Nuclear power plant operation status adjustment method, device, computer equipment, and storage medium

By generating trend coefficient curves and load comparison curves, nuclear power plants proactively adjust their operating status to match grid demand, solving the frequency mismatch problem caused by nuclear power plants passively accepting grid commands and improving grid security.

CN115115228BActive Publication Date: 2024-11-05LINGAO NUCLEAR POWER +4
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210756638.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-30
Publication Date
2024-11-05
Estimated Expiration
2042-06-30

AI Technical Summary

Technical Problem

Nuclear power plants passively accept grid commands during peak-shaving periods, causing their output frequency to mismatch with the grid frequency, which affects grid security.

Method used

By acquiring the grid load curve, generating trend coefficient curves and load comparison curves, analyzing the difference in the nuclear power plant load curves, and proactively adjusting the nuclear power plant's operating status to match grid demand.

Benefits of technology

This enables nuclear power plants to proactively predict and adjust their operating status, avoiding frequency mismatch issues caused by untimely passive adjustments and improving grid security.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115115228B_ABST
    Figure CN115115228B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of nuclear power plant operation optimization, and discloses a method, device, computer equipment, and storage medium for adjusting the operating status of a nuclear power plant, obtains a power grid load curve, generates a trend coefficient curve based on the power grid load curve, and the trend coefficient curve is used to express the changing trend of the power grid load; pre-processes the power grid load curve to generate a load comparison curve, and the load comparison curve is used to compare with the nuclear power plant load curve; determines a nuclear power plant adjustment plan based on the trend coefficient curve; determines a comparison deviation based on the absolute value of the difference between the value of the load comparison curve and the value of the nuclear power plant load curve corresponding to the same time point; and adjusts the operating status of the nuclear power plant based on the nuclear power plant adjustment plan and the comparison deviation. The present application can actively predict whether a nuclear power plant needs to adjust its operating status, and solve the problem that the output frequency of the nuclear power plant does not match the power grid frequency due to passive acceptance of power grid adjustment instructions, which affects the safety of the power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of nuclear power plant operation optimization, and in particular to a method, device, computer equipment and storage medium for adjusting the operating state of a nuclear power plant. Background Art

[0002] Nuclear power plants are the main load-bearing units in my country's power grid, and nuclear power units are generally in base load operation. With the increase in the proportion of nuclear power load in the power grid capacity, nuclear power units are required to implement long-term low power operation (ELPO) during the peak load regulation period of the power grid during holidays. For a long time, the existing technology has mainly focused on the impact of the ELPO mode on the operation of nuclear power reactors. Whether nuclear power units implement the ELPO mode has always been in a situation of passively accepting grid instructions. Passive acceptance of instructions is prone to untimely adjustments, and the output frequency of nuclear power plants does not match the grid frequency, affecting the safety of the grid.

[0003] Currently, no effective solution has been proposed for the above technical problems. Summary of the invention

[0004] Based on the deficiencies of the prior art, the present invention provides a method, device, computer equipment, and storage medium for adjusting the operating status of a nuclear power plant, so as to at least solve the problem in the prior art that the operating status of the nuclear power plant is adjusted passively by accepting grid instructions, and the adjustment is not timely, resulting in the output frequency of the nuclear power plant not being consistent with the grid frequency, thereby affecting the safety of the grid.

[0005] In a first aspect, the present application proposes a method for adjusting the operating state of a nuclear power plant, the method comprising:

[0006] Acquire a power grid load curve, and generate a trend coefficient curve based on the power grid load curve, wherein the trend coefficient curve is used to express a change trend of the power grid load;

[0007] Preprocessing the power grid load curve to generate a load comparison curve, wherein the load comparison curve is used for comparison with the load curve of the nuclear power plant;

[0008] Determine a nuclear power plant adjustment plan based on the trend coefficient curve; determine a comparison deviation based on the absolute value of the difference between the value of the load comparison curve corresponding to the same time point and the value of the nuclear power plant load curve;

[0009] The operating state of the nuclear power plant is adjusted based on the nuclear power plant adjustment plan and the comparison deviation.

[0010] In one embodiment, the acquiring of the power grid load curve and the generating of the trend coefficient curve based on the power grid load curve include:

[0011] Dividing the power grid load curve based on the first cycle value, and extracting the signal peak value of each cycle in the divided power grid load curve;

[0012] Based on the signal peak value of each cycle, a peak signal curve is generated by fitting;

[0013] The peak signal curve is differentiated to obtain a trend coefficient curve.

[0014] In one embodiment, the preprocessing of the power grid load curve to generate a load comparison curve includes:

[0015] The grid load curve is subjected to differentiation processing, delay processing, and normalization processing to generate the load comparison curve.

[0016] In one embodiment, the preprocessing of the power grid load curve to generate a load comparison curve includes:

[0017] Splitting the power grid load curve to obtain at least two split load curves, where the split load curves are used to express a change rule of the power grid load curve;

[0018] Performing differentiation processing and time delay processing on the split load curves respectively, and superimposing the split load curves that have undergone differentiation processing and time delay processing to obtain a superimposed load curve;

[0019] The superposition curve is normalized to generate the load comparison curve.

[0020] In one embodiment, the nuclear power plant adjustment plan includes: adjusting to a normal power plan, adjusting to a low power plan, and not adjusting the plan; and determining the nuclear power plant adjustment plan based on the trend coefficient curve includes:

[0021] Based on the trend coefficient curve, obtaining the trend coefficient value corresponding to the current time node;

[0022] When the trend coefficient value is greater than a preset upper limit value, the normal power plan is adjusted;

[0023] When the trend coefficient value is less than a preset lower limit, adjusting to a low power plan is executed;

[0024] When the trend coefficient is less than the preset upper limit and greater than the preset lower limit, the non-adjustment plan is executed.

[0025] In one embodiment, adjusting the operating state of the nuclear power plant based on the adjustment to the normal power plan and the comparison deviation includes:

[0026] Get the current operation mode of the nuclear power plant unit;

[0027] If all the units of the nuclear power plant are in low power mode, when the comparison deviation is less than the first target value, one unit is adjusted to normal power mode; when the comparison deviation is greater than the first target value, at least two units are adjusted to normal power mode;

[0028] If at least one of the units of the nuclear power plant is in the normal power mode, when the comparison deviation is greater than the second target value, the at least one unit is adjusted to the normal power mode.

[0029] In one embodiment, adjusting the operating state of the nuclear power plant based on the adjustment to the low power plan and the comparison deviation includes:

[0030] Get the current operation mode of the nuclear power plant unit;

[0031] If all the units of the nuclear power plant are in normal power mode, when the comparison deviation is less than the third target value, one unit is adjusted to low power mode; when the comparison deviation is greater than the third target value, at least two units are adjusted to low power mode;

[0032] If at least one of the units of the nuclear power plant is in low power mode, when the absolute value of the comparison deviation is greater than the fourth target value, the at least one unit is adjusted to the low power mode.

[0033] In a second aspect, the present application provides a nuclear power plant operation state adjustment device, the device comprising:

[0034] A trend coefficient curve generating module: used to obtain a power grid load curve, and to generate a trend coefficient curve based on the power grid load curve, wherein the trend coefficient curve is used to express a change trend of the power grid load;

[0035] A load comparison curve generating module is used to pre-process the load curve of the power grid to generate a load comparison curve, and the load comparison curve is used to compare with the load curve of the nuclear power plant;

[0036] Parameter determination module: determining a nuclear power plant adjustment plan based on the trend coefficient curve; determining a comparison deviation based on the absolute value of the difference between the value of the load comparison curve corresponding to the same time point and the value of the nuclear power plant load curve;

[0037] Adjustment module: adjusts the operation status of the nuclear power plant based on the nuclear power plant adjustment plan and the comparison deviation.

[0038] In a third aspect, the present application provides a computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method for adjusting the operating status of a nuclear power plant as described in the first aspect above is implemented.

[0039] In a fourth aspect, an embodiment of the present application provides a storage medium having a computer program stored thereon, which, when executed by a processor, implements the method for adjusting the operating status of a nuclear power plant as described in the first aspect above.

[0040] Compared with the background technology, the method, device, computer equipment, and storage medium for adjusting the operating status of a nuclear power plant provided by the present application obtain a power grid load curve, generate a trend coefficient curve based on the power grid load curve, and the trend coefficient curve is used to express the changing trend of the power grid load; pre-process the power grid load curve to generate a load comparison curve, and the load comparison curve is used to compare with the nuclear power plant load curve; determine the nuclear power plant adjustment plan based on the trend coefficient curve; determine the comparison deviation based on the absolute value of the difference between the value of the load comparison curve and the value of the nuclear power plant load curve corresponding to the same time point; adjust the operating status of the nuclear power plant based on the nuclear power plant adjustment plan and the comparison deviation. By analyzing and comparing the power grid load curve and the nuclear power plant load curve, the present application can actively predict whether the nuclear power plant needs to adjust its operating status, make preparations in advance, and solve the problem of passively accepting power grid adjustment instructions and not adjusting in time, resulting in the output frequency of the nuclear power plant not being consistent with the power grid frequency, affecting the safety of the power grid.

[0041] Details of one or more embodiments of the present application are set forth in the following drawings and description to make other features, objects, and advantages of the present application more readily apparent. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0043] Figure 1 It is a terminal hardware structure frame of a method for adjusting the operating status of a nuclear power plant in one embodiment of the present application;

[0044] Figure 2 This is a schematic diagram of the load curve of the Guangdong power grid in 2019;

[0045] Figure 3 This is a schematic diagram of the load change curve of a nuclear power plant (with four units) in Guangdong in 2019;

[0046] Figure 4 is a flow chart of a method for adjusting the operating status of a nuclear power plant in one embodiment of the present application;

[0047] Figure 5 is a flow chart of generating a trend coefficient curve in one embodiment of the present application;

[0048] Figure 6is a flow chart of generating a load comparison curve in one embodiment of the present application;

[0049] Figure 7 is a flow chart for determining a nuclear power plant adjustment plan based on a trend coefficient curve in one embodiment of the present application;

[0050] Figure 8 This is a schematic diagram of the load curves of the Guangxi and Hunan power grids;

[0051] Fig. 9 is a flow chart of adjusting the operating state of a nuclear power plant based on adjusting to a normal power plan and comparing deviations in one embodiment of the present application;

[0052] Fig.10 is a flow chart of adjusting the operating state of a nuclear power plant based on adjusting to a low power plan and comparing deviations in one embodiment of the present application;

[0053] Fig.11 This is a schematic diagram of the structure of the nuclear power plant operating state adjustment device in the embodiment of the present application;

[0054] Fig.12 A schematic diagram of the structure of a computer device according to an embodiment of the present application. DETAILED DESCRIPTION

[0055] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application. In addition, it can also be understood that although the efforts made in this development process may be complex and lengthy, for ordinary technicians in the field related to the contents disclosed in the present application, some changes such as design, manufacturing or production based on the technical contents disclosed in the present application are only conventional technical means, and should not be understood as insufficient contents disclosed in the present application.

[0056] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.

[0057] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantitative limitation, and may represent the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "multiple" involved in this application refers to greater than or equal to two. "And / or" describes the association relationship of associated objects, indicating that there can be three relationships, for example, "A and / or B" can represent: A exists alone, A and B exist at the same time, and B exists alone. The terms "first", "second", "third" and the like involved in the present application are merely used to distinguish similar objects and do not represent a specific ordering of the objects.

[0058] The method embodiment provided in this embodiment can be executed in a terminal, a computer or a similar computing device. Taking running on a terminal as an example, Figure 1 FIG. 1 is a hardware structure diagram of a terminal of a website identification method according to an embodiment of the present invention. Figure 1 As shown, the terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data. Optionally, the terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the above terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.

[0059] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the nuclear power plant operation state adjustment method in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, to implement the above method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the terminal via a network. Examples of the above network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0060] The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 can be a radio frequency (Radio Frequency, referred to as RF) module, which is used to communicate with the Internet wirelessly.

[0061] by Figure 2 Taking the load curve of Guangdong power grid in 2019 as an example, it can be seen from Figure 2 It can be seen from the data that the load of Guangdong power grid fluctuates significantly every week, about 10,000MW-20,000MW; there is a big drop in load during the Spring Festival (more than 50%). The main trend in the first half of the year is an increase, and the main trend in the second half of the year is a decrease. The load drops significantly during the May Day and National Day (more than 30%). The load peaks on weekends in the first half of the year vary greatly, about 15,000-20,000MW; after October, the load peaks on weekends vary less, about 10,000-15,000MW, which is relatively stable.

[0062] Figure 3 This is the load change curve of a nuclear power plant (with four units) in Guangdong in 2019. It can be seen that the load curve of the nuclear power plant is highly correlated with the load curve of the power grid: ELPO is frequently executed during holidays, especially during weekends in the second half of the year. Therefore, by analyzing and comparing the power grid load curve and the nuclear power long load curve, it is possible to proactively predict whether the nuclear power plant needs to adjust its operating status (convert to low power mode or normal power mode) and make preparations in advance.

[0063] It should be noted that the grid load curve in this application can use either provincial grid load or municipal grid load, and this application does not limit the grid level. Generally speaking, for different nuclear power bases, selecting the corresponding municipal grid load is more conducive to calculating the correlation between grid load and nuclear power plant load, and achieving more accurate

[0064] In particular, the proportion of other power generation modes such as West-to-East Power Transmission and hydropower in the power grid will have a certain impact on the load of nuclear power plants. Therefore, it is also possible to remove the load of other power generation modes such as West-to-East Power Transmission and hydropower in the power grid, and then adjust and predict the operating status of nuclear power plants based on the remaining power grid load curve.

[0065] This embodiment provides a method for adjusting the operating status of a nuclear power plant. Figure 4 is a flow chart of a method for adjusting the operating status of a nuclear power plant according to an embodiment of the present application, such as Figure 4 As shown, the process includes the following steps:

[0066] Step S21, obtaining a power grid load curve, and generating a trend coefficient curve based on the power grid load curve, wherein the trend coefficient curve is used to express a change trend of the power grid load.

[0067] Specifically, through the experience accumulated in long-term production activities, the load change rules of the power grid can be divided into the following types of load changes: 1) Load changes with a frequency of one week, mainly manifested in the reduction of power grid load on weekends; 2) Load changes with a frequency of one year, mainly manifested in the reduction of load demand during the Spring Festival and the National Day; 3) Load changes with a frequency of one day, mainly manifested in the increase or decrease of load at night. By analyzing and processing the power grid load curve, a trend coefficient curve is generated to express the change trend of the power grid load.

[0068] In one embodiment, the above step S21: obtaining the grid load curve, generating a trend coefficient curve based on the grid load curve, such as Figure 5 As shown, the specific steps include:

[0069] Step S211, dividing the power grid load curve based on the first cycle value, and extracting the signal peak value of each cycle in the divided power grid load curve.

[0070] Step S212: generating a peak signal curve by fitting based on the signal peak value of each cycle.

[0071] Step S213, deriving the peak signal curve to obtain a trend coefficient curve.

[0072] Specifically, the first cycle value can be set according to actual needs, such as 7 days, 10 days, and this application does not limit this. Taking the first cycle value of 7 days as an example, the power grid load curve is divided into 7-day cycles, the signal peak of each cycle is extracted and fitted into a peak signal curve, and the peak signal curve is derived to obtain a trend coefficient curve.

[0073] For example, to predict the operation status of a nuclear power plant on June 1, based on the grid load curve from January to May of that year, it can be divided into 7-day cycles or monthly (30 days). The signal peak of each cycle is extracted and fitted into a peak signal curve, and the peak signal curve is derived to obtain a trend coefficient curve. Based on field work experience, the first cycle value is preferably 7 days.

[0074] In the above steps S211-S213, the power grid load curve is divided based on the first cycle value, and the signal peak value of each cycle in the divided power grid load curve is extracted; based on the signal peak value of each cycle, a peak signal curve is fitted and generated; and the peak signal curve is differentiated to obtain a trend coefficient curve, so as to grasp the changing trend of the power grid load curve.

[0075] Step S22, preprocessing the load curve of the power grid to generate a load comparison curve, which is used for comparison with the load curve of the nuclear power plant.

[0076] Specifically, after obtaining the trend coefficient curve reflecting the grid load change trend, it is necessary to preprocess the grid load curve to generate a load comparison curve, and in subsequent steps the load comparison curve is compared with the nuclear power plant load curve.

[0077] In one embodiment, the above step S22: preprocessing the grid load curve to generate a load comparison curve includes:

[0078] The grid load curve is differentiated, delayed and normalized to generate a load comparison curve.

[0079] It should be noted that since the grid load curve after differential processing and time-delay processing has different dimensions and dimensional units from the nuclear power plant load curve, the grid curve also needs to be normalized to achieve comparability between data indicators.

[0080] In another embodiment, the above step S22: pre-processing the grid load curve to generate a load comparison curve, such as Figure 6 As shown, the specific steps include:

[0081] Step S221, splitting the power grid load curve to obtain at least two split load curves, where the split curves are used to express the change rule of the power grid load curve;

[0082] Step S222, performing differentiation processing and time delay processing on the split load curves respectively, and superimposing the split load curves that have undergone differentiation processing and time delay processing to obtain a superimposed load curve;

[0083] Step S223, normalizing the superposition curve to generate a load comparison curve.

[0084] In the above steps S221-S223, at least two split load curves are obtained by splitting the power grid load curve, and the split curves are used to express the change law of the power grid load curve; the split load curves are subjected to differential processing and time delay processing respectively, and the split load curves subjected to differential processing and time delay processing are superimposed to obtain a superimposed load curve; the superimposed curve is normalized to generate a load comparison curve. Not only can the load comparison curve be generated, but also the change law of the complex power grid load curve can be expressed through the split curve.

[0085] Step S23, determining a nuclear power plant adjustment plan based on the trend coefficient curve.

[0086] Specifically, the trend coefficient curve can express the changing trend of the power grid load, and the adjustment plan of the nuclear power plant can be determined by the size of the corresponding value of the trend coefficient curve.

[0087] Step S24, determining a comparison deviation based on the absolute value of the difference between the value of the load comparison curve corresponding to the same time point and the value of the nuclear power plant load curve.

[0088] Specifically, the values ​​of the corresponding load comparison curve and the nuclear power plant load curve are obtained at the same time point, and the absolute value of the difference between the values ​​of the two curves is the comparison deviation, which is used to measure the difference between the nuclear power plant load and the actual grid demand.

[0089] Step S25, adjusting the operating state of the nuclear power plant based on the nuclear power plant adjustment plan and the comparison deviation.

[0090] Specifically, the adjustment plan of the nuclear power plant is determined by the trend coefficient, and how to adjust the operating status of the nuclear power plant within the adjustment plan of the nuclear power plant is determined by comparing the deviations.

[0091] Through the above steps S21-S25, the power grid load curve is obtained, and a trend coefficient curve is generated based on the power grid load curve, and the trend coefficient curve is used to express the changing trend of the power grid load; the power grid load curve is preprocessed to generate a load comparison curve, and the load comparison curve is used to compare with the nuclear power plant load curve; the nuclear power plant adjustment plan is determined based on the trend coefficient curve; the comparison deviation is determined based on the absolute value of the difference between the value of the load comparison curve corresponding to the same time point and the value of the nuclear power plant load curve; the nuclear power plant operation status is adjusted based on the nuclear power plant adjustment plan and the comparison deviation. This application can actively predict whether the nuclear power plant needs to adjust its operation status through analysis and comparison of the power grid load curve and the nuclear power plant load curve, make preparations in advance, and solve the problem of passively accepting power grid adjustment instructions and not adjusting in time, resulting in the output frequency of the nuclear power plant not being consistent with the power grid frequency, affecting the safety of the power grid.

[0092] In one embodiment, the nuclear power plant adjustment plan includes: adjusting to a normal power plan, adjusting to a low power plan, and not adjusting the plan; the above step S23: determining the nuclear power plant adjustment plan based on the trend coefficient curve, such as Figure 7 As shown, the specific steps include:

[0093] Step S231, based on the trend coefficient curve, obtaining the trend coefficient value corresponding to the current time node;

[0094] Step S232, when the trend coefficient value is greater than the preset upper limit value, execute adjustment to the normal power plan; when the trend coefficient value is less than the preset lower limit value, execute adjustment to the low power plan; when the trend coefficient is less than the preset upper limit value and greater than the preset lower limit value, execute the non-adjustment plan.

[0095] For example: on June 1, the operation status of the nuclear power plant is predicted. The trend coefficient curve is obtained based on the power grid load curve from January to May of that year, and the trend coefficient value corresponding to the current time node is obtained. When the trend coefficient curve is a 7-day cycle curve, the trend coefficient value corresponding to the 4th week of May is obtained; when the trend coefficient curve is a monthly (30-day) cycle curve, the trend coefficient value corresponding to May is obtained. By comparing the trend coefficient with the preset value, it is possible to determine which nuclear power plant adjustment plan to adopt.

[0096] When the trend coefficient value is greater than the preset upper limit, it means that the grid load is increasing rapidly and the nuclear power plant operating power needs to be increased and adjusted to normal power; when the trend coefficient value is less than the preset lower limit, it means that the grid load is decreasing rapidly and the nuclear power plant operating power needs to be reduced and adjusted to low power; when the trend coefficient is less than the preset upper limit and greater than the preset lower limit, it means that the grid load has not changed much and the operating status of the nuclear power plant does not need to be adjusted.

[0097] It should be noted that the preset upper limit value and the preset lower limit value can be adjusted according to the actual regional power grid and application requirements, and this application does not limit this. Figure 8 As shown, Figure 8 is the load curve of the power grid in Guangxi and Hunan. Figure 8 It can be seen that the load curves of the power grids in Guangxi and Hunan are Figure 2 The load curve of Guangdong shown in the figure is very different. At present, the overall load of Guangxi power grid is not high, and the nuclear power load accounts for a small proportion. There is even only an obvious load reduction during the Spring Festival without obvious load changes in the 7-day cycle. The Hunan power grid has obvious peaks in the summer and a load change in the 7-day cycle. Therefore, different preset upper and lower limits can be set according to the actual regional power grid and application requirements.

[0098] In one embodiment, the operation state of the nuclear power plant is adjusted based on the adjustment to the normal power plan and the comparison deviation, such as Fig. 9 As shown, the specific steps include:

[0099] Step S601, obtaining the current operation mode of the nuclear power plant unit;

[0100] Step S602: if all the units of the nuclear power plant are in low power mode, when the comparison deviation is less than the first target value, one unit is adjusted to normal power mode; when the comparison deviation is greater than the first target value, at least two units are adjusted to normal power mode;

[0101] Step S603: if at least one unit of the nuclear power plant is in the normal power mode, when the comparison deviation is greater than the second target value, at least one unit is adjusted to the normal power mode.

[0102] Specifically, from the above content, it can be seen that when the trend coefficient value is greater than the preset upper limit value, it means that the power grid load is increasing slowly or decreasing rapidly, and the operating power of the nuclear power plant needs to be reduced. First, the current operating mode of the nuclear power plant units is obtained. When all the nuclear power plant units are in low power mode, the power of several units to be adjusted is determined based on the comparison deviation and the first target value; when at least one nuclear power plant unit is in normal power mode, it is determined whether to adjust at least one unit to normal power mode based on the comparison deviation and the first target value.

[0103] Through steps S601-S603, on the premise of determining that the normal power plan is adjusted, the number of units that need to be adjusted is further determined by comparing the deviation with the target value.

[0104] In one embodiment, the operation state of the nuclear power plant is adjusted based on the adjustment to the low power plan and the comparison deviation, such as Fig.10 As shown, the specific steps include:

[0105] Step S701, obtaining the current operation mode of the nuclear power plant unit;

[0106] Step S702: if all the units of the nuclear power plant are in normal power mode, when the comparison deviation is less than the third target value, one unit is adjusted to low power mode; when the comparison deviation is greater than the third target value, at least two units are adjusted to low power mode;

[0107] Step S703: if at least one unit of the nuclear power plant is in low power mode, when the absolute value of the comparison deviation is greater than the fourth target value, at least one unit is adjusted to the low power mode.

[0108] Specifically, from the above content, it can be known that when the trend coefficient value is less than the preset upper limit value, it means that the power grid load is decreasing rapidly and the operating power of the nuclear power plant needs to be reduced. First, the current operating mode of the nuclear power plant units is obtained. When the nuclear power plant units are all in normal power mode, the power of several units to be adjusted is determined based on the comparison deviation and the third target value; when at least one nuclear power plant unit is in low power mode, whether to adjust at least one unit to low mode is determined based on the comparison deviation and the fourth target value.

[0109] Through steps S701-S703, on the premise of determining to adjust to a low power plan, the number of units that need to be adjusted is further determined by comparing the deviation with the target value.

[0110] The embodiment of the present application is described and illustrated below through a preferred embodiment. The method for adjusting the operating state of a nuclear power plant includes:

[0111] Step S801, dividing the power grid load curve based on 7 days, and extracting the signal peak value of each 7-day period in the divided power grid load curve.

[0112] Step S802: based on the signal peak value of each cycle, generate a peak signal curve by fitting, and derive the peak signal curve to obtain a trend coefficient curve.

[0113] Step S803, split the power grid load curve to obtain three split load curves, namely: 1) split curve during the Spring Festival; 2) split curve with a 7-day period; 3) split curve with a year period. The three curves are combined to express the change law of the power grid load curve.

[0114] Step S804: perform differentiation processing and time delay processing on the three split load curves respectively, and superimpose the split load curves that have undergone differentiation processing and time delay processing to obtain a superimposed load curve.

[0115] Step S805: normalize the superposition curve to generate a load comparison curve.

[0116] Step S806, based on the trend coefficient curve, obtain the trend coefficient value corresponding to the current time node; when the trend coefficient value is greater than the preset upper limit value, execute adjustment to the normal power plan, execute step S807; when the trend coefficient value is less than the preset lower limit value, execute adjustment to the low power plan, execute step S808; when the trend coefficient is less than the preset upper limit value and greater than the preset lower limit value, execute the non-adjustment plan.

[0117] Step S807, obtaining the current operation mode of the nuclear power plant units; if all the nuclear power plant units are in low power mode, when the comparison deviation is less than the first target value, one unit is adjusted to the normal power mode; when the comparison deviation is greater than the first target value, at least two units are adjusted to the normal power mode;

[0118] If at least one unit of the nuclear power plant is in the normal power mode, when the comparison deviation is greater than the second target value, the at least one unit is adjusted to the normal power mode.

[0119] S808, obtain the current operating mode of the nuclear power plant units; if all the nuclear power plant units are in normal power mode, when the comparison deviation is less than the third target value, one unit is adjusted to low power mode; when the comparison deviation is greater than the third target value, at least two units are adjusted to low power mode; if at least one unit of the nuclear power plant is in low power mode, when the absolute value of the comparison deviation is greater than the fourth target value, at least one unit is adjusted to low power mode.

[0120] It should be noted that the steps shown in the above process or the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0121] In this embodiment, a nuclear power plant operation state adjustment device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. The terms "module", "unit", "subunit", etc. used below can implement a combination of software and / or hardware for a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0122] Fig.11 is a structural block diagram of the nuclear power plant operation status adjustment device of this embodiment, such as Fig.11 As shown, the nuclear power plant operation state adjustment device 90 includes: a trend coefficient curve generation module 92, a load comparison curve generation module 94, a parameter determination module 96, and an adjustment module 98, wherein:

[0123] The trend coefficient curve generating module 92 is used to obtain the grid load curve and generate the trend coefficient curve based on the grid load curve. The trend coefficient curve is used to express the change trend of the grid load.

[0124] Load comparison curve generation module 94: used to pre-process the load curve of the power grid and generate a load comparison curve, which is used to compare with the load curve of the nuclear power plant;

[0125] Parameter determination module 96: determining a nuclear power plant adjustment plan based on the trend coefficient curve; determining a comparison deviation based on the absolute value of the difference between the value of the load comparison curve corresponding to the same time point and the value of the nuclear power plant load curve;

[0126] Adjustment module 98: adjusts the operation status of the nuclear power plant based on the nuclear power plant adjustment plan and the comparison deviation.

[0127] In one embodiment, the trend coefficient curve generation module 92 is used to divide the power grid load curve based on the first cycle value, extract the signal peak of each cycle in the divided power grid load curve; based on the signal peak of each cycle, fit and generate a peak signal curve; and derive the peak signal curve to obtain a trend coefficient curve.

[0128] In one embodiment, the load comparison curve generating module 94 is used to perform differentiation processing, delay processing, and normalization processing on the power grid load curve to generate a load comparison curve.

[0129] In one embodiment, the load comparison curve generating module 94 is used to split the power grid load curve to obtain at least two split load curves, where the split load curves are used to express the changing law of the power grid load curve; the split load curves are differentiated and delayed respectively, and the split load curves that have undergone differentiation and delay processing are superimposed to obtain a superimposed load curve; the superimposed curve is normalized to generate a load comparison curve.

[0130] In one embodiment, the adjustment plan of the nuclear power plant includes: adjustment to a normal power plan, adjustment to a low power plan, and no adjustment plan; the parameter determination module 96 is used to obtain the trend coefficient value corresponding to the current time node based on the trend coefficient curve; when the trend coefficient value is greater than the preset upper limit value, the parameter determination module 96 is used to determine the execution of the adjustment to the normal power plan; when the trend coefficient value is less than the preset lower limit value, the parameter determination module 96 is used to determine the execution of the adjustment to the low power plan; when the trend coefficient is less than the preset upper limit value and greater than the preset lower limit value, the parameter determination module 96 is used to determine the execution of the no adjustment plan.

[0131] In one embodiment, the adjustment module 98 is used to adjust the operating status of the nuclear power plant based on the adjustment to normal power plan and the comparison deviation, including: obtaining the current operating mode of the nuclear power plant units; if all the units of the nuclear power plant are in low power mode, when the comparison deviation is less than the first target value, one unit is adjusted to normal power mode; when the comparison deviation is greater than the first target value, at least two units are adjusted to normal power mode; if at least one unit of the nuclear power plant is in normal power mode, when the comparison deviation is greater than the second target value, at least one unit is adjusted to normal power mode.

[0132] In one embodiment, the adjustment module 98 is used to adjust the operating status of the nuclear power plant based on the adjustment to a low power plan and a comparison deviation, including: obtaining the current operating mode of the nuclear power plant units; if the nuclear power plant units are all in normal power mode, when the comparison deviation is less than the third target value, one unit is adjusted to a low power mode; when the comparison deviation is greater than the third target value, at least two units are adjusted to a low power mode; if at least one unit of the nuclear power plant is in a low power mode, when the absolute value of the comparison deviation is greater than the fourth target value, at least one unit is adjusted to a low power mode.

[0133] In this embodiment, the power grid load curve is obtained through the trend coefficient curve generation module, and the trend coefficient curve is generated based on the power grid load curve, and the trend coefficient curve is used to express the change trend of the power grid load; the power grid load curve is preprocessed through the load comparison curve generation module to generate a load comparison curve, and the load comparison curve is used to compare with the nuclear power plant load curve; the nuclear power plant adjustment plan is determined based on the trend coefficient curve through the parameter determination module; the comparison deviation is determined based on the absolute value of the difference between the value of the load comparison curve corresponding to the same time point and the value of the nuclear power plant load curve through the parameter determination module; the operation state of the nuclear power plant is adjusted based on the nuclear power plant adjustment plan and the comparison deviation through the adjustment module. By analyzing and comparing the power grid load curve and the nuclear power plant load curve, this device can actively predict whether the nuclear power plant needs to adjust its operation state, and solve the problem of passively accepting power grid adjustment instructions and not adjusting in time, resulting in the output frequency of the nuclear power plant not being consistent with the power grid frequency, affecting the safety of the power grid.

[0134] It should be noted that the above modules can be functional modules or program modules, and can be implemented by software or hardware. For modules implemented by hardware, the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.

[0135] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Fig.12As shown. The computer device includes a processor, a memory and a network interface connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store motion detection data. The network interface of the computer device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, the steps in any of the above-mentioned embodiments of the method for adjusting the operating status of a nuclear power plant are implemented.

[0136] Those skilled in the art will understand that Fig.12 The structure shown is merely a block diagram of a portion of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than shown in the figure, or combine certain components, or have a different arrangement of components.

[0137] In one embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the computer program, the steps in any of the above-mentioned embodiments of the method for adjusting the operating status of a nuclear power plant are implemented.

[0138] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in any of the above-mentioned embodiments of the method for adjusting the operating status of a nuclear power plant are implemented.

[0139] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory or optical memory, etc. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).

[0140] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0141] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

Claims

1. A method for adjusting the operating status of a nuclear power plant, characterized in that: The method comprises: Obtaining a power grid load curve, and generating a trend coefficient curve based on the power grid load curve, wherein the trend coefficient curve is used to express a change trend of the power grid load, including: Dividing the power grid load curve based on the first cycle value, and extracting the signal peak value of each cycle in the divided power grid load curve; Based on the signal peak value of each cycle, a peak signal curve is generated by fitting; Derivative the peak signal curve to obtain a trend coefficient curve; Preprocessing the power grid load curve to generate a load comparison curve, wherein the load comparison curve is used for comparison with the load curve of the nuclear power plant; Determining a nuclear power plant adjustment plan based on the trend coefficient curve includes: Based on the trend coefficient curve, obtaining the trend coefficient value corresponding to the current time node; When the trend coefficient value is greater than a preset upper limit value, the normal power plan is adjusted; When the trend coefficient value is less than a preset lower limit, adjusting to a low power plan is executed; When the trend coefficient is less than the preset upper limit and greater than the preset lower limit, the non-adjustment plan is executed; The nuclear power plant adjustment plan includes: adjustment to normal power plan, adjustment to low power plan, and no adjustment plan; Determining a comparison deviation based on an absolute value of a difference between a value of the load comparison curve corresponding to a same time point and a value of the nuclear power plant load curve; adjusting the operating state of the nuclear power plant based on the nuclear power plant adjustment plan and the comparison deviation; The adjusting the operating state of the nuclear power plant based on the adjustment to normal power plan and the comparison deviation includes: Get the current operation mode of the nuclear power plant unit; If all the units of the nuclear power plant are in low power mode, when the comparison deviation is less than the first target value, one unit is adjusted to normal power mode; when the comparison deviation is greater than the first target value, at least two units are adjusted to normal power mode; If at least one of the nuclear power plant units is in normal power mode, when the comparison deviation is greater than a second target value, at least one unit is adjusted to normal power mode; The adjusting the operating state of the nuclear power plant based on the adjustment to the low power plan and the comparison deviation includes: Get the current operation mode of the nuclear power plant unit; If all the units of the nuclear power plant are in normal power mode, when the comparison deviation is less than the third target value, one unit is adjusted to low power mode; when the comparison deviation is greater than the third target value, at least two units are adjusted to low power mode; If at least one of the units of the nuclear power plant is in low power mode, when the absolute value of the comparison deviation is greater than the fourth target value, the at least one unit is adjusted to the low power mode.

2. A method for adjusting the operating status of a nuclear power plant according to claim 1, characterized in that: The preprocessing of the power grid load curve to generate a load comparison curve includes: The grid load curve is subjected to differentiation processing, delay processing, and normalization processing to generate the load comparison curve.

3. A method for adjusting the operating status of a nuclear power plant according to claim 1, characterized in that: The preprocessing of the power grid load curve to generate a load comparison curve includes: Splitting the power grid load curve to obtain at least two split load curves, where the split load curves are used to express a change rule of the power grid load curve; Performing differentiation processing and time delay processing on the split load curves respectively, and superimposing the split load curves that have undergone differentiation processing and time delay processing to obtain a superimposed load curve; The superposition curve is normalized to generate the load comparison curve.

4. A nuclear power plant operating state adjustment device, characterized in that: The device comprises: Trend coefficient curve generation module: used to obtain the power grid load curve, and generate a trend coefficient curve based on the power grid load curve, wherein the trend coefficient curve is used to express the change trend of the power grid load, including: Dividing the power grid load curve based on the first cycle value, and extracting the signal peak value of each cycle in the divided power grid load curve; Based on the signal peak value of each cycle, a peak signal curve is generated by fitting; Derivative the peak signal curve to obtain a trend coefficient curve; A load comparison curve generating module is used to pre-process the load curve of the power grid to generate a load comparison curve, and the load comparison curve is used to compare with the load curve of the nuclear power plant; Parameter determination module: Determine the nuclear power plant adjustment plan based on the trend coefficient curve, including: Based on the trend coefficient curve, obtaining the trend coefficient value corresponding to the current time node; When the trend coefficient value is greater than a preset upper limit value, the normal power plan is adjusted; When the trend coefficient value is less than a preset lower limit, adjusting to a low power plan is executed; When the trend coefficient is less than the preset upper limit and greater than the preset lower limit, the non-adjustment plan is executed; The nuclear power plant adjustment plan includes: adjustment to normal power plan, adjustment to low power plan, and no adjustment plan; Determining a comparison deviation based on an absolute value of a difference between a value of the load comparison curve corresponding to a same time point and a value of the nuclear power plant load curve; Adjustment module: adjusting the operation state of the nuclear power plant based on the adjustment plan of the nuclear power plant and the comparison deviation; The adjusting the operating state of the nuclear power plant based on the adjustment to normal power plan and the comparison deviation includes: Get the current operation mode of the nuclear power plant unit; If all the units of the nuclear power plant are in low power mode, when the comparison deviation is less than the first target value, one unit is adjusted to normal power mode; when the comparison deviation is greater than the first target value, at least two units are adjusted to normal power mode; If at least one of the nuclear power plant units is in normal power mode, when the comparison deviation is greater than a second target value, at least one unit is adjusted to normal power mode; The adjusting the operating state of the nuclear power plant based on the adjustment to the low power plan and the comparison deviation includes: Get the current operation mode of the nuclear power plant unit; If all the units of the nuclear power plant are in normal power mode, when the comparison deviation is less than the third target value, one unit is adjusted to low power mode; when the comparison deviation is greater than the third target value, at least two units are adjusted to low power mode; If at least one of the units of the nuclear power plant is in low power mode, when the absolute value of the comparison deviation is greater than the fourth target value, the at least one unit is adjusted to the low power mode.

5. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 3 are implemented.

6. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 3 are implemented.