A steam leakage simulation test system and test method for main steam pipeline of power plant
By designing a steam leakage simulation test system for the main steam pipeline of a power plant that includes a deionized water tank, a plunger pump, a spiral tube steam generator and a pressure vessel, the problem that there is no domestic main steam pipeline LBB technology application is solved, and steam leakage is achieved. The stability and adjustability of parameters improve test efficiency and reduce costs, and test the performance of steam leak detection devices.
Patent Information
- Application Number
- CN202110564616.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-24
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-05-24
AI Technical Summary
There is no main steam pipeline in China that uses Leak Before Break (LBB) technology for steam leak simulation test systems and testing methods, and it is unable to effectively test the performance of steam leak detection devices.
A steam leakage simulation test system for the main steam pipeline of a power plant is designed, including a deionized water tank, a plunger pump, a spiral tube steam generator, a Venturi flow meter, a pressure vessel and a condenser. The spiral tube steam generator is heated by a DC power supply. , forming a steam source, and simulating leak points through the valve group to achieve precise adjustment of steam parameters.
It improves test efficiency, reduces operating costs, achieves stability and adjustability of steam parameters, can accurately adjust power load according to working conditions, simulates a suitable steam leak environment, and tests the performance of steam leak detection devices.
Smart Images

Figure CN115389104B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a thermal hydraulic experimental device and a testing method, and in particular to a steam leakage simulation test system and a testing method for a main steam pipeline of a power plant. Background Art
[0002] LBB (Leak Before Break) technology is an advanced design technology to ensure the safety and reliability of reactor operation. The basic idea is that when a pipeline leaks and the leakage reaches a certain level, it can be detected by a dedicated leakage monitoring system.
[0003] The application scope of LBB technology is becoming more and more extensive, but currently there is no actual engineering application of LBB in the main steam pipeline in China.
[0004] Therefore, there is a particular need for a steam leakage simulation test system and test method for the main steam pipeline of a power plant to solve the above-mentioned existing problems. Summary of the invention
[0005] The purpose of the present invention is to provide a steam leakage simulation test system and test method for the main steam pipeline of a power plant. In view of the shortcomings of the prior art, the system is capable of generating steam required for working conditions and providing an environmental background for simulating steam leakage for testing the performance of a steam leakage detection device.
[0006] The technical problem solved by the present invention can be achieved by adopting the following technical solutions:
[0007] A first aspect of the present invention provides a power plant main steam pipeline steam leakage simulation test system, comprising an open loop, the open loop comprising a deionized water tank, a plunger pump, a spiral tube steam generator, a venturi flowmeter, a pressure vessel and a condenser connected by a plurality of pipelines;
[0008] The outlet of the deionized water tank is connected to the inlet of the plunger pump, the deionized water tank and the outlet of the plunger pump are connected to each other to form a first bypass, the deionized water tank and the outlet of the spiral tube steam generator are connected to each other to form a second bypass, the outlet of the pressure vessel is divided into a main route and a branch route, the main route of the outlet of the pressure vessel is connected to a condenser and a deionized water tank in sequence; the branch route of the outlet of the pressure vessel is connected to a valve group and a main steam pipeline in sequence through a venturi flowmeter; the spiral tube steam generator uses a DC power supply to heat the deionized water flowing through it.
[0009] In one embodiment of the present invention, an electric regulating valve TF1 is provided on the first bypass pipe between the deionized water tank and the plunger pump, and an electric regulating valve TF2 is provided on the second bypass between the deionized water tank and the plunger pump; an electric valve TF3 is provided on the main road on the outlet side of the spiral tube steam generator; an electric valve TF4 is provided between the outlet of the pressure vessel and the condenser; an electric valve TF5 is provided at the rear end of the Venturi flowmeter on the branch road of the outlet of the pressure vessel; and a valve group TF6, a valve group TF7, a valve group TF8, a valve group TF9 and a valve group TF10 are provided in parallel at the rear end of the electric valve TF5.
[0010] In one embodiment of the present invention, the valve group TF6, valve group TF7, valve group TF8, valve group TF9 and valve group TF10 and the pipelines connected thereto correspond to simulated leakage points at different positions of the main steam pipeline respectively.
[0011] In one embodiment of the present invention, the spiral tube steam generator is made of DN20 304 stainless steel tubes wound in 20 layers with a radius of 500 mm.
[0012] In one embodiment of the present invention, the inlet and outlet of the spiral tube steam generator are respectively connected to the positive electrode and the negative electrode of a DC power supply.
[0013] In one embodiment of the present invention, the spiral tube steam generator is heated by loading direct current, and the heating power reaches 300KW.
[0014] In one embodiment of the present invention, a temperature measuring point is provided between the deionized water tank and the plunger pump, and a temperature measuring point is provided on the pressure vessel, and the temperature measuring point adopts an armored K-type thermocouple.
[0015] In one embodiment of the present invention, a pressure measuring point is provided between the plunger pump and the spiral tube steam generator, a pressure measuring point is provided on the pressure vessel, and the pressure measuring point adopts a Yokogawa EJA530E pressure transmitter.
[0016] In one embodiment of the present invention, a flow measuring point is provided between the plunger pump and the spiral tube steam generator, a flow measuring point is provided between the spiral tube steam generator and the pressure vessel, and a flow measuring point is provided between the pressure vessel and the valve group, and the flow measuring point adopts a Venturi flowmeter.
[0017] In one embodiment of the present invention, the deionized water tank and the plunger pump are connected by a stainless steel 304 pipe.
[0018] A second aspect of the present invention provides a testing method for a steam leakage simulation test system of a main steam pipeline of a power plant, comprising the following steps:
[0019] Before the experiment begins, open the electric regulating valve TF2 on the second bypass and close the other valves;
[0020] If the test is to be carried out, start the plunger pump, slowly adjust the opening of the electric control valve TF2 to increase the pressure of the open circuit as a whole, turn on the DC power supply, adjust the heating power of the spiral tube steam generator through the power regulator, monitor the temperature measured by the temperature measuring point T2 at the outlet of the spiral tube steam generator and the pressure of the pressure measuring point P1 at the plunger outlet; adjust the pressure of the loop by continuously adjusting the opening of the electric control valve TF2 to make the pressure meet the working condition requirements; gradually increase the power of the heater of the spiral tube steam generator, monitor the temperature of the temperature measuring point T2 at the outlet of the spiral tube steam generator and the system pressure of the pressure measuring point P1 until the outlet of the spiral tube steam generator reaches the state of superheated steam, then gradually close the electric control valve TF2 on the second bypass, and at the same time The electric regulating valve TF3 is gradually opened, and the superheated steam enters the pressure vessel through the electric regulating valve TF3; the temperature measuring point T3 and the pressure measuring point P2 are monitored, and when the pressure in the pressure vessel reaches 1MPa, the electric valve TF4 is gradually opened, and when the temperature and pressure in the pressure vessel rise to the working condition requirements, the temperature and pressure in the pressure vessel are kept stable by adjusting the opening of the electric valve TF4; then, according to the working condition requirements, one of the valve groups TF6, TF7, TF8, TF9 and TF10 is opened, and then the electric valve TF5 is slowly opened, and the Venturi flowmeter between the pressure vessel and the valve group is monitored, and the opening of the electric valve TF5 is continuously adjusted to make the flow meet the working condition requirements.
[0021] In one embodiment of the present invention, the pressure range of the open loop is 0.1-20 MPa, and the spiral tube steam generator is heated so that the maximum operating temperature of the open loop can reach 350°C.
[0022] Compared with the prior art, the power plant main steam pipeline steam leakage simulation test system and test method of the present invention adopts a spiral tube steam generator with a DC power supply and a pressure vessel in series as a steam source, which has the advantages of a large heating rate, stable pressure, stable steam flow, and greatly increased adjustability, thereby greatly improving the test efficiency; the power load can be accurately adjusted according to the steam parameter requirements, and the test bench operation cost can be greatly reduced, thereby achieving the purpose of the present invention.
[0023] The features of the present invention can be clearly understood by referring to the drawings and the following detailed description of the preferred embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of a steam leakage simulation test system for a main steam pipeline of a power plant according to the present invention. DETAILED DESCRIPTION
[0025] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below with reference to specific diagrams.
[0026] Example
[0027] like Figure 1 As shown, the power plant main steam pipeline steam leakage simulation test system of the present invention comprises an open loop, wherein the open loop comprises a deionized water tank 1, a plunger pump 2, a spiral tube steam generator 4, a venturi flowmeter, a pressure vessel 6 and a condenser 7 connected by a plurality of pipelines;
[0028] The outlet of the deionized water tank 1 is connected to the inlet of the plunger pump 2, the outlets of the deionized water tank 1 and the plunger pump 2 are connected to each other to form a first bypass, the deionized water tank 1 and the outlet of the spiral tube steam generator 4 are connected to each other to form a second bypass, the outlet of the pressure vessel 6 is divided into a main route and a branch route, the main route of the outlet of the pressure vessel 6 is connected to the condenser 7 and the deionized water tank 1 in sequence; the branch route of the outlet of the pressure vessel 6 is connected to the valve group and the main steam pipeline 9 in sequence through a venturi flowmeter; the spiral tube steam generator 4 uses a DC power supply to heat the deionized water flowing therethrough.
[0029] An electric regulating valve TF1 is provided on the first bypass pipeline between the deionized water tank 1 and the plunger pump 2, and an electric regulating valve TF2 is provided on the second bypass between the deionized water tank 1 and the plunger pump 2; an electric valve TF3 is provided on the main road on the outlet side of the spiral tube steam generator 4; an electric valve TF4 is provided between the outlet of the pressure vessel 6 and the condenser 7; an electric valve TF5 is provided at the rear end of the venturi flowmeter 8 on the branch road at the outlet of the pressure vessel 6; and a valve group TF6, a valve group TF7, a valve group TF8, a valve group TF9 and a valve group TF10 are provided in parallel at the rear end of the electric valve TF5.
[0030] The valve group TF6, the valve group TF7, the valve group TF8, the valve group TF9 and the valve group TF10 and the pipelines connected thereto correspond to the simulated leakage points at different positions of the main steam pipeline 9 respectively.
[0031] The spiral tube steam generator 4 is made of DN20 304 stainless steel pipe with a radius of 500mm and wound in 20 layers; the inlet and outlet of the spiral tube steam generator 4 are respectively connected to the positive and negative poles of the DC power supply; the spiral tube steam generator 4 is heated by loading DC power, and the heating power reaches 300KW.
[0032] A temperature measuring point T1 is provided between the deionized water tank 1 and the plunger pump 2, and a temperature measuring point T2 is provided on the pressure vessel 6. The temperature measuring point T1 and the temperature measuring point T2 adopt armored K-type thermocouples.
[0033] A pressure measuring point P1 is provided between the plunger pump 2 and the spiral tube steam generator 4, and a pressure measuring point P2 is provided on the pressure vessel 6. The pressure measuring point P1 and the pressure measuring point P2 use Yokogawa EJA530E pressure transmitters.
[0034] A flow measuring point is provided between the plunger pump 2 and the spiral tube steam generator 4, and a Venturi flowmeter 3 is used for the flow measuring point; a flow measuring point is provided between the spiral tube steam generator 4 and the pressure vessel 6, and a Venturi flowmeter 5 is used for the flow measuring point; a flow measuring point is provided between the pressure vessel 6 and the valve group, and a Venturi flowmeter 8 is used for the flow measuring point.
[0035] The deionized water tank 1 and the plunger pump 2 are connected by a stainless steel 304 pipe.
[0036] The testing method of the steam leakage simulation test system of the main steam pipeline of a power plant of the present invention comprises the following steps:
[0037] Before the experiment begins, open the electric regulating valve TF2 on the second bypass and close the other valves;
[0038] If the test is to be carried out, the plunger pump 2 is turned on, and the opening of the electric control valve TF2 is slowly adjusted to increase the overall pressure of the open circuit to 2MPa. The DC power supply is turned on, and the heating power of the spiral tube steam generator 4 is adjusted through the power regulator. The temperature measured by the temperature measuring point T2 at the outlet of the spiral tube steam generator 4 and the pressure of the pressure measuring point P1 at the plunger outlet are monitored; the pressure of the circuit is adjusted to 8.66MPa by continuously adjusting the opening of the electric control valve TF2 to make the pressure meet the working condition requirements; the power of the heater of the spiral tube steam generator 4 is gradually increased, and the temperature of the temperature measuring point T2 at the outlet of the spiral tube steam generator reaches 300.6℃ and the system pressure of the pressure measuring point P1, until the outlet of the spiral tube steam generator reaches the state of superheated steam, and then the electric control valve TF2 on the second bypass is gradually closed, and the electric control valve TF2 is gradually opened at the same time. Valve TF3, superheated steam enters the pressure vessel 6 through the electric regulating valve TF3; monitor the temperature measuring point T3 and the pressure measuring point P2, when the pressure in the pressure vessel reaches 1MPa, gradually open the electric valve TF4, and when the temperature and pressure in the pressure vessel rise to 300.6℃ and 8.66MPa, adjust the opening of the electric valve TF4 to keep the temperature and pressure in the pressure vessel stable; then open one of the valve groups TF6, TF7, TF8, TF9 and TF10 according to the working conditions, then slowly open the electric valve TF5, monitor the Venturi flowmeter 8 between the pressure vessel 6 and the valve group, and continuously adjust the opening of the electric valve TF5 to make the flow rate reach the working condition requirement of 20kg / h, realize the steam injection working condition, and test the performance of the steam leakage detection device.
[0039] The pressure range of the open loop is 0.1-20 MPa, and the spiral tube steam generator is heated so that the maximum operating temperature of the open loop can reach 350°C.
[0040] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected, and the scope of the present invention to be protected is defined by the attached claims and their equivalents.
Claims
1. A steam leakage simulation test system for the main steam pipeline of a power plant, characterized in that: It includes an open circuit, wherein the open circuit includes a deionized water tank, a plunger pump, a spiral tube steam generator, a venturi flowmeter, a pressure vessel and a condenser connected by a plurality of pipelines; The outlet of the deionized water tank is connected to the inlet of the plunger pump, the deionized water tank and the outlet of the plunger pump are connected to each other to form a first bypass, the deionized water tank and the outlet of the spiral tube steam generator are connected to each other to form a second bypass, the outlet of the pressure vessel is divided into a main route and a branch route, the main route of the outlet of the pressure vessel is connected to a condenser and a deionized water tank in sequence; the branch route of the outlet of the pressure vessel is connected to a valve group and a main steam pipeline in sequence through a venturi flowmeter; the spiral tube steam generator uses a DC power supply to heat the deionized water flowing through it.
2. The power plant main steam pipeline steam leakage simulation test system according to claim 1, characterized in that: An electric regulating valve TF1 is provided on the first bypass pipeline between the deionized water tank and the plunger pump, and an electric regulating valve TF2 is provided on the second bypass pipeline between the deionized water tank and the plunger pump; an electric valve TF3 is provided on the main road on the outlet side of the spiral tube steam generator; an electric valve TF4 is provided between the outlet of the pressure vessel and the condenser; an electric valve TF5 is provided at the rear end of the Venturi flowmeter on the branch road of the outlet of the pressure vessel; and a valve group TF6, a valve group TF7, a valve group TF8, a valve group TF9 and a valve group TF10 are provided in parallel at the rear end of the electric valve TF5.
3. The steam leakage simulation test system for the main steam pipeline of a power plant according to claim 1, characterized in that: The valve group TF6, valve group TF7, valve group TF8, valve group TF9 and valve group TF10 and the pipelines connected thereto correspond to simulated leakage points at different positions of the main steam pipeline respectively.
4. The power plant main steam pipeline steam leakage simulation test system according to claim 1, characterized in that: The spiral tube steam generator adopts DN20 304 stainless steel tube and is wound in 20 layers with a radius of 500 mm.
5. The power plant main steam pipeline steam leakage simulation test system according to claim 1, characterized in that: The inlet and outlet of the spiral tube steam generator are respectively connected to the positive electrode and the negative electrode of the DC power supply.
6. The power plant main steam pipeline steam leakage simulation test system according to claim 1, characterized in that: The spiral tube steam generator is heated by loading direct current, and the heating power reaches 300KW.
7. The power plant main steam pipeline steam leakage simulation test system according to claim 1, characterized in that: A temperature measuring point is arranged between the deionized water tank and the plunger pump, and a temperature measuring point is arranged on the pressure vessel. The temperature measuring point adopts an armored K-type thermocouple.
8. The power plant main steam pipeline steam leakage simulation test system according to claim 1, characterized in that: A pressure measuring point is provided between the plunger pump and the spiral tube steam generator, and a pressure measuring point is provided on the pressure vessel. The pressure measuring point adopts a Yokogawa EJA530E pressure transmitter.
9. The power plant main steam pipeline steam leakage simulation test system according to claim 1, characterized in that: A flow measuring point is provided between the plunger pump and the spiral tube steam generator, a flow measuring point is provided between the spiral tube steam generator and the pressure vessel, and a flow measuring point is provided between the pressure vessel and the valve group. The flow measuring points use Venturi flowmeters.
10. The power plant main steam pipeline steam leakage simulation test system according to claim 1, characterized in that: The deionized water tank and the plunger pump are connected by a stainless steel 304 pipe.
11. A testing method for a steam leakage simulation test system for a main steam pipeline of a power plant as claimed in claim 1, characterized in that: The steps include: Before the experiment begins, open the electric regulating valve TF2 on the second bypass and close the other valves; If the test is to be carried out, start the plunger pump, slowly adjust the opening of the electric control valve TF2 to increase the pressure of the open circuit as a whole, turn on the DC power supply, adjust the heating power of the spiral tube steam generator through the power regulator, monitor the temperature measured by the temperature measuring point T2 at the outlet of the spiral tube steam generator and the pressure of the pressure measuring point P1 at the plunger outlet; adjust the pressure of the loop by continuously adjusting the opening of the electric control valve TF2 to make the pressure meet the working condition requirements; gradually increase the power of the heater of the spiral tube steam generator, monitor the temperature of the temperature measuring point T2 at the outlet of the spiral tube steam generator and the system pressure of the pressure measuring point P1 until the outlet of the spiral tube steam generator reaches the state of superheated steam, then gradually close the electric control valve TF2 on the second bypass, and at the same time The electric regulating valve TF3 is gradually opened, and the superheated steam enters the pressure vessel through the electric regulating valve TF3; the temperature measuring point T3 and the pressure measuring point P2 are monitored, and when the pressure in the pressure vessel reaches 1MPa, the electric valve TF4 is gradually opened, and when the temperature and pressure in the pressure vessel rise to the working condition requirements, the temperature and pressure in the pressure vessel are kept stable by adjusting the opening of the electric valve TF4; then, according to the working condition requirements, one of the valve groups TF6, TF7, TF8, TF9 and TF10 is opened, and then the electric valve TF5 is slowly opened, and the Venturi flowmeter between the pressure vessel and the valve group is monitored, and the opening of the electric valve TF5 is continuously adjusted to make the flow meet the working condition requirements.
12. The testing method of the steam leakage simulation test system of the main steam pipeline of a power plant according to claim 11, characterized in that: The pressure range of the open loop is 0.1-20 MPa, and the spiral tube steam generator is heated so that the maximum operating temperature of the open loop can reach 350°C.
Citation Information
Patent Citations
CAP1400 metal O-type sealing ring detection method and experiment platform
CN104409116A
Test device for verifying main steam pipeline leakage monitoring method
CN110957054A
Test loop and method for simulating steam generator with or without axial flow preheater
CN112798310A
Simulation test system for steam leakage of main steam pipeline of power plant
CN215004095U
Trouble detection of nuclear reactor and its device, and ouput control of nuclear reactor and its device
JP1993072378A