A method for installing a secondary lining contact pressure test device
By designing a secondary lining contact pressure test device with fixed seats, adjusting parts, sandbags and partitions, the difficulty in installing pressure boxes and gap problems in tunnel engineering has been solved, and the accuracy and stability of pressure measurement have been improved.
Patent Information
- Application Number
- CN202211018911.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-24
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-08-24
AI Technical Summary
In tunnel engineering, the existing secondary lining contact pressure testing device is difficult to install, and the pressure cell is prone to installation misalignment, damage, and gaps between it and the initial support, which affects the accuracy of the measured pressure.
A secondary lining contact pressure testing device including a fixed seat, an adjusting piece, a sandbag and a partition is designed. The sandbag is quickly fixed on the initial support through a removable adhesive layer and bagging. The adjusting piece adjusts the pressure box and the initial support. The tightness of the protective layer isolates the concrete pressure, ensuring the stability and accuracy of the pressure box.
It realizes the convenient installation of the pressure box, avoids installation deviation and gaps, improves the measurement accuracy of the contact pressure of the second lining, and ensures the reliability of the test results.
Smart Images

Figure CN115452219B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil construction equipment, and in particular to a secondary lining contact pressure testing device and an installation method thereof. Background Art
[0002] Highways are often constructed in mountainous and hilly terrains in the form of tunnels. When a tunnel line passes through an unfavorable geological zone with faults, broken surrounding rocks, etc., there is a greater construction risk. At this time, strict monitoring and risk warning are required to ensure the construction safety of tunnel projects crossing unfavorable geological zones. In the construction and scientific research monitoring of tunnel projects crossing unfavorable geological zones, the secondary lining contact pressure is an important indicator that reflects the stress state of the tunnel support structure. This indicator is generally obtained by installing a pressure box test between the initial tunnel support and the secondary lining.
[0003] A secondary lining contact pressure testing device is a sensitive component and cannot be directly connected to the secondary lining steel mesh by welding. Therefore, its installation and fixation are very difficult. The existing installation method has a cumbersome installation process and is prone to problems such as pressure box installation misalignment, damage, gaps between the initial support, and the test surface and side walls being constrained by the secondary lining concrete. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention provides a secondary lining contact pressure testing device, which is easy to install and ensures the accuracy of the secondary lining contact pressure measurement.
[0005] The invention also provides a method for installing a secondary lining contact pressure testing device.
[0006] According to an embodiment of the first aspect of the present invention, a secondary lining contact pressure testing device comprises a fixing seat, an adjusting member, a sandbag, a pressure box and a partition layer, wherein the fixing seat can be fixedly connected to the steel mesh of the secondary lining by grounding; the number of the adjusting members and the number of the fixing seats are both multiple, and one end of the adjusting member is threadedly connected to the fixing seat; the sandbag is filled with a portion of homogeneous sand, one side of the sandbag is provided with a peel-off adhesive layer for bonding with the initial support, and the other side of the sandbag is provided with a cover bag; the pressure box extends into the cover bag so that the front side of the pressure box pushes the sandbag, and the back side of the pressure box is provided with a plurality of limiting slots, and the other end of the adjusting member extends into the limiting slots and abuts against the inner wall of the limiting slots to adjust the tightness between the pressure box and the initial support; the partition layer is coated on the cover bag, the sandbag and the peel-off adhesive layer to isolate the concrete of the secondary lining, and the wire of the pressure box passes through the partition layer and is led out from the bottom of the secondary lining.
[0007] At least the following beneficial effects are achieved: the sandbag can be quickly placed on the waterproof layer of the initial support through the easy-to-remove adhesive layer, the bag acts as a limit pressure box to prevent the pressure box from being offset, the bag initially connects the pressure box to the waterproof layer of the initial support, the sandbag acts as a cushion to prevent the pressure box from directly resting on the uneven initial support, so that the end face of the pressure box is balanced. The tightness between the pressure box and the initial support can be adjusted by rotating the adjustment piece, eliminating the gap between the pressure box and the initial support, so that the pressure box is in a stable state, and the pressure tested by the pressure box is more accurate.
[0008] According to some embodiments of the present invention, one of the adjusting members is paired with one of the limiting slots, and the paired adjusting member and the limiting slot are coaxial.
[0009] According to some embodiments of the present invention, the fixing seat and the adjusting member are respectively a first nut and a bolt.
[0010] According to some embodiments of the present invention, the adjusting member is threadedly connected with a second nut and a third nut in regions on both sides of the fixing seat, respectively.
[0011] According to some embodiments of the present invention, the cross-section of the partition gradually increases from the fixing seat to the sandbag.
[0012] According to some embodiments of the present invention, the partition layer is made of foamed rubber.
[0013] According to some embodiments of the present invention, the bag is made of a 0.3 mm thick plastic soft film, and a wire outlet hole is provided on the bag for the wire to pass through.
[0014] According to some embodiments of the present invention, a zipper is provided at the opening of the sandbag.
[0015] According to some embodiments of the present invention, a label is adhered to the wire led out from the bottom of the second substrate, and the label is used to record the mileage of the monitoring section, the monitoring location, the instrument number and the measurement index information.
[0016] A method for installing a second lining contact pressure test device according to a second aspect of the present invention is used to install a second lining contact pressure test device according to the first aspect of the present invention, comprising the following steps:
[0017] Locate the installation point: determine the installation point of a secondary lining contact pressure test device according to the requirements of the monitoring and risk warning mechanism;
[0018] Install the fixing seat: measure the position data of each of the limit grooves and the center point of the pressure box, and according to the installation point and the position data, accurately position and weld the fixing seat to the area corresponding to the installation point on the steel mesh of the second lining by grounding;
[0019] Laying sandbags: adjusting the content of homogeneous sand in the sandbags to fill the uneven pits of the initial support when the sandbags are pressed, and adhering the sandbags to the area corresponding to the installation point on the waterproof layer of the initial support through the peel-off adhesive layer;
[0020] Install the pressure box: put the front of the pressure box toward the initial support and put it into the bag, rotate the pressure box so that each of the limit slots can be coaxial with each of the adjustment parts, one end of the adjustment part is threadedly connected to the fixing seat, turn the adjustment part until the other end of the adjustment part is against the back of the pressure box, continue to turn the adjustment part so that the adjustment part pushes the pressure box tightly against the waterproof layer of the initial support, measure the installation torque of the adjustment part with a torque wrench, and control the tightness of the fit between the pressure box and the sandbag;
[0021] Setting the interlayer: putting the manufactured interlayer on the pressure box covered with the bag; or manufacturing the interlayer on the pressure box covered with the bag on site using the material for manufacturing the interlayer;
[0022] Leading out the wire: stick the wire to the waterproof layer of the initial support, and then run it downward along the waterproof layer. Pre-open holes for leading out the wire on the mudguard at the bottom of the secondary lining. When the secondary lining is poured, the wire is located between the gap between the trolley steel formwork of the secondary lining and the ground. A label is attached to the end of the wire to record the mileage of the monitoring section, monitoring location, instrument number and measurement index information.
[0023] The invention has at least the following beneficial effects: the installation steps of the test device are clear and easy to operate, and can avoid the occurrence of a gap between the pressure box and the initial support, avoid the deviation of the installation of the pressure box, and prevent the concrete slurry from penetrating into the pressure box and restraining the side wall of the pressure box during the construction of the secondary lining, so that the pressure box can measure the contact pressure of the secondary lining with higher accuracy.
[0024] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present invention will be further described below with reference to the accompanying drawings and embodiments, wherein:
[0026] Figure 1 This is a schematic cross-sectional view of a second lining contact pressure testing device according to an embodiment of the present invention;
[0027] Figure 2 It is a schematic structural diagram of a side view of a second lining contact pressure testing device according to an embodiment of the present invention;
[0028] Figure 3 This is a schematic diagram of the structure of a sandbag, a cover bag and a peel-off adhesive layer in a second lining contact pressure testing device according to an embodiment of the present invention;
[0029] Figure 4 This is a schematic structural diagram of a sandbag and a zipper in a secondary lining contact pressure testing device according to an embodiment of the present invention.
[0030] Reference numerals: fixing seat 100 , adjusting member 200 , second nut 210 , third nut 220 , sandbag 300 , peel-off adhesive layer 310 , bag 320 , wire outlet hole 321 , zipper 330 , pressure box 400 , limiting slot hole 410 , wire 420 , partition 500 , steel mesh 600 , initial support 700 . DETAILED DESCRIPTION
[0031] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0032] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0033] In the description of the present invention, "a plurality" means more than two. If there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0034] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0035] Reference Figures 1 to 3The present invention discloses a secondary lining contact pressure testing device, comprising a fixing seat 100, an adjusting member 200, a sandbag 300, a pressure box 400 and a partition 500. The fixing seat 100 can be fixedly connected to a steel mesh 600 of the secondary lining by grounding; the sandbag 300 is partially filled with homogeneous sand, one side of the sandbag 300 is provided with a removable adhesive layer 310 for bonding with an initial support 700, and the other side of the sandbag 300 is provided with a bag 320, and the sandbag 300 can be quickly placed on the initial support 700 through the removable adhesive layer 310. The pressure box 400 is placed on the waterproof layer of the initial support 700, and the pressure box 400 extends into the bag 320 so that the front of the pressure box 400 pushes the sandbag 300. A plurality of limiting slots 410 are provided on the back of the pressure box 400. The bag 320 serves to limit the pressure box 400 and prevent the pressure box 400 from being displaced. The bag 320 initially connects the pressure box 400 to the waterproof layer of the initial support 700, and the sandbag 300 serves as a cushion layer to prevent the pressure box 400 from directly pressing against the uneven initial support 700, so that the end face of the pressure box 400 is evenly stressed.
[0036] The number of the adjusting member 200 and the number of the fixing seat 100 are both multiple, and one end of the adjusting member 200 is threadedly connected to the fixing seat 100; the other end of the adjusting member 200 extends into the limiting slot hole 410 and abuts against the inner wall of the limiting slot hole 410 to adjust the tightness between the pressure box 400 and the initial support 700. The adjusting member 200 can be driven to move on the fixing seat 100 by rotating the adjusting member 200, and the adjusting member 200 pushes the pressure box 400, and the front of the pressure box 400 is pressed against the waterproof layer of the initial support 700 through the sandbag 300. The tightness between the pressure box 400 and the initial support 700 can be adjusted by rotating the adjusting member 200, and the gap between the pressure box 400 and the initial support 700 can be eliminated, so that the pressure box 400 is in a stable state, and the pressure tested by the pressure box 400 is more accurate.
[0037] The interlayer 500 is wrapped around the cover bag 320, the sandbag 300 and the removable adhesive layer 310 to isolate the concrete of the secondary lining. Since the pressure box 400 is placed in the cover bag 320, the interlayer 500 can prevent the concrete from directly pressing against the surrounding of the pressure box 400, thereby preventing the pressure box 400 from being subjected to lateral pressure and reducing the accuracy of the test pressure. The wire 420 of the pressure box 400 passes through the interlayer 500 and is led out from the bottom of the secondary lining. When the contact pressure of the secondary lining needs to be tested, the exposed wire 420 can be directly electrically connected to an external reading device, and the contact pressure test result of the secondary lining can be quickly and conveniently obtained.
[0038] When installing the test device, after the steel mesh 600 of the secondary lining is constructed, the fixing seat 100 is fixed in advance to the area on the steel mesh 600 corresponding to the installation point of the test device. Before the secondary lining is constructed with concrete, the sandbag 300 is fixed to the area corresponding to the installation point on the waterproof layer of the initial support 700 through the peel-off adhesive layer 310, and the pressure box 400 is initially fixed to the sandbag 300 through the bag 320. The sandbag 300 is placed between the initial support 700 and the pressure box 400. The sandbag 300 eliminates the unfavorable factors of the uneven surface of the initial support 700, so that the end face of the pressure box 400 facing the initial support 700 is uniformly stressed, that is, the front face of the pressure box 400 is uniformly stressed. The adjusting member 200 is installed on the fixing seat 100, and the adjusting member 200 is rotated so that the other end of the adjusting member 200 is against the inner bottom wall of the limiting slot hole 410 on the back of the pressure box 400, and the pressure box 400 is firmly placed between the initial support 700 and the secondary lining. Then fill the material for making the interlayer 500 around the pressure box 400 to form the interlayer 500, or put the already made interlayer 500 on the pressure box 400. Finally, the construction of the secondary lining can be continued. The installation steps of the test device are organized, the method is simple, and it is conducive to the test device to accurately test the contact pressure of the secondary lining.
[0039] The fixing seat 100 and the steel mesh 600 of the second lining are connected by welding, and the multiple fixing seats 100 are parallel to each other, so that the multiple adjustment members 200 are also parallel to each other, which is conducive to adjusting the posture of the pressure box 400.
[0040] One adjusting member 200 is paired with one limiting slot 410, and the paired adjusting member 200 and limiting slot 410 are coaxial. The limiting slot 410 plays the role of positioning and limiting the adjusting member 200, so as to prevent the adjusting member 200 from being deviated.
[0041] In this embodiment, the number of the limiting slots 410, the number of the adjusting members 200 and the number of the fixing seats 100 are all four, and the four limiting slots 410 are distributed in a square shape on the end surface of the other end of the pressure box 400, and the limiting slots 410, the adjusting members 200 and the fixing seats 100 are arranged in coordination. The front and back sides of the pressure box 400 are the two end surfaces of the pressure box 400.
[0042] The fixing seat 100 and the adjusting member 200 are respectively the first nut and the bolt, which have simple structure, convenient material, low cost and simple operation. After the first nut is fixed on the steel mesh 600 of the second lining, the threaded section of the bolt is matched and connected with the first nut.
[0043] The adjusting member 200 is threadedly connected with a second nut 210 and a third nut 220 in the areas on both sides of the fixing seat 100, respectively. The fixing seat 100 is located between the second nut 210 and the third nut 220. The positions of the second nut 210 and the third nut 220 on the adjusting member 200 can be adjusted by rotating the second nut 210 and the third nut 220, and vice versa, the position of the adjusting member 200 is also adjusted. By rotating the second nut 210 and the third nut 220, the second nut 210 and the third nut 220 are respectively pressed against both sides of the fixing seat 100, and the connection between the adjusting member 200 and the fixing seat 100 is more secure.
[0044] The cross section of the partition 500 gradually increases from the fixing seat 100 to the sandbag 300. In other words, the outer wall of the partition 500 is an inclined surface. The partition 500 is made of foamed plastic, which has the function of filling gaps and adhesiveness. The foamed plastic can bond the pressure box 400 to the waterproof layer of the initial support 700. The partition 500 can separate the pressure box 400 from the concrete and limit the pressure box 400 on the waterproof layer of the initial support 700. The partition 500 can be set by making the partition 500 on site, applying the foamed plastic around the pressure box 400, and then shaping it. Finally, the foamed plastic is solidified to fix the shape to obtain the partition 500.
[0045] A label is attached to the wire 420 led out from the bottom of the secondary lining. The label is used to record the monitoring section mileage, monitoring location, instrument number and measurement index information, so as to facilitate the test personnel to record the test data and analyze the stress of the secondary lining.
[0046] See also Figure 4 The bag 320 is made of a 0.3 mm thick plastic soft film. The bag 320 is provided with a wire outlet hole 321 for the wire 420 to pass through. The wire outlet hole 321 facilitates the arrangement of the wire 420. The wire 420 passes through the wire outlet hole 321 and the interlayer 500 in sequence. The wire outlet hole 321 is provided on the bag 320 corresponding to the area where the pressure box 400 is connected to the wire 420. Of course, the plastic soft film can also be greater than 0.3 mm. The bag 320 can also be made of other materials.
[0047] A zipper 330 is provided at the bag opening of the sandbag 300 , and the bag opening of the sandbag 300 is opened through the zipper 330 , so as to fill the sandbag 300 with homogeneous sand or take the homogeneous sand out of the sandbag 300 .
[0048] The present invention also discloses a method for installing a secondary lining contact pressure testing device, which is used to install the above-mentioned secondary lining contact pressure testing device, and includes the following steps: locating installation points, installing fixing seats, laying sandbags, installing pressure boxes and setting partitions.
[0049] Locating the installation point: Determine the installation point of a secondary lining contact pressure test device according to the requirements of the monitoring and risk warning mechanism, so that the test device is in the correct test point position.
[0050] Install the fixing seat: measure the position data of each limit groove 410 and the center point of the pressure box 400, and according to the installation point and the position data, accurately position and weld the fixing seat 100 to the area corresponding to the installation point on the steel mesh 600 of the second lining through grounding, in preparation for the subsequent installation of the adjustment member 200. The position of the fixing seat 100 defines the position of the adjustment member 200, the positional relationship between the fixing seat 100 and the fixing seat 100 defines the positional relationship between the adjustment member 200 and the adjustment member 200, and the position of the adjustment member 200 defines the position of the adjustment member 200 in the pressure box 400.
[0051] Laying out sandbags: Adjust the content of homogeneous sand in the sandbag 300 to fill the uneven pits of the initial support 700 when the sandbag 300 is pressed, and form a flat surface on the sandbag 300 when the sandbag 300 is pressed, so as to avoid too much homogeneous sand in the sandbag 300, thereby preventing the sandbag 300 from being unable to deform and form a surface in contact with the initial support 700 / pressure box 400, and to avoid too little homogeneous sand in the sandbag 300, thereby preventing the thickness of the cushion layer formed by the sandbag 300 from being insufficient. The sandbag 300 is adhered to the area corresponding to the installation point on the waterproof layer of the initial support 700 through the peel-off adhesive layer 310, and the laying out of the sandbag 300 is convenient and quick.
[0052] Install the pressure box: put the front of the pressure box 400 toward the initial support 700 and put it into the bag 320, rotate the pressure box 400 so that each limiting slot hole 410 can be coaxial with each adjusting member 200, and the bag 320 plays a preliminary limiting role on the pressure box 400. One end of the adjusting member 200 is threadedly connected to the fixing seat 100, and the adjusting member 200 is screwed until the other end of the adjusting member 200 is against the inner bottom wall of the limiting slot 410 on the back of the pressure box 400. Continue to screw the adjusting member 200 so that the adjusting member 200 pushes the pressure box 400 tightly against the waterproof layer of the initial support 700. Use a torque wrench to measure the installation torque of the adjusting member 200 to control the tightness of the fit between the pressure box 400 and the sandbag 300. The pressure box 400 can be accurately positioned between the secondary lining and the initial support 700 to avoid the situation where the two end faces of the pressure box 400 are in virtual contact with the secondary lining and the initial support 700.
[0053] Setting up the interlayer: Wrap the finished interlayer 500 on the cover bag 320, the sandbag 300 and the peel-off adhesive layer 310; or use the material for making the interlayer 500 to make the interlayer 500 on the pressure box 400 covered with the cover bag 320 on site. The cover bag 320 completely covers the gap between the cover bag 320 and the pressure box 400 to prevent the concrete slurry from penetrating into the pressure box 400 during the construction of the secondary lining. Under the condition that the side wall of the pressure box 400 is not constrained, the interlayer 500 isolates the concrete of the secondary lining from contacting the pressure box 400. Compared with the method in which the interlayer 500 directly contacts the pressure box 400, the method of using the cover bag 320 can increase the degree of freedom of the side wall of the pressure box 400 to a greater extent, so as to avoid being constrained by the interlayer 500 and ensure the accuracy of the test results.
[0054] The installation steps of the test device are clear and easy to operate. It can avoid the gap between the pressure box 400 and the initial support 700, avoid the deviation of the installation of the pressure box 400, and prevent the concrete slurry from penetrating into the pressure box to constrain the side wall of the pressure box during the construction of the secondary lining, so that the pressure box 400 can measure the contact pressure of the secondary lining with higher accuracy;
[0055] Leading out the conductor: Paste the conductor 420 on the waterproof layer of the initial support 700, and then run it downward along the waterproof layer. Pre-open a hole for leading out the conductor 420 on the mudguard at the bottom of the secondary lining. When the secondary lining is poured, the conductor 420 is located between the gap between the trolley steel formwork of the secondary lining and the ground. A label is pasted on the end of the conductor 420 to record the mileage of the monitoring section, monitoring location, instrument number and measurement index information.
[0056] The conductor 420 passes through the gap between the steel template of the secondary lining trolley and the ground, which protects the conductor 420 from damage and does not affect the secondary lining construction.
[0057] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0058] Of course, the present invention is not limited to the above-mentioned embodiments, and those skilled in the art may make equivalent modifications or substitutions without violating the spirit of the present invention, and these equivalent modifications or substitutions are all included in the scope defined by the claims of this application.
Claims
1. A method for installing a secondary lining contact pressure test device, It is characterized in that The method comprises a secondary lining contact pressure testing device and steps of positioning installation points, installing fixing seats, laying sandbags, installing pressure boxes and setting interlayers: A second lining contact pressure testing device comprises: A plurality of fixing seats, wherein the fixing seats are fixedly connected to the steel mesh of the secondary lining via grounding; Adjusting members, the number of which is equal to the number of the fixing seats, and one end of the adjusting member is threadedly connected to the fixing seat; A sandbag, wherein the sandbag is partially filled with homogeneous sand, one side of the sandbag is provided with a removable adhesive layer for bonding with the waterproof layer of the initial support, and the other side of the sandbag is provided with a bag; A pressure box, the pressure box extends into the bag so that the front of the pressure box pushes the sandbag, a plurality of limiting slots are provided on the back of the pressure box, and the other end of the adjustment member extends into the limiting slot and abuts against the inner wall of the limiting slot to adjust the tightness between the pressure box and the initial support; A partition layer, the partition layer is coated around the cover bag, the sandbag and the peel-off adhesive layer to isolate the concrete of the secondary lining, and the wire of the pressure box passes through the partition layer and is led out from the bottom of the secondary lining; Locate the installation point: determine the installation point of a secondary lining contact pressure test device according to the requirements of the monitoring and risk warning mechanism; Install the fixing seat: measure the position data of each of the limit grooves and the center point of the pressure box, and according to the installation point and the position data, accurately position and weld the fixing seat to the area corresponding to the installation point on the steel mesh of the second lining by grounding; Laying sandbags: adjusting the content of homogeneous sand in the sandbags to fill the uneven pits of the initial support when the sandbags are pressed, and adhering the sandbags to the area corresponding to the installation point on the waterproof layer of the initial support through the peel-off adhesive layer; Install the pressure box: put the front of the pressure box toward the initial support and put it into the bag, rotate the pressure box so that each of the limit slots can be coaxial with each of the adjustment parts, one end of the adjustment part is threadedly connected to the fixing seat, turn the adjustment part until the other end of the adjustment part is against the back of the pressure box, continue to turn the adjustment part so that the adjustment part pushes the pressure box tightly against the waterproof layer of the initial support, measure the installation torque of the adjustment part with a torque wrench, and control the tightness of the fit between the pressure box and the sandbag; Setting the interlayer: covering the prepared interlayer on the cover bag, the sandbag and the peel-off adhesive layer; or making the partition layer on the pressure box covered with the bag on site using the material for making the partition layer; Leading out the wire: stick the wire to the waterproof layer of the initial support, and then run it downward along the waterproof layer. Pre-open holes for leading out the wire on the mudguard at the bottom of the secondary lining. When the secondary lining is poured, the wire is located between the gap between the trolley steel formwork of the secondary lining and the ground. A label is attached to the end of the wire to record the mileage of the monitoring section, monitoring location, instrument number and measurement index information.
2. A method for installing a secondary lining contact pressure test device according to claim 1, Features: One of the adjusting members is paired with one of the limiting slots, and the paired adjusting member and the limiting slot are coaxial.
3. A method for installing a secondary lining contact pressure test device according to claim 1, Features: The fixing seat and the adjusting member are respectively a first nut and a bolt.
4. A method for installing a secondary lining contact pressure test device according to claim 1 or 3, Features: The adjusting member is threadedly connected with a second nut and a third nut in regions on both sides of the fixing seat.
5. A method for installing a secondary lining contact pressure test device according to claim 1, Features: The cross section of the partition gradually increases from the fixing seat to the sandbag.
6. A method for installing a secondary lining contact pressure test device according to claim 1, Features: The partition is made of foam rubber.
7. A method for installing a secondary lining contact pressure test device according to claim 1, Features: The bag is made of a 0.3mm thick plastic soft film, and a wire outlet hole is provided on the bag for the wire to pass through.
8. A method for installing a secondary lining contact pressure test device according to claim 1, Features: A zipper is arranged at the bag opening of the sandbag.
9. A method for installing a secondary lining contact pressure test device according to claim 1, Features: The wire led out from the bottom of the second substrate is adhered with a label, and the label is used to record the mileage of the monitoring section, the monitoring position, the instrument number and the measurement index information.
Citation Information
Patent Citations
Tunnel lining concrete pressure detection device
CN210768812U