Pile group construction component and pile group construction method

By using strip holes on the grouting pipe structure and the side walls of the pipe piles in the pile group construction, grouting between two adjacent pipe piles is formed, which solves the problem of insufficient bearing capacity of the existing pile group and significantly improves the Overall bearing capacity.

CN115596001BActive Publication Date: 2024-11-26CHINA FIRST HIGHWAY ENGINEERING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211104155.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-09
Publication Date
2024-11-26
Estimated Expiration
2042-09-09

AI Technical Summary

Technical Problem

The individual single piles of existing group piles are only connected by concrete bearings, and there is less cross-linking between single piles, resulting in insufficient overall bearing capacity of group piles.

Method used

Using a pile group construction component including a grouting pipe structure and prefabricated pipe piles, grouting is carried out between two adjacent pipe piles through the strip holes on the side walls of the pipe piles and the grouting pipe structure to form a connecting wall to strengthen the single piles. crosslinking.

Benefits of technology

Through grouting pipe structure and strip holes on the side walls of the pipe piles, grouting between two adjacent pipe piles forms a connecting wall, which significantly improves the overall bearing capacity of the group piles, and solves the problem of insufficient cross-linking between single piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115596001B_ABST
    Figure CN115596001B_ABST
Patent Text Reader

Abstract

The present invention provides a pile group construction component and a pile group construction method, and relates to the technical field of pile foundation construction. The pile group construction component includes a grouting pipe structure and a plurality of prefabricated pipe piles; the side wall of each pipe pile is provided with a strip hole that penetrates to the top of the pipe pile and extends along the axial direction of the pipe pile; the plurality of pipe piles are spaced apart in pairs, and each group of two adjacent pipe piles is respectively a left pipe pile and a right pipe pile, and a grouting pipe structure is provided between the strip holes of the left pipe pile and the right pipe pile; the grouting pipe structure is provided with a left grouting port and a right grouting port that are spaced apart, and both ends of the grouting pipe structure are connected to an external grouting device, the left grouting port is located in the left pipe pile and can be raised and lowered in the left pipe pile, and the right grouting port is located in the right pipe pile and can be raised and lowered in the right pipe pile. The pile group construction component can grout between two adjacent pipe piles through the grouting pipe structure and the strip holes on the side wall of the pipe pile, thereby forming a connecting wall between the two adjacent pipe piles, and strengthening the overall bearing capacity of the pile group.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation construction, and in particular to a pile group construction component and a pile group construction method. Background Art

[0002] A pile group is a pile foundation composed of multiple single piles. In existing pile groups, multiple single piles are arranged in pairs, and concrete caps are constructed between the pile tops of multiple single piles. However, the single piles in existing pile groups are only connected by concrete caps, and the cross-linking between the single piles is still relatively small, resulting in insufficient overall bearing capacity of the pile group. Summary of the invention

[0003] The object of the present invention is to provide a pile group construction assembly and a pile group construction method, so as to alleviate the technical problem existing in the prior art that the individual piles of the existing pile group are only connected by concrete caps, and the cross-linking between the individual piles is still relatively small, resulting in insufficient overall bearing capacity of the pile group.

[0004] In a first aspect, the present invention provides a pile group construction assembly, comprising a grouting pipe structure and a plurality of prefabricated pipe piles;

[0005] The side wall of each of the pipe piles is provided with a strip hole which passes through to the top of the pipe pile and extends along the axial direction of the pipe pile, and the strip hole is connected with the internal space of the pipe pile;

[0006] The plurality of pipe piles are spaced apart in pairs, and each group of two adjacent pipe piles is a left pipe pile and a right pipe pile, respectively, and the grouting pipe structure is provided between the strip hole of the left pipe pile and the strip hole of the right pipe pile;

[0007] The grouting pipe structure is provided with a left grouting port and a right grouting port which are spaced apart. Both ends of the grouting pipe structure are connected to an external grouting device. The left grouting port is located in the left pipe pile and can be raised and lowered in the left pipe pile. The right grouting port is located in the right pipe pile and can be raised and lowered in the right pipe pile.

[0008] In an optional embodiment, the grouting pipe structure includes a left grouting pipe, a pull rope and a right grouting pipe connected in sequence;

[0009] The opening of the left grouting pipe close to the end of the pull rope is the left grouting port, and the opening of the right grouting pipe close to the end of the pull rope is the right grouting port.

[0010] In an optional embodiment, the pull rope is a steel wire rope.

[0011] In an optional embodiment, it also includes a left support rod and a right support rod;

[0012] The left support rod is used to abut against the grouting pipe structure located in the left pipe pile to drive the left grouting port to descend in the left pipe pile;

[0013] The right support rod is used to abut against the grouting pipe structure located in the right pipe pile to drive the right grouting port to descend in the right pipe pile.

[0014] In an optional embodiment, a left abutment and a right abutment are further included, wherein the left abutment is fixed to one end of the left support rod, and the right abutment is fixed to one end of the right support rod.

[0015] In an optional embodiment, the left abutment member and the right abutment member are both pulleys, and the circumferential side walls of the pulleys are provided with grooves extending along the circumference thereof.

[0016] In an optional embodiment, the side wall of the pipe pile is provided with an expansion hole located on the hole side of the strip hole and connected to the strip hole, and the expansion holes are multiple and spaced apart along the axial direction of the pipe pile.

[0017] In an optional embodiment, the left grouting port and the right grouting port are both circular openings;

[0018] The expanded hole and the strip-shaped hole are connected to form a circular hole, and the diameter of the circular hole is not less than the diameter of the left grouting port and is not less than the diameter of the right grouting port.

[0019] In a second aspect, the present invention provides a pile group construction method, using the pile group construction assembly described in any one of the aforementioned embodiments, comprising:

[0020] S1: driving a plurality of pipe piles in the pile group construction assembly into the ground;

[0021] S2: installing a grouting pipe structure in the pile group construction assembly between two adjacent pipe piles;

[0022] Wherein, step S2 comprises:

[0023] S20: connecting both ends of the grouting pipe structure to an external grouting device, placing the left grouting port of the grouting pipe structure at the top of the left pipe pile, and placing the right grouting port of the grouting pipe structure at the top of the right pipe pile;

[0024] S21: driving the portion of the grouting pipe structure located between the left grouting port and the right grouting port to descend between the strip holes of the left pipe pile and the strip holes of the right pipe pile, so that the left grouting port enters into the left pipe pile and the right grouting port enters into the right pipe pile.

[0025] In an optional embodiment, the method further includes the following steps after step S2:

[0026] S3: Continue to drive the left grouting port to descend in the left pipe pile and drive the right grouting port to descend in the right pipe pile until the left grouting port is descended to a preset depth and the right grouting port is descended to a preset depth;

[0027] S4: starting the external grouting device to inject grout into the left pipe pile and the right pipe pile respectively through the grouting pipe structure.

[0028] The pile group construction assembly provided by the present invention includes a grouting pipe structure and a plurality of prefabricated pipe piles; the side wall of each pipe pile is provided with a strip hole that penetrates to the top of the pipe pile and extends along the axial direction of the pipe pile, and the strip hole is connected to the internal space of the pipe pile; the plurality of pipe piles are spaced apart in pairs, and each group of two adjacent pipe piles is respectively a left pipe pile and a right pipe pile, and a grouting pipe structure is provided between the strip hole of the left pipe pile and the strip hole of the right pipe pile; the grouting pipe structure is provided with a left grouting port and a right grouting port that are spaced apart, and both ends of the grouting pipe structure are connected to an external grouting device, the left grouting port is located in the left pipe pile and can be raised and lowered in the left pipe pile, and the right grouting port is located in the right pipe pile and can be raised and lowered in the right pipe pile. The pile group construction assembly provided by the present invention can cooperate with the external grouting device to construct a connecting wall between the prefabricated pipe piles of the pile group, thereby strengthening the cross-linking between the prefabricated pipe piles of the pile group. When performing pile group construction, multiple prefabricated pipe piles in the pile group construction assembly can be sunk into the ground in sequence, and multiple pipe piles can be distributed in pairs, and then a grouting pipe structure can be installed between any two adjacent pipe piles. Specifically, the left grouting port of the grouting pipe structure is placed in the left pipe pile, and the right grouting port of the grouting pipe structure is placed in the right pipe pile, and then the left grouting port and the right grouting port are driven to descend in the left pipe pile and the right pipe pile respectively, until the left grouting port and the right grouting port are moved to the corresponding position at the bottom of the connecting wall to be constructed. Among them, the end of the strip hole on the side wall of the pipe pile close to the bottom of the pipe pile may not penetrate to the bottom of the pipe pile, and at this time, the end of the strip hole away from the bottom of the pipe pile can correspond to the bottom of the connecting wall to be constructed. After the left grouting port and the right grouting port are lowered to their proper positions, the external grouting device is driven to inject cement slurry or other slurry into the left grouting port and the right grouting port through the two ends of the grouting pipe structure. Since the left grouting port is located in the left pipe pile and the right grouting port is located in the right pipe pile, and since the side walls of the left pipe pile and the right pipe pile are respectively provided with strip holes penetrating the inside of the pipe pile, the slurry can be respectively filled into the left pipe pile and the right pipe pile through the left grouting port and the right grouting port, and at the same time, the strip holes of the left pipe pile and the right pipe pile are infiltrated into the soil between the left pipe pile and the right pipe pile and connected to each other. In the process of injecting the slurry, the grouting pipe structure can also be lifted up at intervals so that the left grouting port and the right grouting port rise in the left pipe pile and the right pipe pile respectively. After repeating the operations of grouting and lifting the grouting pipe structure, the slurry between the left pipe pile and the right pipe pile can have a height. After the slurry solidifies, a connecting wall connecting the left pipe pile and the right pipe pile can be formed. It should be noted that when the left grouting port and the right grouting port are raised and lowered at the same time, since the side walls of the left pipe pile and the right pipe pile are both provided with strip holes, the portion of the grouting pipe structure located between the left grouting port and the right grouting port will not be hindered by the side walls of the pipe pile and can be raised and lowered in the strip holes on the side walls of the pipe pile. At the same time, the portion of the grouting pipe structure located between the left grouting port and the right grouting port can be raised and lowered by cutting the soil between the left pipe pile and the right pipe pile under the drive of external force.

[0029] Therefore, compared with the prior art, the pile group construction assembly provided by the present invention can inject grout between two adjacent pipe piles through the grouting pipe structure and the strip holes on the side walls of the pipe piles, thereby forming a connecting wall between the two adjacent pipe piles, strengthening the cross-linking between the prefabricated pipe piles of the pile group, and improving the overall bearing capacity of the pile group.

[0030] The pile group construction method provided by the present invention uses the above-mentioned pile group construction assembly, including: step S1: driving multiple pipe piles in the pile group construction assembly into the ground; step S2: setting the grouting pipe structure in the pile group construction assembly between two adjacent pipe piles; wherein step S2 includes: step S20: connecting both ends of the grouting pipe structure with the external grouting device, and placing the left grouting port of the grouting pipe structure at the top of the left pipe pile, and the right grouting port of the grouting pipe structure at the top of the right pipe pile; step S21: driving the part of the grouting pipe structure located between the left grouting port and the right grouting port to descend between the strip hole of the left pipe pile and the strip hole of the right pipe pile, so that the left grouting port enters the left pipe pile and the right grouting port enters the right pipe pile. The pile group construction method provided by the present invention uses the above-mentioned pile group construction assembly, so the pile group construction method provided by the present invention can also construct a connecting wall between each prefabricated pipe pile of the pile group by using the above-mentioned pile group construction assembly, thereby strengthening the cross-linking between each prefabricated pipe pile of the pile group and improving the overall bearing capacity of the pile group. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 A schematic diagram of the structure of a pile group construction assembly provided by an embodiment of the present invention;

[0033] Figure 2 A schematic diagram of the structure of a left pipe pile, a right pipe pile and a pull rope provided in an embodiment of the present invention;

[0034] Figure 3 A schematic diagram of the structure of a left pipe pile, a right pipe pile and a grouting pipe structure provided by an embodiment of the present invention;

[0035] Figure 4 Another structural schematic diagram of the left pipe pile, the right pipe pile and the grouting pipe structure provided by an embodiment of the present invention;

[0036] Figure 5 A schematic diagram of the structure of a left pipe pile, a right pipe pile and a connecting wall provided by an embodiment of the present invention;

[0037] Figure 6 Another structural schematic diagram of the left pipe pile, the right pipe pile and the connecting wall provided by the embodiment of the present invention;

[0038] Figure 7 A schematic diagram of the structure of a pipe pile and a pull rope provided in an embodiment of the present invention;

[0039] Figure 8 A schematic diagram of the structure of a pipe pile and a grouting pipe structure provided by an embodiment of the present invention;

[0040] Fig. 9 Another structural schematic diagram of a pipe pile and a grouting pipe structure provided by an embodiment of the present invention;

[0041] Fig.10 A schematic diagram of the structure of pipe piles and connecting walls provided in an embodiment of the present invention;

[0042] Fig.11 Another structural schematic diagram of a pipe pile and a connecting wall provided in an embodiment of the present invention;

[0043] Fig.12 A flow chart of a pile group construction method provided by an embodiment of the present invention;

[0044] Fig.13 Another flow chart of the pile group construction method provided by an embodiment of the present invention.

[0045] Icons: 1- grouting pipe structure; 10- left grouting port; 11- right grouting port; 12- left grouting pipe; 13- pull rope; 14- right grouting pipe; 2- pipe pile; 20- strip hole; 200- expansion hole; 21- left pipe pile; 22- right pipe pile; 3- connecting wall; 4- left support rod; 40- left abutment; 5- right support rod; 50- right abutment. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0047] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] Some embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.

[0049] Example:

[0050] like Figure 1 As shown, the pile group construction assembly provided in this embodiment includes a grouting pipe structure 1 and a plurality of prefabricated pipe piles 2; Figure 2-Figure 4 as well as Figure 7-Figure 9 As shown, the side wall of each pipe pile 2 is provided with a strip hole 20 which passes through to the top of the pipe pile 2 and extends along the axial direction of the pipe pile 2, and the strip hole 20 is connected with the internal space of the pipe pile 2; the plurality of pipe piles 2 are spaced apart in pairs, and each group of two adjacent pipe piles 2 are respectively a left pipe pile 21 and a right pipe pile 22, and a grouting pipe structure 1 is provided between the strip hole 20 of the left pipe pile 21 and the strip hole 20 of the right pipe pile 22; the grouting pipe structure 1 is provided with a left grouting port 10 and a right grouting port 11 which are spaced apart, and both ends of the grouting pipe structure 1 are connected with an external grouting device, the left grouting port 10 is located in the left pipe pile 21 and can be raised and lowered in the left pipe pile 21, and the right grouting port 11 is located in the right pipe pile 22 and can be raised and lowered in the right pipe pile 22.

[0051] The pile group construction assembly provided in this embodiment can cooperate with the external grouting device to construct the connecting wall 3 between each prefabricated pipe pile 2 of the pile group, so as to strengthen the cross-linking between each prefabricated pipe pile 2 of the pile group. When performing the pile group construction, the multiple prefabricated pipe piles 2 in the pile group construction assembly can be sunk into the ground in sequence, and the multiple pipe piles 2 are spaced apart in pairs, and then the grouting pipe structure 1 can be installed between any two adjacent pipe piles 2. Specifically, the left grouting port 10 of the grouting pipe structure 1 is placed in the left pipe pile 21, and the right grouting port 11 of the grouting pipe structure 1 is placed in the right pipe pile 22, and then the left grouting port 10 and the right grouting port 11 are driven to descend in the left pipe pile 21 and the right pipe pile 22 respectively, until the left grouting port 10 and the right grouting port 11 are moved to the corresponding position at the bottom of the connecting wall 3 to be constructed.

[0052] When the left grouting port 10 and the right grouting port 11 are driven to descend in the left pipe pile 21 and the right pipe pile 22, respectively, foreign objects can be inserted into the left pipe pile 21 and the right pipe pile 22, respectively, and the left grouting port 10 and the right grouting port 11 can be driven to descend in the left pipe pile 21 and the right pipe pile 22, respectively. In the process of the left grouting port 10 and the right grouting port 11 descending, the foreign objects can also prevent the left grouting port 10 in the left pipe pile 21 from extending out of the left pipe pile 21 from the strip hole 20 on the side wall of the left pipe pile 21, and prevent the right grouting port 11 in the right pipe pile 22 from extending out of the right pipe pile 22 from the strip hole 20 on the side wall of the right pipe pile 22. After the left grouting port 10 and the right grouting port 11 are moved to the corresponding position at the bottom of the connecting wall 3 to be constructed, the foreign objects in the left pipe pile 21 and the right pipe pile 22 can also be withdrawn so as not to hinder the grouting process.

[0053] Among them, the end of the strip hole 20 on the side wall of the pipe pile 2 close to the bottom of the pipe pile 2 may not penetrate to the bottom of the pipe pile 2. At this time, the end of the strip hole 20 away from the bottom of the pipe pile 2 can correspond to the bottom of the connecting wall 3 to be constructed. After the left grouting port 10 and the right grouting port 11 are lowered into place, the external grouting device is driven to inject cement slurry or other slurry into the left grouting port 10 and the right grouting port 11 through the two ends of the grouting pipe structure 1. Since the left grouting port 10 is located in the left pipe pile 21 and the right grouting port 11 is located in the right pipe pile 22, and since the side walls of the left pipe pile 21 and the side walls of the right pipe pile 22 are respectively provided with strip holes 20 that pass through the interior of the pipe pile 2, the slurry can be filled in the left pipe pile 21 and the right pipe pile 22 through the left grouting port 10 and the right grouting port 11, respectively, and at the same time penetrate into the soil between the left pipe pile 21 and the right pipe pile 22 through the strip holes 20 of the left pipe pile 21 and the strip holes 20 of the right pipe pile 22 and connect with each other.

[0054] During the process of injecting slurry, the grouting pipe structure 1 can be lifted up at regular intervals so that the left grouting port 10 and the right grouting port 11 rise in the left pipe pile 21 and the right pipe pile 22 respectively. After repeating the operations of grouting and lifting the grouting pipe structure 1, the slurry between the left pipe pile 21 and the right pipe pile 22 has a height. After the slurry solidifies, Figure 5 , Figure 6 , Fig.10 and Fig.11 As shown, a connection wall 3 connecting the left pipe pile 21 and the right pipe pile 22 can be formed.

[0055] It should be noted that when the left grouting port 10 and the right grouting port 11 are raised and lowered at the same time, since the side walls of the left pipe pile 21 and the side walls of the right pipe pile 22 are both provided with strip holes 20, the portion of the grouting pipe structure 1 located between the left grouting port 10 and the right grouting port 11 will not be hindered by the side walls of the pipe pile 2 and can be raised and lowered in the strip holes 20 on the side walls of the pipe pile 2. At the same time, the portion of the grouting pipe structure 1 located between the left grouting port 10 and the right grouting port 11 can be raised and lowered by cutting the soil between the left pipe pile 21 and the right pipe pile 22 under the drive of external force.

[0056] Therefore, compared with the prior art, the pile group construction assembly provided in this embodiment can inject grout between two adjacent pipe piles 2 through the grouting pipe structure 1 and the strip holes 20 on the side walls of the pipe piles 2, thereby forming a connecting wall 3 between the two adjacent pipe piles 2, strengthening the cross-linking between the prefabricated pipe piles 2 of the pile group, and improving the overall bearing capacity of the pile group.

[0057] Among them, since the space inside the pipe of each pipe pile 2 can be injected with slurry through the grouting port of the grouting pipe structure 1, after the construction of the connecting wall 3 is completed, each pipe pile 2 in the pile group can be constructed to form a solid pile. The solid pile can not only effectively guarantee the bearing capacity of each single pile in the pile group, thereby effectively guaranteeing the overall bearing capacity of the pile group, but also effectively prevent groundwater from gushing into the interior of the pipe pile 2 and reducing the bearing capacity of the pile group.

[0058] It should also be noted that there is no limit to the number of individual piles in a pile group. Correspondingly, there is no limit to the number of prefabricated pipe piles 2 in the pile group construction assembly provided in this embodiment. Figure 1-Figure 6 As shown, the number of prefabricated pipe piles 2 can be two; Figure 8-Figure 11 As shown, the number of the prefabricated pipe piles 2 can also be three.

[0059] When the number of the prefabricated pipe piles 2 is two, the two pipe piles 2 are respectively a left pipe pile 21 and a right pipe pile 22 .

[0060] When the number of prefabricated pipe piles 2 is three, the three pipe piles 2 include three groups of two adjacent pipe piles 2. At this time, one of the pipe piles 2 in any group of two adjacent pipe piles 2 is a left pipe pile 21, and the other pipe pile 2 is a right pipe pile 22. It should be noted that the settings of the left pipe pile 21 and the right pipe pile 22 in the above three groups of two adjacent pipe piles 2 do not interfere with each other, and the left pipe pile 21 in the previous group of two adjacent pipe piles 2 can be the right pipe pile 22 in the next group of two adjacent pipe piles 2.

[0061] like Figure 1 , Figure 2 and Figure 7 As shown, the grouting pipe structure 1 includes a left grouting pipe 12, a pull rope 13 and a right grouting pipe 14 connected in sequence; the opening of the left grouting pipe 12 near the end of the pull rope 13 is the left grouting port 10, and the opening of the right grouting pipe 14 near the end of the pull rope 13 is the right grouting port 11.

[0062] As mentioned above, the portion of the grouting pipe structure 1 between the left grouting port 10 and the right grouting port 11 needs to cut the soil between two adjacent pipe piles 2 as the left grouting port 10 and the right grouting port 11 are raised and lowered. Therefore, in order to improve the cutting efficiency of the grouting pipe structure 1 on the soil, the portion of the grouting pipe structure 1 between the left grouting port 10 and the right grouting port 11 can use a pull rope 13 instead of a pipe body. Compared with the pipe body, the contact area between the pull rope 13 and the soil is smaller, so the pull rope 13 has a higher cutting efficiency on the soil.

[0063] When the grouting pipe structure 1 includes a left grouting pipe 12, a pull rope 13, and a right grouting pipe 14 connected in sequence, the slurry in the left grouting pipe 12 can not only flow into the left pipe pile 21 where the left grouting port 10 is located through the left grouting port 10, but also can penetrate into the soil through the strip holes 20 on the side wall of the left pipe pile 21 after the left pipe pile 21 is filled with sufficient slurry. Similarly, the slurry in the right grouting pipe 14 can not only flow into the right pipe pile 22 where the right grouting port 11 is located through the right grouting port 11, but also can penetrate into the soil through the strip holes 20 on the side wall of the right pipe pile 22 after the right pipe pile 22 is filled with sufficient slurry. The slurry infiltrated into the soil can eventually converge and merge in the soil between the left pipe pile 21 and the right pipe pile 22, so as to connect to each other to form a connecting wall 3, which can play a role in reinforcing the left pipe pile 21 and the right pipe pile 22.

[0064] Furthermore, the pull rope 13 may be a steel wire rope.

[0065] The steel wire rope makes the pull rope 13 have a certain flexibility, which not only makes the pull rope 13 easy to deform with the construction conditions and prevents the pull rope 13 from being stuck in the strip hole 20 on the side wall of the pipe pile 2, but also effectively ensures that the pull rope 13 has a high strength and is not easy to break as the construction progresses.

[0066] In practical applications, the pull rope 13 may also be made of steel strands or plastic fibers with relatively high strength.

[0067] like Figure 1 As shown, the pile group construction assembly provided in this embodiment may also include a left support rod 4 and a right support rod 5; the left support rod 4 is used to abut against the grouting pipe structure 1 located in the left pipe pile 21 to drive the left grouting port 10 to descend in the left pipe pile 21; the right support rod 5 is used to abut against the grouting pipe structure 1 located in the right pipe pile 22 to drive the right grouting port 11 to descend in the right pipe pile 22.

[0068] During the construction process, the grouting pipe structure 1 can be placed horizontally between the top of the left pipe pile 21 and the top of the right pipe pile 22. When it is necessary to drive the left grouting port 10 to descend in the left pipe pile 21 and drive the right grouting port 11 to descend in the right pipe pile 22, the left support rod 4 can be abutted against the connection between the left grouting pipe 12 and the pull rope 13, and the right support rod 5 can be abutted against the connection between the right grouting pipe 14 and the pull rope 13. Then, the left support rod 4 can be driven into the left pipe pile 21 and the right support rod 5 can be driven into the right pipe pile 22 at the same time. At this time, the left support rod 4 can drive the connection between the left grouting pipe 12 and the pull rope 13 to descend in the left pipe pile 21, and the left support rod 4 can drive the connection between the right grouting pipe 14 and the pull rope 13 to descend in the right pipe pile 22. At the same time, the pull rope 13 can be driven by the left support rod 4 and the right support rod 5 to cut the soil between the left pipe pile 21 and the right pipe pile 22 and descend.

[0069] The left support rod 4 and the right support rod 5 are the aforementioned external objects used to drive the left grouting port 10 and the left grouting port 10 to descend. The left support rod 4 can not only be used to drive the left grouting port 10 to descend in the left pipe pile 21, but also can limit the left grouting port 10 in the left pipe pile 21 from extending out of the left pipe pile 21 from the strip hole 20 on the side wall of the left pipe pile 21. Similarly, the right support rod 5 can not only be used to drive the right grouting port 11 to descend in the right pipe pile 22, but also can limit the right grouting port 11 in the right pipe pile 22 from extending out of the right pipe pile 22 from the strip hole 20 on the side wall of the right pipe pile 22.

[0070] Further, such as Figure 1 As shown, the pile group construction assembly provided in this embodiment may further include a left abutment 40 and a right abutment 50 . The left abutment 40 is fixed to one end of the left support rod 4 , and the right abutment 50 is fixed to one end of the right support rod 5 .

[0071] The left abutment 40 is used to increase the abutment area between the connection between the left grouting pipe 12 and the pull rope 13 and the left support rod 4, which not only makes the left support rod 4 more convenient to use, but also effectively prevents the left support rod 4 from wearing the connection between the left grouting pipe 12 and the pull rope 13.

[0072] Similarly, the right abutment 50 is used to increase the abutment area between the connection between the right grouting pipe 14 and the pull rope 13 and the right support rod 5, which not only makes the right support rod 5 more convenient to use, but also effectively prevents the right support rod 5 from wearing the connection between the right grouting pipe 14 and the pull rope 13.

[0073] Among them, the left abutment 40 and the right abutment 50 can both be block structures. In order to further improve the ease of use of the left abutment 40 and the right abutment 50, in this embodiment, the left abutment 40 and the right abutment 50 are preferably pulleys, and the circumferential side walls of the pulleys are provided with grooves extending along their circumferences.

[0074] The groove on the pulley is used to engage with the pull rope 13, which can effectively prevent the pull rope 13 from separating from the pulley, thereby effectively ensuring the abutment stability between the left support rod 4 and the grouting pipe structure 1, and effectively ensuring the abutment stability between the right support rod 5 and the grouting pipe structure 1.

[0075] Furthermore, the pulley on the left support rod 4 and the pulley on the right support rod 5 can rotate. At this time, the pull rope 13 can be wrapped around the groove of the pulley on the left support rod 4 or the groove of the pulley on the right support rod 5. The pull rope 13 can be wound around or unfolded by driving the pulley to rotate.

[0076] In this embodiment, when the pulley can rotate, a plurality of left grouting ports 10 may be provided on the pipe body of the left grouting pipe 12 , and a plurality of right grouting ports 11 may be provided on the pipe body of the right grouting pipe 14 .

[0077] When the grouting pipe structure 1 needs to be driven to rise and fall between two adjacent pipe piles 2, the pull rope 13 of the grouting pipe structure 1 needs to be unfolded on the pulley. At this time, the pull rope 13 is used to cut the soil between the two adjacent pipe piles 2, which can improve the lifting efficiency of the grouting pipe structure 1.

[0078] When it is necessary to use the grouting port of the grouting pipe structure 1 to inject grout between two adjacent pipe piles 2, the pulley on the left support rod 4 and the pulley on the right support rod 5 can be driven to rotate in the same direction (clockwise or counterclockwise), so that the pull rope 13 is wound around one of the pulleys. Figure 3 , Figure 4 , Figure 8 and Fig. 9 As shown, the grouting pipe of the left grouting pipe 12 and the right grouting pipe 14, which is far from the pulley with the rope 13 wound, will be driven by the rope 13 and extend out of the pile 2 through the strip hole 20 on the side wall of the pile 2 and be located between two adjacent piles 2. Since the left grouting pipe 12 is provided with a plurality of left grouting ports 10 and the right grouting pipe 14 is provided with a plurality of right grouting ports 11, at this time, at least one grouting port is distributed on the pipe body of the grouting pipe between two adjacent piles 2, and the pipe body of the grouting pipe in each pile 2 of two adjacent piles 2 is also respectively distributed with grouting ports. When the external grouting device grouts into the grouting pipe, the slurry is not only easy to flow into the pile 2 through the grouting pipe, but also easy to flow into the soil between two adjacent piles 2 through the grouting pipe, so that the connecting wall 3 is easy to form.

[0079] When the construction of the connecting wall 3 is completed, the pulleys on the left support rod 4 and the right support rod 5 can also be driven to rotate in the opposite direction, so that the pulled rope 13 wound on the pulley can be unfolded, and then the support rods of the left support rod 4 and the right support rod 5 that are away from the pulleys with the pulled rope 13 wound on them can be lifted up, so that the pulled rope 13 is tightened between the two adjacent pipe piles 2, and the grouting pipe between the two adjacent pipe piles 2 is returned to the pipe piles 2, so that the pulled rope 13 continues to cut the soil as the left grouting port 10 and the right grouting port 11 are raised and lowered.

[0080] It can be seen that when the pull rope 13 can be rolled up or unrolled at the groove of the pulley, the construction efficiency of the pile group construction assembly can be further improved.

[0081] like Figure 2-Figure 4 As shown, the side wall of the pipe pile 2 is provided with an expansion hole 200 located at the hole side of the strip hole 20 and connected to the strip hole 20 . There are multiple expansion holes 200 , and the multiple expansion holes 200 are distributed at intervals along the axial direction of the pipe pile 2 .

[0082] Furthermore, the left grouting port 10 and the right grouting port 11 are both circular openings; the expansion hole 200 and the strip hole 20 are connected to form a circular hole, and the diameter of the circular hole is not less than the diameter of the left grouting port 10 and not less than the diameter of the right grouting port 11.

[0083] The expansion hole 200 is used to expand the hole width of the strip hole 20 , so that the grouting pipe with a diameter larger than the pull rope 13 can be easily pulled out of the pipe pile 2 during the process of winding the pull rope 13 .

[0084] like Fig.12 and Fig.13 As shown, this embodiment also provides a pile group construction method, which uses the above-mentioned pile group construction assembly and includes:

[0085] Step S1: driving a plurality of pipe piles 2 in a pile group construction assembly into the ground;

[0086] Step S2: arranging a grouting pipe structure 1 in a pile group construction assembly between two adjacent pipe piles 2;

[0087] Wherein, step S2 comprises:

[0088] Step S20: connecting both ends of the grouting pipe structure 1 to an external grouting device, and placing the left grouting port 10 of the grouting pipe structure 1 on the top of the left pipe pile 21, and the right grouting port 11 of the grouting pipe structure 1 on the top of the right pipe pile 22;

[0089] Step S21: drive the portion of the grouting pipe structure 1 located between the left grouting port 10 and the right grouting port 11 to descend between the strip holes 20 of the left pipe pile 21 and the strip holes 20 of the right pipe pile 22, so that the left grouting port 10 enters the left pipe pile 21 and the right grouting port 11 enters the right pipe pile 22.

[0090] Furthermore, the pile group construction method provided in this embodiment further includes the following steps after step S2:

[0091] Step S3: Continue to drive the left grouting port 10 to descend in the left pipe pile 21 and drive the right grouting port 11 to descend in the right pipe pile 22 until the left grouting port 10 is lowered to a preset depth and the right grouting port 11 is lowered to a preset depth;

[0092] Step S4: start the external grouting device to inject grout into the left pipe pile 21 and the right pipe pile 22 through the grouting pipe structure 1 respectively.

[0093] The pile group construction method provided in the present embodiment applies the above-mentioned pile group construction assembly. When constructing a pile group using the pile group construction method provided in the present embodiment, step S1, step S20, step S21, step S3 and step S4 can be performed in sequence. After step S4, slurry will be injected into the left pipe pile 21 and the right pipe pile 22 to form a solid pile. At the same time, the slurry in the left pipe pile 21 and the right pipe pile 22 can penetrate into the soil between the left pipe pile 21 and the right pipe pile 22 through the strip holes 20 on their respective side walls, thereby forming a connecting wall 3 connected between the left pipe pile 21 and the right pipe pile 22.

[0094] It can be seen that the pile group construction method provided in this embodiment can also use the above-mentioned pile group construction components to construct a connecting wall 3 between the prefabricated pipe piles 2 of the pile group, thereby strengthening the cross-linking between the prefabricated pipe piles 2 of the pile group and improving the overall bearing capacity of the pile group.

[0095] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A pile group construction assembly, characterized in that: It comprises a grouting pipe structure (1) and a plurality of prefabricated pipe piles (2); The side wall of each pipe pile (2) is provided with a strip hole (20) penetrating to the top of the pipe pile (2) and extending along the axial direction of the pipe pile (2), and the strip hole (20) is connected to the internal space of the pipe pile (2); The plurality of pipe piles (2) are spaced apart in pairs, and each group of two adjacent pipe piles (2) are respectively a left pipe pile (21) and a right pipe pile (22), and the grouting pipe structure (1) is provided between the strip hole (20) of the left pipe pile (21) and the strip hole (20) of the right pipe pile (22); The grouting pipe structure (1) is provided with a left grouting port (10) and a right grouting port (11) which are spaced apart from each other. Both ends of the grouting pipe structure (1) are connected to an external grouting device. The left grouting port (10) is located in the left pipe pile (21) and can be raised and lowered in the left pipe pile (21). The right grouting port (11) is located in the right pipe pile (22) and can be raised and lowered in the right pipe pile (22). The grouting pipe structure (1) comprises a left grouting pipe (12), a pull rope (13), and a right grouting pipe (14) which are connected in sequence; The opening of the end of the left grouting pipe (12) close to the pull rope (13) is the left grouting port (10), and the opening of the end of the right grouting pipe (14) close to the pull rope (13) is the right grouting port (11); Also includes a left support rod (4) and a right support rod (5); The left support rod (4) is used to abut against a grouting pipe structure (1) located in the left pipe pile (21) to drive the left grouting port (10) to descend in the left pipe pile (21); The right support rod (5) is used to abut against a grouting pipe structure (1) located in the right pipe pile (22) to drive the right grouting port (11) to descend in the right pipe pile (22).

2. The pile group construction assembly according to claim 1, characterized in that: The pull rope (13) is a steel wire rope.

3. The pile group construction assembly according to claim 1, characterized in that: It also comprises a left abutment member (40) and a right abutment member (50), wherein the left abutment member (40) is fixed to one end of the left support rod (4), and the right abutment member (50) is fixed to one end of the right support rod (5).

4. The pile group construction assembly according to claim 3, characterized in that: The left abutment member (40) and the right abutment member (50) are both pulleys, and the circumferential side walls of the pulleys are provided with grooves extending along the circumference thereof.

5. The pile group construction assembly according to any one of claims 1 to 2, characterized in that: The side wall of the pipe pile (2) is provided with an expansion hole (200) located on the hole side of the strip hole (20) and connected to the strip hole (20), and there are a plurality of expansion holes (200), which are spaced apart and distributed along the axial direction of the pipe pile (2).

6. The pile group construction assembly according to claim 5, characterized in that: The left grouting port (10) and the right grouting port (11) are both circular openings; The expansion hole (200) and the strip hole (20) are connected to form a circular hole, and the diameter of the circular hole is not less than the diameter of the left grouting port (10) and not less than the diameter of the right grouting port (11).

7. A pile group construction method, using the pile group construction assembly according to any one of claims 1 to 6, characterized in that: include: S1: driving a plurality of pipe piles (2) in the pile group construction assembly into the ground; S2: arranging the grouting pipe structure (1) in the pile group construction assembly between two adjacent pipe piles (2); Wherein, step S2 comprises: S20: connecting both ends of the grouting pipe structure (1) to an external grouting device, and placing the left grouting port (10) of the grouting pipe structure (1) at the top of the left pipe pile (21), and the right grouting port (11) of the grouting pipe structure (1) at the top of the right pipe pile (22); S21: driving the portion of the grouting pipe structure (1) located between the left grouting port (10) and the right grouting port (11) to descend between the strip hole (20) of the left pipe pile (21) and the strip hole (20) of the right pipe pile (22), so that the left grouting port (10) enters the left pipe pile (21) and the right grouting port (11) enters the right pipe pile (22); Also included after step S2 is the step of: S3: Continue to drive the left grouting port (10) to descend in the left pipe pile (21) and drive the right grouting port (11) to descend in the right pipe pile (22) until the left grouting port (10) is lowered to a preset depth and the right grouting port (11) is lowered to a preset depth; S4: starting the external grouting device to inject grout into the left pipe pile (21) and the right pipe pile (22) respectively through the grouting pipe structure (1).