A multi-robot path planning method based on conflict classification search
By classifying conflicts in multi-robot path planning and designing resolution solutions for different types, the problems of large calculation volume and low resolution efficiency of existing algorithms are solved, and efficient and optimal multi-robot path planning is achieved.
Patent Information
- Application Number
- CN202210850762.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-20
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-07-20
AI Technical Summary
The existing multi-robot path planning algorithm requires a large amount of calculation, and it is easy to cause new avoidable conflicts when resolving conflicts, and cannot resolve multiple conflicts at one time, which affects efficiency.
Using a method based on conflict classification search, conflicts are divided into key opposite vertex conflicts, key cross-vertex conflicts and key edge conflicts. Different types of conflict resolution solutions are designed. Constraints are added at the high level, and the low level updates the path through path re-planning or waiting. Ensure that resolving current conflicts does not cause new conflicts and resolve multiple conflicts at once.
It effectively reduces the calculation amount of the algorithm, realizes the rapid calculation of the optimal solution of multi-robot path planning, ensures the optimality and completeness of path planning, and avoids the occurrence of new conflicts.
Smart Images

Figure CN114967712B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of multi-robot path planning, and in particular relates to a multi-robot path planning method based on conflict classification search. Background Art
[0002] Multi-robot path planning is one of the important research issues in the field of multi-robots. Reasonable and efficient multi-robot path planning methods can improve the work efficiency and economic benefits of multi-robot systems. Multi-robot path planning has practical applications in the fields of multi-robot collaborative control, intelligent warehousing, and traffic control.
[0003] The multi-robot path planning problem has attracted extensive attention from researchers and many research methods have been proposed. Chinese patent CN113985880A discloses "multi-robot path planning method, multi-robot system and robot". The method described in this patent can avoid congestion caused by two or more robots running towards each other in the same narrow road, and improve the working efficiency of the multi-robot system. However, this method depends on the particularity of the environment and has a limited scope of application. Chinese patent CN112362063A discloses "multi-robot path planning method and system based on collision type classification", which divides the conflict type according to the relative positions of the two robots. The advantage of this method is that it can quickly re-plan a new path to avoid conflicts. It is simple to implement, but the optimality of the algorithm cannot be guaranteed.
[0004] The conflict-based search (CBS) algorithm and its improved algorithms are a class of algorithms that can find the optimal solution for multi-robot path planning problems. The conflict-based search algorithm has a two-layer structure. The high-level structure constructs a binary constraint tree. The nodes of the constraint tree include constraints, solutions, and costs. The high-level structure selects and expands the nodes in the constraint tree in descending order of cost value. For the current node selected, if its solution is a set of conflict-free paths, the current node is used as the target node; otherwise, for the conflict in the current node, constraints are added and left and right child nodes are expanded to resolve the conflict. The nodes are repeatedly selected and expanded until a target node with a conflict-free solution is obtained. The low-level structure plans the shortest path set that satisfies the node constraints, that is, provides a solution for the node. The conflict-based search algorithm has optimality, but the multiple constraint tree node expansions and path replanning make the algorithm require a high amount of computation. The improved conflict-based search (ICBS) algorithm divides conflicts into three categories: critical conflicts, semi-critical conflicts, and non-critical conflicts, and uses the method of changing paths to reduce and resolve some conflicts. This algorithm has two shortcomings: (1) resolving key conflicts may lead to avoidable new conflicts; (2) the algorithm only resolves a single conflict independently each time and does not consider how to resolve multiple conflicts at once. Summary of the invention
[0005] In order to overcome the shortcomings of the prior art, the present invention proposes a multi-robot path planning method based on conflict classification search, while retaining the optimality of the conflict search algorithm, from the perspectives of reducing the algorithm calculation amount, not causing new avoidable conflicts when resolving conflicts, and resolving multiple conflicts at one time.
[0006] The method of the present invention adopts the conflict classification of critical conflicts and non-critical conflicts. In particular, the method further divides critical conflicts into critical opposite vertex conflicts, critical intersection vertex conflicts and critical edge conflicts. Then, for critical opposite vertex conflicts, a conflict resolution scheme is designed in which the high-level layer adds two vertex constraints in advance and the low-level layer replans the path, ensuring that no new avoidable conflicts are caused when resolving the current conflict; for critical intersection vertex conflicts, a conflict resolution scheme is designed in which the high-level layer adds vertex constraints and the low-level layer adopts a conflict resolution scheme that waits before the conflict moment, ensuring that while resolving the critical intersection vertex conflicts, other non-critical conflicts can be resolved as much as possible; for critical edge conflicts, a conflict resolution scheme is designed in which the high-level layer adds edge constraints and the low-level layer replans the path to ensure that the current conflict is smoothly resolved. The method of the present invention has low computational requirements and can quickly find the optimal solution for the multi-robot path planning problem.
[0007] The technical solution adopted by the present invention is:
[0008] A multi-robot path planning method based on conflict classification search includes the following steps:
[0009] Step 1: Construct the root node of the constraint tree. Use the A* algorithm to plan the shortest path set from the starting point to the target point for the robot in the known environment map; use the shortest path set as the solution of the root node;
[0010] Step 2, detect conflicts. Mark the root node as the current child node, and check whether there is a conflict in the shortest path set of the current child node in chronological order; if there is no conflict, go directly to step 10; if there is a conflict, go to step 3 to further detect the key attributes of the conflict;
[0011] Step 3: Detect the key attributes of the conflict. According to the key attribute conflicts, they are divided into key conflicts and non-key conflicts. If the conflict is a key conflict, go to step 4. If the conflict is not a key conflict, that is, a non-key conflict, go to step 9 to resolve the conflict. When key conflicts and non-key conflicts exist at the same time, the key conflicts are resolved first.
[0012] Step 4: Detect the type attribute of the key conflict. The key conflict is divided into key vertex conflict and key edge conflict according to the type attribute. If it is a key vertex conflict, go to step 5 for reclassification; if it is a key edge conflict, go to step 8 for conflict resolution.
[0013] Step 5, check the direction attribute of the key vertex conflict. Key vertex conflicts are divided into key opposite vertex conflicts and key cross vertex conflicts according to the direction attribute; if it is a key opposite vertex conflict, go to step 6 to resolve the conflict; if it is a key cross vertex conflict, go to step 7 to resolve the conflict; if there are multiple key vertex conflicts, resolve them in chronological order;
[0014] Step 6: Expand the node to resolve the conflict between key vertices facing each other. After completing the sub-node expansion, go to step 10.
[0015] Step 7, update the node, resolve the key intersection vertex conflict, and go to step 10 after completing the child node update;
[0016] Step 8, expand the node, resolve the key edge conflict, and go to step 10 after completing the child node expansion;
[0017] Step 9, expand the node, resolve non-critical conflicts, and go to step 10 after completing the sub-node expansion;
[0018] Step 10, select the node with the smallest cost value from all the expanded new generation child nodes as the current child node, and return to step 2 until the target node G with a set of conflict-free paths is obtained. The solution to the target node G is the solution to the multi-robot path planning problem.
[0019] Furthermore, the conflict in step 2 is expressed as (a i ,a j ,X,t), that is, robot a i and a j At time t, they jointly occupy element X, where element X is a vertex v or an edge (u, v).
[0020] Furthermore, the key conflict in step 3 is defined as: if in conflict (a i ,a j ,X,t) in robot a i The total cost is c i The paths of all occupy element X at time t, and robot a j The total cost is c j The paths all occupy element X at time t, then there is a conflict (a i ,a j ,X,t) is the key conflict.
[0021] Furthermore, the critical facing vertex conflict in step 5 is: if robot a i At time t-1 and t+1, robot a occupies vertices u and w respectively. j At time t-1 and t+1, vertices w and u are occupied respectively, that is, robot a i and aj By exchanging the vertices occupied by each other at time t-1 and time t+1, the key vertex conflict (a i ,a j ,v,t) is determined as a critical vertex conflict (a i ,a j ,u,v,w,t);
[0022] The key intersection vertex conflict in step 5 is: if robot a i At time t-1 and t+1, robot a occupies vertices u and w respectively, but robot a j At time t-1, vertex w or robot a is not occupied j At time t+1, vertex u is not occupied, that is, robot a i and a j If the vertices occupied by each other at time t-1 and t+1 are not exchanged, the key vertex conflict (a i ,a j ,v,t) is determined as a critical intersection vertex conflict
[0023] Furthermore, the step 6 of resolving the conflict of key opposite vertices is specifically as follows:
[0024] Step 6.1, the high-level key vertex conflicts (a i ,a j ,u,v,w,t) add constraints (a i ,u,v,t) is robot a i At time t, vertices u and v are prohibited from being occupied, and the left child node is expanded; add constraints (a j ,w,v,t) is robot a j At time t, it is forbidden to occupy vertices v and w, and expand the right child node;
[0025] Step 6.2, the lower layer is robot a i Re-plan from the starting position s i To the target position g i And satisfy the constraints (a i ,u,v,t) the shortest path p i '; The path p i 'Marked as p i , update the path set P as the solution of the left child node; for robot a j Re-plan from the starting position s j To the target position g j And satisfy the constraints (a j ,w,v,t) j '; The path p j 'Marked as p j, update the path set P as the solution of the right child node; after completing the child node expansion, go to step 10.
[0026] Furthermore, step 7 is to resolve key intersection vertex conflicts, specifically:
[0027] Step 7.1, high-level determination of the robot a to which constraints are added i : Critical intersection vertex conflict Medium Robot i There are N cti Non-critical conflicts, robot a j There are N ctj non-critical conflicts; robot a is preferred i Add constraints (a i ,v,t) expansion node, where N cti ≥N ctj ;
[0028] Step 7.2, the lower layer determines the waiting time t w :Assume robot a i N that existed before time t cti The non-critical conflict moments are Then t w ∈[0,t min ),in
[0029] Step 7.3, low-level adjustment path p i : In the original path p i Medium w Wait for 1 moment at the vertex corresponding to the moment, and adjust the path p i , update the path set P as the solution of the child node, and go to step 10 after completing the child node expansion.
[0030] Furthermore, step 8 is to resolve the key edge conflicts, specifically:
[0031] Step 8.1, high-level edge conflicts (a i ,a j ,v,u,t) add constraints (a i ,(u,v),t) is robot a i At time t, it is forbidden to pass through the edge (v,u) and expand the left child node; add constraints (a j ,(u,v),t) is robot a j At time t, it is forbidden to go through the edge (v,u) in the opposite direction and expand the right child node;
[0032] Step 8.2, the lower layer is robot a i Re-plan from the starting position s iTo the target position g i And satisfy the constraints (a i ,(u,v),t) i ', the path p i 'Marked as p i , update the path set P as the solution of the left child node; for robot a j Re-plan from the starting position s j To the target position g j And satisfy the constraints (a j ,(u,v),t) j ', the path p j 'Marked as p j , update the path set P as the solution of the right child node; after completing the child node expansion, go to step 10.
[0033] Furthermore, step 9 is to resolve non-critical conflicts, specifically:
[0034] Step 9.1: Senior management addresses non-critical conflicts (a i ,a j ,X,t) where X represents vertex v or edge (u,v), add constraints (a i ,X,t) is robot a i At time t, it is forbidden to occupy X and expand the left child node; add constraints (a j ,X,t) is robot a j At time t, it is forbidden to occupy X and expand the right child node;
[0035] Step 9.2, the lower layer is robot a i Re-plan from the starting position s i To the target position g i Satisfy the constraints (a i ,X,t), and the cost is c i The shortest path p i ', the path p i 'Marked as p i , update the path set P as the solution of the left child node; for robot a j Re-plan from the starting position s j To the target position g j And satisfy the constraints (a j ,X,t), and the cost is c j The shortest path p j ', the path p j 'Marked as p j , update the path set P as the solution of the right child node, and go to step 10 after completing the child node expansion.
[0036] In order to solve the problem of large algorithm computational complexity, the present invention divides the key conflicts between multi-robot paths into key opposite vertex conflicts, key intersection vertex conflicts and key edge conflicts, designs conflict resolution schemes such as re-planning paths and adjusting paths in a waiting manner, reduces the number of node expansions of the constraint tree and the number of calls to the low-level path planning algorithm, thereby effectively reducing the algorithm computational complexity.
[0037] For key opposite vertex conflicts, the present invention adds two vertex constraints in advance at the high level to prevent new avoidable conflicts from being caused when resolving the current conflicts. For key cross vertex conflicts, the present invention adopts the method of adding two vertex constraints at multiple times t before the conflict occurs. w The conflicts are resolved by waiting at the corresponding vertices, ensuring that while resolving the conflicts at the key intersections, other non-key conflicts can be resolved as much as possible, that is, multiple conflicts can be resolved at one time.
[0038] The beneficial effects of the present invention are as follows: the present invention proposes a multi-robot path planning method based on conflict classification search, which classifies path conflicts more clearly, proposes key opposite vertex conflicts, key intersection vertex conflicts and key edge conflicts, and designs solutions for conflict types. The high-level method adds constraints according to the conflict type, and the low-level method updates the set of shortest paths that meet the constraints through path replanning or waiting. The method can achieve the function of resolving the current conflict without causing new avoidable conflicts and resolving multiple conflicts with one path update. The method of the present invention has optimality and completeness, while reducing the number of node expansions at the high-level of the algorithm and the number of path replanning at the low-level, effectively reducing the overall computational complexity of the algorithm, and can quickly find the optimal solution for the multi-robot path planning problem. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 This is a flow chart of the multi-robot path planning method based on conflict classification search described in the present invention.
[0040] Figure 2 Categorize conflicts.
[0041] Figure 3 Schematic diagram of the initial shortest path for multiple robots.
[0042] Figure 4 Schematic diagram of the process of resolving conflicts between key opposite vertices based on the conflict classification search method.
[0043] Figure 5 Schematic diagram of the process of resolving conflicts between key opposite vertices based on the conflict search algorithm.
[0044] Figure 6 Schematic diagram of the process of resolving key cross vertex conflicts based on the conflict classification search method.
[0045] Figure 7Schematic diagram of the process of resolving key intersection vertex conflicts based on the conflict search algorithm.
[0046] Figure 8 Implementing a case target node for multi-robot path planning.
[0047] Fig. 9 This is a three-dimensional space display of multi-robot conflict-free paths. DETAILED DESCRIPTION
[0048] The present invention is further described below in conjunction with the accompanying drawings and a multi-robot path planning implementation case.
[0049] The flowchart of the multi-robot path planning method based on conflict classification search is as follows Figure 1 As shown, the conflict classification of the present invention is as follows Figure 2 As shown, the method of the present invention comprises the following steps:
[0050] Step 1: Construct the root node R of the constraint tree. Use the A* algorithm to plan the shortest path set P = (p1, p2, p3, p4, p5) from the starting point position S = (s1, s2, s3, s4, s5) to the target point position G = (g1, g2, g3, g4, g5) for the robot A = (a1, a2, a3, a4, a5) in the known environment map, such as Figure 3 As shown. Use the shortest path set P as the root node solution, that is, R.solution = P = (p1, p2, p3, p4, p5); robot a i In the path p i The cost is c i , the cost of the root node There is no constraint in the root node, that is, R.constraint = φ.
[0051] Step 2: Detect conflicts. Mark the root node R as the current node N. cur , detect the current node N in chronological order cur There are conflicts in the shortest path set P (a3,a4,D2,1), (a1,a2,A3,2) and (a3,a5,D4,3).
[0052] Step 3, detect the key attributes of the conflict. In the conflict (a1, a2, A3, 2), all paths of robot a1 with a cost of c1 = 3 occupy vertex A3 at time 2, and all paths of robot a2 with a cost of c2 = 3 occupy vertex A3 at time 2. Therefore, the conflict (a1, a2, A3, 2) is a key conflict. In the conflict (a3, a5, D4, 3), all paths of robot a3 with a cost of c3 = 4 occupy vertex D4 at time 3, and all paths of robot a5 with a cost of c5 = 4 occupy vertex D4 at time 3. Therefore, the vertex conflict (a3, a5, D4, 3) is a key conflict. In the conflict (a3, a4, D2, 1), robot a4 has another path that satisfies the cost of c4 = 4 and does not occupy vertex D2 at time 1. Therefore, the conflict (a3, a4, D2, 1) is not a key conflict, that is, a non-key conflict.
[0053] Step 4: Detect the type attribute of the critical conflict. In the critical conflicts (a1, a2, A3, 2) and (a3, a5, D4, 3) detected in step 3, the elements commonly occupied by the robots are vertices (vertex A3 and vertex D4), so these two conflicts are both critical vertex conflicts.
[0054] Step 5: Detect the direction attributes of key vertex conflicts.
[0055] In the key vertex conflict (a1, a2, A3, 2), robot a1 occupies vertices A2 and A4 at time 1 and 3 respectively, and robot a2 occupies vertices A4 and A2 at time 1 and 3 respectively, that is, robots a1 and a2 exchange the vertices occupied by each other at time 1 and 3. Therefore, the key vertex conflict (a1, a2, A3, 2) is determined as the key opposite vertex conflict (a1, a2, A2, A3, A4, 2).
[0056] In the critical vertex conflict (a3, a5, D4, 3), robot a3 occupies vertices D3 and D5 at time 2 and time 4 respectively, and robot a5 occupies vertices C4 and E4 at time 2 and time 4 respectively. That is, robots a3 and a5 do not exchange the vertices occupied by each other at time 2 and time 4. The vertex conflict (a3, a5, D4, 3) is determined as a critical intersection conflict.
[0057] Step 6: Expand the nodes and resolve the conflict between key opposite vertices (a1, a2, A2, A3, A4, 2).
[0058] Step 6.1: The high-level layer adds constraints (a1, A2, A3, 2) to the key conflicting vertices (a1, a2, A2, A3, A4, 2) to expand the left child node; and adds constraints (a2, A3, A4, 2) to expand the right child node.
[0059] Step 6.2, the lower layer re-plans the shortest path p1' = {A1, B1, B2, B3, B4, A4} from the starting position s1 = A1 to the target position g1 = A4 and satisfies the constraints (a1, A2, A3, 2) for robot a1; mark the path p1' as p1, and update the path set P as the solution of the left child node. Re-plan the shortest path p2' = {A5, B5, B4, B3, B2, A2} from the starting position s2 = A5 to the target position g2 = A2 and satisfies the constraints (a2, A3, A4, 2) for robot a2. Mark the path p2' as p2, and update the path set P as the solution of the right child node. The conflict resolution process is as follows: Figure 4 shown.
[0060] Figure 5 This is the process of resolving conflicts between key vertices based on the conflict search algorithm. Based on the conflict search algorithm, the key vertex conflict (a1, a2, A2, A3, A4, 2) is only regarded as the vertex conflict (a1, a2, A3,, 2). After adding constraints (a1, A3,, 2) or (a2, A3,, 2), although the current conflict is resolved, new conflicts (a1, a2, A2, A3,, 2) or (a1, a2, A3, A4,, 2) are triggered, and these conflicts can be avoided. In order to resolve the new conflicts, the conflict search algorithm needs to continue to add constraints and expand nodes. Therefore, the number of node expansions of the constraint tree based on the conflict search algorithm is large, and the amount of calculation is large.
[0061] The performance comparison between the method of the present invention and the method based on the conflict search algorithm for resolving key opposite vertex conflicts (a1, a2, A2, A3, A4, 2) is shown in Table 1. As shown in Table 1, after resolving key opposite vertex conflicts (a1, a2, A2, A3, A4, 2) based on the conflict search algorithm, a new conflict is triggered, and it takes 6 node expansions and calls to the low-level path planning algorithm to completely resolve these conflicts; the method of the present invention resolves the conflict (a1, a2, A3,, 2) without triggering new conflicts, and only requires 2 node expansions and calls to the low-level path planning algorithm. In short, the method of the present invention has more advantages in terms of computational complexity.
[0062] Table 1 Comparison of conflict performance of key opposite vertices
[0063]
[0064] After completing the child node expansion in step 6, go to step 10 and select the left child node as the current node N in the child node expanded in step 6. cur , and then return to step 2 to detect conflicts. curThere are conflicts (a3,a4,D2,1) and (a3,a5,D4,3) in the shortest path set P. Reuse the detection results of the previous step 3-5: the conflict (a3,a5,D4,3) is a key intersection vertex conflict Vertex conflict (a3, a4, D2, 1) is a non-critical conflict. Prioritize resolving critical intersection vertex conflicts. Go to step 7.
[0065] Step 7: Update nodes to resolve key intersection vertex conflicts
[0066] Step 7.1: High-level determination of the robot a to which constraints are added i . Critical intersection vertex conflict Robot a3 existed in N moments ago ct3 = 1 non-critical conflict, robot a5 existed in N ct5 = 0 non-critical conflicts. Obviously N ct3 >N ct5 , prioritize robot a3 to add constraint (a3,D4,3) extension node.
[0067] Step 7.2: The lower layer determines the waiting time t w :A non-critical conflict (a3, a4, D2, 1) existed for robot a3 3 moments ago and occurred at time 1. Then t min = 1. Waiting time t w ∈[0,1), that is, t w =0.
[0068] Step 7.3: The lower layer adjusts the path p3. In the original path p3 = {D1, D2, D3, D4, D5}, w =0, wait for 1 second at the vertex D1 corresponding to the time, adjust the path p3 = {D1, D1, D2, D3, D4, D5}, and update the path set P as the solution for the child node. Critical intersection vertex conflict The digestion process is as follows Figure 6 shown. Figure 6 Clearly shows that by adjusting path p3, the key intersection vertex conflict is resolved Afterwards, non-critical conflicts (a3, a4, D2, 1) were resolved at the same time.
[0069] Figure 7 The following is a schematic diagram of the process of resolving key intersection conflicts based on the conflict search algorithm. Figure 6From the node U, we can know that in order to resolve the conflict (a3, a5, D4, 3), the algorithm adds constraint (a3, D4, 3) to the high-level algorithm. The shortest path from the starting point D1 to the target point D5 is p3 = {D1, D2, D2, D3, D4, D5}. After resolving the conflict (a3, a5, D4, 3), the non-critical conflict (a3, a4, D2, 1) still exists. That is, the conflict search algorithm cannot resolve multiple conflicts through a single path update.
[0070] The method of the present invention is based on the conflict search algorithm to resolve the key intersection vertex conflict The performance comparison is shown in Table 2. As shown in Table 2, the method of the present invention resolves conflicts. At the same time, it can resolve one other conflict (non-critical conflict (a3, a4, D2, 1)), and resolving these conflicts only requires one node expansion and does not call the low-level path planning algorithm. Based on the conflict search algorithm, it is impossible to resolve other conflicts (non-critical conflicts (a3, a4, D2, 1)) at the same time, and resolving these conflicts requires six node expansions and calls to the low-level path planning algorithm. In short, the method of the present invention has more advantages in terms of computational complexity.
[0071] Table 2 Comparison of key cross vertex conflict performance
[0072]
[0073] After completing the child node expansion in step 7, go to step 10 and select the child node expanded in step 7 as the current node N cur , and then return to step 2 to detect conflicts. Current node N cur There is no conflict anymore, so the current node N cur Denoted as the target node G, Figure 8 The specific solution is shown in Table 3. From Table 3, we know that the optimal cost of the solution is 21 and there is no conflict.
[0074] Table 3 Solution for this multi-robot path planning implementation case
[0075]
[0076] Fig. 9 This is a three-dimensional spatial display of the optimal conflict-free path for multiple robots in this implementation case.
[0077] In this case, there are no critical edge conflicts and non-critical conflicts that cannot be resolved simultaneously by resolving critical intersection conflicts, so there is no need to perform steps 8-9. This case has been able to reflect the purpose and advantages of the method of the present invention, namely, retaining the optimality of the conflict search algorithm and reducing the amount of algorithm calculation, while achieving the function of not inducing new avoidable conflicts when resolving conflicts and resolving multiple conflicts with one path update. Critical edge conflicts and non-critical conflicts not involved in this case can also be processed according to steps 8-9 to obtain the optimal path for resolving conflicts.
Claims
1. A multi-robot path planning method based on conflict classification search, characterized in that: The steps include: Step 1: Use the A* algorithm to plan the shortest path set from the starting point to the target point for the robot in the known environment map; use the shortest path set as the solution of the root node; Step 2: Mark the root node as the current child node, and check in chronological order whether there is a conflict in the shortest path set of the current child node; If there is no conflict, go directly to step 10; if there is a conflict, go to step 3 to further detect the conflicting key attributes; Step 3: Classify the conflicts into key conflicts and non-key conflicts based on key attribute conflicts; if the conflict is a key conflict, go to step 4; if the conflict is not a key conflict, that is, a non-key conflict, go to step 9 to resolve the conflict; when key conflicts and non-key conflicts exist at the same time, resolve the key conflicts first; Step 4: Critical conflicts are divided into critical vertex conflicts and critical edge conflicts according to the type attribute; If it is a key vertex conflict, go to step 5 for reclassification; if it is a key edge conflict, go to step 8 for conflict resolution; Step 5: The key vertex conflicts are divided into key opposite vertex conflicts and key cross vertex conflicts according to the direction attributes; If there is a conflict between key opposite vertices, go to step 6 to resolve the conflict; If it is a key intersection vertex conflict, go to step 7 to resolve the conflict; if there are multiple key vertex conflicts, resolve them in chronological order; Step 6: Expand the node to resolve the conflict between key vertices facing each other. After completing the sub-node expansion, go to step 10. Step 7, update the node, resolve the key intersection vertex conflict, and go to step 10 after completing the child node update; Step 8, expand the node, resolve the key edge conflict, and go to step 10 after completing the child node expansion; Step 9, expand the node, resolve non-critical conflicts, and go to step 10 after completing the sub-node expansion; Step 10, select the node with the smallest cost value from all the expanded new generation child nodes as the current child node, and return to step 2 until the target node G with a set of conflict-free paths is obtained. The solution to the target node G is the solution to the multi-robot path planning problem.
2. The multi-robot path planning method based on conflict classification search according to claim 1 is characterized in that: The conflict in step 2 is expressed as (a i ,a j ,X,t), that is, robot a i and a j At time t, they jointly occupy element X, where element X is a vertex v or an edge (u, v).
3. The multi-robot path planning method based on conflict classification search according to claim 2 is characterized in that: The key conflict in step 3 is defined as: i ,a j ,X,t) in robot a i The total cost is c i The paths of all occupy element X at time t, and robot a j The total cost is c j The paths all occupy element X at time t, then there is a conflict (a i ,a j ,X,t) is the key conflict.
4. The multi-robot path planning method based on conflict classification search according to claim 3 is characterized in that: The key opposite vertex conflict in step 5 is: if robot a i At time t-1 and t+1, robot a occupies vertices u and w respectively. j At time t-1 and t+1, vertices w and u are occupied respectively, that is, robot a i and a j By exchanging the vertices occupied by each other at time t-1 and time t+1, the key vertex conflict (a i ,a j ,v,t) is determined as a critical vertex conflict (a i ,a j ,u,v,w,t); The key intersection vertex conflict in step 5 is: if robot a i At time t-1 and t+1, robot a occupies vertices u and w respectively, but robot a j At time t-1, vertex w or robot a is not occupied j At time t+1, vertex u is not occupied, that is, robot a i and a j If the vertices occupied by each other at time t-1 and t+1 are not exchanged, the key vertex conflict (a i ,a j ,v,t) is determined as a critical intersection vertex conflict 5. The multi-robot path planning method based on conflict classification search according to claim 4 is characterized in that: Step 6 resolves the conflict of key opposite vertices, specifically: Step 6.1, the high-level key vertex conflicts (a i ,a j ,u,v,w,t) add constraints (a i ,u,v,t) is robot a i At time t, vertices u and v are prohibited from being occupied, and the left child node is expanded; add constraints (a j ,w,v,t) is robot a j At time t, it is forbidden to occupy vertices v and w, and expand the right child node; Step 6.2, the lower layer is robot a i Re-plan from the starting position s i To the target position g i And satisfy the constraints (a i ,u,v,t) the shortest path p i '; The path p i 'Marked as p i , update the path set P as the solution of the left child node; for robot a j Re-plan from the starting position s j To the target position g j And satisfy the constraints (a j ,w,v,t) j '; The path p j 'Marked as p j , update the path set P as the solution of the right child node; After completing the child node expansion, go to step 10.
6. The multi-robot path planning method based on conflict classification search according to claim 4 is characterized in that: Step 7: Resolve key intersection vertex conflicts, specifically: Step 7.1, high-level determination of the robot a to which constraints are added i : Critical intersection vertex conflict Medium Robot i There are N cti A non-critical conflict, robot a j There are N ctj non-critical conflicts; robot a is preferred i Add constraints (a i ,v,t) expansion node, where N cti ≥N ctj ; Step 7.2, the lower layer determines the waiting time t w :Assume robot a i N that existed before time t cti The non-critical conflict moments are Then t w ∈[0,t min ),in Step 7.3, low-level adjustment path p i : In the original path p i Medium w Wait for 1 moment at the vertex corresponding to the moment, and adjust the path p i , update the path set P as the solution of the child node, and go to step 10 after completing the child node expansion.
7. The multi-robot path planning method based on conflict classification search according to claim 3 is characterized in that: Step 8: Resolve key edge conflicts, specifically: Step 8.1, high-level edge conflicts (a i ,a j ,v,u,t) add constraints (a i ,(u,v),t) is robot a i At time t, it is forbidden to pass through the edge (v,u) and expand the left child node; add constraints (a j ,(u,v),t) is robot a j At time t, it is forbidden to go through the edge (v,u) in the opposite direction and expand the right child node; Step 8.2, the lower layer is robot a i Re-plan from the starting position s i To the target position g i And satisfy the constraints (a i ,(u,v),t) i ', the path p i 'Marked as p i , update the path set P as the solution of the left child node; for robot a j Re-plan from the starting position s j To the target position g j And satisfy the constraints (a j ,(u,v),t) j ', the path p j 'Marked as p j , update the path set P as the solution of the right child node; After completing the child node expansion, go to step 10.
8. The multi-robot path planning method based on conflict classification search according to claim 3 is characterized in that: Step 9: Resolve non-critical conflicts, specifically: Step 9.1: Senior management addresses non-critical conflicts (a i ,a j ,X,t) where X represents vertex v or edge (u,v), add constraints (a i ,X,t) is robot a i At time t, it is forbidden to occupy X and expand the left child node; add constraints (a j ,X,t) is robot a j At time t, it is forbidden to occupy X and expand the right child node; Step 9.2, the lower layer is robot a i Re-plan from the starting position s i To the target position g i Satisfy the constraints (a i ,X,t), and the cost is c i The shortest path p i ', the path p i 'Marked as p i , update the path set P as the solution of the left child node; for robot a j Re-plan from the starting position s j To the target position g j And satisfy the constraints (a j ,X,t), and the cost is c j The shortest path p j ', the path p j 'Marked as p j , update the path set P as the solution of the right child node, and go to step 10 after completing the child node expansion.
Citation Information
Patent Citations
Multi-robot path planning method and system based on collision type division
CN112362063A
Multi-robot path planning method, multi-robot system and robot
CN113985880A
Hop searching based conflict-avoiding path planning method for multiple robots
CN109115226A
Unmanned aerial vehicle conflict resolution method based on improved ant colony algorithm
CN113253756A
Multi-robot path planning method based on dynamic time window conflict search
CN113311829A
