Battery replacement control method and system, electronic device and storage medium

Through the collaborative work of the sandwich lane and the two power swapping equipment, the movement and posture of the power swapping equipment are precisely controlled, which solves the problem of long power swapping time for electric vehicles and improves the power swapping efficiency.

CN115416539BActive Publication Date: 2024-10-18AULTON NEW ENERGY AUTOMOBILE TECHNOLOGY CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211017644.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-23
Publication Date
2024-10-18
Estimated Expiration
2040-01-23

AI Technical Summary

Technical Problem

Existing electric vehicles take a long time to swap batteries and have low efficiency, mainly because the battery swapping equipment requires a long process of disassembling and installing battery packs.

Method used

Through the collaborative work of the sandwich lane and the two battery swapping equipment, the liftable vehicle loading plane and battery swapping position are used to accurately control the movement and posture of the battery swapping equipment, enabling rapid removal and installation of battery packs and optimizing the battery swapping process.

Benefits of technology

It significantly saves battery swapping time, improves battery swapping efficiency, and realizes rapid battery swapping for electric vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115416539B_ABST
    Figure CN115416539B_ABST
Patent Text Reader

Abstract

The present invention discloses a battery exchange control method and system, an electronic device and a storage medium, which are realized by the cooperation of a sandwich lane, a first battery exchange device and a second battery exchange device. A battery exchange device walking plane for the first and second battery exchange devices to walk is provided on the sandwich lane, and a battery exchange position is provided in the battery exchange device walking plane. The battery exchange control method includes: controlling the vehicle-carrying plane to rise to a first height; controlling the first battery exchange device to reach the battery exchange position to disassemble the battery pack; controlling the first battery exchange device to leave the battery exchange position; controlling the second battery exchange device to reach the battery exchange position to install the battery pack; controlling the second battery exchange device to leave the battery exchange position; and controlling the vehicle-carrying plane to descend to the initial position. The present invention realizes the overall process of removing and installing the battery pack by controlling the sandwich lane, the first battery exchange device and the second battery exchange device, which saves the battery exchange time of the vehicle and improves the battery exchange efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of the invention patent with application date of January 23, 2020, application number 202010076929.8, and name “Battery replacement control method and system, electronic device and storage medium”. Technical Field

[0002] The present invention relates to the field of battery replacement control, and in particular to a battery replacement control method and system, electronic equipment and storage medium. Background Art

[0003] There are two main charging methods for existing electric vehicles, one is direct charging and the other is quick replacement. Among them, direct charging requires the installation of charging piles to charge electric vehicles, but the charging time is long and the efficiency is low. The battery replacement method requires the installation of a battery replacement station to achieve quick battery replacement by replacing the battery pack of the electric vehicle, which shortens the time compared to direct charging, but the battery replacement process includes the removal and installation of the battery pack, and there is still a problem of long battery pack replacement time and low battery replacement efficiency.

[0004] In the prior art, one battery swapping device completes the process of removing and installing batteries: the battery swapping device removes the low-power battery pack from the bottom of the electric vehicle, then transports the battery pack to the battery rack, then takes out the fully charged battery pack from the battery rack, and finally returns to the vehicle to install the battery pack. The whole process is time-consuming. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the defects of long battery replacement time and low efficiency in the prior art of electric vehicles, and to provide a battery replacement control method and system, electronic equipment and storage medium.

[0006] The present invention solves the above technical problems through the following technical solutions:

[0007] The present invention provides a battery swap control method, which is implemented by the cooperation of a sandwich lane, a first battery swap device, and a second battery swap device. A battery swap device walking plane for the first battery swap device and the second battery swap device to walk on is provided on the sandwich lane, and a battery swap position is provided in the battery swap device walking plane.

[0008] The battery replacement control method comprises:

[0009] In the process of the first battery swapping device driving toward the battery swapping position, determining whether the first battery swapping device has reached a preset first positioning point, the first positioning point being located on the travel path of the first battery swapping device, and if so, controlling the first battery swapping device to decelerate and move until it reaches the battery swapping position, and then stop;

[0010] and / or,

[0011] During the process of the second battery exchange device driving towards the battery exchange position, it is determined whether the second battery exchange device has reached a preset second positioning point, and the second positioning point is located on the travel path of the second battery exchange device. If so, the second battery exchange device is controlled to slow down and move until it reaches the battery exchange position, and then stops.

[0012] Preferably, the clamping lane has a liftable vehicle loading surface, and the battery replacement control method further includes:

[0013] Controlling the vehicle-carrying plane to reach a first height;

[0014] Controlling the first battery swapping device to reach the battery swapping position to remove the battery pack;

[0015] Controlling the first battery swapping device to drive away from the battery swapping position;

[0016] Controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack;

[0017] Controlling the second battery swapping device to drive away from the battery swapping position;

[0018] Control the vehicle-carrying plane to return to an initial height.

[0019] Preferably, a battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down;

[0020] The first height is higher than the initial height;

[0021] Controlling the vehicle loading plane to reach a first height includes: after the electric vehicle is parked on the vehicle loading plane and the battery pack under the electric vehicle is aligned with the battery swapping station, lifting the vehicle loading plane to the first height so that the height difference between the vehicle loading plane and the walking plane of the battery swapping equipment exceeds the height of the first battery swapping equipment.

[0022] Preferably, the battery replacement control method further includes:

[0023] Before the first battery exchange device leaves the battery exchange position or before the electric vehicle parks on the vehicle loading platform, control the second battery exchange device to remove the battery pack adapted to the electric vehicle from the battery rack, and then wait for the first battery exchange device to leave the battery exchange position;

[0024] And / or, after controlling the first battery exchange device to drive away from the battery exchange position, controlling the first battery exchange device to drive toward the battery rack and returning the battery pack removed from the electric vehicle to the battery rack.

[0025] Preferably, a first track for the first battery swapping device to walk alone and a second track for the second battery swapping device to walk alone are arranged in the walking plane of the battery swapping device, and the first track and the second track are connected to the battery rack and the battery swapping position through different paths respectively;

[0026] The battery replacement control method further includes:

[0027] Pre-storing a total distance of the first track and a first distance from the battery rack to the first positioning point;

[0028] Control the first battery swapping device to travel the first distance at a first speed, control the first battery swapping device to travel the third distance at a second speed, determine whether the first battery swapping device has reached the battery swapping position, and if so, stop moving; otherwise, control the first battery swapping device to travel the third distance at the second speed again and determine whether the first battery swapping device has reached the battery swapping position, and repeat the cycle until the first battery swapping device reaches the battery swapping position, the first speed is greater than the second speed, and the third distance is less than the difference between the total distance of the first track and the first distance;

[0029] and / or, pre-storing the total distance of the second track and the second distance from the battery rack to the second positioning point;

[0030] Control the second battery exchange device to travel the second distance at a third speed, control the second battery exchange device to travel the fourth distance at a fourth speed, determine whether the second battery exchange device has reached the battery exchange position, and if so, stop moving; otherwise, control the second battery exchange device to travel the fourth distance at the fourth speed again and determine whether the second battery exchange device has reached the battery exchange position, and repeat the cycle until the second battery exchange device reaches the battery exchange position, the third speed is greater than the fourth speed, and the fourth distance is less than the difference between the total distance of the second track and the second distance.

[0031] Preferably, controlling the first battery swapping device to reach the battery swapping position to remove the battery pack includes:

[0032] Controlling the first battery swapping device to arrive at the battery swapping position without a battery pack;

[0033] Adjust the posture of the first battery exchange device to remove the battery pack from the electric vehicle.

[0034] Preferably, before controlling the first battery swapping device to leave the battery swapping position, the method further includes:

[0035] After the first battery exchange device removes the battery pack from the electric vehicle, the vehicle loading plane is controlled to reach a second height, so that the height difference between the vehicle loading plane and the walking plane of the battery exchange device exceeds the height of the first battery exchange device after the battery pack is loaded, and the second height is higher than the initial height;

[0036] The first height is less than or equal to the second height.

[0037] Preferably, after controlling the first battery swapping device to leave the battery swapping position and before controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack, the method further includes:

[0038] When the height of the second battery exchange device after loading the battery pack is equal to the height of the first battery exchange device after loading the battery pack, controlling the vehicle loading plane to remain at the second height;

[0039] Or, when the height of the second battery exchange device after loading the battery pack is not equal to the height of the first battery exchange device after loading the battery pack, the vehicle loading plane is controlled to reach a third height so that the height difference between the vehicle loading plane and the walking plane of the battery exchange device exceeds the height of the second battery exchange device after loading the battery pack, and the third height is higher than the initial height.

[0040] Preferably, controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack includes:

[0041] Controlling the second battery exchange device to arrive at the battery exchange position in a state of loading a battery pack;

[0042] Adjust the posture of the second battery exchange device to install the battery pack loaded by the second battery exchange device on the electric vehicle.

[0043] Preferably, after controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack, and before controlling the second battery swapping device to leave the battery swapping position, it also includes:

[0044] Controlling the vehicle-carrying plane to reach a fourth height so that the height difference between the vehicle-carrying plane and the walking plane of the battery-swapping device exceeds the height of the second battery-swapping device, and the fourth height is higher than the initial height;

[0045] The third height is greater than or equal to the fourth height.

[0046] Preferably, adjusting the posture of the first battery exchange device to remove the battery pack from the electric vehicle includes:

[0047] Adjust the relative position relationship between the battery swapping platform of the first battery swapping device and the vehicle-carrying plane in the horizontal and / or vertical direction to meet the battery removal conditions;

[0048] Control the first battery exchange device to perform a battery removal action, wherein the battery removal action is used to remove the battery pack from the electric vehicle.

[0049] Preferably, a battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down;

[0050] Adjusting the relative positional relationship between the battery swapping platform of the first battery swapping device and the vehicle-carrying plane in the vertical direction to meet the battery removal conditions includes:

[0051] Controlling the battery swap platform to reach a fifth height;

[0052] Controlling the vehicle-carrying plane to a sixth height so that the battery-swapping platform passes through the battery-swapping station and the distance between the platform and the bottom of the electric vehicle is a negative distance, thus satisfying the battery removal height condition;

[0053] And / or, adjusting the relative positional relationship between the battery swapping platform of the first battery swapping device and the vehicle-carrying plane in the horizontal direction to meet the battery removal conditions, including:

[0054] Controlling the battery swap platform to move horizontally so that the battery swap platform is aligned with the battery pack on the electric vehicle to meet the battery removal alignment conditions;

[0055] The sixth height is lower than the initial height.

[0056] Preferably, adjusting the posture of the second battery exchange device so as to install the battery pack loaded by the second battery exchange device on the electric vehicle comprises:

[0057] Adjust the relative position relationship between the battery swapping platform of the second battery swapping device and the vehicle loading plane in the horizontal and / or vertical direction to meet the battery installation conditions;

[0058] Control the second battery exchange device to perform a battery installation action, wherein the battery installation action is used to install the loaded battery pack in the electric vehicle.

[0059] Preferably, a battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down;

[0060] Adjusting the relative position relationship between the battery swapping platform of the second battery swapping device and the vehicle loading plane in the vertical direction to meet the battery installation conditions includes:

[0061] Controlling the battery swap platform to reach a seventh height;

[0062] Controlling the vehicle loading plane to reach an eighth height so that the battery swapping platform passes through the battery swapping station and the distance between the battery swapping platform and the bottom of the electric vehicle is a negative distance, satisfying the battery loading height condition;

[0063] And / or, adjusting the relative positional relationship between the battery swapping platform of the second battery swapping device and the vehicle loading plane in the horizontal direction to meet the battery installation conditions, including:

[0064] Controlling the horizontal movement of the battery swap platform so that the battery swap platform is aligned with the battery pack outer box on the electric vehicle to meet the battery installation alignment conditions;

[0065] The eighth height is lower than the initial height.

[0066] Preferably, the battery replacement control method further includes:

[0067] After the first battery swapping device has completed disassembling the battery pack and before leaving the battery swapping position, restoring the battery swapping platform to its initial position without the battery pack;

[0068] And / or, after the second battery exchange device completes installation of the battery pack and before leaving the battery exchange position, restore the battery exchange platform to its initial position without the battery pack.

[0069] Preferably, the battery replacement control method further includes:

[0070] Each time the battery is exchanged, the control steps for the first battery exchange device and the second battery exchange device are exchanged.

[0071] Preferably, the time difference between the time when the second battery exchange device arrives at the battery exchange position and the time when the first battery exchange device leaves the battery exchange position does not exceed a preset duration.

[0072] The present invention also provides a battery exchange control system, which controls a sandwich lane, a first battery exchange device, and a second battery exchange device. The sandwich lane is provided with a battery exchange device walking plane for the first battery exchange device and the second battery exchange device to walk on, and a battery exchange position is provided in the battery exchange device walking plane;

[0073] The battery replacement control system comprises:

[0074] A battery control module is used to determine whether the first battery swapping device has reached a preset first positioning point during the process of the first battery swapping device driving toward the battery swapping position, and the first positioning point is located on the travel path of the first battery swapping device. If so, the first battery swapping device is controlled to slow down and move until it reaches the battery swapping position, and then stops;

[0075] And / or, a battery control module is installed to determine whether the second battery exchange device has reached a preset second positioning point during the process of the second battery exchange device moving towards the battery exchange position, and the second positioning point is located on the travel path of the second battery exchange device. If so, the second battery exchange device is controlled to slow down and move until it reaches the battery exchange position, and then stop.

[0076] Preferably, the clamping track has a liftable vehicle loading surface, and the battery exchange control system further includes:

[0077] A lane clamping control module, used for controlling the vehicle loading plane to reach a first height;

[0078] The battery removal control module is also used to control the first battery replacement device to arrive at the battery replacement position to remove the battery pack, and to control the first battery replacement device to leave the battery replacement position;

[0079] The battery installation control module is also used to control the second battery replacement device to arrive at the battery replacement position to install the battery pack, and control the second battery replacement device to leave the battery replacement position;

[0080] The lane clamping control module is also used to control the vehicle loading plane to return to an initial height.

[0081] Preferably, a battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down;

[0082] The first height is higher than the initial height;

[0083] The lane control module is specifically used to lift the vehicle loading plane to the first height after the electric vehicle is parked on the vehicle loading plane and the battery pack under the electric vehicle is aligned with the battery exchange station, so that the height difference between the vehicle loading plane and the walking plane of the battery exchange equipment exceeds the height of the first battery exchange equipment.

[0084] Preferably, the battery loading control module is also used to control the second battery swapping device to remove the battery pack compatible with the electric vehicle from the battery rack before the first battery swapping device leaves the battery swapping position or before the electric vehicle parks on the vehicle loading platform, and then wait for the first battery swapping device to leave the battery swapping position;

[0085] And / or, the battery removal control module is also used to control the first battery exchange device to drive towards the battery rack and return the battery pack removed from the electric vehicle to the battery rack after controlling the first battery exchange device to drive away from the battery exchange position.

[0086] Preferably, a first track for the first battery swapping device to walk alone and a second track for the second battery swapping device to walk alone are arranged in the walking plane of the battery swapping device, and the first track and the second track are connected to the battery rack and the battery swapping position through different paths respectively;

[0087] The battery removal control module is specifically used to pre-store the total distance of the first track and the first distance from the battery rack to the first positioning point, control the first battery swapping device to walk the first distance at a first speed, control the first battery swapping device to walk the third distance at a second speed, and judge whether the first battery swapping device has reached the battery swapping position. If so, stop walking; otherwise, control the first battery swapping device to walk the third distance at the second speed again and judge whether the first battery swapping device has reached the battery swapping position, and repeat the cycle until the first battery swapping device reaches the battery swapping position, the first speed is greater than the second speed, and the third distance is less than the difference between the total distance of the first track and the first distance;

[0088] And / or, the battery loading control module is specifically used to pre-store the total distance of the second track and the second distance from the battery rack to the second positioning point, control the second battery exchange device to travel the second distance at a third speed, control the second battery exchange device to travel the fourth distance at a fourth speed, and determine whether the second battery exchange device has reached the battery exchange position. If so, stop moving; otherwise, control the second battery exchange device to travel the fourth distance at the fourth speed again and determine whether the second battery exchange device has reached the battery exchange position, and repeat the cycle until the second battery exchange device reaches the battery exchange position, the third speed is greater than the fourth speed, and the fourth distance is less than the difference between the total distance of the second track and the second distance.

[0089] Preferably, the battery removal control module comprises:

[0090] A first battery removal control unit is used to control the first battery replacement device to reach the battery replacement position without a battery pack;

[0091] The second control unit for removing the battery is used to adjust the posture of the first battery replacement device to remove the battery pack from the electric vehicle.

[0092] Preferably, after the first battery exchange device removes the battery pack from the electric vehicle, the lane control module is further used to control the vehicle loading plane to reach a second height, so that the height difference between the vehicle loading plane and the walking plane of the battery exchange device exceeds the height of the first battery exchange device after loading the battery pack, and the second height is higher than the initial height;

[0093] The first height is less than or equal to the second height.

[0094] Preferably, the lane clamping control module is further used for:

[0095] When the height of the second battery exchange device after loading the battery pack is equal to the height of the first battery exchange device after loading the battery pack, controlling the vehicle loading plane to remain at the second height;

[0096] Or, when the height of the second battery exchange device after loading the battery pack is not equal to the height of the first battery exchange device after loading the battery pack, the vehicle loading plane is controlled to reach a third height so that the height difference between the vehicle loading plane and the walking plane of the battery exchange device exceeds the height of the second battery exchange device after loading the battery pack, and the third height is higher than the initial height.

[0097] Preferably, the battery control module comprises:

[0098] A first battery loading control unit, used to control the second battery swapping device to arrive at the battery swapping position in a state of loading a battery pack;

[0099] The second battery control unit is used to adjust the posture of the second battery exchange device so as to install the battery pack loaded by the second battery exchange device on the electric vehicle.

[0100] Preferably, after controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack, and before controlling the second battery swapping device to leave the battery swapping position, the lane control module is further used to control the vehicle loading plane to reach a fourth height, so that the height difference between the vehicle loading plane and the walking plane of the battery swapping device exceeds the height of the second battery swapping device, and the fourth height is higher than the initial height;

[0101] The third height is greater than or equal to the fourth height.

[0102] Preferably, the second battery removal control unit comprises:

[0103] The second battery removal adjustment subunit is used to adjust the relative position relationship between the battery replacement platform of the first battery replacement equipment and the vehicle-carrying plane in the horizontal and / or vertical direction to meet the battery removal conditions;

[0104] The second battery removal execution subunit is used to control the first battery replacement device to perform a battery removal action, and the battery removal action is used to remove the battery pack from the electric vehicle.

[0105] Preferably, a battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down;

[0106] The second battery removal adjustment subunit is specifically used to control the battery swap platform to reach the fifth height and control the vehicle loading plane to reach the sixth height, so that the battery swap platform passes through the battery swap station and the distance between the battery swap platform and the bottom of the electric vehicle is a negative distance, satisfying the battery removal height condition;

[0107] And / or, the second battery removal adjustment subunit is specifically used to control the horizontal movement of the battery swap platform so that the battery swap platform is aligned with the battery pack on the electric vehicle to meet the battery removal alignment conditions;

[0108] The sixth height is lower than the initial height.

[0109] Preferably, the second battery control unit comprises:

[0110] A second battery installation adjustment subunit, used to adjust the relative position relationship between the battery replacement platform of the second battery replacement equipment and the vehicle-carrying plane in the horizontal and / or vertical direction to meet the battery installation conditions;

[0111] The second battery installation execution subunit is used to control the second battery replacement equipment to execute the battery installation action, and the battery installation action is used to install the loaded battery pack in the electric vehicle.

[0112] Preferably, a battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down;

[0113] The second battery installation adjustment subunit is specifically used to control the battery replacement platform to reach the seventh height and control the vehicle loading plane to reach the eighth height, so that the battery replacement platform passes through the battery replacement station and the distance between the battery replacement platform and the bottom of the electric vehicle is a negative distance, meeting the battery installation height condition;

[0114] And / or, the second battery installation adjustment subunit is specifically used to control the horizontal movement of the battery swap platform so that the battery swap platform is aligned with the battery pack outer box on the electric vehicle to meet the battery installation alignment conditions;

[0115] The eighth height is lower than the initial height.

[0116] Preferably, the battery removal control module is further used to restore the battery swap platform to an initial position without a battery pack after the first battery swap device completes the removal of the battery pack and before leaving the battery swap position;

[0117] And / or, the battery installation control module is also used to restore the battery exchange platform to its initial position without a battery pack after the second battery exchange device completes the installation of the battery pack and before leaving the battery exchange position.

[0118] Preferably, each time the battery is replaced, the battery removal control module and the battery installation control module exchange control over the first battery replacement device and the second battery replacement device.

[0119] Preferably, the time difference between the time when the second battery exchange device arrives at the battery exchange position and the time when the first battery exchange device leaves the battery exchange position does not exceed a preset duration.

[0120] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method described above when executing the program.

[0121] The present invention also provides a computer-readable storage medium having a computer program stored thereon, and when the program is executed by a processor, the steps of the method described above are implemented.

[0122] The positive progressive effect of the present invention is that the present invention realizes the overall process of removing and installing the battery pack by controlling the sandwich lane, the first battery exchange device and the second battery exchange device, thereby saving the vehicle's battery exchange time and improving the battery exchange efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0123] Figure 1 This is a top view schematic diagram of the layout of the lane, the first battery exchange device and the second battery exchange device.

[0124] Figure 2 This is a flow chart of a battery replacement control method according to embodiment 1 of the present invention.

[0125] Figure 3 It is a side view of the vehicle loading plane reaching an initial height according to Embodiment 1 of the present invention.

[0126] Figure 4 It is a side view of the vehicle loading plane reaching a first height according to Embodiment 1 of the present invention.

[0127] Figure 5 This is a flowchart of step S2 in the battery replacement control method according to embodiment 1 of the present invention.

[0128] Figure 6 Schematic diagram of the process of the first battery exchange device and the second battery exchange device arriving at the battery exchange position in Example 1 of the present invention.

[0129] Figure 7 It is a side view of the first battery exchange device after reaching the battery exchange position according to Example 1 of the present invention.

[0130] Figure 8 This is a side view of the battery exchange platform after reaching the fifth height in Example 1 of the present invention.

[0131] Fig. 9It is a side view after the vehicle loading plane reaches the sixth height according to Embodiment 1 of the present invention.

[0132] Fig.10 This is a side view of the battery exchange platform returning to its initial position after carrying the battery pack in Example 1 of the present invention, with the vehicle-carrying plane lifted to a second height.

[0133] Fig.11 This is a flowchart of step S4 in the battery replacement control method according to embodiment 1 of the present invention.

[0134] Fig.12 It is a side view of the second battery exchange device after reaching the battery exchange position according to Example 1 of the present invention.

[0135] Fig.13 This is a side view of the battery exchange platform after reaching the seventh height in Example 1 of the present invention.

[0136] Fig.14 It is a side view after the vehicle loading plane reaches the eighth height according to Embodiment 1 of the present invention.

[0137] Fig.15 This is a side view of the battery swap platform returning to its initial position after the battery pack is installed in Example 1 of the present invention, with the vehicle carrier plane lifted to the fourth height.

[0138] Fig.16 Schematic diagram of the modules of the battery replacement control system according to the second embodiment of the present invention.

[0139] Fig.17 Schematic diagram of the structure of an electronic device according to Embodiment 3 of the present invention. DETAILED DESCRIPTION

[0140] The present invention is further described below by way of examples, but the present invention is not limited to the scope of the examples.

[0141] Before describing the various embodiments of the present invention in detail, a brief description of the lane clamping and the battery replacement equipment is given first. Figure 1 As shown, the clamping lane 1 is a device used in removing and installing battery packs, usually used in battery swap stations. Its main function is to adjust the height of the vehicle for the bottom battery swapping method, thereby providing sufficient space at the bottom of the vehicle for battery swapping.

[0142] The lane 1 has a vehicle-carrying plane 11, which is used to carry the electric vehicle 9 and can be raised and lowered in height. The lifting and lowering can be achieved by a related lifting mechanism. Since the mechanical structure of the lifting mechanism is not the focus of the present invention, it will not be described in detail here. The vehicle-carrying plane 11 is not a continuous and complete plane, but a segmented one, that is, there are two sections of vehicle-carrying planes 11 on both sides that can carry wheels 91. The hollow area between the two sections of the vehicle-carrying planes 11 can be called a battery-changing station, which is used for replacing the battery pack of the electric vehicle. When the vehicle 9 is parked on the vehicle-carrying plane 11, the battery pack at the bottom of the vehicle 9 (located in the battery pack outer box shown in the figure) is aligned with the battery-changing station. In the following embodiment, the two sections of the vehicle-carrying plane 11 are synchronously controlled, that is, they rise or fall at the same time and the height is always the same.

[0143] The battery swapping device is a bottom battery swapping device used to remove and install the battery pack from the bottom of the vehicle, and has a liftable battery swapping platform, a lifting mechanism for controlling the lifting of the battery swapping platform, and other components. Two battery swapping devices are used in the present invention, namely, a first battery swapping device 21 and a second battery swapping device 22, one of which is used to remove the battery pack and the other is used to install the battery pack. A battery swapping device walking plane 12 for the first battery swapping device 21 and the second battery swapping device 22 to walk is provided on the clamping lane 1. A battery swapping position is provided in the battery swapping device walking plane 12. The battery swapping position corresponds to the battery swapping station up and down, that is, when the battery swapping device is located at the battery swapping position, the battery swapping device only needs to adjust the height of the battery swapping platform up and down, and cooperate with a small horizontal movement or no horizontal movement, so that the battery swapping platform can pass through the battery swapping station to reach the bottom of the vehicle, thereby completing the removal or installation of the battery pack. A first track for the first battery swapping device to walk and a second track for the second battery swapping device to walk can also be arranged in the battery swapping device walking plane 12. One end of the first track leads to the battery replacement position, and the other end can lead to the battery rack or other positions near the battery rack. One end of the second track also leads to the battery replacement position, and the other end can also lead to the same or different battery rack as the first track or other positions near the battery rack.

[0144] Figure 1 The arrows A1 and A2 in the figure represent a feasible walking route for the first battery exchange device 21, namely, entering the bottom of the vehicle from one end of the walking plane 12 of the battery exchange device, and then retreating out from the bottom of the vehicle from the same end. Figure 1 The arrows B1 and B2 in the figure represent a feasible walking route for the second battery exchange device 22, namely, entering the bottom of the vehicle from the other end of the battery exchange device walking plane 12, and then retreating out from the bottom of the vehicle from the same end.

[0145] It should be noted that the above content and drawings only schematically show a type of lane clamping and battery exchange equipment that can be applicable to the following embodiments, but it does not mean that the following embodiments can only be used for lane clamping and battery exchange equipment of the above structure or style. Lane clamping and battery exchange equipment with the same or similar functions and battery exchange principles are also applicable to the following embodiments.

[0146] Example 1

[0147] This embodiment provides a battery replacement control method. Figure 2 A flowchart of this embodiment is shown, referring to Figure 2 , the battery replacement control method of this embodiment includes:

[0148] S1: Control the vehicle-carrying plane to reach the first height;

[0149] S2: Control the first battery swapping device to reach the battery swapping position to remove the battery pack;

[0150] S3: Control the first battery swapping device to drive away from the battery swapping position;

[0151] S4: Control the second battery swapping device to arrive at the battery swapping position to install the battery pack;

[0152] S5: Control the second battery swapping device to drive away from the battery swapping position;

[0153] S6: Control the vehicle carrier plane to return to its initial position.

[0154] Among them, Figure 3 As shown, the initial height h0 is the height of the vehicle-carrying plane 11 when it is not raised or lowered. When the vehicle-carrying plane 11 is at the initial height h0, it can be in the same plane as the battery-swapping equipment walking plane 12 and the plane where the lane 1 is located. Before the electric vehicle enters the lane 1, the vehicle-carrying plane 11 is always at the initial height h0 to facilitate the entry of the vehicle.

[0155] like Figure 4 As shown, the first height h1 is higher than the initial height h0. Step S1 may specifically include, after the electric vehicle is parked on the vehicle-carrying plane and the battery pack (equivalent to the location of the battery pack outer box) under the electric vehicle is aligned with the battery-swapping station, the step of lifting the vehicle-carrying plane to the first height, so that the height difference between the vehicle-carrying plane and the walking plane of the battery-swapping equipment exceeds the height of the first battery-swapping equipment, thereby enabling the first battery-swapping equipment without a battery pack to smoothly reach the battery-swapping position below the vehicle-carrying plane, and perform the operation of removing the battery pack from the electric vehicle.

[0156] Figure 5 A flowchart of step S2 is shown, referring to Figure 5 , step S2 specifically includes:

[0157] S21, controlling the first battery swapping device to arrive at the battery swapping position without a battery pack;

[0158] S22. Adjust the posture of the first battery exchange device to remove the battery pack from the electric vehicle.

[0159] Specifically, in the process of controlling the first battery swapping device to drive to the battery swapping position in step S21, it may specifically include a step of determining whether the first battery swapping device has reached a preset first positioning point, such as Figure 6 As shown (the car is omitted in the figure), the first positioning point P1 is located on the travel path of the first battery exchange device 21 (i.e., the direction indicated by arrow A1). If it is determined that the first battery exchange device 21 reaches the preset first positioning point P1, the step of controlling the first battery exchange device 21 to slow down and move until it reaches the battery exchange position is executed, and then the step of controlling the first battery exchange device 21 to stop is executed.

[0160] In this embodiment, the total distance L01 of the first track (if the first track starts from the battery rack, the total distance of the first track is the total distance from the battery rack to the battery replacement position) and the first distance L1 from the battery rack to the first positioning point P1 can be pre-stored. The above steps may specifically include:

[0161] Control the first battery exchange device 21 to travel the first distance L1 at the first speed v1 (reaching Figure 6 P1 in the figure), control the first battery exchange device 21 to travel a third distance L3 at a second speed v2 (such as reaching Figure 6 P1' in the figure, determine whether the first battery exchange device 21 has reached the battery exchange position, if so, stop moving, otherwise control the first battery exchange device 21 to move the third distance L3 at the second speed v2 again (if reaching Figure 6 P1” in the figure) and determine whether the first battery exchange device 21 has reached the battery exchange position, and the cycle is repeated until the first battery exchange device 21 reaches the battery exchange position.

[0162] Among them, the first speed v1 is greater than the second speed v2. In this embodiment, the first battery exchange device first drives to the first positioning point at a higher speed, and then drives to the battery exchange position at a lower speed. That is, the first battery exchange device first drives to the first positioning point adjacent to the battery exchange position, and then continuously adjusts and judges the position of the first battery exchange device at a slightly smaller third distance, so that the first battery exchange device can be accurately positioned at the battery exchange position.

[0163] Furthermore, considering the high-speed travel of the first battery-swapping device, when it is determined that the first battery-swapping device has reached the first positioning point, there is a situation where the actual distance traveled by the first battery-swapping device is greater than the first distance. Therefore, the third distance traveled by the first battery-swapping device at the second speed may be less than the difference between the total distance of the first track and the first distance. Even if an error occurs during the process of walking the first distance, the error previously generated can be compensated by walking the third distance multiple times to ensure that the first battery-swapping device accurately reaches the battery-swapping position.

[0164] Furthermore, in this embodiment, a visual method can be used to determine whether the first battery swapping device is precisely positioned at the battery swapping position. For example, the first battery swapping device can be equipped with a visual camera to capture a first actual image of the electric vehicle at the battery swapping station during the movement of the first battery swapping device. Based on the comparison result between the first actual image and the first standard image corresponding to the first battery swapping device at the battery swapping position, it can be determined whether the first battery swapping device is precisely positioned at the battery swapping position. Figure 7 A schematic diagram is shown after the first battery exchange device 21 reaches the battery exchange position.

[0165] Specifically, step S22 may include the step of adjusting the relative position relationship between the battery swap platform and the vehicle-carrying plane of the first battery swap device in the vertical direction to meet the battery removal conditions, and specifically, may include the step of controlling the battery swap platform to reach the fifth height ( Figure 8 Schematic diagram showing the battery exchange platform 221 reaching the fifth height), and the step of controlling the vehicle-carrying plane to reach the sixth height ( Fig. 9 The figure shows a schematic diagram after the vehicle-carrying plane 11 reaches the sixth height h6), so that the distance between the battery swap platform and the bottom of the electric vehicle is a negative distance, satisfying the battery removal height condition. The battery removal height condition needs to be determined according to the operation process of the first battery swap device when removing the battery, and usually needs to satisfy the requirements that the battery removal structure on the battery swap platform (such as the battery unlocking mechanism that unlocks the battery pack from the battery pack outer box) is sufficient to contact the battery pack outer box at the bottom of the vehicle in the height direction. The fifth height and the sixth height can cooperate with each other to reduce the distance between the bottom of the vehicle and the battery swap platform. The fifth height is higher than the initial height of the battery swap platform, and the sixth height is lower than the first height, and can even be lower than the initial height.

[0166] Step S22 may also specifically include the step of adjusting the relative positional relationship between the battery swap platform of the first battery swap device and the vehicle-carrying plane in the horizontal direction to meet the battery removal condition. Specifically, it may include the step of controlling the horizontal movement of the battery swap platform so that the battery swap platform is aligned with the battery pack on the electric vehicle to meet the battery removal alignment condition. The battery removal alignment condition also needs to be determined according to the operation process of the first battery swap device when removing the battery. It is usually necessary to meet the requirements that the battery removal structure on the battery swap platform (such as the battery unlocking mechanism that unlocks the battery pack from the battery pack outer box) can be vertically aligned with the locking mechanism on the battery pack outer box.

[0167] Step S22 specifically also includes the step of controlling the first battery exchange device to perform a battery removal action, wherein the battery removal action is used to remove the battery pack from the electric vehicle. The battery removal action needs to be determined according to the operation process of the first battery exchange device when removing the battery, and may include translating the battery exchange platform so that the battery unlocking mechanism can unlock the battery pack.

[0168] In this embodiment, after controlling the first battery exchange device to remove the battery pack from the electric vehicle in step S2 and before controlling the first battery exchange device to leave the battery exchange position in step S3, the battery exchange control method of this embodiment may further include the step of restoring the battery exchange platform to its initial position without the battery pack.

[0169] In this embodiment, after controlling the first battery exchange device to remove the battery pack from the electric vehicle in step S2 and before controlling the first battery exchange device to drive away from the battery exchange position in step S3, the battery exchange control method of this embodiment may further include the step of controlling the vehicle loading plane to reach a second height, so that the height difference between the vehicle loading plane and the walking plane of the battery exchange device exceeds the height of the first battery exchange device after loading the battery pack. Fig.10 As shown, the battery exchange platform returns to its initial position after carrying the battery pack 03, and the vehicle-carrying plane 11 is lifted to the second height h2. The second height h2 is higher than the initial height h0. The first battery exchange device corresponding to the first height h1 does not carry a battery pack, but the electric vehicle carries a battery pack. The first battery exchange device corresponding to the second height h2 carries a battery pack, but the electric vehicle does not carry a battery pack. In addition, the chassis of the electric vehicle carrying the battery pack is lower than the chassis of the electric vehicle without the battery pack. Therefore, the first height h1 is less than or equal to the second height h2.

[0170] In this embodiment, in step S3, the first battery exchange device that is leaving can drive to the battery rack and return the battery pack removed from the electric vehicle to the battery rack. The return here can be that the first battery exchange device directly puts the battery pack into the battery rack, or the first battery exchange device indirectly, that is, through a transfer device (such as a palletizer), puts the battery pack into the battery rack.

[0171] At this point, the operation of disassembling the battery pack of the electric vehicle is completed, and the operation of installing the battery pack of the electric vehicle can be performed subsequently.

[0172] Before the first battery exchange device leaves the battery exchange position or before the electric vehicle is parked on the vehicle loading plane, the battery exchange control method of this embodiment may also include controlling the second battery exchange device to remove the battery pack compatible with the electric vehicle from the battery rack, so that the second battery exchange device is in a standby state, waiting for the first battery exchange device to leave the battery exchange position. Furthermore, in this embodiment, the time difference between the time when the second battery exchange device arrives at the battery exchange position and the time when the first battery exchange device leaves the battery exchange position does not exceed a preset time length, wherein the preset time length can be set to a smaller value according to the adaptability of the actual application, so as to shorten the connection time between the first battery exchange device and the second battery exchange device, thereby improving the battery exchange efficiency.

[0173] Specifically, after step S3 and before step S4 of this embodiment, the height of the vehicle carrying plane can be controlled according to whether the height of the second battery exchange device is the same as the height of the first battery exchange device. Specifically, when the height of the second battery exchange device after loading the battery pack is equal to the height of the first battery exchange device after loading the battery pack, the vehicle carrying plane can be controlled to maintain the second height; and when the height of the second battery exchange device after loading the battery pack is not equal to the height of the first battery exchange device after loading the battery pack, the vehicle carrying plane can be controlled to adjust to the third height, so that the height difference between the vehicle carrying plane and the walking plane of the battery exchange device exceeds the height of the second battery exchange device after loading the battery pack.

[0174] Fig.11 The flowchart of step S4 is shown in FIG. Fig.11 , step S4 specifically includes:

[0175] S41, controlling the second battery swapping device to arrive at the battery swapping position in a state of loading the battery pack;

[0176] S42. Adjust the posture of the second battery exchange device to install the battery pack loaded by the second battery exchange device on the electric vehicle.

[0177] Specifically, in the process of controlling the second battery exchange device to drive to the battery exchange position in step S41, it may specifically include the step of determining whether the second battery exchange device has reached the preset second positioning point, such as Figure 6 As shown, the second positioning point P2 is located on the travel path of the second battery exchange device 22 (i.e., the direction indicated by the arrow B1). If it is determined that the second battery exchange device 22 has reached the preset second positioning point P2, the step of controlling the second battery exchange device 22 to slow down and move until it reaches the battery exchange position is executed, and then the step of controlling the second battery exchange device 22 to stop is executed.

[0178] In this embodiment, the total distance L02 of the second track (if the second track starts from the battery rack, the total distance of the second track is the total distance from the battery rack to the battery replacement position) and the second distance L2 from the battery rack to the second positioning point P2 can be pre-stored. The above steps may specifically include:

[0179] Control the second battery exchange device 22 to travel the second distance L2 (reaching Figure 6 P2 in the figure), control the second battery exchange device 22 to travel the fourth distance L4 at the fourth speed v4 (such as reaching Figure 6 P2' in the figure, determine whether the second battery exchange device 22 has reached the battery exchange position, if so, stop moving, otherwise control the second battery exchange device 22 to move the fourth distance L4 at the fourth speed v4 again (if reaching Figure 6 P2” in the figure) and determine whether the second battery exchange device 22 has reached the battery exchange position, and the cycle is repeated until the second battery exchange device reaches the battery exchange position.

[0180] Among them, the third speed v3 is greater than the fourth speed v4. In this embodiment, the second battery exchange device first drives to the second positioning point at a higher speed, and then drives to the battery exchange position at a lower speed. That is, the second battery exchange device first drives to the second positioning point adjacent to the battery exchange position, and then continuously adjusts and judges the position of the second battery exchange device at a slightly smaller fourth distance, so that the second battery exchange device can be accurately positioned at the battery exchange position.

[0181] Furthermore, considering the high-speed travel of the second battery exchange device, when it is determined that the second battery exchange device has reached the second positioning point, there is a situation where the actual distance traveled by the second battery exchange device is greater than the second distance. Therefore, the fourth distance traveled by the second battery exchange device at the fourth speed is less than the difference between the total distance of the second track and the second distance. Even if an error occurs during the process of walking the second distance, the error previously generated can be compensated by walking the fourth distance multiple times to ensure that the second battery exchange device accurately reaches the battery exchange position.

[0182] Furthermore, in this embodiment, a visual method can be used to determine whether the second battery swapping device is precisely positioned at the battery swapping position. For example, the second battery swapping device can be equipped with a visual camera to capture a second actual image of the electric vehicle at the battery swapping station during the movement of the second battery swapping device. Based on the comparison result between the second actual image and the second standard image corresponding to the second battery swapping device at the battery swapping position, it can be determined whether the second battery swapping device is precisely positioned at the battery swapping position. Fig.12 A schematic diagram is shown after the second battery exchange device 22 reaches the battery exchange position.

[0183] Specifically, step S42 may include the step of adjusting the relative position relationship between the battery swap platform and the vehicle-carrying plane of the second battery swap device in the vertical direction to meet the battery installation conditions, and specifically, may include the step of controlling the battery swap platform to reach the seventh height ( Fig.13 Schematic diagram showing the battery exchange platform 221 reaching the seventh height), and the step of controlling the vehicle-carrying plane to reach the eighth height ( Fig.14 The figure shows a schematic diagram after the vehicle-carrying plane 11 reaches the eighth height h8), so that the distance between the battery swap platform and the bottom of the electric vehicle is a negative distance, satisfying the battery installation height condition. The battery installation height condition needs to be determined according to the operation process of the second battery swap device when installing the battery, and usually needs to satisfy the requirements that the battery installation structure can sufficiently place the battery pack on the battery swap platform into the battery pack outer box at the bottom of the vehicle in the height direction. The seventh height and the eighth height can cooperate with each other to reduce the distance between the bottom of the vehicle and the battery swap platform. The seventh height is higher than the initial height of the battery swap platform, and the eighth height is lower than the second height, and can even be lower than the initial height.

[0184] Step S42 may also specifically include the step of adjusting the relative positional relationship between the battery swap platform and the vehicle-carrying plane of the second battery swap device in the horizontal direction to meet the battery installation conditions. Specifically, it may include the step of controlling the horizontal movement of the battery swap platform so that the battery swap platform is aligned with the battery pack outer box on the electric vehicle to meet the battery installation alignment conditions. The battery installation alignment conditions also need to be determined according to the operation process of the second battery swap device when installing the battery. It is usually necessary to meet the requirements that the battery installation structure on the battery swap platform (such as the battery locking mechanism that locks the battery pack in the battery pack outer box) can be vertically aligned with the locking mechanism on the battery pack outer box.

[0185] Step S42 specifically also includes the step of controlling the second battery exchange device to perform a battery installation action, wherein the battery installation action is used to install the loaded battery pack on the electric vehicle. The battery installation action needs to be determined according to the operation process of the second battery exchange device when installing the battery, and may include translating the battery exchange platform so that the battery locking mechanism can lock the battery pack.

[0186] In this embodiment, after controlling the second battery exchange equipment to arrive at the battery exchange position to install the battery pack in step S4 and before controlling the second battery exchange equipment to leave the battery exchange position in step S5, the battery exchange control method of this embodiment may further include the step of restoring the battery exchange platform to its initial position without the battery pack.

[0187] In this embodiment, after controlling the second battery exchange device to arrive at the battery exchange position to install the battery pack in step S4 and before controlling the second battery exchange device to leave the battery exchange position in step S5, the battery exchange control method of this embodiment may further include the step of controlling the vehicle loading plane to reach a fourth height, so that the height difference between the vehicle loading plane and the battery exchange device walking plane exceeds the height of the second battery exchange device. Fig.15As shown, after the battery pack 03 is installed on the battery exchange platform, it returns to its initial position, and the vehicle-carrying plane 11 is lifted to the fourth height h4. The fourth height h4 is higher than the initial height h0. The second battery exchange device corresponding to the third height or the second height carries a battery pack while the electric vehicle does not carry a battery pack. The second battery exchange device corresponding to the fourth height does not carry a battery pack while the electric vehicle carries a battery pack. In addition, the chassis of the electric vehicle carrying the battery pack is lower than the chassis of the electric vehicle not carrying the battery pack, so the third height is greater than or equal to the fourth height. In addition, when the heights of the first battery exchange device and the second battery exchange device are the same, the fourth height can be the same as the first height.

[0188] At this point, the operation of installing the battery pack on the electric vehicle is completed.

[0189] Furthermore, the battery exchange control method of this embodiment may further include a control step of exchanging the first battery exchange device and the second battery exchange device every time the battery is exchanged. Specifically, after the first battery exchange device drives toward the battery rack and returns the battery pack removed from the electric vehicle to the battery rack, the time during which the second battery exchange device installs the battery pack on the electric vehicle can be used to remove the battery pack compatible with another electric vehicle from the battery rack, and then the first battery exchange device is controlled by the control step of controlling the second battery exchange device. After the second battery exchange device drives toward the battery rack, it stands by in a state without a battery pack, and then the second battery exchange device is controlled by the control step of controlling the first battery exchange device. In this way, the exchange control of the first battery exchange device and the second battery exchange device can further save the battery exchange time of the vehicle and improve the battery exchange efficiency.

[0190] This embodiment realizes the overall process of removing and installing batteries by controlling the sandwiched lanes, the first battery-exchanging device and the second battery-exchanging device, thereby saving the battery-exchanging time of the vehicle and improving the battery-exchanging efficiency.

[0191] Example 2

[0192] This embodiment provides a battery exchange control system to control the sandwich lane, the first battery exchange device and the second battery exchange device. Fig.16 The module diagram of this embodiment is shown. Fig.16 , the battery replacement control system of this embodiment includes:

[0193] The lane clamping control module 41 is used to control the vehicle carrying plane to reach a first height;

[0194] The battery removal control module 42 is used to control the first battery replacement device to reach the battery replacement position to remove the battery pack, and to control the first battery replacement device to leave the battery replacement position;

[0195] A battery control module 43 is provided to control the second battery exchange device to arrive at the battery exchange position to install the battery pack, and to control the second battery exchange device to leave the battery exchange position;

[0196] In this embodiment, the lane clamping control module 41 is also used to control the vehicle loading plane to return to the initial position.

[0197] In this embodiment, the lane control module 41 can be specifically used to lift the vehicle loading plane to a first height after the electric vehicle is parked on the vehicle loading plane, so that the height difference between the vehicle loading plane and the walking plane of the battery exchange equipment exceeds the height of the first battery exchange equipment, thereby allowing the first battery exchange equipment without a battery pack to smoothly reach the battery exchange position below the vehicle loading plane and remove the battery pack from the electric vehicle.

[0198] Reference Fig.16 The battery removal control module 42 in this embodiment may specifically include:

[0199] The first battery removal control unit 421 is used to control the first battery replacement device to reach the battery replacement position without a battery pack;

[0200] The second battery removal control unit 422 is used to adjust the posture of the first battery replacement device to remove the battery pack from the electric vehicle.

[0201] Specifically, the first battery removal control unit 421 can be used to determine whether the first battery exchange device has reached a preset first positioning point during the process of controlling the first battery exchange device to move toward the battery exchange position, wherein the first positioning point is located on the travel path of the first battery exchange device. If it is determined that the first battery exchange device has reached the preset first positioning point, the first battery exchange device is controlled to slow down until it reaches the battery exchange position, and then the first battery exchange device is controlled to stop.

[0202] In this embodiment, the first battery removal control unit 421 can be specifically used to pre-store the total distance of the first track and the first distance from the battery rack to the first positioning point, control the first battery exchange device to walk the first distance at a first speed, control the first battery exchange device to walk the third distance at a second speed, and determine whether the first battery exchange device has reached the battery exchange position. If so, stop moving; otherwise, control the first battery exchange device to walk the third distance at the second speed again and determine whether the first battery exchange device has reached the battery exchange position, and repeat the cycle until the first battery exchange device reaches the battery exchange position.

[0203] Among them, the first speed is greater than the second speed. In this embodiment, the first battery exchange device first drives to the first positioning point at a higher speed, and then drives to the battery exchange position at a lower speed. That is, the first battery exchange device first drives to the first positioning point adjacent to the battery exchange position, and then continuously adjusts and judges the position of the first battery exchange device at a slightly smaller third distance, so that the first battery exchange device can be accurately positioned at the battery exchange position.

[0204] Furthermore, considering the high-speed travel of the first battery-swapping device, when it is determined that the first battery-swapping device has reached the first positioning point, there is a situation where the actual distance traveled by the first battery-swapping device is greater than the first distance. Therefore, the third distance traveled by the first battery-swapping device at the second speed may be less than the difference between the total distance of the first track and the first distance. Even if an error occurs during the process of walking the first distance, the error previously generated can be compensated by walking the third distance multiple times to ensure that the first battery-swapping device accurately reaches the battery-swapping position.

[0205] Furthermore, in this embodiment, a visual method can be used to determine whether the first battery swapping device is precisely positioned at the battery swapping position. For example, the first battery swapping device can be equipped with a visual camera to capture a first actual image of the electric vehicle at the battery swapping station during the movement of the first battery swapping device. Based on the comparison result between the first actual image and the first standard image corresponding to the first battery swapping device at the battery swapping position, it can be determined whether the first battery swapping device is precisely positioned at the battery swapping position.

[0206] Reference Fig.16 In this embodiment, the second battery removal control unit 422 may specifically include:

[0207] The second battery removal adjustment subunit 4221 is used to adjust the relative position relationship between the battery replacement platform of the first battery replacement equipment and the vehicle carrier plane in the horizontal and / or vertical direction to meet the battery removal conditions.

[0208] The second adjustment subunit 4221 for battery removal can be used to control the battery swap platform to reach the fifth height and the vehicle loading plane to reach the sixth height, so that the distance between the battery swap platform and the bottom of the electric vehicle is a negative distance, meeting the height condition for battery removal. The second adjustment subunit 4221 for battery removal can also be used to control the horizontal movement of the battery swap platform, so that the battery swap platform and the battery pack on the electric vehicle are aligned, meeting the alignment condition for battery removal.

[0209] Reference Fig.16 In this embodiment, the second battery removal control unit 422 may further include:

[0210] The second battery removal execution subunit 4222 is used to control the first battery replacement device to execute the battery removal action, and the battery removal action is used to remove the battery pack from the electric vehicle.

[0211] In this embodiment, the battery removal control module 42 can also be used to restore the battery exchange platform to its initial position without the battery pack after the first battery exchange device completes removing the battery pack and before leaving the battery exchange position.

[0212] In this embodiment, after controlling the first battery exchange device to remove the battery pack from the electric vehicle and before controlling the first battery exchange device to drive away from the battery exchange position, the lane control module 41 can also be used to control the vehicle loading plane to reach a second height, so that the height difference between the vehicle loading plane and the walking plane of the battery exchange device exceeds the height of the first battery exchange device after loading the battery pack. Among them, the second height is higher than the initial height, the first battery exchange device corresponding to the first height does not carry a battery pack while the electric vehicle carries a battery pack, and the first battery exchange device corresponding to the second height carries a battery pack while the electric vehicle does not carry a battery pack, and the chassis of the electric vehicle carrying the battery pack is lower than the chassis of the electric vehicle without the battery pack, so the first height is less than or equal to the second height.

[0213] In this embodiment, after controlling the first battery exchange device to leave the battery exchange position, the battery removal control module 42 controls the first battery exchange device to drive to the battery rack and return the battery pack removed from the electric vehicle to the battery rack. The return here can be that the first battery exchange device directly puts the battery pack into the battery rack, or the first battery exchange device indirectly, that is, through a certain transfer device (such as a palletizer), puts the battery pack into the battery rack.

[0214] At this point, the operation of disassembling the battery pack of the electric vehicle is completed, and the operation of installing the battery pack of the electric vehicle can be performed subsequently.

[0215] Before the first battery exchange device leaves the battery exchange position or before the electric vehicle is parked on the vehicle loading plane, the battery control module 43 can also control the second battery exchange device to remove the battery pack compatible with the electric vehicle from the battery rack, so that the second battery exchange device is in a standby state, waiting for the first battery exchange device to leave the battery exchange position. Furthermore, in this embodiment, the time difference between the time when the second battery exchange device arrives at the battery exchange position and the time when the first battery exchange device leaves the battery exchange position does not exceed the preset time length, wherein the preset time length can be set to a smaller value according to the adaptability of the actual application, so as to shorten the connection time between the first battery exchange device and the second battery exchange device, thereby improving the battery exchange efficiency.

[0216] Specifically, in this embodiment, the lane control module 41 can control the height of the vehicle carrying plane according to whether the height of the second battery exchanging device is the same as the height of the first battery exchanging device. Specifically, when the height of the second battery exchanging device after loading the battery pack is equal to the height of the first battery exchanging device after loading the battery pack, the lane control module 41 can control the vehicle carrying plane to remain at the second height; and when the height of the second battery exchanging device after loading the battery pack is not equal to the height of the first battery exchanging device after loading the battery pack, the lane control module 41 can control the vehicle carrying plane to adjust to the third height, so that the height difference between the vehicle carrying plane and the walking plane of the battery exchanging device exceeds the height of the second battery exchanging device after loading the battery pack.

[0217] Reference Fig.16 The battery control module 43 in this embodiment may specifically include:

[0218] The first battery loading control unit 431 is used to control the second battery swapping device to arrive at the battery swapping position in a state of loading the battery pack;

[0219] The second battery installation control unit 432 is used to adjust the posture of the second battery exchange device so as to install the battery pack loaded by the second battery exchange device on the electric vehicle.

[0220] Specifically, the first battery control unit 431 can be used to determine whether the second battery exchange device has reached a preset second positioning point in the process of controlling the second battery exchange device to move towards the battery exchange position, wherein the second positioning point is located on the travel path of the second battery exchange device. If it is determined that the second battery exchange device has reached the preset second positioning point, the second battery exchange device is controlled to slow down until it reaches the battery exchange position, and then the second battery exchange device is controlled to stop.

[0221] In this embodiment, the first battery installation control unit 431 can be specifically used to pre-store the total distance of the second track and the second distance from the battery rack to the second positioning point, control the second battery exchange device to travel the second distance at a third speed, control the second battery exchange device to travel the fourth distance at a fourth speed, and determine whether the second battery exchange device has reached the battery exchange position. If so, stop moving; otherwise, control the second battery exchange device to travel the fourth distance at the fourth speed again and determine whether the second battery exchange device has reached the battery exchange position, and repeat the cycle until the second battery exchange device reaches the battery exchange position.

[0222] Among them, the third speed is greater than the fourth speed. In this embodiment, the second battery exchange device first drives to the second positioning point at a higher speed, and then drives to the battery exchange position at a lower speed. That is, the second battery exchange device first drives to the second positioning point adjacent to the battery exchange position, and then continuously adjusts and judges the position of the second battery exchange device at a slightly smaller fourth distance, so that the second battery exchange device can be accurately positioned at the battery exchange position.

[0223] Furthermore, considering the high-speed travel of the second battery exchange device, when it is determined that the second battery exchange device has reached the second positioning point, there is a situation where the actual distance traveled by the second battery exchange device is greater than the second distance. Therefore, the fourth distance traveled by the second battery exchange device at the fourth speed is less than the difference between the total distance of the second track and the second distance. Even if an error occurs during the process of walking the second distance, the error previously generated can be compensated by walking the fourth distance multiple times to ensure that the second battery exchange device accurately reaches the battery exchange position.

[0224] Furthermore, in this embodiment, a visual method can be used to determine whether the second battery swapping device is precisely positioned at the battery swapping position. For example, the second battery swapping device can be equipped with a visual camera to capture a second actual image of the electric vehicle at the battery swapping station during the movement of the second battery swapping device. Based on the comparison result between the second actual image and the second standard image corresponding to the second battery swapping device at the battery swapping position, it can be determined whether the second battery swapping device is precisely positioned at the battery swapping position.

[0225] Reference Fig.16 In this embodiment, the second battery control unit 432 may specifically include:

[0226] The second battery installation adjustment subunit 4321 is used to adjust the relative position relationship between the battery replacement platform and the vehicle loading plane of the second battery replacement equipment in the horizontal and / or vertical direction to meet the battery installation conditions.

[0227] Among them, the second battery installation adjustment subunit 4321 can be used to lift the battery swap platform to the seventh height and lower the vehicle loading plane to the eighth height, so that the distance between the battery swap platform and the bottom of the electric vehicle is a negative distance, meeting the battery installation height condition. The second battery installation adjustment subunit 4321 can also be used to control the horizontal movement of the battery swap platform, so that the battery swap platform and the battery pack outer box on the electric vehicle are aligned, meeting the battery installation alignment condition.

[0228] Reference Fig.16 In this embodiment, the second battery control unit 432 may further include:

[0229] The second battery installation execution subunit 4322 is used to control the second battery replacement equipment to execute the battery installation action, and the battery installation action is used to install the loaded battery pack in the electric vehicle.

[0230] In this embodiment, the battery installation control module 43 can also be used to restore the battery exchange platform to its initial position without the battery pack after the second battery exchange device completes the installation of the battery pack and before leaving the battery exchange position.

[0231] In this embodiment, after controlling the second battery exchange device to arrive at the battery exchange position to install the battery pack, and before controlling the second battery exchange device to leave the battery exchange position, the lane control module 41 can also be used to control the vehicle-carrying plane to reach a fourth height, so that the height difference between the vehicle-carrying plane and the walking plane of the battery exchange device exceeds the height of the second battery exchange device. Among them, the fourth height is higher than the initial height, the second battery exchange device corresponding to the third height carries a battery pack while the electric vehicle does not carry a battery pack, and the second battery exchange device corresponding to the fourth height does not carry a battery pack while the electric vehicle carries a battery pack. In addition, the chassis of the electric vehicle carrying the battery pack is lower than the chassis of the electric vehicle not carrying the battery pack, so the third height is greater than or equal to the fourth height. In addition, when the heights of the first battery exchange device and the second battery exchange device are the same, the fourth height can be the same height as the first height.

[0232] At this point, the operation of installing the battery pack on the electric vehicle is completed.

[0233] Furthermore, in the present embodiment, each time the battery is replaced, the battery removal control module 42 and the battery installation control module 43 exchange control over the first battery replacement device and the second battery replacement device. Specifically, after the first battery replacement device drives toward the battery rack and returns the battery pack removed from the electric vehicle to the battery rack, the time when the second battery replacement device installs the battery pack on the electric vehicle can be used to remove the battery pack compatible with another electric vehicle from the battery rack. After that, the battery installation control module 43 is used to control the first battery replacement device. After the second battery replacement device drives toward the battery rack, it is on standby without a battery pack. After that, the battery removal control module 2 is used to control the second battery replacement device. In this way, the exchange control of the first battery replacement device and the second battery replacement device can further save the vehicle's battery replacement time and improve the battery replacement efficiency.

[0234] This embodiment realizes the overall process of removing and installing batteries by controlling the sandwiched lanes, the first battery-exchanging device and the second battery-exchanging device, thereby saving the battery-exchanging time of the vehicle and improving the battery-exchanging efficiency.

[0235] Example 3

[0236] Fig.17 This is a schematic diagram of the structure of an electronic device provided in Embodiment 3 of the present invention. The electronic device includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and the processor implements a method in Embodiment 1 when executing the program. Fig.17 The electronic device 50 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0237] like Fig.17As shown, the electronic device 50 may be in the form of a general-purpose computing device, for example, it may be a server device. The components of the electronic device 50 may include, but are not limited to: at least one processor 51, at least one memory 52, and a bus 53 connecting different system components (including the memory 52 and the processor 51).

[0238] The bus 53 includes a data bus, an address bus, and a control bus.

[0239] The memory 52 may include a volatile memory, such as a random access memory (RAM) 521 and / or a cache memory 522 , and may further include a read-only memory (ROM) 523 .

[0240] The memory 52 may also include a program / utility 525 having a set (at least one) of program modules 524, such program modules 524 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.

[0241] The processor 51 executes various functional applications and data processing by running the computer program stored in the memory 52, such as the method provided in Embodiment 1 of the present invention.

[0242] The electronic device 50 may also communicate with one or more external devices 54 (e.g., keyboards, pointing devices, etc.). Such communication may be performed via an input / output (I / O) interface 55. Furthermore, the model generating device 50 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) via a network adapter 56. Fig.17 As shown, the network adapter 56 communicates with other modules of the model-generated device 50 via the bus 53. It should be understood that, although not shown in the figure, other hardware and / or software modules can be used in conjunction with the model-generated device 50, including but not limited to: microcode, device drivers, redundant processors, external disk drive arrays, RAID (disk array) systems, tape drives, and data backup storage systems, etc.

[0243] It should be noted that although several units / modules or sub-units / modules of the electronic device are mentioned in the above detailed description, this division is merely exemplary and not mandatory. In fact, according to an embodiment of the present invention, the features and functions of two or more units / modules described above can be embodied in one unit / module. Conversely, the features and functions of one unit / module described above can be further divided into multiple units / modules to be embodied.

[0244] Example 4

[0245] This embodiment provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps of a method provided in Embodiment 1 are implemented.

[0246] The readable storage medium may include but is not limited to: a portable disk, a hard disk, a random access memory, a read-only memory, an erasable programmable read-only memory, an optical storage device, a magnetic storage device or any suitable combination of the above.

[0247] In a possible implementation manner, the present invention may also be implemented in the form of a program product, which includes a program code. When the program product is run on a terminal device, the program code is used to enable the terminal device to execute the steps in the method described in Embodiment 1.

[0248] The program code for executing the present invention may be written in any combination of one or more programming languages, and may be executed entirely on a user device, partially on a user device, as an independent software package, partially on a user device and partially on a remote device, or entirely on a remote device.

[0249] Although the specific embodiments of the present invention are described above, it should be understood by those skilled in the art that this is only for illustration and the protection scope of the present invention is defined by the appended claims. Those skilled in the art may make various changes or modifications to these embodiments without departing from the principles and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.

Claims

1. A battery replacement control method, characterized in that: The battery exchange control method is implemented by the cooperation of a sandwich track, a first battery exchange device, and a second battery exchange device. A battery exchange device walking plane for the first battery exchange device and the second battery exchange device to walk on is provided on the sandwich track, and a battery exchange position is provided in the battery exchange device walking plane; a first track for the first battery exchange device to walk alone and a second track for the second battery exchange device to walk alone are arranged in the battery exchange device walking plane, and the first track and the second track are respectively connected to the battery rack and the battery exchange position through different paths; The battery replacement control method comprises: In the process of the first battery swapping device driving toward the battery swapping position, determining whether the first battery swapping device has reached a preset first positioning point, the first positioning point being located on the travel path of the first battery swapping device, and if so, controlling the first battery swapping device to decelerate and move until it reaches the battery swapping position, and then stop; Pre-storing a total distance of the first track and a first distance from the battery rack to the first positioning point; Control the first battery swapping device to travel the first distance at a first speed, control the first battery swapping device to travel the third distance at a second speed, determine whether the first battery swapping device has reached the battery swapping position, and if so, stop moving; otherwise, control the first battery swapping device to travel the third distance at the second speed again and determine whether the first battery swapping device has reached the battery swapping position, and repeat the cycle until the first battery swapping device reaches the battery swapping position, the first speed is greater than the second speed, and the third distance is less than the difference between the total distance of the first track and the first distance; and / or, In the process of the second battery swapping device driving towards the battery swapping position, determining whether the second battery swapping device has reached a preset second positioning point, the second positioning point being located on the travel path of the second battery swapping device, and if so, controlling the second battery swapping device to decelerate and move until it reaches the battery swapping position, and then stopping; Pre-storing the total distance of the second track and the second distance from the battery rack to the second positioning point; Control the second battery exchange device to travel the second distance at a third speed, control the second battery exchange device to travel the fourth distance at a fourth speed, determine whether the second battery exchange device has reached the battery exchange position, and if so, stop moving; otherwise, control the second battery exchange device to travel the fourth distance at the fourth speed again and determine whether the second battery exchange device has reached the battery exchange position, and repeat the cycle until the second battery exchange device reaches the battery exchange position, the third speed is greater than the fourth speed, and the fourth distance is less than the difference between the total distance of the second track and the second distance.

2. The battery replacement control method according to claim 1, characterized in that: The clamping track has a liftable vehicle loading plane, and the battery replacement control method further includes: Controlling the vehicle-carrying plane to reach a first height; Controlling the first battery swapping device to reach the battery swapping position to remove the battery pack; Controlling the first battery swapping device to drive away from the battery swapping position; Controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack; Controlling the second battery swapping device to drive away from the battery swapping position; The vehicle-carrying plane is controlled to return to an initial height.

3. The battery replacement control method according to claim 2, characterized in that: A battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down; The first height is higher than the initial height; Controlling the vehicle loading plane to reach a first height includes: after the electric vehicle is parked on the vehicle loading plane and the battery pack under the electric vehicle is aligned with the battery swapping station, lifting the vehicle loading plane to the first height so that the height difference between the vehicle loading plane and the walking plane of the battery swapping equipment exceeds the height of the first battery swapping equipment.

4. The battery replacement control method according to claim 2 or 3, characterized in that: The battery replacement control method further includes: Before the first battery exchange device leaves the battery exchange position or before the electric vehicle is parked on the vehicle loading plane, control the second battery exchange device to remove the battery pack adapted to the electric vehicle from the battery rack, and then wait for the first battery exchange device to leave the battery exchange position; And / or, after controlling the first battery exchange device to drive away from the battery exchange position, controlling the first battery exchange device to drive toward the battery rack and returning the battery pack removed from the electric vehicle to the battery rack.

5. The battery replacement control method according to claim 2, characterized in that: Controlling the first battery swapping device to reach the battery swapping position to remove the battery pack includes: Controlling the first battery swapping device to arrive at the battery swapping position without a battery pack; Adjust the posture of the first battery exchange device to remove the battery pack from the electric vehicle.

6. The battery replacement control method according to claim 2, characterized in that: Before controlling the first battery swapping device to leave the battery swapping position, the method further includes: After the first battery exchange device removes the battery pack from the electric vehicle, the vehicle loading plane is controlled to reach a second height, so that the height difference between the vehicle loading plane and the walking plane of the battery exchange device exceeds the height of the first battery exchange device after the battery pack is loaded, and the second height is higher than the initial height; The first height is less than or equal to the second height.

7. The battery replacement control method according to claim 2 or 6, characterized in that: After controlling the first battery swapping device to leave the battery swapping position and before controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack, it also includes: When the height of the second battery exchange device after loading the battery pack is equal to the height of the first battery exchange device after loading the battery pack, controlling the vehicle loading plane to remain at the second height; Or, when the height of the second battery exchange device after loading the battery pack is not equal to the height of the first battery exchange device after loading the battery pack, the vehicle loading plane is controlled to reach a third height so that the height difference between the vehicle loading plane and the walking plane of the battery exchange device exceeds the height of the second battery exchange device after loading the battery pack, and the third height is higher than the initial height.

8. The battery replacement control method according to claim 2, characterized in that: Controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack includes: Controlling the second battery exchange device to arrive at the battery exchange position in a state of loading a battery pack; Adjust the posture of the second battery exchange device to install the battery pack loaded by the second battery exchange device on the electric vehicle.

9. The battery replacement control method according to claim 7, characterized in that: After controlling the second battery swapping device to arrive at the battery swapping position to install the battery pack, and before controlling the second battery swapping device to leave the battery swapping position, it also includes: Controlling the vehicle-carrying plane to reach a fourth height so that the height difference between the vehicle-carrying plane and the walking plane of the battery-swapping device exceeds the height of the second battery-swapping device, and the fourth height is higher than the initial height; The third height is greater than or equal to the fourth height.

10. The battery replacement control method according to claim 5, characterized in that: Adjusting the posture of the first battery exchange device to remove the battery pack from the electric vehicle includes: Adjust the relative position relationship between the battery swapping platform of the first battery swapping device and the vehicle-carrying plane in the horizontal and / or vertical direction to meet the battery removal conditions; Control the first battery exchange device to perform a battery removal action, wherein the battery removal action is used to remove the battery pack from the electric vehicle.

11. The battery replacement control method according to claim 10, characterized in that: A battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down; Adjusting the relative positional relationship between the battery swapping platform of the first battery swapping device and the vehicle-carrying plane in the vertical direction to meet the battery removal conditions includes: Controlling the battery swap platform to reach a fifth height; Controlling the vehicle-carrying plane to a sixth height so that the battery-swapping platform passes through the battery-swapping station and the distance between the platform and the bottom of the electric vehicle is a negative distance, thus satisfying the battery removal height condition; And / or, adjusting the relative positional relationship between the battery swapping platform of the first battery swapping device and the vehicle-carrying plane in the horizontal direction to meet the battery removal conditions, including: Controlling the battery swap platform to move horizontally so that the battery swap platform is aligned with the battery pack on the electric vehicle to meet the battery removal alignment conditions; The sixth height is lower than the initial height.

12. The battery replacement control method according to claim 8, characterized in that: Adjusting the posture of the second battery exchange device to install the battery pack loaded by the second battery exchange device on the electric vehicle includes: Adjust the relative position relationship between the battery swapping platform of the second battery swapping device and the vehicle loading plane in the horizontal and / or vertical direction to meet the battery installation conditions; Control the second battery exchange device to perform a battery installation action, wherein the battery installation action is used to install the loaded battery pack in the electric vehicle.

13. The battery replacement control method according to claim 12, characterized in that: A battery replacement station is provided in the vehicle-carrying plane, and the battery replacement station is used for replacing the battery pack of the electric vehicle, and the battery replacement station corresponds to the battery replacement position up and down; Adjusting the relative position relationship between the battery swapping platform of the second battery swapping device and the vehicle loading plane in the vertical direction to meet the battery installation conditions includes: Controlling the battery swap platform to reach a seventh height; Controlling the vehicle loading plane to reach an eighth height so that the battery swapping platform passes through the battery swapping station and the distance between the battery swapping platform and the bottom of the electric vehicle is a negative distance, satisfying the battery loading height condition; And / or, adjusting the relative positional relationship between the battery swapping platform of the second battery swapping device and the vehicle loading plane in the horizontal direction to meet the battery installation conditions, including: Controlling the horizontal movement of the battery swap platform so that the battery swap platform is aligned with the battery pack outer box on the electric vehicle to meet the battery installation alignment conditions; The eighth height is lower than the initial height.

14. The battery replacement control method according to claim 10 or 12, characterized in that: The battery replacement control method further includes: After the first battery swapping device has completed disassembling the battery pack and before leaving the battery swapping position, restoring the battery swapping platform to its initial position without the battery pack; And / or, after the second battery exchange device completes installation of the battery pack and before leaving the battery exchange position, restore the battery exchange platform to its initial position without the battery pack.

15. The battery replacement control method according to claim 2, characterized in that: The battery replacement control method further includes: Each time the battery is exchanged, the control steps for the first battery exchange device and the second battery exchange device are exchanged.

16. The battery replacement control method according to claim 2, characterized in that: The time difference between the time when the second battery exchange device arrives at the battery exchange position and the time when the first battery exchange device leaves the battery exchange position does not exceed a preset time length.

17. A battery replacement control system, characterized in that: The sandwiched lane, the first battery-swapping device, and the second battery-swapping device are controlled; a battery-swapping device walking plane for the first battery-swapping device and the second battery-swapping device to walk on is provided on the sandwiched lane, and a battery-swapping position is provided in the battery-swapping device walking plane; a first track for the first battery-swapping device to walk alone and a second track for the second battery-swapping device to walk alone are arranged in the battery-swapping device walking plane, and the first track and the second track are connected to the battery rack and the battery-swapping position through different paths respectively; The battery replacement control system comprises: A battery control module is used to determine whether the first battery swapping device has reached a preset first positioning point during the process of the first battery swapping device driving toward the battery swapping position, and the first positioning point is located on the travel path of the first battery swapping device. If so, the first battery swapping device is controlled to slow down and move until it reaches the battery swapping position, and then stops; The battery removal control module is also used to pre-store the total distance of the first track and the first distance from the battery rack to the first positioning point; The battery removal control module is also used to control the first battery exchange device to walk the first distance at a first speed, control the first battery exchange device to walk the third distance at a second speed, and determine whether the first battery exchange device has reached the battery exchange position. If so, stop walking. If not, control the first battery exchange device to walk the third distance at the second speed again and determine whether the first battery exchange device has reached the battery exchange position. The cycle is repeated until the first battery exchange device reaches the battery exchange position, the first speed is greater than the second speed, and the third distance is less than the difference between the total distance of the first track and the first distance. And / or, a battery control module is provided, which is used to determine whether the second battery exchange device has reached a preset second positioning point during the process of the second battery exchange device driving towards the battery exchange position, and the second positioning point is located on the travel path of the second battery exchange device. If so, the second battery exchange device is controlled to slow down and move until it reaches the battery exchange position, and then stops; The battery removal control module is also used to pre-store the total distance of the second track and the second distance from the battery rack to the second positioning point; The battery removal control module is also used to control the second battery exchange device to travel the second distance at a third speed, control the second battery exchange device to travel the fourth distance at a fourth speed, and determine whether the second battery exchange device has reached the battery exchange position. If so, stop moving; otherwise, control the second battery exchange device to travel the fourth distance at the fourth speed again and determine whether the second battery exchange device has reached the battery exchange position. The cycle is repeated until the second battery exchange device reaches the battery exchange position, the third speed is greater than the fourth speed, and the fourth distance is less than the difference between the total distance of the second track and the second distance.

18. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 16 is implemented.

19. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 16 are implemented.

Citation Information

Patent Citations

  • Transmission equipment automatic positioning method and device based on encoder

    CN107807681A

  • Automatic battery exchange system for electric automobile

    CN109501756A

  • Quick battery swapping station of electric automobile

    CN208469763U