A permanent and temporary combined prefabricated membrane shell support structure and its construction method

By adopting a permanently combined prefabricated membrane shell cap structure in the construction of the foundation cap, using prefabricated steel formwork and concrete reinforcement structures, combined with a waterproof layer and curved hook rings, the problem of brick membranes being easily deformed and collapsed has been solved, and the problem has been achieved. It achieves the effects of fast construction speed, high quality and environmental protection.

CN115288180BActive Publication Date: 2024-10-08SHENZHEN SPECIAL ZONE CONSTR ENG GRP CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211086161.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-06
Publication Date
2024-10-08
Estimated Expiration
2042-09-06

AI Technical Summary

Technical Problem

In traditional foundation cap construction, the brick membrane is prone to deformation and collapse, and cannot be effectively protected and waterproofed, resulting in a long construction period, high costs, and heavy labor investment.

Method used

It adopts Yonglin combined with prefabricated membrane shell cap structure, including prefabricated steel formwork and concrete filler. It is equipped with crisscrossing steel bars, waterproof layer and curved hook rings. It is hoisted by crane and sealed reserved pile holes to ensure structural strength. and waterproof effect.

Benefits of technology

It reduces labor input, shortens the construction cycle, improves construction speed and quality, avoids the deformation and collapse of the brick membrane, achieves good waterproofing effects, and has the advantages of energy saving and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115288180B_ABST
    Figure CN115288180B_ABST
Patent Text Reader

Abstract

The present invention relates to a membrane shell pedestal structure that can be prefabricated in combination with permanent and temporary structures, including a membrane shell pedestal body, the membrane shell pedestal body including pedestal side walls and pedestal bottom plates, the pedestal side walls and pedestal bottom plates both including prefabricated steel formworks, and concrete fillers and crisscrossed steel bars arranged in the prefabricated steel formworks; the side wall vertical steel bars in the pedestal side walls extend upward from the pedestal side walls, and the top ends are horizontally bent inwards; the pedestal bottom plates are provided with a number of reserved pile holes and a number of curved hook rings, the reserved pile holes are used to pass through engineering piles, and the curved hook rings are used to lift the membrane shell pedestal body. The membrane shell pedestal of the present invention, as a part of the structural pedestal, eliminates the need for the input of brick fetal membranes, and avoids the protection and waterproofing effects of the foundation pedestal affected by the damage, deformation and collapse of the brick fetal membranes; through the curved hook rings of the membrane shell pedestal, the membrane shell pedestal can be stably lifted by a crane during the construction process; the present invention is simple and convenient to install, has a fast construction speed, and is more guaranteed in terms of construction period, quality and safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to a permanent and temporary combined prefabricated membrane shell bearing platform structure and a construction method thereof. Background Art

[0002] The foundation cap refers to a reinforced concrete platform that connects the tops of the piles to bear and distribute the loads transmitted by the pier body. At present, the traditional foundation cap construction technology is mainly brick membrane masonry. For most projects, large-scale cap masonry construction has a long construction period, high labor input, and high cost. In addition, the lateral pressure of the backfill soil on the brick membrane will increase with the increase of masonry height. During the tamping of the backfill soil or the vibration of the concrete, the brick membrane will be deformed or even collapsed, and it will not be able to play a protective and waterproof role.

[0003] The above problems are worth solving. Summary of the invention

[0004] In order to solve the problem that the brick membrane used in the existing foundation pedestal construction cannot provide protection and waterproofing due to deformation of the brick membrane, the present invention provides a permanent and temporary combined prefabricated membrane shell pedestal structure and a construction method thereof.

[0005] The technical solution of the present invention is as follows:

[0006] A membrane shell pedestal structure that can be prefabricated in combination with permanent and temporary structures comprises a membrane shell pedestal body, wherein the membrane shell pedestal body comprises pedestal side walls and a pedestal bottom plate, wherein the pedestal side walls and the pedestal bottom plate both comprise prefabricated steel formworks, and concrete fillers and crisscrossed steel bars arranged in the prefabricated steel formworks; the steel bars in the pedestal side walls comprise side wall vertical steel bars, wherein the side wall vertical steel bars extend upwardly from the pedestal side walls, and the top ends of the side wall vertical steel bars are bent horizontally inwardly; the pedestal bottom plate is provided with a plurality of reserved pile holes and a plurality of bent lifting hook rings, wherein the reserved pile holes are used to pass through engineering piles, and the bent lifting hook rings are used to lift the membrane shell pedestal body.

[0007] The present invention according to the above scheme is characterized in that a bottom waterproof layer is provided at the bottom of the membrane shell support body, and a lateral waterproof layer is provided at the outer side wall of the membrane shell support body.

[0008] Furthermore, a flat cushion layer is provided between the bottom waterproof layer and the bottom of the pedestal groove.

[0009] The present invention according to the above scheme is characterized in that a bending hook ring is provided on each of the four sides of the base bottom plate, and the four bending hook rings are distributed in a cross shape.

[0010] The present invention according to the above scheme is characterized in that the thickness of the base bottom plate is greater than 1.5 times the thickness of the base side wall but less than 2 times the thickness of the base side wall.

[0011] Furthermore, the thickness of the side wall of the pedestal is 100 mm, and the thickness of the bottom plate of the pedestal is 170 mm.

[0012] The present invention according to the above scheme is characterized in that the top surface of the support platform side wall and the top surface of the support platform bottom plate are provided with a rough drawing surface.

[0013] The present invention according to the above scheme is characterized in that the bent lifting hook ring is a lifting ring steel bar with a "J"-shaped symmetrical structure, and the bent lifting hook ring includes a middle lifting ring part and anchoring parts on both sides, the lifting ring part is used to connect with the hook of the crane, and the anchoring part is used to anchor and connect with the base bottom plate.

[0014] Furthermore, the eye portion protrudes from the base plate by 100 mm to 150 mm.

[0015] Furthermore, the anchoring length between the anchoring portion and the base plate is not less than 30 times the diameter of the eye reinforcement.

[0016] Furthermore, the model of the eye reinforcement is HPB300, and its diameter is 20 mm.

[0017] Furthermore, the thickness of the protective layer of the eye reinforcement is not less than 50 mm.

[0018] The present invention according to the above scheme is characterized in that the length of the horizontal bending section at the top end of the side wall vertical steel bar is not less than 400 mm.

[0019] The present invention according to the above scheme is characterized in that the diameter of the reserved pile hole is 100 mm larger than the diameter of the engineering pile, and the center of the reserved pile hole is aligned with the center of the corresponding engineering pile.

[0020] Furthermore, a polyurethane sealing paste is provided between the gap between the engineering pile and the reserved pile hole.

[0021] The present invention according to the above scheme is characterized in that the steel bars in the base bottom plate include concave steel bars, and the notches of the concave steel bars face upward, and the two short sides of the concave steel bars are anchored and connected to the side walls of the base.

[0022] The present invention according to the above scheme is characterized in that the permanent and temporary combined prefabricated membrane shell foundation structure also includes a basement floor located above the membrane shell foundation body, and the horizontal bending section of the side wall vertical steel bar is anchored and connected to the basement floor.

[0023] Furthermore, the basement floor is provided with a floor cushion layer and a floor waterproof layer.

[0024] The present invention also provides a permanent and temporary combined prefabricated membrane shell foundation construction method, comprising the following steps:

[0025] Step 1: Make drawings of the main body of the membrane shell support and complete the preliminary preparations for production;

[0026] Through BIM technology, the project is comprehensively analyzed; the types and structures of the foundations are split and the corresponding large drawings are made; the corresponding process flow and installation sequence are compiled according to the number of components in the split drawings;

[0027] Step 2: Make the membrane shell support body according to the drawing;

[0028] The component factory manufactures prefabricated steel formwork and the steel bars in the prefabricated steel formwork according to the drawings; fills the formwork with concrete and processes it into the main body of the membrane shell cap;

[0029] Step 3: Complete the preparation work of the base groove before installing the membrane shell base body;

[0030] Step 301: firstly excavate the earth and compact the foundation to form a cap groove;

[0031] Step 302, inspect the cap groove, and after the groove is inspected and confirmed to be correct, pour a level cushion layer at the bottom of the groove;

[0032] Step 303: After the concrete pouring of the leveling cushion is completed and the strength reaches the requirement, the bottom waterproof layer is constructed. The bottom waterproof layer needs to be flat and straight without obvious wrinkles;

[0033] Step 4: Check whether the membrane shell support body meets the design requirements;

[0034] Check whether the reserved pile holes on the base plate match the position and size of the engineering piles.

[0035] Step 5: hoist the membrane shell support body;

[0036] The membrane shell cap is hoisted by a crane through the curved hook ring on the base plate body. During this process, the installation personnel will check that all pile positions have entered the reserved pile holes and then command the crane to slowly descend;

[0037] Step 6: Caulking and sealing of the reserved pile holes;

[0038] After the membrane shell cap body is placed in place, the gap between the membrane shell cap body and the engineering pile is sealed with polyurethane sealant;

[0039] Step 7: Post-process the membrane shell foundation to complete the basement floor;

[0040] Step 701: After the membrane shell support body is installed, the outer wall surface of the support side wall is bonded to the reserved lateral waterproof layer;

[0041] Step 702, the top of the side wall vertical steel bar extends from the top of the cap side wall, and is bent when it meets the basement floor reinforcement: it is bent horizontally toward the center of the membrane shell cap body to form a horizontal bending section;

[0042] Step 703: construct a basement floor above the membrane shell foundation body, including a basement floor cushion and a basement floor waterproof layer, to achieve an integral waterproof effect.

[0043] The present invention according to the above scheme has the following beneficial effects:

[0044] The membrane shell cap of the present invention, as a part of the structural cap, saves the investment of brick membrane, avoids the damage, deformation and collapse of the brick membrane, and affects the protection and waterproofing of the foundation cap; through the curved lifting hook ring of the membrane shell cap, the crane can stably lift the membrane shell cap during the construction process, and it can be installed with simple manual assistance, so it is conducive to reducing manual labor; and compared with the traditional brick membrane construction method, the present invention is simple and convenient to install, the construction speed is fast, and the construction period, quality and safety are more guaranteed;

[0045] The prefabricated steel formwork used in the processing of the present invention can be circulated and applied to the next project; on the other hand, the present invention avoids the construction waste caused by the cutting of prefabricated panels in the brick membrane process, so the present invention has more advantages in energy saving and environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a plane view of the membrane shell support platform body in the present invention;

[0047] Figure 2 It is a longitudinal cross-sectional view of the membrane shell support body in the present invention;

[0048] Figure 3 for Figure 2 Exploded view of the middle membrane shell abutment body.

[0049] In the figure, 1, the main body of the membrane shell support platform; 10, the bottom plate of the support platform; 11, the side wall of the support platform;

[0050] 2. Vertical reinforcement of side wall; 21. Horizontal bending section; 3. Reserved pile hole; 4. Bending hook ring; 41. Lifting ring part; 42. Anchor part; 5. Concave reinforcement;

[0051] 6. Basement floor; 7. Engineering piles. DETAILED DESCRIPTION

[0052] In order to better understand the purpose, technical solution and technical effect of the present invention, the present invention is further explained below in conjunction with the accompanying drawings and embodiments. At the same time, it is stated that the embodiments described below are only used to explain the present invention and are not used to limit the present invention.

[0053] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be an intermediate element at the same time.

[0054] The directions or positions indicated by the terms "upper", "lower", "left", "right", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like are based on the directions or positions shown in the drawings and are only for the convenience of description and cannot be understood as limiting the technical solution. "Several" means two or more, unless otherwise clearly and specifically defined.

[0055] like Figure 1 to Figure 3 As shown, a membrane shell foundation structure that can be prefabricated in combination with a permanent and temporary structure includes a membrane shell foundation body 1, the membrane shell foundation body 1 includes a foundation side wall 11 and a foundation bottom plate 10, the foundation side wall 11 and the foundation bottom plate 10 both include a prefabricated steel formwork, and concrete fillers and crisscrossed steel bars arranged in the prefabricated steel formwork, the concrete fillers and the crisscrossed steel bars form a concrete steel bar structure, so that the structural strength of the membrane shell foundation body is high, and it can withstand the increasing side pressure of the backfill soil during the backfill soil tamping process, and there is no deformation similar to the brick tire membrane. Among them, the prefabricated steel formwork can be used in the next project, so the present invention has more advantages in energy saving and environmental protection.

[0056] The steel bars in the side wall 11 of the pedestal include vertical steel bars 2 of the side wall, which extend upward from the side wall 11 of the pedestal, and the top of the vertical steel bars 2 of the side wall is bent horizontally inward; the pedestal bottom plate 10 is provided with a plurality of reserved pile holes 3 and a plurality of curved hook rings 4, the reserved pile holes 3 are used to pass through the engineering piles 7, and the curved hook rings 4 are used to lift the main body 1 of the membrane shell pedestal. It can be seen that the membrane shell pedestal, as a part of the structural pedestal, saves the investment of brick tire membrane, avoids the damage, deformation and collapse of the brick tire membrane, and affects the protection and waterproofing of the foundation pedestal; through the curved hook ring of the membrane shell pedestal, the crane can smoothly lift the membrane shell pedestal during the construction process, and it can be installed with simple manual assistance, so it is conducive to reducing manual labor.

[0057] The steel bars in the base plate 10 include concave steel bars 5, and the concave steel bars 5 have their notches facing upward, and the two short sides of the concave steel bars 5 are anchored and connected to the base side walls 11. The concave steel bars include longitudinal concave steel bars and transverse concave steel bars, which are crisscrossed to form a grid on the base plate, and multiple short connecting steel bars extending into the base side walls are formed on the base, so that the connection between the base side walls and the base base is tighter, further improving the overall structural strength of the membrane shell base.

[0058] The bottom of the membrane shell support body 1 is provided with a bottom waterproof layer, and the outer wall of the membrane shell support body 1 is provided with a lateral waterproof layer, so that the membrane shell support structure has good waterproof effect all around. Preferably, a flat cushion layer is provided between the bottom waterproof layer and the bottom of the support groove, and the flat cushion layer serves as a flat foundation for the bottom waterproof layer, ensuring that the bottom waterproof layer is flat and straight without obvious wrinkles during construction.

[0059] In a preferred embodiment, a curved hook ring 4 is provided on each of the four sides of the base bottom plate 10, and the four curved hook rings 4 are distributed in a cross shape. During the lifting operation, the hook of the crane is connected to the four curved hook rings, and the force is uniform, so that the membrane shell base body is stable during the lifting process, and finally the membrane shell base body is stably installed in the base groove.

[0060] In a preferred embodiment, the thickness of the pedestal bottom plate 10 is greater than 1.5 times the thickness of the pedestal side wall 11, but less than 2 times the thickness of the pedestal side wall 11. In a specific embodiment, the thickness of the pedestal side wall 11 is 100 mm, and the thickness of the pedestal bottom plate 10 is 170 mm. The pedestal bottom plate and the pedestal side wall have sufficient thickness to ensure the structural strength and anti-deformation of the membrane shell pedestal body; the pedestal bottom plate and the pedestal side wall are set through reasonable structural proportions, so that the center of gravity of the membrane shell pedestal body is stable and not easy to shake during the hoisting process.

[0061] The top surface of the support platform side wall 11 and the top surface of the support platform bottom plate 10 are provided with a rough drawing surface.

[0062] In the present invention, the curved lifting hook ring 4 is a lifting ring steel bar with a "J"-shaped symmetrical structure. The curved lifting hook ring 4 includes a lifting ring portion 41 in the middle and anchoring portions 42 on both sides. The lifting ring portion 41 is used to connect with the lifting hook of the crane, and the anchoring portion 42 is used to anchor and connect with the base plate 10. The anchoring portion of the curved lifting hook ring is firmly combined with the base plate, which can provide a stable force point for the lifting process and provide safety for the lifting process; the lifting ring portion of the curved lifting hook ring facilitates construction personnel to quickly hang the crane hook, thereby improving construction efficiency.

[0063] The lifting ring 41 protrudes from the base plate by 100 mm to 150 mm. In a specific embodiment, the lifting ring 41 protrudes from the base plate by 150 mm. The anchoring length between the anchoring part 42 and the base plate 10 is not less than 30 times the diameter of the lifting ring steel bar, further improving the firmness of the connection between the bent lifting hook ring and the base plate. In a specific embodiment, the lifting ring steel bar is HPB300, and its diameter is 20 mm; the thickness of the protective layer of the lifting ring steel bar is not less than 50 mm, and the protective layer adopts conventional steel bar rust inhibitor or rust-proof paint.

[0064] In the present invention, the diameter of the reserved pile hole 3 is 100 mm larger than the diameter of the engineering pile 7, and the center of the reserved pile hole 3 is aligned with the center of the corresponding engineering pile 7. A polyurethane sealing paste is provided between the gap between the engineering pile 7 and the reserved pile hole 3 to ensure the waterproof sealing effect of the bottom of the membrane shell cap.

[0065] In the present invention, the membrane shell foundation structure that can be prefabricated in combination with the permanent and temporary structure also includes a basement floor 6 located above the membrane shell foundation body 1, and the horizontal bending section 21 of the side wall vertical reinforcement 2 is anchored and connected to the basement floor 6. The length of the horizontal bending section 21 at the top of the side wall vertical reinforcement 2 is not less than 400 mm, which can increase the bonding strength between the side wall vertical reinforcement and the basement floor. Among them, the basement floor 6 is provided with a floor cushion layer and a floor waterproof layer, so as to improve the overall waterproof effect of the membrane shell foundation structure that can be prefabricated in combination with the permanent and temporary structure.

[0066] The present invention also provides a permanent and temporary combined prefabricated membrane shell foundation construction method, comprising the following steps:

[0067] Step 1: Make drawings of the main body of the membrane shell support and complete the preliminary preparations for production;

[0068] Through BIM technology, the project is comprehensively analyzed; the types and structures of the foundations are split and the corresponding large drawings are made; the corresponding process flow and installation sequence are compiled according to the number of components in the split drawings;

[0069] Step 2: Make the membrane shell support body according to the drawing;

[0070] The component factory manufactures prefabricated steel formwork and the steel bars in the prefabricated steel formwork according to the drawings; fills the formwork with concrete and processes it into the main body of the membrane shell cap;

[0071] Step 3: Complete the preparation work of the base groove before installing the membrane shell base body;

[0072] Step 301: firstly excavate the earth and compact the foundation to form a cap groove;

[0073] Step 302, inspect the cap groove, and after the groove is inspected and confirmed to be correct, pour a level cushion layer at the bottom of the groove;

[0074] Step 303: After the concrete pouring of the leveling cushion is completed and the strength reaches the requirement, the bottom waterproof layer is constructed. The bottom waterproof layer needs to be flat and straight without obvious wrinkles;

[0075] Step 4: Check whether the membrane shell support body meets the design requirements;

[0076] Check whether the reserved pile holes on the base plate match the position and size of the engineering piles.

[0077] Step 5: hoist the membrane shell support body;

[0078] The membrane shell cap is hoisted by a crane through the curved hook ring on the base plate body. During this process, the installation personnel will check that all pile positions have entered the reserved pile holes and then command the crane to slowly descend;

[0079] Step 6: Caulking and sealing of the reserved pile holes;

[0080] After the membrane shell cap body is placed in place, the gap between the membrane shell cap body and the engineering pile is sealed with polyurethane sealant;

[0081] Step 7: Post-process the membrane shell foundation to complete the basement floor;

[0082] Step 701: After the membrane shell support body is installed, the outer wall surface of the support side wall is bonded to the reserved lateral waterproof layer;

[0083] Step 702, the top of the side wall vertical steel bar extends from the top of the cap side wall, and is bent when it meets the basement floor reinforcement: it is bent horizontally toward the center of the membrane shell cap body to form a horizontal bending section;

[0084] Step 703: construct a basement floor above the membrane shell foundation body, including a basement floor cushion and a basement floor waterproof layer, to achieve an integral waterproof effect.

[0085] In summary, compared with the traditional brick membrane construction method, the present invention is simple and convenient to install, has a fast construction speed, and has better guarantees in terms of construction period, quality and safety.

[0086] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0087] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for those of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A construction method for a membrane shell foundation that can be prefabricated by combining permanent and temporary construction, comprising the following steps: Step 1: Make drawings of the main body of the membrane shell support and complete the preliminary preparations for production; Step 2: Make the membrane shell support body according to the drawing; Make prefabricated steel formwork and steel bars in the prefabricated steel formwork according to the drawings; fill with concrete and process into the main body of the membrane shell cap; Step 3: Complete the preparation work of the base groove before installing the membrane shell base body; Step 4: Check whether the membrane shell support body meets the design requirements; Check whether the reserved pile holes on the base plate are consistent with the position and size of the engineering piles; Step 5: hoist the membrane shell support body; Step 6: Caulking and sealing of the reserved pile holes; Step 7: Post-process the membrane shell foundation to complete the basement floor; Step 701: After the membrane shell support body is installed, the outer wall surface of the support side wall is bonded to the reserved lateral waterproof layer; Step 702, the top of the side wall vertical steel bar extends from the top of the cap side wall, and is bent when it meets the basement floor reinforcement: it is bent horizontally toward the center of the membrane shell cap body to form a horizontal bending section; Step 703: constructing a basement floor above the membrane shell foundation body, including a basement floor cushion layer and a basement floor waterproof layer; The membrane shell cap body includes a cap side wall and a cap bottom plate, and the cap side wall and the cap bottom plate both include a prefabricated steel formwork, and concrete fillers and crisscrossed steel bars arranged in the prefabricated steel formwork; The thickness of the base bottom plate is greater than 1.5 times the thickness of the base side wall but less than 2 times the thickness of the base side wall; The steel bars in the side wall of the cap include side wall vertical steel bars, the side wall vertical steel bars extend upward from the side wall of the cap, and the top ends of the side wall vertical steel bars are bent horizontally inwards; The membrane shell cap structure that can be prefabricated in combination with the permanent temporary structure also includes a basement floor located above the membrane shell cap body, and the horizontal bending section of the side wall vertical steel bar is anchored and connected to the basement floor; The steel bars in the cap bottom plate include longitudinal concave steel bars and transverse concave steel bars. The two concave steel bars are crisscrossed to form a grid shape in the cap bottom plate, and multiple connecting short steel bars of the concave steel bars extend into the inside of the cap side wall and are anchored and connected to the cap side wall; The base plate of the pedestal is provided with a plurality of reserved pile holes and a plurality of bent lifting hook rings, the reserved pile holes are used to pass through engineering piles, and the bent lifting hook rings are used to lift the membrane shell base body; the bent lifting hook rings are lifting ring steel bars with a "J"-shaped symmetrical structure, and the bent lifting hook rings include a middle lifting ring part and anchoring parts on both sides, the lifting ring part is used to be connected to the hook of a crane, and the anchoring part is used to be anchored and connected to the base plate of the pedestal; the anchoring length of the anchoring part and the base plate of the pedestal is not less than 30 times the diameter of the lifting ring steel bar.

2. The construction method of the permanent and temporary combined prefabricated membrane shell foundation according to claim 1 is characterized in that: The bottom of the membrane shell support platform body is provided with a bottom waterproof layer, and the outer side wall of the membrane shell support platform body is provided with a lateral waterproof layer.

3. The construction method of the permanent and temporary combined prefabricated membrane shell foundation according to claim 1 is characterized in that: The length of the horizontal bending section at the top end of the side wall vertical reinforcement is not less than 400 mm.

4. The construction method of the permanent and temporary combined prefabricated membrane shell foundation according to claim 1 is characterized in that: The hole diameter of the reserved pile hole is 100 mm larger than the diameter of the engineering pile, and the center of the reserved pile hole is aligned with the center of the corresponding engineering pile.