A road maintenance grouting equipment

By designing highway maintenance seam filling equipment including seam filling box, moving wheel, heating wire and adjustment module, the problem that existing equipment cannot adjust the seam width of the tank sealing rubber seam according to the crack width is solved, and better filling effect and equipment flexibility are achieved.

CN114922039BActive Publication Date: 2025-04-08ANHUI HOUFU CONSTRUCTION ENGINEERING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210587713.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-26
Publication Date
2025-04-08
Estimated Expiration
2042-05-26

AI Technical Summary

Technical Problem

Existing highway maintenance equipment cannot adjust the filling width of the potting adhesive according to the width of the crack, which affects the filling effect.

Method used

A highway maintenance seam filling equipment is designed, including a seam filling box, a moving wheel, a heating wire and an adjustment module. The drive assembly drives the connecting plate to rotate, so that the adjustment column drives the moving rod to rotate, and the connecting column and the adjustment plate rotate accordingly, and the distance of the adjustment plate can be adjusted according to the crack width.

Benefits of technology

The filling width of the potting adhesive is dynamically adjusted according to the crack width, improving the filling effect and equipment flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114922039B_ABST
    Figure CN114922039B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of highway maintenance, and in particular to a highway maintenance grouting device; the device comprises a grouting box, a moving wheel, a heating wire and an adjusting module, wherein the adjusting module comprises a liquid guide plate, a connecting column, a moving rod, an adjusting column, an adjusting plate, a driving assembly and a connecting disk, wherein the liquid guide plate is fixedly connected to the grouting box, two connecting columns are rotatably connected to the liquid guide plate respectively, one end of each connecting column is fixedly connected to the corresponding moving rod, the other end of each connecting column is fixedly connected to the corresponding adjusting plate, the connecting disk is fixedly connected to the driving assembly, one end of the two adjusting columns is rotatably connected to the connecting disk, and the other end of the two adjusting columns is rotatably connected to the corresponding moving rod, the connecting disk is driven to rotate by the driving assembly, so that the adjusting column drives the moving rod to rotate, so as to adjust the distance formed by the two adjusting plates away from one end of the connecting column, thereby obtaining the effect of changing the grouting width of the potting glue according to the width of the crack.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of highway maintenance, and in particular to a highway maintenance seam grouting device. Background Art

[0002] At present, when cracks appear on the road surface, they need to be filled with caulking glue, but the caulking glue is easy to solidify, which affects the filling effect.

[0003] By arranging a heating wire in the caulking box, the temperature of the caulking box is maintained and the caulking glue is prevented from solidifying, so as to improve the filling effect.

[0004] However, during the filling process, it is impossible to change the filling width of the potting compound according to the width of the crack. Summary of the invention

[0005] The purpose of the present invention is to provide a road maintenance grouting device, which solves the problem that the grouting width of the sealing glue cannot be changed according to the width of the crack.

[0006] To achieve the above-mentioned purpose, the present invention adopts a road maintenance caulking equipment, comprising a caulking box, a moving wheel, a heating wire and an adjustment module, wherein the caulking box has an opening, the heating wire is arranged in the caulking box, the moving wheel is in a plurality of numbers, and each of the moving wheels is arranged below the caulking box;

[0007] The adjusting module comprises a liquid guide plate, two connecting columns, two movable rods, two adjusting columns, two adjusting plates, a driving assembly and a connecting plate. The liquid guide plate is fixedly connected to the caulking box and is located at the opening. The two connecting columns are rotatably connected to the liquid guide plate respectively and both pass through the liquid guide plate. One end of each of the connecting columns is fixedly connected to the corresponding movable rod, and the other end of each of the connecting columns is fixedly connected to the corresponding adjusting plate. The driving assembly is fixedly connected to the liquid guide plate and is located on the outer side wall of the liquid guide plate. The connecting plate is fixedly connected to the driving assembly. One end of the two adjusting columns is rotatably connected to the connecting plate, and the other end of the two adjusting columns is rotatably connected to the corresponding movable rod.

[0008] Wherein, the adjustment module also includes a track and two sliders, the track is fixedly connected to the liquid guide plate and is located on the outer wall of the liquid guide plate, each slider is fixedly connected to the corresponding moving rod and is slidably arranged in the track.

[0009] Wherein, the regulating module also includes a drainage block, which is fixedly connected to the caulking box and located at the opening.

[0010] Wherein, the driving assembly includes a driving motor and a reducer, the driving motor is fixedly connected to the liquid guide plate, the reducer is fixedly connected to the output end of the driving motor, and the connecting disk is fixedly connected to the output end of the reducer.

[0011] Wherein, the highway maintenance grouting equipment also includes a stirring component, and the stirring component is arranged in the grouting box.

[0012] Among them, the stirring assembly includes a rotating motor, a speed changer, a rotating shaft and a stirring block. The rotating motor is fixedly connected to the caulking box and is located on the outer wall of the caulking box. The speed changer is fixedly connected to the output end of the rotating motor. One end of the rotating shaft is fixedly connected to the output end of the speed changer. There are multiple stirring blocks, and each stirring block is respectively arranged on the outer wall of the rotating shaft.

[0013] Wherein, the stirring assembly also includes a connecting rod and a scraper, one end of the connecting rod is fixedly connected to the rotating shaft, and the scraper is fixedly connected to the other end of the connecting rod and adheres to the inner wall of the caulking box.

[0014] The present invention provides a highway maintenance caulking equipment, wherein caulking glue is placed in the caulking box, the heating wire is operated to increase the temperature in the caulking box to prevent the caulking glue from solidifying in the caulking box, the caulking box is moved under the action of a plurality of moving wheels, the caulking glue drips from the opening, and the cracks on the ground are caulked with the caulking glue, and before caulking, the driving component is controlled to operate to drive the connecting disk to rotate, so that the adjusting column drives the moving rod to rotate, the connecting column rotates with the rotation of the moving rod, and drives the adjusting plate to rotate, so as to adjust the distance formed by the two adjusting plates away from one end of the connecting column, thereby obtaining the effect of changing the caulking width of the caulking glue according to the width of the crack. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the present invention.

[0017] Figure 2 It is an overall rear view of the first embodiment of the present invention.

[0018] Figure 3It is a cross-sectional view of the overall structure of the first embodiment of the present invention.

[0019] Figure 4 It is a partial enlarged view of the first embodiment of the present invention.

[0020] Figure 5 It is a cross-sectional view of the overall structure of the second embodiment of the present invention.

[0021] Figure 6 It is a schematic diagram of the overall structure of the third embodiment of the present invention.

[0022] 101-caulking box, 102-opening, 103-moving wheel, 104-heating wire, 105-liquid guide plate, 106-connecting column, 107-moving rod, 108-adjusting column, 109-adjusting plate, 110-driving motor, 111-reducing machine, 112-connecting plate, 113-track, 114-slider, 115-drainage block, 201-rotating motor, 202-speed changer, 203-rotating shaft, 204-stirring block, 205-connecting rod, 206-scraper, 301-adjusting spring, 302-rotating column, 303-scraper, 304-outer cylinder, 305-inner rod. DETAILED DESCRIPTION

[0023] The first embodiment is:

[0024] See also Figure 1 to Figure 4 ,in Figure 1 is a schematic diagram of the overall structure of the first embodiment, Figure 2 is an overall rear view of the first embodiment, Figure 3 is a cross-sectional view of the overall structure of the first embodiment, Figure 4 The present invention provides a road maintenance grouting device, comprising a grouting box 101, a moving wheel 103, a heating wire 104 and an adjustment module, wherein the adjustment module comprises a liquid guide plate 105, two connecting columns 106, two moving rods 107, two adjustment columns 108, two adjustment plates 109, a driving assembly, a connecting plate 112, a track 113, two sliding blocks 114 and a drainage block 115, and the driving assembly comprises a driving motor 110 and a reducer 111;

[0025] According to this specific embodiment, the caulking box 101 has an opening 102, the heating wire 104 is arranged in the caulking box 101, the number of the moving wheels 103 is multiple, each of the moving wheels 103 is arranged under the caulking box 101, the caulking glue is placed in the caulking box 101, and the heating wire 104 is operated to increase the temperature in the caulking box 101 to prevent the caulking glue from solidifying in the caulking box 101. Under the action of the multiple moving wheels 103, the caulking box 101 is moved, and the caulking glue drips from the opening 102, and the cracks in the ground are caulked with the caulking glue.

[0026] The liquid guide plate 105 is fixedly connected to the caulking box 101 and is located at the opening 102. The two connecting columns 106 are respectively rotatably connected to the liquid guide plate 105 and both penetrate the liquid guide plate 105. One end of each connecting column 106 is fixedly connected to the corresponding moving rod 107, and the other end of each connecting column 106 is fixedly connected to the corresponding adjusting plate 109. The driving assembly is fixedly connected to the liquid guide plate 105 and is located on the outer side wall of the liquid guide plate 105. The connecting plate 112 is fixedly connected to the driving assembly. The two connecting columns 106 are fixedly connected to the liquid guide plate 105 and are located on the outer side wall of the liquid guide plate 105. One end of the adjusting column 108 is rotatably connected to the connecting disk 112, and the other ends of the two adjusting columns 108 are rotatably connected to the corresponding moving rods 107. The driving assembly is controlled to operate and the connecting disk 112 is driven to rotate, so that the adjusting column 108 drives the moving rod 107 to rotate, and the connecting column 106 rotates with the rotation of the moving rod 107, and drives the adjusting plate 109 to rotate, so as to adjust the distance formed by the two adjusting plates 109 away from one end of the connecting column 106, so as to obtain the effect of changing the filling width of the potting glue according to the width of the crack.

[0027] Secondly, the track 113 is fixedly connected to the liquid guide plate 105 and is located on the outer wall of the liquid guide plate 105. Each of the sliders 114 is fixedly connected to the corresponding moving rod 107 and is slidably arranged in the track 113. During the rotation of the moving rod 107, the slider 114 slides in the track 113, thereby improving the stability of the moving rod 107, the connecting column 106 and the adjustment plate 109 during the rotation.

[0028] At the same time, the drainage block 115 is fixedly connected to the caulking box 101 and is located at the opening 102. The drainage block 115 guides the caulking glue to the liquid guide plate 105 so that the caulking glue drips into the cracks on the ground.

[0029] In addition, the driving motor 110 is fixedly connected to the liquid guide plate 105, the reducer 111 is fixedly connected to the output end of the driving motor 110, and the connecting disk 112 is fixedly connected to the output end of the reducer 111. The driving motor 110 is controlled to operate. The driving motor 110 cooperates with the reducer 111 to drive the connecting disk 112 to rotate, so that the adjusting column 108 drives the moving rod 107 to rotate.

[0030] The caulking glue is placed in the caulking box 101, and the heating wire 104 is operated to increase the temperature in the caulking box 101 to prevent the caulking glue from solidifying in the caulking box 101. Under the action of the plurality of moving wheels 103, the caulking box 101 is moved, and the caulking glue drips from the opening 102. The cracks on the ground are caulked with the caulking glue. Before caulking, the driving motor 110 is controlled to operate, and the driving motor 110 cooperates with the reducer 111 to drive the connecting plate 112 to rotate, so that the adjusting column 108 drives the moving rod 107 to rotate, and the connecting column 106 rotates with the rotation of the moving rod 107, and drives the adjustment plate 109 to rotate, so as to adjust the distance formed by the two adjustment plates 109 away from one end of the connecting column 106. The drainage block 115 guides the caulking glue to the liquid guide plate 105 so that the caulking glue drips into the cracks on the ground. During the rotation of the moving rod 107, the slider 114 slides in the track 113, thereby improving the stability of the moving rod 107, the connecting column 106 and the adjustment plate 109 during the rotation, and obtaining the effect of changing the caulking width of the potting glue according to the width of the crack.

[0031] The second embodiment is:

[0032] Based on the first embodiment, please refer to Figure 5 ,in Figure 5 The present invention provides a road maintenance grouting device, which also includes a stirring assembly, wherein the stirring assembly includes a rotating motor 201, a speed changer 202, a rotating shaft 203, a stirring block 204, a connecting rod 205 and a scraper 206;

[0033] According to this specific embodiment, the stirring component is provided in the caulking box 101, and the stirring component stirs the caulking glue in the caulking box 101 so as to maintain the quality of the caulking glue.

[0034] Among them, the rotating motor 201 is fixedly connected to the caulking box 101 and is located on the outer wall of the caulking box 101, the speed changer 202 is fixedly connected to the output end of the rotating motor 201, one end of the rotating shaft 203 is fixedly connected to the output end of the speed changer 202, the number of the stirring blocks 204 is multiple, and each of the stirring blocks 204 is respectively arranged on the outer wall of the rotating shaft 203, and the rotating motor 201 is in operation, and the rotating motor 201 cooperates with the speed changer 202 to drive the rotating shaft 203 to rotate, so that the multiple stirring blocks 204 stir the caulking glue in the caulking box 101 to maintain the quality of the caulking glue.

[0035] Secondly, one end of the connecting rod 205 is fixedly connected to the rotating shaft 203, and the scraper 206 is fixedly connected to the other end of the connecting rod 205 and is attached to the inner wall of the caulking box 101. The connecting rod 205 rotates with the rotating shaft 203, so that the scraper 206 scrapes off the potting glue adhered to the inner wall of the caulking box 101.

[0036] The rotating motor 201 operates, and the rotating motor 201 cooperates with the speed changer 202 to drive the rotating shaft 203 to rotate, so that the multiple stirring blocks 204 stir the caulking glue in the caulking box 101, and the connecting rod 205 rotates with the rotating shaft 203, so that the scraper 206 scrapes the caulking glue adhered to the inner wall of the caulking box 101 to maintain the quality of the caulking glue.

[0037] The third embodiment is:

[0038] Based on the first embodiment, please refer to Figure 6 ,in Figure 6 The present invention provides a road maintenance and grouting device, which also includes a scraping assembly, wherein the scraping assembly includes two adjustment springs 301, two rotating columns 302, a scraper 303, an outer cylinder 304 and an inner rod 305;

[0039] According to this specific embodiment, the scraping assembly is arranged below the caulking box 101, and the scraping assembly is used to scrape the potting glue.

[0040] Among them, one end of each of the adjusting springs 301 is fixedly connected to the caulking box 101, each of the rotating columns 302 is fixedly connected to the other end of the corresponding adjusting spring 301, the scraper 303 is rotatably connected to the two rotating columns 302 respectively, the scraper 303 contacts the ground, the adjusting spring 301 is squeezed and compressed, and has a rebound force. Under the rebound force of the adjusting spring 301, the scraper 303 scrapes the potting glue flat.

[0041] Secondly, the outer cylinder 304 is fixedly connected to the caulking box 101, one end of the inner rod 305 is fixedly connected to the rotating column 302, and the adjusting spring 301 surrounds the outer side walls of the outer cylinder 304 and the inner rod 305 respectively, the inner rod 305 slides in the outer cylinder 304, and the inner rod 305 cooperates with the outer cylinder 304 to improve the stability of the adjusting spring 301.

[0042] The scraper 303 is rotatably connected to the two rotating columns 302, and the scraper 303 contacts the ground. The adjusting spring 301 is squeezed and compressed and has a rebound force. Under the rebound force of the adjusting spring 301, the scraper 303 scrapes the potting glue flat. The adjusting spring 301 surrounds the outer side walls of the outer cylinder 304 and the inner rod 305 respectively, and the inner rod 305 slides in the outer cylinder 304. The inner rod 305 cooperates with the outer cylinder 304 to improve the stability of the adjusting spring 301.

[0043] What is disclosed above is only a preferred embodiment of the present invention, and it certainly cannot be used to limit the scope of rights of the present invention. Ordinary technicians in this field can understand that all or part of the processes of the above embodiment and equivalent changes made according to the claims of the present invention still fall within the scope of the invention.

Claims

1. A road maintenance caulking device, comprising a caulking box, a moving wheel and a heating wire, wherein the caulking box has an opening, the heating wire is arranged in the caulking box, the moving wheel is multiple, and each moving wheel is arranged below the caulking box, characterized in that: Also includes a regulation module; The adjusting module comprises a liquid guide plate, two connecting columns, two movable rods, two adjusting columns, two adjusting plates, a driving assembly and a connecting plate. The liquid guide plate is fixedly connected to the caulking box and is located at the opening. The two connecting columns are rotatably connected to the liquid guide plate respectively and both pass through the liquid guide plate. One end of each of the connecting columns is fixedly connected to the corresponding movable rod, and the other end of each of the connecting columns is fixedly connected to the corresponding adjusting plate. The driving assembly is fixedly connected to the liquid guide plate and is located on the outer side wall of the liquid guide plate. The connecting plate is fixedly connected to the driving assembly. One end of the two adjusting columns is rotatably connected to the connecting plate, and the other end of the two adjusting columns is rotatably connected to the corresponding movable rod.

2. The road maintenance caulking equipment according to claim 1, characterized in that: The adjustment module also includes a track and two sliders. The track is fixedly connected to the liquid guide plate and is located on the outer side wall of the liquid guide plate. Each slider is fixedly connected to the corresponding moving rod and is slidably arranged in the track.

3. The road maintenance caulking equipment according to claim 1, characterized in that: The regulating module also includes a drainage block, which is fixedly connected to the caulking box and is located at the opening.

4. The road maintenance caulking equipment according to claim 1, characterized in that: The driving assembly includes a driving motor and a reducer, the driving motor is fixedly connected to the liquid guide plate, the reducer is fixedly connected to the output end of the driving motor, and the connecting disk is fixedly connected to the output end of the reducer.

5. The road maintenance caulking equipment according to claim 1, characterized in that: The highway maintenance caulking equipment also includes a stirring component, and the stirring component is arranged in the caulking box.

6. The road maintenance caulking equipment according to claim 5, characterized in that: The stirring assembly includes a rotating motor, a speed changer, a rotating shaft and a stirring block. The rotating motor is fixedly connected to the caulking box and is located on the outer wall of the caulking box. The speed changer is fixedly connected to the output end of the rotating motor. One end of the rotating shaft is fixedly connected to the output end of the speed changer. There are multiple stirring blocks, and each stirring block is respectively arranged on the outer wall of the rotating shaft.

7. The road maintenance caulking equipment according to claim 6, characterized in that: The stirring assembly also includes a connecting rod and a scraper. One end of the connecting rod is fixedly connected to the rotating shaft, and the scraper is fixedly connected to the other end of the connecting rod and is attached to the inner wall of the caulking box.

Citation Information

Patent Citations

  • Road maintenance crack pouring device

    CN211522797U

  • Road maintenance pavement crack pouring device

    CN212641158U