A thermal power plant crushing and screening equipment abnormality monitoring system and method
By designing a monitoring, transmission and analysis subsystem for crushing and screening equipment, real-time monitoring and analysis of equipment operation data solves the problem of existing equipment being unable to understand abnormal conditions in a timely manner, enabling timely warning and processing of equipment abnormal conditions, and extending The service life of the equipment.
Patent Information
- Application Number
- CN202211372646.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-03
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-11-03
AI Technical Summary
Existing crushing and screening equipment cannot monitor the operating status in a timely manner, resulting in operators being unable to understand equipment abnormalities in a timely manner and affecting the service life of the equipment.
An anomaly monitoring system is designed that includes a monitoring subsystem, a transmission subsystem and an analysis subsystem. Through real-time monitoring of equipment operation data, compression, processing, transmission and storage, an analysis model is created based on equipment parameters, identifying equipment abnormal conditions, and operating Provide early warning to staff.
It realizes real-time monitoring of crushing and screening equipment and timely warning of abnormal conditions, extending the service life of the equipment.
Smart Images

Figure CN115625029B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of monitoring equipment, and in particular to a system and method for monitoring abnormality of crushing and screening equipment in a thermal power plant. Background Art
[0002] The coal burned in thermal power plants usually needs to be crushed using crushing and screening equipment. Crushing and screening equipment is a machine that crushes large-sized solid raw materials into required sizes.
[0003] The crushing and screening equipment consists of coarse crushing, fine crushing and wind conveying devices. It achieves the purpose of crushing and screening equipment in the form of high-speed impact, uses wind energy to produce powder in one go, and cancels the traditional screening process. It is mainly used in various industries such as mining and building materials. There are four types of external forces applied to solids during the crushing process: shearing, impact, rolling and grinding. Shearing is mainly used in crushing and pulverizing operations, and is suitable for crushing or pulverizing tough or fibrous materials and large blocks of materials. Impact is mainly used in pulverizing operations and is suitable for pulverizing brittle materials; rolling is mainly used in high-fineness pulverizing operations and is suitable for ultra-fine pulverizing of materials of most properties; grinding is mainly used for ultra-fine pulverizing or ultra-large pulverizing equipment, and is suitable for further pulverizing operations after pulverizing operations.
[0004] However, the existing crushing and screening equipment is unable to monitor the status of the equipment during operation, and the operator cannot promptly know when the crushing and screening equipment is abnormal, thus affecting the service life of the equipment. Summary of the invention
[0005] The purpose of the present invention is to provide a system and method for monitoring abnormality of crushing and screening equipment in a thermal power plant, aiming to solve the problem that the existing crushing and screening equipment cannot timely understand abnormal conditions, thus affecting the service life of the equipment.
[0006] To achieve the above-mentioned object, in a first aspect, the present invention provides an abnormality monitoring system for crushing and screening equipment in a thermal power plant, comprising a monitoring subsystem, a transmission subsystem and an analysis subsystem, wherein the monitoring subsystem, the transmission subsystem and the analysis subsystem are connected in sequence, and the analysis subsystem comprises a data module, an analysis module and an early warning module, wherein the data module, the analysis module and the early warning module are connected in sequence;
[0007] The monitoring subsystem is used to monitor the operation data of the crushing and screening equipment in real time, obtain monitoring data, and compress the monitoring data to obtain a data packet;
[0008] The transmission subsystem is used to transmit the data packet to the data module;
[0009] The data module is used to receive the data packet, restore the monitoring data, and store the monitoring data to obtain stored data;
[0010] The analysis module creates an analysis model based on the parameters of the crushing and screening equipment, and uses the analysis model to train and analyze the stored data to obtain abnormal conditions of the equipment;
[0011] The early warning module promptly warns the operator based on the abnormal condition of the equipment.
[0012] Wherein, the monitoring subsystem includes a monitoring module, an installation module and a protection module, and the installation module and the protection module are respectively connected to the monitoring module;
[0013] The installation module is used to install and fix the monitoring module on the crushing and screening equipment;
[0014] The protection module is used to provide waterproof, shockproof and dustproof protection for the monitoring module;
[0015] The monitoring module is used to monitor the crushing and screening equipment in real time.
[0016] Wherein, the monitoring module comprises a monitoring unit, a compression unit and a self-checking unit, and the self-checking unit is connected to the monitoring unit and the compression unit respectively;
[0017] The monitoring unit is used to monitor the operating status of the crushing and screening equipment in real time to obtain monitoring data;
[0018] The compression unit is used to compress the monitoring data to obtain a data packet;
[0019] The self-checking unit is used to check the monitoring unit and the compression unit.
[0020] Wherein, the data module comprises a receiving unit, a decompression unit and a storage unit, and the receiving unit, the decompression unit and the storage unit are connected in sequence;
[0021] The receiving unit is used to receive the data packet;
[0022] The decompression unit is used to decompress the data packet and restore the monitoring data;
[0023] The storage unit is used to store the restored monitoring data to obtain stored data.
[0024] Wherein, the analysis module includes a modeling unit and an analysis unit, and the modeling unit and the analysis unit are connected;
[0025] The modeling unit creates a model using a big data analysis algorithm based on the parameters of the crushing and screening equipment to obtain a training model;
[0026] The analysis unit trains the stored data based on the training model to obtain an abnormal condition of the equipment.
[0027] In a second aspect, the present invention further provides a method for monitoring abnormality of crushing and screening equipment in a thermal power plant, comprising the following steps:
[0028] Preset equipment parameters to the analysis subsystem based on the parameters of the crushing and screening equipment;
[0029] The monitoring subsystem is installed on the crushing and screening equipment to monitor the operation data of the crushing and screening equipment in real time to obtain a data packet;
[0030] The transmission subsystem transmits the data packet to the analysis subsystem for analysis based on the device parameters to obtain the abnormal status of the device.
[0031] The transmission subsystem transmits the data packet to the analysis subsystem for analysis in combination with the device parameters to obtain the specific method of the abnormal condition of the device:
[0032] The transmission subsystem transmits the monitoring data to the data module to obtain the storage data;
[0033] The analysis module creates a training model based on device parameters using big data analysis algorithms;
[0034] The stored data is input into the training model for analysis and training to obtain the abnormal status of the equipment.
[0035] The present invention provides a system and method for monitoring abnormality of crushing and screening equipment in a thermal power plant. The monitoring subsystem monitors the operating data of the crushing and screening equipment in real time to obtain monitoring data, and compresses the monitoring data to obtain a data packet. The transmission subsystem transmits the data packet to the data module. The data module receives the data packet and restores the monitoring data, and stores the monitoring data to obtain stored data. The analysis module creates an analysis model based on the parameters of the crushing and screening equipment, and uses the analysis model to train and analyze the stored data to obtain an abnormal condition of the equipment. The abnormal condition of the equipment includes two conditions: normal equipment and abnormal equipment. When the equipment is abnormal, the early warning module warns the operator, so that the operator can deal with the abnormal equipment in time, thereby solving the problem that the existing crushing and screening equipment cannot understand the abnormal condition in time, which affects the service life of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 The present invention is a schematic structural diagram of a thermal power plant crushing and screening equipment abnormality monitoring system.
[0038] Figure 2 It is a schematic diagram of a monitoring subsystem of an abnormal monitoring system for crushing and screening equipment in a thermal power plant provided by the present invention.
[0039] Figure 3 It is a schematic diagram of a data module of a thermal power plant crushing and screening equipment abnormality monitoring system provided by the present invention.
[0040] Figure 4 It is a schematic diagram of an analysis module of an abnormal monitoring system for crushing and screening equipment in a thermal power plant provided by the present invention.
[0041] Figure 5 It is a schematic diagram of an early warning module of an abnormal monitoring system for crushing and screening equipment in a thermal power plant provided by the present invention.
[0042] Figure 6 The present invention provides a flow chart of a method for monitoring abnormalities of crushing and screening equipment in a thermal power plant.
[0043] Figure 7 The transmission subsystem transmits the data packet to the analysis subsystem for analysis in combination with the device parameters to obtain a flow chart of the abnormal condition of the device.
[0044] 1- monitoring subsystem, 2- transmission subsystem, 3- analysis subsystem, 4- data module, 5- analysis module, 6- early warning module, 7- monitoring module, 8- installation module, 9- protection module, 10- monitoring unit, 11- compression unit, 12- self-test unit, 13- receiving unit, 14- decompression unit, 15- storage unit, 16- modeling unit, 17- analysis unit, 18- alarm unit, 19- positioning unit, 20- tracing subunit, 21- positioning subunit. DETAILED DESCRIPTION
[0045] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0046] See also Figures 1 to 5 In a first aspect, the present invention provides an abnormal monitoring system for crushing and screening equipment in a thermal power plant, comprising a monitoring subsystem 1, a transmission subsystem 2 and an analysis subsystem 3, wherein the monitoring subsystem 1, the transmission subsystem 2 and the analysis subsystem 3 are connected in sequence, and the analysis subsystem 3 comprises a data module 4, an analysis module 5 and an early warning module 6, wherein the data module 4, the analysis module 5 and the early warning module 6 are connected in sequence;
[0047] The monitoring subsystem 1 is used to monitor the operation data of the crushing and screening equipment in real time, obtain monitoring data, and compress the monitoring data to obtain a data packet;
[0048] The transmission subsystem 2 is used to transmit the data packet to the data module 4;
[0049] The data module 4 is used to receive the data packet, restore the monitoring data, and store the monitoring data to obtain stored data;
[0050] The analysis module 5 creates an analysis model based on the parameters of the crushing and screening equipment, and uses the analysis model to train and analyze the stored data to obtain abnormal conditions of the equipment;
[0051] The warning module 6 warns the operator based on the abnormal condition of the equipment.
[0052] In this embodiment, the monitoring subsystem 1 monitors the operating data of the crushing and screening equipment in real time to obtain monitoring data, and compresses the monitoring data to obtain a data packet. The transmission subsystem 2 transmits the data packet to the data module 4. The data module 4 receives the data packet to restore the monitoring data, and stores the monitoring data to obtain stored data. The analysis module 5 creates an analysis model based on the crushing and screening equipment parameters, and uses the analysis model to train and analyze the stored data to obtain equipment abnormal conditions. The equipment abnormal conditions include two conditions: normal equipment and abnormal equipment. When the equipment is abnormal, the early warning module 6 warns the operator, so that the operator can deal with the abnormal equipment in time, thereby solving the problem that the existing crushing and screening equipment cannot understand the abnormal conditions in time, affecting the service life of the equipment.
[0053] Further, the monitoring subsystem 1 includes a monitoring module 7, an installation module 8 and a protection module 9, the installation module 8 and the protection module 9 are respectively connected to the monitoring module 7; the monitoring module 7 includes a monitoring unit 10, a compression unit 11 and a self-test unit 12, the self-test unit 12 is respectively connected to the monitoring unit 10 and the compression unit 11;
[0054] The installation module 8 is used to install and fix the monitoring module 7 on the crushing and screening equipment;
[0055] The protection module 9 is used to provide waterproof, shockproof and dustproof protection to the monitoring module 7;
[0056] The monitoring module 7 is used to monitor the crushing and screening equipment in real time;
[0057] The monitoring unit 10 is used to monitor the operating status of the crushing and screening equipment in real time to obtain monitoring data;
[0058] The compression unit 11 is used to compress the monitoring data to obtain a data packet;
[0059] The self-checking unit 12 is used to check the monitoring unit 10 and the compression unit 11 .
[0060] In this embodiment, the operator installs and fixes the monitoring module 7 on the corresponding crushing and screening equipment through the installation module 8, and uses the protection module 9 to provide multi-directional protection for the monitoring module 7 in terms of waterproofing, shockproofing and dustproofing to prevent external factors from affecting the monitoring module 7 and improve the service life of the monitoring module 7. The monitoring module 7 monitors the crushing and screening equipment in real time and records parameters such as current, voltage and temperature of the crushing and screening equipment. Specifically, the monitoring module 7 monitors the operating status of the crushing and screening equipment in real time through the monitoring unit 10 to obtain monitoring data, and uses the compression unit 11 to compress the monitoring data to obtain a data packet, thereby reducing the bytes occupied by the monitoring data and improving the transmission speed of the subsequent transmission subsystem 2. The self-test unit 12 detects the monitoring unit 10 and the compression unit 11, and can timely understand the abnormal conditions of the monitoring unit 10 and the compression unit 11.
[0061] Further, the data module 4 includes a receiving unit 13, a decompression unit 14 and a storage unit 15, and the receiving unit 13, the decompression unit 14 and the storage unit 15 are connected in sequence; the analysis module 5 includes a modeling unit 16 and an analysis unit 17, and the modeling unit 16 and the analysis unit 17 are connected;
[0062] The receiving unit 13 is used to receive the data packet;
[0063] The decompression unit 14 is used to decompress the data packet and restore the monitoring data;
[0064] The storage unit 15 is used to store the restored monitoring data to obtain stored data;
[0065] The modeling unit 16 creates a model based on the crushing and screening equipment parameters using a big data analysis algorithm to obtain a training model;
[0066] The analysis unit 17 trains the stored data based on the training model to obtain abnormal conditions of the equipment.
[0067] In this embodiment, the data packet is received by the receiving unit 13, the decompression unit 14 decompresses and restores the received data packet to obtain the monitoring data, and finally the monitoring data is processed by the storage unit 15 to obtain storage data. The modeling unit 16 creates a model using a big data analysis algorithm according to the preset parameters of the crushing and screening equipment to obtain a training model. The analysis unit 17 inputs the storage data into the training model for training analysis to obtain the abnormal condition of the equipment, that is, the equipment is operating normally or the equipment is operating abnormally.
[0068] Further, the early warning module 6 includes an alarm unit 18 and a positioning unit 19, and the alarm unit 18 and the positioning unit 19 are connected;
[0069] The alarm unit 18 timely warns the operator based on the abnormal condition of the equipment;
[0070] The positioning unit 19 traces the area where the abnormal device is located based on the abnormal condition of the device and locates the abnormal device.
[0071] In this embodiment, the alarm unit 18 promptly warns the operator based on the abnormal condition of the equipment, so that the operator can deal with the abnormal equipment in time. The positioning unit 19 traces the area where the abnormal equipment is located based on the abnormal condition of the equipment and locates the abnormal equipment, so that the operator can quickly find the abnormal equipment.
[0072] Further, the positioning unit 19 includes a tracing subunit 20 and a positioning subunit 21, and the tracing subunit 20 is connected to the positioning subunit 21;
[0073] The tracing subunit 20 traces the area where the abnormal device is located based on the abnormal condition of the device to obtain the abnormal area;
[0074] The positioning subunit 21 is used to accurately locate the abnormal device in the abnormal area.
[0075] In this embodiment, the tracing subunit 20 traces the area where the abnormal device is located according to the abnormal condition of the device to obtain the abnormal area, and the positioning subunit 21 accurately locates the abnormal device in the abnormal area, so that the operator can quickly find the abnormal device for processing, thereby improving practicality.
[0076] See also Figure 6 to Figure 7 In a second aspect, the present invention further provides a method for monitoring abnormalities of crushing and screening equipment in a thermal power plant, comprising the following steps:
[0077] S1 presets equipment parameters to the analysis subsystem 3 based on the parameters of the crushing and screening equipment;
[0078] Specifically, the operator presets equipment parameters to the data module 4 of the analysis subsystem 3 according to the parameters on the nameplate of the crushing and screening equipment.
[0079] S2: installing the monitoring subsystem 1 on the crushing and screening equipment to monitor the operation data of the crushing and screening equipment in real time to obtain a data packet;
[0080] Specifically, the monitoring unit 10 monitors the operating status of the crushing and screening equipment in real time to obtain monitoring data, and the compression unit 11 compresses the monitoring data to obtain a data packet.
[0081] S3 transmission subsystem 2 transmits the data packet to analysis subsystem 3 for analysis based on the device parameters to obtain the abnormal status of the device.
[0082] Specific method:
[0083] S31 The transmission subsystem 2 transmits the monitoring data to the data module 4 to obtain storage data;
[0084] Specifically, the receiving unit 13 receives the data packet, the decompression unit 14 decompresses and restores the received data packet to obtain the monitoring data, and finally the storage unit 15 processes the monitoring data to obtain storage data.
[0085] S32 analysis module 5 creates a training model based on device parameters using a big data analysis algorithm;
[0086] Specifically, the modeling unit 16 creates a model using a big data analysis algorithm according to preset parameters of the crushing and screening equipment to obtain a training model.
[0087] S33 stores the data and inputs it into the training model for analysis and training to obtain the abnormal condition of the equipment.
[0088] Specifically, the analysis unit 17 inputs the stored data into the training model for training analysis to obtain the abnormal status of the equipment, that is, whether the equipment operates normally or abnormally.
[0089] What is disclosed above is only a preferred embodiment of the patent name of the present invention, and it certainly cannot be used to limit the scope of rights of the present invention. Ordinary technicians in this field can understand that all or part of the processes of the above embodiment are implemented, and equivalent changes made according to the claims of the present invention are still within the scope of the invention.
Claims
1. A thermal power plant crushing and screening equipment abnormality monitoring system, characterized in that: It includes a monitoring subsystem, a transmission subsystem and an analysis subsystem, wherein the monitoring subsystem, the transmission subsystem and the analysis subsystem are connected in sequence, and the analysis subsystem includes a data module, an analysis module and an early warning module, wherein the data module, the analysis module and the early warning module are connected in sequence; The monitoring subsystem is used to monitor the operation data of the crushing and screening equipment in real time, obtain monitoring data, and compress the monitoring data to obtain a data packet; The transmission subsystem is used to transmit the data packet to the data module; The data module is used to receive the data packet, restore the monitoring data, and store the monitoring data to obtain stored data; The analysis module creates an analysis model based on the parameters of the crushing and screening equipment, and uses the analysis model to train and analyze the stored data to obtain abnormal conditions of the equipment; The early warning module warns the operator based on the abnormal condition of the equipment; The monitoring subsystem includes a monitoring module, an installation module and a protection module, wherein the installation module and the protection module are respectively connected to the monitoring module; The installation module is used to install and fix the monitoring module on the crushing and screening equipment; The protection module is used to provide waterproof, shockproof and dustproof protection for the monitoring module; The monitoring module is used to monitor the crushing and screening equipment in real time; The data module comprises a receiving unit, a decompression unit and a storage unit, wherein the receiving unit, the decompression unit and the storage unit are connected in sequence; The receiving unit is used to receive the data packet; The decompression unit is used to decompress the data packet and restore the monitoring data; The storage unit is used to store the restored monitoring data to obtain storage data; The analysis module includes a modeling unit and an analysis unit, and the modeling unit is connected to the analysis unit; The modeling unit creates a model using a big data analysis algorithm based on the parameters of the crushing and screening equipment to obtain a training model; The analysis unit trains the stored data based on the training model to obtain an abnormal condition of the equipment.
2. The abnormal monitoring system for crushing and screening equipment in a thermal power plant according to claim 1, characterized in that: The monitoring module comprises a monitoring unit, a compression unit and a self-checking unit, wherein the self-checking unit is connected to the monitoring unit and the compression unit respectively; The monitoring unit is used to monitor the operating status of the crushing and screening equipment in real time to obtain monitoring data; The compression unit is used to compress the monitoring data to obtain a data packet; The self-checking unit is used to check the monitoring unit and the compression unit.
3. A method for monitoring abnormality of crushing and screening equipment in a thermal power plant, using the abnormality monitoring system for crushing and screening equipment in a thermal power plant as claimed in claim 1, the method comprising the following steps: Preset equipment parameters to the analysis subsystem based on the parameters of the crushing and screening equipment; The monitoring subsystem is installed on the crushing and screening equipment to monitor the operation data of the crushing and screening equipment in real time to obtain a data packet; The transmission subsystem transmits the data packet to the analysis subsystem for analysis based on the device parameters to obtain the abnormal status of the device; The transmission subsystem transmits the data packet to the analysis subsystem for analysis in combination with the device parameters to obtain the specific method of the abnormal condition of the device: The transmission subsystem transmits the monitoring data to the data module to obtain the storage data; The analysis module creates a training model based on device parameters using big data analysis algorithms; The stored data is input into the training model for analysis and training to obtain the abnormal status of the equipment.
Citation Information
Patent Citations
Crushing and screening system
CN107649283A
Safety monitoring system and method for thermal power plant in mixed coal combustion mode
CN113741359A
Dangerous condition early warning device and early warning method based on block chain
CN114783145A
Systems, methods, and devices for detecting anomalies in an industrial control system
WO2015104691A2