 11. For example, the target derivation unit 110 reduces the pressure command value. In this way, the pressure Pw2 of the fluid near the outlet of the turbine 11 is reduced (the water head ΔPw of the turbine 11 increases), thereby reducing the pressure Pb of the fluid in the second flow path 42 and approaching the second target pressure Pb*.

[0154] <Step ST27>

[0155] When the pressure Pb of the fluid in the second flow path 42 is lower than the second target pressure Pb*, the control unit 13 increases the pressure Pw2 of the fluid near the outlet of the turbine 11. For example, the target derivation unit 110 increases the pressure command value. In this way, the pressure Pw2 of the fluid near the outlet of the turbine 11 increases (the water head ΔPw of the turbine 11 decreases), thereby increasing the pressure Pb of the fluid in the second flow path 42 and bringing the pressure Pb of the fluid in the second flow path 42 close to the second target pressure Pb*.

[0156] <Step ST28>

[0157] When the pressure Pb of the fluid in the second flow path 42 is consistent with the second target pressure Pb*, the control unit 13 maintains the pressure Pw2 of the fluid near the outlet of the turbine 11. For example, the target derivation unit 110 does not change the pressure command value but maintains the pressure command value. In this way, by maintaining the pressure Pw2 of the fluid near the outlet of the turbine 11 (the water head ΔPw of the turbine 11), the pressure Pb of the fluid in the second flow path 42 is maintained.

[0158] 〔Speed ​​control〕

[0159] It should be noted that the control unit 13 may also be configured to control the flow rate Qw or the water head ΔPw of the turbine 11 by controlling the rotation speed of the generator 12, instead of controlling the flow rate Qw or the water head ΔPw of the turbine 11 by controlling the torque of the generator 12. Specifically, the generator control unit 101 may also have a rotation speed calculation unit (not shown) instead of the torque calculation unit 111. The rotation speed calculation unit derives a rotation speed command value corresponding to the target value of the rotation speed of the generator 12 so that the flow rate Qw of the turbine 11 approaches the flow rate command value Qw*. Alternatively, the rotation speed calculation unit derives the rotation speed command value so that the water head ΔPw of the turbine 11 (for example, the pressure Pw2 of the fluid near the outlet of the turbine 11) approaches the water head command value (for example, the pressure command value). The voltage calculation unit 112 may also derive the voltage command value V* based on the rotation speed command value derived by the rotation speed calculation unit.

[0160] [Effects of the first embodiment]

[0161] As described above, the hydroelectric power generation system 10 of the first embodiment includes the turbine 11, the generator 12, and the control unit 13, wherein the turbine 11 is arranged in the flow path 40 through which the fluid flows, the generator 12 is driven by the turbine 11, and the control unit 13 performs the first control. The flow path 40 includes the first flow path 41 located on the inflow side of the turbine 11. The control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the first control so that the fluid pressure Pa in the first flow path 41 approaches the first target value.

[0162] In the first embodiment, by performing the first control, the pressure Pa of the fluid in the first flow path 41, which is the flow path on the inflow side of the water turbine 11 (an example of the state of the first flow path 41) can be managed. For example, since the pressure Pa of the fluid in the first flow path 41 can be controlled to be constant, the pressure applied to the pipe constituting the first flow path 41 can be reduced. In this way, the occurrence of fluid leakage (for example, water leakage) in the first flow path 41 can be suppressed.

[0163] In addition, in the hydroelectric power generation system 10 of the first embodiment, the control unit 13 can switch and execute the first control and the second control. The flow path 40 includes the first flow path 41 and the second flow path 42 located on the outflow side of the turbine 11. The control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the second control so that the pressure Pb of the fluid in the second flow path 42 approaches the second target value.

[0164] In the first embodiment, by performing the second control, it is possible to manage the pressure Pb of the fluid in the second flow path 42 which is the flow path on the outflow side of the water turbine 11 (an example of the state of the second flow path 42 ).

[0165] Furthermore, in the hydraulic power generation system 10 of the first embodiment, the first flow path 41 includes the turbine flow path 45 through which at least a part of the fluid flowing into the turbine 11 flows, and the branch flow path 46 branching from the turbine flow path 45 .

[0166] In the first embodiment, by performing the first control, the pressure Pb of the fluid in the turbine flow path 45 or the branch flow path 46 (an example of the state of the turbine flow path 45 or the branch flow path 46) can be managed.

[0167] Furthermore, in the hydraulic power generation system 10 according to the first embodiment, the control unit 13 is capable of operating using the electric power generated by the generator 12 .

[0168] In the first embodiment, the control unit 13 is operated using the electric power generated by the generator 12 , so that the first control can be performed even when there is a power outage in the electric power system that supplies electric power to the control unit 13 .

[0169] (Variation 1 of the First Embodiment)

[0170] like Figure 8 As shown, the branch flow path 46 may also be composed of a plurality of flow paths. Figure 8 In the example of FIG. 4 , the branch flow path 46 is composed of a first branch flow path 46a and a second branch flow path 46b. The first branch flow path 46a and the second branch flow path 46b are respectively branched from the turbine flow path 45. Figure 8 In the example of FIG. 4 , a manual valve 61 as an example of an adjustment mechanism 60 is provided in each of the first branch flow path 46a and the second branch flow path 46b. A branch storage tank 52 is connected to each outlet of the first branch flow path 46a and the second branch flow path 46b.

[0171] (Variation 2 of the first embodiment)

[0172] like Fig. 9 As shown, the branch flow path 46 can also be branched into multiple flow paths. Fig. 9 In the example of FIG. 4 , the branch flow path 46 is composed of a main flow path 46c, a first sub-flow path 46d, and a second sub-flow path 46e. The main flow path 46c branches out from the turbine flow path 45. The first sub-flow path 46d and the second sub-flow path 46e are connected to the outlet of the main flow path 46c, respectively. Fig. 9 In the example of FIG. 4 , a manual valve 61 as an example of an adjustment mechanism 60 is provided in each of the first auxiliary flow path 46d and the second auxiliary flow path 46e. A branch storage tank 52 is connected to each outlet of the first auxiliary flow path 46d and the second auxiliary flow path 46e.

[0173] (Variation 3 of the first embodiment)

[0174] like Fig.10 As shown, the first flow path 41 may not have the branch flow path 46 but may have only the turbine flow path 45. In other words, the first flow path 41 may also be composed of a single flow path. In this example, the first flow path 41 connects the first storage tank 50 and the turbine 11.

[0175] (Variation 4 of the first embodiment)

[0176] It should be noted that the control unit 13 may also control the flow rate Qw or the water head ΔPw of the turbine 11 in the first control so that the pressure of the fluid near the inlet of the regulating mechanism 60 approaches the first target value. In other words, the pressure Pa of the fluid in the first flow path 41 that is the control object in the first control may also be the pressure of the fluid near the inlet of the regulating mechanism 60.

[0177] As described above, in the first control, the flow rate Qw or the hydraulic head ΔPw of the water turbine 11 is controlled so that the pressure of the fluid near the inlet of the regulating mechanism 60 approaches the first target value, thereby improving the controllability of the regulating mechanism 60. For example, the normal capacity of the regulating mechanism 60 can be derived by controlling the flow rate Qw or the hydraulic head ΔPw of the water turbine 11 so that the pressure of the fluid near the inlet of the regulating mechanism 60 is within a range corresponding to the normal performance of the regulating mechanism 60 (a range in which the normal capacity of the regulating mechanism 60 can be derived).

[0178] (Second Embodiment)

[0179] Fig.11 The structure of the flow path 40 provided with the hydraulic power generation system 10 of the second embodiment is exemplified. In the hydraulic power generation system 10 of the second embodiment, the first control and the second control of the control unit 13 are different from those of the hydraulic power generation system 10 of the first embodiment. In addition, the first flow sensor 32 is provided in the hydraulic power generation system 10 of the second embodiment instead of the first pressure sensor 31a and the second pressure sensor 31b. The other structures of the hydraulic power generation system 10 of the second embodiment are the same as those of the hydraulic power generation system 10 of the first embodiment.

[0180] 〔First flow sensor〕

[0181] The first flow sensor 32 detects the flow rate Qa of the fluid in the first flow path 41. In this example, the first flow sensor 32 is provided in the branch flow path 46. The first flow sensor 32 transmits a detection signal indicating the detection result (the flow rate Qa of the fluid in the first flow path 41) to the control unit 13.

[0182] 〔Control Department〕

[0183] In the second embodiment, the control unit 13 controls the flow rate Qw or the hydraulic head ΔPw of the turbine 11 in the first control so that the flow rate Qa of the fluid in the first flow path 41 approaches the first target value. Specifically, in the first control, the flow rate Qa of the fluid in the first flow path 41 and the first target flow rate Qa* (an example of the first target value) corresponding to the target value of the flow rate Qa of the fluid in the first flow path 41 are input to the target deriving unit 110. The target deriving unit 110 derives the flow rate command value Qw* so that the flow rate Qa of the fluid in the first flow path 41 approaches the first target flow rate Qa*.

[0184] In the second embodiment, the control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the second control so that the flow rate Qb of the fluid in the second flow path 42 approaches the second target value. Specifically, in the second control, the flow rate Qb of the fluid in the second flow path 42 and the second target flow rate Qb* (an example of the second target value) are input to the target derivation unit 110, and the second target flow rate Qb* is equivalent to the target value of the flow rate Qb of the fluid in the second flow path 42. The target derivation unit 110 derives the flow command value Qw* so that the flow rate Qb of the fluid in the second flow path 42 approaches the second target flow rate Qb*. It should be noted that in Fig.11 In the example of FIG. 4 , the flow rate Qb of the fluid in the second flow path 42 is equal to the flow rate Qw of the turbine 11 .

[0185] 〔First control (flow control)〕

[0186] Next, refer to Fig.12 The first control of the control unit 13 in the second embodiment will be described. Hereinafter, the case where flow rate control (control of the flow rate Qw of the water turbine 11) is performed in the first control will be described as an example.

[0187] <Step ST31>

[0188] The control unit 13 determines whether the flow rate Qa of the fluid in the first flow path 41 exceeds the first target flow rate Qa*. For example, the determination is made by the target derivation unit 110. If the flow rate Qa of the fluid in the first flow path 41 exceeds the first target flow rate Qa*, the process of step ST13 is performed, otherwise the process of step ST32 is performed.

[0189] <Step ST32>

[0190] The control unit 13 determines whether the flow rate Qa of the fluid in the first flow path 41 is lower than the first target flow rate Qa*. For example, the determination is made by the target derivation unit 110. If the flow rate Qa of the fluid in the first flow path 41 is lower than the first target flow rate Qa*, the process of step ST14 is performed, otherwise the process of step ST15 is performed.

[0191] <Step ST13>

[0192] When the flow rate Qa of the fluid in the first flow path 41 exceeds the first target flow rate Qa*, the control unit 13 increases the flow rate Qw of the turbine 11. Thus, the flow rate Qa of the fluid in the first flow path 41 decreases, and the flow rate Qa of the fluid in the first flow path 41 approaches the first target flow rate Qa*.

[0193] <Step ST14>

[0194] When the flow rate Qa of the fluid in the first flow path 41 is lower than the first target flow rate Qa*, the control unit 13 reduces the flow rate Qw of the turbine 11. Thus, the flow rate Qa of the fluid in the first flow path 41 increases, and the flow rate Qa of the fluid in the first flow path 41 approaches the first target flow rate Qa*.

[0195] <Step ST15>

[0196] When the flow rate Qa of the fluid in the first flow path 41 matches the first target flow rate Qa*, the control unit 13 maintains the flow rate Qw of the turbine 11. In this way, the flow rate Qa of the fluid in the first flow path 41 is maintained.

[0197] 〔Second control (flow control)〕

[0198] Next, refer to Fig.13 The second control of the control unit 13 in the second embodiment will be described. Next, a case where flow rate control (control of the flow rate Qw of the water turbine 11) is performed in the second control will be described as an example.

[0199] <Step ST41>

[0200] The control unit 13 determines whether the flow rate Qb of the fluid in the second flow path 42 exceeds the second target flow rate Qb*. For example, the determination is made by the target derivation unit 110. If the flow rate Qb of the fluid in the second flow path 42 exceeds the second target flow rate Qb*, the process of step ST23 is performed, otherwise the process of step ST42 is performed.

[0201] <Step ST42>

[0202] The control unit 13 determines whether the flow rate Qb of the fluid in the second flow path 42 is lower than the second target flow rate Qb*. For example, the determination is made by the target derivation unit 110. If the flow rate Qb of the fluid in the second flow path 42 is lower than the second target flow rate Qb*, the process of step ST24 is performed, otherwise the process of step ST25 is performed.

[0203] <Step ST23>

[0204] When the flow rate Qb of the fluid in the second flow path 42 exceeds the second target flow rate Qb*, the control unit 13 reduces the flow rate Qw of the turbine 11. Thus, the flow rate Qb of the fluid in the second flow path 42 is reduced, and the flow rate Qb of the fluid in the second flow path 42 approaches the second target flow rate Qb*.

[0205] <Step ST24>

[0206] When the flow rate Qb of the fluid in the second flow path 42 is lower than the second target flow rate Qb*, the control unit 13 increases the flow rate Qw of the turbine 11. Thus, the flow rate Qb of the fluid in the second flow path 42 increases, and the flow rate Qb of the fluid in the second flow path 42 approaches the second target flow rate Qb*.

[0207] <Step ST25>

[0208] When the flow rate Qb of the fluid in the second flow path 42 matches the second target flow rate Qb*, the control unit 13 maintains the flow rate Qw of the turbine 11. Thus, the flow rate Qb of the fluid in the second flow path 42 is maintained.

[0209] 〔Head control〕

[0210] Note that, similarly to the first embodiment, in the second embodiment, the control unit 13 may be configured to control the water head ΔPw of the water turbine 11 by controlling the torque of the generator 12 .

[0211] 〔First control (water head control)〕

[0212] When the hydraulic head control (control of the hydraulic head ΔPw of the hydraulic turbine 11) is performed in the first control of the control unit 13 of the second embodiment, Figure 6 Steps ST16, ST17, and ST18 shown in the figure are replaced by Fig.12 Steps ST13, ST14, and ST15 are shown.

[0213] 〔Second control (water head control)〕

[0214] When the hydraulic head control (control of the hydraulic head ΔPw of the hydraulic turbine 11) is performed in the second control of the control unit 13 of the second embodiment, Figure 7 Steps ST26, ST27, and ST28 are shown in the figure, and are replaced by Fig.13 Steps ST23, ST24, and ST25 are shown.

[0215] 〔Speed ​​control〕

[0216] It should be noted that, similar to the first embodiment, in the second embodiment, the control unit 13 can also be configured to control the flow rate Qw or the water head ΔPw of the turbine 11 by controlling the rotational speed of the generator 12, instead of controlling the flow rate Qw or the water head ΔPw of the turbine 11 by controlling the torque of the generator 12.

[0217] [Effects of the Second Embodiment]

[0218] As described above, the hydroelectric power generation system 10 of the second embodiment includes the turbine 11, the generator 12, and the control unit 13, wherein the turbine 11 is arranged in the flow path 40 through which the fluid flows, the generator 12 is driven by the turbine 11, and the control unit 13 performs the first control. The flow path 40 includes the first flow path 41 located on the inflow side of the turbine 11. The control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the first control so that the flow rate Qa of the fluid in the first flow path 41 approaches the first target value.

[0219] In the second embodiment, by performing the first control, the flow rate Qa of the fluid in the first flow path 41, which is the flow path on the inflow side of the turbine 11 (an example of the state of the first flow path 41), can be managed. In this way, since it is not necessary to provide a mechanism for adjusting the flow rate Qa of the fluid in the first flow path 41 in the first flow path 41, the installation cost can be reduced.

[0220] In addition, in the hydroelectric power generation system 10 of the second embodiment, the control unit 13 can switch and execute the first control and the second control. The flow path 40 includes the first flow path 41 and the second flow path 42 located on the outflow side of the turbine 11. The control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the second control so that the flow rate Qb of the fluid in the second flow path 42 approaches the second target value.

[0221] In the second embodiment, by performing the second control, the flow rate Qb of the fluid in the second flow path 42 which is the flow path on the outflow side of the water turbine 11 can be managed (an example of the state of the second flow path 42 ).

[0222] Furthermore, in the hydraulic power generation system 10 of the second embodiment, the first flow path 41 includes the turbine flow path 45 through which at least a part of the fluid flowing into the turbine 11 flows, and the branch flow path 46 branching from the turbine flow path 45 .

[0223] In the second embodiment, by performing the first control, the flow rate Qb of the fluid in the turbine flow path 45 or the branch flow path 46 (an example of the state of the turbine flow path 45 or the branch flow path 46) can be managed.

[0224] Furthermore, in the hydraulic power generation system 10 according to the second embodiment, the control unit 13 is capable of operating using the electric power generated by the generator 12 .

[0225] In the second embodiment, the control unit 13 is operated using the electric power generated by the generator 12 , so that the first control can be performed even when there is a power failure in the electric power system that supplies electric power to the control unit 13 .

[0226] It should be noted that, in the second embodiment, the flow path 40 may also have Figure 8 , Fig. 9 , Fig.10 Specifically, the branch flow path 46 may be composed of a plurality of flow paths, or the branch flow path 46 may be branched into a plurality of flow paths. Alternatively, the first flow path 41 may be composed of a single flow path.

[0227] (Third Embodiment)

[0228] Fig.14 The structure of the flow path 40 provided with the hydraulic power generation system 10 of the third embodiment is exemplified. In the hydraulic power generation system 10 of the third embodiment, the first control and the second control of the control unit 13 are different from those of the hydraulic power generation system 10 of the first embodiment. In addition, in the hydraulic power generation system 10 of the third embodiment, a first liquid level sensor 33a and a second liquid level sensor 33b are provided instead of the first pressure sensor 31a and the second pressure sensor 31b. The other structures of the hydraulic power generation system 10 of the third embodiment are the same as those of the hydraulic power generation system 10 of the first embodiment.

[0229] 〔First liquid level sensor〕

[0230] The first liquid level sensor 33a detects the liquid level Ha of the liquid in the first storage tank 50. The first liquid level sensor 33a transmits a detection signal indicating the detection result (the liquid level Ha of the liquid in the first storage tank 50) to the control unit 13.

[0231] 〔Second liquid level sensor〕

[0232] The second liquid level sensor 33b detects the liquid level Hb of the liquid in the second storage tank 51. The second liquid level sensor 33b transmits a detection signal indicating the detection result (the liquid level Hb of the liquid in the second storage tank 51) to the control unit 13.

[0233] 〔Control Department〕

[0234] In the third embodiment, the control unit 13 controls the flow rate Qw or the hydraulic head ΔPw of the turbine 11 in the first control so that the liquid level Ha of the fluid in the first storage tank 50 from which the fluid flows out to the first flow path 41 approaches the first target value. Specifically, in the first control, the liquid level Ha of the fluid in the first storage tank 50 and the first target liquid level (an example of the first target value) corresponding to the target value of the liquid level Ha of the fluid in the first storage tank 50 are input to the target deriving unit 110. The target deriving unit 110 derives the flow rate command value Qw* so that the liquid level Ha of the fluid in the first storage tank 50 approaches the first target liquid level.

[0235] In the third embodiment, the control unit 13 controls the flow rate Qw or the hydraulic head ΔPw of the turbine 11 in the second control so that the liquid level Hb of the fluid in the second storage tank 51 into which the fluid flows from the second flow path 42 approaches the second target value. Specifically, in the second control, the liquid level Hb of the fluid in the second storage tank 51 and the second target liquid level Hb* (an example of the second target value) corresponding to the target value of the liquid level Hb of the fluid in the second storage tank 51 are input to the target deriving unit 110. The target deriving unit 110 derives the flow rate command value Qw* so that the liquid level Hb of the fluid in the second storage tank 51 approaches the second target liquid level Hb*.

[0236] 〔First control (flow control)〕

[0237] Next, refer to Fig.15 The first control of the control unit 13 in the third embodiment will be described. Hereinafter, the case where the flow rate control (control of the flow rate Qw of the turbine 11) is performed in the first control will be described as an example. In addition, the case where the liquid level Ha of the fluid in the first storage tank 50 is controlled by controlling the total water head ΔPz will be described as an example. Specifically, the total water head ΔPz and the target total water head ΔPz* (an example of the first target value) corresponding to the target value of the total water head ΔPz are input to the target derivation unit 110. The target derivation unit 110 derives the flow rate instruction value Qw* so that the total water head ΔPz approaches the target total water head ΔPz*. It should be noted that the total water head ΔPz is equivalent to the sum of the water head ΔP1 between the first storage tank 50 and the turbine 11, the water head ΔPw of the turbine 11, and the water head ΔP2 between the turbine 11 and the second storage tank 51. Here, it is assumed that the liquid level Hb of the fluid in the second storage tank 51 is maintained at a constant value.

[0238] <Step ST51>

[0239] The control unit 13 determines whether the total water head ΔPz exceeds the target total water head ΔPz*. For example, the target derivation unit 110 performs this determination. If the total water head ΔPz exceeds the target total water head ΔPz*, the process of step ST13 is performed, otherwise the process of step ST52 is performed.

[0240] <Step ST52>

[0241] The control unit 13 determines whether the total water head ΔPz is lower than the target total water head ΔPz*. For example, the target derivation unit 110 makes this determination. If the total water head ΔPz is lower than the target total water head ΔPz*, the process of step ST14 is performed, otherwise the process of step ST15 is performed.

[0242] <Step ST13>

[0243] When the total water head ΔPz exceeds the target total water head ΔPz*, the control unit 13 increases the flow rate Qw of the turbine 11. As a result, the total water head ΔPz decreases, and the total water head ΔPz approaches the target total water head ΔPz*. In other words, the liquid level Ha of the fluid in the first storage tank 50 decreases, and the liquid level Ha of the fluid in the first storage tank 50 approaches the first target liquid level.

[0244] <Step ST14>

[0245] When the total water head ΔPz is lower than the target total water head ΔPz*, the control unit 13 reduces the flow rate Qw of the turbine 11. In this way, the total water head ΔPz increases, and the total water head ΔPz approaches the target total water head ΔPz*. In other words, the liquid level Ha of the fluid in the first storage tank 50 increases, and the liquid level Ha of the fluid in the first storage tank 50 approaches the first target liquid level.

[0246] <Step ST15>

[0247] When the total water head ΔPz coincides with the target total water head ΔPz*, the control unit 13 maintains the flow rate Qw of the turbine 11. In this way, the total water head ΔPz is maintained. In other words, the liquid level Ha of the fluid in the first storage tank 50 is maintained.

[0248] 〔Second control (flow control)〕

[0249] Next, refer to Fig.16 The second control of the control unit 13 in the third embodiment will be described. Next, a case where flow rate control (control of the flow rate Qw of the water turbine 11) is performed in the second control will be described as an example.

[0250] <Step ST61>

[0251] The control unit 13 determines whether the liquid level Hb of the fluid in the second storage tank 51 exceeds the second target liquid level Hb*. For example, the target derivation unit 110 performs this determination. If the liquid level Hb of the fluid in the second storage tank 51 exceeds the second target liquid level Hb*, the process of step ST23 is performed, and otherwise, the process of step ST62 is performed.

[0252] <Step ST62>

[0253] The control unit 13 determines whether the liquid level Hb of the fluid in the second storage tank 51 is lower than the second target liquid level Hb*. For example, the target derivation unit 110 performs this determination. If the liquid level Hb of the fluid in the second storage tank 51 is lower than the second target liquid level Hb*, the process of step ST24 is performed, and otherwise, the process of step ST25 is performed.

[0254] <Step ST23>

[0255] When the liquid level Hb of the fluid in the second storage tank 51 exceeds the second target liquid level Hb*, the control unit 13 reduces the flow rate Qw of the turbine 11. Thus, the liquid level Hb of the fluid in the second storage tank 51 decreases, and the liquid level Hb of the fluid in the second storage tank 51 approaches the second target liquid level Hb*.

[0256] <Step ST24>

[0257] When the liquid level Hb of the fluid in the second storage tank 51 is lower than the second target liquid level Hb*, the control unit 13 increases the flow rate Qw of the turbine 11. As a result, the liquid level Hb of the fluid in the second storage tank 51 increases, and the liquid level Hb of the fluid in the second storage tank 51 approaches the second target liquid level Hb*.

[0258] <Step ST25>

[0259] When the liquid level Hb of the fluid in the second storage tank 51 matches the second target liquid level Hb*, the control unit 13 maintains the flow rate Qw of the turbine 11. In this way, the liquid level Hb of the fluid in the second storage tank 51 is maintained.

[0260] 〔Head control〕

[0261] Note that, similarly to the first embodiment, in the third embodiment, the control unit 13 may be configured to control the water head ΔPw of the water turbine 11 by controlling the torque of the generator 12 .

[0262] 〔First control (water head control)〕

[0263] When the hydraulic head control (control of the hydraulic head ΔPw of the hydraulic turbine 11) is performed in the first control of the control unit 13 of the third embodiment, Figure 6 Steps ST16, ST17, and ST18 shown in the figure are replaced by Fig.15 Steps ST13, ST14, and ST15 are shown.

[0264] 〔Second control (water head control)〕

[0265] When the hydraulic head control (control of the hydraulic head ΔPw of the hydraulic turbine 11) is performed in the second control of the control unit 13 of the third embodiment, Figure 7 Steps ST26, ST27, and ST28 are shown in the figure, and are replaced by Fig.16 Steps ST23, ST24, and ST25 are shown.

[0266] 〔Speed ​​control〕

[0267] It should be noted that, similar to the first embodiment, in the third embodiment, the control unit 13 can also be configured to control the flow rate Qw or the water head ΔPw of the turbine 11 by controlling the rotational speed of the generator 12, instead of controlling the flow rate Qw or the water head ΔPw of the turbine 11 by controlling the torque of the generator 12.

[0268] [Effects of the Third Embodiment]

[0269] As described above, the hydroelectric power generation system 10 of the third embodiment includes the turbine 11, the generator 12, and the control unit 13, wherein the turbine 11 is arranged in the flow path 40 through which the fluid flows, the generator 12 is driven by the turbine 11, and the control unit 13 performs the first control. The flow path 40 includes the first flow path 41 located on the inflow side of the turbine 11. The control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the first control so that the liquid level Ha of the fluid in the first storage tank 50 from which the fluid flows out to the first flow path 41 approaches the first target value.

[0270] Furthermore, in the third embodiment, by performing the first control, it is possible to manage the liquid level Ha (an example of the state of the first flow path 41) of the fluid in the first storage tank 50 that causes the fluid to flow out to the first flow path 41 that is the flow path on the inflow side of the water turbine 11. For example, it is possible to manage the liquid level Ha of the fluid in the first storage tank 50 so that the first storage tank 50 is not emptied.

[0271] In addition, in the hydroelectric power generation system 10 of the third embodiment, the control unit 13 can switch between the first control and the second control. The flow path 40 includes the first flow path 41 and the second flow path 42 located on the outflow side of the water turbine 11. The control unit 13 controls the flow rate Qw or the water head ΔPw of the water turbine 11 in the second control so that the liquid level Hb of the fluid in the second storage tank 51 into which the fluid flows from the second flow path 42 approaches the second target value.

[0272] In the third embodiment, by performing the second control, it is possible to manage the liquid level Hb of the fluid in the second storage tank 51 (an example of the state of the second flow path 42), which is the flow path on the outflow side of the water turbine 11. For example, when the second storage tank 51 is about to be emptied, by switching from the first control to the second control, it is possible to manage the liquid level Hb of the fluid in the second storage tank 51 so that the second storage tank 51 is not emptied.

[0273] Furthermore, in the hydraulic power generation system 10 of the third embodiment, the first flow path 41 includes the turbine flow path 45 through which at least a part of the fluid flowing into the turbine 11 flows, and the branch flow path 46 branching off from the turbine flow path 45 .

[0274] In the third embodiment, by performing the first control, the liquid level Ha of the fluid in the first storage tank 50 that causes the fluid to flow out to the turbine flow path 45 (an example of the state of the turbine flow path 45 or the branch flow path 46 ) can be managed.

[0275] Furthermore, in the hydraulic power generation system 10 according to the third embodiment, the control unit 13 is capable of operating using the electric power generated by the generator 12 .

[0276] In the third embodiment, the control unit 13 is operated using the electric power generated by the generator 12 , so that the first control can be performed even when there is a power failure in the electric power system that supplies electric power to the control unit 13 .

[0277] It should be noted that, in the third embodiment, the flow path 40 may also have Figure 8 , Fig. 9 , Fig.10 Specifically, the branch flow path 46 may be composed of a plurality of flow paths, or the branch flow path 46 may be branched into a plurality of flow paths. Alternatively, the first flow path 41 may be composed of a single flow path.

[0278] (Summary of the first to third embodiments)

[0279] As described above, the hydroelectric power generation system of the first to third embodiments includes the turbine 11, the generator 12, and the control unit 13, wherein the turbine 11 is arranged in the flow path 40 through which the fluid flows, the generator 12 is driven by the turbine 11, and the control unit 13 performs the first control. The flow path 40 includes the first flow path 41 located on the inflow side of the turbine 11. The control unit 13 controls the flow rate Qw or the water head ΔPw of the turbine 11 in the first control so that any one of the pressure Pa of the fluid in the first flow path 41, the flow rate Qa of the fluid in the first flow path 41, and the liquid level Ha of the fluid in the first storage tank 50 from which the fluid flows out to the first flow path 41 approaches the first target value.

[0280] In the first to third embodiments, by performing the first control, the state of the first flow path 41 which is the flow path on the inflow side of the water turbine 11 can be managed.

[0281] In the hydroelectric power generation system 10 of the first to third embodiments, the control unit 13 can switch between the first control and the second control. The flow path 40 includes the first flow path 41 and the second flow path 42 located on the outflow side of the water turbine 11. The control unit 13 controls the flow rate Qw or the water head ΔPw of the water turbine 11 in the second control so that any one of the pressure Pb of the fluid in the second flow path 42, the flow rate Qb of the fluid in the second flow path 42, and the liquid level Hb of the fluid in the second storage tank 51 into which the fluid flows from the second flow path 42 approaches the second target value.

[0282] In the first to third embodiments, the state of the second flow path 42 which is the flow path on the outflow side of the water turbine 11 can be managed by performing the second control.

[0283] Furthermore, in the hydroelectric power generation system 10 of the first to third embodiments, the first flow path 41 includes the turbine flow path 45 through which at least a portion of the fluid flowing into the turbine 11 flows, and the branch flow path 46 branching off from the turbine flow path 45 .

[0284] In the first to third embodiments, the state of the turbine flow path 45 or the branch flow path 46 can be managed by performing the first control.

[0285] In the hydraulic power generation system 10 according to the first to third embodiments, the control unit 13 controls the flow rate Qw or the water head ΔPw of the water turbine 11 by controlling the torque or the rotation speed of the generator 12 .

[0286] Furthermore, in the hydraulic power generation system 10 of the first to third embodiments, the regulating mechanism 60 for regulating the flow rate or pressure of the fluid is provided in the branch flow path 46 .

[0287] When setting the first target value and the second target value, a predetermined value may be set, a target range may be set, or an upper limit or a lower limit may be set.

[0288] (Fourth Embodiment)

[0289] The operation of the control unit 13 of the hydraulic power generation system 10 of the fourth embodiment is different from that of the hydraulic power generation system 10 of the first to third embodiments. In the fourth embodiment, the control unit 13 performs the first control so that the cumulative flow rate of the fluid in the branch flow path 46 approaches the target cumulative flow rate. It should be noted that the other structures of the hydraulic power generation system 10 of the fourth embodiment are the same as those of the hydraulic power generation system 10 of the first to third embodiments.

[0290] [Cumulative flow control]

[0291] Next, refer to Fig.17 The integrated flow rate control by the control unit 13 in the fourth embodiment will be described. In this example, the purpose is to ensure the target integrated flow rate in each control period P0.

[0292] exist Fig.17, the first branch flow Q1, the second branch flow Q2, and the third branch flow Q3 are the flow rates of the fluid in the branch flow path 46. The second branch flow Q2 is greater than the first branch flow Q1. The third branch flow Q3 is greater than the second branch flow Q2. The first turbine flow Qw1, the second turbine flow Qw2, and the third turbine flow Qw3 are the flow rates Qw of the turbine 11. The second turbine flow Qw2 is greater than the first turbine flow Qw1. The third turbine flow Qw3 is greater than the second turbine flow Qw2.

[0293] exist Fig.17 In the example, the first turbine flow Qw1 is equal to the first branch flow Q1, the second turbine flow Qw2 is equal to the second branch flow Q2, and the third turbine flow Qw3 is equal to the third branch flow Q3. The difference between the first branch flow Q1 and the third branch flow Q3 is the first flow difference ΔQ1. The difference between the second branch flow Q2 and the third branch flow Q3 is the second flow difference ΔQ2. In addition, the difference between the first turbine flow Qw1 and the second turbine flow Qw2 is also the second flow difference ΔQ2. The control period P0 includes the adjustment period P1. The adjustment period P1 is a period including the end point of the control period P0. In addition, the target cumulative flow is set to Q3×(P0-P1)+Q1×P1.

[0294] like Fig.17 As shown, in the first control period P0, during the period from time t0 to time t1, the control unit 13 performs the first control so that the flow rate of the fluid in the branch flow path 46 becomes the third branch flow rate Q3. During the period from time t0 to time t1, the flow rate Qw of the turbine 11 becomes the first turbine flow rate Qw1. Next, during the period from time t1 to time t2 (adjustment period P1), the control unit 13 performs the first control so that the flow rate of the fluid in the branch flow path 46 becomes the first branch flow rate Q1. During the period from time t1 to time t2, the flow rate Qw of the turbine 11 becomes the third turbine flow rate Qw3. By such control, the target cumulative flow rate is ensured in the first control period P0.

[0295] Next, in the second control period P0, the first control is interrupted and the second control is performed during the period from time t11 to time t12. The control unit 13 performs the second control during the period from time t11 to time t12 so that the flow rate Qw of the turbine 11 becomes the second turbine flow rate Qw2. Thus, during the period from time t11 to time t12, the flow rate of the fluid in the branch flow path 46 becomes the second branch flow rate Q2 which is less than the third branch flow rate Q3. Next, during the period from time t12 to time t13, the control unit 13 performs the first control so that the flow rate of the fluid in the branch flow path 46 becomes the third branch flow rate Q3. Thus, the cumulative flow rate of the fluid in the branch flow path 46 at time t13 becomes a cumulative flow rate which is less than the target cumulative flow rate "Q3×(P0-P1)+Q1×P1" by "ΔQ2×Δt1". It should be noted that the time Δt1 is the time from time t11 to time t12.

[0296] At time t13 within the second control period P0, the control unit 13 calculates the time Δt2 so that the following formula 1 holds true. The time Δt2 is the time from the starting point of the adjustment period P1 of the control period P0 to the time point when the flow rate of the fluid in the branch flow path 46 is changed from the third branch flow rate Q3 to the first branch flow rate Q1.

[0297] ΔQ2×Δt1=ΔQ1×Δt2……Formula 1

[0298] Then, the control unit 13 performs the first control during the period from time t13 to the elapsed time Δt2 (the period from time t13 to time t14) so ​​as to maintain the flow rate of the fluid in the branch flow path 46 at the third branch flow rate Q3. In other words, the control unit 13 performs the first control during the adjustment period P1 of the control period P0 so as to maintain the flow rate of the fluid in the branch flow path 46 at the third branch flow rate Q3 for a time corresponding to the shortfall of the target cumulative flow rate. By such control, the target cumulative flow rate is ensured during the second control period P0.

[0299] For example, when the flow rate of the fluid in the branch flow path 46 is increased in the morning, noon, and evening, and the flow rate Qw of the turbine 11 is increased at midnight, the fluid is supplied to the branch flow path 46 so that the accumulated flow rate of the fluid in the branch flow path 46 for one day becomes a constant value. In the control as described above, if the liquid level of the fluid in the second storage tank 51 located on the outflow side of the turbine 11 suddenly drops during the day, it is necessary to temporarily increase the flow rate Qw of the turbine 11 even during the day. If the flow rate Qw of the turbine 11 is temporarily increased during the day, the accumulated flow rate of the fluid in the branch flow path 46 for one day may be insufficient. Therefore, by performing the accumulated flow rate control as described above, even when the flow rate Qw of the turbine 11 is temporarily increased during the day, the accumulated flow rate of the fluid in the branch flow path 46 for one day can be ensured.

[0300] [Effects of the Fourth Embodiment]

[0301] As described above, in the hydraulic power generation system 10 according to the fourth embodiment, the control unit 13 performs the first control so that the integrated flow rate of the fluid in the branch flow path 46 approaches the target integrated flow rate.

[0302] In the fourth embodiment, the integrated flow rate of the fluid in the branch flow path 46 can be managed.

[0303] (Modification of the adjustment mechanism)

[0304] like Fig.18 As shown, as the regulating mechanism 60, an electric valve 62 may be provided, or a pressure reducing valve may be provided.

[0305] When an electric valve 62 is set as the regulating mechanism 60, the controllability of the electric valve 62 can be improved by performing a first control (specifically, controlling the flow rate Qw or the water head ΔPw of the turbine 11 so that the pressure of the fluid near the inlet of the electric valve 62 approaches a first target value).

[0306] Furthermore, when cavitation is about to occur in the electric valve 62, the fluid pressure near the inlet of the electric valve 62 is reduced by the first control, thereby preventing cavitation from occurring in the electric valve 62. In this way, a low-cost (low-performance) electric valve can be used as the electric valve 62. Furthermore, the service life of the electric valve 62 can be extended.

[0307] It should be noted that cavitation refers to a phenomenon (cavitation phenomenon) in which a large number of bubbles are generated due to the pressure of the fluid dropping to near the saturated vapor pressure caused by the acceleration of the fluid inside the turbine 11. A large number of bubbles are generated along with the generation of cavitation, and when these bubbles collapse, extremely high pressures of tens of thousands of atmospheres are generated locally. As a result, the performance of the turbine 11 is reduced, the surface of the turbine 11 is eroded, and vibrations or noises are generated.

[0308] (Modification of the control unit)

[0309] Next, refer to Fig.19 and Fig. 20 A modification of the control unit 13 will be described. The control unit 13 may be configured to estimate the pressure Pa of the fluid in the first flow path 41 , the flow rate Qa of the fluid in the first flow path 41 , and the liquid level Ha of the fluid in the first storage tank 50 .

[0310] exist Fig.19 In the example of , the first flow path 41 is composed of the turbine flow path 45, the first branch flow path 46a, and the second branch flow path 46b. Hereinafter, the branch storage tank 52 connected to the outlet of the first branch flow path 46a is described as "first branch storage tank 52a", and the branch storage tank 52 connected to the outlet of the second branch flow path 46b is described as "second branch storage tank 52b".

[0311] exist Fig.19 In the example of , the first connection point 71 is the connection point between the turbine flow path 45 and the first branch flow path 46a. The second connection point 72 is the connection point between the turbine flow path 45 and the second branch flow path 46b. The first location X1 is a location between the first storage tank 50 and the first connection point 71 on the turbine flow path 45. The second location X2 is a location located in the middle of the first branch flow path 46a. The third location X3 is a location located in the middle of the second branch flow path 46b.

[0312] Pressure P50 is the pressure of the fluid in the first storage tank 50. Pressure PX1 is the pressure of the fluid at the first location X1. Pressure P71 is the pressure of the fluid at the first connection point 71. Pressure P72 is the pressure of the fluid at the second connection point 72. Pressure P51 is the pressure of the fluid in the second storage tank 51.

[0313] The pressure difference ΔP70 is the pressure difference of the fluid between the first storage tank 50 and the first point X1 on the turbine flow path 45. The pressure difference ΔP71 is the pressure difference of the fluid between the first point X1 and the first connection point 71 on the turbine flow path 45. The pressure difference ΔP72 is the pressure difference of the fluid between the first connection point 71 and the second connection point 72 on the turbine flow path 45. The pressure difference ΔP73 is the pressure difference of the fluid between the second connection point 72 on the turbine flow path 45 and the turbine 11. The pressure difference ΔP74 is the pressure difference of the fluid between the turbine 11 and the second storage tank 51 on the turbine flow path 45.

[0314] The pressure PX2 is the pressure of the fluid at the second location X2. The pressure P52a is the pressure of the fluid in the first branch storage tank 52a. The pressure difference ΔP75 is the pressure difference of the fluid between the first connection point 71 on the first branch flow path 46a and the second location X2. The pressure difference ΔP76 is the pressure difference of the fluid between the second location X2 on the first branch flow path 46a and the first branch storage tank 52a. The liquid level Hd is the liquid level of the fluid in the first branch storage tank 52a.

[0315] The pressure PX3 is the pressure of the fluid at the third location X3. The pressure P52b is the pressure of the fluid in the second branch storage tank 52b. The pressure difference ΔP77 is the pressure difference of the fluid between the second connection point 72 on the second branch flow path 46b and the third location X3. The pressure difference ΔP78 is the pressure difference of the fluid between the third location X3 on the second branch flow path 46b and the second branch storage tank 52b. The liquid level Hc is the liquid level of the fluid in the first branch storage tank 52b.

[0316] The flow rate QX1 is the flow rate of the fluid between the first storage tank 50 and the first connection point 71 on the turbine flow path 45, and is the flow rate of the fluid flowing through the first location X1. The flow rate Q70 is the flow rate of the fluid between the first connection point 71 and the second connection point 72 on the turbine flow path 45. The flow rate QX2 is the flow rate of the fluid in the first branch flow path 46a, and is the flow rate of the fluid flowing through the second location X2. The flow rate QX3 is the flow rate of the fluid in the second branch flow path 46b, and is the flow rate of the fluid flowing through the third location X3. The flow rate Q70 is equivalent to the sum of the flow rate Qw of the turbine 11 and the flow rate QX3 of the fluid in the second branch flow path 46b. The flow rate QX1 is equivalent to the sum of the flow rate Q70 and the flow rate QX2 of the fluid in the first branch flow path 46a.

[0317] It should be noted that the characteristic diagram of the water turbine 11 (see Figure 3 ), the flow rate Qw and the water head ΔPw of the turbine 11 can be estimated based on the torque or rotation speed of the generator 12.

[0318] In addition, the Darcy-Weisbach equation and the Hazen-Williams equation can be used to estimate the pressure difference (water head) of the fluid between two locations based on the flow rate of the fluid flowing in the flow path between the two locations and the flow path conditions between the two locations (length of the flow path, cross-sectional area, etc.). Fig.19 In the example of , the pressure difference Δ71 can be estimated based on the flow rate QX1 and the flow path condition between the first location X1 and the first connection point 71 .

[0319] In addition, the Darcy-Weisbach equation, the Hazen-Williams equation, and the Bernoulli theorem allow the flow rate of the fluid flowing in the flow path between two locations to be estimated based on the pressure difference (water head) of the fluid between the two locations and the flow path conditions (length of the flow path, cross-sectional area, etc.) between the two locations. For example, Fig.19 In the example of , the flow rate QX1 can be estimated based on the pressure difference Δ71 and the flow path condition between the first location X1 and the first connection point 71 .

[0320] In addition, Fig.19 In the example of , when the second storage tank 51 is open to the atmosphere, the pressure P51 of the fluid in the second storage tank 51 is zero. In addition, the pressure difference ΔP74 between the turbine 11 and the second storage tank 51 can be estimated based on the liquid level Hb of the fluid in the second storage tank 51, the flow path conditions between the turbine 11 and the second storage tank 51, and the flow rate Qw of the turbine 11. It should be noted that when the liquid level Hb does not change, the pressure difference ΔP74 can be estimated based on the flow path conditions between the turbine 11 and the second storage tank 51 and the flow rate Qw of the turbine 11. In this way, when the liquid level Hb does not change, the liquid level sensor for measuring the liquid level Hb can be omitted. It should be noted that the first branch storage tank 52a and the second branch storage tank 52b can also be said to be the same as the second storage tank 51. In addition, the pressure P50 of the fluid in the first storage tank 50 can be estimated based on the liquid level Ha of the fluid in the first storage tank 50.

[0321] It should be noted that, when the pressure sensor for measuring the pressure of the fluid is disposed in the turbine flow path 45 or the second flow path 42 of the first flow path 41, from the viewpoint of reducing the installation cost, the pressure sensor is preferably disposed near the inlet or near the outlet of the turbine 11. In addition, from the viewpoint of reducing the installation cost, the pressure sensor is preferably disposed in the second flow path 42 rather than in the first flow path 41.

[0322] (Variation 1 of Control Unit: Estimation of Fluid Pressure)

[0323] The control unit 13 can also be configured to estimate the pressure Pa of the fluid in the first flow path 41 based on the pressure of the fluid at any location included in the flow path 40, the flow path conditions between the any location and the estimated object location, and the flow rate of the fluid in the flow path between the any location and the estimated object location. The above-mentioned estimated object location is a location different from the any location where the pressure Pa of the fluid in the first flow path 41 should be estimated.

[0324] For example, assuming that the pressure Pa of the fluid in the first flow path 41 is to be estimated as "the pressure PX1 at the first location X1", when the pressure Pw1 near the inlet of the turbine 11, the flow rate Qw of the turbine 11, the flow rate Q70 between the first connection point 71 and the second connection point 72, and the flow rate QX1 between the first storage tank 50 and the first connection point 71 are measured (or estimated), the pressure PX1 at the first location X1 can be estimated by the following formula 2.

[0325] PX1=Pw1+ΔP73+ΔP72+ΔP71…Equation 2

[0326] It should be noted that the pressure difference ΔP73 is estimated based on the flow rate Qw of the turbine 11 and the flow path condition between the second connection point 72 and the turbine 11. The pressure difference ΔP72 is estimated based on the flow rate Q70 and the flow path condition between the first connection point 71 and the second connection point 72. The pressure difference ΔP71 is estimated based on the flow rate QX1 and the flow path condition between the first point X1 and the first connection point 71. In the above example, the estimation target point where the pressure Pa of the fluid in the first flow path 41 is to be estimated is the "first point X1", and the arbitrary point included in the flow path 40 is the "point near the inlet of the turbine 11".

[0327] Furthermore, assuming that the pressure to be estimated as the pressure Pa of the fluid in the first flow path 41 is “the pressure PX1 at the first point X1”, when the second storage tank 51 is opened to the atmosphere and the liquid level Hb of the second storage tank 51, the flow rate Qw and the water head ΔPw of the turbine 11, the flow rate Q70 between the first connection point 71 and the second connection point 72, and the flow rate QX1 between the first storage tank 50 and the first connection point 71 are measured (or estimated), the pressure PX1 at the first point X1 can be estimated by the following formula 3.

[0328] PX1=P51+ΔP74+ΔPw+ΔP73+ΔP72+ΔP71…Equation 3

[0329] It should be noted that the pressure P51 of the second storage tank 51 is zero. The pressure difference ΔP74 is estimated based on the liquid level Hb of the second storage tank 51, the flow rate Qw of the turbine 11, and the flow path conditions between the turbine 11 and the second storage tank 51. The pressure difference ΔP73 is estimated based on the flow rate Qw of the turbine 11 and the flow path conditions between the second connection point 72 and the turbine 11. The pressure difference ΔP72 is estimated based on the flow rate Q70 and the flow path conditions between the first connection point 71 and the second connection point 72. The pressure difference ΔP71 is estimated based on the flow rate QX1 and the flow path conditions between the first point X1 and the first connection point 71. In the above example, the estimation target point where the pressure Pa of the fluid in the first flow path 41 is to be estimated is the "first point X1", and the arbitrary point included in the flow path 40 is the "point of the second storage tank 51".

[0330] In addition, assuming that the pressure Pa of the fluid in the first flow path 41 should be estimated as "the pressure PX3 at the third location X3", when the pressure Pw2 near the outlet of the turbine 11, the flow rate Qw and the head ΔPw of the turbine 11, and the flow rate QX3 of the second branch flow path 46b are measured (or estimated), the pressure PX3 at the third location X3 can be estimated by the following formula 4.

[0331] PX3=Pw2+ΔPw+ΔP73-ΔP77...Equation 4

[0332] It should be noted that the pressure difference ΔP73 is estimated based on the flow rate Qw of the turbine 11 and the flow path condition between the second connection point 72 and the turbine 11. The pressure difference ΔP77 is estimated based on the flow rate QX3 and the flow path condition between the second connection point 72 and the third point X3. In the above example, the estimation target point where the pressure Pa of the fluid in the first flow path 41 is to be estimated is the "third point X3", and the arbitrary point included in the flow path 40 is the "point near the outlet of the turbine 11".

[0333] It should be noted that in Figure 1 The structure of the flow path 40 shown in FIG. Fig.10 Also in the structure of the flow path 40 shown in the figure, the pressure Pa of the fluid in the first flow path 41 can be estimated by the same steps as described above.

[0334] [Effects of Modification 1 of Control Unit]

[0335] As described above, in this variant example 1, the control unit 13 estimates the pressure Pa of the fluid in the first flow path 41 based on the pressure of the fluid at any location included in the flow path 40, the flow path conditions between the any location and the estimated object location, and the flow rate of the fluid in the flow path between the any location and the estimated object location. The above-mentioned estimated object location is a location different from the any location where the pressure Pa of the fluid in the first flow path 41 should be estimated.

[0336] In this modification 1, since it is not necessary to provide a pressure sensor for detecting the fluid pressure Pa in the first flow path 41, the installation cost can be reduced.

[0337] (Variation 2 of the Control Unit: Estimation of Fluid Flow Rate)

[0338] Furthermore, the control unit 13 may be configured to estimate the flow rate Qa of the fluid in the first flow path 41 based on the flow rate of the fluid at an arbitrary point different from the estimation target point, the estimation target point being a point where the flow rate Qa of the fluid in the first flow path 41 should be estimated. Alternatively, the control unit 13 may be configured to estimate the flow rate Qa of the fluid in the first flow path 41 based on the pressure of the fluid at the estimation target point where the flow rate Qa of the fluid in the first flow path 41 should be estimated, the pressure of the fluid at an arbitrary point different from the estimation target point, and the flow path conditions between the estimation target point and the arbitrary point.

[0339] For example, assuming that the flow rate Qa of the fluid in the first flow path 41 should be estimated as "the flow rate QX2 at the second location X2", when the flow rate QX1 between the first storage tank 50 and the first connection point 71, the flow rate Qw of the turbine 11, and the flow rate QX3 of the second branch flow path 46b are measured (or estimated), the flow rate QX2 at the second location X2 can be estimated by the following formula 5.

[0340] QX2=QX1-(Qw+QX3)……Formula 5

[0341] In the above example, the estimation target location at which the flow rate Qa of the fluid in the first flow path 41 is to be estimated is the "third location X3", and any location different from the estimation target location is "any location between the first storage tank 50 and the first connection point 71", "the location where the turbine 11 is arranged", and "any location on the second branch flow path 46b".

[0342] In addition, assuming that the flow rate Qa of the fluid in the first flow path 41 should be estimated to be "the flow rate QX3 at the third location X3", when the pressure Pw1 near the inlet of the turbine 11, the flow rate Qw of the turbine 11, and the pressure PX3 at the third location X3 are measured (or estimated), the pressure difference ΔP77 between the second connection point 72 and the third location X3 is estimated by the following formula 6.

[0343] ΔP77=(Pw1+ΔP73)-PX3...Equation 6

[0344] It should be noted that the pressure difference ΔP73 is estimated based on the flow rate Qw of the turbine 11 and the flow path condition between the second connection point 72 and the turbine 11. "Pw1+ΔP73" is equivalent to the pressure P72 at the second connection point 72. In addition, the flow rate QX3 at the third location X3 can be estimated based on the pressure difference ΔP77 between the second connection point 72 and the third location X3 and the flow path condition between the second connection point 72 and the third location X3. In the above example, the estimation target location for which the flow rate Qa of the fluid in the first flow path 41 should be estimated is the "third location X3", and any location different from the estimation target location is the "second connection point 72".

[0345] In addition, Figure 1 The structure of the flow path 40 shown in FIG. Fig.10 Also in the structure of the flow path 40 shown, the flow rate Qa of the fluid in the first flow path 41 can be estimated by the same steps as described above.

[0346] [Effects of Modification Example 2 of Control Unit]

[0347] As described above, in this modification 2, the control unit 13 estimates the flow rate Qa of the fluid in the first flow path 41 based on the flow rate of the fluid at an arbitrary point, which is a point different from the estimation target point at which the flow rate Qa of the fluid in the first flow path 41 is to be estimated. Alternatively, the control unit 13 estimates the flow rate Qa of the fluid in the first flow path 41 based on the pressure of the fluid at the estimation target point at which the flow rate Qa of the fluid in the first flow path 41 is to be estimated, the pressure of the fluid at an arbitrary point different from the estimation target point, and the flow path conditions between the estimation target point and the arbitrary point.

[0348] In this modification 2, since it is not necessary to provide a flow rate sensor for detecting the flow rate Qa of the fluid in the first flow path 41, the installation cost can be reduced.

[0349] (Variation 3 of the Control Unit: Estimation of the Liquid Level of the Fluid in the First Storage Tank)

[0350] Furthermore, the control unit 13 may be configured to estimate the liquid level Ha of the fluid in the first storage tank 50 based on the pressure corresponding to the different flow rates of the fluid at an arbitrary point in the flow path 40 between the first storage tank 50 and the turbine 11 .

[0351] like Fig. 20As shown, the loss curve Lz can be estimated based on the change in pressure PX corresponding to the change in flow rate QX1 of the fluid at the first location X1. Specifically, the loss curve Lz can be drawn based on the first pressure PX1a, which is the pressure PX1 of the fluid when the flow rate QX1 of the fluid at the first location X1 is the first flow rate QX1a, and the second pressure PX1b, which is the pressure PX1 of the fluid when the flow rate QX1 of the fluid at the first location X1 is the second flow rate QX1b. Here, the first flow rate QX1a and the second flow rate QX1b may be, for example, flow rates obtained by changing the liquid level Ha of the fluid in the first storage tank 50, or may be flow rates obtained by arbitrarily changing the flow rates. In addition, the pressure when the flow rate QX1 is zero in the loss curve Lz corresponds to the total water head ΔPz. Here, if the total water head not affected by the liquid level Ha of the fluid in the first storage tank 50 and the liquid level Hb of the fluid in the second storage tank 51 is defined as a “reference total water head ΔPz0”, the liquid level Ha of the fluid in the first storage tank 50 is expressed by the following equation 7.

[0352] Ha=ΔPz-ΔPz0+Hb……Formula 7

[0353] It should be noted that the reference total water head ΔPz0 can be estimated based on the flow path conditions between the first storage tank 50 and the second storage tank 51 .

[0354] Specifically, the loss curve Lz can be estimated based on the change in the flow rate QX1 at the first point X1 and the change in the pressure PX1 at the first point X1, and the total water head ΔPz can be estimated based on the loss curve Lz. Furthermore, the liquid level Ha of the first storage tank 50 can be estimated based on the total water head ΔPz, the reference total water head ΔPz0, and the liquid level Hb of the second storage tank 51. In the above example, an arbitrary point between the first storage tank 50 and the turbine 11 in the flow path 40 is the "first point X1".

[0355] It should be noted that the pressure PX1 of the fluid at the first point X1 can also be estimated by the same procedure as in Modification 1 of the control unit. The flow rate QX1 of the fluid at the first point X1 can also be estimated by the same procedure as in Modification 2 of the control unit.

[0356] In addition, Figure 1 The structure of the flow path 40 shown in FIG. Fig.10 Also in the structure of the flow path 40 shown, the liquid level Ha of the fluid in the first storage tank 50 can be estimated by the same steps as described above.

[0357] [Effects of Modification 3 of Control Unit]

[0358] As described above, in this modification 3, the control unit 13 estimates the liquid level Ha of the fluid in the first storage tank 50 based on the pressure corresponding to the different flow rates of the fluid at an arbitrary point between the first storage tank 50 and the turbine 11 in the flow path 40 .

[0359] In this modification 3, since it is not necessary to provide a liquid level sensor for detecting the liquid level Ha of the fluid in the first storage tank 50, the installation cost can be reduced.

[0360] (Other embodiments)

[0361] It should be noted that the hydraulic turbine 11 has better responsiveness than the electric valve. Therefore, when the pressure Pa of the fluid in the first flow path 41 (or the flow rate Qa of the fluid in the first flow path 41, or the liquid level Ha of the fluid in the first storage tank 50 that causes the fluid to flow out to the first flow path 41) changes suddenly, the hydraulic turbine 11 can respond quickly to the sudden change, so that compared with the case of using the electric valve for control, the sudden change of the pressure Pa of the fluid in the first flow path 41 (or the flow rate Qa of the fluid in the first flow path 41, or the liquid level Ha of the fluid in the first storage tank 50 that causes the fluid to flow out to the first flow path 41) can be suppressed.

[0362] In addition, even if the water turbine 11 is replaced with a structure in which a water turbine and an electric valve are connected in series or in parallel, the same control can be performed.

[0363] The embodiments and variations are described, but it should be understood that various changes can be made to the embodiments or technical solutions without departing from the spirit and scope of the claims. As long as the functions of the objects of the present disclosure are not destroyed, the above embodiments and variations can also be appropriately combined or replaced.

[0364] - Industrial Applicability -

[0365] In summary, the present disclosure is useful as a hydroelectric power generation system.

[0366] - Explanation of symbols -

[0367] 10 Hydroelectric power generation system

[0368] 11. Turbine

[0369] 12 Generator

[0370] 13. Control Unit

[0371] 21 Primary pressure sensor

[0372] 22 Secondary pressure sensor

[0373] 31a First pressure sensor

[0374] 31b Second pressure sensor

[0375] 32 First flow sensor

[0376] 33a First level sensor

[0377] 33b Second level sensor

[0378] 40 flow path

[0379] 41 First flow path

[0380] 42 Second flow path

[0381] 45 Turbine flow path

[0382] 46 Branch Flow

[0383] 50 First storage tank

[0384] 51 Second storage tank

[0385] 60 Adjustment mechanism

Claims

1. A hydroelectric power generation system, characterized in that: It includes a turbine (11), a generator (12) and a control unit (13), The water turbine (11) is arranged in a flow path (40) for fluid flow. The generator (12) is driven by the turbine (11), The control unit (13) performs a first control, The flow path (40) includes a first flow path (41) located on the inflow side of the water turbine (11), The first flow path (41) includes a turbine flow path (45) and a branch flow path (46), wherein at least a portion of the fluid flowing into the turbine (11) flows in the turbine flow path (45), and the branch flow path (46) branches off from the turbine flow path (45). The outlet of the branch flow path (46) is not connected to the downstream side of the turbine (11), but is connected to the branch storage tank (52). The control unit (13) controls the flow rate (Qw) or the water head (ΔPw) of the water turbine (11) in the first control so that any one of the pressure (Pa) of the fluid in the first flow path (41), the flow rate (Qa) of the fluid in the first flow path (41), and the liquid level (Ha) of the fluid in the first storage tank (50) for causing the fluid to flow out of the first flow path (41) approaches a first target value.

2. The hydroelectric power generation system according to claim 1, characterized in that: The control unit (13) controls the flow rate (Qw) or water head (ΔPw) of the water turbine (11) by controlling the torque or rotation speed of the generator (12).

3. The hydroelectric power generation system according to claim 1 or 2, characterized in that: The control unit (13) is capable of executing the first control and the second control, The flow path (40) includes the first flow path (41) and a second flow path (42) located on the outflow side of the water turbine (11), The control unit (13) controls the flow rate (Qw) or the water head (ΔPw) of the turbine (11) in the second control so that any one of the pressure (Pb) of the fluid in the second flow path (42), the flow rate (Qb) of the fluid in the second flow path (42), and the liquid level (Hb) of the fluid in the second storage tank (51) into which the fluid flows from the second flow path (42) approaches a second target value.

4. The hydroelectric power generation system according to claim 1 or 2, characterized in that: The control unit (13) performs the first control so that the integrated flow rate of the fluid in the branch flow path (46) approaches a target integrated flow rate.

5. The hydroelectric power generation system according to claim 1 or 2, characterized in that: The branch flow path (46) is provided with a regulating mechanism (60) for regulating the flow rate or pressure of the fluid.

6. The hydroelectric power generation system according to claim 5, characterized in that: The control unit (13) controls the flow rate (Qw) or the water head (ΔPw) of the water turbine (11) in the first control so that the pressure of the fluid near the inlet of the regulating mechanism (60) approaches the first target value.

7. The hydroelectric power generation system according to claim 1 or 2, characterized in that: The control unit (13) estimates the pressure (Pa) of the fluid in the first flow path (41) based on the pressure of the fluid at any location included in the flow path (40), the flow path conditions between the arbitrary location and the estimated object location, and the flow rate of the fluid in the flow path between the arbitrary location and the estimated object location. The estimated object location is a location different from the arbitrary location where the pressure (Pa) of the fluid in the first flow path (41) should be estimated.

8. The hydroelectric power generation system according to claim 1 or 2, characterized in that: The control unit (13) estimates a liquid level (Ha) of the fluid in the first storage tank (50) based on pressures corresponding to different flow rates of the fluid at an arbitrary point between the first storage tank (50) and the turbine (11) in the flow path (40).

9. The hydroelectric power generation system according to claim 1 or 2, characterized in that: The control unit (13) estimates the flow rate (Qa) of the fluid in the first flow path (41) based on the flow rate of the fluid at an arbitrary point different from an estimation target point, wherein the estimation target point is a point where the flow rate (Qa) of the fluid in the first flow path (41) is to be estimated.

10. The hydroelectric power generation system according to claim 1 or 2, characterized in that: The control unit (13) estimates the flow rate (Qa) of the fluid in the first flow path (41) based on the pressure of the fluid at an estimated object point where the flow rate (Qa) of the fluid in the first flow path (41) is to be estimated, the pressure of the fluid at an arbitrary point different from the estimated object point, and the flow path conditions between the estimated object point and the arbitrary point.

11. The hydroelectric power generation system according to claim 1 or 2, characterized in that: The control unit (13) can operate using the electric power generated by the generator (12).

12. A hydroelectric power generation system, characterized in that: It includes a turbine (11), a generator (12) and a control unit (13), The water turbine (11) is arranged in a flow path (40) for fluid flow. The generator (12) is driven by the turbine (11), The control unit (13) performs a first control, The flow path (40) includes a first flow path (41) located on the inflow side of the water turbine (11), The control unit (13) controls the flow rate (Qw) or the water head (ΔPw) of the water turbine (11) in the first control so that any one of the pressure (Pa) of the fluid in the first flow path (41), the flow rate (Qa) of the fluid in the first flow path (41), and the liquid level (Ha) of the fluid in the first storage tank (50) for causing the fluid to flow out of the first flow path (41) approaches a first target value, The first flow path (41) includes a turbine flow path (45) and a branch flow path (46), wherein at least a portion of the fluid flowing into the turbine (11) flows in the turbine flow path (45), and the branch flow path (46) branches off from the turbine flow path (45). The control unit (13) performs the first control so that the integrated flow rate of the fluid in the branch flow path (46) approaches a target integrated flow rate.

13. A hydroelectric power generation system, characterized in that: It includes a turbine (11), a generator (12) and a control unit (13), The water turbine (11) is arranged in a flow path (40) for fluid flow. The generator (12) is driven by the turbine (11), The control unit (13) performs a first control, The flow path (40) includes a first flow path (41) located on the inflow side of the water turbine (11), The control unit (13) controls the flow rate (Qw) or the water head (ΔPw) of the water turbine (11) in the first control so that any one of the pressure (Pa) of the fluid in the first flow path (41), the flow rate (Qa) of the fluid in the first flow path (41), and the liquid level (Ha) of the fluid in the first storage tank (50) for causing the fluid to flow out of the first flow path (41) approaches a first target value, The first flow path (41) includes a turbine flow path (45) and a branch flow path (46), wherein at least a portion of the fluid flowing into the turbine (11) flows in the turbine flow path (45), and the branch flow path (46) branches off from the turbine flow path (45). The branch flow path (46) is provided with a regulating mechanism (60) for regulating the flow rate or pressure of the fluid. The control unit (13) controls the flow rate (Qw) or the water head (ΔPw) of the water turbine (11) in the first control so that the pressure of the fluid near the inlet of the regulating mechanism (60) approaches the first target value.