Failure performance test circuit and method for AC-DC-AC-DC four-port power electronic device

By designing an AC-DC four-port power electronic device failure performance test circuit, and using a companion test device and a control switch to implement a circulation test, the problems of high test cost and power waste are solved, and efficient and economical test results are achieved.

CN115356564BActive Publication Date: 2024-10-18TAIYUAN INST OF CHINA COAL TECH & ENG GROUP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210982844.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-16
Publication Date
2024-10-18
Estimated Expiration
2042-08-16

AI Technical Summary

Technical Problem

In the current failure performance testing of multi-port power electronic devices, the equipment required for efficiency and temperature rise testing is costly and has the problem of wasting electric energy.

Method used

Design an AC-DC four-port power electronic device failure performance test circuit. By adding accompanying test power electronic devices and control switches of the same specifications, the circulation test is realized, the test cost is reduced and the waste of electric energy is reduced.

Benefits of technology

It simplifies the test process, reduces the difficulty of the test, saves the cost of the experimental device, avoids waste of power, and meets the assessment of efficiency and temperature rise test indicators, especially in the test of power electronic devices with multiple power levels and a large number of ports. time and economic cost advantages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115356564B_ABST
    Figure CN115356564B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of power electronic converters, and particularly relates to an efficiency and temperature rise test circuit and method for an AC / DC four-port power electronic device. The device comprises a test companion device Z2, a temperature sensor, a temperature recorder, a power analyzer and a plurality of connecting cables, which are the same as the power electronic device to be tested; the input end of the slave port U11 of the power electronic device to be tested Z1 is connected to the AC power grid through a transformer T1, and the output end is respectively connected to the input ends of the main port U12, the main port U13 and the main port U14, the output ends of the main port U12, the main port U13 and the main port U14 are respectively connected to the output ends of the main port U22, the main port U23 and the main port U24 of the test companion device Z2, the input ends of the main port U22, the main port U23 and the main port U24 are connected to the output end of the slave port U21, and the input end of the slave port U21 is connected to the AC power grid through a transformer T2. The present invention has a simple structure, convenient detection and reduces the difficulty of the test.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of failure performance testing of multi-port power electronic converters, and in particular relates to a failure performance analysis testing circuit and method for an AC-DC-AC-DC four-port power electronic device. Background Art

[0002] With the intersection of various AC and DC loads, renewable energy and traditional energy on the user side, and the application of technologies such as "solar storage direct current and flexible", power electronic devices with AC and DC ports of various voltage levels are gradually increasing, such as photovoltaic access DC / DC devices, four-port power electronic transformers for energy storage bidirectional DC / DC, photovoltaic access grid-connected inverters, wind power grid-connected converters and multi-energy complementary regulation devices in AC / DC microgrids.

[0003] In the process of failure performance assessment and testing of power electronic devices with multiple AC and DC ports, two important test items are the long-term efficiency test (including maximum efficiency, rated efficiency, etc.) and temperature rise test of the converter device. The usual test method is to use AC power and DC power, transformer and AC and DC loads that meet the voltage and power level of the device, and obtain the efficiency of two ports of the device by controlling the different power levels of the load. After repeated multiple times, the efficiency curve of all ports is obtained; in the temperature rise test, the load of each port is switched to the rated power level to perform the temperature rise test of the device. This method requires a high test device cost, and the electric energy generated during the test also needs to be converted into heat energy through the load and dissipated; some test systems use regenerative power supplies to recover electric energy, but due to the maximum power and cost of regenerative power supplies, only a small number of them are used in actual tests. Summary of the invention

[0004] In view of the problems of high device cost and electric energy waste in efficiency and temperature rise tests, the present invention provides a circuit and method for testing the failure performance of an AC-DC-AC-DC four-port power electronic device. Based on the topology of a power electronic device with multiple AC and DC ports, a circulating current test circuit in which the power of each port can be actively adjusted is formed by adding accompanying test power electronic devices of the same specification, so as to achieve the test of the failure performance of the AC-DC-AC-DC four-port power electronic device.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: an AC-DC AC-DC four-port power electronic device failure performance test circuit, the power electronic device Z1 to be tested includes a slave port U11, a master port U12, a master port U13, and a master port U14, and includes a companion test device Z2 that is the same as the power electronic device to be tested, a temperature sensor, a temperature recorder, a power analyzer, and a plurality of connecting cables; the companion test device Z2 includes a slave port U21, a master port U22, a master port U23, and a master port U24;

[0006] The input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the AC power grid through the transformer T1, and the output end is respectively connected to the input ends of the main port U12, the main port U13, and the main port U14, and the output ends of the main port U12, the main port U13, and the main port U14 are respectively connected to the output ends of the main port U22, the main port U23, and the main port U24 of the accompanying power electronic device Z2, and the input ends of the main port U22, the main port U23, and the main port U24 are connected to the output end of the slave port U21, and the input end of the slave port U21 is connected to the AC power grid through the transformer T2;

[0007] The slave port U11, main port U12, main port U13 and main port U14 of the power electronic device Z1 to be tested are all provided with temperature sensors, and the output end of the temperature sensor is connected to the temperature recorder; the input end of the slave port U11 is provided with a first voltage and current probe, and the output ends of the main port U12, main port U13 and main port U14 are provided with a second voltage and current probe; the output ends of the first voltage and current probe and the second voltage and current probe are connected to the power analyzer.

[0008] The AC-DC-AC-DC four-port power electronic device failure performance test circuit also includes a control switch S11 and a control switch S21.

[0009] The control switch S11 is arranged between the input end of the slave port of the power electronic device to be tested and the transformer T1 , and the control switch S21 is arranged between the input end of the slave port of the accompanying device to be tested and the transformer T2 .

[0010] The AC-DC-AC-DC four-port power electronic device failure performance test circuit also includes a control switch S12, a control switch S22, a control switch S12, a control switch S23, a control switch S14, and a control switch S24. The output end of the main port U12 of the power electronic device to be tested is connected to the main port U22 of the accompanying test device through the control switch S12, the connecting cable, and the control switch S22; the output end of the main port U13 of the power electronic device to be tested is connected to the main port U23 of the accompanying test device through the control switch S13, the connecting cable, and the control switch S23.

[0011] The output end of the main port U14 of the power electronic device to be tested is connected to the main port U24 of the accompanying test device through the control switch S14, the connecting cable and the control switch S24.

[0012] In addition, the present invention also provides a method for testing the failure performance of an AC-DC-AC-DC four-port power electronic device, comprising the following steps:

[0013] ①, when testing the efficiency of the slave port U11 and one of the main ports U12 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, and the output end is connected to the main port U22 of the accompanying test device Z2 through the main port U12, the main port U13 and the main port U14 are disconnected from the main ports U23 and U24 of the accompanying test device Z2, and the input end of the slave port U21 of the accompanying test device Z2 is connected to the output end of the transformer T2; then the slave port U11 of the power electronic device Z1 to be tested is controlled to control the internal bus voltage or output a high-frequency square wave signal with a fixed phase according to the original control strategy, and the control strategy of the main port U12 is to perform closed-loop control on the current of the port; the main port U22 of the accompanying test device Z2 is controlled to maintain the mode of controlling the output voltage; the main port U12 of the power electronic device Z1 to be tested is controlled to output different currents, and the efficiency curves under different power levels are obtained through multiple point tests; and the temperature rise curve is measured at the same time;

[0014] ②, when testing the efficiency of the main port U12 and the main port U13 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the main port U22 of the accompanying test device Z2 via the main port U12, the output end of the slave port U11 is connected to the corresponding main port of the accompanying test device Z2 via the main port U13, the main port U14 is disconnected from the main port U24 of the accompanying test device Z2; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2; then the slave port U11 is controlled to control the internal bus voltage or The output of the high-frequency square wave signal with a fixed phase, the control strategy of the main ports U12 and U13 is changed from the original closed-loop control output voltage to the closed-loop control of the port current, and the current command values ​​of the main ports U12 and U13 are controlled to be the same in magnitude and opposite in direction; the main ports U22 and U23 of the accompanying test device Z2 maintain the original closed-loop control output voltage mode, and the control mode of the slave port U21 of the accompanying test device Z2 is the same as that of the slave port U11, and the main port U12 of the power electronic device Z1 to be tested is controlled to output different currents, and the efficiency curves under different power levels are obtained through multiple point-taking tests; and the temperature rise curve is measured at the same time;

[0015] ③. When testing the efficiency of the slave port U11, the master port U12 and the master port U13 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U12, the output end of the slave port U11 is connected to the corresponding master port of the accompanying test device Z2 via the master port U13, the master port U14 is disconnected from the master port U24 of the accompanying test device Z2; the slave port input end of the accompanying test device Z2 is connected to the master port U22 of the accompanying test device Z2 via the master port U13, and the master port U14 is disconnected from the master port U24 of the accompanying test device Z2; the slave port input end of the accompanying test device Z2 is connected to the master port U22 of the accompanying test device Z2 via the master port U12; the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U13; the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U13; the output end of the slave port U11 of the accompanying test device Z2 ... The input end is connected to the transformer T2; then the control strategy of controlling the main port U12 and the main port U13 is changed from the original closed-loop control output voltage to the closed-loop control of the port current; the main port U22 and the main port U23 are controlled to maintain the closed-loop control output voltage. The control method of the slave port U21 of the accompanying test device Z2 is the same as that of the slave port U11. The main ports U12 and U13 of the power electronic device Z1 to be tested are controlled to output different currents. Through multiple point tests, the efficiency curves at different power levels are obtained; and the temperature rise curve is measured at the same time;

[0016] ④. When testing the efficiency of the main port U12, main port U13 and main port U14 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the main port U22 of the accompanying test device Z2 via the main port U12, the output end of the slave port U11 is connected to the corresponding main port of the accompanying test device Z2 via the main port U13, the output end of the slave port U11 is disconnected from the main port U24 of the accompanying test device Z2 via the main port U14; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2 ; Then, the control strategy of controlling the main port U12, the main port U13, and the main port U14 is changed from the original closed-loop control output voltage to closed-loop control of the port current; the main port U22, the main port U23, and the main port U24 are controlled to maintain the closed-loop control output voltage. The control method of the slave port U21 of the accompanying test device Z2 is the same as that of the slave port U11. The current of the main port U12, the main port U13, and the main port U14 of the power electronic device Z1 to be tested is controlled to make the sum of their powers zero. Through multiple point tests, the efficiency curves at different power levels are obtained; and the temperature rise curve is measured at the same time;

[0017] ⑤. When testing the efficiency of the slave port U11, the master port U12, the master port U13 and the master port U14 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U12, the output end of the slave port U11 is connected to the corresponding master port of the accompanying test device Z2 via the master port U13, the output end of the slave port U11 is disconnected from the master port U24 of the accompanying test device Z2 via the master port U14; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2; then control The control strategy of the main port U12, the main port U13, and the main port U14 is changed from the original closed-loop control output voltage to the closed-loop control of the port current; the main port U22, the main port U23, and the main port U24 are controlled to maintain the closed-loop control output voltage. The control method of the slave port U21 of the test device Z2 is the same as the slave port U11. The current of the main port U12, the main port U13, and the main port U14 of the power electronic device Z1 to be tested is controlled so that the sum of the absolute values ​​of their power is less than the power capacity of the slave port U11. Through multiple point tests, the efficiency curves at different power levels are obtained; and the temperature rise curve is measured at the same time.

[0018] In step ①, the efficiency calculation formula is:

[0019]

[0020] Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U11 Indicates the power value measured from the input end of port U11.

[0021] In step ②, the efficiency calculation formula is:

[0022]

[0023] Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U11 Indicates the power value measured from the input end of port U11.

[0024] In step ③, the efficiency calculation formula is:

[0025]

[0026] Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13It represents the power value measured at the output of the main port U13, P U11 Indicates the power value measured from the input end of port U11.

[0027] In step ④, the efficiency calculation formula is:

[0028]

[0029] Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U14 It represents the power value measured at the output of the main port U14, P U11 Indicates the power value measured from the input end of port U11.

[0030] In step ⑤, the efficiency calculation formula is:

[0031]

[0032] Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U14 It represents the power value measured at the output of the main port U14, P U11 Indicates the power value measured from the input end of port U11.

[0033] Compared with the prior art, the present invention has the following beneficial effects:

[0034] 1. The present invention provides a failure performance test circuit and method for an AC-DC four-port power electronic device, which is implemented by adding devices of the same specifications, switching switches and connecting cables as auxiliary circuits. Since converters of the same specifications are easy to obtain during the factory test or inspection stage of the enterprise, the present invention has a simple structure, convenient detection, and reduces the difficulty of the test; moreover, when necessary, the present invention can realize efficiency and temperature rise tests of two sets of converter devices at the same time.

[0035] 2. Compared with the scheme of using high-power load or regenerative load, the present invention not only greatly saves the cost of experimental equipment, but also avoids the waste of electric energy. The present invention can meet the assessment of efficiency and temperature rise test indicators in the test scheme. In the test of power electronic devices with a large power level and a large number of ports, the present invention can show great advantages in time cost and economic cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1A schematic diagram of the circuit principle of a failure performance test circuit of an AC-DC-AC-DC four-port power electronic device provided by an embodiment of the present invention;

[0037] Figure 2 Schematic diagram of the state switching of the main DC port control mode in an embodiment of the present invention;

[0038] Figure 3 Schematic diagram of the state switching of the main AC port control mode in an embodiment of the present invention. DETAILED DESCRIPTION

[0039] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0040] Embodiment 1

[0041] like Figure 1 As shown, the first embodiment of the present invention provides a failure performance test circuit of an AC-DC-AC-DC four-port power electronic device, wherein the power electronic device Z1 to be tested includes a slave port U11, a master port U12, a master port U13, and a master port U14, and includes a companion test device Z2, a temperature sensor, a temperature recorder, a power analyzer, and a plurality of connecting cables that are the same as the power electronic device to be tested; the companion test device Z2 includes a slave port U21, a master port U22, a master port U23, and a master port U24; the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the AC power grid through a transformer T1, and the output end is respectively connected to the input end of the master port U12, the master port U13, and the master port U14, and the output ends of the master port U12, the master port U13, and the master port U14 are respectively connected to the companion test The output ends of the main port U22, the main port U23, and the main port U24 of the device Z2 are connected, and the input ends of the main port U22, the main port U23, and the main port U24 are connected to the output end of the slave port U21, and the input end of the slave port U21 is connected to the AC power grid through the transformer T2; the slave port U11, the main port U12, the main port U13, and the main port U14 of the power electronic device Z1 to be tested are all provided with temperature sensors, and the output end of the temperature sensor is connected to the temperature recorder; the input end of the slave port U11 is provided with a first voltage and current probe, and the output ends of the main port U12, the main port U13, and the main port U14 are provided with a second voltage and current probe; the output ends of the first voltage and current probe and the second voltage and current probe are connected to the power analyzer.

[0042] Specifically, in this embodiment, the AC power grid is AC10kV, which provides the AC power required for the test. Figure 1 It is a test circuit for a four-port device, in which U11 is a slave port, and U12, U13 and U14 are master ports. Power can be transmitted in four ports, or only in two or three ports, so the efficiency test should be carried out in pairs. The circuit connection relationship is: the device consists of a slave port unit U11 and master port units U12, U13, U14 and connecting parts, in which each unit is a circuit composed of power electronic devices and passive devices such as capacitors and inductors. The output voltage levels of each port are inconsistent, and the connection between each unit can be a DC bus or other forms of connection. During normal operation, the slave port U11 is connected to the power grid, and the master port can be connected to AC and DC loads as needed, or to bidirectional loads such as new energy power generation equipment or energy storage. During the test, the power grid is connected from port U11 through transformer T1, and the output test cables of U12, U13, and U14 are connected to switches S22, S23, and S24 after passing through their respective reactors, and then enter the corresponding ports U22, U23, and U24 of device S2, and then sent back to the AC 10kV power grid through U21, switch S21, and transformer T2, forming the power circulation circuit required for the test. The test circuit is: current and voltage probes are installed at the ports of U11, U12, U13, and U14 of Z1 respectively, and connected to the power analyzer, so that the efficiency curves at different power levels can be tested; the real-time temperature curves and temperature rise test results of different parts of the device can be obtained through 4 temperature sensors.

[0043] Furthermore, if Figure 1 As shown, a failure performance test circuit of an AC-DC-AC-DC four-port power electronic device of this embodiment also includes a control switch S11 and a control switch S21. The control switch S11 is arranged between the input end of the slave port of the power electronic device to be tested and the transformer T1, and the control switch S21 is arranged between the input end of the slave port of the accompanying test device and the transformer T2.

[0044] Furthermore, if Figure 1As shown, a failure performance test circuit of an AC-DC-AC-DC four-port power electronic device of the present embodiment also includes a control switch S12, a control switch S22, a control switch S12, a control switch S23, a control switch S14, and a control switch S24. The output end of the main port U12 of the power electronic device to be tested is connected to the main port U22 of the accompanying test device through the control switch S12, the connecting cable, and the control switch S22; the output end of the main port U13 of the power electronic device to be tested is connected to the main port U23 of the accompanying test device through the control switch S13, the connecting cable, and the control switch S23; the output end of the main port U14 of the power electronic device to be tested is connected to the main port U24 of the accompanying test device through the control switch S14, the connecting cable, and the control switch S24.

[0045] Embodiment 2

[0046] Embodiment 2 of the present invention provides a method for testing the failure performance of an AC-DC-AC-DC four-port power electronic device, comprising the following steps:

[0047] ①. When testing the efficiency of the slave port U11 and one of the main ports U12 of the power electronic device Z1 to be tested, control the switch S11 and the control switch S21 to be closed, control the switch S12 and the control switch S22 to be closed, and the remaining switches are opened. The input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, and the output end is connected to the main port U22 of the accompanying device Z2 through the main port U12. The main ports U13 and U14 are disconnected from the main ports U23 and U24 of the accompanying device Z2, and the input end of the slave port U21 of the accompanying device Z2 is connected to the output end of the transformer T2; then the slave port U11 of the power electronic device Z1 to be tested is controlled to control the internal bus voltage or output a high-frequency square wave signal with a fixed phase according to the original control strategy, and the control strategy for controlling the main port U12 is to perform closed-loop control on the current of the port, such as Figure 2 The voltage mode state is switched to the test state; the main port U22 of the accompanying test device Z2 is controlled to maintain the mode of controlling the output voltage; the main port U12 of the power electronic device Z1 to be tested is controlled to output different currents, and the efficiency curves under different power levels are obtained through multiple point tests; and the temperature rise curve is measured at the same time.

[0048] In this embodiment, at this time, the main port U22 of the accompanying test device Z2 is still in a mode of controlling the output voltage, so that the port voltage is clamped through the U22 port, and controlling the U12 current actually controls the output power of the U12 port, and different output powers can be obtained by specifying different output current command values. The output power returns to the power grid through U22, U21, and T2, and continuously circulates in the devices Z1, Z2 and the power grid. During stable operation, the AC power grid only provides the power loss of the tested device Z1 and the accompanying test device Z2, which greatly reduces the consumption of electric energy in the test load, and the set test power gear can be set arbitrarily, so it is easy to find the power point with maximum efficiency, and the efficiency curve is better fitted through multiple point tests.

[0049] In step ①, the efficiency calculation formula is:

[0050]

[0051] Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U11 Indicates the power value measured from the input end of port U11.

[0052] In addition, when testing the efficiency of the two ports U11 and U13, S11 and S21 are closed, S13 and S23 are closed, and the other switches are open. The efficiency curve test method of the two ports in the above step ① can be followed, and the control method remains unchanged. The efficiency calculation formula is:

[0053]

[0054] Among them, η represents efficiency, P U13 It represents the power value measured at the output of the main port U13, P U11 Indicates the power value measured from the input end of port U11.

[0055] When testing the efficiency of the two ports U11 and U14, S11 and S21 are closed, S14 and S24 are closed, and the other switches are open. Follow the efficiency curve test method of the two ports in step ① above, and the control method remains unchanged. The efficiency calculation formula is:

[0056]

[0057] Among them, η represents efficiency, P U14 It represents the power value measured at the output of the main port U14, P U11 Indicates the power value measured from the input end of port U11.

[0058] ②, when testing the efficiency of the main port U12 and the main port U13 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the main port U22 of the accompanying test device Z2 via the main port U12, the output end of the slave port U11 is connected to the corresponding main port of the accompanying test device Z2 via the main port U13, the main port U14 is disconnected from the main port U24 of the accompanying test device Z2; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2; then the slave port U11 is controlled to control the internal bus voltage according to the original control strategy Or a high-frequency square wave signal with a fixed phase is output, and the control strategy of the main ports U12 and U13 is changed from the original closed-loop control output voltage to closed-loop control of the port current, and at the same time, the current command values ​​of the main ports U12 and U13 are controlled to be the same in size and opposite in direction; the main ports U22 and U23 of the companion test device Z2 maintain the original closed-loop control output voltage mode, and the control method of the slave port U21 of the companion test device Z2 is the same as that of the U11 port, and the main port U12 of the power electronic device Z1 to be tested is controlled to output different currents, and the efficiency curves under different power levels are obtained through multiple point tests; and the temperature rise curve is measured at the same time.

[0059] In this embodiment, the control strategy of the main port U12 and the main port U13 is changed from the original closed-loop control of the output voltage to the closed-loop control of the current of the port. Figure 2 , Figure 3 Switch from voltage mode or inverter mode to test mode; Figure 3 As shown in , in the main port, a switch is set between AVR and ACR. In the inverter state, the switch is switched to the inverter terminal, and the voltage enters the ACR after being regulated and output by the AVR. The set grid phase θg is input into the dq-αβ coordinate transformation module after the ACR output; when the switch is switched from the inverter state to the test state, the loading signal i required for the current test id and i iqThe ACR module is input through the switching switch, and the grid phase signal of the dq-αβ coordinate transformation module is phase-locked by the grid voltage after the abc-αβ coordinate transformation; at this time, the main port of the device Z2 still uses the original closed-loop control output voltage mode, so that the voltages of the U12 and U13 ports are clamped through the U22 and U23 ports respectively, and controlling the current of U12 and U13 actually controls the output power of the U12 and U13 ports. According to the power flow direction from U12 to U13, the current command value of U12 and the current command value of U13 are set. If the values ​​are opposite, power in opposite directions can be obtained at the two ports, as well as the compensation power flowing through the U11 port. In this power circulation circuit, the main power circulates among U12, U13, U23, and U22, and the loss power is compensated by U11 and U21. During stable operation, the AC power grid only provides the loss power of the tested device Z1 and the accompanying test device Z2, which greatly reduces the consumption of electric energy in the test load, and the set test power gear can be set arbitrarily. Through multiple point tests, the efficiency curve can be better fitted.

[0060] In step ②, the efficiency calculation formula is:

[0061]

[0062] Among them, η represents efficiency, P U13 It represents the power value measured at the output of the main port U13, P U12 It represents the power value measured at the output of the main port U12, P U11 Indicates the power value measured from the input end of port U11.

[0063] When testing the efficiency of the two ports U12 and U14, S11 and S21 are closed, S12 and S22 are closed, S14 and S24 are closed, and the other switches are open. The efficiency curve test method of the two ports in ② above can be followed, and the control method remains unchanged. The efficiency calculation formula is:

[0064]

[0065] Among them, η represents efficiency, P U14 It represents the power value measured at the output of the main port U14, P U12 It represents the power value measured at the output of the main port U12, P U11 Indicates the power value measured from the input end of port U11.

[0066] When testing the efficiency of the two ports U13 and U14, S11 and S21 are closed, S13 and S23 are closed, S14 and S24 are closed, and the other switches are open. The efficiency curve test method of the two ports in ② above can be followed, and the control method remains unchanged. The efficiency calculation formula is:

[0067]

[0068] Among them, η represents efficiency, P U14 It represents the power value measured at the output of the main port U14, P U13 It represents the power value measured at the output of the main port U13, P U11 Indicates the power value measured from the input end of port U11.

[0069] ③. When testing the efficiency of the slave port U11, the master port U12 and the master port U13 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U12, the output end of the slave port U11 is connected to the corresponding master port of the accompanying test device Z2 via the master port U13, the master port U14 is disconnected from the master port U24 of the accompanying test device Z2; the slave port input end of the accompanying test device Z2 is connected to the master port U22 of the accompanying test device Z2 via the master port U13, and the master port U14 is disconnected from the master port U24 of the accompanying test device Z2; the slave port input end of the accompanying test device Z2 is connected to the master port U22 of the accompanying test device Z2 via the master port U12; the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U13; the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U13; the output end of the slave port U11 of the accompanying test device Z2 ... The input end is connected to the transformer T2; then the control strategy of controlling the main port U12 and the main port U13 is changed from the original closed-loop control output voltage to closed-loop control of the port current; the main port U22 and the main port U23 are controlled to maintain the closed-loop control output voltage, and the control method of the slave port U21 of the test device Z2 is the same as the slave port U11, and the main ports U12 and U13 of the power electronic device Z1 to be tested are controlled to output different currents, and the efficiency curves under different power levels are obtained through multiple point tests; and the temperature rise curve is measured at the same time.

[0070] In this embodiment, the slave port U11 controls the internal bus voltage or outputs a high-frequency square wave signal with a fixed phase according to the original control strategy, and the control strategy of the U12 and U13 units is changed from the original closed-loop control of the output voltage to the closed-loop control of the port current, such as Figure 2 , Figure 3 The test state is switched from voltage mode or inverter mode to test state; at this time, the main port of the power electronic device Z2 to be tested is still in the closed-loop control output voltage mode, so that the voltages of U12 and U13 ports are clamped by U22 and U23 ports respectively, and controlling the current of U12 and U13 actually controls the output power of U12 and U13 ports. According to the power flow direction of power flowing into U11 and outflowing from U12 and U13, the current command values ​​of U12 and U13 are set. In this power circulation circuit, the main power circulates between U11, U12, U13, U23, U22, U21 and the power grid. During stable operation, the AC power grid only provides the loss power of the device under test Z1 and the accompanying test device Z2, which greatly reduces the consumption of electric energy in the test load, and the set test power gear can be set arbitrarily. Through multiple point tests, the fitting degree of the efficiency curve is better.

[0071] In step ③, the efficiency calculation formula is:

[0072]

[0073] Among them, η represents efficiency, P U13 It represents the power value measured at the output of the main port U13, P U12 It represents the power value measured at the output of the main port U12, P U11 Indicates the power value measured from the input end of port U11.

[0074] When testing the efficiency of the three ports U11, U12 and U14, S11 and S21 are closed, S12 and S22 are closed, S14 and S24 are closed, and the other switches are open. The efficiency curve test method of the three ports in ③ above can be followed, and the control method remains unchanged. The efficiency calculation formula is:

[0075]

[0076] Among them, η represents efficiency, P U14 It represents the power value measured at the output of the main port U14, P U12 It represents the power value measured at the output of the main port U12, P U11 Indicates the power value measured from the input end of port U11.

[0077] When testing the efficiency of the three ports U11, U13 and U14, S11 and S21 are closed, S13 and S23 are closed, S14 and S24 are closed, and the other switches are open. The efficiency curve test method of the three ports in ③ above can be followed, and the control method remains unchanged. The efficiency calculation formula is:

[0078]

[0079] Among them, η represents efficiency, P U13 It represents the power value measured at the output of the main port U13, P U14 It represents the power value measured at the output of the main port U14, P U11 Indicates the power value measured from the input end of port U11.

[0080] ④. When testing the efficiency of the main port U12, main port U13 and main port U14 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the main port U22 of the accompanying test device Z2 via the main port U12, the output end of the slave port U11 is connected to the corresponding main port of the accompanying test device Z2 via the main port U13, the output end of the slave port U11 is disconnected from the main port U24 of the accompanying test device Z2 via the main port U14; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2 ; Then the control strategy of controlling the main port U12, main port U13, and main port U14 is changed from the original closed-loop control output voltage to closed-loop control of the port current; the main port U22, main port U23, and main port U24 are controlled to maintain the closed-loop control output voltage. The control method of the slave port U21 of the test device Z2 is the same as that of the slave port U11. The current of the main port U12, main port U13, and main port U14 of the power electronic device Z1 to be tested is controlled to make the sum of their powers zero. Through multiple point tests, the efficiency curves at different power levels are obtained; and the temperature rise curve is measured at the same time.

[0081] When testing the efficiency of the three ports U12, U13 and U14, S11 and S21 are closed, S12 and S22 are closed, S13 and S23 are closed, and S14 and S24 are closed. The efficiency curve test method of the three ports in ④ above can be followed. It should be noted that the sum of the powers of U12, U13 and U14 is controlled to be close to zero, which is in accordance with the power balance relationship with the power loss provided by U11. Taking the case where U12 and U13 input power, U14 output power, and U11 provides power loss as an example, the efficiency calculation formula is:

[0082]

[0083] Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U14 It represents the power value measured at the output of the main port U14, P U11 Indicates the power value measured from the input end of port U11.

[0084] ⑤. When testing the efficiency of the slave port U11, the master port U12, the master port U13 and the master port U14 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U12, the output end of the slave port U11 is connected to the corresponding master port of the accompanying test device Z2 via the master port U13, the output end of the slave port U11 is disconnected from the master port U24 of the accompanying test device Z2 via the master port U14; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2; then control The control strategy of the main port U12, the main port U13, and the main port U14 is changed from the original closed-loop control output voltage to the closed-loop control of the port current; the main port U22, the main port U23, and the main port U24 are controlled to maintain the closed-loop control output voltage. The control method of the slave port U21 of the test device Z2 is the same as the slave port U11. The current of the main port U12, the main port U13, and the main port U14 of the power electronic device Z1 to be tested is controlled so that the sum of the absolute values ​​of their power is less than the power capacity of the slave port U11. Through multiple point tests, the efficiency curves at different power levels are obtained; and the temperature rise curve is measured at the same time.

[0085] When testing the efficiency of the four ports U11, U12, U13 and U14, S11 and S21 are closed, S12 and S22 are closed, S13 and S23 are closed, and S14 and S24 are closed. Similar to the efficiency curve test method of the three ports in ③ above, the power of U12, U13, and U14 can be specified arbitrarily, but the sum of the absolute values ​​cannot exceed the power capacity of the U11 port. In the end, the sum of the power of the four ports is close to zero, which meets the power balance relationship. Taking the output power of U12, U13, and U14 and the input power of U11 as an example, in step ⑤, the efficiency calculation formula is:

[0086]

[0087] Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U14 It represents the power value measured at the output of the main port U14, P U11 Indicates the power value measured from the input end of port U11.

[0088] When it is necessary to measure the port efficiency when the power is reversed, it is only necessary to assign the reverse direction value to the current command value of the active port. In addition, it should be noted that for devices with more than four AC ports, the method of the embodiment of the present invention can be referred to. Power electronic devices that do not distinguish between master and slave port control methods are not within the scope of protection of this patent.

[0089] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A failure performance test circuit for an AC / DC four-port power electronic device, wherein the power electronic device Z1 to be tested comprises a slave port U11, a master port U12, a master port U13, and a master port U14, and is characterized in that: It includes a test companion device Z2, a temperature sensor, a temperature recorder, a power analyzer and a plurality of connecting cables, which are the same as the power electronic device to be tested; the test companion device Z2 includes a slave port U21, a master port U22, a master port U23 and a master port U24; The input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the AC power grid through the transformer T1, and the output end is respectively connected to the input ends of the main port U12, the main port U13, and the main port U14, and the output ends of the main port U12, the main port U13, and the main port U14 are respectively connected to the output ends of the main port U22, the main port U23, and the main port U24 of the accompanying test device Z2, and the input ends of the main port U22, the main port U23, and the main port U24 are connected to the output end of the slave port U21, and the input end of the slave port U21 is connected to the AC power grid through the transformer T2; The slave port U11, the master port U12, the master port U13 and the master port U14 of the power electronic device Z1 to be tested are all provided with temperature sensors, and the output end of the temperature sensor is connected to the temperature recorder; the input end of the slave port U11 is provided with a first voltage and current probe, and the output ends of the master port U12, the master port U13 and the master port U14 are provided with a second voltage and current probe; the output ends of the first voltage and current probe and the second voltage and current probe are connected to the power analyzer; It also includes a control switch S11 and a control switch S21, wherein the control switch S11 is arranged between the input end of the slave port of the power electronic device to be tested and the transformer T1, and the control switch S21 is arranged between the input end of the slave port of the accompanying test device and the transformer T2; It also includes a control switch S12, a control switch S22, a control switch S12, a control switch S23, a control switch S14, and a control switch S24, wherein the output end of the main port U12 of the power electronic device to be tested is connected to the main port U22 of the accompanying test device through the control switch S12, the connecting cable, and the control switch S22; The output end of the main port U13 of the power electronic device to be tested is connected to the main port U23 of the accompanying test device through the control switch S13, the connecting cable, and the control switch S23; The output end of the main port U14 of the power electronic device to be tested is connected to the main port U24 of the accompanying test device through the control switch S14, the connecting cable and the control switch S24.

2. A method for testing the failure performance of an AC-DC-AC-DC four-port power electronic device, characterized in that: A failure performance test circuit for an AC-DC-AC-DC four-port power electronic device according to claim 1 is implemented, comprising the following steps: ①, when testing the efficiency of the slave port U11 and one of the main ports U12 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, and the output end is connected to the main port U22 of the accompanying test device Z2 through the main port U12, the main port U13 and the main port U14 are disconnected from the main ports U23 and U24 of the accompanying test device Z2, and the input end of the slave port U21 of the accompanying test device Z2 is connected to the output end of the transformer T2; then the slave port U11 of the power electronic device Z1 to be tested is controlled to control the internal bus voltage or output a high-frequency square wave signal with a fixed phase according to the original control strategy, and the control strategy of the main port U12 is to perform closed-loop control on the current of the port; the main port U22 of the accompanying test device Z2 is controlled to maintain the mode of controlling the output voltage; the main port U12 of the power electronic device Z1 to be tested is controlled to output different currents, and the efficiency curves under different power levels are obtained through multiple point tests; and the temperature rise curve is measured at the same time; ②, when testing the efficiency of the main port U12 and the main port U13 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the main port U22 of the accompanying test device Z2 via the main port U12, the output end of the slave port U11 is connected to the corresponding main port of the accompanying test device Z2 via the main port U13, the main port U14 is disconnected from the main port U24 of the accompanying test device Z2; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2; then the slave port U11 is controlled to control the internal bus voltage or The output of the high-frequency square wave signal with a fixed phase, the control strategy of the main ports U12 and U13 is changed from the original closed-loop control output voltage to the closed-loop control of the port current, and the current command values ​​of the main ports U12 and U13 are controlled to be the same in magnitude and opposite in direction; the main ports U22 and U23 of the accompanying test device Z2 maintain the original closed-loop control output voltage mode, and the control mode of the slave port U21 of the accompanying test device Z2 is the same as that of the slave port U11, and the main port U12 of the power electronic device Z1 to be tested is controlled to output different currents, and the efficiency curves under different power levels are obtained through multiple point-taking tests; and the temperature rise curve is measured at the same time; ③. When testing the efficiency of the slave port U11, the master port U12 and the master port U13 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U12, the output end of the slave port U11 is connected to the corresponding master port of the accompanying test device Z2 via the master port U13, the master port U14 is disconnected from the master port U24 of the accompanying test device Z2; the slave port input end of the accompanying test device Z2 is connected to the master port U22 of the accompanying test device Z2 via the master port U13, and the master port U14 is disconnected from the master port U24 of the accompanying test device Z2; the slave port input end of the accompanying test device Z2 is connected to the master port U22 of the accompanying test device Z2 via the master port U12; the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U13; the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U13; the output end of the slave port U11 of the accompanying test device Z2 ... The input end is connected to the transformer T2; then the control strategy of controlling the main port U12 and the main port U13 is changed from the original closed-loop control output voltage to the closed-loop control of the port current; the main port U22 and the main port U23 are controlled to maintain the closed-loop control output voltage. The control method of the slave port U21 of the accompanying test device Z2 is the same as that of the slave port U11. The main ports U12 and U13 of the power electronic device Z1 to be tested are controlled to output different currents. Through multiple point tests, the efficiency curves at different power levels are obtained; and the temperature rise curve is measured at the same time; ④. When testing the efficiency of the main port U12, main port U13 and main port U14 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the main port U22 of the accompanying test device Z2 via the main port U12, the output end of the slave port U11 is connected to the corresponding main port of the accompanying test device Z2 via the main port U13, the output end of the slave port U11 is disconnected from the main port U24 of the accompanying test device Z2 via the main port U14; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2 ; Then, the control strategy of controlling the main port U12, the main port U13, and the main port U14 is changed from the original closed-loop control output voltage to closed-loop control of the port current; the main port U22, the main port U23, and the main port U24 are controlled to maintain the closed-loop control output voltage. The control method of the slave port U21 of the accompanying test device Z2 is the same as that of the slave port U11. The current of the main port U12, the main port U13, and the main port U14 of the power electronic device Z1 to be tested is controlled to make the sum of their powers zero. Through multiple point tests, the efficiency curves at different power levels are obtained; and the temperature rise curve is measured at the same time; ⑤. When testing the efficiency of the slave port U11, the master port U12, the master port U13 and the master port U14 of the power electronic device Z1 to be tested, the input end of the slave port U11 of the power electronic device Z1 to be tested is connected to the transformer T1, the output end of the slave port U11 of the power electronic device Z1 to be tested is connected to the master port U22 of the accompanying test device Z2 via the master port U12, the output end of the slave port U11 is connected to the corresponding master port of the accompanying test device Z2 via the master port U13, the output end of the slave port U11 is disconnected from the master port U24 of the accompanying test device Z2 via the master port U14; the input end of the slave port of the accompanying test device Z2 is connected to the transformer T2; then control The control strategy of the main port U12, the main port U13, and the main port U14 is changed from the original closed-loop control output voltage to the closed-loop control of the port current; the main port U22, the main port U23, and the main port U24 are controlled to maintain the closed-loop control output voltage. The control method of the slave port U21 of the test device Z2 is the same as the slave port U11. The current of the main port U12, the main port U13, and the main port U14 of the power electronic device Z1 to be tested is controlled so that the sum of the absolute values ​​of their power is less than the power capacity of the slave port U11. Through multiple point tests, the efficiency curves at different power levels are obtained; and the temperature rise curve is measured at the same time.

3. The method for testing the failure performance of an AC-DC-AC-DC four-port power electronic device according to claim 2, characterized in that: In step ①, the efficiency calculation formula is: ; Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U11 Indicates the power value measured from the input end of port U11.

4. The method for testing failure performance of an AC-DC-AC-DC four-port power electronic device according to claim 2, characterized in that: In step ②, the efficiency calculation formula is: ; Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U11 Indicates the power value measured from the input end of port U11.

5. The method for testing failure performance of an AC-DC-AC-DC four-port power electronic device according to claim 2, characterized in that: In step ③, the efficiency calculation formula is: ; Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U11 Indicates the power value measured from the input end of port U11.

6. The method for testing failure performance of an AC-DC-AC-DC four-port power electronic device according to claim 2, characterized in that: In step ④, the efficiency calculation formula is: ; Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U14 It represents the power value measured at the output of the main port U14, P U11 Indicates the power value measured from the input end of port U11.

7. The method for testing failure performance of an AC-DC-AC-DC four-port power electronic device according to claim 2, characterized in that: In step ⑤, the efficiency calculation formula is: ; Among them, η represents efficiency, P U12 It represents the power value measured at the output of the main port U12, P U13 It represents the power value measured at the output of the main port U13, P U14 It represents the power value measured at the output of the main port U14, P U11 Indicates the power value measured from the input end of port U11.

Citation Information

Patent Citations

  • Test device of power operation of flexible direct current power transmission converter valve submodule and test method

    CN106872834A

  • Power electronic transformer operation system and control method

    CN113640693A