Battery-powered fixed measuring devices for measuring or detecting values at utility facilities
By adopting selective expansion and limited search strategies in the LPWAN connection module, the problem of insufficient battery life of the consumption meter in the LPWAN network is solved, achieving power saving and long-term reliable operation of the consumption meter.
Patent Information
- Application Number
- CN202111478595.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-06
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-12-06
AI Technical Summary
Existing battery-powered consumption meters are difficult to predict the power consumption during regular searches in the Low Power Wide Area Network (LPWAN) network, resulting in insufficient battery life and the inability to effectively manage the power consumed by long-term searches, affecting the continued operation of the device.
By introducing selective expansion and limited search strategies in the LPWAN connection module, the expansion search is only performed when a specific power saving threshold is reached, otherwise the search is limited to save power, and the power budget is accumulated after an unsuccessful limited search to delay the expansion search, Minimum guarantee period to ensure battery life.
It effectively extends the battery life, avoids excessive power consumption due to long-term LPWAN searches, and ensures the continuous and reliable data recording capability of the consumption meter for 8 or 10 years.
Smart Images

Figure CN114615565B_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to a battery powered fixed measuring device for measuring or detecting values at a utility installation, in particular to a consumption meter for recording the consumption of water, gas and / or thermal energy. Background Art
[0002] It is known that utility providers of water, gas and / or heat use automatic meter reading (AMR) systems or advanced meter infrastructure (AMI) systems to manage customer bills efficiently and reliably. Such systems may be referred to as "dedicated" meter reading systems. Dedicated meter reading systems are characterized in that, for example, consumption meters are installed in multiple homes and the consumption data is communicated to a head-end system (HES) via wireless communication with a dedicated data collector. A single data collector may collect consumption data read by thousands of consumption meters. Several data collectors may be distributed in a city or region to cover all consumption meters located therein. Typically, the consumption meters communicate wirelessly with the data collector using unlicensed frequency bands in a manner that conserves the battery power of the consumption meters as much as possible, since there is usually no opportunity to charge or replace the consumption meter batteries. Therefore, being able to guarantee a minimum battery life of, for example, at least 10 years, 15 years, or preferably even 20 years with hourly or daily readings is a persistent challenge.
[0003] In order to reduce the cost of implementing and maintaining the infrastructure of dedicated data collectors, public cellular communication networks can be used instead of dedicated data collectors to collect consumption data. For example, the consumption meter may include a connection module (e.g., a modem) to connect to a low power wide area network (LPWAN) provided by a public cellular communication network, such as a narrowband Internet of Things (NB-IoT) or a long-term evolution machine type communication (LTE-M) network, such as LTE Cat NB1, LTE Cat NB2, LTE Cat M1, or LTE Cat M2. The frequency bands used in such LPWANs are authorized, but the link budget is large. Therefore, it is desirable to provide a battery-powered consumption meter that is capable of effectively recording consumption data regularly (e.g., once an hour or a day) via the LPWAN over a guaranteed minimum usage period, such as 8 or 10 years.
[0004] In contrast to "dedicated" meter reading systems that "own" (including lease) the data collector infrastructure, public cellular communication networks are part of "universal" meter reading systems, in which the wireless communication infrastructure (i.e., LPWAN) between the consumption meters and the HES is owned, maintained and controlled by an external party (e.g., a mobile network operator (MNO)). With a universal meter reading system, the utility provider (UP) of water, gas and / or heat only owns (or leases), maintains and controls the consumption meters and the HES.
[0005] Therefore, in principle, the LPWAN network is unknown to the consumption meter when it is first initially installed. Since the LPWAN network is not controlled by the utility provider, the LPWAN network may change over time, such that the consumption meter may not be able to connect to the LPWAN network it was previously using.
[0006] However, searching for a suitable LPWAN network with sufficient signal quality may take a long time, for example, 15 minutes, or longer in some cases if multiple frequency bands must be searched. It is a problem that searching for a suitable LPWAN network with sufficient signal quality consumes a lot of battery power, but it is impossible to predict how often the search will be performed and how long the search will take.
[0007] It is therefore an object of the present disclosure to provide a consumption meter with a guaranteed minimum battery life for periodic consumption meter readings without the need to know how often a long LPWAN search needs to be performed and how long such a search will take. This object may not be limited to consumption meters, but may be applicable to any type of battery-powered fixed measuring device for measuring or detecting values at a utility facility. For example, this may include consumption meters, alarm sensors, acoustic noise detectors, chemical sensors, turbidity sensors, remote control valves, or other types of monitoring sensors. Summary of the invention
[0008] According to a first aspect of the present disclosure, there is provided a battery-powered fixed measuring device for measuring or detecting a value at a utility facility, wherein the measuring device comprises a LPWAN connection module configured to establish a wireless communication connection to a low power wide area network (LPWAN) to communicate data to a head end system (HES) via the LPWAN, wherein the LPWAN connection module is configured to:
[0009] - attempt to successfully establish a connection to the LPWAN by selectively performing one of the group consisting of: an extended LPWAN search and a limited LPWAN search;
[0010] - as long as the total or total amount of power budget savings has not been reached, the extended LPWAN search is rejected;
[0011] - increasing the total or aggregate amount of power budget savings for each unsuccessful limited LPWAN search; and
[0012] - If the total or total amount of power budget savings reaches a savings threshold, allowing an extended LPWAN search, wherein the total or total amount of power budget savings decreases with each performed extended LPWAN search.
[0013] Therefore, the basic idea is that the LPWAN search is limited to save power consumption as long as a certain saving threshold has not been reached. As long as the limited LPWAN search is successful, the power consumption is relatively low. However, if the limited LPWAN search is unsuccessful, the idea is not to immediately perform an extended LPWAN search, but to "save" energy by stopping trying to establish an LPWAN connection. Therefore, energy is saved because the maximum energy consumption of the limited LPWAN search is lower than the energy consumption of the extended LPWAN search. If the LPWAN connection can be established, the LPWAN search is considered successful in this article, otherwise it is considered unsuccessful. The LPWAN connection module can be powered off without sending data until the next regularly scheduled reading expires. Therefore, not sending data can further save energy, for example, a certain maximum or typical average energy quota for each data transmission based on the schedule will not be spent. Thereby, the shortest battery life can be guaranteed because excessive long LPWAN searches are prevented. It should be noted that "power on" / "power off" in this article should include turning on / off or leaving / entering a power saving mode (PSM), in which the LPWAN connection module cannot be reached via the LPWAN, but the LPWAN connection module remains registered with the LPWAN. The term "reduce" in this article should include reducing the power budget savings to a certain number or amount, or reducing the power budget savings by a certain number or amount. Preferably, the total number or total amount of power budget savings is reduced (e.g., reset) to an initial number (e.g., zero), or reduced by a certain amount, for example, equal to the amount of power budget spent by the extended LPWAN search over the typical or average limited LPWAN search.
[0014] The measuring device may include an electronic housing enclosing electronic components, such as a microcontroller, that are signal-connected to the LPWAN connection module. The LPWAN connection module may be part of the enclosed electronic components and / or at least partially integrated into the microcontroller. For example, the LPWAN connection module may be arranged on a common printed circuit board (PCB) together with the microcontroller or on a separate PCB. Alternatively, the LPWAN connection module may be arranged in an additional housing of the measuring device, wherein the additional housing may be integrated with, attached to, or separate from the electronic housing.
[0015] Preferably, the LPWAN may be a network using Narrowband Internet of Things (NB-IoT) or Long Term Evolution Machine Type Communication (LTE-M) technology standards developed by the Third Generation Partnership Project (3GPP). Preferably, any specification defined in 3GPP Release 13, 14, 15, 16 or higher may be used. Possible 3GPP Internet of Things technologies may include LTE Cat NB1, LTE Cat NB2, LTE Cat M1 or LTE Cat M2.
[0016] Since the link budget of authorized LPWAN connections is relatively high, the data may include redundant information of a certain number (e.g., 10) of the most recent readings so that meter readings can be “seamless” even if no data is transmitted during certain scheduled readings.
[0017] If a limited LPWAN search has been unsuccessful for a certain number of scheduled reads, a certain power budget savings are accumulated. Once these power budget savings reach a savings threshold, an extended LPWAN search is allowed. The savings threshold may be determined based on guaranteed battery life, average power savings per unsuccessful limited LPWAN search, and / or redundancy / overlap in the data.
[0018] Alternatively, the total amount of power budget savings may be a counter value for counting the number of unsuccessful limited LPWAN searches, wherein the savings threshold may be a predetermined integer value, e.g., 10. This is particularly advantageous if it can be assumed that the average power savings per unsuccessful limited LPWAN search is constant.
[0019] Optionally, the total amount of power budget savings may be a cumulative value of the sum of power budget savings of unsuccessful limited LPWAN searches, wherein the savings threshold may be a predetermined threshold. This may be particularly advantageous if the average energy savings for each unsuccessful limited LPWAN search is not constant. The energy consumption of each performed extended LPWAN search may be determined and stored to update the savings threshold based on past experience of the energy consumption of the extended LPWAN search. The energy saved for each skipped data transmission may also be added to the power budget savings.
[0020] Optionally, the LPWAN connection module may be configured to limit the limited LPWAN search to a predetermined maximum search duration and / or prioritized frequencies or frequency bands. Since the energy consumption of the LPWAN search is primarily proportional to the power-on time of the LPWAN connection module, it is preferred to limit the limited LPWAN search to a predetermined maximum search duration, for example, to 45 seconds. It should be noted that if the LPWAN connection can be successfully established, it is preferred to stop the limited LPWAN search before the maximum search duration is reached. It is also preferred to increase the chances of success of the limited LPWAN search by prioritizing certain frequencies or frequency bands. For example, the LPWAN connection module may use a subscriber identity module (SIM) card of a certain mobile network operator (MNO) that uses specific frequencies or frequency bands that can be prioritized (i.e., searched before other frequencies or frequency bands). The country / region where the measurement device is to be used may provide additional information about specific frequencies or frequency bands used for the LPWAN provided in that country.
[0021] Optionally, the LPWAN connection module may be configured to use the LPWAN connection information stored in or transmitted to the measuring device for a limited LPWAN search. This is a very effective method to improve the success rate of a limited LPWAN search. It may be used in combination with the above-mentioned first aspect of the present disclosure or independently as the second aspect of the present disclosure. Preferably, the LPWAN connection information may also be used for an extended LPWAN search.
[0022] For example, each base station of a public land mobile network (PLMN) may be identified by an E-UTRA Absolute Radio Frequency Channel Number (EARFCN). If the EARFCN of the base station closest to the measurement device facility is known, a limited LPWAN search is likely to be successful, since connecting to a known base station typically takes only a few seconds. Since the measurement device is stationary, the EARFCN of the nearest base station is unlikely to change. Therefore, it is beneficial to store the EARFCN of the most recent successful LPWAN connection for subsequent reading. However, it should be noted that the MNO may change the frequency or frequency band used by the PLMN during the life of the measurement device, so a successful EARFCN known in the past may not guarantee that this EARFCN will always be successful. In addition, before the measurement device is installed for the first time, there are no stored EARFCNs available based on past experience with the measurement device. Since the installer must ensure a successful first initial LPWAN connection, if he / she wants to force the LPWAN connection module to perform an extended LPWAN search to find a suitable LPWAN network, he / she may have to wait for 15 minutes or more. Therefore, it is advantageous for the installer to use a mobile device, such as a smartphone or tablet, which has stored the LPWAN connection information of the network element it is currently located in. The mobile device may be used to transmit the stored LPWAN connection information (e.g., in the form of an EARFCN) to the measurement device prior to the first search for an LPWAN network. This significantly increases the chances of a limited LPWAN search being successful, even for the first initial LPWAN connection after installation. As a result, the installer may only have to wait a few seconds instead of 15 minutes to successfully establish a LPWAN connection after the first installation. This significantly reduces the time and cost of the installation process. The mobile device may have useful "local" LPWAN connection information based on its own connectivity experience, such as the EARFCN of the nearest base station. Alternatively or additionally, the mobile device may "learn" the appropriate EARFCN from a previous installation of a nearby measurement device (i.e., possibly located in the same network element). Thus, the measurement device may be able to wirelessly communicate one or more stored appropriate EARFCNs to the mobile device after a successful connection to the LPWAN, such as via WiFi, wMBus, optical eye, Bluetooth LE, or a proprietary ISM protocol or near field communication. The mobile device may then pass the EARFCN to the next measurement device to be installed nearby. For example, the EARFCN may be communicated from the mobile device to the HES together with a postal address or GPS information. Alternatively, the measurement device can send the EARFCN to the HES via LPWAN. The EARFCN combined with the relevant address or GPS information can be retrieved by other mobile devices operated by other installers, thereby improving installation efficiency.The LPWAN connection information may include a set or list of several EARFCNs so that the LPWAN connection module may test more than one promising EARFCN.
[0023] Optionally, the measuring device can be configured to power on the LPWAN connection module according to a predetermined data transmission schedule. For example, the data transmission schedule can be hourly, daily or any other regularly spaced scheme, depending on the needs of the UP for the billing process.
[0024] Optionally, the measuring device can be configured to power off the LPWAN connection module after each unsuccessful limited LPWAN search. This is most effective for energy conservation and cumulative power budget savings. An inactive powered LPWAN connection module consumes energy without any need. Preferably, power is not applied until the next reading is due according to a predetermined data transmission schedule. Therefore, an unsuccessful limited LPWAN search means that the due data reading is skipped as long as the extended LPWAN search is rejected. This disadvantage can be compensated by a redundant data set transmitted at each successful reading. For example, each data set may partially include previously read information to prevent information "gaps" in the event of skipped reading. The measuring device may include a microcontroller for powering on the LPWAN connection module at predefined regular intervals to communicate data, and then powering off the LPWAN connection module to save battery power. The LPWAN connection module may be at least partially integrated into the microcontroller, or a completely independent electronic module.
[0025] Optionally, the LPWAN connection module may be configured to conduct a limited LPWAN search if the extended LPWAN search is overruled. Preferably, the limited LPWAN search and the extended LPWAN search may not differ from each other except for the search time. In other words, if the LPWAN search is stopped when a predetermined maximum search duration is reached or after a preferred frequency or band search is unsuccessful, it is a limited LPWAN search. Otherwise, it is an extended LPWAN search. It should be noted that if an LPWAN connection can be successfully established, it is preferred that the limited LPWAN search be stopped before the maximum search duration is reached.
[0026] Optionally, the extended LPWAN search includes a longer duration and / or scanning of more frequencies or frequency bands than the limited LPWAN search to successfully establish a LPWAN connection between the measurement device and the LPWAN network. Preferably, the start of the extended LPWAN search may be the same as the limited LPWAN search so as to utilize any LPWAN connection information stored in or transmitted to the measurement device. Alternatively, when the limited LPWAN search may have proven to be unsuccessful, the extended LPWAN search may prioritize other frequencies and frequency bands. It should be noted that once a LPWAN connection can be successfully established, it is preferred to stop the extended LPWAN search. This means that in some quick success events, the extended LPWAN search may have a shorter duration and / or search fewer frequencies or frequency bands than the limited LPWAN search.
[0027] Alternatively, the measuring device may be a consumption meter for recording the consumption of water, gas and / or heat at a utility facility.
[0028] Optionally, the LPWAN connection module is configured to send data to the headend system (HES) via the LPWAN network after each successful establishment of an LPWAN connection. Since successfully establishing an LPWAN connection always consumes battery power, it is effective to use any established connection for data (e.g., consuming data) transmission. Vice versa, it is effective to power on the LPWAN connection module only if data is to be transmitted according to a predetermined data transmission schedule and to power it off immediately once the data transmission is completed.
[0029] Optionally, the LPWAN connection module may be configured to conduct an allowed extended LPWAN search if the most recent limited LPWAN search was unsuccessful. Thus, the most recent unsuccessful limited LPWAN search may have saved enough power budget such that the total or total amount of power budget exceeds a savings threshold that allows an extended LPWAN search to be conducted when the next scheduled read is due. This means that if an extended LPWAN search is allowed at power-up of the LPWAN connection module, then the extended LPWAN search is conducted. As shown in the following example, this is not always the case, as an allowed extended LPWAN search does not necessarily have to be conducted. Further conditions may be applied to minimize the number of extended LPWAN searches.
[0030] Optionally, the LPWAN connection module may be configured to perform an allowed extended LPWAN search if the success rate of the limited LPWAN search is below a predetermined success rate threshold. Thus, the total or total amount of power budget savings having exceeded the savings threshold is a first condition for first allowing an extended LPWAN search to be performed, and the success rate of the limited LPWAN search being below the predetermined success rate threshold is a second condition for actually performing the extended LPWAN search. For example, the predetermined success rate threshold may be set to 50%. The rationale behind this is that if the success rate of successes experienced so far is higher than this, then the next limited LPWAN search has a high chance of success. Therefore, in order to avoid an extended LPWAN search as much as possible, it is beneficial to try another limited LPWAN search until the success rate drops below the threshold.
[0031] Optionally, the LPWAN connection module may be configured to perform an allowed extended LPWAN search if a predetermined number of the most recent limited LPWAN searches have been unsuccessful in succession. Preferably, if a counter value is used to count the total number of power budget savings, the predetermined number may be the same as a predetermined integer value (e.g., 10) used as a savings threshold. This would mean that the total number of power budget savings must have been accumulated in consecutive unsuccessful limited LPWAN searches. The rationale here is that a limited LPWAN search should be attempted as long as the most recent successful limited LPWAN search was not too long ago.
[0032] According to an independent second aspect of the present disclosure, in order to speed up the process of installing the measuring device at a plurality of distributed utility facilities, a battery-powered fixed measuring device for measuring or detecting values at a utility facility is provided, wherein the measuring device comprises an LPWAN connection module configured to establish a wireless communication connection to a low power wide area network (LPWAN) network to communicate data to a head end system (HES) via the LPWAN network, wherein the LPWAN connection module is configured to:
[0033] - receiving LPWAN connection information from the mobile device via near field communication (e.g., NCF, RFID) or another type of wireless local area network (WLAN) (e.g., WiFi, wMBus, optical eye, Bluetooth LE, or a proprietary ISM protocol), and
[0034] - Establishing a connection to a LPWAN network based on the received LPWAN connection information, and / or performing a LPWAN search prioritizing certain frequencies and / or frequency bands based on the received LPWAN connection information.
[0035] Optionally, the LPWAN connection module may also be configured to save and / or update the LPWAN connection after successfully establishing a connection to the LPWAN, and send the stored and / or updated LPWAN connection information to the mobile device via the near field communication (e.g., NCF, RFID) or the other type of wireless local area network (WLAN) (e.g., WiFi, wMBus, optical eye, Bluetooth LE or proprietary ISM protocol). Thereby, the mobile device can "carry" the most recent successful LPWAN connection information from one installed and connected measurement device to the next measurement device to be installed and connected nearby (i.e., possibly located in the same LPWAN cell). In a preferred embodiment, the EARFCN (preferably combined with a postal address or GPS information) can be communicated from the mobile device to the HES. Alternatively, the measurement device can send the EARFCN to the HES via the LPWAN. The EARFCN (preferably combined with the associated address or GPS information) can be retrieved by other mobile devices operated by other installers, thereby improving installation efficiency.
[0036] The above-mentioned LPWAN connection information may specifically include one or more EARFCN identification frequency bands, which are used by one or more base stations serving the local cell of the LPWAN. In addition to receiving the LPWAN connection information from the previously installed and connected measurement device, or instead of receiving the LPWAN connection information from the previously installed and connected measurement device, the mobile device may include its own LPWAN modem for providing the LPWAN connection information based on its own connectivity experience in the current LPWAN cell. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Embodiments of the present disclosure will now be described by way of example with reference to the following drawings, in which:
[0038] Figure 1 A schematic diagram showing a meter reading system including an example of a measuring device disclosed herein; and
[0039] Figure 2 A schematic diagram showing an example of a configuration of a measurement device disclosed herein. DETAILED DESCRIPTION
[0040] Figure 1A meter reading system 1 is schematically shown, comprising a head end system (HES) 3, a base station 5 of a low power wide area network (LPWAN) and a measuring device 7 in the form of a consumption meter. The measuring device 7 may be a consumption meter for recording the consumption of water, gas and / or heat energy at a utility facility (e.g. a private household, a public facility or an industrial facility). Alternatively, the measuring device 7 may be an alarm sensor, an acoustic noise detector, a chemical sensor, a turbidity sensor, a remote control valve or another monitoring device that is intended to send information to the HES 3 at regular intervals. The HES 3 receives and processes information from and / or controls the behavior of a plurality of measuring devices 7 installed in a plurality of utility facilities.
[0041] LPWAN is provided by a plurality of distributed base stations 5 of a public cellular mobile communication network. Figure 1 Only one of these base stations is shown as base station 5, to which the measuring device 7 is wirelessly connected via a connection 9, currently using a narrowband Internet of Things (NB-IoT) or LTE-M technical standard (e.g. LTE Cat NB1, LTE Cat NB2, LTE Cat M1 or LTE Cat M2). The HES 3 is connected to the base station 5 of the LPWAN via an Internet connection 11, preferably by wire or glass fiber.
[0042] Once the measuring device 7 has successfully established a connection 9 to the base station 5, it can transmit consumption data or any other data it intends to send to the HES 3. The communication may be essentially unidirectional from the measuring device 7 to the HES 3, but is preferably bidirectional between the measuring device 7 and the HES 3. Bidirectional communication allows the HES 3 not only to receive data from the measuring device 7, but also to control and update the behavior of the measuring device 7, for example, to control an integrated valve.
[0043] The measuring device 7 may include a microcontroller (e.g., a CPU, a MOSFET, an EEPROM, or an FPGA), a permanent or volatile storage medium (e.g., a RAM), a LPWAN connection module (e.g., a modem), a battery, and preferably a human-machine interface (HMI), such as a display, a touch screen, buttons, and / or switches. A sensor module for measuring or detecting a value at a utility facility may be integrated into the measuring device 7 or connected to the measuring device 7 by wire or wireless means. The measuring device 7 may include a metering unit and a metering transmission unit (MTU) connected to the metering unit. The value may represent a physical quantity, such as a fluid flow or heat flow through a pipe on which the sensor module is mounted. The measuring device 7 is configured to continuously, periodically, or occasionally store the measured or detected values with or without a timestamp. Alternatively or additionally, the measuring device 7 may be configured to process (e.g., sum) the measured or detected values and store the processed values (e.g., accumulated values).
[0044] The microcontroller of the measuring device 7 is configured to power up the LPWAN connection module according to a predetermined data transmission schedule (e.g., hourly or daily). The LPWAN connection module may be at least partially integrated into the microcontroller, or be a completely independent electronic module. In order to save battery power as much as possible, the LPWAN connection module is powered only for the duration it needs to establish the LPWAN connection 9 and transmit data to the connected base station 5. The data may include all or part of stored, measured, detected or processed values with or without timestamps and identification data for identifying the measuring device 7 or sensor module or utility facility, respectively. The data may be encrypted and authenticated using symmetric or asymmetric encryption methods and algorithms, including message authentication codes.
[0045] Figure 1 Also shown is a mobile device 13, such as a smartphone, tablet or other handheld device, of an operator who is installing, maintaining, replacing or inspecting the measuring device 7. The mobile device 13 can be configured to communicate with the measuring device 7 via near field communication 15 (e.g., NFC, RFID) or a wireless local area network (WLAN) (e.g., WiFi, wMBus, optical eye, Bluetooth LE or a proprietary ISM protocol). It can also be equipped to connect to the base station 5 of the LPWAN via a wireless connection 17. The wireless connection 17 is optional and the NB-IoT standard or other mobile communication standards can be used.
[0046] The mobile device 13 may have stored the latest LPWAN connection information, for example, at least one E-UTRA Absolute Radio Frequency Channel Number (EARFCN) for identifying the frequency or frequency band used by one or more base stations 5 within the connectivity range (i.e., the LPWAN cell where the fixed measuring device 7 is installed or to be installed). Therefore, the mobile device 13 can be used to speed up the process of installing, maintaining, replacing or inspecting the measuring device 7. Before completing the process of installing, maintaining, replacing or inspecting the measuring device 7, the operator will have to ensure that the measuring device 7 has successfully established the LPWAN connection 9 to the base station 5. In the absence of any LPWAN connection information, the LPWAN connection module may search for up to 15 minutes or more for a suitable LPWAN connection. In order to speed up the process, the mobile device 13 can use near field communication 15 to communicate one or more promising EARFCNs used by one or more base stations 5 in the current LPWAN cell. With this LPWAN connection information, the LPWAN connection module is likely to find a suitable LPWAN connection within a few seconds. This makes the process of installing, maintaining, replacing or inspecting the measuring device 7 more efficient and faster. The mobile device 13 may have learned the local LPWAN connection information (e.g., EARFCN) from its own connectivity experience using its wireless connection 17 to the base station 5. Alternatively or additionally, the mobile device 13 may have learned the local LPWAN connection information (e.g., EARFCN) from another measurement device 7 that was previously installed nearby (e.g., adjacent) and may be located within the same LPWAN cell. Therefore, the near field communication 15 is preferably bidirectional, so that the measurement device 7 can communicate the local LPWAN connection information (e.g., EARFCN) to the mobile device 13 after it successfully establishes the LPWAN connection 9 to the base station 5. In this case, the mobile device 13 will not need a wireless connection 17 to the base station 5.
[0047] The measurement device may be shipped with certain LPWAN connection information stored thereon. For example, the LPWAN connection module may use a subscriber identity module (SIM) card of a certain mobile network operator (MNO) that uses specific frequencies or frequency bands that may be prioritized (i.e., searched before other frequencies or frequency bands). Alternatively or additionally, the country / region in which the measurement device 7 is to be used may provide other information about specific frequencies or frequency bands used for LPWANs provided in that country.
[0048] Preferably, the measuring device 7 stores LPWAN connection information (e.g., EARFCN) that allows successful LPWAN connections 9 to the base station 5. Since the measuring device 7 is fixed and the LPWAN is unlikely to change often, the stored LPWAN connection information (e.g., EARFCN) is preferably used for any subsequent attempts to establish a LPWAN connection 9 with the base station 5. However, since the base station 5 and such LPWAN are part of a public cellular communication system controlled by the MNO, i.e., typically outside the control of the utility provider (UP) operating the HES 3 and the measuring device 7. Therefore, during the lifetime of the measuring device 7, the LPWAN may change in certain aspects. However, it is important for the UP to guarantee a minimum battery life of the measuring device 7, e.g., 8 or 10 years. Unpredictably long LPWAN searches may consume too much battery power to guarantee this.
[0049] As a solution to this problem, Figure 2A schematic diagram of an example of a configuration of a measuring device 7 is shown, wherein the configuration can be implemented by a software program installed on and executed on a microcontroller of the measuring device 7. In a first step 201, the microcontroller of the measuring device 7 powers the LPWAN connection module according to a predetermined data transmission schedule. For example, it is assumed that the reading of the measuring device 7 occurs once every hour or every day. Therefore, when the reading is due, the LPWAN connection module is powered on 201. Alternatively or additionally, the LPWAN connection module can be powered on according to a user request (for example, by pressing a button, switching a switch or sending a command to the measuring device 7 via near field communication 15 by the mobile device 13). Alternatively or additionally, an event can trigger the LPWAN connection module to be powered on, i.e., wake up the LPWAN connection module, the event being, for example, the detection of a leak, a burst and / or tampering with the measuring device 7. The LPWAN connection module is then set in step 203, i.e., the latest stored or transmitted LPWAN connection information (e.g., EARFCN) (if available) can be loaded into the LPWAN connection module. It is then decided in step 205 whether the veto for blocking the extended LPWAN search is valid. The veto may be a Boolean flag including a state of "yes" Y and a state of "no" N. The LPWAN connection module is configured to attempt to successfully establish a connection to the base station 5 by performing an extended LPWAN search or a limited LPWAN search. The limited LPWAN search may be essentially the same as the extended LPWAN search limited to a maximum search duration. Alternatively, the search strategy between the extended LPWAN search and the limited LPWAN search (e.g., the priority and order of searches for frequencies or frequency bands) may be different. Depending on the initial default setting, the veto may be valid or invalid. Therefore, after the first power-on of the LPWAN connection module, it may perform an extended LPWAN search or a limited LPWAN search. If there is no LPWAN connection information (e.g., EARFCN) initially available for storage or transmission at the first power-on of the LPWAN connection module, it may be advantageous to perform an extended LPWAN search. Otherwise, it may be advantageous to perform a limited LPWAN search.
[0050] If the veto is valid at step 205, a limited LPWAN search is performed at step 207, for example, a LPWAN search of up to 45 seconds. The limited LPWAN search may use any available LPWAN connection information (e.g., EARFCN) to prioritize certain frequencies or frequency bands (i.e., search these frequencies or frequency bands before other frequencies or frequency bands) to successfully establish a LPWAN connection within a set time limit (e.g., 45 seconds). In step 209, the limited LPWAN search 207 is stopped by successfully establishing a LPWAN connection to the base station 5, or by reaching the set time limit without successfully establishing a LPWAN connection to the base station 5. In the event that the LPWAN connection to the base station 5 is successful, in step 211, the LPWAN connection module sends data to the HES 3 via the connected base station 5. The data transmission window may be open for as long as the data transmission is required as shown in step 213. Alternatively, the data transmission window may be limited to ensure that a certain maximum energy quota for each data transmission is not exceeded. Such a quota can be used to estimate a portion of the power budget saved in each unsuccessful limited LPWAN search. The LPWAN connection information (e.g., EARFCN) of the successful LPWAN connection is then stored for subsequent reading in step 215. Then, in order to save battery power, in step 217, the LPWAN connection module is powered off until the next reading is due according to the data transmission schedule.
[0051] If the limited LPWAN search 207 is not successfully stopped in step 209, the total power budget savings is increased in step 217. This can be to increase the counter value by 1 or to add the amount of power budget savings of the unsuccessful limited LPWAN search to the total accumulated amount of power budget savings of past unsuccessful limited LPWAN searches. In step 221, it is checked whether the total power budget savings has reached a savings threshold (e.g., 10 unsuccessful limited LPWAN searches or a predetermined savings threshold in terms of the amount of battery energy). If the savings threshold has not been reached, the LPWAN connection module is powered off in step 217 until the next read is due according to the data transmission schedule. If the savings threshold has been reached, the LPWAN connection module is powered off in step 217 until the next read is due according to the data transmission schedule, and the veto is deactivated in step 223. It is important to understand that an unsuccessful limited LPWAN search means that the scheduled read is "skipped", i.e., there is no retry or other LPWAN search triggered by the failed limited LPWAN search, and no data is sent. This actually "generates" the power budget savings that are increased in step 219.
[0052] If the veto is activated by a recent failed limited LPWAN search because the total power budget savings have reached the savings threshold, the LPWAN connection module performs an extended LPWAN search at step 225 when the next read is due. Note that in addition to the veto, further conditions may be checked before performing the extended LPWAN search ( Figure 2 (not shown). For example, the success rate of past limited LPWAN searches may need to be below a certain success rate threshold and / or a certain number of recent limited LPWAN searches must have been unsuccessful in succession, or at least the most recent limited LPWAN searches must have been unsuccessful. If these further conditions are not met, a limited LPWAN search may be performed at each scheduled read until these conditions are met.
[0053] With each performed extended LPWAN search 225, the total power budget savings is reduced in step 227, preferably reset to zero, or reduced by an amount equal to the power budget spent by the extended LPWAN search over a typical or average limited LPWAN search. In addition, a veto is activated in step 229 to prevent an extended LPWAN search 225 from being performed in a subsequent read until sufficient power budget savings have been accumulated. If the extended LPWAN search 225 is successful, data is sent to the HES 3 via the base station 5 in step 211, the LPWAN connection information (e.g., EARFCN) is stored in step 215, and the LPWAN connection module is powered off in step 217. If the extended LPWAN search 225 fails, the LPWAN connection module is immediately powered off in step 217. The time between powering off in step 217 and powering on in step 201 is determined by the data transmission schedule 233.
[0054] The LPWAN search process for limited LPWAN search and extended LPWAN search is described below by way of example. In this example, the Quectel BC66NA NB-IoT modem is used as an LPWAN connection module. The module first searches for a registered public land mobile network (RPLMN). If the module has been previously registered with the network, it is set to the public land mobile network (PLMN) to be used. If no RPLMN exists, the "equivalent home PLMN" (EHPLMN), if available, is selected as the PLMN. If no EHPLMN is available, the "home PLMN" (HPLMN) is selected as the PLMN. The module will search for a suitable cell in the selected PLMN to reside in.
[0055] Both limited LPWAN search and extended LPWAN search include a scanning process in which different frequencies or frequency bands are scanned. By way of example, the scanning process may start with a high priority frequency based on stored or received LPWAN connection information. If this is unsuccessful and / or no LPWAN connection information is available, the high priority frequency band may be scanned. Each band may be scanned step by step. First, the band may be scanned with a high threshold, i.e., only sensitive to LPWANs with high signal strength. Then, the threshold may be lowered in one or more steps to find LPWANs with lower signal strength. If more than one band is enabled, all bands may be scanned with a high threshold, and if no LPWAN matching the selected PLMN is found, all bands may be scanned with a low threshold.
[0056] If no priority is defined for the bands, the bands may be scanned in ascending order of band number. For example, if bands 3, 8, and 20 are active, the scanning order may be as follows:
[0057] 1. Search band 3, then band 8, then band 20 using a low threshold.
[0058] 2. Use a high threshold to search band 3, then band 8, then band 20.
[0059] If some bands are given priority, the prioritized bands may be scanned with a low threshold before any non-prioritized bands are scanned with a high threshold. For example, if four bands are enabled (e.g., bands 1, 3, 8, 20) and two of them are prioritized in order (e.g., band 20 first, then band 8), the search order may be as follows:
[0060] 1. Search band 20, then band 8 (high threshold)
[0061] 2. Search band 20, then band 8 (low threshold)
[0062] 3. Search Band 1, then Band 3 (high threshold)
[0063] 4. Search Band 1, then Band 3 (low threshold)
[0064] If only one band is scanned at a time, it may take a relatively long time to scan in ascending order, for example, if band 20 is the band to be found. This is because the search bands 3 and 8 may be scanned twice before the search in band 20 begins. To reduce this effect, the enabled bands may be limited to those authorized in the country and / or region and preset in order according to the bands used by the MNOs in the country and / or region. The measurement device may be shipped with the enabled bands preset accordingly.
[0065] The LPWAN connection information may include an EARFCN list that lists the frequencies to be prioritized (i.e., the frequencies to be scanned first), for example, a list of EARFCNs that the modem has previously successfully used. The list may have a certain length, for example, including 10 slots, and the oldest entry may be overwritten if there are no more free slots.
[0066] Where, in the foregoing description, integers or elements are mentioned that have known, obvious or foreseeable equivalents, such equivalents are incorporated herein as if set forth individually. Reference should be made to the claims to determine the true scope of the disclosure, which should be interpreted to encompass any such equivalents. The reader should also understand that integers or features of the disclosure that are described as optional, preferred, advantageous, convenient, etc. are optional and do not limit the scope of the independent claims.
[0067] The above embodiments are to be understood as exemplary examples of the present disclosure. It should be understood that any feature described for any one aspect or embodiment may be used alone or in combination with other features described, and may also be used in combination with one or more features of any other aspect or embodiment or any combination of any other aspect or embodiment. Although at least one exemplary aspect or embodiment has been shown and described, it should be understood that other modifications, substitutions, and variations are obvious to those of ordinary skill in the art and may be changed without departing from the scope of the subject matter described herein, and this application is intended to cover any changes or variations of the specific embodiments discussed herein.
[0068] In addition, "comprising" does not exclude other elements or steps, and "one" or "an" does not exclude plural forms. In addition, the features or steps described with reference to one of the above exemplary aspects or embodiments may also be used in combination with other features or steps of the above other exemplary embodiments. The method steps may be applied in any order or in parallel, or may constitute a part of or a more detailed version of another method step. It should be understood that all such modifications that reasonably and appropriately fall within the scope of the contribution made to the art should fall within the scope of the authorized patent. These modifications, substitutions and variations may be made without departing from the spirit and scope of the present disclosure, which shall be determined by the appended claims and their legal equivalents.
[0069] Reference Mark List:
[0070] 1 Meter reading system
[0071] 3 HES
[0072] 5 Base Station
[0073] 7. Measuring device
[0074] 9 LPWAN connections using NB-IoT
[0075] 11 Internet connection
[0076] 13 Mobile Devices
[0077] 15 Near Field Communication or WLAN
[0078] 17 Wireless Connection
[0079] 201 Power on LPWAN connection module
[0080] 203 Setting up the LPWAN connection module
[0081] 205 Check veto
[0082] 207 Conduct limited LPWAN search
[0083] 209 Check successful
[0084] 211 Send data to HES
[0085] 213 Checking whether to send more data
[0086] 215 Store LPWAN connection information
[0087] 217 Disconnect the LPWAN connection module
[0088] 219 Increased Power Budget Savings
[0089] 221 Check whether the savings threshold has been reached
[0090] 223 Deactivation of veto power
[0091] 225 Expanded LPWAN Search
[0092] 227 Reset Power Budget Savings
[0093] 229 Activate Veto
[0094] 231 Check successful
[0095] 233 Data Transfer Schedule
Claims
1. A battery-powered fixed measuring device (7) for measuring or detecting values at a utility facility, wherein: The measuring device (7) comprises a low power wide area network LPWAN connection module, which is configured to establish a wireless communication connection to the LPWAN to communicate data to the front-end system HES (3) via the LPWAN, wherein the LPWAN connection module is configured to: Attempting to successfully establish a connection to the LPWAN (9) by selectively performing one of the group consisting of: an extended LPWAN search (225) and a limited LPWAN search (207); As long as the total or total amount of power budget savings has not yet reached a savings threshold, vetoing the extended LPWAN search (225); For each unsuccessful limited LPWAN search (207), increasing (219) the total or aggregate amount of power budget savings; and If the total or total amount of power budget savings has reached the savings threshold, the extended LPWAN search (225) is allowed, wherein the total or total amount of power budget savings decreases (227) with each performed extended LPWAN search (225).
2. The measuring device (7) according to claim 1, wherein: The total amount of power budget savings is a counter value for counting the number of unsuccessful limited LPWAN searches (207), wherein the saving threshold is a predetermined integer value.
3. The measuring device (7) according to claim 1, wherein: The total amount of power budget savings is a cumulative value of the sum of power budget savings of unsuccessful limited LPWAN searches (207), wherein the savings threshold is a predetermined threshold.
4. The measuring device (7) according to claim 1, wherein: The LPWAN connection module is configured to restrict the limited LPWAN search (207) to a predetermined maximum search duration and / or a prioritized frequency or frequency band.
5. The measuring device (7) according to any one of claims 1 to 4, wherein: The LPWAN connection module is configured to use LPWAN connection information stored in the measurement device (7) or transmitted to the measurement device (7) for the limited LPWAN search (207).
6. The measuring device (7) according to any one of claims 1 to 4, wherein: The measuring device (7) is configured to power on (201) the LPWAN connection module according to a predetermined data transmission schedule (233).
7. The measuring device (7) according to any one of claims 1 to 4, wherein: The measuring device (7) is configured to power off (217) the LPWAN connection module after each unsuccessful limited LPWAN search (207).
8. The measuring device (7) according to any one of claims 1 to 4, wherein: The LPWAN connection module is configured to perform the limited LPWAN search if the extended LPWAN search is rejected (207).
9. The measuring device (7) according to any one of claims 1 to 4, wherein: The extended LPWAN search (225) includes searching of a longer duration and / or more frequencies or frequency bands than the limited LPWAN search (207).
10. The measuring device (7) according to any one of claims 1 to 4, wherein: The measuring device (7) is a consumption meter for recording the consumption of water, gas and / or heat at the utility facility.
11. The measuring device (7) according to any one of claims 1 to 4, wherein: The LPWAN connection module is configured to send data (211) to the headend system HES (3) via the LPWAN after each successful establishment of the LPWAN connection (9).
12. The measuring device (7) according to any one of claims 1 to 4, wherein: The LPWAN connection module is configured to conduct an allowed extended LPWAN search (225) if the most recent limited LPWAN search (207) was unsuccessful.
13. The measuring device (7) according to any one of claims 1 to 4, wherein: The LPWAN connection module is configured to perform an allowed extended LPWAN search (225) if the success rate of the limited LPWAN search (207) is below a predetermined success rate threshold.
14. The measuring device (7) according to any one of claims 1 to 4, wherein: The LPWAN connection module is configured to conduct an enabled extended LPWAN search (225) if a predetermined number of recent limited LPWAN searches (207) have been unsuccessful in succession.
15. The measuring device (7) according to any one of claims 1 to 4, wherein: The LPWAN is a network that uses the narrowband Internet of Things NB-IoT or long-term evolution machine type communication LTE-M technology standards.
Citation Information
Patent Citations
Method and system for carrying out PLMN (Public Land Mobile Network) search in terminal device
CN106332232A
Energy consumption information management method of low-power consumption wide area network internet of things networking technology
CN107360537A
Narrowband carrier searching
CN108141818A
Water meter with water management capabilities
CN110686738A
A Gateway for communication, an onboarding device, and methods thereof
GB202003535D0
