A pushing structure of top-pull pipe for sewer network construction and a using method thereof

By installing telescopic support components on the rods to fit tightly against the inner wall of the pipe, the problem of pipe damage due to insufficient contact points during jacking construction is solved, achieving efficient and safe pipe advancement and adapting to the construction needs of different pipe diameters.

CN115596054BActive Publication Date: 2026-01-13YANGTZE ECOLOGY & ENVIRONMENT CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202211139215.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-19
Publication Date
2026-01-13
Estimated Expiration
2042-09-19

AI Technical Summary

Technical Problem

During the construction of sewage pipe networks, the outer wall and internal structure of the pipes are damaged by the stretching of the pushing or stretching mechanism. Moreover, the jacking construction requires a large pushing or pulling force, resulting in a small pipe connection surface and fewer contact points, which affects the service life and construction efficiency.

Method used

Multiple sets of telescopic support assemblies are installed on the rod, including first and second telescopic components and fixing components. The telescopic support assemblies are tightly fitted with the inner wall of the pipe to avoid direct contact. The pipe is advanced by using a pushing and pulling mechanism on the rod.

Benefits of technology

This design enables multi-point contact between the pipe and the rod, avoiding direct damage to the pipe during jacking construction, adapting to different pipe diameters, improving construction efficiency and practicality, and ensuring the integrity of the pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115596054B_ABST
    Figure CN115596054B_ABST
Patent Text Reader

Abstract

The application provides a pushing structure of a top-pulling pipe for sewage pipe network construction and a use method, which utilizes a rod member to penetrate through the whole pipe and connects multiple pipes through telescopic supporting mechanisms arranged on the rod member, realizes multi-point contact between the pipe and the rod member, and then enables the subsequent top-pulling mechanism to directly act on the rod member without directly contacting the pipe, thereby greatly ensuring the integrity of the pipe during top-pulling construction. The pushing structure of the top-pulling pipe for sewage pipe network construction and the method thereof have simple overall structure and convenient operation, realize the contact between the top-pulling mechanism and the pipe through the pushing structure, not only avoid the problems such as damage of the pipe during top-pulling construction, but also effectively improve the efficiency of the pipe top-pulling construction, and have good practical value and application prospect.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application belongs to the technical field of sewage pipe network construction, and particularly relates to a pushing structure of a top-pull pipe for sewage pipe network construction and a use method. BACKGROUND

[0002] The sewage pipeline system is composed of pipes for collecting and transporting urban sewage and its auxiliary structures. The sewage flows into the main pipe from the branch pipe, and then flows into the main pipe, and finally flows into the sewage treatment plant. The pipes are small to large, and are distributed like rivers, which are completely different from the circulation of the water supply pipe network. The sewage generally flows from high to low in the pipe by the difference in water level at both ends of the pipe, and the pipe does not bear pressure, i.e. it relies on gravity flow.

[0003] In the process of sewage pipe network construction, the top-pull pipe process is used for construction, and the pipe is laid in the constructed pipe hole in sequence, thereby forming a completed sewage pipeline discharge system. However, the following problems often occur during the top-pull pipe process:

[0004] 1. The outer wall and internal structural stress of the pipe are damaged due to the stretching of the pushing mechanism or the pipe pulling mechanism, affecting the service life of the pipe;

[0005] 2. Due to the factors such as the volume and weight of the pipe, a large pushing force or pulling force needs to be applied to the pipe during the top-pull construction, and the fundamental reason is that the connection surface between the top-pull mechanism and the pipe is small, and the contact points are few. SUMMARY

[0006] The purpose of the present application is to overcome the shortcomings of the prior art and provide a pushing structure of a top-pull pipe for sewage pipe network construction and a use method, which realizes the contact between the rod and the pipe by setting the telescopic support assembly on the rod, facilitating the subsequent top-pull operation of the pipe.

[0007] In order to achieve the above technical features, the purpose of the present application is achieved as follows: a pushing structure of a top-pull pipe for sewage pipe network construction, which comprises a rod, a plurality of telescopic support assemblies are arranged on the outer periphery of the rod in the transverse direction, each telescopic support assembly has a plurality of telescopic support assemblies arranged in the same vertical plane and arranged in a ring shape around the central axis of the rod;

[0008] The telescopic support assembly comprises a first telescopic member, and a fixing member is connected to the telescopic end of the first telescopic member, so that the first telescopic member can tightly fit the inner wall of the pipe when it is in the elongated state.

[0009] A second telescopic member is hinged between the cylinder of the first telescopic member and the outer wall of the rod, and is used to assist in supporting the first telescopic member.

[0010] The fixing member comprises a contact plate connected with the telescopic end of the first telescopic member, and a plurality of barbs are arranged on the side of the contact plate close to the inner wall of the pipeline.

[0011] Or the fixing member comprises a contact plate connected with the telescopic end of the first telescopic member, and a suction cup is arranged at one end of the contact plate.

[0012] Further comprising at least one first component; the first component is sleeved on the rod, and the first component is fixed on the rod through the mounting member, and one end thereof abuts against the outer frame of the side surface of the pipeline.

[0013] The first component comprises a connecting ring, and one side of the connecting ring is connected with a pressing plate through a spring member;

[0014] The pressing plate abuts against the outer frame of the pipeline.

[0015] A limiting member is arranged on the side of the connecting disc away from the center of the rod, the limiting member can slide on the connecting disc, is used for being connected with the telescopic arm of the pushing mechanism, and fixes the telescopic arm of the pushing mechanism.

[0016] The limiting member comprises a sliding member, a ring-shaped groove is arranged on the connecting disc corresponding to the sliding member, the sliding member is slidingly connected in the groove, and a plurality of adjusting screws arranged in a ring are arranged on the sliding member.

[0017] The first component has two, and the two first components are arranged at two ends of the rod and abut against the outer frames of the two ends of the pipeline.

[0018] In the actual setting process, a butt joint member is arranged at one end of the rod, is used for being connected with the pipe pulling mechanism, and pulls the pipeline to move.

[0019] A use method of a pushing structure of a top-pulling pipe for sewage pipe network construction:

[0020] Step 1, one end of the rod penetrates through the pipeline to be pushed and pulled;

[0021] Step 2, the inner wall of the pipeline is fixed by using the telescopic supporting assembly, so that the connection between the rod and the inner wall of the pipeline is realized;

[0022] Step 3, one side of the pipeline is pushed by using the pushing mechanism, and the rod is pulled by using the pipe pulling mechanism on the opposite side;

[0023] Step 4, after the pipeline is pushed and pulled to the designated position, the pushing operation of the pipeline is completed.

[0024] The present application has the following beneficial effects:

[0025] 1. The advancing structure of the jacking pipe for sewage pipe network construction and the method thereof, which utilizes a rod to penetrate through the entire pipe and connects multiple pipes through the telescopic support mechanism arranged on the rod, realizes the multi-point contact between the pipe and the rod, and thus enables the subsequent jacking mechanism to directly act on the rod without directly contacting the pipe, greatly ensuring the integrity of the pipe during jacking construction.

[0026] 2. The advancing structure of the jacking pipe for sewage pipe network construction and the method thereof, which is preferred in the form of the first telescopic component, the second telescopic component, and the fixing component structure, so that the advancing structure can adapt to the advancement of pipes of different diameters and different types, effectively improving the practicality of the advancing structure.

[0027] 3. The advancing structure of the jacking pipe for sewage pipe network construction and the method thereof, which has a simple overall structure and is easy to operate, realizes the contact between the jacking mechanism and the pipe through the advancing structure, not only avoids the damage of the pipe during jacking construction, but also effectively improves the efficiency of pipe jacking construction, has good practical value and application prospect. BRIEF DESCRIPTION OF DRAWINGS

[0028] The present application will be further described below in conjunction with the drawings and examples.

[0029] Figure 1 is the overall structure schematic diagram of the advancing structure of the jacking pipe for sewage pipe network construction and the method thereof in the embodiment of the present application.

[0030] Figure 2 is the overall side view structure schematic diagram of the first component in the advancing structure of the jacking pipe for sewage pipe network construction in the embodiment of the present application.

[0031] Figure 3 is the front view structure schematic diagram of the fixing component in the embodiment of the present application.

[0032] Figure 4 is the front view structure schematic diagram of the fixing component in another embodiment of the present application.

[0033] In all the drawings, the same reference signs represent the same technical features, specifically:

[0034] 100 rod, 101 connecting ring, 102 mounting component, 103 spring component, 104 extrusion plate, 105 limiting component, 1051 groove body, 1052 sliding component, 1053 adjusting screw, 106 first telescopic component, 107 fixing component, 1071 contact plate, 1072 barb, 1073 suction cup, 108 second telescopic component, 109 butt joint component;

[0035] 200 pipe. DETAILED DESCRIPTION

[0036] The embodiments of the present application will be further described below with reference to the drawings.

[0037] Embodiment 1

[0038] Please refer to Figures 1-4 The pushing structure of the top-pull pipe in the preferred embodiment of the present application comprises a rod 100, a plurality of groups of telescopic supporting assemblies are arranged transversely on the outer periphery of the rod 100, each group of telescopic supporting assemblies has a plurality of telescopic supporting assemblies arranged in the same vertical plane and arranged in a ring shape around the central axis of the rod 100.

[0039] Through the above scheme, the plurality of telescopic supporting assemblies on the rod 100 can support and fix the pipe 200 from the inner wall of the pipe 200, thereby greatly avoiding the problems of easy slippage, poor efficiency, and easy damage of the internal structure of the pipe 200 due to excessive stress during external pushing of the pipe 200, facilitating the top-pull construction work of the pipe 200, effectively improving the construction efficiency, and ensuring the integrity of the pipe 200 during the construction process.

[0040] Specifically, the telescopic supporting assembly comprises a first telescopic member 106, and a fixing member 107 is connected to the telescopic end of the first telescopic member 106, so that the first telescopic member 106 can tightly fit the fixing member 107 to the inner wall of the pipe 200 when in the elongated state.

[0041] Further, a second telescopic member 108 is arranged corresponding to the first telescopic member 106, and the second telescopic member 108 is arranged between the first telescopic member 106 and the rod 100 to assist in supporting the first telescopic member 106, and in use, the first telescopic member 106 and the second telescopic member 108 are simultaneously controlled to be elongated, so that the first telescopic member 106 and the second telescopic member can fit the fixing member 107 to the pipe wall in the manner as shown in Figure 1 and realize the fixation between the fixing member 107 and the pipe wall.

[0042] In a specific embodiment, the fixing member 107 comprises a contact plate 1071 connected to the telescopic end of the first telescopic member 106, and a plurality of barbs 1072 are arranged on the side of the contact plate 1071 close to the inner wall of the pipe 200.

[0043] In another specific embodiment, the fixing member 107 comprises a contact plate 1071 connected to the telescopic end of the first telescopic member 106, and a suction cup 1073 is connected to one end of the contact plate 1071.

[0044] Further, the pipe 200 pushing structure in the embodiment of the present application preferably further comprises at least one first component, the first component is sleeved on the rod 100, the first component is fixed on the rod 100 through the mounting 102, and one end of the first component abuts against the outer frame of the side surface of the pipe 200.

[0045] In more detail, the first component comprises a connecting ring 101, one side of the connecting ring 101 is connected with a pressing plate 104 through a spring 103, and the pressing plate 104 abuts against the outer frame of the pipe 200. In this way, the first component realizes soft contact between the pushing mechanism and the pipe 200, prevents the pushing mechanism from directly acting on the end surface of the pipe 200, and reduces damage to the end surface of the pipe 200.

[0046] Further, in actual use, in order to facilitate better contact between the telescopic arm of the pushing mechanism and the first component, and prevent the telescopic arm of the pushing mechanism from slipping during use, a limiting piece 105 is arranged on the side of the connecting disc away from the center of the rod 100, the limiting piece 105 can slide on the connecting disc, is used for being connected with the telescopic arm of the pushing mechanism, and fixes the telescopic arm of the pushing mechanism.

[0047] Specifically, the limiting piece 105 comprises a sliding piece 1052, a ring-shaped groove 1051 is formed on the connecting disc corresponding to the sliding piece 1052, the sliding piece 1052 is slidingly connected in the groove 1051, and a plurality of annularly arranged adjusting screws 1053 are arranged on the sliding piece 1052. In this way, the telescopic arm is clamped and limited through the plurality of adjusting screws 1053, and the stability after contact of the telescopic arm is improved.

[0048] Further preferably, the first component is two, and the two first components are arranged at two ends of the rod 100 and abut against the outer frames of the two ends of the pipe body.

[0049] In addition, in actual arrangement, a butt joint 109 is arranged at one end of the rod 100, is used for being connected with a pipe pulling mechanism, and pulls the pipe 200 to move.

[0050] Embodiment 2:

[0051] On this basis, the present application further provides a pushing method of a top-pulling pipe for sewage pipe network construction, which utilizes the above-mentioned pushing structure to realize, which comprises the following steps,

[0052] Step 1, one end of the rod 100 penetrates through the pipe 200 to be pushed and pulled;

[0053] Step 2, the inner wall surface of the pipe 200 is fixed by using the telescopic supporting assembly, to realize connection between the rod 100 and the inner wall surface of the pipe 200;

[0054] Step 3, pushing one side of the pipe 200 by the pushing mechanism and pulling the rod 100 by the pulling pipe mechanism on the opposite side;

[0055] Step 4, after the pipe 200 is pushed and pulled to the designated position, the pushing operation of the pipe 200 is completed.

Claims

1. A pushing structure of a jacking pipe for sewer network construction, characterized by: It includes a rod (100), a plurality of groups of telescopic support assemblies are arranged transversely on the outer periphery of the rod (100), each group of telescopic support assemblies has a plurality of telescopic support assemblies and the plurality of telescopic support assemblies are in the same vertical plane and are arranged in a ring shape around the central axis of the rod (100); the telescopic support assembly comprises a first telescopic member (106), and a fixing member (107) is connected to the telescopic end of the first telescopic member (106), so that the first telescopic member (106) can make the fixing member (107) tightly fit the inner wall of the pipeline (200) in the elongated state; further comprising at least one first component; the first component is sleeved on the rod (100), the first component is fixed to the rod (100) by a mounting member (102), and one end of the first component abuts against the outer frame of the side of the pipeline (200); the first component comprises a connecting ring (101), one side of the connecting ring (101) is connected with a pressing plate (104) through a spring member (103); the pressing plate (104) abuts against the outer frame of the pipeline (200); a limiting member (105) is arranged on the side of the connecting ring away from the center of the rod (100), the limiting member (105) can slide on the connecting ring and is used for connecting the telescopic arm of the pushing mechanism for pushing the pipeline and fixing the telescopic arm of the pushing mechanism; the first component has two, and the two first components are arranged at the two ends of the rod (100) and abut against the outer frames of the two ends of the pipeline.

2. The pushing structure of the top-pulled pipe for sewage pipe network construction according to claim 1, characterized in that: The cylinder of the first telescopic member (106) and the outer wall of the rod (100) are hinged with a second telescopic member (108) and are used for auxiliary supporting the first telescopic member (106).

3. The pushing structure of the top-pulled pipe for sewage pipe network construction according to claim 1, characterized in that: The fixing member (107) comprises a contact plate (1071) connected to the telescopic end of the first telescopic member (106), and a plurality of barbs (1072) are arranged on the side of the contact plate (1071) close to the inner wall surface of the pipeline; Or the fixing member (107) comprises a contact plate (1071) connected to the telescopic end of the first telescopic member (106), and a suction cup (1073) is arranged at one end of the contact plate (1071).

4. The pushing structure of the top-pulled pipe for sewer network construction according to claim 1, characterized in that: The limiting member (105) comprises a sliding member (1052), a ring-shaped groove (1051) is formed on the connecting ring corresponding to the sliding member (1052), and the sliding member (1052) is slidingly connected in the groove (1051), and a plurality of adjustment screws (1053) are arranged on the sliding member (1052) in a ring shape.

5. The pushing structure of the top-pulled pipe for sewage pipe network construction according to claim 1, characterized in that: In the actual setting process, a butt joint member (109) is arranged at one end of the rod (100) and is used for connecting with the pipe pulling mechanism and pulling the pipeline (200) to move.

6. The method of using the push-on structure of the top-pull pipe for sewer network construction according to any one of claims 1-5, characterized in that, The method comprises the following steps, Step 1: one end of the rod (100) penetrates through the pipeline (200) to be pushed and pulled; Step 2: the inner wall surface of the pipeline (200) is fixed by the telescopic support assembly, and the connection between the rod (100) and the inner wall surface of the pipeline (200) is realized; Step 3: one side of the pipeline (200) is pushed by the pushing mechanism, and the rod (100) is pulled by the pipe pulling mechanism on the opposite side. Step 4, after the pipe (200) is pushed and pulled to the designated position, the pushing operation of the pipe (200) is completed.

Citation Information

Patent Citations

  • Pushing structure of top pull pipe for sewage pipe network construction

    CN218233703U