Intelligent diagnosis method and system for big data gateway faults based on bus balancing
By constructing an energy meter operation error analysis model and using the measurement values of the main transformer side of the busbar and the outlet meter, we can quickly locate the outlet meter that affects the bus balance, solve the problem of low diagnostic efficiency of the bus unbalance rate in the existing technology, and achieve bus balance. Efficient and preventive treatment of governance.
Patent Information
- Application Number
- CN202211255462.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-13
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-10-13
AI Technical Summary
When the bus unbalance rate is unqualified, the existing technology has low fault diagnosis efficiency and cannot prevent potential bus balance defects, resulting in limited governance efficiency and level.
Based on the law of conservation of energy, an energy meter operating error analysis model is constructed. The measurement values of the gateway energy meter and outlet meter on the main transformer side of the bus are used to establish a set of energy meter operating error equations to quickly locate the outlet meter that affects the bus balance and reduce the manual search for defects. process.
It realizes the rapid positioning of bus balance, reduces the workload of automation personnel, shortens the time to find defects, discovers potential hidden danger points, and handles them in advance, which significantly improves the efficiency and level of bus balance management.
Smart Images

Figure CN115494348B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to intelligent diagnosis technology for gateway faults, and in particular to a big data gateway fault intelligent diagnosis method and system based on bus balancing. Background Art
[0002] The busbar power imbalance rate is an important technical indicator that reflects the busbar line loss of each voltage level of the substation, measures the power supply and output of the substation, and is also an intuitive reflection of the power loss in the station. The electric energy collection system uses the measurement and conversion of the voltage and current transformers of the primary equipment in the station, connects to the electric energy meter with the secondary line, and then transmits the measured data from the plant to the main station through the communication equipment, so as to realize the measurement of the power in and out of the busbars at all levels in the station and the statistics of the busbar imbalance rate. By monitoring the busbar imbalance rate, it is helpful to timely discover the busbar fault, eliminate the defect as soon as possible, and realize the scientific and economic management of the power grid.
[0003] Bus balance mainly refers to the balance of bus power in and out of the substation. Bus imbalance rate refers to the line loss rate of the bus of the same voltage level in the substation (if the bus is segmented, it is regarded as one bus as a whole). It can be used to measure the reliability and accuracy of the data of the power acquisition system. The calculation formula is:
[0004] Bus unbalance rate = (bus input power - bus output power) / bus input power * 100%.
[0005] Among them, the bus supply and output power are the metered power of the switch gate meter on the incoming and outgoing sides of the bus of the voltage level of the substation, and it is stipulated that all power directions are positive when the bus points to the line. A substation can have multiple buses of different voltage levels. The index values of buses of different voltage levels are calculated separately. Theoretically, the difference in the power of the bus should be zero. Considering the power loss on the bus and the error of the measuring equipment, in the actual bus balance analysis, it is stipulated that when the difference between the incoming and outgoing bus is kept within the set range, the bus can be considered balanced, otherwise it is considered unbalanced. The bus index of 110kV and below voltage levels meets the standard range of bus unbalance rate between -2% and 2%. The factors that cause the bus unbalance rate to be unqualified are complex and diverse, and are greatly affected by factors such as primary equipment, secondary circuits, electric energy meters, software and communication equipment, and manual system configuration. Existing academic papers and technical materials have analyzed and summarized the causes of substation bus power imbalance. (1) Primary equipment: There are faults in the metering current transformer and voltage transformer. (2) Secondary circuit: faults such as secondary wiring error, short circuit or disconnection of secondary circuit. (3) Electric energy meter: fault in the communication module of the meter, poor interface contact, meter code jump, flying away; failure to update the configuration in time when the meter is newly installed or replaced, etc. (4) Software and communication equipment: loss of master station e-file, communication port failure, interruption of optical fiber or other communication channels, etc. (5) Human factors: configuration errors by management personnel, and failure of operation and maintenance personnel to deal with vacancies in a timely manner.
[0006] The existing busbar unbalance rate defect management process is as follows: 1. First, the automation personnel maintain daily monitoring of the busbar balance in the electric energy collection system. 2. The automation personnel manually analyze the system data anomalies based on the corresponding monitoring system and equipment, and judge the specific defects or fault points based on professional theory and experience. 3. Arrange corresponding personnel to deal with different defects. 4. After the defect is handled, the automation personnel verify whether the busbar inflow and outflow electricity has restored balance. However, the existing busbar unbalance rate defect management process has the following defects and shortcomings: 1. For the process of finding faults and defects in the busbar balance defect management, most of the existing technologies use manual verification methods by automation personnel. When the busbar power imbalance rate is abnormal, the automation personnel analyze and judge the causes of the busbar power imbalance based on the electric energy collection system and carry out the defect. 2. Due to the complexity and diversity of busbar balance defects, involving more equipment, and a large number of substations and buses, it is time-consuming and laborious for personnel to manually analyze defects, the workload is heavy, and the search time is long, which greatly affects the efficiency and level of busbar balance management. 3. The existing technology is based on the principle of managing busbar balance defects when the busbar imbalance rate is unqualified, which is unable to discover potential busbar balance defects, and is unable to prevent and deal with busbar balance defects in advance. Summary of the invention
[0007] Technical problem to be solved by the present invention: In view of the above-mentioned problems in the prior art, a big data gateway fault intelligent diagnosis method and system based on bus balance are provided. The present invention can realize the rapid positioning of the outgoing line meter affecting the bus balance through the big data of the measurement values of the gateway electric energy meter on the main transformer side of the bus and all the outgoing line meters under the bus, thereby eliminating the process of manual defect search, reducing the workload of automation personnel, shortening the time for defect search, discovering potential hidden dangers of bus power imbalance, realizing early disposal of defects, and greatly improving the efficiency and level of bus balance management.
[0008] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0009] A big data gateway fault intelligent diagnosis method based on bus balancing, comprising:
[0010] S1, based on the law of conservation of energy, using the bus or line topology relationship, construct an electric energy meter operation error analysis model;
[0011] S2, using the gateway electric energy meter on the bus main transformer side as a standard device to build an approximate electric energy meter operation error analysis model;
[0012] S3, based on the approximate electric energy meter operation error analysis model, the electric energy meter operation error equation group is established by using the measurement values of the gateway electric energy meter on the bus main transformer side and all the outgoing line meters under the bus, and the electric energy meter operation error of the outgoing line meter is obtained by solving the equation group;
[0013] S4, judging whether the operation error of the electric energy meter of a certain outlet meter exceeds a preset threshold value, and if it exceeds the preset threshold value, judging that the outlet meter is an outlet meter that affects the bus balance.
[0014] Optionally, the function expression of the electric energy meter operation error analysis model constructed in step S1 is:
[0015]
[0016] In the above formula, y i is the total power supply of the busbar on the main transformer side of the lower busbar in the i-th cycle, m is the number of all outgoing line meters under the busbar, x ij is the measurement value of the output meter j in the i-th cycle, β j is the estimated error of the output table j, β y is the bus line loss rate, β0 is the bus fixed loss.
[0017] Optionally, in step S2, using the gateway electric energy meter on the bus main transformer side as the standard device means using the gateway electric energy meter on the bus main transformer side as the standard device, replacing the total bus power supply on the bus main transformer side with the measurement value of the standard device, and approximating the electric energy meter operation error analysis model.
[0018] Optionally, the function expression of the approximate electric energy meter operation error analysis model obtained in step S2 is:
[0019]
[0020] In the above formula, y′ i is the value of the gateway electric energy meter on the main transformer side of the busbar in the i-th cycle, m is the number of all outgoing meters under the busbar, x ij is the measurement value of the output meter j in the i-th cycle, β j is the estimated error of the output table j, β y is the bus line loss rate, β0 is the bus fixed loss.
[0021] Optionally, the function expression of the electric energy meter operation error equation group established in step S3 is:
[0022]
[0023] In the above formula, y′1~y′ n are the measured values of the gateway electric energy meter on the main transformer side of the busbar in n cycles, x 11 ~x m1 are the measured values of m outlet meters in the first cycle, x 12 ~x m2 are the measured values of m outlet meters in the second cycle, x 1n ~xmn They are respectively the measured values of m outlet meters in the nth cycle.
[0024] Optionally, the function expression of the electric energy meter operation error of the outlet meter obtained by solving in step S3 is:
[0025]
[0026]
[0027]
[0028] In the above formula, β1~β m is the estimated error of the 1st to mth outlet tables, β y is the bus line loss rate, β0 is the bus fixed loss, y′1~t′ n are the measured values of the gateway electric energy meter on the main transformer side of the busbar in n cycles, x 11 ~x m1 are the measured values of m outlet meters in the first cycle, x 12 ~x m2 are the measured values of m outlet meters in the second cycle, x 1n ~x mn They are respectively the measured values of m outlet meters in the nth cycle.
[0029] Optionally, after step S4, the method further includes the step of performing a meter pressure loss analysis:
[0030] S101, determine the connection mode of the gateway electric energy meter on the bus main transformer side. If the connection mode is a three-phase three-wire meter, the voltage of phases A and C is collected, and the process jumps to step S102; if the connection mode is a three-phase four-wire meter, the voltage of phases A, B, and C is collected, and the process jumps to step S103;
[0031] S102, determine whether the voltage of any phase of phase A and phase C is less than K*reference voltage. If so, determine that there is a voltage loss phenomenon at the gateway electric energy meter on the bus main transformer side, and issue an alarm; end and exit; K is the reference coefficient;
[0032] S103, determine whether the voltage of any phase of A, B, and C is less than the reference voltage K*. If so, determine that there is a voltage loss phenomenon at the gateway electric energy meter on the main transformer side of the busbar, and issue an alarm; end and exit.
[0033] Optionally, collecting voltage in step S101 also includes collecting current; step S102 also includes determining that there is a current loss phenomenon in the gateway electric energy meter on the bus main transformer side when the current of any phase among phases A and C is less than 0.5% of the rated current and the current of the other phase is not less than 5% of the rated current, and issuing an alarm; end and exit; step S103 also includes determining that there is a current loss phenomenon in the gateway electric energy meter on the bus main transformer side when the current of any phase among phases A, B, and C is less than 0.5% of the rated current and the current of the other phase is not less than 10% of the rated current, and issuing an alarm; end and exit.
[0034] In addition, the present invention also provides a big data gateway fault intelligent diagnosis system based on bus balancing, comprising a microprocessor and a memory connected to each other, wherein the microprocessor is programmed or configured to execute the big data gateway fault intelligent diagnosis method based on bus balancing.
[0035] In addition, the present invention also provides a computer-readable storage medium, in which a computer program is stored, and the computer program is used to be programmed or configured by a microprocessor to execute the big data gateway fault intelligent diagnosis method based on bus balancing.
[0036] Compared with the prior art, the present invention mainly has the following advantages: the present invention includes constructing an energy meter operation error analysis model based on the law of conservation of energy and using the bus or line topology relationship; constructing an approximate energy meter operation error analysis model using the gateway energy meter on the bus main transformer side as a standard; on the basis of the approximate energy meter operation error analysis model, establishing an energy meter operation error equation group using the metering values of the gateway energy meter on the bus main transformer side and all the outgoing line meters under the bus, and solving to obtain the energy meter operation error of the outgoing line meter; judging whether the energy meter operation error of a certain outgoing line meter exceeds a preset threshold, if it exceeds the preset threshold, then judging that the outgoing line meter is an outgoing line meter that affects the bus balance. The present invention can realize the rapid positioning of the outgoing line meter that affects the bus balance through the big data of the metering values of the gateway energy meter on the bus main transformer side and all the outgoing line meters under the bus, eliminating the process of manually finding defects, reducing the workload of automation personnel, shortening the time of finding defects, and discovering the potential hidden danger points of bus power imbalance, realizing early disposal of defects, and generally greatly improving the efficiency and level of bus balance management. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 Schematic diagram of the basic flow of the method of the embodiment of the present invention. DETAILED DESCRIPTION
[0038] like Figure 1 As shown, the big data gateway fault intelligent diagnosis method based on bus balancing in this embodiment includes:
[0039] S1, based on the law of conservation of energy, using the bus or line topology relationship, construct an electric energy meter operation error analysis model;
[0040] S2, using the gateway electric energy meter on the bus main transformer side as a standard device to build an approximate electric energy meter operation error analysis model;
[0041] S3, based on the approximate electric energy meter operation error analysis model, the electric energy meter operation error equation group is established by using the measurement values of the gateway electric energy meter on the bus main transformer side and all the outgoing line meters under the bus, and the electric energy meter operation error of the outgoing line meter is obtained by solving the equation group;
[0042] S4, judging whether the operation error of the electric energy meter of a certain outlet meter exceeds a preset threshold value, and if it exceeds the preset threshold value, judging that the outlet meter is an outlet meter that affects the bus balance.
[0043] In this embodiment, the function expression of the electric energy meter operation error analysis model constructed in step S1 is:
[0044]
[0045] In the above formula, y i is the total power supply of the busbar on the main transformer side of the lower busbar in the i-th cycle, m is the number of all outgoing line meters under the busbar, x ij is the measurement value of the output meter j in the i-th cycle, β j is the estimated error of the output table j, β y is the bus line loss rate, β0 is the bus fixed loss.
[0046] In this embodiment, in step S2, using the gateway electric energy meter on the bus main transformer side as the standard device means using the gateway electric energy meter on the bus main transformer side as the standard device, replacing the total bus power supply on the bus main transformer side with the measurement value of the standard device, and approximating the electric energy meter operation error analysis model.
[0047] In this embodiment, the function expression of the approximate electric energy meter operation error analysis model obtained in step S2 is:
[0048]
[0049] In the above formula, y′ i is the value of the gateway electric energy meter on the main transformer side of the busbar in the i-th cycle, m is the number of all outgoing meters under the busbar, x ij is the measurement value of the output meter j in the i-th cycle, β j is the estimated error of the output table j, β y is the bus line loss rate, β0 is the bus fixed loss.
[0050] In this embodiment, the function expression of the electric energy meter operation error equation group established in step S3 is:
[0051]
[0052] In the above formula, y′1~y′ n are the measured values of the gateway electric energy meter on the main transformer side of the busbar in n cycles, x 11 ~x m1 are the measured values of m outlet meters in the first cycle, x 12 ~x m2 are the measured values of m outlet meters in the second cycle, x 1n ~x mn They are respectively the measured values of m outlet meters in the nth cycle.
[0053] In this embodiment, the function expression of the electric energy meter operation error of the outlet meter obtained by solving in step S3 is:
[0054]
[0055]
[0056]
[0057] In the above formula, β1~β m is the estimated error of the 1st to mth outlet tables, β y is the bus line loss rate, β0 is the bus fixed loss, y′1~y′ n are the measured values of the gateway electric energy meter on the main transformer side of the busbar in n cycles, x 11 ~x m1 are the measured values of m outlet meters in the first cycle, x 12 ~x m2 are the measured values of m outlet meters in the second cycle, x 1n ~x mn They are respectively the measured values of m outlet meters in the nth cycle.
[0058] In this embodiment, after step S4, the step of performing meter pressure loss analysis is also included:
[0059] S101, determine the connection mode of the gateway electric energy meter on the bus main transformer side. If the connection mode is a three-phase three-wire meter, the voltage of phases A and C is collected, and the process jumps to step S102; if the connection mode is a three-phase four-wire meter, the voltage of phases A, B, and C is collected, and the process jumps to step S103;
[0060] S102, determine whether the voltage of any phase of phase A and phase C is less than K*reference voltage. If so, determine that there is a voltage loss phenomenon at the gateway electric energy meter on the main transformer side of the busbar, and issue an alarm; end and exit; K is a reference coefficient, and the reference coefficient K can generally be selected as 1 according to needs;
[0061] S103, determine whether the voltage of any phase of A, B, and C is less than the reference voltage K*. If so, determine that there is a voltage loss phenomenon at the gateway electric energy meter on the main transformer side of the busbar, and issue an alarm; end and exit.
[0062] In this embodiment, collecting voltage in step S101 also includes collecting current; step S102 also includes determining that there is a current loss phenomenon in the gateway electric energy meter on the bus main transformer side when the current of any phase in phases A and C is less than 0.5% of the rated current and the current of the other phase is not less than 5% of the rated current, and issuing an alarm; end and exit; step S103 also includes determining that there is a current loss phenomenon in the gateway electric energy meter on the bus main transformer side when the current of any phase in phases A, B, and C is less than 0.5% of the rated current and the current of the other phase is not less than 10% of the rated current, and issuing an alarm; end and exit.
[0063] In summary, the method of this embodiment is based on the law of conservation of energy, uses the bus (or line) topological relationship, constructs an electric energy meter operation error analysis model, takes the bus main transformer side meter as the standard, and uses the timed frozen electricity of the bus main transformer side meter and the calibrated electric energy meter to establish an equation group and solve it to obtain the electric energy meter operation error. According to the law of conservation of energy, "the power supply of the bus main transformer side meter" = "the sum of the electricity consumption of all outgoing meters under the bus" + "bus loss" + "bus fixed loss" to construct an electric energy meter operation error analysis model; the gateway electric energy meter on the bus main transformer side is used as a standard to construct an approximate electric energy meter operation error analysis model; on the basis of the approximate electric energy meter operation error analysis model, the meter operation error equation group is established using the metering values of the gateway electric energy meter on the bus main transformer side and all the outgoing meters under the bus, and the electric energy meter operation error of the outgoing meter is solved; it is determined whether the electric energy meter operation error of a certain outgoing meter exceeds the preset threshold value, and if it exceeds the preset threshold value, the outgoing meter is determined to be an outgoing meter that affects the bus balance. The energy meter operation error analysis model constructed in the method of this embodiment forms a gateway multi-level electricity balance model, which constitutes a model of building "one bus one balance rate", "one main transformer one loss rate", and "one line one loss rate", thereby improving the accuracy of abnormal monitoring. Moreover, the method of this embodiment can realize the rapid positioning of the outgoing line meter that affects the bus balance through the big data of the measurement values of the gateway energy meter on the main transformer side of the bus and all the outgoing line meters under the bus, eliminating the process of manual defect search, reducing the workload of automation personnel, shortening the time of defect search, and discovering potential hidden dangers of bus power imbalance, realizing early disposal of defects, and generally greatly improving the efficiency and level of bus balance management.
[0064] In addition, this embodiment also provides a big data gateway fault intelligent diagnosis system based on bus balancing, including a microprocessor and a memory connected to each other, and the microprocessor is programmed or configured to execute the aforementioned big data gateway fault intelligent diagnosis method based on bus balancing.
[0065] In addition, this embodiment also provides a computer-readable storage medium, in which a computer program is stored. The computer program is used to be programmed or configured by a microprocessor to execute the aforementioned big data gateway fault intelligent diagnosis method based on bus balancing.
[0066] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application may take the form of a computer program product implemented on one or more computer-readable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes. The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, may be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the functions in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing device to work in a specific way, so that the instructions stored in the computer-readable memory produce a product including an instruction device, which implements the functions specified in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be loaded onto a computer or other programmable data processing device, so that a series of operation steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0067] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A big data gateway fault intelligent diagnosis method based on bus balancing, characterized in that: include: S1, based on the law of conservation of energy, uses the bus or line topology relationship to build an electric energy meter operation error analysis model; S2, using the gateway electric energy meter on the busbar main transformer side as a standard device to build an approximate electric energy meter operation error analysis model; S3, based on the approximate electric energy meter operation error analysis model, the electric energy meter operation error equation group is established using the measurement values of the gateway electric energy meter on the bus main transformer side and all the outgoing line meters under the bus, and the electric energy meter operation error of the outgoing line meters is obtained by solving the equation group; S4, determining whether an electric energy meter operation error of a certain outlet meter exceeds a preset threshold value, and if so, determining that the outlet meter is an outlet meter that affects busbar balance; After step S4, the following steps are also included: S101, determine the connection mode of the gateway electric energy meter on the busbar main transformer side. If the connection mode is three-phase three-wire, the meter collects the voltages of phases A and C, and jumps to step S102; if the connection mode is three-phase four-wire, the meter collects the voltages of phases A, B, and C, and jumps to step S103; S102, determine whether the voltage of any phase of phases A and C is less than K*reference voltage. If so, determine that the gateway electric energy meter on the bus main transformer side has lost voltage and issue an alarm; end and exit; where K is the reference coefficient; S103, determine whether the voltage of any phase of A, B, and C is less than the reference voltage K*. If so, determine that there is a voltage loss phenomenon in the gateway electric energy meter on the bus main transformer side, and issue an alarm; end and exit.
2. The intelligent diagnosis method for big data gateway faults based on bus balancing according to claim 1 is characterized in that: The function expression of the electric energy meter operation error analysis model constructed in step S1 is: , In the above formula, For the i The total bus power supply on the lower bus main transformer side in a cycle, The number of all outgoing line meters under the busbar, For the i Output table under each cycle j The measurement value of For the output table j The estimation error, is the busbar line loss rate, is the fixed bus loss.
3. The intelligent diagnosis method for big data gateway faults based on bus balancing according to claim 2 is characterized in that: In step S2, using the gateway electric energy meter on the bus main transformer side as a standard device means using the gateway electric energy meter on the bus main transformer side as a standard device, replacing the total bus power supply on the bus main transformer side with the measurement value of the standard device, and approximating the electric energy meter operation error analysis model.
4. The intelligent diagnosis method for big data gateway faults based on bus balancing according to claim 3 is characterized in that: The function expression of the approximate electric energy meter operation error analysis model obtained in step S2 is: , In the above formula, For the i The measured value of the energy meter at the main transformer side of the busbar in a cycle is: The number of all outgoing line meters under the busbar, For the i Output table under each cycle j The measurement value of For the output table j The estimation error, is the busbar line loss rate, is the fixed bus loss.
5. The intelligent diagnosis method for big data gateway faults based on bus balancing according to claim 4 is characterized in that: The function expression of the electric energy meter operation error equation group established in step S3 is: , In the above formula, ~ are the measured values of the gateway electric energy meter on the main transformer side of the busbar in n cycles respectively, ~ In the first cycle The measured value of each outlet meter, ~ The second cycle The measured value of each outlet meter, ~ In the nth cycle, The measured value of each outlet meter.
6. The intelligent diagnosis method for big data gateway faults based on bus balancing according to claim 5 is characterized in that: The function expression of the electric energy meter operation error of the outlet meter obtained by solving in step S3 is: , , , , In the above formula, ~ is the estimated error of the 1st to mth outlet meters, is the busbar line loss rate, is the busbar fixed loss, ~ are the measured values of the gateway electric energy meter on the main transformer side of the busbar in n cycles respectively, ~ In the first cycle The measured value of each outlet meter, ~ The second cycle The measured value of each outlet meter, ~ In the nth cycle, The measured value of each outlet meter.
7. The intelligent diagnosis method for big data gateway faults based on bus balancing according to claim 1 is characterized in that: In step S101, collecting voltage also includes collecting current; in step S102, when the current of any phase among phases A and C is less than 0.5% of the rated current and the current of the other phase is not less than 5% of the rated current, it is determined that there is a current loss phenomenon in the gateway electric energy meter on the bus main transformer side, and an alarm is issued; end and exit; in step S103, when the current of any phase among phases A, B, and C is less than 0.5% of the rated current and the current of the other phase is not less than 10% of the rated current, it is determined that there is a current loss phenomenon in the gateway electric energy meter on the bus main transformer side, and an alarm is issued; end and exit.
8. A big data gateway fault intelligent diagnosis system based on bus balancing, comprising a microprocessor and a memory connected to each other, characterized in that: The microprocessor is programmed or configured to execute the big data gateway fault intelligent diagnosis method based on bus balancing as described in any one of claims 1 to 7.
9. A computer-readable storage medium storing a computer program, wherein: The computer program is used to be programmed or configured by a microprocessor to execute the big data gateway fault intelligent diagnosis method based on bus balancing as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Monitoring method and system of electric energy measurement device and terminal equipment
CN109031184A
Transformer substation bus balance fault diagnosis method, system and device and storage medium
CN112560214A