A digital immersive exhibition hall
By using a prefabricated exhibition hall frame and equipment components for rapid and integrated assembly and disassembly, the problems of rapid assembly and disassembly and complex installation of projection equipment in traditional immersive interactive exhibition halls are solved. This results in a portable, quick assembly and disassembly, and intelligent interactive immersive exhibition hall, reducing labor costs and assembly time, and improving the heat dissipation efficiency of the equipment.
Patent Information
- Application Number
- CN202210573916.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-25
- Publication Date
- 2025-10-31
- Estimated Expiration
- 2042-05-25
AI Technical Summary
Traditional offline immersive interactive exhibition halls have long setup times, high professional design labor costs, and are difficult to meet the requirements of rapid disassembly and assembly, cost-effectiveness, and flexible relocation. In addition, the installation of projection equipment is complicated, time-consuming, and labor-intensive, affecting assembly time. High-lumen projectors are bulky and their heat dissipation problems have not been effectively solved.
The exhibition hall adopts a detachable frame, double-layer curtain wall panels, and equipment components, including projectors, lighting fixtures, VR/AR systems, and central control systems. It forms a digital immersive exhibition hall that can be quickly assembled and disassembled through prefabricated beam-column connections. The integrated projection system and cooling fans solve the heat dissipation problem and simplify the installation and debugging process of the projection equipment.
It enables portable mobility, quick assembly and disassembly, immersive experience and intelligent interaction functions in offline immersive interactive spaces, reducing labor costs, shortening assembly time, and improving the heat dissipation efficiency and ease of use of the equipment.
Smart Images

Figure CN115199100B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of immersive interactive exhibition hall technology, and specifically relates to a digital immersive exhibition hall. Background Technology
[0002] Currently, traditional offline immersive interactive exhibition halls suffer from long construction times, high professional design labor costs, and large one-time consumption, making it difficult to meet the requirements of rapid assembly and disassembly, cost-effectiveness, and flexible relocation. Existing common modular buildings are mainly container houses and mobile prefabricated houses, which can integrate building structures and walls / floors, but they cannot meet the needs of immersive interactive exhibition halls in terms of reusability, integration of professional multimedia equipment, and aesthetic design. The public now has a high-level demand for fully integrated immersive interactive experiences that combine multiple technologies; existing experiences are mostly fragmented and independent, failing to form an integrated experience product that combines immersive cinemas, VR, and AR interactive experience spaces.
[0003] In addition, traditional offline immersive interactive exhibition halls also have the following problems:
[0004] Traditional projection equipment installation involves a series of complex processes, including site selection, on-site wiring, installation, grid adjustment, geometric correction, color correction, and blending adjustments. This entire process is time-consuming and labor-intensive. Furthermore, equipment installation and debugging can only be carried out after the digital immersive exhibition hall is fully assembled, thus encroaching on the exhibition hall's assembly time and hindering the achievement of the goal of ≤24-hour assembly time for digital immersive exhibition halls. Moreover, projection equipment installation and debugging require professional personnel, and a single successful installation and debugging session cannot be directly reused for the next application scenario. This necessitates the redeployment of professional personnel for each application demonstration, resulting in significant labor costs.
[0005] Digital immersive time capsules are mostly displayed in bright indoor environments, where severe light pollution significantly impacts projection display quality (ambient light level 200 lux). To provide viewers with a clearer viewing experience, high-lumen projectors are necessary. However, high-lumen projectors exceeding 10,000 lumens are generally bulky. Furthermore, high-lumen laser projectors generate a significant amount of heat during operation; without a cooling system, prolonged operation can severely damage the machine.
[0006] Therefore, the modular, intensive, and multimedia interactive integrated design of digital immersive time-space cabins is a key technical issue that needs to be addressed in the future. Summary of the Invention
[0007] The purpose of this invention is to provide a digital immersive exhibition hall, forming a highly integrated whole-package product that realizes the functions of portable, mobile, quick assembly and disassembly, immersive experience, and intelligent interaction in offline immersive interactive spaces.
[0008] To address the aforementioned technical problems, this invention provides a digital immersive exhibition hall, comprising:
[0009] The exhibition hall frame is composed of multiple beams and columns that can be detachably connected.
[0010] A double-layer curtain wall panel, which is detachably installed on the exhibition hall frame except for the exhibition hall door frame, and encloses at least one equipment room in the exhibition hall frame, and encloses at least one performance room inside the exhibition hall frame;
[0011] The equipment components include a projector, lighting fixtures, a VR / AR system, and a power supply. The central control system is used to control the equipment components. The projector, the power supply, and the central control system are detachably installed in the equipment room via connectors.
[0012] Optionally, in the aforementioned digital immersive exhibition hall, the exhibition hall frame includes top side beams, top crossbeams, bottom side beams, columns, and corner columns. Multiple top side beams are spliced end to end to form a top frame. Multiple top crossbeams are respectively connected to two oppositely arranged top side beams. Multiple bottom side beams are spliced end to end to form a bottom frame. The two ends of multiple columns are respectively connected to the top side beams and the bottom side beams. Multiple corner columns are located at the splicing points of the top frame and are respectively connected to the top side beams and the bottom side beams at both ends.
[0013] Optionally, in the aforementioned digital immersive exhibition hall, the lighting fixtures include light strips installed on the outside of the corner pillars, and / or, multi-layer mirror light boxes installed on the top of the exterior wall of the entrance, and / or, wall washer lights installed on the double-layer curtain wall panels.
[0014] Optionally, in the aforementioned digital immersive exhibition hall, the double-layer curtain wall panel includes an outer wall surface and an inner wall surface. The outer wall surface is composed of multiple perforated outer wall panels. The inner wall surface includes an integrated projection inner wall surface for projecting by the projector and an integrated mirror inner wall surface for serving as a mirror. The integrated projection inner wall surface includes honeycomb aluminum panels, KT panels, and a projection screen stacked sequentially. The integrated mirror inner wall surface includes honeycomb aluminum panels and mirror steel stacked sequentially.
[0015] Optionally, in the aforementioned digital immersive exhibition hall, the integrated mirrored interior walls located on the sides, top, and bottom are respectively the side walls, the ceiling, and the floor. A floor joist is installed below the floor, and the floor joist is connected to the bottom of the exhibition hall frame through floor joist connectors.
[0016] Optionally, in the aforementioned digital immersive exhibition hall, the central control system includes an integrated central control host, relay system, audio system, wireless control system, lighting control system, and wiring connectors; the VR / AR system includes a camera for facial recognition and a touch screen all-in-one machine connected to the camera.
[0017] Optionally, in the aforementioned digital immersive exhibition hall, the wiring between the equipment components and the central control system is located in the middle interlayer of the double-layer curtain wall panel and / or in the hollow corner columns of the exhibition hall frame.
[0018] Optionally, in the aforementioned digital immersive exhibition hall, the equipment components include a projection integration system, which includes a projector bracket detachably connected between the equipment, and a projector and lens detachably mounted on the projector bracket.
[0019] Optionally, in the aforementioned digital immersive exhibition hall, ventilation holes are provided on the top of the equipment room, and cooling fans are installed inside.
[0020] Optionally, in the aforementioned digital immersive exhibition hall, the equipment room is equipped with a projection window and an inspection door, and the equipment room is fitted with an anti-theft door lock.
[0021] This invention provides a digital immersive exhibition hall, comprising an exhibition hall frame, double-layer curtain wall panels, equipment components, and a central control system. The double-layer curtain wall panels are detachably mounted on the exhibition hall frame (excluding the exhibition hall door frame), forming at least one equipment room at the top of the frame and at least one performance room inside. The equipment components include projectors, lighting fixtures, a VR / AR system, and power supply equipment. The central control system controls the equipment components, and the projectors, power supply equipment, and central control system are located within the equipment room. This invention utilizes multiple prefabricated beams and columns that are detachably connected to form the exhibition hall frame. The projectors, lighting fixtures, VR / AR system, power supply equipment, and other equipment components, along with the central control system, can be quickly and seamlessly integrated with the exhibition hall frame and double-layer curtain wall panels, forming a highly integrated, prefabricated product. This achieves portable, mobile, quick-assembly, immersive, and intelligent interactive functions for an offline immersive interactive space. Attached Figure Description
[0022] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.
[0023] Figure 1A schematic diagram of the exhibition hall frame for a digital immersive exhibition hall provided by the present invention;
[0024] Figure 2 A schematic diagram of the structure of the interior wall of a digital immersive exhibition hall provided by the present invention;
[0025] Figure 3 A schematic diagram of the exterior wall of a digital immersive exhibition hall provided by the present invention;
[0026] Figure 4 A schematic diagram of the projection integration system for a digital immersive exhibition hall provided by the present invention;
[0027] Figure 5 A top-down perspective view of a digital immersive exhibition hall (showing the placement of the projectors) provided by the present invention;
[0028] Figure 6 A schematic diagram of the structure of an integrated projection interior wall of a digital immersive exhibition hall provided by the present invention;
[0029] Figure 7 This invention provides a structural schematic diagram of an integrated mirrored interior wall surface for a digital immersive exhibition hall.
[0030] In the image above:
[0031] 101-Top edge beam; 102-Top crossbeam; 103-Column; 104-Corner column; 105-Bottom edge beam; 106-Equipment room;
[0032] 201 - Exterior wall panel; 202 - Integrated projection interior wall panel; 2021 - Honeycomb aluminum panel; 2022 - KT board; 2023 - Projection screen; 203 - Integrated mirror interior wall panel; 2031 - Honeycomb aluminum panel; 2032 - Mirror steel;
[0033] 301-Projector; 302-Lighting fixture; 303-VR / AR system; 304-Projector bracket. Detailed Implementation
[0034] Embodiments of the present invention are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.
[0035] In the description of this invention, it should be understood that the orientation descriptions, such as up, down, front, back, left, right, etc., are based on the orientation or positional relationship shown in the accompanying drawings and are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this invention.
[0036] In the description of this invention, "multiple" means two or more. If "first" and "second" are mentioned, they are only for the purpose of distinguishing technical features and should not be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated or the order of the technical features indicated.
[0037] In the description of this invention, unless otherwise explicitly defined, terms such as "set up," "install," and "connect" should be interpreted broadly, and those skilled in the art can reasonably determine the specific meaning of the above terms in this invention in conjunction with the specific content of the technical solution.
[0038] The core of this invention is to provide a digital immersive exhibition hall, forming a highly integrated whole-package product that enables portable, mobile, quick-assembly and disassembly, immersive experience, and intelligent interactive functions for offline immersive interactive spaces.
[0039] To enable those skilled in the art to better understand the technical solutions provided by the present invention, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0040] Please refer to Figures 1-7 , Figure 1 A schematic diagram of the exhibition hall frame for a digital immersive exhibition hall provided by the present invention; Figure 2 A schematic diagram of the structure of the interior wall of a digital immersive exhibition hall provided by the present invention;
[0041] Figure 3 A schematic diagram of the exterior wall of a digital immersive exhibition hall provided by the present invention; Figure 4 A schematic diagram of the projection integration system for a digital immersive exhibition hall provided by the present invention; Figure 5 A top-down perspective view of a digital immersive exhibition hall (showing the placement of the projectors) provided by the present invention; Figure 6 A schematic diagram of the structure of an integrated projection interior wall of a digital immersive exhibition hall provided by the present invention; Figure 7 This invention provides a structural schematic diagram of an integrated mirrored interior wall surface for a digital immersive exhibition hall.
[0042] The present invention provides a digital immersive exhibition hall, including an exhibition hall frame, double-layer curtain wall panels, equipment components and a central control system.
[0043] The exhibition hall frame is composed of multiple prefabricated beams and columns that can be detachably connected to form prefabricated exhibition hall components.
[0044] The double-layer curtain wall panel adopts an inner and outer two-layer design. It is detachably installed on the exhibition hall frame other than the exhibition hall door frame to form a semi-enclosed space. It also encloses at least one equipment room 106 at the top of the exhibition hall frame and at least one performance room inside the exhibition hall frame.
[0045] The equipment components include a projector 301, a lamp 302, a VR / AR system 303, and power supply equipment (such as a distribution box or an external cable that can be connected to an external power source). The central control system is used to control the equipment components. The projector 301, the power supply equipment, and the central control system are located in the equipment room 106.
[0046] This invention provides a digital immersive exhibition hall, which is constructed by detachably connecting multiple prefabricated beams and columns to form a prefabricated exhibition hall frame. Equipment components such as projectors 301, lighting fixtures 302, VR / AR systems 303, power supply equipment, and a central control system can be quickly and seamlessly assembled and disassembled with the exhibition hall frame and double-layer curtain wall panels. The assembly is done in a weld-free manner to form a highly integrated prefabricated product, realizing the functions of a portable, mobile, quick-assembly and disassembly, immersive experience, and intelligent interaction in an offline immersive interactive space.
[0047] In a specific embodiment, such as Figure 1 As shown, the exhibition hall frame includes a top side beam 101, a top crossbeam 102, a bottom side beam 105, columns 103, and corner columns 104. Multiple top side beams 101 are spliced end to end to form a top frame. Multiple top crossbeams 102 are connected to the opposite top side beams 101. Multiple bottom side beams 105 are spliced end to end to form a bottom frame. The two ends of multiple columns 103 are connected to the top side beams 101 and the bottom side beams 105, respectively. Multiple corner columns 104 are located at the splicing points of the top frame and are connected to the top side beams 101 and the bottom side beams 105, respectively.
[0048] The wiring between the equipment components and the central control system is located in the middle layer of the double-layer curtain wall panel and / or in the hollow cavity of the corner column 104, and is connected to the equipment room.
[0049] Of course, the design of component shapes and material selection can also be carried out according to the functional space module requirements, and the number of components can also be adapted according to the actual situation, which will not be elaborated further here.
[0050] The aforementioned modular design of the exhibition hall frame utilizes prefabricated components. By comprehensively balancing factors such as the load-bearing stability of the frame structure, transportation and storage costs, the building materials for the exhibition hall frame are determined, and the splicing method of the building components is optimized, further improving the assembly rate (increasing the speed of disassembly and assembly) and the recyclability rate.
[0051] Specifically, the lighting fixture 302 includes a light strip, a multi-layered mirror light box, and / or a wall washer light. The light strip can be installed on the outside of the corner post 104, extending along the direction of the corner post 104 and located between two exterior wall panels, forming a dynamic light strip while also concealing the exposed corner post 104 for a decorative purpose. The multi-layered mirror light box is installed at the top of the exterior wall 201 at the entrance. The multi-layered mirror light box consists of two mirrors with different transmittance and reflectivity, providing uniform illumination and an effect of infinite extension. The wall washer light can be installed on the double-layered curtain wall panel (or on the inside of the perforated exterior wall panel when using a perforated exterior wall panel), providing decorative lighting for the exterior wall 201 and enhancing its aesthetic appeal. Of course, the lighting fixture 302 can be composed of one or more combinations of light strips, multi-layered mirror light boxes, and wall washer lights, enabling both interior lighting and exterior decoration functions within the exhibition hall.
[0052] In a specific embodiment, such as Figure 2 and Figure 3 As shown, the double-layer curtain wall panel includes an outer wall surface 201 and an inner wall surface.
[0053] The exterior wall panel 201 is composed of multiple perforated exterior wall panels. The functions of the perforated exterior wall panels are: 1. weight reduction; 2. internal bolt fixing installation through the holes; 3. making the wall washer light effect more beautiful through the holes; 4. custom patterns, which can present various different shapes and patterns according to the actual design to make them look more vivid; 5. easy to hang display boards and other decorative items.
[0054] The interior wall surface includes an integrated projection interior wall surface 202 for projector 301 and an integrated mirror interior wall surface serving as a mirror. The integrated projection interior wall surface 202 includes a honeycomb aluminum panel 2021, a KT board 2022, and a projection screen 2023 stacked sequentially. The honeycomb aluminum panel 2021 provides support and has fire-resistant properties. The KT board 2022 serves as a backing for the projection screen 2023, and the image of the projector 301 is projected onto the projection screen 2023. Stainless steel plates or steel plates can also be installed on the inner and outer sides of the honeycomb aluminum panel 2021 to provide support and prevent light transmission. The integrated mirror interior wall surface includes a honeycomb aluminum panel 2031 and a mirror steel 2032 stacked sequentially. The honeycomb aluminum panel 2031 provides support, and the mirror steel 2032 is used to reflect the image generated by the integrated projection interior wall surface 202.
[0055] Each exterior wall panel 201 is composed of nine perforated exterior wall panels. Exterior wall panels 201 are installed in all circumferential areas except for the entrance, totaling 45 perforated exterior wall panels. The middle layer of the two exterior wall panels 201 adjacent to the entrance has a pre-reserved recess to accommodate an integrated touch screen all-in-one machine; the VR / AR system 303 can be embedded in this recess. The interior walls include an integrated projection interior wall panel 202 and an integrated mirror interior wall panel. No interior wall panel is installed on the side where the entrance is located. The integrated projection interior wall panel 202 is installed at least directly opposite the entrance, and the integrated mirror interior wall panel is installed on at least two adjacent sides of the side where the entrance is located.
[0056] To improve the tightness of the connection, the integrated projection wall panel 202 is composed of honeycomb aluminum panel 2021, KT board 2022 and projection screen 2023 bonded together in sequence. The integrated mirror wall panel is composed of honeycomb aluminum panel 2031 and mirror steel 2032 bonded together.
[0057] Furthermore, the integrated mirrored interior walls located on the sides, top, and bottom are respectively the side walls, ceiling, and floor. A floor joist is installed beneath the floor, and the joist is connected to the exhibition hall frame (bottom edge beam 105) at the bottom via floor joist connectors. The floor includes a floor base plate, an inner lining plate, and a mirrored floor. The floor joist, floor base plate, inner lining plate, and mirrored floor are installed sequentially from bottom to top.
[0058] The perforated panels on the exterior wall 201 are connected to the corresponding beams and columns of the exhibition hall frame via bolts, achieving a stable connection. To enable detachable installation of the interior wall panels on the sides, a top mounting position for the interior wall panels can be reserved between the exhibition hall frame and the ceiling, and a bottom mounting position for the interior wall panels can be reserved between the exhibition hall frame and the floor. The interior wall panels can be quickly and stably connected without bolts during installation.
[0059] Based on the above specific embodiments, the central control system includes an integrated central control host, relay system, audio system, wireless control system, lighting control system, and wiring connectors; the VR / AR system 303 includes a camera for facial recognition and a touch-screen all-in-one machine connected to the camera. The application of a facial recognition camera and a multi-touch all-in-one machine as devices for the VR / AR system is not limited to the aforementioned devices; any device that can provide intelligent interactive experience functions such as VR / AR, motion sensing, and voice control is within the scope of protection of this case. The lighting fixtures 302 and the audio system are all connected to the central control system. The audio system guides the user during use and plays relevant audio content, giving the user a more intuitive auditory experience, increasing the realism of the immersive theater, and improving the user experience.
[0060] Specifically, equipment room 106 includes at least a first equipment room for housing projectors and a second equipment room for housing central control equipment. Since the projection positions are calculated in advance, the position of the first equipment room cannot be moved in principle. The location of the second equipment room (the mobile flight case cabinet described below) can be adapted to different space requirements, such as placing it in the circular platform in the center of the immersive hall, or placing it on the top of the exhibition hall (adjacent to the first equipment room).
[0061] To meet the portability and mobility requirements of the digital immersive time capsule, equipment room 106 integrates a central control unit, relays, routers, and other devices. The central control unit connects to a wireless control system, accepts 5G signals, and enables cloud content transmission. It also supports wireless control devices, allowing for Bluetooth pairing and control with wireless mice and keyboards. The built-in central control system provides basic control functions such as one-button power on / off, volume adjustment, and program switching. An external tablet computer serves as a remote control terminal for convenient operation and management.
[0062] The exterior wall 201 integrates a VR / AR system 303. The VR / AR system 303 can be a multi-touch all-in-one device (including a camera for motion capture and facial recognition). The all-in-one device is embedded in the exterior wall 201 and fixed to the column 103 and corner posts via brackets (two square steel beams). The all-in-one device connects to a wireless receiver, accepting 5G signals for cloud content transmission; it also supports wireless control device connections, enabling Bluetooth pairing and control with a wireless mouse and keyboard.
[0063] The wiring connectors and cables are installed during the construction of the exhibition hall frame. The VR / AR system 303's wiring is installed in the middle layer of the double-layer curtain wall panels and connected to the second equipment room. To achieve a digital immersive time capsule assembly time of less than 24 hours, the wiring can be prefabricated onto the exhibition hall frame components. The equipment component wiring runs uniformly from the interior of the exterior wall 201 to the main power supply at the top of the exhibition hall. On-site wiring can be completed during the frame component assembly process, minimizing the time spent on on-site wiring.
[0064] In addition, the wiring in the exhibition hall mainly involves projection signal cables, central control network cables, audio cables, and power cables. All wiring is prefabricated within the exhibition hall's frame components and is not exposed. The projection signal cable originates from the main unit in the mobile flight case cabinet (the second equipment room housing the central control equipment), runs along the top side beam 101, passes through the ventilation holes in the top panel, and connects to the projector 301. The central control network cable, like the projection signal cable, runs along the top side beam 101, passes through the ventilation holes, and connects to the projector 301. The audio cable originates directly from the cabinet, runs along the top side beam 101, and connects to the two ceiling speakers. The power cords are divided into those for projector 301, ceiling speaker, lamp 302, and all-in-one unit. The projector 301 power cord, like the signal cable, runs along the top edge beam 101 through the ventilation holes to the projector 301. The ceiling speaker power cord, like the audio cable, runs directly from the cabinet, along the top edge beam 101 to the two ceiling speakers. The lamp 302 power cord runs from the cabinet, along the top edge beam 101 to the vicinity of the exhibition hall's top, and a corresponding power strip is installed. The lamp 302 uses a two-prong plug to connect to the power strip. The all-in-one unit power cord runs from the cabinet, along the top edge beam 101 to the node, then down the circular opening of the column 103 to the underside of the outer panel, and finally connects to the all-in-one unit.
[0065] To adapt to the portable and mobile nature of digital immersive exhibition halls, the central control system, projection integration system, and audio system can be quickly packaged and taken away, enabling 5G signal access, immediate installation and use, and eliminating the need for professional installation. The main unit, audio equipment, power amplifier, 5G signal CPE, signal cable, power cable, switches, and other equipment are prefabricated together, and the wiring locations are fixed, concealed, and safe.
[0066] To achieve streamlined installation and debugging without the need for professional intervention, eliminating the need for projection blending and color calibration, the equipment components include a projection integration system. This system comprises a projector bracket 304 detachably connected to the equipment room 106, and a projector 301 and lens detachably mounted on the bracket 304. By customizing the projector bracket 304, the height and angle of the camera mounted on the bracket can be pre-adjusted before installation in the equipment room, ensuring a fixed position for the projector 301. This reduces the difficulty of optical path adjustment and effectively shortens the setup time.
[0067] Based on the above specific embodiments, the equipment room 106 is equipped with a projection window and an inspection door, and the door of the equipment room 106 is provided with a support structure. An anti-theft door lock is installed inside the equipment room 106 to ensure equipment security. This facilitates the installation and commissioning of internal equipment.
[0068] Specifically, ventilation holes are provided on the top wall of equipment room 106, and cooling fans are installed inside. The ventilation holes on the top of equipment room 106 and the cooling fans installed inside create a cooling airflow inside equipment room 106, which is then exhausted from the top, preventing the temperature of equipment room 106 from becoming too high and affecting the normal operation of the equipment.
[0069] The method for building the aforementioned digital immersive exhibition hall includes the following steps:
[0070] 1) Assembly and fixing of the exhibition hall frame: The bottom of multiple corner columns 104 are respectively spliced to multiple bottom side beams 105 and fixed with bolts; multiple top side beams 101 are respectively spliced to the top of multiple corner columns 104 and fixed with bolts; the two ends of multiple columns 103 are respectively spliced to the bottom side beams 105 and the top side beams 101 and fixed with bolts; multiple top crossbeams 102 are spliced to multiple top side beams 101 and fixed with bolts.
[0071] 2) Interior wall panel installation: Pre-lay the floor to level it with the ground, while ensuring the bottom support of the exhibition hall frame; install the ceiling; remove the floor; install the integrated projection interior wall panel and integrated mirror interior wall panel (using an insert installation method, with slots for inserting the interior wall panel at the top and bottom); install the floor and level it.
[0072] 3) Installation of Equipment Room 106: The top beam 102 and the top plate are connected by bolts, and the equipment room 106 is fixed to the top of the exhibition hall near the door.
[0073] 4) Installation and commissioning of equipment components: Install and commission equipment components;
[0074] 5) Installation of exterior wall panel 201: Exterior wall panel 201 is connected to column 103 by bolts. Embedded cutouts for installing touch screen all-in-one machine are reserved on the perforated plate of exterior wall (the touch screen all-in-one machine is fixed between two columns by brackets, and the wall washer light is installed at the top and bottom inside the perforated plate exterior wall).
[0075] 6) Install lighting fixtures 302.
[0076] This invention is applicable to the dissemination of culture. Based on the above design background, the research content of this case involves: modular design of prefabricated mobile exhibition halls; integrated development of 5G+VR / AR / AI interactive experiences based on cloud service technology; achieving an assembly time of ≤24 hours and a warehouse recycling rate of over 90%; and a prefabricated, intensive, digitally immersive integrated cinema with multiple experience modes such as VR experience and AR interaction, featuring characteristics such as being modular, mobile, small footprint, and energy-saving.
[0077] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other.
[0078] This article uses specific examples to illustrate the principles and implementation methods of the present invention. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of the present invention. It should be noted that those skilled in the art can make several improvements and modifications to the present invention without departing from the principles of the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
Claims
1. A digital immersive exhibition hall, characterized in that, include: The exhibition hall frame is composed of multiple beams and columns that can be detachably connected. A double-layer curtain wall panel, which is detachably installed on the exhibition hall frame except for the exhibition hall door frame, and encloses at least one equipment room in the exhibition hall frame, and encloses at least one performance room inside the exhibition hall frame; The equipment components include a projector, lighting fixtures, a VR / AR system, and a power supply system. The central control system is used to control the equipment components. The projector, the power supply system, and the central control system are detachably installed in the equipment room via connectors. The equipment room is installed at the top of the exhibition hall. The top wall of the equipment room is equipped with ventilation holes and a cooling fan is installed inside. The equipment room has a projection window and an inspection door. The double-layer curtain wall panel includes an outer wall surface and an inner wall surface. The outer wall surface is spliced together from multiple perforated outer wall panels. The inner wall surface includes an integrated projection inner wall surface for projection by the projector and an integrated mirror inner wall surface for use as a mirror. The integrated projection inner wall surface includes honeycomb aluminum panels, KT panels and projection screens stacked in sequence. The integrated mirror inner wall surface includes honeycomb aluminum panels and mirror steel stacked in sequence. The exhibition hall frame includes top side beams, top cross beams, bottom side beams, columns, and corner columns. Multiple top side beams are spliced end to end to form a top frame. Multiple top cross beams are respectively connected to two opposite top side beams. Multiple bottom side beams are spliced end to end to form a bottom frame. The two ends of multiple columns are respectively connected to the top side beams and the bottom side beams. Multiple corner columns are located at the splicing points of the top frame and are respectively connected to the top side beams and the bottom side beams at both ends. The integrated mirrored interior wall panels located on the sides, top, and bottom are respectively the side walls, the top panel, and the floor. Floor joists are installed under the floor, and the floor joists are connected to the bottom of the exhibition hall frame through floor joist connectors. The wiring between the equipment components and the central control system is located in the middle layer of the double-layer curtain wall panel and / or in the hollow corner columns of the exhibition hall frame; The equipment components include a projection integration system, which includes a projector bracket detachably connected between the equipment, and a projector and lens detachably mounted on the projector bracket.
2. The digital immersive exhibition hall according to claim 1, characterized in that, The lighting fixtures include light strips installed on the outside of the corner pillars, and / or, multi-layer mirror light boxes installed on the top of the exterior wall of the doorway, and / or, wall washer lights installed on the double-layer curtain wall panels.
3. The digital immersive exhibition hall according to claim 1 or 2, characterized in that, The central control system includes an integrated central control host, relay system, audio system, wireless control system, lighting control system, and wiring connectors; the VR / AR system includes a camera for facial recognition and a touch screen all-in-one machine connected to the camera.
4. The digital immersive exhibition hall according to claim 1 or 2, characterized in that, The equipment room is equipped with a burglarproof door lock.
Citation Information
Patent Citations
Detachable house box
CN104775522A
Reflective lateral projection screen and projection system
CN112255877A
Space display system
CN212965735U
Digital immersive exhibition hall
CN217379912U