A second-life battery screening method, device and medium
By building a safety model and anomaly detection, combined with charging and discharging test data, the problem of low screening efficiency of ladder batteries is solved, efficient screening and reuse of ladder batteries is achieved, and the safety and performance evaluation of batteries are ensured.
Patent Information
- Application Number
- CN202210955244.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-10
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-08-10
AI Technical Summary
In the existing technology, the efficiency of screening the entire package of ladder batteries is low, and there is a lack of efficient screening methods, which results in inaccurate battery safety and performance evaluation and affects the reuse efficiency of ladder batteries.
By constructing a charging and discharging safety model, using anomaly detection methods to obtain safety thresholds, and combining primary charging and discharging test data, a comprehensive evaluation is performed to determine the health of the battery to determine whether it is suitable for energy storage.
It improves the screening efficiency of the entire package utilization of ladder batteries, ensures the safety of batteries and the accuracy of performance evaluation, and achieves efficient screening and reuse of ladder batteries.
Smart Images

Figure CN115236525B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of new energy technology, and in particular to a second-life battery screening method, device and medium. Background Art
[0002] After a period of use (such as being used as a power battery in electric vehicles), the battery decays. The decayed battery is not enough to meet the application requirements of the current equipment (such as electric vehicles), but the battery also has a certain amount of residual capacity and can still meet the needs of electrical equipment (such as charging electric vehicles waiting for charging equipment), that is, the downgraded utilization of the cascade battery. The core factors to be considered in the selection of cascade batteries are mainly safety and economic value. Safety mainly considers the core safety indicators of the battery, which requires that the cascade batteries must be strictly screened in advance, and the cascade batteries with better safety and performance must be selected for cascade utilization.
[0003] Second-life battery utilization includes disassembly and reassembly and whole-package reuse. Compared with disassembly and reassembly, the whole-package utilization of second-life batteries is more efficient. The existing screening and evaluation of second-life batteries is mainly through a large number of charge and discharge tests, so the efficiency is low, and there is a lack of efficient screening methods for the whole-package utilization of second-life batteries.
[0004] It can be seen that how to improve the screening efficiency of the whole package of second-life batteries is a technical problem that people in this field urgently need to solve. Summary of the invention
[0005] The purpose of the present application is to provide a second-life battery screening method, device and medium for improving the screening efficiency of second-life battery whole-package utilization.
[0006] In order to solve the above technical problems, the present application provides a secondary battery screening method, comprising:
[0007] Select the target battery;
[0008] Determine the target new energy device where the target second-life battery is located before second-life utilization and obtain the type of the target new energy device;
[0009] Select multiple new energy devices of the type as analysis objects;
[0010] A charging safety model and a discharging safety model are constructed according to the analysis object, and a first charging safety threshold and a second charging safety threshold are obtained through the charging safety model, and a first discharging safety threshold and a second discharging safety threshold are obtained through the discharging safety model; wherein, constructing the charging safety model comprises: obtaining a reference charging process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charging process data is data generated by the analysis object during the charging process; calculating secondary reference charging process data corresponding to each variable for characterizing the change trend of the variable according to the reference charging process data; determining the reference charging process data according to the corresponding relationship between the reference charging process data and the secondary reference charging process data and time by using an abnormality detection method; The first charging safety threshold corresponding to the process data and the second charging safety threshold corresponding to the secondary reference charging process data are determined; constructing the discharge safety model includes: obtaining the primary reference discharge process data of the analysis object within the preset time range and matching the analysis object, the primary reference discharge process data being the data generated by the analysis object during the discharge process; calculating the secondary reference discharge process data corresponding to each of the variables for characterizing the change trend of the variables according to the primary reference discharge process data; based on the correspondence between the primary reference discharge process data and the secondary reference discharge process data and time, using the abnormality detection method to determine the first discharge safety threshold corresponding to the primary reference discharge process data and determine the second discharge safety threshold corresponding to the secondary reference discharge process data;
[0011] Obtaining primary charging test data and secondary charging test data of the target secondary battery; wherein the primary charging test data is data directly obtained from the target secondary battery charging test, and the secondary charging test data is data corresponding to each of the variables calculated based on the primary charging test data and used to characterize the change trend of the variables;
[0012] comparing the primary charging test data with the first charging safety threshold and comparing the secondary charging test data with the second charging safety threshold to determine the target tiered battery charging anomaly and create a charging anomaly information set;
[0013] Obtaining the primary discharge test data and the secondary discharge test data of the target secondary battery; wherein the primary discharge test data is the data directly obtained from the discharge test of the target secondary battery, and the secondary discharge test data is the data corresponding to each of the variables calculated according to the primary discharge test data and used to characterize the change trend of the variables;
[0014] Comparing the primary discharge test data with the first discharge safety threshold and comparing the secondary discharge test data with the second discharge safety threshold to determine the target cascade battery discharge abnormality and create a discharge abnormality information set;
[0015] The target second-life battery is comprehensively evaluated according to the abnormal charging information set and the abnormal discharging information set, and the health of the target second-life battery is obtained, so as to serve as a basis for determining whether the target second-life battery is used for energy storage.
[0016] Preferably, the obtaining of a reference charging process data of the analysis object within a preset time range and matching the analysis object comprises:
[0017] Acquire a plurality of target charging orders matching the analysis object within the preset time range;
[0018] The reference charging process data is extracted from each of the target charging orders.
[0019] Preferably, the obtaining of a reference discharge process data of the analysis object within the preset time range and matching the analysis object comprises:
[0020] Acquire a plurality of target discharge orders matching the analysis object within the preset time range;
[0021] The reference discharge process data is extracted from each of the target discharge orders.
[0022] Preferably, comparing the primary charging test data with the first charging safety threshold and comparing the secondary charging test data with the second charging safety threshold to determine the target secondary battery charging abnormality includes:
[0023] In a case where the primary charging test data is greater than the first charging safety threshold and / or the secondary charging test data is greater than the second charging safety threshold, it is determined that the target secondary battery is charging abnormally.
[0024] Preferably, comparing the primary discharge test data with the first discharge safety threshold and comparing the secondary discharge test data with the second discharge safety threshold to determine the target secondary battery discharge abnormality includes:
[0025] When the primary discharge test data is greater than the first discharge safety threshold and / or the secondary discharge test data is greater than the second discharge safety threshold, it is determined that the target secondary battery is discharged abnormally.
[0026] Preferably, after comprehensively evaluating the target second-life battery according to the charging abnormality information set and the discharging abnormality information set and obtaining the health of the target second-life battery, the method further includes:
[0027] Determining a first health status corresponding to the target second-life battery primary charging test data and the first charging safety threshold value according to a correspondence relationship between a first preset deviation degree and a health status;
[0028] Determining a second health status corresponding to the target second-life battery secondary charging test data and the second charging safety threshold value according to a corresponding relationship between a second preset deviation degree and the health status;
[0029] The charging health status of the target second-life battery is determined according to the first health status and the second health status.
[0030] Preferably, after comprehensively evaluating the target second-life battery according to the charging abnormality information set and the discharging abnormality information set and obtaining the health of the target second-life battery, the method further includes:
[0031] Determining a third health condition corresponding to the target secondary battery primary discharge test data and the first discharge safety threshold value according to a correspondence relationship between a third preset deviation degree and the health condition;
[0032] Determining a fourth health condition corresponding to the target secondary discharge test data of the second-life battery and the second discharge safety threshold value according to a corresponding relationship between a fourth preset deviation degree and the health condition;
[0033] Determine the discharge health status of the target secondary battery according to the third health status and the fourth health status;
[0034] The health state of the target secondary battery is determined according to the first health state, the second health state, the third health state, and the fourth health state.
[0035] Preferably, the determining, according to the correspondence between the first preset deviation degree and the health condition, the first health condition corresponding to the target secondary battery primary charging test data and the first charging safety threshold comprises:
[0036] Acquire multiple historical charging orders for the target new energy equipment within a predetermined time;
[0037] Acquire a historical charging process data from each of the historical charging orders, wherein the historical charging process data is data generated by the analysis object during the charging process;
[0038] Taking the average value corresponding to each of the variables in the historical charging process data as the first actual average value;
[0039] Calculate a first reference average value corresponding to each of the variables in the reference charging process data within the predetermined time;
[0040] Determine a first variable deviation between the first actual average value and the first reference average value corresponding to the same variable;
[0041] The first actual health level corresponding to the first variable deviation is determined according to a preset correspondence between the first variable deviation and the health level.
[0042] Preferably, the determining, according to the correspondence between the second preset deviation degree and the health condition, the second health condition corresponding to the target cascade battery secondary charging test data and the second charging safety threshold comprises:
[0043] Acquire a plurality of the historical charging orders for the target new energy equipment within a predetermined time;
[0044] Acquire secondary historical charging process data from each of the historical charging orders, wherein the secondary historical charging process data is data corresponding to each of the variables calculated based on the primary historical charging process data and used to characterize the change trend of the variables;
[0045] Taking the average value corresponding to each of the variables in the secondary historical charging process data as the second actual average value;
[0046] Calculate a second reference average value corresponding to each of the variables in the secondary reference charging process data within the predetermined time;
[0047] Determine a second variable deviation between the second actual average value and the second reference average value corresponding to the same variable;
[0048] The second actual health level corresponding to the second variable deviation is determined according to a preset corresponding relationship between the second variable deviation and the health level.
[0049] Preferably, the determining, according to the correspondence between the third preset deviation degree and the health condition, a third health condition corresponding to the target secondary battery primary discharge test data and the first discharge safety threshold comprises:
[0050] Acquire multiple historical discharge orders of the target new energy equipment within a predetermined time;
[0051] Acquire a historical discharge process data from each of the historical discharge orders, wherein the historical discharge process data is data generated by the analysis object during the discharge process;
[0052] Taking the average value corresponding to each of the variables in the historical discharge process data as the third actual average value;
[0053] Calculate the third reference average value corresponding to each of the variables in the predetermined time of the reference discharge process data;
[0054] Determine a third variable deviation between the first actual average value and the third reference average value corresponding to the same variable;
[0055] The third actual health level corresponding to the third variable deviation is determined according to a preset corresponding relationship between the third variable deviation and the health level.
[0056] Preferably, the determining, according to the correspondence between the fourth preset deviation degree and the health condition, a fourth health condition corresponding to the target cascade battery secondary discharge test data and the second discharge safety threshold comprises:
[0057] Acquire a plurality of the historical discharge orders of the target new energy equipment within a predetermined time;
[0058] Acquire secondary historical discharge process data from each of the historical charging orders, wherein the secondary historical discharge process data is data corresponding to each of the variables calculated based on the primary historical discharge process data and used to characterize the change trend of the variables;
[0059] Taking the average value corresponding to each of the variables in the secondary historical discharge process data as a fourth actual average value;
[0060] Calculate a fourth reference average value corresponding to each of the variables in the secondary reference discharge process data within the predetermined time;
[0061] Determine a fourth variable deviation between the fourth actual average value and the fourth reference average value corresponding to the same variable;
[0062] The fourth actual health level corresponding to the fourth variable deviation is determined according to a preset corresponding relationship between the fourth variable deviation and the health level.
[0063] In order to solve the above technical problems, the present application also provides a cascade battery screening device, comprising:
[0064] A first selection module, used to select a target second-life battery;
[0065] A determination and acquisition module, used to determine the target new energy device where the target second-life battery is located before second-life utilization and to acquire the type of the target new energy device;
[0066] A second selection module is used to select a plurality of new energy devices of the type as analysis objects;
[0067] A construction and acquisition module is used to construct a charging safety model and a discharging safety model according to the analysis object, and obtain a first charging safety threshold and a second charging safety threshold through the charging safety model, and obtain a first discharging safety threshold and a second discharging safety threshold through the discharging safety model; wherein, constructing the charging safety model includes: obtaining a reference charging process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charging process data is the data generated by the analysis object during the charging process; calculating the secondary reference charging process data corresponding to each variable for characterizing the trend of variable changes according to the reference charging process data; determining the corresponding relationship between the reference charging process data and the secondary reference charging process data and time using an abnormality detection method A first charging safety threshold corresponding to a reference charging process data and a second charging safety threshold corresponding to the secondary reference charging process data are determined; constructing the discharge safety model includes: obtaining a reference discharge process data of the analysis object within the preset time range and matching the analysis object, the reference discharge process data being the data generated by the analysis object during the discharge process; calculating secondary reference discharge process data corresponding to each variable for characterizing the variable change trend according to the reference discharge process data; based on the correspondence between the reference discharge process data and the secondary reference discharge process data and time, using the abnormality detection method to determine the first discharge safety threshold corresponding to the reference discharge process data and determine the second discharge safety threshold corresponding to the secondary reference discharge process data;
[0068] A first acquisition module is used to acquire the primary charging test data and the secondary charging test data of the target cascade battery; wherein the primary charging test data is the data directly acquired from the charging test of the target cascade battery, and the secondary charging test data is the data corresponding to each variable calculated according to the primary charging test data and used to characterize the variable change trend;
[0069] A first determination module, configured to compare the primary charging test data with the first charging safety threshold and to compare the secondary charging test data with the second charging safety threshold to determine the target tiered battery charging anomaly and create a charging anomaly information set;
[0070] A second acquisition module is used to acquire the primary discharge test data and the secondary discharge test data of the target echelon battery; wherein the primary discharge test data is the data directly acquired from the discharge test of the target echelon battery, and the secondary discharge test data is the data corresponding to each variable calculated according to the primary discharge test data and used to characterize the change trend of the variable;
[0071] A second determination module, configured to compare the primary discharge test data with the first discharge safety threshold and to compare the secondary discharge test data with the second discharge safety threshold to determine the target cascade battery discharge abnormality and create a discharge abnormality information set;
[0072] An evaluation and acquisition module is used to comprehensively evaluate the target second-life battery according to the charging abnormality information set and the discharging abnormality information set and obtain the health of the target second-life battery as a basis for determining whether the target second-life battery is used for energy storage.
[0073] In order to solve the above technical problems, the present application also provides a cascade battery screening device, comprising:
[0074] Memory for storing computer programs;
[0075] A processor is used to implement the steps of the above-mentioned cascade battery screening method when executing the computer program.
[0076] In order to solve the above technical problems, the present application also provides a computer-readable storage medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above-mentioned cascade battery screening method are implemented.
[0077] The present application provides a method for screening second-life batteries, including: selecting a target second-life battery; determining a target new energy device where the target second-life battery is located before second-life utilization and obtaining the type of the target new energy device; selecting multiple new energy devices under the type as analysis objects; constructing a charging safety model and a discharging safety model according to the analysis object, and obtaining a first charging safety threshold and a second charging safety threshold through the charging safety model, and obtaining a first discharging safety threshold and a second discharging safety threshold through the discharging safety model; obtaining primary charging test data and secondary charging test data of the target second-life battery; comparing the primary charging test data with the first charging safety threshold and comparing the secondary charging test data with the second charging safety threshold to determine charging anomalies of the target second-life battery and creating a charging anomaly information set; obtaining primary discharging test data and secondary discharging test data of the target second-life battery; comparing the primary discharging test data with the first discharging safety threshold and comparing the secondary discharging test data with the second discharging safety threshold to determine discharging anomalies of the target second-life battery and creating a discharging anomaly information set; comprehensively evaluating the target second-life battery according to the charging anomaly information set and the discharging anomaly information set and obtaining the health of the target second-life battery, so as to serve as a basis for judging whether the target second-life battery is used for energy storage. It can be seen that after obtaining the second-hand battery in this method, the second-hand battery is traced, the vehicle model previously used for the second-hand battery is obtained, the second-hand battery is charged and discharged once, and big data anomaly detection and analysis is performed based on the charging process data of the same vehicle model to obtain the charging safety evaluation information of the battery. Big data anomaly detection and analysis is performed based on the discharge process data of the same vehicle model to obtain the discharge safety evaluation information of the battery. The charging safety evaluation information and the discharge safety evaluation information are comprehensively evaluated to determine whether they meet the requirements for the application of second-hand energy storage. That is, the present application can complete the evaluation of the second-hand battery pack by performing one charge and discharge on the second-hand battery pack, thereby ensuring the accuracy of the evaluation of the second-hand battery and improving the screening efficiency of the whole pack of second-hand batteries.
[0078] In addition, the present application also provides a cascade battery screening device and a computer-readable storage medium, which have the same or corresponding technical features as the above-mentioned cascade battery screening method and have the same effects as above. BRIEF DESCRIPTION OF THE DRAWINGS
[0079] In order to more clearly illustrate the embodiments of the present application, the following is a brief introduction to the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0080] Figure 1 A flowchart of a second-life battery screening method provided in an embodiment of the present application;
[0081] Figure 2 A flowchart of a method for constructing a charging safety model provided in an embodiment of the present application;
[0082] Figure 3 A structural diagram of a secondary battery screening device provided in one embodiment of the present application;
[0083] Figure 4 A structural diagram of a secondary battery screening device provided in another embodiment of the present application;
[0084] Figure 5 An overall flow chart of a secondary battery screening method provided in an embodiment of the present application. DETAILED DESCRIPTION
[0085] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0086] The core of this application is to provide a second-life battery screening method, device and medium, which are used to improve the screening efficiency of second-life battery whole-package utilization.
[0087] After a period of use (such as being used as a power battery in electric vehicles), the battery has decayed. The decayed battery is not sufficient to meet the application requirements of the current equipment (such as electric vehicles). However, the battery also has a certain residual capacity and can still meet the needs of electrical equipment (such as charging electric vehicles waiting for charging equipment). This is called a second-hand battery. The core factors to be considered in the screening of second-hand batteries are mainly safety and economic value. Safety mainly considers the core safety indicators of the battery, which requires that the second-hand batteries must be strictly screened in advance to select the second-hand batteries with better safety and performance for second-hand use. In order to improve the screening efficiency of second-hand batteries, this application completes the evaluation of the second-hand battery pack by performing a charge and discharge on the second-hand battery pack.
[0088] In order to enable those skilled in the art to better understand the present application, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. Figure 1 A flowchart of a secondary battery screening method provided in an embodiment of the present application is as follows: Figure 1 As shown, the method includes:
[0089] S10: Select a target battery.
[0090] A second-life battery refers to a battery that has been degraded, i.e., the battery has decayed after a period of use (such as being used as a power battery in an electric vehicle). The decayed battery is not sufficient to meet the application requirements of the current device (such as an electric vehicle), but the battery also has a certain amount of remaining capacity and can still meet the needs of the power-consuming device (such as charging an electric vehicle waiting for a charging device). In this embodiment, the second-life battery that needs to be evaluated for energy storage is called the target second-life battery.
[0091] S11: Determine the target new energy equipment where the target second-life battery is located before second-life utilization and obtain the type of the target new energy equipment.
[0092] After determining the target second-life battery, trace back the target new energy device that uses the target second-life battery to facilitate subsequent evaluation of the energy storage of the target second-life battery based on the conductivity data (including charging data and / or discharging data) of the target new energy device and the conductivity data of new energy devices of the same type as the target new energy device.
[0093] S12: Select multiple new energy devices under the type as analysis objects.
[0094] In implementation, there is no limit on the number of specific analysis objects selected. Assuming that the type of the target new energy equipment obtained in the above step is BYD EV450, multiple BYD EV450s can be selected as analysis objects in this step. It should be noted that multiple new energy equipment of the same type are selected as analysis objects here. In order to improve the accuracy of the acquired health information of the target new energy equipment, multiple new energy equipment of the same type, age and region as the target new energy equipment can be selected as analysis objects.
[0095] S13: constructing a charging safety model and a discharging safety model according to the analysis object, and obtaining a first charging safety threshold and a second charging safety threshold through the charging safety model, and obtaining a first discharging safety threshold and a second discharging safety threshold through the discharging safety model.
[0096] Figure 2 A flowchart of a method for constructing a charging safety model provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, the method includes:
[0097] S131: Acquire a reference charging process data of the analysis object within a preset time range and matching the analysis object; wherein the reference charging process data is data generated by the analysis object during the charging process.
[0098] The charging process data mentioned in this application is the data generated by any new energy device during the charging process. The charging process data comes from the charging cloud platform and charging equipment, including charging system data and charging data. The charging system data mainly refers to the charging pile / charging terminal data, user data, and vehicle data stored in the cloud platform system that supports the charging business. The charging data is obtained from the vehicle by the charging equipment during the charging process (handshake stage, parameter configuration stage, charging stage, and charging end). The reference charging process data is the data generated by the analysis object during the charging process.
[0099] Correspondingly, the reference charging process data may be the charging process data of a new energy device of the same type as the target new energy device, or the charging process data of a new energy device of the same type and age as the target new energy device, etc. The reference charging process data includes but is not limited to the maximum temperature, the minimum temperature of the power battery, the state of charge (SOC) of the power battery, the maximum voltage of the single cell, the minimum voltage of the single cell, the number of the maximum voltage of the single cell, the number of the maximum temperature monitoring point, and the number of the minimum temperature monitoring point.
[0100] S132: Calculating secondary reference charging process data corresponding to each variable and used to characterize a variable change trend according to the primary reference charging process data.
[0101] The secondary reference charging process data includes but is not limited to the maximum temperature difference, the maximum pressure difference of the power battery, the maximum temperature rise rate of the power battery, the maximum SOC change rate of the power battery, the maximum change rate of the single cell voltage, the Shannon entropy value of the highest temperature monitoring point number, the Shannon entropy value of the lowest temperature monitoring point number, and the Shannon entropy value of the single cell with the highest voltage.
[0102] Taking the maximum temperature of the power battery as an example of the primary reference charging process data, the secondary reference charging process data includes other variables (such as temperature rise) that are directly or indirectly affected by the maximum temperature. In this embodiment, the battery temperature specifically refers to the maximum temperature of the battery cell. Taking charging as an example, the battery temperature rise refers to the change in the maximum temperature of the battery during the battery charging process. For example, at the 20th minute of battery charging, the maximum temperature of the battery cell is 47°C, and at the 21st minute of battery charging, the maximum temperature of the battery cell rises to 48°C, then the battery temperature rise in this 1 minute is expressed as 48-47=1°C.
[0103] S133: Based on the correspondence between the primary reference charging process data and the secondary reference charging process data and time, an abnormality detection method is used to determine a first charging safety threshold corresponding to the primary reference charging process data and a second charging safety threshold corresponding to the secondary reference charging process data.
[0104] There is no limitation on the abnormality detection method used, such as statistical analysis method or cluster analysis method. Among them, the statistical analysis method can be a normal distribution statistical method, and the cluster analysis method can be a Gaussian mixture clustering method. Here, the normal distribution statistical method is taken as an example to illustrate the determination of the first charging safety threshold corresponding to the highest temperature data in the reference charging process.
[0105] (1) Select reference charging process data from charging orders of new energy equipment of the same type as the target new energy equipment within the past 30 days as sample data;
[0106] (2) For each order, the maximum value of the maximum battery temperature per minute is obtained as the maximum temperature corresponding to the order;
[0107] (3) Calculate the average μ and standard deviation σ of the maximum temperature of all orders;
[0108] (4) According to the "3σ" principle of normal distribution: the interval (μ-3σ, μ+3σ) is the actual possible value interval of the random variable X. The probability of X falling outside this interval is less than three thousandths. In practical problems, it is generally believed that such an event will not occur. If the variable exceeds this three thousandths, it is an abnormal point. Then the threshold of the maximum temperature is μ+3σ, which is the first charging safety threshold. The method of determining the second charging safety threshold corresponding to the secondary reference charging process data is similar to the method of determining the first charging safety threshold, which will not be repeated here.
[0109] The above describes in detail the process of constructing a charging safety model. Since the method of constructing a discharge safety model is similar to that of constructing a charging safety model, the embodiment of constructing a discharge safety model will not be repeated here. Constructing a discharge safety model mainly includes the following steps: obtaining a reference discharge process data of the analysis object within a preset time range and matching the analysis object, the primary reference discharge process data is the data generated by the analysis object during the discharge process; calculating the secondary reference discharge process data corresponding to each variable for characterizing the change trend of the variable according to the primary reference discharge process data; based on the correspondence between the primary reference discharge process data and the secondary reference discharge process data and time, using an abnormality detection method to determine the first discharge safety threshold corresponding to the primary reference discharge process data and determine the second discharge safety threshold corresponding to the secondary reference discharge process data.
[0110] S14: Obtaining primary charging test data and secondary charging test data of the target secondary battery.
[0111] The primary charging test data is data directly obtained from the target battery charging test, and the secondary charging test data is data corresponding to each variable calculated based on the primary charging test data and used to characterize the variable change trend.
[0112] In the above steps, the charging and discharging data of the analysis object are obtained. In order to obtain the energy storage situation of the target echelon battery, it is necessary to perform a charging test and a discharging test on the target echelon battery. It should be noted that, in practice, the order of the charging test and the discharging test is not limited. In this embodiment, the target echelon battery is first charged and then discharged to prevent the echelon battery from being damaged again if the echelon battery originally stores less electricity. The target echelon battery charging test data of the target new energy equipment also includes primary charging data and secondary charging data.
[0113] S15: Compare the primary charging test data with the first charging safety threshold, and compare the secondary charging test data with the second charging safety threshold to determine the target echelon battery charging abnormality and create a charging abnormality information set.
[0114] In order to detect the charging abnormality of the target cascade battery, the primary charging test data can be compared with the first charging safety threshold, and the secondary charging test data can be compared with the second charging safety threshold. When the primary charging test data is greater than the first charging safety threshold or the secondary charging test data is greater than the second charging safety threshold, it can be considered that the target cascade battery is charging abnormally, and a charging abnormality information set is created for user viewing.
[0115] S16: Obtain the primary discharge test data and the secondary discharge test data of the target cascade battery.
[0116] The primary discharge test data is data directly obtained from the target battery discharge test, and the secondary discharge test data is data corresponding to each variable calculated based on the primary discharge test data and used to characterize the variable change trend.
[0117] S17: Compare the primary discharge test data with the first discharge safety threshold and compare the secondary discharge test data with the second discharge safety threshold to determine the target battery discharge abnormality and create a discharge abnormality information set.
[0118] Similar to the above-mentioned determination of target secondary battery charging abnormality detection, the embodiment of target secondary battery discharging abnormality detection is not described in detail here.
[0119] S18: Comprehensively evaluate the target second-life battery according to the abnormal charging information set and the abnormal discharging information set and obtain the health of the target second-life battery as a basis for determining whether the target second-life battery is used for energy storage.
[0120] The target echelon is evaluated according to the obtained charging abnormality information set and discharging abnormality information set to obtain the health of the target echelon battery, and the target echelon battery is screened according to the health.
[0121] A second-life battery screening method provided in the present embodiment includes: selecting a target second-life battery; determining a target new energy device where the target second-life battery is located before second-life utilization and obtaining the type of the target new energy device; selecting multiple new energy devices under the type as analysis objects; constructing a charging safety model and a discharging safety model according to the analysis object, and obtaining a first charging safety threshold and a second charging safety threshold through the charging safety model and obtaining a first discharging safety threshold and a second discharging safety threshold through the discharging safety model; obtaining primary charging test data and secondary charging test data of the target second-life battery; comparing the primary charging test data with the first charging safety threshold and comparing the secondary charging test data with the second charging safety threshold to determine charging anomaly of the target second-life battery and creating a charging anomaly information set; obtaining primary discharging test data and secondary discharging test data of the target second-life battery; comparing the primary discharging test data with the first discharging safety threshold and comparing the secondary discharging test data with the second discharging safety threshold to determine discharging anomaly of the target second-life battery and creating a discharging anomaly information set; comprehensively evaluating the target second-life battery according to the charging anomaly information set and the discharging anomaly information set and obtaining the health of the target second-life battery as a basis for determining whether the target second-life battery is used for energy storage. It can be seen that after obtaining the second-hand battery in this method, the second-hand battery is traced, the vehicle model previously used for the second-hand battery is obtained, the second-hand battery is charged and discharged once, and big data anomaly detection and analysis is performed based on the charging process data of the same vehicle model to obtain the charging safety evaluation information of the battery. Big data anomaly detection and analysis is performed based on the discharge process data of the same vehicle model to obtain the discharge safety evaluation information of the battery. The charging safety evaluation information and the discharge safety evaluation information are comprehensively evaluated to determine whether they meet the requirements for the application of second-hand energy storage. That is, the present application can complete the evaluation of the second-hand battery pack by performing one charge and discharge on the second-hand battery pack, thereby ensuring the accuracy of the evaluation of the second-hand battery and improving the screening efficiency of the whole pack of second-hand batteries.
[0122] In implementation, in order to quickly obtain a reference charging process data, a preferred implementation mode is that obtaining a reference charging process data of the analysis object within a preset time range and matching the analysis object includes:
[0123] Acquire multiple target charging orders that match the analysis object within a preset time range;
[0124] Extract a reference charging process data from each target charging order.
[0125] In order to facilitate the understanding of the data of the battery during the charging process, the data generated by the new energy equipment during the charging process is stored in the charging order. The charging order records the charging amount, charging power, temperature corresponding to each charging moment and other data of the new energy equipment during the charging process according to the charging time. Therefore, when you want to obtain a reference charging process data, you can directly obtain it from the first target charging order. In order to make the reference charging process data obtained through each analysis object referenceable and to improve the accuracy of charging anomaly detection of the target tiered battery of the target new energy equipment, in this embodiment, when obtaining the target charging order corresponding to the analysis object, it is limited to the target charging order within the preset time range. There is no limitation on the preset time range.
[0126] The method provided in this embodiment is to obtain a reference charging process data of an analysis object during a reference charging process from a target charging order. Since the target charging order records a reference charging process data corresponding to different moments in the charging process of the new energy equipment according to the charging time, the method of obtaining a reference charging process data from a charging order is relatively convenient and fast.
[0127] Similar to the acquisition of reference charging process data in the above embodiment, acquiring reference discharging process data of the analysis object within a preset time range and matching the analysis object includes:
[0128] Acquire multiple target discharge orders that match the analysis object within a preset time range;
[0129] A reference discharge process data is extracted from each target discharge order.
[0130] The above embodiment has described in detail the embodiment of obtaining a reference charging process data, and the embodiment of obtaining a reference discharging process data will not be described in detail here.
[0131] In order to more accurately determine the charging abnormality or discharging abnormality of the target cascade battery, a preferred embodiment is that comparing the primary charging test data with the first charging safety threshold and comparing the secondary charging test data with the second charging safety threshold to determine the charging abnormality of the target cascade battery includes:
[0132] When the primary charging test data is greater than the first charging safety threshold and / or the secondary charging test data is greater than the second charging safety threshold, it is determined that the target secondary battery is charging abnormally.
[0133] Correspondingly, comparing the primary discharge test data with the first discharge safety threshold and comparing the secondary discharge test data with the second discharge safety threshold to determine the target cascade battery discharge abnormality includes:
[0134] When the primary discharge test data is greater than the first discharge safety threshold and / or the secondary discharge test data is greater than the second discharge safety threshold, it is determined that the target secondary battery is discharged abnormally.
[0135] The present embodiment provides that when there is a conductivity anomaly in the primary conductivity test data (charging test data or discharging test data) and / or the secondary conductivity test data that is greater than the corresponding safety threshold, the conductivity anomaly of the target secondary battery is determined, so that the conductivity anomaly of the target secondary battery is accurately determined.
[0136] In the above embodiment, the health of the target second-life battery is obtained according to abnormality detection. In practice, the second-life battery may also be in a sub-healthy state. Therefore, a preferred embodiment is that after comprehensively evaluating the target second-life battery according to the charging abnormality information set and the discharging abnormality information set and obtaining the health of the target second-life battery, the second-life battery screening method further includes:
[0137] Determine a first health status corresponding to the target second-life battery primary charging test data and a first charging safety threshold value according to a correspondence relationship between a first preset deviation degree and a health status;
[0138] Determine a second health status corresponding to the target second-life battery secondary charging test data and a second charging safety threshold value according to a corresponding relationship between the second preset deviation degree and the health status;
[0139] The charging health status of the target secondary battery is determined according to the first health status and the second health status.
[0140] Similarly, after comprehensively evaluating the target second-life battery according to the abnormal charging information set and the abnormal discharging information set and obtaining the health of the target second-life battery, the second-life battery screening method further includes:
[0141] Determine, according to the correspondence between the third preset deviation degree and the health status, a third health status corresponding to the target echelon battery primary discharge test data and the first discharge safety threshold;
[0142] Determine, according to the correspondence between the fourth preset deviation degree and the health condition, a fourth health condition corresponding to the target echelon battery secondary discharge test data and the second discharge safety threshold;
[0143] Determine the discharge health state of the target secondary battery according to the third health state and the fourth health state;
[0144] The health state of the target second-life battery is determined according to the first health state, the second health state, the third health state, and the fourth health state.
[0145] Specifically, according to the correspondence between the first preset deviation degree and the health condition, determining the first health condition corresponding to the target second-life battery primary charging test data and the first charging safety threshold includes:
[0146] Obtain multiple historical charging orders within the scheduled time of the target new energy equipment;
[0147] Obtaining a historical charging process data from each historical charging order, wherein the historical charging process data is data generated by the analysis object during the charging process;
[0148] Taking the average value corresponding to each variable in the historical charging process data as the first actual average value;
[0149] Calculate a first reference average value corresponding to each variable of a reference charging process data within a predetermined time;
[0150] Determine a first variable deviation between a first actual mean value and a first reference mean value corresponding to the same variable;
[0151] The first actual health level corresponding to the first variable deviation is determined according to a preset correspondence between the first variable deviation and the health level.
[0152] According to the corresponding relationship between the second preset deviation degree and the health condition, determining the second health condition corresponding to the target cascade battery secondary charging test data and the second charging safety threshold includes:
[0153] Obtain multiple historical charging orders within the scheduled time of the target new energy equipment;
[0154] Acquire secondary historical charging process data from each historical charging order, wherein the secondary historical charging process data is data corresponding to each variable calculated based on the primary historical charging process data and used to characterize the variable change trend;
[0155] The average value corresponding to each variable in the secondary historical charging process data is used as the second actual average value;
[0156] Calculate a second reference average value corresponding to each variable of the secondary reference charging process data within a predetermined time;
[0157] Determine a second variable deviation of a second actual mean value corresponding to the same variable from a second reference mean value;
[0158] The second actual health level corresponding to the second variable deviation is determined according to a preset correspondence between the second variable deviation and the health level.
[0159] According to the correspondence between the third preset deviation degree and the health condition, determining the third health condition corresponding to the target echelon battery primary discharge test data and the first discharge safety threshold includes:
[0160] Obtain multiple historical discharge orders of target new energy equipment within a predetermined time;
[0161] Obtaining a historical discharge process data from each historical discharge order, wherein the historical discharge process data is data generated by the analysis object during the discharge process;
[0162] The average value corresponding to each variable in a historical discharge process data is used as the third actual average value;
[0163] Calculate a third reference average value corresponding to each variable of a reference discharge process data within a predetermined time;
[0164] determining a third variable deviation between a first actual mean value and a third reference mean value corresponding to the same variable;
[0165] The third actual health level corresponding to the third variable deviation is determined according to a preset correspondence relationship between the third variable deviation and the health level.
[0166] According to the corresponding relationship between the fourth preset deviation degree and the health condition, determining the fourth health condition corresponding to the target echelon battery secondary discharge test data and the second discharge safety threshold includes:
[0167] Obtain multiple historical discharge orders of target new energy equipment within a predetermined time;
[0168] Obtain secondary historical discharge process data from each historical charging order, wherein the secondary historical discharge process data is data corresponding to each variable calculated based on the primary historical discharge process data and used to characterize the variable change trend;
[0169] Taking the average value corresponding to each variable in the secondary historical discharge process data as the fourth actual average value;
[0170] Calculate a fourth reference average value corresponding to each variable of the secondary reference discharge process data within a predetermined time;
[0171] determining a fourth variable deviation between a fourth actual average value and a fourth reference average value corresponding to the same variable;
[0172] The fourth actual health level corresponding to the fourth variable deviation is determined according to a preset corresponding relationship between the fourth variable deviation and the health level.
[0173] There is no limitation on the correspondence between the preset deviation degree and the health level, which is determined according to the actual situation. In practice, generally, the greater the deviation of the variable, the lower the health level, indicating that it is a high-risk device.
[0174] This embodiment provides a method for further evaluating the health status of the target second-life battery based on identifying the abnormal charging of the target second-life battery, so that the user can understand the health status of the target second-life battery and can screen the second-life batteries more accurately.
[0175] In the above embodiments, the secondary battery screening method is described in detail, and the present application also provides a corresponding embodiment of the secondary battery screening device. It should be noted that the present application describes the embodiments of the device part from two perspectives, one is based on the functional module perspective, and the other is based on the hardware perspective.
[0176] Figure 3 A structural diagram of a secondary battery screening device provided in an embodiment of the present application. This embodiment is based on the perspective of functional modules and includes:
[0177] A first selection module 10, for selecting a target second-life battery;
[0178] A determination and acquisition module 11 is used to determine the target new energy device where the target second-life battery is located before second-life utilization and to acquire the type of the target new energy device;
[0179] A second selection module 12 is used to select a plurality of new energy devices under a type as analysis objects;
[0180] The construction and acquisition module 13 is used to construct a charging safety model and a discharging safety model according to the analysis object, and obtain the first charging safety threshold and the second charging safety threshold through the charging safety model, and obtain the first discharging safety threshold and the second discharging safety threshold through the discharging safety model; wherein, constructing the charging safety model includes: obtaining a reference charging process data of the analysis object within a preset time range and matching the analysis object, the primary reference charging process data being the data generated by the analysis object during the charging process; calculating the secondary reference charging process data corresponding to each variable for characterizing the trend of the variable change according to the primary reference charging process data; based on the correspondence between the primary reference charging process data and the secondary reference charging process data and time, using an anomaly detection method Determine a first charging safety threshold corresponding to a reference charging process data and determine a second charging safety threshold corresponding to a secondary reference charging process data; construct a discharge safety model including: obtaining a reference discharge process data of an analysis object within a preset time range and matching the analysis object, the reference discharge process data being data generated by the analysis object during the discharge process; calculate secondary reference discharge process data corresponding to each variable for characterizing a variable change trend according to the reference discharge process data; determine a first discharge safety threshold corresponding to the reference discharge process data and determine a second discharge safety threshold corresponding to the secondary reference discharge process data based on a correspondence between the reference discharge process data and the secondary reference discharge process data and time using an abnormality detection method;
[0181] The first acquisition module 14 is used to acquire the primary charging test data and the secondary charging test data of the target echelon battery; wherein the primary charging test data is the data directly acquired from the charging test of the target echelon battery, and the secondary charging test data is the data corresponding to each variable calculated according to the primary charging test data and used to characterize the variable change trend;
[0182] A first determination module 15, for comparing the primary charging test data with the first charging safety threshold and comparing the secondary charging test data with the second charging safety threshold to determine the target echelon battery charging abnormality and create a charging abnormality information set;
[0183] The second acquisition module 16 is used to acquire the primary discharge test data and the secondary discharge test data of the target echelon battery; wherein the primary discharge test data is the data directly acquired from the discharge test of the target echelon battery, and the secondary discharge test data is the data corresponding to each variable calculated according to the primary discharge test data and used to characterize the change trend of the variable;
[0184] A second determination module 17, for comparing the primary discharge test data with the first discharge safety threshold and the secondary discharge test data with the second discharge safety threshold to determine the target echelon battery discharge abnormality and create a discharge abnormality information set;
[0185] The evaluation and acquisition module 18 is used to comprehensively evaluate the target second-life battery according to the charging abnormality information set and the discharging abnormality information set and obtain the health of the target second-life battery as a basis for determining whether the target second-life battery is used for energy storage.
[0186] Since the embodiments of the device part correspond to the embodiments of the method part, the embodiments of the device part refer to the description of the embodiments of the method part and will not be repeated here. The embodiments of the device part have the same beneficial effects as the cascade battery screening method.
[0187] Figure 4 This is a structural diagram of a secondary battery screening device provided in another embodiment of the present application. This embodiment is based on the hardware perspective, such as Figure 4 As shown, the secondary battery screening device includes:
[0188] A memory 20, used for storing computer programs;
[0189] The processor 21 is used to implement the steps of the method for cascade battery screening mentioned in the above embodiment when executing the computer program.
[0190] The cascade battery screening device provided in this embodiment may include but is not limited to a smart phone, a tablet computer, a laptop computer or a desktop computer.
[0191] Among them, the processor 21 may include one or more processing cores, such as a 4-core processor, an 8-core processor, etc. The processor 21 can be implemented in at least one hardware form of a digital signal processor (DSP), a field-programmable gate array (FPGA), and a programmable logic array (PLA). The processor 21 may also include a main processor and a coprocessor. The main processor is a processor for processing data in the awake state, also known as a central processing unit (CPU); the coprocessor is a low-power processor for processing data in the standby state. In some embodiments, the processor 21 may be integrated with a graphics processing unit (GPU), which is responsible for rendering and drawing the content to be displayed on the display screen. In some embodiments, the processor 21 may also include an artificial intelligence (AI) processor, which is used to process computing operations related to machine learning.
[0192] The memory 20 may include one or more computer-readable storage media, which may be non-transitory. The memory 20 may also include a high-speed random access memory, and a non-volatile memory, such as one or more disk storage devices, flash memory storage devices. In this embodiment, the memory 20 is at least used to store the following computer program 201, wherein, after the computer program is loaded and executed by the processor 21, it can implement the relevant steps of the cascade battery screening method disclosed in any of the aforementioned embodiments. In addition, the resources stored in the memory 20 may also include an operating system 202 and data 203, etc., and the storage method may be temporary storage or permanent storage. Among them, the operating system 202 may include Windows, Unix, Linux, etc. Data 203 may include but is not limited to the data involved in the above-mentioned cascade battery screening method, etc.
[0193] In some embodiments, the cascade battery screening device may also include a display screen 22 , an input / output interface 23 , a communication interface 24 , a power supply 25 , and a communication bus 26 .
[0194] Those skilled in the art will understand that Figure 4 The structure shown in the figure does not constitute a limitation on the cascade battery screening device, and may include more or fewer components than shown in the figure.
[0195] The cascade battery screening device provided in the embodiment of the present application includes a memory and a processor. When the processor executes the program stored in the memory, it can implement the following method: a cascade battery screening method, with the same effect as above.
[0196] Finally, the present application also provides an embodiment corresponding to a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps recorded in the above method embodiment are implemented.
[0197] It is understandable that if the method in the above embodiment is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk and other media that can store program code.
[0198] The computer-readable storage medium provided in the present application includes the above-mentioned cascade battery screening method, and the effect is the same as above.
[0199] In order to enable those skilled in the art to better understand the technical solution of the present application, Figure 5 Further details of the above application are given. Figure 5 The overall flow chart of a secondary battery screening method provided in an embodiment of the present application is as follows: Figure 5 As shown, the method includes:
[0200] The method includes two parts: anomaly detection and health assessment. Specifically, the anomaly detection method includes:
[0201] S19: Determine the vehicle where the target battery was before recycling and conduct electricity to the vehicle;
[0202] S20: determine the conductive vehicle model;
[0203] S21: extracting batch conductive orders for all vehicles under this model within a preset time range;
[0204] S22: extract the required variables from each order; directly proceed to step S24 or first proceed to step S23 and then to step S24;
[0205] S23: Obtain secondary variables;
[0206] S24: Establish the corresponding relationship between variables and time;
[0207] S25: Obtaining safety threshold through anomaly detection;
[0208] S26: Acquire current conductive data of the conductive vehicle;
[0209] S27: comparing the safety threshold with current conductivity data of the conductive vehicle;
[0210] S28: Determine whether it is abnormal / high risk (alarm);
[0211] S29: Output report.
[0212] The method of health assessment includes two parts: obtaining the vehicle average and obtaining the model average.
[0213] Obtaining the vehicle mean includes the following steps:
[0214] After the vehicle is charged in step S19, the process proceeds to step S30;
[0215] S30: Obtain historical charging orders (including current orders) of conductive vehicles;
[0216] S31: extract the required variables from each order;
[0217] S32: Establish the corresponding relationship between variables and time;
[0218] S33: averaging all data under the required variables (such as mean model or time and distance weighted average model);
[0219] Obtaining the vehicle model mean includes the following steps:
[0220] After step S24, proceed to step S34;
[0221] S34: Calculate the mean or weighted average of all data under the required variables (which can also be regarded as a safety threshold).
[0222] In the above steps, the vehicle average and the model average are obtained respectively, and then the process proceeds to step S35;
[0223] S35: Compare the model mean and the vehicle mean, and set the corresponding health level according to the deviation;
[0224] S36: Determine health;
[0225] S37: Comprehensive health status (early warning); and enter the output report of step S29.
[0226] In this embodiment, by using abnormality detection and health assessment as the health information of the target echelon battery, the misjudgment of the health information of the target echelon battery that appears normal after abnormality detection (in fact, the target echelon battery may be in a sub-healthy state) can be reduced as much as possible, so that the obtained health information of the target echelon battery is more accurate, thereby enabling more accurate screening of the target echelon battery based on the health information of the target echelon battery.
[0227] The above is a detailed introduction to a secondary battery screening method, device and medium provided by the present application. The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same and similar parts between the embodiments can refer to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of the present application.
[0228] It should also be noted that, in this specification, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "comprise", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
Claims
1. A secondary battery screening method, characterized in that: include: Select the target battery; Determine the target new energy device where the target second-life battery is located before second-life utilization and obtain the type of the target new energy device; Select multiple new energy devices of the type as analysis objects; A charging safety model and a discharging safety model are constructed according to the analysis object, and a first charging safety threshold and a second charging safety threshold are obtained through the charging safety model, and a first discharging safety threshold and a second discharging safety threshold are obtained through the discharging safety model; wherein, constructing the charging safety model comprises: obtaining a reference charging process data of the analysis object within a preset time range and matching the analysis object, wherein the reference charging process data is data generated by the analysis object during the charging process; calculating secondary reference charging process data corresponding to each variable for characterizing the change trend of the variable according to the reference charging process data; determining the reference charging process data according to the corresponding relationship between the reference charging process data and the secondary reference charging process data and time by using an abnormality detection method; The first charging safety threshold corresponding to the process data and the second charging safety threshold corresponding to the secondary reference charging process data are determined; constructing the discharge safety model includes: obtaining the primary reference discharge process data of the analysis object within the preset time range and matching the analysis object, the primary reference discharge process data being the data generated by the analysis object during the discharge process; calculating the secondary reference discharge process data corresponding to each of the variables for characterizing the change trend of the variables according to the primary reference discharge process data; based on the correspondence between the primary reference discharge process data and the secondary reference discharge process data and time, using the abnormality detection method to determine the first discharge safety threshold corresponding to the primary reference discharge process data and determine the second discharge safety threshold corresponding to the secondary reference discharge process data; Obtaining primary charging test data and secondary charging test data of the target secondary battery; wherein the primary charging test data is data directly obtained from the target secondary battery charging test, and the secondary charging test data is data corresponding to each of the variables calculated based on the primary charging test data and used to characterize the change trend of the variables; comparing the primary charging test data with the first charging safety threshold and comparing the secondary charging test data with the second charging safety threshold to determine the target tiered battery charging anomaly and create a charging anomaly information set; Obtaining the primary discharge test data and the secondary discharge test data of the target secondary battery; wherein the primary discharge test data is the data directly obtained from the discharge test of the target secondary battery, and the secondary discharge test data is the data corresponding to each of the variables calculated according to the primary discharge test data and used to characterize the change trend of the variables; Comparing the primary discharge test data with the first discharge safety threshold and comparing the secondary discharge test data with the second discharge safety threshold to determine the target cascade battery discharge abnormality and create a discharge abnormality information set; The target second-life battery is comprehensively evaluated according to the abnormal charging information set and the abnormal discharging information set, and the health of the target second-life battery is obtained, so as to serve as a basis for determining whether the target second-life battery is used for energy storage.
2. The secondary battery screening method according to claim 1, characterized in that: The obtaining of a reference charging process data of the analysis object within a preset time range and matching the analysis object comprises: Acquire a plurality of target charging orders matching the analysis object within the preset time range; The reference charging process data is extracted from each of the target charging orders.
3. The method for screening secondary batteries according to claim 2, characterized in that: The step of obtaining reference discharge process data of the analysis object within the preset time range and matching the analysis object includes: Acquire a plurality of target discharge orders matching the analysis object within the preset time range; The reference discharge process data is extracted from each of the target discharge orders.
4. The secondary battery screening method according to claim 1, characterized in that: The step of comparing the primary charging test data with the first charging safety threshold and comparing the secondary charging test data with the second charging safety threshold to determine the target secondary battery charging abnormality comprises: In a case where the primary charging test data is greater than the first charging safety threshold and / or the secondary charging test data is greater than the second charging safety threshold, it is determined that the target secondary battery is charging abnormally.
5. The secondary battery screening method according to claim 1, characterized in that: The step of comparing the primary discharge test data with the first discharge safety threshold and comparing the secondary discharge test data with the second discharge safety threshold to determine the target secondary battery discharge abnormality comprises: When the primary discharge test data is greater than the first discharge safety threshold and / or the secondary discharge test data is greater than the second discharge safety threshold, it is determined that the target secondary battery is discharged abnormally.
6. The method for screening secondary batteries according to any one of claims 1 to 5, characterized in that: After comprehensively evaluating the target second-life battery according to the charging abnormality information set and the discharging abnormality information set and obtaining the health of the target second-life battery, the method further includes: Determining a first health status corresponding to the target second-life battery primary charging test data and the first charging safety threshold value according to a correspondence relationship between a first preset deviation degree and a health status; Determining a second health status corresponding to the target second-life battery secondary charging test data and the second charging safety threshold value according to a corresponding relationship between a second preset deviation degree and the health status; The charging health status of the target second-life battery is determined according to the first health status and the second health status.
7. The method for screening secondary batteries according to claim 6, characterized in that: After comprehensively evaluating the target second-life battery according to the charging abnormality information set and the discharging abnormality information set and obtaining the health of the target second-life battery, the method further includes: Determining a third health condition corresponding to the target secondary battery primary discharge test data and the first discharge safety threshold value according to a correspondence relationship between a third preset deviation degree and the health condition; Determining a fourth health condition corresponding to the target secondary discharge test data of the second-life battery and the second discharge safety threshold value according to a corresponding relationship between a fourth preset deviation degree and the health condition; Determine the discharge health status of the target secondary battery according to the third health status and the fourth health status; The health state of the target secondary battery is determined according to the first health state, the second health state, the third health state, and the fourth health state.
8. The method for screening secondary batteries according to claim 7, characterized in that: The determining, according to the correspondence between the first preset deviation degree and the health condition, the first health condition corresponding to the target secondary battery primary charging test data and the first charging safety threshold comprises: Acquire multiple historical charging orders for the target new energy equipment within a predetermined time; Acquire a historical charging process data from each of the historical charging orders, wherein the historical charging process data is data generated by the analysis object during the charging process; Taking the average value corresponding to each of the variables in the historical charging process data as the first actual average value; Calculate a first reference average value corresponding to each of the variables in the reference charging process data within the predetermined time; Determine a first variable deviation between the first actual average value and the first reference average value corresponding to the same variable; The first actual health level corresponding to the first variable deviation is determined according to a preset correspondence between the first variable deviation and the health level.
9. The method for screening secondary batteries according to claim 8, characterized in that: The determining, according to the correspondence between the second preset deviation degree and the health condition, a second health condition corresponding to the target secondary charging test data of the second-life battery and the second charging safety threshold comprises: Acquire a plurality of the historical charging orders for the target new energy equipment within a predetermined time; Acquire secondary historical charging process data from each of the historical charging orders, wherein the secondary historical charging process data is data corresponding to each of the variables calculated based on the primary historical charging process data and used to characterize the change trend of the variables; Taking the average value corresponding to each of the variables in the secondary historical charging process data as the second actual average value; Calculate a second reference average value corresponding to each of the variables in the secondary reference charging process data within the predetermined time; Determine a second variable deviation between the second actual average value and the second reference average value corresponding to the same variable; The second actual health level corresponding to the second variable deviation is determined according to a preset corresponding relationship between the second variable deviation and the health level.
10. The method for screening secondary batteries according to claim 9, characterized in that: The determining, according to the correspondence between the third preset deviation degree and the health condition, a third health condition corresponding to the target secondary battery primary discharge test data and the first discharge safety threshold comprises: Acquire multiple historical discharge orders of the target new energy equipment within a predetermined time; Acquire a historical discharge process data from each of the historical discharge orders, wherein the historical discharge process data is data generated by the analysis object during the discharge process; Taking the average value corresponding to each of the variables in the historical discharge process data as the third actual average value; Calculate the third reference average value corresponding to each of the variables in the predetermined time of the reference discharge process data; Determine a third variable deviation between the first actual average value and the third reference average value corresponding to the same variable; The third actual health level corresponding to the third variable deviation is determined according to a preset corresponding relationship between the third variable deviation and the health level.
11. The secondary battery screening method according to claim 10, characterized in that: Determining the fourth health status corresponding to the target secondary discharge test data of the second-life battery and the second discharge safety threshold according to the corresponding relationship between the fourth preset deviation degree and the health status includes: Acquire a plurality of the historical discharge orders of the target new energy equipment within a predetermined time; Acquire secondary historical discharge process data from each of the historical charging orders, wherein the secondary historical discharge process data is data corresponding to each of the variables calculated based on the primary historical discharge process data and used to characterize the change trend of the variables; Taking the average value corresponding to each of the variables in the secondary historical discharge process data as a fourth actual average value; Calculate a fourth reference average value corresponding to each of the variables in the secondary reference discharge process data within the predetermined time; Determine a fourth variable deviation between the fourth actual average value and the fourth reference average value corresponding to the same variable; The fourth actual health level corresponding to the fourth variable deviation is determined according to a preset corresponding relationship between the fourth variable deviation and the health level.
12. A secondary battery screening device, characterized in that: include: A first selection module, used to select a target second-life battery; A determination and acquisition module, used to determine the target new energy device where the target second-life battery is located before second-life utilization and to acquire the type of the target new energy device; A second selection module is used to select a plurality of new energy devices of the type as analysis objects; A construction and acquisition module is used to construct a charging safety model and a discharging safety model according to the analysis object, and obtain a first charging safety threshold and a second charging safety threshold through the charging safety model, and obtain a first discharging safety threshold and a second discharging safety threshold through the discharging safety model; wherein, constructing the charging safety model includes: obtaining a primary reference charging process data of the analysis object within a preset time range and matching the analysis object, wherein the primary reference charging process data is data generated by the analysis object during the charging process; calculating secondary reference charging process data corresponding to each variable for characterizing the change trend of the variable according to the primary reference charging process data; determining the primary reference charging process data based on the corresponding relationship between the primary reference charging process data and the secondary reference charging process data and time by using an abnormality detection method The first charging safety threshold corresponding to the secondary reference charging process data and the second charging safety threshold corresponding to the secondary reference charging process data are determined; constructing the discharge safety model includes: obtaining the primary reference discharge process data of the analysis object within the preset time range and matching the analysis object, the primary reference discharge process data being the data generated by the analysis object during the discharge process; calculating the secondary reference discharge process data corresponding to each of the variables for characterizing the change trend of the variables according to the primary reference discharge process data; based on the correspondence between the primary reference discharge process data and the secondary reference discharge process data and time, using the abnormality detection method to determine the first discharge safety threshold corresponding to the primary reference discharge process data and determine the second discharge safety threshold corresponding to the secondary reference discharge process data; A first acquisition module is used to acquire the primary charging test data and the secondary charging test data of the target cascade battery; wherein the primary charging test data is the data directly acquired from the charging test of the target cascade battery, and the secondary charging test data is the data corresponding to each of the variables calculated according to the primary charging test data and used to characterize the change trend of the variables; A first determination module, configured to compare the primary charging test data with the first charging safety threshold and to compare the secondary charging test data with the second charging safety threshold to determine the target tiered battery charging anomaly and create a charging anomaly information set; A second acquisition module is used to acquire the primary discharge test data and the secondary discharge test data of the target echelon battery; wherein the primary discharge test data is the data directly acquired from the discharge test of the target echelon battery, and the secondary discharge test data is the data corresponding to each of the variables calculated according to the primary discharge test data and used to characterize the change trend of the variables; A second determination module, configured to compare the primary discharge test data with the first discharge safety threshold and to compare the secondary discharge test data with the second discharge safety threshold to determine the target cascade battery discharge abnormality and create a discharge abnormality information set; An evaluation and acquisition module is used to comprehensively evaluate the target second-life battery according to the charging abnormality information set and the discharging abnormality information set and obtain the health of the target second-life battery as a basis for determining whether the target second-life battery is used for energy storage.
13. A secondary battery screening device, characterized in that: include: Memory for storing computer programs; A processor, configured to implement the steps of the second-life battery screening method as described in any one of claims 1 to 11 when executing the computer program.