Model building method and construction method of a lateral deviation correction and jacking device for a cable-stayed bridge
By constructing a three-dimensional model and a variable temperature lateral pushing unit, the correction process of the main beam of the cable-stayed bridge is simulated, which solves the problem of jack thrust and force safety in cable-stayed bridges with small curvature radius, and achieves a more accurate and intuitive correction effect. .
Patent Information
- Application Number
- CN202210136646.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-15
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-02-15
AI Technical Summary
In a cable-stayed bridge with a small curvature radius, during the process of correcting the lateral deflection of the main girder, it is difficult to determine the specific size of the jack thrust and the stress safety of the structural components. The existing modeling method cannot intuitively reflect the pushing process and stress conditions. Poor adaptability.
By constructing a three-dimensional model and setting up a variable temperature lateral pushing unit, the jack pushing process is simulated. The linear expansion coefficient and elastic modulus are used to calculate the pushing force and distance, and the experimental results are recorded intuitively. The cable force is adjusted according to the model to ensure construction safety.
The relationship between the displacement distance of the main beam and the pushing force is clear, the pushing process is continuous and intuitive, the accuracy and safety of the correction process are improved, and the bridge status requirements are met.
Smart Images

Figure CN114692263B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a model building method and a construction method of a lateral deviation correction and jacking device of a cable-stayed bridge in the technical field of bridge modeling. Background Art
[0002] As social development places higher and higher demands on transportation, it becomes increasingly important to improve the operating efficiency of cross-sea transportation, and long-distance cross-sea bridges have begun to be valued by people. Compared with ordinary bridges, cross-sea bridges are generally designed as curved bridges with an arc-shaped bridge body to reduce the impact of waves on the bridge body. Most bridge structures are also cable-stayed bridges to reduce the impact of sea breeze on the bridge body. During the construction and operation of cable-stayed bridges with small curvature radius, lateral displacement of the main beam is a phenomenon with a high probability of occurring in such bridges. Considering the overall and local stress safety of the main beam structure, the main beam is generally pushed back to the designed position by jacking.
[0003] However, the force on the structure of a cable-stayed bridge with a small curvature radius is complex, and the use of jacking to correct the deviation will face many problems. For example, it is difficult to determine the specific size of the jacking force; it is difficult to infer the force safety of structural components such as the main beam, cable tower, and cable during the jacking process; after jacking into place, whether the state of the bridge after appropriate adjustment meets the state requirements of the designed bridge.
[0004] In order to solve the above problems, a more accurate and appropriate model construction method is needed to simulate the lateral jacking process of the jack. It needs to be able to intuitively reflect the jacking process of the jack, and then it needs to be able to accurately reflect the magnitude of the jacking force during the jacking process, and finally it needs to accurately reflect the stress conditions of each structural component of the cable-stayed bridge. In the existing modeling methods, forced main beam displacement is often used. This method cannot obtain the relationship between the lateral jacking distance and the jacking force, and this process is not intuitive. When selecting the jack and controlling the jacking force, this method has poor adaptability. Summary of the invention
[0005] The purpose of the present invention is to solve at least one of the technical problems existing in the prior art, and to provide a model building method and a construction method for a lateral deviation correction and jacking device of a cable-stayed bridge, which can intuitively obtain the relationship between the main beam displacement distance and the jacking force, and the test results are more continuous.
[0006] According to a first aspect of the present invention, there is provided a model building method for a lateral deviation correction and jacking device of a cable-stayed bridge, comprising:
[0007] Obtain the size parameters of the actual cable-stayed bridge;
[0008] constructing a three-dimensional model of the actual cable-stayed bridge according to the size parameters, and adding mechanical parameters to the three-dimensional model;
[0009] The three-dimensional model is adjusted to a main beam offset state consistent with the actual cable-stayed bridge to obtain an offset distance that needs to be corrected;
[0010] A transverse pushing unit is arranged at the cable tower of the three-dimensional model, two ends of the transverse pushing unit are respectively connected to the cable tower and the main beam, and the transverse pushing unit can change the telescopic length by changing the temperature;
[0011] Applying a temperature increase load to the lateral pushing unit, the lateral pushing unit pushes the main beam, and recording the experimental results until the pushing is completed;
[0012] Wherein, the lateral pushing unit satisfies the following relationship:
[0013]
[0014] ΔL is the telescopic length of the lateral pushing unit;
[0015] T is the temperature value applied to the lateral pushing unit;
[0016] L is the length of the lateral pushing unit;
[0017] γ is the linear expansion coefficient;
[0018] F is the thrust value of the lateral thrust unit;
[0019] E is the elastic modulus of the lateral pushing unit;
[0020] A is the cross-sectional area of the lateral pushing unit.
[0021] According to the first aspect of the present invention, further, firstly, the initial temperature value corresponding to the telescopic length ΔL is calculated by ΔL=T×L×γ, and then the initial temperature value is substituted into the three-dimensional model of the cable-stayed bridge to obtain the thrust value F, and the thrust value F is substituted into the relationship: The temperature value T is obtained again, and the relationship is used to perform iterative calculation to obtain the thrust value F finally corresponding to the target thrust distance value and the temperature value T that needs to be applied.
[0022] According to the embodiment of the first aspect of the present invention, further, the linear expansion coefficient is 0.01.
[0023] According to an embodiment of the first aspect of the present invention, further, an initial value of the temperature value is obtained according to a definition formula of the linear expansion coefficient and the expansion length.
[0024] According to an embodiment of the first aspect of the present invention, further, after completing the jacking of the main beam, the cable force of each inclined cable of the three-dimensional model is adjusted to the current working condition, and the cable force value is recorded.
[0025] According to a second aspect of the present invention, there is provided a construction method for a lateral deviation correction and jacking device for a cable-stayed bridge, comprising:
[0026] Select the jack according to the offset distance and thrust value requirements;
[0027] The jack is installed on the cable tower, and two ends of the jack are respectively connected to the cable tower and the main beam;
[0028] Start the jack and push the main beam until the deviation correction is completed.
[0029] According to an embodiment of the second aspect of the present invention, further, the cable tower is provided with an anti-overthrow device for limiting the maximum pushing distance of the jack.
[0030] According to an embodiment of the second aspect of the present invention, further, the jack is provided with a locking device for locking the pushing distance of the jack after completing the pushing.
[0031] According to the second aspect of the embodiment of the present invention, further, after the deviation correction is completed, the cable force of each inclined cable is adaptively adjusted.
[0032] The beneficial effects of the embodiments of the present invention include at least: the present invention provides a lateral pushing unit that adjusts the telescopic length by changing the temperature, which can simulate the process of driving the jack to extend to achieve pushing in reality, and the experimental results are continuous and highly intuitive, which is convenient for recording simulated experimental data for use in actual construction processes. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly describes the drawings required for use in the description of the embodiments. Obviously, the drawings described are only part of the embodiments of the present invention, not all of the embodiments, and those skilled in the art can also obtain other design solutions and drawings based on these drawings without creative work.
[0034] Figure 1 is a schematic diagram of an embodiment of the first aspect of the present invention;
[0035] Figure 2 This is the structural diagram of the cable-stayed bridge in the example;
[0036] Figure 3 In the example, it is a table of measured transverse deviation of the main beam and the control value of jacking, a table of the most unfavorable cross-section stress values of the tower limbs during jacking, and a table of deviation values of the south tower during jacking;
[0037] Figure 4 This is the curve of the force variation of the left side cable of the south tower in the example;
[0038] Figure 5 This is the curve of the force variation of the right side cable of the south tower in the example;
[0039] Figure 6 This is the variation curve of the main beam elevation value in the example;
[0040] Figure 7 This is the curve of the change of the force value of the left-side inclined cable in the example;
[0041] Figure 8 This is the curve of the change of the cable force value on the right side of the example;
[0042] Fig. 9 This is a curve chart of the measured main beam elevation error value after cable adjustment in the example. DETAILED DESCRIPTION
[0043] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.
[0044] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0045] In the description of the present invention, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood as not including the number itself, and "above", "below", "within" etc. are understood as including the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0046] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0047] The first embodiment of the present invention designs a model construction method for a lateral deviation correction and jacking device of a cable-stayed bridge. By setting a lateral jacking unit whose length can change with temperature, when different temperature loads are applied to it, the lateral jacking unit can be extended and retracted accordingly, thereby simulating the effect of a jack in reality to perform jacking work by extending and retracting. During the simulation, the corresponding three-dimensional model of the cable-stayed bridge is adjusted to the same offset state as the actual cable-stayed bridge. After the lateral jacking unit is installed on the cable tower, it is heated up so that the lateral jacking unit applies a jacking force to the main beam. The experimental process is intuitive, and the changes in the jacking force during the jacking process can be more clearly observed.
[0048] The second aspect of the embodiment of the present invention designs a construction method for a lateral deviation correction and jacking device for a cable-stayed bridge. Based on the jacking thrust value and jacking distance value obtained by the above-mentioned model construction method, a corresponding jack is selected, and the jack is installed at the corresponding position for jacking construction, which can complete the deviation correction and jacking work more safely and accurately.
[0049] Reference Figure 1 The model building method of the cable-stayed bridge transverse deviation correction and jacking device in the first embodiment of the present invention comprises:
[0050] S1. Obtain the dimensional parameters of the actual cable-stayed bridge by surveying and mapping, consulting the original drawings, etc., and measure the offset distance of the main beam 3 of the cable-stayed bridge compared to the theoretical position, as raw data to be input into the digital model;
[0051] S2. construct a three-dimensional model corresponding to the actual cable-stayed bridge according to the size parameters obtained in step S1, and add mechanical parameters such as bridge weight and cable force to the three-dimensional model;
[0052] S3. adjusting the three-dimensional model to a main beam offset state consistent with the actual cable-stayed bridge, thereby obtaining the offset distance that needs to be corrected;
[0053] S4. A lateral pushing unit 2 is provided at the cable tower 1 of the three-dimensional model, and both ends of the lateral pushing unit 2 are connected to the cable tower 1 and the main beam 3, respectively. The lateral pushing unit 2 can change the telescopic length by changing the temperature;
[0054] S5. Apply a temperature increase load to the lateral pushing unit 2 so that the lateral pushing unit 2 pushes the main beam 3, and record the experimental results such as the pushing distance and the pushing force value until the main beam 3 reaches the original design position and the pushing is completed.
[0055] Wherein, the lateral pushing unit 2 satisfies the following relationship:
[0056]
[0057] ΔL is the telescopic distance of the lateral pushing unit 2;
[0058] T is the temperature value applied to the lateral pushing unit 2;
[0059] L is the length of the lateral pushing unit 2;
[0060] γ is the linear expansion coefficient;
[0061] F is the thrust value of the lateral thrust unit 2;
[0062] E is the elastic modulus of the lateral pushing unit 2;
[0063] A is the cross-sectional area of the lateral pushing unit 2.
[0064] Specifically, the linear expansion coefficient γ, elastic modulus E and cross-sectional area A of the lateral pushing unit 2 are all preset fixed values before the experiment begins. Among them, the linear expansion coefficient refers to the ratio of the change in length of a solid substance to its length at the original temperature when the temperature changes by 1°C. The larger the value, the more obvious the degree of change in its length with temperature. Its definition is ΔL / L=γT, and the relationship between the telescopic length of the lateral pushing unit 2 and the applied temperature value can be determined by this definition. In this embodiment, the linear expansion coefficient γ is 0.01. The elastic modulus refers to the change in shape of the elastic body when an external force is applied to the elastic body. At this time, its stress and strain become in direct proportion, and the proportional coefficient is the elastic modulus. In this embodiment, E is taken as the elastic modulus value of the steel.
[0065] The offset distance ΔL that needs to be corrected is the difference obtained by comparing the offset state position of the main beam 3 with the original design position before the experiment begins. In the modeling process, since the two ends of the lateral jacking unit 2 are respectively in contact with the cable tower 1 and the main beam 3, the length value L of the lateral jacking unit 2 is equal to the original distance between the cable tower 1 and the main beam 3 before jacking. After applying the temperature load to the lateral jacking unit 2, the lateral jacking unit 2 begins to heat up, the temperature value T increases, the lateral jacking unit 2 extends and jacks the main beam 3, and the specific jacking thrust value F can be obtained by iterative calculation according to the above relationship. Iterative calculation refers to taking an approximate value first, and then using the same recursive formula to approximate it successively, and repeatedly correcting this initial value until the predetermined accuracy requirement is met. After the main beam 3 is finally jacked to the original design position, the measured data is analyzed to provide data support for the actual jacking work.
[0066] Furthermore, after the main beam 3 is pushed, the cable forces of each inclined cable in the three-dimensional model are adjusted to the current working condition to prevent the inclined cable from pulling the bridge body destructively. The adjusted cable force values are recorded to provide data support for subsequent actual construction.
[0067] The construction method of the cable-stayed bridge transverse deviation correction and jacking device in the second embodiment of the present invention comprises:
[0068] S1. Select the jack according to the thrust value and the jacking distance measured in the first aspect of the embodiment, so that the jack can meet the requirements of the jacking distance and the jacking thrust;
[0069] S2. Install the jack on the cable tower 1, specifically at the installation position of the lateral thrust unit 2 on the cable tower 1 in the three-dimensional model, with both ends of the jack connected to the cable tower 1 and the main beam 3 respectively;
[0070] S3. Start the jack and push the main beam 3 until the deviation correction work is completed.
[0071] Specifically, when long-distance deviation correction work is performed, multiple jacks can be used for staged jacking.
[0072] Furthermore, an anti-overthrust device 4 is provided on the cable tower 1, which is arranged on the other side opposite to the jack, and is used to prevent the jack from over-pushing the main beam 3 and causing damage to the bridge body.
[0073] Furthermore, a locking device is provided on the jack, which can limit the output distance of the output end of the jack, thereby preventing the output end of the jack from retreating due to external force, resulting in jacking failure.
[0074] Furthermore, after the deviation correction is completed, the cable force of each inclined cable is adaptively adjusted to prevent the inclined cable from destructively pulling the bridge body after the deviation correction. Specifically, the cable force value adjustment of each inclined cable can refer to the cable force value data obtained in the embodiment of the first aspect.
[0075] Below, the operation process of the present invention is explained in detail through an example:
[0076] Reference Figure 2 The bridge body shown in this example is a cable-stayed bridge body with a small curvature radius. Figure 2 The area shown is the area where the bridge body is laterally offset, specifically the bridge body part between piers 11#, 12#, 13#, 14#, 15#, 16# and 17#. Since cable towers are installed on piers 13# and 14#, according to the guidance of the north-south direction, the cable tower on pier 13# is called the south tower, and the cable tower on pier 14# is called the north tower.
[0077] First, the bridge in this area was measured on site and compared with the original design dimensions. Figure 3 The table of measured transverse deviation of the main beam and the control value of the top cone (Table 1).
[0078] It can be seen from the data in Table 1 that the lateral deviation of the main beam mainly occurs in the south tower curve section from pier 11# to pier 13#, and the maximum lateral deviation of the main beam occurs at pier 11#. The main reason for the deviation is that the lateral constraint stiffness at piers 11#, 12# and 13# is insufficient, and it is judged that lateral correction and jacking work is needed.
[0079] The data of the bridge body in this area is used to generate a three-dimensional model, and the model of the lateral correction and jacking device is prepared to be constructed. Due to the large lateral deviation of the curved section of the south tower, the lateral jacking unit is installed at the corresponding position of the south tower. The specific parameters of the lateral jacking unit are set, among which the elastic modulus E = 1.95E + 5MPa; the linear expansion coefficient γ = 0.01; the cross-sectional area A = 0.19625m2; the elastic modulus E = 0; the length value L = 500mm. According to the measured lateral deviation values of the main beam shown in Table 1, the jacking distances are selected as 100mm, 200mm and 320mm, respectively. The initial values of the temperature values T to be applied are calculated by the linear expansion coefficient relationship ΔL / L = γT, which are 20℃, 40℃ and 64℃, respectively. Substitute the 3D model of the cable-stayed bridge to obtain the thrust value F of the lateral jacking unit, and substitute the data into the relationship The updated applied temperature value T is obtained in the calculation. After multiple iterative calculations, the corresponding applied temperature values T are 20.002°C, 40.006°C and 64.009°C, and the top thrust force values F are 928kN, 2442kN and 3613kN, respectively, and are recorded.
[0080] At the same time, in order to facilitate the subsequent adjustment of the actual cable force value, the cables in the digital model are adjusted and simulated accordingly to ensure that the cables do not cause destructive pulling on the bridge body.
[0081] After obtaining the relevant simulation data, the lateral deviation correction work of the actual cable-stayed bridge was started. According to the calculated jacking distance ΔL and thrust value F, a jack that can meet the conditions is selected. If the jacking distance ΔL is too large, multiple jacks can be connected in series to achieve multi-stage jacking. The jack is set at the corresponding position of the cable tower, so that the two ends of the jack are connected to the cable tower and the main beam respectively. In order to prevent excessive jacking, an anti-overthrow device 4 is set on the cable tower 1, and a locking device is set on the jack.
[0082] The main beam was started to be pushed, and the cable tension of each inclined cable was monitored and measured in real time during the pushing process.
[0083] Reference Figure 3 The most unfavorable cross-sectional stress value table of the tower members during the jacking process (Table 2) shows that the cross-sectional stress of the tower is in a compressive state during the jacking process. Therefore, the stress state of the tower meets the control requirements during the jacking process.
[0084] Reference Figure 3The table of incremental values of the tower deviation during the jacking process (Table 3) shows that the actual change value of the tower deviation during the jacking process is basically consistent with the theoretical calculated value. Therefore, it can be determined that the force and deformation of the tower structure during the jacking process meet the control requirements.
[0085] Reference Figure 4 and Figure 5 During the top-pushing process of the main beam at the south tower, the cable forces of the left and right inclined cables of the north tower were very little affected by it, while the cable forces of the tail cables of the side spans of the south tower and the short cables in the tower area were relatively greatly affected by it. After the theoretical calculation, the cable force of SL-FLS5 was the most affected, and the cable force increased by 471kN, accounting for about 27% of the total cable force. After the actual top-pushing, the cable force of SL-FLS5 was still the most affected, and the cable force increased by 536kN, accounting for about 29% of the total cable force. In general, the horizontal top-pushing of the main beam has a great influence on the change of the cable force value of the inclined cable.
[0086] Reference Figure 6 During the process of pushing the main beam at the south tower, the elevation of the side span main beams was less affected, while the elevation of the mid-span of the main beam was more affected. After the pushing was completed, the mid-span elevation was raised by about 47.6mm. The actual on-site measurement showed that the mid-span elevation was raised by 43mm, and the maximum error between the actual measurement value and the theoretical value was about 4.6mm.
[0087] After the jacking is completed, the cable force analysis of the completed bridge is carried out. After the lateral jacking is completed, the plane position of the main beam reaches the design requirements of the completed bridge. At this time, the cable force and main beam elevation of the completed bridge are quite different from the expected design state. Therefore, it is necessary to adjust the cable force value of the inclined cable to ensure that the cable force value and main beam elevation value of the completed bridge meet the design requirements. Figure 7 and Figure 8 The maximum relative percentage errors of the measured cable tension of the left inclined cable and the theoretical calculated cable tension and the designed cable tension are 4.2% and 3.5% respectively, and the minimum relative percentage errors are -5.1% and -5.6% respectively. The maximum relative percentage errors of the measured cable tension of the right inclined cable and the theoretical calculated cable tension and the designed cable tension are 4.8% and 4.2% respectively, and the minimum relative percentage errors are -4.4% and -4.7% respectively. Analysis shows that the errors between the measured values of the cable tension, the theoretical calculated values and the designed values all meet the construction control requirements.
[0088] After the jacking is completed, the main beam elevation analysis is carried out. During the cable adjustment process of the entire bridge, according to the actual error of the main beam, the local cable force of the inclined cable is appropriately adjusted to adjust the main beam elevation error to an acceptable range for construction. Fig. 9The maximum error between the measured elevation and the theoretical elevation of the top surface of the steel beam at the web of the left side of the main beam is 18mm, and the minimum is -5mm. The maximum error between the measured elevation and the theoretical elevation of the top surface of the steel beam at the web of the right side of the main beam is 12mm, and the minimum is -7mm. The maximum difference in the measured elevations of the top surfaces of the steel beams at the webs of the left and right sides of the main beam is 10mm. The ratio of the maximum error value of the mid-span elevation to the main span is approximately 18 / 364000≈1 / 20222, and the ratio of the elevation difference between the left and right sides to the transverse span is approximately 10 / 35500≈1 / 3550. Analysis shows that the measured linear shape of the main beam meets the design smoothness requirements, and the elevation error and the elevation difference between the left and right sides meet the construction control requirements.
[0089] The above is a specific description of the preferred implementation mode of the present invention, but the invention is not limited to the embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.
Claims
1. A model construction method for a lateral deviation correction and jacking device for a cable-stayed bridge. It is characterized in that include: Obtain the size parameters of the actual cable-stayed bridge; constructing a three-dimensional model of the actual cable-stayed bridge according to the size parameters, and adding mechanical parameters to the three-dimensional model; The three-dimensional model is adjusted to a main beam offset state consistent with the actual cable-stayed bridge to obtain an offset distance that needs to be corrected; A transverse pushing unit (2) is arranged at the cable tower (1) of the three-dimensional model, two ends of the transverse pushing unit (2) are respectively connected to the cable tower (1) and the main beam (3), and the transverse pushing unit (2) can change the telescopic length by changing the temperature; Applying a temperature increase load to the transverse pushing unit (2), so that the transverse pushing unit (2) pushes the main beam (3), and recording the experimental results until the pushing is completed; Wherein, the lateral thrust unit (2) satisfies the following relationship: ; ΔL is the telescopic length of the lateral pushing unit (2); T is the temperature value applied to the lateral pushing unit (2); L is the length of the lateral thrust unit (2); γ is the linear expansion coefficient; F is the thrust value of the lateral thrust unit (2); E is the elastic modulus of the lateral pushing unit (2); A is the cross-sectional area of the lateral thrust unit (2).
2. The model construction method of the cable-stayed bridge transverse deviation correction and jacking device according to claim 1, Features: First pass Calculate the initial temperature value corresponding to the telescopic length ΔL, then substitute the initial temperature value into the three-dimensional model of the cable-stayed bridge to obtain the thrust value F, and substitute the thrust value F into the relationship: The temperature value T is obtained again, and the relationship is used to perform iterative calculation to obtain the thrust value F finally corresponding to the target thrust distance value and the temperature value T that needs to be applied.
3. The model construction method of the cable-stayed bridge transverse deviation correction and jacking device according to claim 1, Features: The linear expansion coefficient is 0.
01.
4. The model construction method of the cable-stayed bridge transverse deviation correction and jacking device according to claim 3, Features: The initial value of the temperature value is obtained according to the definition formula of the linear expansion coefficient and the expansion length.
5. The model construction method of the cable-stayed bridge transverse deviation correction and jacking device according to claim 1, Features: After the jacking of the main beam (3) is completed, the cable force of each inclined cable in the three-dimensional model is adjusted to the current working condition, and the cable force value is recorded.
6. A construction method for a cable-stayed bridge transverse deviation correction and jacking device constructed by the model construction method of any one of claims 1 to 5, It is characterized in that include: Select the jack according to the offset distance and thrust value requirements; The jack is installed on the cable tower (1), with two ends of the jack being connected to the cable tower (1) and the main beam (3) respectively; The jack is started to push the main beam (3) until the deviation correction is completed.
7. The construction method of the cable-stayed bridge transverse deviation correction and jacking device according to claim 6, Features: The cable tower (1) is also provided with an anti-overthrow device (4) for limiting the maximum pushing distance of the jack.
8. The construction method of the cable-stayed bridge transverse deviation correction and jacking device according to claim 6, Features: The jack is provided with a locking device for locking the pushing distance of the jack after the pushing is completed.
9. The construction method of the cable-stayed bridge transverse deviation correction and jacking device according to claim 6, Features: After the deviation correction is completed, the cable force of each inclined cable is adaptively adjusted.
Citation Information
Patent Citations
Continuous bridge incremental launching construction deviation rectifying method
CN109837836A
Closure system for main beam of arch tower cable-stayed bridge and construction method thereof
CN111119068A