Prefabricated segmental bridge pier and construction method thereof
By setting up vertical steel tube concrete and prestressed steel bars at the bottom section of the bridge pier to connect with the cap, the problem of insufficient seismic extension effect of the existing bridge piers in unexpected disasters is solved, the compression and tensile resistance of the bridge piers is improved, and the improve its seismic performance under earthquakes.
Patent Information
- Application Number
- CN202210493322.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-07
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-05-07
AI Technical Summary
Under unexpected disaster conditions, the existing bridge piers cannot effectively exert the seismic extension effect of prestressed tendons and concrete-filled steel tubes, resulting in low energy dissipation capacity at the bottom and low ductility of the bridge piers.
Prefabricated segmental pier design is adopted. Vertical steel tube concrete is installed at the four corners of the bottom section of the pier, and is connected to the cap through prestressed tendons to increase the compression resistance of the bottom section of the pier and the bending ductility of the tension side, thereby improving Overall anti-seismic extension effect.
Under earthquake disasters, steel tube concrete is used to enhance the compression resistance and ductility of the bottom section of the pier, improve the self-resetting ability and seismic performance of the pier, and give full play to the role of steel tube concrete.
Smart Images

Figure CN114775412B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge structures, and in particular to a prefabricated segmental bridge pier and a construction method thereof. Background Art
[0002] In highway bridges, a self-resetting system connected by prestressed steel strands is often used, that is, a "non-equivalent cast-in-place system". Its main advantage is that under the action of earthquakes, the opening and closing of its node joints can reduce the damage accumulation of concrete in the tension zone, and the post-tensioning prestressing can achieve the self-resetting ability to restore the initial position. However, there are also problems such as weak energy dissipation capacity and insufficient ductility. In order to solve the problems of energy dissipation characteristics and poor ductility of the self-resetting pier system itself, steel tube concrete is placed at the center of the existing piers, and prestressed tendons are distributed on the periphery of the steel tube concrete to improve the energy dissipation capacity of the bottom of the pier and improve the ductility of the pier. However, under unexpected disaster conditions, the main tension and compression positions of the pier components are located at the edges of the section, and the seismic extension effect of the prestressed tendons and steel tube concrete located in the center cannot be effectively exerted. Summary of the invention
[0003] The purpose of the present invention is to provide a prefabricated segmental pier to solve the technical problem in the prior art that the seismic extension effect of prestressed tendons and steel tube concrete cannot be effectively exerted, resulting in low bottom energy dissipation capacity and low ductility of the pier.
[0004] In order to achieve the above-mentioned purpose, the first aspect of the present invention provides a prefabricated segmental pier, which includes: a cap, a prefabricated square pier body arranged on the cap, and four prestressed tendons; a first prestressed anchor is arranged at the center of the top surface of the prefabricated square pier body, and the prefabricated square pier body has four prestressed channels with upper ends facing the first prestressed anchor, and the lower ends of the four prestressed channels are respectively located at the four corners of the square bottom surface of the prefabricated square pier body; the bottom end of the prefabricated square pier body has a pier bottom section; vertically arranged steel tube concrete is arranged at the four corners of the pier bottom section, and the prestressed channels pass through the steel tube concrete; each of the prestressed tendons passes through a corresponding prestressed channel, and the first prestressed anchor is connected to the cap through the four prestressed tendons.
[0005] Preferably, a support seat is provided on the outer side surface of the pier bottom section, and the support seat is located at the lower part of the pier bottom section.
[0006] Preferably, the support seat is square, the support platform is provided with a square receiving groove for receiving the support seat, and the four side surfaces of the support seat and the four groove walls of the square receiving groove are provided with a plurality of shear bolts.
[0007] Preferably, the prefabricated square pier body has multiple pier body sections; the multiple pier body sections are stacked on the pier bottom section in sequence from bottom to top, and the prestressed ducts are penetrated in the multiple pier body sections.
[0008] Preferably, two adjacent pier body sections are connected via a first concave-convex shear key.
[0009] Preferably, there is adhesive between the contact surfaces of two adjacent pier body sections.
[0010] Preferably, the pier body section located at the bottom is connected to the pier bottom section via a second concave-convex shear key.
[0011] Preferably, a groove for accommodating the first prestressed anchor is provided on the top of the prefabricated square pier body.
[0012] Preferably, four second prestressed anchors are provided at the bottom of the pedestal, and each of the second prestressed anchors is connected to one of the prestressed tendons.
[0013] A second aspect of the present invention provides a construction method for a prefabricated segmental bridge pier, comprising:
[0014] According to the height of the prefabricated square pier body, a pier bottom section and multiple pier body sections are prepared; when the pier bottom section is cast and formed, round steel pipes and prestressed pipes need to be pre-buried at the four corners of the square steel cage to form a pier bottom section with prestressed pipes and steel tube concrete; when the pier body section is cast and formed, the prestressed pipes are pre-buried first;
[0015] A second prestressed anchor is reserved at the bottom of the cap base, and a prestressed tendon of sufficient length is extended from the second prestressed anchor, followed by anchoring and fixing, and pouring concrete for the cap;
[0016] Move the pier bottom section to the installation position of the cap, pass the prestressed tendons through the pre-buried prestressed pipes, and use concrete to fill and compact the connection between the pier bottom section and the cap; then stack multiple pier bottom sections one by one on the pier bottom section from bottom to top to form a prefabricated square pier body; when the pier bottom sections are stacked, the prestressed tendons must first be passed through the pre-buried prestressed pipes;
[0017] After the prefabricated square pier body is stacked and assembled, the first prestressed anchor is installed on the top of the prefabricated square pier body, and four prestressed tendons are passed through the first prestressed anchor to tension the prestressed tendons, thereby completing the construction work.
[0018] The prefabricated segmental bridge pier and the construction method thereof provided by the present invention have the following beneficial effects: the prefabricated square pier body of the prefabricated segmental bridge pier has a pier bottom section, and vertically arranged steel tube concrete is arranged at the four corners of the pier bottom section to improve the energy dissipation capacity of the cross-sectional edge of the pier bottom section. In the event of an earthquake disaster, the steel tube concrete can be used to increase the compressive resistance and ductility of the compression zone of the pier bottom section, and can also increase the bending ductility of the tension side, thereby improving the overall seismic extension effect of the pier bottom section, so as to give full play to the role of the steel tube concrete; moreover, the first prestressed anchor at the top of the prefabricated square pier body is anchored to the abutment through four eccentrically arranged prestressed tendons. Compared with existing bridge piers of the same height, the tensile force arm and the compressive force arm of the prestressed tendons are longer, and the tensile and compressive resistance effects are better, so as to improve the self-resetting ability of the prefabricated square pier body.
[0019] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 is a structural schematic diagram of a prefabricated segmental bridge pier according to an embodiment of the first aspect of the present invention;
[0021] Figure 2 It is a structural schematic diagram of a pier body section of a prefabricated segmental bridge pier according to an embodiment of the first aspect of the present invention;
[0022] Figure 3 2 is a schematic structural diagram of a pier bottom section of a prefabricated segmental bridge pier according to a first aspect of an embodiment of the present invention;
[0023] Figure 4 It is a schematic diagram of the cross-sectional structure of the pier bottom section of the prefabricated segmental pier according to the embodiment of the first aspect.
[0024] In the figure, 1. prefabricated square pier body; 11. pier bottom section; 12. support seat; 13. pier body section; 14. groove; 2. pedestal; 21. square receiving groove; 3. prestressed tendons; 4. first concave-convex shear key; 41. second concave-convex shear key; 5. first prestressed anchor; 6. shear stud; 7. steel tube concrete; 8. prestressed channel; 9. second prestressed anchor. DETAILED DESCRIPTION
[0025] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0026] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0027] In the description of the present invention, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood as not including the number itself, and "above", "below", "within" etc. are understood as including the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0028] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0029] Please also read Figures 1 to 4 Now, the prefabricated segmental bridge pier provided in the embodiment of the present invention is described.
[0030] Reference Figures 1 to 4 The prefabricated segmental pier of the embodiment of the present invention comprises: a cap 2, a prefabricated square pier body 1 arranged on the cap 2, and four prestressed tendons 3; a first prestressed anchor 5 is arranged at the center of the top surface of the prefabricated square pier body 1, the prefabricated square pier body 1 has four prestressed channels 8 with the upper ends facing the first prestressed anchor 5, and the lower ends of the four prestressed channels 8 are respectively located at the four corners of the square bottom surface of the prefabricated square pier body 1; the bottom end of the prefabricated square pier body 1 has a pier bottom section 11; vertically arranged steel tube concrete 7 are arranged at the four corners of the pier bottom section 11, and the prestressed channels 8 pass through the steel tube concrete 7; each prestressed tendon 3 passes through a corresponding prestressed channel 8, and the first prestressed anchor 5 is connected to the cap 2 through the four prestressed tendons 3.
[0031] The prefabricated square pier body 1 is in the shape of a square column. The upper ends of the four prestressed channels 8 converge at the first prestressed anchor 5 at the top of the prefabricated square pier body 1, which extends divergently toward the four corners of the bottom surface of the pier bottom section 11, so that the prestressed channels 8 in the pier bottom section 11 can be located in the steel tube concrete 7. The steel tube concrete 7 is formed by filling the round steel tube of the pier bottom section 11 with concrete to improve the energy dissipation capacity of the cross-sectional edge of the pier bottom section 11 and the overall seismic extension effect of the pier bottom section 11, so as to give full play to the role of the steel tube concrete 7. The first prestressed anchor 5 of the prefabricated square pier body 1 is anchored to the pedestal 2 through four prestressed tendons 3 arranged off the center of the prefabricated square pier body 1. Compared with the existing bridge piers of the same height, the tensile arm and the compressive arm of the prestressed tendons 3 are longer, and the tensile and compressive effects are better, so as to improve the self-resetting ability of the prefabricated square pier body 1.
[0032] It should be noted that after the four prestressed tendons 3 are anchored and tensioned with the first prestressed anchor 5, the prestressed tendons 3 can be regarded as the side edges of a quadrangular pyramid. Two adjacent prestressed tendons 3 can form a triangle with the cap 2. Compared with the square compression and tension frames, the triangular tension and compression frames have better compression and compression resistance, so as to improve the self-resetting ability and earthquake resistance of the prefabricated square pier body 1.
[0033] The prefabricated square pier body 1 of the prefabricated segmental pier of the present embodiment has a pier bottom section 11, and vertically arranged steel tube concrete 7 are arranged at the four corners of the pier bottom section 11 to improve the energy dissipation capacity of the cross-sectional edge of the pier bottom section 11. Under earthquake disasters, the steel tube concrete 7 can be used to increase the compressive capacity and ductility of the compression zone of the pier bottom section 11, and can also increase the bending ductility of the tension side, improve the overall seismic extension effect of the pier bottom section 11, and give full play to the role of the steel tube concrete 7; moreover, the first prestressed anchor 5 on the top of the prefabricated square pier body 1 is anchored to the abutment 2 through four eccentrically arranged prestressed tendons 3. Compared with the existing bridge piers of the same height, the tensile force arm and the compressive force arm of the prestressed tendons 3 are longer, and the tensile and compressive effects are better, so as to improve the self-resetting ability of the prefabricated square pier body 1.
[0034] In a preferred embodiment of the present invention, referring to Figure 1 and Figure 3 The outer side of the pier bottom section 11 is provided with a support seat 12, and the support seat 12 is located at the lower part of the pier bottom section 11. The support seat 12 is integrally formed with the pier bottom section 11. By providing the support seat 12, the contact area between the pier bottom section 11 and the pedestal 2 is increased, the connection strength between the pier bottom section 11 and the pedestal 2 is improved, and the collapse of the prefabricated square pier body 1 is prevented.
[0035] In a preferred embodiment of the present invention, referring to Figure 1The support seat 12 is square, and the cap 2 is provided with a square receiving groove 21 for receiving the support seat 12. The four sides of the support seat 12 and the four groove walls of the square receiving groove 21 are provided with a plurality of shear bolts 6. The gap between the support seat 12 and the square receiving groove 21 of the cap 2 can be filled and compacted with non-shrinkage self-compacting concrete, so that the connection between the cap 2 and the pier bottom section 11 is more stable, and the shear resistance of the bridge pier under extreme disaster conditions is improved. In addition, the combined prestressed tendons 3 can prevent the pier bottom section 11 from tipping over when subjected to force, so that the bridge pier and the cap 2 form a whole to resist force.
[0036] In a preferred embodiment of the present invention, referring to Figure 1 The prefabricated square pier body 1 has multiple pier body sections 13; the multiple pier body sections 13 are stacked on the pier bottom section 11 from bottom to top, and the prestressed channels 8 are penetrated in the multiple pier body sections 13. That is, the prefabricated square pier body 1 is formed by assembling the pier bottom section 11 with the multiple pier body sections 13, wherein the prestressed channels 8 are all penetrated in the pier body sections 13 so that the prestressed tendons 3 can pass through. By setting up multiple pier body sections 13, it is convenient to divide the large prefabricated square pier body 1 into multiple small pier body sections 13, so as to facilitate transportation and assembly. The prestressed channels 8 are polyvinyl chloride pipes or other plastic pipes commonly used on the market, which can be pre-buried in the pier body section 13 or the pier bottom section 11 to form prestressed channels 8.
[0037] In a preferred embodiment of the present invention, referring to Figure 1 , two adjacent pier body sections 13 are connected by a first concave-convex shear key 4. The contact surfaces of the two adjacent pier body sections 13 are provided with the first concave-convex shear key 4, and cooperate with each other to facilitate positioning, assembly and installation, so as to improve the cross-sectional friction force and improve the shear resistance of the entire prefabricated square pier body 1.
[0038] In a preferred embodiment of the present invention, there is an adhesive between the contact surfaces of two adjacent pier body sections 13. That is, the two adjacent pier body sections 13 are coated with an adhesive at the first concave-convex shear key 4 to enhance the bonding force, increase the cross-sectional friction force, and greatly improve the shear resistance of the prefabricated square pier body 1. It should be mentioned that the adhesive is an epoxy resin adhesive, which has a more reliable bonding performance and good shear resistance. In addition, other adhesives can also be used.
[0039] In a preferred embodiment of the present invention, referring to Figure 1 The pier body section 13 at the bottom is connected to the pier bottom section 11 through the second concave-convex shear key 41. The second concave-convex shear key 41 has the same shape as the first concave-convex shear key 4, so as to facilitate the selection of the pier body section 13 and the pier bottom section 11 for connection. The contact surfaces of the second concave-convex shear key 41 between the pier body section 13 and the pier bottom section 11 are bonded with epoxy resin glue.
[0040] In a preferred embodiment of the present invention, referring to Figure 1The top of the prefabricated square pier body 1 is provided with a groove 14 for accommodating the first prestressed anchor 5. The groove 14 can prevent the first prestressed anchor 5 from falling off the top surface of the prefabricated square pier body 1, thereby avoiding tension failure. By providing the groove 14, the first prestressed anchor 5 can also be quickly positioned and tensioned.
[0041] In a preferred embodiment of the present invention, referring to Figure 1 , four second prestressed anchors 9 are arranged at the bottom of the cap 2, and each second prestressed anchor 9 is connected to a prestressed tendon 3. The second prestressed anchor 9 is located below the lower end of the prestressed channel 8 and is arranged at the bottom of the cap 2 to better anchor the prestressed tendon 3. It should be noted that the prestressed tendon 3 is a steel strand, so that the prestressed tendon 3 can pass through the prestressed channel 8 and the first prestressed anchor 5 can anchor the upper end of the prestressed tendon 3.
[0042] The present invention also provides a construction method for a prefabricated segmental bridge pier, which comprises:
[0043] According to the height of the prefabricated square pier body 1, a pier bottom section 11 and multiple pier body sections 13 are prepared; wherein, when the pier bottom section 11 is cast and formed, round steel pipes and prestressed pipes need to be pre-embedded at the four corners of the square steel cage to form the pier bottom section 11 with prestressed pipes and steel tube concrete 7; when the pier body section 13 is cast and formed, the prestressed pipes are first pre-embedded; the pier bottom section 11 and multiple pier body sections 13 are all produced in the factory to produce the pier bottom section 11 with pre-embedded steel tube concrete 7 and prestressed channels 8, and the prestressed channels 8 with pre-embedded prestressed channels 8; wherein the prestressed channels 8 are polyvinyl chloride pipes. In order to facilitate assembly and increase shear resistance, the support seat 12 and the second concave-convex shear key 41 are directly formed when the pier bottom section 11 is cast, and the shear bolts 6 are embedded on the outside of the support seat 12, and the first concave-convex shear key 4 is directly formed when the pier body section 13 is cast;
[0044] A second prestressed anchor 9 is reserved at the bottom of the base of the cap 2, and a prestressed tendon 3 of sufficient length is extended from the second prestressed anchor 9, and then anchored and fixed, and the concrete of the cap 2 is poured; the cap 2 is cast on site to anchor the lower end of the prestressed tendon 3 on the cap 2, and then the cap 2 with a square receiving groove 21 is poured, and the shear bolt 6 is buried in the groove wall of the square receiving groove 21;
[0045] The pier bottom section 11 is moved to the installation position of the pedestal 2, that is, moved to the square receiving groove 21, the prestressed tendons 3 are passed through the pre-buried prestressed pipe, and the connection between the pier bottom section 11 and the pedestal 2 is sealed tightly with concrete, that is, the square receiving groove 21 and the support seat 12 are sealed tightly with concrete; then multiple sections of pier bottom sections 11 are stacked one by one on the pier bottom section 11 from bottom to top to form a prefabricated square pier body 1; wherein, when the pier bottom sections 11 are stacked, the prestressed tendons 3 must be inserted into the pre-buried prestressed pipe first; that is, when the prefabricated square pier body 1 is stacked and formed, the prestressed tendons 3 must be passed through the pier bottom section 11 and multiple pier body sections 13 one by one to pass out from the top of the prefabricated square pier body 1.
[0046] After the prefabricated square pier body 1 is stacked and assembled, the first prestressed anchor 5 is installed on the top of the prefabricated square pier body 1, and the four prestressed tendons 3 passing through the top of the prefabricated square pier body 1 pass through the first prestressed anchor 5, and the prestressed tendons 3 are tensioned in conjunction with the first prestressed anchor 5 to achieve the installation of post-tensioning prestressing and complete the construction work.
[0047] The four corners of the pier bottom section 11 of the prefabricated square pier body 1 formed by the construction method of the prefabricated segmental pier in this embodiment are all provided with vertically arranged steel tube concrete 7 to improve the energy dissipation capacity of the cross-sectional edge of the pier bottom section 11. Under earthquake disasters, the steel tube concrete 7 can be used to increase the compressive capacity and ductility of the compression zone of the pier bottom section 11, and can also increase the bending ductility of the tension side, so as to improve the overall seismic extension effect of the pier, so as to give full play to the role of the steel tube concrete 7; moreover, the first prestressed anchor 5 on the top of the prefabricated square pier body 1 is anchored to the abutment 2 through four eccentrically arranged prestressed tendons 3. Compared with the existing piers of the same height, the tensile force arm and the compressive force arm of the prestressed tendons 3 are longer, and the tensile and compressive effects are better, so as to improve the self-resetting ability of the pier.
[0048] The above are only preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A prefabricated segmental bridge pier, characterized in that: include: A cap, a prefabricated square pier body arranged on the cap, and four prestressed tendons; A first prestressed anchor is arranged at the center of the top surface of the prefabricated square pier body, and the prefabricated square pier body has four prestressed channels with the upper ends facing the first prestressed anchor, and the lower ends of the four prestressed channels are respectively located at the four corners of the square bottom surface of the prefabricated square pier body; the bottom end of the prefabricated square pier body has a pier bottom section; vertically arranged steel tube concrete is arranged at the four corners of the pier bottom section, and the prestressed channels pass through the steel tube concrete; each of the prestressed tendons passes through a corresponding prestressed channel, and the first prestressed anchor is connected to the pedestal through the four prestressed tendons; two adjacent prestressed tendons cooperate with the pedestal to form a triangular frame.
2. The prefabricated segmental bridge pier according to claim 1, characterized in that: A support seat is arranged on the outer side surface of the pier bottom section, and the support seat is located at the lower part of the pier bottom section.
3. The prefabricated segmental bridge pier according to claim 2, characterized in that: The support seat is square in shape, the support platform is provided with a square receiving groove for receiving the support seat, and the four side surfaces of the support seat and the four groove walls of the square receiving groove are provided with a plurality of shear bolts.
4. The prefabricated segmental bridge pier according to claim 1, characterized in that: The prefabricated square pier body has multiple pier body sections; the multiple pier body sections are stacked on the pier bottom section in sequence from bottom to top, and the prestressed ducts are penetrated in the multiple pier body sections.
5. The prefabricated segmental bridge pier according to claim 4, characterized in that: Two adjacent pier body sections are connected via a first concave-convex shear key.
6. The prefabricated segmental bridge pier according to claim 5, characterized in that: Adhesive is provided between contact surfaces of two adjacent pier body sections.
7. The prefabricated segmental bridge pier according to claim 4, characterized in that: The pier body section located at the bottom is connected to the pier bottom section via a second concave-convex shear key.
8. The prefabricated segmental bridge pier according to claim 1, characterized in that: A groove for accommodating the first prestressed anchor is provided on the top of the prefabricated square pier body.
9. The prefabricated segmental bridge pier according to claim 1, characterized in that: Four second prestressed anchors are arranged at the bottom of the pedestal, and each of the second prestressed anchors is connected to one of the prestressed tendons.
10. A construction method for a prefabricated segmental bridge pier according to any one of claims 1 to 9, characterized in that: include: According to the height of the prefabricated square pier body, a pier bottom section and multiple pier body sections are prepared; when the pier bottom section is cast and formed, round steel pipes and prestressed pipes need to be pre-buried at the four corners of the square steel cage to form a pier bottom section with prestressed pipes and steel tube concrete; when the pier body section is cast and formed, the prestressed pipes are pre-buried first; A second prestressed anchor is reserved at the bottom of the cap base, and a prestressed tendon of sufficient length is extended from the second prestressed anchor, followed by anchoring and fixing, and pouring concrete for the cap; Move the pier bottom section to the installation position of the cap, pass the prestressed tendons through the pre-buried prestressed pipes, and use concrete to fill and compact the connection between the pier bottom section and the cap; then stack multiple pier bottom sections one by one on the pier bottom section from bottom to top to form a prefabricated square pier body; when the pier bottom sections are stacked, the prestressed tendons must first be passed through the pre-buried prestressed pipes; After the prefabricated square pier body is stacked and assembled, the first prestressed anchor is installed on the top of the prefabricated square pier body, and four prestressed tendons are passed through the first prestressed anchor to tension the prestressed tendons, thereby completing the construction work.
Citation Information
Patent Citations
Prefabricated segment assembling pier structure system and construction method thereof
CN103374881A
Socket type self-returning multi-section prefabricated pier and assembly method thereof
CN110468694A
Prefabricated assembled solid single-column pier based on root expanded section and construction method thereof
CN111021237A
Segment prefabricated assembled concrete-filled steel tube pier with recoverable function
CN112853933A
Precast pier and precast pier construction method using same
WO2016060334A1