A mechanized supporting tunnel initial support sequence construction method
By analyzing the stability of the surrounding rock in the tunnel and determining the sequenced construction method of initial support, the problem of mutual restriction of equipment flow in mechanized supporting tunnel construction is solved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202210321296.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-30
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2042-03-30
AI Technical Summary
During the mechanized supporting tunnel construction process, due to the limitation of the tunnel operation surface space, excavation, slag output, and initial support equipment flow are restricted, which limits the improvement of construction efficiency.
By obtaining the basic information parameters of the tunnel, analyzing the stability of the surrounding rock in the tunnel, and determining the sequenced construction method of initial support based on the surrounding rock stability and the safety coefficient of the anchor rock bearing arch, reducing the support volume of initial support and shortening the excavation-support single cycle time.
On the premise of ensuring safety, the initial support volume of the palm surface is reduced, the excavation-support single cycle time is shortened, the construction efficiency is improved, and the problem of limited construction efficiency improvement caused by the space limitations of the tunnel operation surface is solved.