Integrated pool and sewage treatment system

By combining the construction of the initial sedimentation tank, the first adjustment tank and the second adjustment tank, and using the water distribution components to distribute sewage, the problems of large space occupation and low regulation efficiency in the existing sewage treatment system are solved, and efficient sewage treatment is achieved.

CN115608008BActive Publication Date: 2025-01-03CHINA ENFI ENG CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211354816.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-01
Publication Date
2025-01-03
Estimated Expiration
2042-11-01

AI Technical Summary

Technical Problem

In the existing sewage treatment system, the adjustment tank and the initial sedimentation tank occupy a large space and have low adjustment efficiency, which cannot effectively meet the alternate operation and maintenance needs of the sewage treatment system.

Method used

Design a comprehensive pool, combine the construction of the initial sedimentation tank, the first adjustment tank and the second adjustment tank, and distribute the sewage in the initial sedimentation tank according to the predetermined flow rate to the two adjustment tanks through the water distribution component, reducing the floor area and improving the adjustment efficiency.

Benefits of technology

It realizes the functions of having the primary sedimentation tank and the adjustment tank in a smaller space, improves the adjustment efficiency of the first and second adjustment tanks, and meets the alternating operation and maintenance needs of the sewage treatment system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115608008B_ABST
    Figure CN115608008B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of sewage treatment, and in particular to a comprehensive tank and a sewage treatment system, wherein the comprehensive tank comprises a primary sedimentation tank, a first regulating tank, a second regulating tank and a water distribution assembly, wherein a portion of the first regulating tank is adjacent to the primary sedimentation tank, and a common first tank wall is provided between the two; a portion of the second regulating tank is adjacent to the primary sedimentation tank, and a common second tank wall is provided between the two; the water distribution assembly is connected to the first tank wall and the second tank wall and is located in the primary sedimentation tank, so that the sewage in the primary sedimentation tank is distributed to the first regulating tank and the second regulating tank respectively according to a predetermined flow rate. The comprehensive tank implemented by the present invention not only has the functions of a primary sedimentation tank and a regulating tank, but also reduces the floor space compared to the separate construction of the primary sedimentation tank and the regulating tank.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sewage treatment, and in particular to an integrated pool and a sewage treatment system. Background Art

[0002] In the process of sewage treatment engineering, the regulating tank is the first link. In order to meet the needs of alternating operation and maintenance of various systems in sewage treatment engineering, regulating tanks are usually set up to separate various systems. Among them, sewage needs to pass through the regulating tank before entering the subsequent treatment process. In addition, in order to remove large particles of sediment in sewage, the primary sedimentation tank is also indispensable.

[0003] In the related art, the sewage treatment system includes an equalization tank and a primary sedimentation tank. The equalization tank and the primary sedimentation tank occupy a large space, and the equalization efficiency of the equalization tank is low. Summary of the invention

[0004] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, an embodiment of the present invention provides a comprehensive tank for treating sewage, the comprehensive tank comprising a primary sedimentation tank, a first regulating tank, a second regulating tank and a water distribution component;

[0005] A portion of the first regulating tank is adjacent to the primary settling tank, and a common first tank wall is provided between the two;

[0006] A portion of the second regulating tank is adjacent to the primary settling tank, and a common second tank wall is provided between the two;

[0007] The water distribution assembly is connected to the first tank wall and the second tank wall and is located in the primary sedimentation tank, so that the sewage in the primary sedimentation tank is distributed to the first regulating tank and the second regulating tank according to a predetermined flow rate.

[0008] The primary sedimentation tank, the first regulating tank and the second regulating tank are built together, and the first regulating tank and the second regulating tank are adjacent to the primary sedimentation tank respectively. They not only have the functions of the primary sedimentation tank and the regulating tank, but also reduce the floor space compared to the separate construction of the primary sedimentation tank and the regulating tank. At the same time, in the integrated tank, the primary sedimentation tank uses the water distribution component to distribute sewage to the first regulating tank and the second regulating tank according to the predetermined flow rate, so that the first regulating tank and the second regulating tank can receive sewage of the predetermined flow rate to improve the regulation efficiency of the first regulating tank and the second regulating tank.

[0009] Optionally, the water distribution assembly includes:

[0010] A water collecting tank, one end of which is connected to the first tank wall and communicated with the first regulating tank, and the other end of which is connected to the second tank wall and communicated with the second regulating tank;

[0011] A first valve, which is arranged at the connection between the water collecting tank and the first regulating tank, and is used to distribute the sewage in the primary settling tank to the first regulating tank according to a predetermined flow rate;

[0012] The second valve is arranged at the connection point between the water collecting tank and the second regulating tank, so as to distribute the sewage in the primary settling tank to the second regulating tank according to a predetermined flow rate.

[0013] Optionally, the comprehensive pool includes:

[0014] The slag retaining plate is located in the primary settling tank and adjacent to the water inlet side of the water collecting tank, and the slag retaining plate and the water collecting tank are spaced apart from each other;

[0015] The slag retaining plate extends along the length direction of the water collecting trough to the first pool wall and the second pool wall, the upper edge of the slag retaining plate is higher than the water inlet edge on the water inlet side, and the lower edge of the slag retaining plate is lower than the water inlet edge.

[0016] Optionally, the comprehensive pool includes:

[0017] The weir plate is arranged on the water inlet side, and the weir plate extends along the length direction of the water collecting trough to the first pool wall and the second pool wall, and the overflow water level of the weir plate is lower than the upper edge of the slag retaining plate.

[0018] Optionally, the integrated pool also includes:

[0019] A flushing pipe is arranged on the upper edge of the weir plate and extends along the length direction of the water collecting tank. The flushing pipe is provided with an overflow port facing the weir plate and flushing ports are arranged in sequence along the length direction of the water collecting tank.

[0020] Optionally, the integrated pool further comprises a sludge suction assembly, which comprises:

[0021] A first sludge suction pipe, a portion of which is arranged in the primary sedimentation tank, one end of which is spaced apart from the inner wall surface of the primary sedimentation tank and is connected to the primary sedimentation tank, and one end of which is spaced apart from the bottom of the primary sedimentation tank;

[0022] A second mud suction pipe, a part of which is arranged in the primary sedimentation tank, one end of which is separated from the inner wall surface of the primary sedimentation tank and connected to the primary sedimentation tank, and one end of which is located at the bottom of the primary sedimentation tank.

[0023] Optionally, the integrated pool further comprises a drainage component, the drainage component comprising:

[0024] A first variable frequency pump body, wherein a liquid inlet of the first variable frequency pump body is respectively connected to a first regulating tank and a second regulating tank;

[0025] a second variable frequency pump body, wherein the liquid inlet of the second variable frequency pump body is respectively connected with the first regulating tank and the second regulating tank;

[0026] A downstream system pipe, wherein a water inlet of the downstream system pipe is respectively connected to a water outlet of the first variable frequency pump body and a water outlet of the second variable frequency pump body;

[0027] A regulating pipe, one end of which is connected to the downstream system pipe, and the other end of which is connected to the primary sedimentation tank.

[0028] Optionally, the integrated pool further includes a retaining wall, which is arranged in the primary sedimentation tank. The integrated pool has a sewage inlet, which is connected to the primary sedimentation tank. The retaining wall is arranged adjacent to the sewage inlet to slow down the flow rate of the sewage.

[0029] Optionally, a first overflow port connected to the primary sedimentation tank and the first regulating tank is provided on the first tank wall;

[0030] A second overflow port connected to the primary sedimentation tank and the second regulating tank is provided on the second tank wall;

[0031] The first overflow port and the second overflow port are located at the same height, and the heights of both are higher than the height of the water distribution component.

[0032] An embodiment of the present invention provides another sewage treatment system, which includes the above-mentioned integrated pool. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic diagram of an implementation method of the comprehensive pool in the present invention.

[0034] Figure 2 yes Figure 1 Partial schematic diagram of a.

[0035] Figure 3 yes Figure 1 Sectional view of AA.

[0036] Figure 4 yes Figure 3 Partial schematic diagram of b.

[0037] Figure 5 yes Figure 1 Cross-sectional view of BB.

[0038] Reference numerals:

[0039] 1-comprehensive tank, 10-primary sedimentation tank, 11-sewage inlet, 20-first regulating tank, 30-second regulating tank 30, 40-water distribution assembly, 41-water collecting tank, 411-water inlet side, 4111-water inlet edge, 42-first valve, 43-second valve, 50-first tank wall, 51-first overflow port, 60-second tank wall, 61-second overflow port, 70-slag retaining plate, 80-weir plate, 90-sludge suction assembly, 91-first sludge suction pipe, 92-second sludge suction pipe, 93-sludge suction pump, 100-drainage assembly, 101-first variable frequency pump body, 102-second variable frequency pump body, 103-downstream system pipe, 104-regulating pipe, 110-water retaining wall, 120-flushing pipe. DETAILED DESCRIPTION

[0040] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0041] The integrated pool for treating sewage according to an embodiment of the present invention will be described below with reference to the accompanying drawings.

[0042] like Figures 1 to 5 As shown, the integrated tank 1 according to an embodiment of the present invention includes a primary sedimentation tank 10 , a first regulating tank 20 , a second regulating tank 30 and a water distribution assembly 40 .

[0043] A portion of the first regulating tank 20 is adjacent to the primary settling tank 10, and a common first tank wall 50 is provided between the two. A portion of the second regulating tank 30 is adjacent to the primary settling tank 10, and a common second tank wall 60 is provided between the two. The water distribution assembly 40 is connected to the first tank wall 50 and the second tank wall 60 and is located in the primary settling tank 10, so that the sewage in the primary settling tank 10 is distributed to the first regulating tank 20 and the second regulating tank 30 according to a predetermined flow rate.

[0044] According to the integrated tank 1 of the embodiment of the present invention, the primary sedimentation tank 10, the first regulating tank 20 and the second regulating tank 30 are constructed together, and the first regulating tank 20 and the second regulating tank 30 are respectively adjacent to the primary sedimentation tank 10, which not only has the functions of the primary sedimentation tank and the regulating tank, but also reduces the floor space compared to the separate construction of the primary sedimentation tank and the regulating tank. At the same time, in the integrated tank 1, the primary sedimentation tank 10 uses the water distribution component 40 to distribute sewage to the first regulating tank 20 and the second regulating tank 30 according to the predetermined flow rate, so that the first regulating tank 20 and the second regulating tank 30 can receive sewage of the predetermined flow rate to improve the regulation efficiency of the first regulating tank 20 and the second regulating tank 30.

[0045] It should be noted that the predetermined flow rate is based on the sewage demand of the first regulating tank 20 and the second regulating tank 30, and sewage is distributed to the first regulating tank 20 and the second regulating tank 30 at a certain flow rate. The predetermined flow rate of the first regulating tank 20 and the predetermined flow rate of the second regulating tank 30 may be different or the same.

[0046] like Figures 1 to 5 As shown, in order to make the technical solution of the present application easier to understand, the technical solution of the present application is described in more detail below with a specific implementation of the integrated tank 1. The integrated tank 1 according to an embodiment of the present invention includes a primary settling tank 10, a first regulating tank 20, a second regulating tank 30 and a water distribution assembly 40.

[0047] In some embodiments, a portion of the first regulating tank 20 is adjacent to the primary settling tank 10, and a common first tank wall 50 is provided between the two. A portion of the second regulating tank 30 is adjacent to the primary settling tank 10, and a common second tank wall 60 is provided between the two. The water distribution assembly 40 is connected to the first tank wall 50 and the second tank wall 60 and is located in the primary settling tank 10, so that the sewage in the primary settling tank 10 is distributed to the first regulating tank 20 and the second regulating tank 30 according to a predetermined flow rate.

[0048] Specifically, a portion of the first regulating tank 20 is adjacent to the primary settling tank 10, and a portion of the second regulating tank 30 is adjacent to the primary settling tank 10. The first regulating tank 20 and the second regulating tank 30 may be spaced apart from each other, and the two are connected via the primary settling tank 10. In addition, the first regulating tank 20 and the second regulating tank 30 may also be adjacent to each other, that is, the first regulating tank 20, the second regulating tank 30 and the primary settling tank 10 are adjacent to each other. In this regard, the first regulating tank 20 and the second regulating tank 30 are adjacent to each other or spaced apart from each other, and the first regulating tank 20, the second regulating tank 30 and the primary settling tank 10 are combined and constructed. Compared with the separate construction of the three, not only does the integrated tank 1 have the functions of the primary settling tank and the regulating tank at the same time, but also reduces the floor space occupied by the separate construction of the three.

[0049] At the same time, the primary sedimentation tank 10 can distribute a predetermined flow of sewage to the first regulating tank 20 and the second regulating tank 30 respectively through the water distribution component 40 to control the amount of sewage entering the first regulating tank 20 and the second regulating tank 30 respectively, so that the primary sedimentation tank 10 can participate in the sewage regulation process of the first regulating tank 20 and the second regulating tank 30 to improve the regulation efficiency of the first regulating tank 20 and the second regulating tank 30. That is to say, when the first regulating tank 20 or the second regulating tank 30 is in the process of regulating sewage, when the first regulating tank 20 or the second regulating tank 30 needs a large amount of sewage in a short time, more sewage can be distributed to the first regulating tank 20 or the second regulating tank 30 by controlling the water distribution component 40 to meet the sewage demand of the first regulating tank 20 or the second regulating tank 30. In addition, when the first regulating tank 20 does not need to take in water, all the sewage in the primary sedimentation tank 10 can be distributed to the second regulating tank 30 to avoid the sewage in the primary sedimentation tank 10 from being full, that is, the first regulating tank 20 and the second regulating tank 30 are in a standby relationship with each other. When the second regulating tank 30 does not need to be filled with water, the principle is the same as that of the first regulating tank 20 not needing to be filled with water, and will not be repeated here.

[0050] In some embodiments, the water distribution assembly 40 includes a water collection tank 41, a first valve 42, and a second valve 43. One end of the water collection tank 41 is connected to the first tank wall 50 and communicated with the first regulating tank 20, and the other end of the water collection tank 41 is connected to the second tank wall 60 and communicated with the second regulating tank 30. The first valve 42 is provided at the connection between the water collection tank 41 and the first regulating tank 20, so as to distribute the sewage in the primary settling tank 10 to the first regulating tank 20 according to a predetermined flow rate. The second valve 43 is provided at the connection between the water collection tank 41 and the second regulating tank 30, so as to distribute the sewage in the primary settling tank 10 to the second regulating tank 30 according to a predetermined flow rate.

[0051] Specifically, Figure 1 , Figure 3 , Figure 4 and Figure 5 As shown, the water collection tank 41 in the primary sedimentation tank 10 can be used to collect sewage precipitated by the primary sedimentation tank 10. Then the sewage collected in the water collection tank 41 is distributed to the first regulating tank 20 and the second regulating tank 30 according to a predetermined flow rate through the first valve 42 and the second valve 43. Among them, the first valve 42 is installed at the connection between the water collection tank 41 and the first regulating tank 20, and can control the flow of sewage flowing from the water collection tank 41 into the first regulating tank 20, so as to achieve the distribution of sewage to the first regulating tank 20 according to the predetermined flow rate. At the same time, the function and principle of the second valve 43 are similar to those of the first valve 42, and will not be repeated here.

[0052] The first valve 42 and the second valve 43 in the present invention can be long-rod knife gate valves, which can be turned on and off by rotating the long rod to operate the valve opening to control the amount of sewage entering the first valve 42 and the second valve 43.

[0053] In addition, the water distribution assembly 40 in the present invention is far away from the sewage inlet 11 of the primary sedimentation tank 10. In other words, the water collection tank 41 is far away from the sewage inlet 11 of the primary sedimentation tank 10. When the water collection tank 41 is farther away from the sewage inlet 11 of the primary sedimentation tank 10, that is, the distance from the sewage just entering the primary sedimentation tank 10 to flowing into the water collection tank 41 is farther, the sewage is more fully precipitated in the primary sedimentation tank 10.

[0054] In some embodiments, the integrated pool 1 includes a slag retaining plate 70, which is located in the primary sedimentation tank 10 and adjacent to the water inlet side 411 of the sump 41, and the slag retaining plate 70 and the sump 41 are spaced apart from each other, wherein the slag retaining plate 70 extends along the length direction of the sump 41 to the first pool wall 50 and the second pool wall 60, and the upper edge of the slag retaining plate 70 is higher than the water inlet edge 4111 of the water inlet side 411, and the lower edge of the slag retaining plate 70 is lower than the water inlet edge 4111.

[0055] Specifically, Figures 1 to 4 As shown, one end of the slag retaining plate 70 is installed on the first pool wall 50, and the other end of the slag retaining plate 70 is installed on the second pool wall 60, and is located in the primary sedimentation tank 10 and adjacent to the water inlet side 411 of the sump 41, so as to prevent the scum in the primary sedimentation tank 10 from crossing the water inlet side 411 and entering the sump 41, thereby preventing the scum from blocking the connection between the sump 41 and the first regulating tank 20 and the second regulating tank 30.

[0056] In addition, if Figures 1 to 4 As shown, one of the two sides of the water collecting tank 41 is the water inlet side 411, or the two sides of the water collecting tank 41 are the water inlet sides 411. When the two sides of the water collecting tank 41 are the water inlet sides 411, slag retaining plates 70 are installed at intervals on both sides of the water collecting tank 41 to retain the scum in the primary sedimentation tank 10.

[0057] In some embodiments, the integrated pool 1 includes a weir plate 80, which is arranged on the water inlet side 411, and the weir plate 80 extends along the length direction of the sump 41 to the first pool wall 50 and the second pool wall 60, and the overflow water level of the weir plate 80 is lower than the upper edge of the slag retaining plate 70.

[0058] Specifically, Figure 1 , Figure 3 , Figure 4 and Figure 5As shown, the weir plate 80 is installed on the water inlet side 411 of the water collecting tank 41, which can not only regulate the water volume, but also prevent the scum from entering the water collecting tank 41. In addition, the weir plate 80 and the scum blocking plate 70 can further prevent the scum from being blocked under the coordinated action. Among them, the weir plate 80 in the present invention is a triangular weir.

[0059] In some instances, the integrated pool 1 further includes a flushing pipe 120 , which is disposed on the upper edge of the weir plate 80 and extends along the length direction of the sump 41 . The flushing pipe 120 is provided with an overflow port toward the weir plate 80 and flushing ports arranged sequentially along the length direction of the sump 41 .

[0060] Specifically, Figure 5 As shown, the flushing pipe 120 is installed on the upper edge of the weir plate 80, and the flushing pipe 120 can flush the sludge in the overflow port of the weir plate 80 through the flushing port, thereby preventing the overflow port of the weir plate 80 from being blocked by accumulated sludge, thereby ensuring the normal operation of the weir plate 80.

[0061] In some embodiments, the integrated pool 1 further includes a mud suction assembly 90, which includes a first mud suction pipe 91 and a second mud suction pipe 92. A portion of the first mud suction pipe 91 is arranged in the primary sedimentation tank 10, one end of the first mud suction pipe 91 is spaced from the inner wall surface of the primary sedimentation tank 10 and is connected to the primary sedimentation tank 10, and one end of the first mud suction pipe 91 is spaced from the bottom of the primary sedimentation tank 10. A portion of the second mud suction pipe 92 is arranged in the primary sedimentation tank 10, one end of the second mud suction pipe 92 is spaced from the inner wall surface of the primary sedimentation tank 10 and is connected to the primary sedimentation tank 10, and one end of the second mud suction pipe 92 is located at the bottom of the primary sedimentation tank 10.

[0062] Specifically, Figure 1 , Figure 2 , Figure 3 and Figure 5As shown, the sludge suction port of the first sludge suction pipe 91 is spaced apart from the inner wall surface of the primary sedimentation tank 10 and is spaced apart from the bottom of the primary sedimentation tank 10. In other words, the first sludge suction pipe 91 is used to absorb the sludge located in the middle of the primary sedimentation tank 10. That is, the sludge suction port of the first sludge suction pipe 91 is located at the center of the horizontal cross-section of the primary sedimentation tank 10, and the sludge suction port of the first sludge suction pipe 91 is spaced apart from the bottom of the primary sedimentation tank 10. The sludge suction port of the second sludge suction pipe 92 is spaced apart from the inner wall surface of the primary sedimentation tank 10 and is located at the bottom of the primary sedimentation tank 10. In other words, the second sludge suction pipe 92 is used to absorb the sludge at the bottom of the primary sedimentation tank 10. When the primary sedimentation tank 10 actually absorbs sludge, the sludge suction assembly 90 is not always in working condition. When the sludge in the primary sedimentation tank 10 accumulates to a certain extent, the sludge suction assembly 90 is started to absorb the sludge in the primary sedimentation tank 10. Sometimes, the sludge in the primary sedimentation tank 10 accumulates a lot over a period of time, making the viscosity of the sludge at the bottom of the primary sedimentation tank 10 too high, which causes the second sludge suction pipe 92 to absorb the sludge unsmoothly, and is more likely to cause the second sludge suction pipe 92 to be blocked. In the present invention, the first sludge suction pipe 91 can absorb the sludge above the bottom of the tank, reduce the accumulation of sludge, and thus reduce the viscosity of the sludge at the bottom of the primary sedimentation tank 10, ensuring that the second sludge suction pipe 92 can smoothly absorb the sludge at the bottom of the primary sedimentation tank 10.

[0063] In the present invention, the sludge suction assembly 90 also includes a sludge suction pump 93, which mainly provides power for the first sludge suction pipe 91 and the second sludge suction pipe 92. The sludge suction pumps 93 can be installed in parallel in a form of multiple units to ensure that the sludge suction assembly 90 efficiently absorbs the sludge in the primary sedimentation tank 10. The multiple parallel sludge suction pumps 93 serve as backup for each other, which can ensure the continuous operation of the sludge suction assembly 90. That is, when some of the sludge suction pumps 93 are damaged, the other sludge suction pumps 93 can also operate normally to ensure the sludge suction progress of the sludge suction assembly 90.

[0064] In some embodiments, the integrated pool 1 further includes a drainage assembly 100, which includes a first variable frequency pump body 101, a second variable frequency pump body 102, a downstream system pipe 103 and a regulating pipe 104. The liquid inlet of the first variable frequency pump body 101 is respectively connected to the first regulating pool 20 and the second regulating pool 30. The liquid inlet of the second variable frequency pump body 102 is respectively connected to the first regulating pool 20 and the second regulating pool 30. The water inlet of the downstream system pipeline 103 is respectively connected to the water outlet of the first variable frequency pump body 101 and the water outlet of the second variable frequency pump body 102. One end of the regulating pipe 104 is connected to the downstream system pipe 103, and the other end of the regulating pipe 104 is connected to the primary sedimentation tank 10.

[0065] Specifically, Figure 1 and Figure 2As shown, after the sewage is regulated by the first regulating tank 20 and the second regulating tank 30, the sewage of the first regulating tank 20 and the second regulating tank 30 is discharged into the next system by the drainage component 100, so as to perform subsequent treatment on the sewage. Among them, the water outlet of the first variable frequency pump body 101 and the water outlet of the second variable frequency pump body 102 are simultaneously connected to the downstream system pipe 103, and the first variable frequency pump body 101 and the second variable frequency pump body 102 can adjust the water output of the first regulating tank 20 and the second regulating tank 30 respectively. In other words, the first variable frequency pump body 101 and the second variable frequency pump body 102 work separately, and one of the first variable frequency pump body 101 and the second variable frequency pump body 102 fails or is repaired, and the other of the first variable frequency pump body 101 and the second variable frequency pump body 102 can still work normally. In addition, one end of the regulating pipe 104 is connected to the downstream system pipe 103, and the other end of the regulating pipe 104 is connected to the primary sedimentation tank 10. When the pressure in the downstream system pipe 103 is too high, the regulating pipe 104 can discharge a portion of the liquid into the primary sedimentation tank 10 to relieve the pressure in the upstream system pipe 103 and can also regulate the flow in the downstream system pipe 103 .

[0066] In some embodiments, the integrated pool 1 also includes a retaining wall 110, which is arranged in the primary sedimentation tank 10. The integrated pool 1 has a sewage inlet 11, which is connected to the primary sedimentation tank 10. The retaining wall 110 is arranged adjacent to the sewage inlet 11 to slow down the flow rate of the sewage.

[0067] Specifically, Figures 1 to 3 As shown, the water retaining 110 is mainly used to slow down the flow rate of sewage entering the primary settling tank 10. That is, the flow rate of sewage entering the primary settling tank 10 is too high, and the sewage flows into the sump 41 in a very short time, causing the pollutants in the sewage to enter the first regulating tank 20 and the second regulating tank 30 without sufficient precipitation.

[0068] In some embodiments, a first overflow port 51 connected to the primary settling tank 10 and the first regulating tank 20 is provided on the first pool wall 50, and a second overflow port 61 connected to the primary settling tank 10 and the second regulating tank 30 is provided on the second pool wall 60, wherein the first overflow port 51 and the second overflow port 61 are located at the same height, and the heights of both are higher than the height of the water distribution assembly 40.

[0069] Specifically, Figures 1 to 3 As shown, when there is too much sewage in the primary sedimentation tank 10, the first overflow port 51 and the second overflow port 61 can discharge the sewage in the primary sedimentation tank 10 into the first regulating tank 20 and the second regulating tank 30 in time, avoiding leakage of sewage in the primary sedimentation tank 10 and preventing the sewage in the primary sedimentation tank 10 from contaminating the water in the subsequent system.

[0070] A sewage treatment system according to an embodiment of the present invention includes the above-mentioned integrated pool.

[0071] In the sewage treatment system, the primary sedimentation tank 10, the first regulating tank 20 and the second regulating tank 30 are constructed together, which reduces the floor space compared to the separate construction of the primary sedimentation tank and the regulating tank. In addition, the water distribution component 40 can be used to efficiently control the water inflow into the first regulating tank 20 and the second regulating tank 30 to ensure the efficient operation of the sewage treatment system. Finally, during the process of the sludge suction component 90 discharging sludge from the primary sedimentation tank 10, the sludge suction component 90 can avoid blockage and efficiently discharge sludge from the primary sedimentation tank 10.

[0072] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0073] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0074] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0075] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0076] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0077] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.

Claims

1. A comprehensive pool for treating sewage, characterized in that: It includes a primary sedimentation tank, a first regulating tank, a second regulating tank and a water distribution component; A portion of the first regulating tank is adjacent to the primary settling tank, and a common first tank wall is provided between the two; A portion of the second regulating tank is adjacent to the primary settling tank, and a common second tank wall is provided between the two; The water distribution assembly is connected to the first tank wall and the second tank wall and is located in the primary sedimentation tank, so that the sewage in the primary sedimentation tank is distributed to the first regulating tank and the second regulating tank according to a predetermined flow rate, the integrated tank has a sewage inlet, and the water distribution assembly is far away from the sewage inlet; The water distribution assembly comprises: A water collecting tank, one end of which is connected to the first pool wall and communicated with the first regulating pool, and the other end of which is connected to the second pool wall and communicated with the second regulating pool; a first valve, the first valve being arranged at the connection between the water collecting tank and the first regulating tank, and being used for distributing the sewage in the primary settling tank to the first regulating tank according to the predetermined flow rate; The second valve is arranged at the connection point between the water collecting tank and the second regulating tank, so as to distribute the sewage in the primary settling tank to the second regulating tank according to the predetermined flow rate.

2. The integrated pool according to claim 1, characterized in that: The comprehensive pool includes: A slag retaining plate, the slag retaining plate is located in the primary settling tank and adjacent to the water inlet side of the water collecting tank, the slag retaining plate and the water collecting tank are spaced apart from each other; The slag retaining plate extends along the length direction of the water collecting trough to the first pool wall and the second pool wall, the upper edge of the slag retaining plate is higher than the water inlet edge of the water inlet side, and the lower edge of the slag retaining plate is lower than the water inlet edge.

3. The integrated pool according to claim 2, characterized in that: The comprehensive pool includes: A weir plate is arranged on the water inlet side, the weir plate extends along the length direction of the water collecting trough to the first pool wall and the second pool wall, and the overflow water level of the weir plate is lower than the upper edge of the slag retaining plate.

4. The integrated pool according to claim 3, characterized in that: The comprehensive pool also includes: A flushing pipe is arranged on the upper edge of the weir plate and extends along the length direction of the water collecting tank. The flushing pipe is provided with an overflow port facing the weir plate and flushing ports are arranged in sequence along the length direction of the water collecting tank.

5. The integrated pool according to claim 1, characterized in that: The integrated pool also includes a sludge suction assembly, which includes: a first sludge suction pipe, a portion of which is arranged in the primary sedimentation tank, one end of which is spaced apart from the inner wall surface of the primary sedimentation tank and is in communication with the primary sedimentation tank, and one end of which is spaced apart from the bottom of the primary sedimentation tank; A second mud suction pipe, a portion of which is arranged in the primary sedimentation tank, one end of the second mud suction pipe is separated from the inner wall surface of the primary sedimentation tank and is connected to the primary sedimentation tank, and one end of the second mud suction pipe is located at the bottom of the primary sedimentation tank.

6. The integrated pool according to claim 1, characterized in that: The integrated pool also includes a drainage component, which includes: a first variable frequency pump body, wherein a liquid inlet of the first variable frequency pump body is respectively connected to the first regulating tank and the second regulating tank; a second variable frequency pump body, wherein the liquid inlet of the second variable frequency pump body is respectively connected to the first regulating tank and the second regulating tank; A downstream system pipe, the water inlet of the downstream system pipe is respectively connected with the water outlet of the first variable frequency pump body and the water outlet of the second variable frequency pump body; A regulating pipe, one end of which is connected to the downstream system pipe, and the other end of which is connected to the primary sedimentation tank.

7. The integrated pool according to any one of claims 1 to 6, characterized in that: The integrated pool also includes a water retaining wall, which is arranged in the primary sedimentation tank. The sewage inlet is connected to the primary sedimentation tank. The water retaining wall is arranged adjacent to the sewage inlet to slow down the flow rate of the sewage.

8. The integrated pool according to any one of claims 1 to 6, characterized in that: The first tank wall is provided with a first overflow port connected to the primary settling tank and the first regulating tank; The second tank wall is provided with a second overflow port connected to the primary sedimentation tank and the second regulating tank; Wherein, the first overflow port and the second overflow port are located at the same height, and the heights of both are higher than the height of the water distribution component.

9. A sewage treatment system, characterized in that: Comprising an integrated pool according to any one of claims 1-8.