A method for analyzing prestress loss of prestressed anchor roadbed
By constructing a coupling effect model of prestressed roadbed, the loss of prestressed steel tension force can be accurately predicted, which solves the problem of insufficient safety of prestressed roadbed in the existing technology and realizes long-term safety guarantee for anchoring projects.
Patent Information
- Application Number
- CN202210213605.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-03
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-03-03
AI Technical Summary
Existing technologies cannot accurately predict the loss of tension in prestressed steel bars in prestressed roadbeds, resulting in insufficient long-term safety of anchorage projects.
By considering the additional stress diffusion effect in the subgrade, we established the steel bar shrinkage deformation equation and the subgrade soil creep deformation equation, constructed a coupling effect model of steel bar tension and subgrade soil creep, used the Burgers model to describe the creep behavior of the subgrade soil, and verified it using the FLAC 3D simulation platform.
Accurately predicting the loss of prestressed steel tension caused by soil creep can guide subsequent prestressing and ensure the long-term safety of anchorage projects.
Smart Images

Figure CN114722652B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of civil engineering, and in particular relates to a method for analyzing prestress loss of a prestressed anchor roadbed. Background Art
[0002] Prestressed anchoring / reinforcement technology is widely used in engineering fields such as slopes, foundation pits and mining. As the core of prestressed anchoring technology, the prestress level and its change over time are related to the success or failure of the anchoring project. In actual projects, accidents of anchoring project failure due to excessive prestress loss occur from time to time, and the economic losses caused are very huge. Therefore, for specific prestressed anchoring technology, studying its prestress loss law is of great significance to ensure the long-term safety of anchoring projects.
[0003] In previous studies, most of them focused on bonded prestressed anchor structures. Due to the obvious bonding effect between the anchor rod and the surrounding soil, the strain of the anchor rod can be approximately considered to be equal to the strain of the surrounding rock and soil. Therefore, previous studies have focused on bonded prestressed anchor structures and described the change law of prestress loss caused by creep of rock and soil based on the principle of equal strain. However, the prestressed tendons in the prestressed roadbed are wrapped by protective casings, which have no contact and friction relationship with the roadbed soil. They belong to the full-length non-bonded prestressed anchor structure, and the equal strain assumption is no longer applicable. In addition, for the prestressed anchor structure of non-bonded rock and soil, the deformation of the reinforced rock and soil along the axial direction of the anchor cable or anchor rod is usually simplified to uniform distribution, and its prestress loss characteristics are analyzed; however, in the prestressed roadbed, the additional stress caused by the prestressed reinforcement components has a significant diffusion effect, and the deformation of the roadbed soil at different positions is different, which cannot be assumed to be uniformly distributed.
[0004] In summary, it is necessary to propose a new method for analyzing prestress loss of prestressed anchor roadbed. Summary of the invention
[0005] The main purpose of the present invention is to provide a method for analyzing prestress loss in a prestressed anchor roadbed, which can accurately predict the loss of prestressed steel bar tensioning force caused by soil creep, and then can guide the subsequent prestressing supplementary tensioning, which is of great significance to ensuring the long-term safety of the anchoring project.
[0006] To this end, the present invention provides a method for analyzing prestress loss of a prestressed anchor roadbed, wherein the roadbed is reinforced by a reinforcement assembly, wherein the reinforcement assembly includes two side pressure plates arranged on both sides of the roadbed, prestressed steel bars anchored between the two side pressure plates, and a protective sleeve sleeved outside the prestressed steel bars, and the method includes the following steps:
[0007] Step 1: Considering the diffusion effect of additional stress in the roadbed, the creep of soil is simplified, and the creep strain of the roadbed soil is calculated by using the initial horizontal additional stress of the unit soil and the average value of the horizontal additional stress at time t to obtain the creep deformation equation of the roadbed soil;
[0008] Step 2: Establish the steel bar shrinkage deformation equation;
[0009] Step 3: Consider the soil behind the center point of the contact surface between the steel bar, the side pressure plate and the roadbed as multiple independent component models. By establishing a connection between the displacement compatibility and stress continuity of the contact surface between the side pressure plate and the roadbed, a coupling effect model of the steel bar tension force and roadbed soil creep is constructed to obtain the steel bar tension force F at time t. pt The prediction equation is:
[0010]
[0011]
[0012] Where: t is time, F p0 is the initial tension force of the steel bar, H is the horizontal distance between the center point of the contact surface between the side pressure plates on both sides of the roadbed and the roadbed, b and l are the lengths of the bottom surface of the side pressure plate along the longitudinal direction of the line and the roadbed slope direction, respectively, A s is the cross-sectional area of the steel bar, E s is the elastic modulus of the steel bar, K h is the horizontal additional stress coefficient at any point on the horizontal path behind the center point of the contact surface between the side pressure plate and the roadbed, E m 、E k are the elastic constants of Maxwell body and Kelvin body respectively, η m , η k are the viscosity constants of Maxwell body and Kelvin body respectively, and h is the horizontal distance between soil unit i and the roadbed slope on the horizontal path behind the center point of the contact surface between the side pressure plate and the roadbed.
[0013] Specifically, the creep deformation equation of roadbed soil is expressed as:
[0014]
[0015] Where: l st is the creep deformation of the roadbed soil, q0, q t are the initial horizontal average distributed load and the horizontal average distributed load at the contact surface between the side pressure plate and the roadbed at time t respectively.
[0016] Specifically, the prestressed steel bar is simulated by Hooke body, and the shrinkage strain ε of the steel bar along its axial direction under the half-width roadbed model is pt and shrinkage deformation pt The specific expression is as follows:
[0017]
[0018]
[0019] Specifically, step three includes the following steps:
[0020] The pre-compression stress of the side pressure plate on the roadbed slope is simplified to a horizontal rectangular uniformly distributed load q, then the initial horizontal uniformly distributed load q0 and the horizontal uniformly distributed load q at the contact surface between the side pressure plate and the roadbed at time t are t Can be expressed as:
[0021]
[0022]
[0023] Without considering the deformation of the anchor and the side pressure plate, the shrinkage deformation of the steel bar at any time t is l pt Creep deformation of roadbed soil st Satisfies the following relationship:
[0024] l st = l pt
[0025] Combining the above relationships, we can get the steel bar tension F pt expression.
[0026] Specifically, K h The expression is:
[0027] K h =m·exp(n·(h / b)+c)
[0028] Where: m, n, c are the fitting parameters of the horizontal additional stress distribution curve.
[0029] Compared with the prior art, the present invention has the following advantages and effects: the present application is proposed based on the compatibility of the shrinkage deformation of prestressed steel bars and the creep deformation of roadbed soil, the stress continuity at the contact surface between the side pressure plates on both sides of the roadbed and the roadbed soil, and the diffusion effect of the additional stress in the roadbed. The diffusion effect of the additional stress in the prestressed roadbed is taken into account, the calculation principle is clear, and the soil creep treatment is simple. The obtained prediction equation can accurately predict the loss of prestressed steel bar tensioning force caused by soil creep, and then can guide the subsequent prestressing tensioning, which is of great significance to ensuring the long-term safety of the anchoring project. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0031] Figure 1 is a flow chart of an embodiment of the present invention;
[0032] Figure 2 is a schematic diagram of a prestressed anchor roadbed structure involved in an embodiment of the present invention;
[0033] Figure 3 1 is a schematic cross-sectional diagram of a half-width prestressed roadbed passing through a centerline of a side pressure plate involved in an embodiment of the present invention;
[0034] Figure 4 A schematic diagram of a mechanical calculation model of a prestressed anchor roadbed according to an embodiment of the present invention;
[0035] Figure 5 It is a schematic diagram of calculating the horizontal additional stress involved in an embodiment of the present invention;
[0036] Figure 6 It is a schematic diagram of the block load PFBE and upper and lower corner points involved in the embodiment of the present invention;
[0037] Figure 7 K under three typical slopes involved in the embodiments of the present invention h -h / b relationship curve;
[0038] Figure 8 It is a schematic diagram of a coupling effect model involved in an embodiment of the present invention. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0041] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0042] See also Figure 1 A method for analyzing prestress loss of a prestressed anchor roadbed reinforced with the above reinforcement assembly comprises the following steps:
[0043] Step 1: Considering the diffusion effect of additional stress in the roadbed, the creep of soil is simplified, and the creep strain of the roadbed soil is calculated by using the initial horizontal additional stress of the unit soil and the average value of the horizontal additional stress at time t to obtain the creep deformation equation of the roadbed soil;
[0044] Figure 2 The figure shows a schematic diagram of a prestressed anchored roadbed structure. The roadbed is reinforced by a reinforcement assembly, which includes two side pressure plates arranged on both sides of the roadbed, prestressed steel bars anchored between the two side pressure plates, and a protective sleeve sleeved outside the prestressed steel bars. The prestressed roadbed is a symmetrical structure, in which the plate-soil contact surface (the contact surface between the side pressure plate and the roadbed) is provided with a serrated anti-skid step (see Figure 2 ), and the roadbed can achieve a better reinforcement effect when the steel bar tension tonnage is small (such as 10t). Figure 3 is a schematic cross-sectional diagram of the half-width prestressed roadbed passing through the center line of the side pressure plate, where F p is the steel bar tensioning force, h is the horizontal distance between the soil unit i and the roadbed slope on the horizontal path behind the center point of the contact surface between the side pressure plate and the roadbed, H is the horizontal distance between the center point of the contact surface between the side pressure plates on both sides of the roadbed and the roadbed, θ is the roadbed slope angle, b and l are the lengths of the bottom surface of the side pressure plate along the longitudinal direction of the line and the roadbed slope direction respectively.
[0045] The present invention retains the basic characteristics of the three-dimensional space problem (such as Figure 3 ), since the analysis focuses on the horizontal path behind the center point (i.e., characteristic point) of the plate-soil contact surface (see Figure 3 ) is an additional stress distribution law on the side of the road. For the convenience of description, the mechanical model is illustrated and explained based on the roadbed section passing the center line of the side pressure plate.
[0046] like Figure 4 As shown in the figure, a three-dimensional coordinate system is established with the center of the bottom surface of the side pressure plate as the origin, where the x-axis is along the roadbed slope, the y-axis is along the longitudinal direction of the line, and the z-axis is along the normal direction of the roadbed slope. The pre-compression stress of the side pressure plate on the roadbed slope is simplified to a horizontal rectangular uniformly distributed load q, which can be further decomposed into a uniformly distributed load q along the normal direction of the slope n and the uniformly distributed tangential load q along the slope t Based on the block corner point method for additional stress calculation in soil mechanics, the contact surface between the side pressure plate and the roadbed is divided into four equal parts (such as Figure 4 ), then the horizontal additional stress σ at any point on the horizontal path behind the center of the plate-soil contact surface is h for:
[0047]
[0048] σ h =qK h =qK h-PEAH +qK h-PFBE +qK h-PFCG +qK h-PGDH (2)
[0049] Where: K h is the horizontal additional stress coefficient at any point on the horizontal path behind the center point P of the plate-soil contact surface; the subscripts PEAH, PFBE, PFCG, and PGDH refer to Figure 4 The corresponding load block in . Horizontal additional stress σ h The specific derivation process is as follows:
[0050] When studying the horizontal diffusion law of prestress in the roadbed, it is necessary to change the stress calculation direction of soil unit i. According to the stress state analysis theory, the additional normal stress in any direction of soil unit i can be obtained by Figure 5 The six stress components σ in the calculation coordinate system x , σ y , σ z , τ xy =τ yx , τ yz =τ zy and τ zx =τ xz So the horizontal additional stress σ in the prestressed roadbed is h It can be expressed as:
[0051] σ h = l 2 σ x +m 2 σ y +n 2 σ z +2mnτ yz +2nlτ zx +2lmτ xy (3)
[0052] Where: x , σ y and σ z are the additional normal stresses of soil unit i along the x-direction (slope direction), y-direction (longitudinal direction of the line) and z-direction (normal direction of the slope) under the action of the horizontal uniformly distributed load q; τ xy , τ yz and τ xz are the additional shear stresses in surfaces xy, yz and xz of soil element i under the action of horizontal uniformly distributed load q; l, m and n are direction cosines, where l = cos(h, x), m = cos(h, y), n = cos(h, z).
[0053] The analysis diagram of the horizontal additional stress in the roadbed is as follows: Figure 5 ,according to Figure 4 From the established coordinate system, it can be seen that the horizontal direction is perpendicular to the y direction (longitudinal direction of the line), that is, the direction cosine m = cos (h, y) = 0, so the horizontal additional stress σ in the prestressed roadbed h Can be simplified to:
[0054] σ h = l 2 σ x +n 2 σ z +2nlτ xz (4)
[0055] It can be seen that solving the horizontal additional stress σ h Only the additional stress component σ needs to be calculated x , σ z and τ xz . Figure 3 The load component q of each block load along the slope normal n and the tangential load component q along the slope tangent t The additional stress components caused at the corner points of the block load can be obtained by integrating the Boussinesq formula and the Cerruti formula in the elastic theory respectively;
[0056] like Figure 6As shown in the figure, taking the block load PFBE as an example, the specific expression of the additional stress component is as follows:
[0057]
[0058]
[0059]
[0060]
[0061]
[0062]
[0063] Where: xn , σ zn and τ xzn The normal uniform load q n The additional normal stress in the x-direction (roadbed slope direction) and z-direction (slope normal direction) of the soil unit i under the action, as well as the additional shear stress in the xz plane; σ xt , σ zt and τ xzt are the tangential uniformly distributed loads q t The additional normal stress in the x-direction and z-direction and the additional shear stress in the xz plane of the soil unit i under the action; ω represents the block load area; μ is the Poisson's ratio; x, y, z represent the x-coordinate, y-coordinate and z-coordinate of the soil unit i respectively; R is the distance between the soil unit i and the coordinate origin:
[0064] R=(x 2 +y 2 +z 2 ) 1 / 2 .
[0065] According to the stress state analysis theory, the upper and lower corner points of the block load PFBE (such as Figure 4 and Figure 6 As shown in the figure, the corner point close to the shoulder is the upper corner point (such as point B and E), and the corner point close to the foot of the embankment is the lower corner point (such as point F and P). hu and σ hd , the specific expression is as follows:
[0066] σ hu =qK zu =(σ xn +σ xt )cos 2 θ+(σ zn +σ zt )sin 2 θ+(-τ xzn+τ xzt )sin2θ (11)
[0067] σ hd =qK zd =(σ xn -σ xt )cos 2 θ+(σ zn -σ zt )sin 2 θ+(τ xzn +τ xzt )sin2θ (12)
[0068] Where: K zu , K zd They are respectively expressed as the horizontal additional stress coefficient at any point on the z-direction path at the upper and lower corners of the block load PFBE.
[0069] Further, according to the block superposition principle and the calculation path conversion method, the horizontal additional stress at each point of the horizontal path behind the center point of the plate-soil contact surface can be obtained, and the horizontal additional stress coefficient K behind the center point of the plate-soil contact surface can be calculated. h The relationship curve with the change of h / b is fitted by an exponential function, and the specific expression is as follows:
[0070] K h =m·exp(n·(h / b)+c) (13)
[0071] Where: m, n, c are the fitting parameters of the horizontal additional stress distribution curve. The typical exponential function fitting effect is shown in Figure 7 The present invention adopts the Burgers model to describe the creep behavior of roadbed soil, and the specific expression of the creep equation is:
[0072]
[0073] ε=σC (15)
[0074]
[0075] Where: t is time, σ and ε represent the creep stress and creep strain of the subgrade soil respectively; They represent the first-order derivatives of creep stress and creep strain of roadbed soil with respect to time respectively; They represent the second-order derivatives of creep stress and creep strain of roadbed soil with respect to time; E m 、E k are the elastic constants of Maxwell body and Kelvin body respectively, η m , η kThey are the viscosity constants of Maxwell body and Kelvin body respectively. The specific values can be obtained through indoor creep test and parameter inversion.
[0076] A soil unit i on the horizontal path behind the side pressure plate is taken as the research object (e.g. Figure 3 ), the initial horizontal additional force of the unit soil after the reinforcement is locked should be σ h0 ; Due to the loss effect of prestress, the additional stress of the soil will decrease over time. Let the horizontal additional stress of the unit soil at time t be σ ht ; Existing studies have mostly used constant additional stress to calculate the creep strain of soil, that is, ε ht =σ h0 C, however, there is a significant coupling effect between the additional stress in the prestressed roadbed and the soil creep. The additional stress σ on the unit soil i h It decays over time. If the initial additional stress σ h0 When calculating the creep deformation of soil, the calculated result is too large, that is, If the additional stress σ at the calculation time (i.e. time t) ht Considering, the calculated result is too small, that is The creep strain of actual roadbed soil should be between the two. Therefore, the present invention adopts the initial horizontal additional stress σ of the unit soil body h0 and the horizontal additional stress σ at time t ht The mean value of the creep strain of the subgrade soil is calculated by The specific expression is as follows:
[0077]
[0078] According to the elastic constant E of the Maxwell body in the Burgers model m , then the instantaneous strain of unit soil i at the initial moment is The specific expression is:
[0079]
[0080] Therefore, the subsequent creep strain ε of unit soil i is ht for:
[0081]
[0082]
[0083] With the loss of prestress of steel bars, the additional stress on unit soil i is actually in a state of continuous reduction. The prestress remains unchanged until the deformation coordination and internal force balance between the steel bars and the soil are stable. Therefore, the elastic recovery deformation of unit soil i in the unloading process (i.e., additional stress attenuation) should be considered.
[0084] The additional horizontal stress of unit soil i is given by σ h0 Decay to σ ht The elastic recovery strain of the soil is for:
[0085]
[0086] Where: Represents the elastic recovery strain of the roadbed soil at time t.
[0087] Therefore, the actual creep of unit soil i at time t is for:
[0088]
[0089] According to formula (2), σ h0 and σ ht Can be expressed as:
[0090] σ h0 =q0K h (twenty three)
[0091] σ ht =q t K h (twenty four)
[0092] Where: q0 and q t They represent the initial horizontal average distributed load at the plate-soil contact surface and the horizontal average distributed load at time t respectively.
[0093] Considering the diffusion law of the additional stress along the horizontal path behind the center point of the plate-soil contact surface, the horizontal creep deformation l of the roadbed soil behind the center point of the plate-soil contact surface in the half-width roadbed can be obtained by integrating along the horizontal path H: st for:
[0094]
[0095] Step 2: Establish the steel bar shrinkage deformation equation;
[0096] Prestressed steel bars are typical elastic materials and can be simulated using a Hooke body (H body). Their deformation satisfies the law of elasticity. Assume that the tension force of the steel bar at time t is F pt , then the shrinkage strain ε of the steel bar along its axial direction under the half-width roadbed model is pt (compression is positive, tension is negative) and retraction deformation l pt They can be represented by the following formulae respectively.
[0097]
[0098]
[0099] Where: F p0 is the initial tension of the steel bar, A s is the cross-sectional area of the steel bar, E s is the elastic modulus of the steel bar, H is the horizontal distance between the center point of the contact surface between the side pressure plates on both sides of the roadbed and the roadbed, and h is the horizontal distance between the soil unit i on the horizontal path behind the center point of the contact surface between the side pressure plate and the roadbed and the roadbed slope.
[0100] Step 3: Consider the soil behind the center point of the contact surface between the steel bar, the side pressure plate and the roadbed as multiple independent component models, establish a connection between the displacement compatibility and stress continuity of the contact surface between the side pressure plate and the roadbed, and construct a coupling effect model of the steel bar tension force and the roadbed soil creep (such as Figure 8 (shown)
[0101] According to formula (1), the initial horizontal average load q0 at the roadbed-soil contact surface and the horizontal average load q at time t are t Can be expressed as:
[0102]
[0103]
[0104] If the deformation of anchors and side pressure plates is not considered, the shrinkage deformation of the steel bar at any time t is l pt Creep deformation of roadbed soil st The following expression should be satisfied:
[0105] l st = l pt (30)
[0106] Substituting equations (25), (27), (28) and (29) into equation (30), we can obtain the steel bar tension F pt It can be expressed as formula (30).
[0107] Get the steel bar tension F at time t pt The prediction equation is:
[0108]
[0109] Among them: F p0 is the initial tension force of the steel bar, H is the horizontal distance between the center point of the contact surface between the side pressure plates on both sides of the roadbed and the roadbed, b and l are the lengths of the bottom surface of the side pressure plate along the longitudinal direction of the line and the roadbed slope direction, respectively, A s is the cross-sectional area of the steel bar, E s is the elastic modulus of the steel bar, K h is the horizontal additional stress coefficient at any point on the horizontal path behind the center point of the plate-soil contact surface, E m、E k are the elastic constants of Maxwell body and Kelvin body respectively, η m , η k are the viscosity constants of Maxwell body and Kelvin body respectively, and h is the horizontal distance between soil unit i and the roadbed slope on the horizontal path behind the center point of the contact surface between the side pressure plate and the roadbed.
[0110] A finite difference numerical model of a typical prestressed roadbed is established based on the FLAC 3D simulation platform, and the finite difference numerical model is used to simulate the loss of steel bar tension force under three different working conditions. By comparing the simulation results with the results obtained by the analysis method of the present invention, the results show that the predicted curve of steel bar tension loss over time is in good agreement with the numerical simulation curve, and the deviation between the two is less than 5%, which demonstrates the effectiveness of the roadbed prestress loss model proposed in this paper.
[0111] This application proposes a prestress loss model for prestressed roadbed based on the compatibility of the shrinkage deformation of prestressed steel bars and the creep deformation of roadbed soil, the stress continuity at the contact surface between the side pressure plates on both sides of the roadbed and the roadbed soil, and the diffusion effect of the additional stress in the roadbed. Taking the Burgers creep model to describe the creep behavior of roadbed soil as an example, a specific roadbed prestress loss equation is derived, and the effectiveness of the model is verified based on FLAC 3D numerical simulation. The method in this paper takes into account the diffusion effect of additional stress in the prestressed roadbed, the calculation principle is clear, and the soil creep treatment is simple. The obtained prediction equation can accurately predict the loss of prestressed steel bar tension caused by soil creep, and then can guide the subsequent prestressing tensioning, which is of great significance to ensure the long-term safety of anchoring projects.
[0112] Unless otherwise stated, any technical solution disclosed in the present invention disclosed above, if it discloses a numerical range, then the disclosed numerical range is a preferred numerical range, and any technician in the field should understand that the preferred numerical range is only a numerical value with a more obvious technical effect or representative value among many implementable numerical values. Since there are too many numerical values to be exhaustive, the present invention discloses some numerical values to illustrate the technical solution of the present invention, and the numerical values listed above should not constitute a limitation on the scope of protection of the present invention.
[0113] At the same time, if the above-mentioned invention discloses or involves components or structural parts that are fixedly connected to each other, then, unless otherwise stated, the fixed connection can be understood as: a detachable fixed connection (for example, connected by bolts or screws), and can also be understood as: a non-detachable fixed connection (for example, riveting, welding). Of course, the mutual fixed connection can also be replaced by an integrated structure (for example, manufactured by one-piece molding using a casting process) (except when it is obviously impossible to use an one-piece molding process).
[0114] In addition, the terms used in any technical solution disclosed in the present invention to indicate positional relationships or shapes include states or shapes that are similar, similar or close to them unless otherwise stated. Any component provided by the present invention may be assembled from multiple separate components or may be a separate component manufactured by an integrated molding process.
[0115] The above embodiments are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. The obvious changes or modifications derived therefrom are still within the scope of protection of the present invention.
Claims
1. A method for analyzing prestress loss of a prestressed anchor roadbed, wherein the roadbed is reinforced by a reinforcement assembly, wherein the reinforcement assembly comprises two side pressure plates arranged on both sides of the roadbed, prestressed steel bars anchored between the two side pressure plates, and a protective sleeve sleeved outside the prestressed steel bars. It is characterized in that The steps include: Step 1: Considering the diffusion effect of additional stress in the roadbed, the creep of soil is simplified, and the creep strain of the roadbed soil is calculated by using the initial horizontal additional stress of the unit soil and the average value of the horizontal additional stress at time t to obtain the creep deformation equation of the roadbed soil; Step 2: Establish the steel bar shrinkage deformation equation; Step 3: Consider the soil behind the center point of the contact surface between the steel bar, the side pressure plate and the roadbed as multiple independent component models. By establishing a connection between the displacement compatibility and stress continuity of the contact surface between the side pressure plate and the roadbed, a coupling effect model of the steel bar tension force and roadbed soil creep is constructed to obtain the steel bar tension force F at time t. pt The prediction equation of Steel bar tension F pt The expression of the prediction equation is: Where: t is time, F p0 is the initial tension force of the steel bar, H is the horizontal distance between the center point of the contact surface between the side pressure plates on both sides of the roadbed and the roadbed, b and l are the lengths of the bottom surface of the side pressure plate along the longitudinal direction of the line and the roadbed slope direction, respectively, A s is the cross-sectional area of the steel bar, E s is the elastic modulus of the steel bar, K h is the horizontal additional stress coefficient at any point on the horizontal path behind the center point of the contact surface between the side pressure plate and the roadbed, E m 、E k are the elastic constants of Maxwell body and Kelvin body respectively, η m , η k are the viscosity constants of the Maxwell body and the Kelvin body, respectively; h is the horizontal distance between the soil unit i and the embankment slope on the horizontal path behind the center point of the contact surface between the side pressure plate and the embankment; The creep deformation equation of roadbed soil is expressed as: Where: l st is the creep deformation of the roadbed soil, q 0 ,q t are the initial horizontal average load and the horizontal average load at the contact surface between the side pressure plate and the roadbed at time t respectively; The prestressed steel bar is simulated by Hooke body, and the shrinkage strain ε of the steel bar along its axial direction under the half-width roadbed model is pt and shrinkage deformation pt The specific expression is as follows:
2. The method for analyzing prestress loss of prestressed anchor roadbed according to claim 1, It is characterized in that Step 3 specifically includes the following steps: The pre-compression stress of the side pressure plate on the roadbed slope is simplified to a horizontal rectangular uniformly distributed load q, then the initial horizontal uniformly distributed load q at the contact surface between the side pressure plate and the roadbed is 0 and the horizontal average load q at time t t Respectively expressed as: Without considering the deformation of the anchor and the side pressure plate, the shrinkage deformation of the steel bar at any time t is l pt Creep deformation of roadbed soil st Satisfies the following relationship: l st =l pt Combining the above relationships, we can get the steel bar tension F pt expression.
3. The method for analyzing prestress loss of prestressed anchor roadbed according to claim 1, It is characterized in that K h The expression is: K h =m·exp(n·(h / b)+c) Where: m, n, c are fitting parameters.