Well blockage dredging device and dredging method based on microwave irradiation heating
Through the use of microwave irradiation heating-based chute clogging and unblocking devices, microwave heating technology and monitoring systems are used to solve the safety hazards and low efficiency problems of existing chute clogging and unblocking methods, and achieve simple, safe, and low-cost unblocking of chute wells.
Patent Information
- Application Number
- CN202211352941.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-01
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-11-01
AI Technical Summary
Existing methods for clearing blockages in mine shafts have safety hazards, high costs, and low efficiency. In particular, hydraulic flushing and blasting methods have shortcomings in certainty and safety, making it difficult to effectively solve the problem of blockage of slide shafts.
A chute blockage and unblocking device based on microwave irradiation heating is used, including a microwave manufacturing system, a conduction system and a monitoring system. Microwaves are generated through the magnetron assembly, and the rectangular waveguide and microwave applicator are used to heat the blockage. The monitoring system observes the blockage in real time. status to ensure safe and reliable dredging.
It achieves easy-to-operate, safe, reliable, low-energy consumption, and pollution-free unblocking of chute well blockages, improves the unblocking success rate and work efficiency, reduces construction costs, and is suitable for blockages of different depths and types.
Smart Images

Figure CN115515267B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mining equipment, and in particular to a chute blockage unblocking device based on microwave irradiation heating, and a chute blockage unblocking method based on microwave irradiation heating using the dredging device. Background Art
[0002] In underground mining activities of metal mines, different types of chutes are responsible for the transportation of ore and waste rock during the mining stage. They are also the key to ensuring the low-cost and high-efficiency transportation of mine ore and waste rock, and play an extremely important role in the efficient mining of metal mines. However, in actual mining activities, factors such as long ore deposition time and high ore block rate often cause chute blockage, which seriously affects the mining progress and economic benefits of the mine, and poses a serious threat to the personal safety of on-site workers. Therefore, ensuring the smooth operation of the mine chute system is of great practical significance for the safe and efficient mining of underground metal mines.
[0003] At present, the main methods used to dredge chute blockage are hydraulic flushing and blasting.
[0004] The hydraulic flushing dredging method is to inject water into the chute at the upper stage of the chute blockage or in sections, and destroy the bonding state between the blocks of the blocked material through the lubricating effect of water, reduce the friction between the blocks, and finally cause the material to fall under the action of gravity, so as to achieve the purpose of unblocking the chute. However, the hydraulic flushing dredging method also has obvious disadvantages and safety hazards: First, the amount of water injected into the chute cannot be determined. When the amount of water injected into the chute is small, the bonding state and friction between the blocked blocks are difficult to reduce, and the purpose of unblocking the chute cannot be achieved. When the amount of water injected into the chute is large, the blocked blocks are easy to form strong impact debris flows with water, posing a serious threat to the safety of the next stage of workers and mechanical equipment. Second, the dredging time cannot be determined. Due to the complexity of the block structure of the material blocking the chute, the time of hydraulic flushing dredging is difficult to determine, which will also affect the subsequent mining plan of the mining site.
[0005] At present, the main blasting and unblocking methods include blasting vibration method, deep hole blasting method, mining rocket blasting method, hydrogen balloon blasting method, etc. Among them, the blasting vibration method is to fix the explosive bag on the support rod, and then manually extend the support rod from the bottom of the chute to the blockage and detonate the explosive. The shock wave generated by the explosion loosens the blocked material, thereby achieving the purpose of unblocking the chute. However, in the actual site, the unblocking success rate of the blasting vibration method is difficult to guarantee, and the blasting effect is often poor. Since the deep hole blasting method requires drilling an upward or downward deep hole before charging and blasting, it has the disadvantages of high difficulty in operation, low unblocking efficiency, and high construction cost. The mining rocket blasting method and the hydrogen balloon blasting method are the most widely used chute blockage unblocking methods in mining enterprises. Rockets and hydrogen balloons are used to transport explosives to the blocked part for blasting and unblocking. Since the explosives are delivered by rockets and hydrogen balloons, the blasting uniformity and reliability are low, and it is difficult to ensure the success of one-time dredging. Multiple blasting is often required, which poses a serious threat to the safety of underground operations. Therefore, finding a simple, safe, low-energy, and green chute blockage dredging device and dredging method is still of great significance to the mining activities of metal mines. Summary of the invention
[0006] The purpose of the present invention is to provide a device and method for dredging a chute blockage based on microwave irradiation technology, which is simple to operate, safe and reliable, low in cost, clean and pollution-free, in view of the shortcomings of the existing mine chute blockage dredging technology. The technical scheme is as follows:
[0007] The present invention discloses a chute blockage dredging device based on microwave irradiation heating, the dredging device comprises: a microwave manufacturing system, a conduction system, a monitoring system and a loading mobile body, the microwave manufacturing system, the conduction system and the monitoring system are detachably assembled and arranged on the loading mobile body; the microwave manufacturing system comprises a power supply, a transformer and a magnetron assembly, the magnetron assembly is connected to the transformer circuit, and the transformer is connected to the power supply circuit; the conduction system comprises an isolator, a directional coupler, a conduction section rectangular waveguide, an E-surface bent waveguide, a dredging section rectangular waveguide and microwave applicator, the isolator is connected to the magnetron assembly, the directional coupler is connected to the isolator, the conductive section rectangular waveguide, the E-surface bent waveguide, the dredging section rectangular waveguide and the microwave applicator are connected in sequence; the monitoring system includes a power monitor and a real-time observation camera for the dredging status of the blockage, the power monitor is arranged between the directional coupler and the conductive section rectangular waveguide, and is respectively connected to the directional coupler and the conductive section rectangular waveguide, and the real-time observation camera for the dredging status of the blockage is arranged on the peripheral wall of the dredging section rectangular waveguide.
[0008] Furthermore, the conductive section rectangular waveguide, the E-surface curved waveguide and the dredging section rectangular waveguide are all waveguides with detachable structures; when the dredging device is in a non-operating state or entering and evacuating the chute dredging site, the conductive section rectangular waveguide, the E-surface curved waveguide and the dredging section rectangular waveguide are in a detached state and stored in the loading mobile body; when the dredging device is in an operating state, the dredging section rectangular waveguide, the E-surface curved waveguide and the dredging section rectangular waveguide of appropriate length are selected to be connected into a combined state; when the dredging device is in a non-operating state or entering and evacuating the chute dredging site, the connection ports of the conductive section rectangular waveguide, the E-surface curved waveguide and the dredging section rectangular waveguide are provided with waveguide protective covers.
[0009] Furthermore, the camera for real-time observation of the dredging status of the blockage is detachably arranged on the peripheral wall of the rectangular waveguide of the dredging section through a connecting buckle, and at least four cameras for real-time observation of the dredging status of the blockage are evenly spaced on the peripheral wall of the rectangular waveguide of the dredging section.
[0010] Furthermore, the waveguide protective cover is made of rubber material, and the camera for real-time observation of the dredging status of the blockage body is a high-temperature resistant camera.
[0011] A method for clearing a chute blockage based on microwave irradiation heating of the present invention uses the clearing device as described above, and the clearing method comprises the following steps:
[0012] Step 1: determine the type of rock of the blockage body, calculate the blockage depth and the length of the blockage body; use a laser rangefinder to measure the straight-line distance L1 from the upper section transport tunnel to the blockage body and the straight-line distance L3 from the lower section transport tunnel to the blockage body, respectively. The stope segment height is a known value L, and then calculate the length of the blockage body L2 = L-L1-L3;
[0013] Step 2: According to the calculation result of the length L2 of the blockage body in the chute, select the dredging section rectangular waveguide of appropriate length, install the microwave applicator and the real-time observation camera of the dredging status of the blockage body on the dredging section rectangular waveguide, connect the dredging section rectangular waveguide with the E-surface curved waveguide, then place the dredging section rectangular waveguide and the E-surface curved waveguide to the blocked chute, install the conductive section rectangular waveguide, and connect the conductive section rectangular waveguide with the power monitor;
[0014] Step 3: After assembly, according to the type of surrounding rock of the well plugging body and the length L2 of the plugging body, according to the formula P = 2πfε ↓ 0ε ↑ E↑2, determine the microwave power and irradiation time required for the dredging device to dredge the blockage, where f is the microwave frequency, ε0 is the vacuum dielectric constant (8.85×10-12F / m), ε↑ is the dielectric loss factor of rock material, E is the electric field intensity; the irradiation time is determined by the observation camera on the monitoring system. When the operator observes from the observation camera that the blockage begins to fall, the power is turned off and the irradiation is stopped.
[0015] Step 4, starting the dredging device, the magnetron assembly generates microwaves, the microwaves are transmitted to the microwave applicator through the isolator, the directional coupler, the power monitor, the conductive section rectangular waveguide, the E-surface curved waveguide and the dredging section rectangular waveguide, and finally irradiated to the surface of the blockage body by the microwave applicator;
[0016] The rock inside the plugging body heats up rapidly under the action of microwaves, and the bonding force between different rock blocks weakens rapidly, and even the rock blocks melt and eventually fall off. During the microwave irradiation process, the real-time observation camera for the dredging status of the plugging body observes the status of the plugging body in all directions and in real time. Once the plugging body falls off, the power supply is immediately turned off and the irradiation is stopped.
[0017] Step five, after the chute blockage is unblocked, the conductive section rectangular waveguide, the E-surface curved waveguide, the unblocking section rectangular waveguide, the microwave applicator and the real-time observation camera for the unblocking condition of the blockage are disassembled in sequence; after the disassembly is completed, the waveguide protective covers are respectively installed on both ends of the conductive section rectangular waveguide, the E-surface curved waveguide and the unblocking section rectangular waveguide, and the conductive section rectangular waveguide, the E-surface curved waveguide, the unblocking section rectangular waveguide, the microwave applicator and the real-time observation camera for the unblocking condition of the blockage are stored in the carrying box of the mobile body.
[0018] The beneficial effects of the present invention are:
[0019] The chute blockage dredging device based on microwave irradiation of the present invention can generate microwaves through the internal magnetron assembly by connecting the power supply and the transformer, and irradiate the microwaves to the surface of the blocked surrounding rock of the chute at different depths through the detachably assembled rectangular waveguide and the applicator; the dipole molecules inside different types of surrounding rocks move at high frequency under the action of the microwave electromagnetic field, absorb microwave energy to varying degrees and convert it into heat energy internally, the temperature of the blockage body rises rapidly, the internal bonding force between the rock blocks gradually weakens and falls off, and finally the goal of dredging the chute is achieved; compared with the traditional blasting method, the water flushing method has the disadvantages of low safety factor, great environmental pollution, and low dredging success rate. The microwave radiation heating dredging operation is simple, safe and reliable, the dredging effect is remarkable, low energy consumption and pollution-free, and it has wide application value.
[0020] The detachable structures of the conducting section rectangular waveguide, the E-surface curved waveguide, and the dredging section rectangular waveguide of the present invention enable the dredging device to quickly and flexibly reach a complex working environment, saving operation time and improving work efficiency.
[0021] The selective dredging section rectangular waveguide combination of the present invention is suitable for dredging tasks of chutes with different blockage depths, thereby improving the applicability of the dredging device.
[0022] The high temperature resistant observation camera arranged in an annular direction of the present invention can observe the dredging status of the blockage body in all directions and in real time, and can grasp the dredging degree of the blockage body in real time to ensure the safety of the operation.
[0023] The snap-on detachable structure of the high-temperature resistant observation camera and the rectangular waveguide of the dredging section of the present invention can make the observation camera and the rectangular waveguide independent of each other. When a failure occurs, there is no need to replace all of them. Only the failed part needs to be replaced and they can continue to be used, thereby improving the economic benefits of the dredging work.
[0024] The protective cover made of rubber material with high ductility of the present invention can be used for connecting ports of conductive section rectangular waveguide, E-surface curved waveguide and dredging section rectangular waveguide, thereby increasing the service life of different rectangular waveguides. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0026] Figure 1 This is a schematic diagram of the structure of a chute blockage dredging device based on microwave irradiation heating;
[0027] Figure 2 It is a structural schematic diagram of the working state of the chute blockage dredging device based on microwave irradiation heating;
[0028] Figure 3 It is a partial schematic diagram of the camera for real-time observation of the dredging status of the blockage body;
[0029] Figure 4 It is a schematic diagram of the top view of the structure at the camera where the blockage dredging status is observed in real time;
[0030] Figure 5 It is a schematic diagram of the combination of different types of rectangular waveguides in the dredging section. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the technical solutions in the embodiments of the present invention and to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, the specific implementation modes of the present invention are further described below in conjunction with the accompanying drawings.
[0032] It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in each embodiment of the present invention described below can be combined with each other as long as there is no conflict between them.
[0033] Please refer to Figures 1 to 5 The present embodiment is a device for clearing a well blockage based on microwave irradiation heating, the clearing device comprising: a microwave manufacturing system 1, a conduction system 2, a monitoring system 3 and a loading mobile body 4, wherein the microwave manufacturing system 1, the conduction system 2 and the monitoring system 3 are detachably assembled and arranged on the loading mobile body 4; the microwave manufacturing system 1 comprises a power supply 11, a transformer 12 and a magnetron assembly 13, the magnetron assembly 13 is connected to the transformer 12 circuit, and the transformer 12 is connected to the power supply 11 circuit; the conduction system 2 comprises an isolator 21, a directional coupler 22, a conduction section rectangular waveguide 23, an E-surface bent waveguide 24, a clearing device 25, a conductive section rectangular waveguide 26, a conductive section rectangular waveguide 27, a conductive section rectangular waveguide 28, a conductive section rectangular waveguide 29, a conductive section rectangular waveguide 30, a conductive section rectangular waveguide 31, a conductive section rectangular waveguide 32, a conductive section rectangular waveguide 33, a conductive section rectangular waveguide 34, a conductive section rectangular waveguide 35, a conductive section rectangular waveguide 36, a conductive section rectangular waveguide 37, a conductive section rectangular waveguide 38, a conductive section rectangular waveguide 39, a conductive section rectangular waveguide 31 ... The isolator 21 is connected to the magnetron assembly 13, the directional coupler 22 is connected to the isolator 21, the conduction section rectangular waveguide 23, the E-surface bent waveguide 24, the dredging section rectangular waveguide 25 and the microwave applicator 26 are connected in sequence; the monitoring system 3 includes a power monitor 31 and a real-time observation camera 32 for the dredging status of the blockage, the power monitor 31 is arranged between the directional coupler 22 and the conduction section rectangular waveguide 23, and is respectively connected to the directional coupler 22 and the conduction section rectangular waveguide 23, and the real-time observation camera 32 for the dredging status of the blockage is arranged on the peripheral wall of the dredging section rectangular waveguide 25.
[0034] Preferably, the conductive section rectangular waveguide 23, the E-surface curved waveguide 24 and the dredging section rectangular waveguide 25 are all waveguides with detachable structures; when the dredging device is in a non-operating state or entering and evacuating the chute dredging site, the conductive section rectangular waveguide 23, the E-surface curved waveguide 24 and the dredging section rectangular waveguide 25 are in a detached state and stored in the loading mobile body 4; when the dredging device is in an operating state, the dredging section rectangular waveguide 23, the E-surface curved waveguide 24 and the dredging section rectangular waveguide 25 of appropriate length are selected to be connected into a combined state; when the dredging device is in a non-operating state or entering and evacuating the chute dredging site, the connection ports of the conductive section rectangular waveguide 23, the E-surface curved waveguide 24 and the dredging section rectangular waveguide 25 are provided with waveguide protective covers 27.
[0035] Preferably, the real-time observation camera 32 for the dredging status of the blockage is detachably arranged on the peripheral wall of the dredging section rectangular waveguide 25 through a connecting buckle 33, and at least four real-time observation cameras 32 for the dredging status of the blockage are evenly spaced on the peripheral wall of the dredging section rectangular waveguide 25.
[0036] Preferably, the waveguide protection sleeve 27 is made of rubber material, and the camera 32 for real-time observation of the blockage dredging status is a high temperature resistant camera.
[0037] A method for unclogging a chute based on microwave irradiation and heating in this embodiment uses the unclogging device as described above, and the unclogging method includes the following steps:
[0038] Step 1: Determine the type of rock of the blockage body of the chute, calculate the blockage depth and the length of the blockage body; use a laser rangefinder to measure the straight-line distance L1 from the upper section transport tunnel 5 to the blockage body 7 and the straight-line distance L3 from the lower section transport tunnel 6 to the blockage body 7, respectively. The stope segment height is a known value L, and the length of the blockage body 7 is calculated as L2 = L-L1-L3;
[0039] Step 2: According to the calculation result of the length L2 of the blockage body 7 in the chute, a dredging section rectangular waveguide 25 of a suitable length is selected, and a microwave applicator 26 and a real-time observation camera 32 for dredging the blockage body are installed on the dredging section rectangular waveguide 25, and the dredging section rectangular waveguide 25 is connected with the E-surface curved waveguide 24, and then the dredging section rectangular waveguide 25 and the E-surface curved waveguide 24 are placed at the blocked chute, and then the conductive section rectangular waveguide 23 is installed, and the conductive section rectangular waveguide 23 is connected with the power monitoring meter 31;
[0040] Step 3: After assembly, according to the type of surrounding rock of the well plugging body and the length L2 of the plugging body 7, according to the formula P = 2πfε ↓ 0ε ↑ E ↑ 2. Determine the microwave power required for the dredging device to dredge the blockage; where f is the microwave frequency, ε0 is the vacuum dielectric constant (8.85×10-12F / m), ε ↑ is the dielectric loss factor of rock material, E is the electric field intensity;
[0041] Step 4, start the dredging device, the magnetron assembly 13 generates microwaves, the microwaves are transmitted to the microwave applicator 26 through the isolator 21, the directional coupler 22, the power monitor 31, the conductive section rectangular waveguide 23, the E-surface curved waveguide 24 and the dredging section rectangular waveguide 25, and finally irradiated to the surface of the blocking body 7 by the microwave applicator 26; the rock inside the blocking body 7 heats up rapidly under the action of microwaves, the bonding force between different rock blocks is rapidly weakened, and even the rock blocks melt and eventually fall off; during the microwave irradiation process, the real-time observation camera 32 for the dredging status of the blocking body observes the status of the blocking body 7 in all directions and in real time. Once the blocking body 7 falls off, the power is immediately turned off and the irradiation is stopped;
[0042] Step five, after the blockage in the chute is unblocked, the conductive section rectangular waveguide 23, the E-surface curved waveguide 24, the unblocking section rectangular waveguide 25, the microwave applicator 26 and the real-time observation camera 32 for the unblocking condition of the blockage are disassembled in sequence. After the disassembly is completed, waveguide protection covers 27 are added to both ends of the conductive section rectangular waveguide 23, the E-surface curved waveguide 24 and the unblocking section rectangular waveguide 25, respectively, and the conductive section rectangular waveguide 23, the E-surface curved waveguide 24, the unblocking section rectangular waveguide 25, the microwave applicator 26 and the real-time observation camera 32 for the unblocking condition of the blockage are stored in the carrying box for loading the mobile body 4.
[0043] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.
[0044] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. For those skilled in the art, various changes, modifications, substitutions and variations made to these embodiments without departing from the principles and spirit of the present invention are still within the scope of protection of the present invention.
Claims
1. A method for clearing a chute blockage based on microwave irradiation and heating, using a chute blockage clearing device using microwave irradiation and heating, the clearing device comprising: A microwave manufacturing system (1), a conduction system (2), a monitoring system (3), and a loading mobile body (4), wherein the microwave manufacturing system (1), the conduction system (2), and the monitoring system (3) are detachably assembled and arranged on the loading mobile body (4); The microwave manufacturing system (1) comprises a power supply (11), a transformer (12) and a magnetron assembly (13), wherein the magnetron assembly (13) is connected to the transformer (12) circuit, and the transformer (12) is connected to the power supply (11) circuit; The conduction system (2) comprises an isolator (21), a directional coupler (22), a conduction section rectangular waveguide (23), an E-surface curved waveguide (24), a dredging section rectangular waveguide (25) and a microwave applicator (26); the isolator (21) is connected to the magnetron assembly (13); the directional coupler (22) is connected to the isolator (21); the conduction section rectangular waveguide (23), the E-surface curved waveguide (24), the dredging section rectangular waveguide (25) and the microwave applicator (26) are connected in sequence; when the dredging device is in a non-operating state or is entering or evacuating a chute dredging site, the connection ports of the conduction section rectangular waveguide (23), the E-surface curved waveguide (24) and the dredging section rectangular waveguide (25) are provided with waveguide protective sleeves (27); The monitoring system (3) comprises a power monitoring meter (31) and a real-time observation camera (32) for monitoring the unblocking status of the blockage body. The power monitoring meter (31) is arranged between the directional coupler (22) and the conductive section rectangular waveguide (23), and is respectively connected to the directional coupler (22) and the conductive section rectangular waveguide (23). The real-time observation camera (32) for monitoring the unblocking status of the blockage body is arranged on the peripheral wall of the unblocking section rectangular waveguide (25). Characterized in that the dredging method comprises the following steps: Step 1: determine the type of rock of the blockage body of the chute, calculate the blockage depth and the length of the blockage body; use a laser rangefinder to measure the straight-line distance L1 from the upper segmented transport tunnel (5) to the blockage body (7), and the straight-line distance L3 from the lower segmented transport tunnel (6) to the blockage body (7), respectively. The stope segment height is a known value L, and then calculate the length of the blockage body (7) L2 = L-L1-L3; Step 2: According to the calculation result of the length L2 of the obstruction body (7) in the chute, a suitable length of the dredging section rectangular waveguide (25) is selected, and the microwave applicator (26) and the real-time observation camera (32) for the dredging status of the obstruction body are installed on the dredging section rectangular waveguide (25), and the dredging section rectangular waveguide (25) is connected to the E-surface curved waveguide (24), and then the dredging section rectangular waveguide (25) and the E-surface curved waveguide (24) are placed at the obstruction chute, and then the conductive section rectangular waveguide (23) is installed, and the conductive section rectangular waveguide (23) is connected to the power monitoring meter (31); Step 3: After assembly, according to the type of surrounding rock of the well plugging body and the length L2 of the plugging body (7), according to the formula , determine the microwave power required by the dredging device to dredge the blockage, where, is the microwave frequency, is the dielectric constant of vacuum (8.85×10-12F / m), is the dielectric loss factor of rock material, is the electric field strength; Step 4, starting the dredging device, the magnetron assembly (13) generates microwaves, the microwaves are transmitted to the microwave applicator (26) through the isolator (21), the directional coupler (22), the power monitor (31), the conductive section rectangular waveguide (23), the E-surface curved waveguide (24) and the dredging section rectangular waveguide (25), and finally irradiated to the surface of the blocking body (7) by the microwave applicator (26); The rock inside the plugging body (7) heats up rapidly under the action of microwaves, and the bonding force between different rock blocks rapidly weakens, and even the rock blocks melt and eventually fall off; during the microwave irradiation process, the real-time observation camera (32) for the dredging status of the plugging body observes the status of the plugging body (7) in all directions and in real time; once the plugging body (7) falls off, the power supply is immediately turned off and the irradiation is stopped; Step 5: After the blockage in the chute is cleared, the conductive section rectangular waveguide (23), the E-surface curved waveguide (24), the clearing section rectangular waveguide (25), the microwave applicator (26) and the real-time observation camera (32) for the clearing condition of the blockage are disassembled in sequence. After the disassembly is completed, the waveguide protective sleeves (27) are respectively installed at both ends of the conductive section rectangular waveguide (23), the E-surface curved waveguide (24) and the clearing section rectangular waveguide (25), and the conductive section rectangular waveguide (23), the E-surface curved waveguide (24), the clearing section rectangular waveguide (25), the microwave applicator (26) and the real-time observation camera (32) for the clearing condition of the blockage are stored in the carrying box of the loading mobile body (4).
Citation Information
Patent Citations
Microwave heating device
CN102308668A
High-power microwave generator for engineering rock mass microwave cracking
CN108834247A
Experiment device used for rock boring research with microwave
CN108931538A
Movable deicing device for removing icing of blast hole and method for removing icing of blast hole
CN110700792A
Abrasive jet assisted mechanical rock breaking system and method
CN112196571A
