Adaptive control method and system for intersection signals based on dynamic programming model
Through the dynamic programming model, the vehicle's initial state and optimized signal timing scheme are solved, and the problem of vehicle queue length error and individual vehicle travel time is not considered under medium and low traffic flow, and the inter-intersection signal control is refined and efficient.
Patent Information
- Application Number
- CN202211509816.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-11-29
AI Technical Summary
The existing adaptive control method for intersections is in the case of medium and low traffic flows, and there is a large error in the estimated vehicle queue length, which affects the traffic signal control effect. It is not possible to consider the travel time of individual vehicles in a refined manner, so it is impossible to achieve refined crossovers. Port control.
Adaptive control method of intersection signal based on dynamic programming model is adopted, by screening the initial state of the vehicle entering the control area, using the dynamic programming model to calculate the average travel time of the vehicle with the green light time as the control variable, and optimize the signal timing scheme to minimize Average vehicle travel time.
It realizes accurate prediction of the signal timing scheme for the next control cycle, improves computing efficiency, can adapt to traffic flow changes more accurately, and improves the effect of traffic signal control.
Smart Images

Figure CN115862351B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of urban traffic control, and in particular to an intersection signal adaptive control method and system based on a dynamic programming model. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] Intersections are areas where vehicles converge and diverge. Traffic signals allocate right of way to vehicles with different turns in sequence, separating conflicting vehicles in time to avoid vehicle conflicts.
[0004] The formulation of traffic signal timing schemes should be able to adapt to dynamically changing traffic flows. At present, there are three main types of intersection traffic signal control methods: timing control, induction control, and adaptive control. Timing control formulates signal timing schemes based on historical data, which is mainly suitable for intersections with relatively regular traffic flow changes and cannot adapt to random changes in traffic flow; induction control dynamically adjusts signal timing schemes based on vehicle arrival information collected in real time by vehicle detectors, but the rules of induction control are relatively simple and cannot achieve global optimal control of intersections; adaptive control can optimize the timing scheme with the best control index based on the real-time data of the detector, with richer control parameters and more flexible control rules, which can better adapt to the dynamic changes of traffic flow. Existing intersection adaptive control methods usually optimize signal timing schemes based on vehicle queue length as a performance indicator, which is suitable for intersections with large traffic flow. However, in many cases, the traffic flow at the intersection is at a medium or low level. At this time, the existing vehicle queue estimation method has large errors, which in turn affects the control effect of traffic signals.
[0005] In addition, vehicle traffic efficiency (travel time) is the core goal of traffic signal control optimization. Since the calculation of individual vehicle travel time is relatively complex and is affected by the comprehensive influence of the interaction between vehicles and between vehicles and traffic signals, it is difficult to establish an analytical relationship between traffic signals and individual vehicle travel time. Existing adaptive control algorithms usually use macro or meso indicators such as vehicle queue length as performance indicators for signal timing scheme optimization, fail to consider the travel time of individual vehicles, and cannot achieve refined intersection control. Summary of the invention
[0006] In order to solve the above problems, the present invention proposes an intersection signal adaptive control method and system based on a dynamic programming model, which can accurately predict the signal timing scheme of the next control cycle by predicting the initial state of the vehicle entering the control area.
[0007] To achieve the above object, the present invention adopts the following technical solution:
[0008] First, an adaptive control method for intersection signals based on a dynamic programming model is proposed, including:
[0009] At the beginning of control cycle c, the vehicles on each lane to be considered in the next control cycle are screened out, and the initial state of the screened vehicles entering the control area is obtained;
[0010] The signal timing plan for the next control cycle is determined based on the initial state of the screened vehicles entering the control area and the dynamic programming model. The dynamic programming model uses the green light duration allocated at a certain decision stage as the control variable and the duration that has been allocated at the end of a certain decision stage as the state variable. In each decision stage, the average travel time of the screened vehicles is calculated based on the control variable value and the initial state of the vehicles entering the control area, and the performance function is calculated based on the average travel time of the vehicles. With the goal of minimizing the average travel time of the vehicles, the dynamic programming model is solved to obtain the signal timing plan for the next control cycle.
[0011] Secondly, an adaptive control system for intersection signals based on a dynamic programming model is proposed, including:
[0012] The vehicle initial state acquisition module is used to screen out the vehicles on each lane to be considered in the next control cycle at the beginning of the control cycle c, and obtain the initial state of the screened vehicles entering the control area;
[0013] The signal timing acquisition module is used to determine the signal timing plan for the next control cycle based on the initial state of the selected vehicles entering the control area and the dynamic programming model. The dynamic programming model uses the green light duration allocated at a certain decision stage as the control variable and the duration that has been allocated at the end of a certain decision stage as the state variable. In each decision stage, the average travel time of the selected vehicles is calculated based on the control variable value and the initial state of the vehicles entering the control area, and the performance function is calculated based on the average travel time of the vehicles. With the goal of minimizing the average travel time of the vehicles, the dynamic programming model is solved to obtain the signal timing plan for the next control cycle.
[0014] In a third aspect, an electronic device is proposed, comprising a memory and a processor, and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the steps of the intersection signal adaptive control method based on a dynamic programming model are completed.
[0015] In a fourth aspect, a computer-readable storage medium is proposed for storing computer instructions. When the computer instructions are executed by a processor, the steps of the intersection signal adaptive control method based on a dynamic programming model are completed.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. When obtaining the initial state of a vehicle entering a control area, the present invention takes into account the influence of traffic signals and vehicle following behavior on the vehicle travel time, so that the obtained initial state is more accurate, and thus the signal timing plan for the next control cycle can be accurately obtained.
[0018] 2. The present invention calculates the average travel time of the vehicle based on the initial state of the vehicle, calculates the performance function according to the average travel time of the vehicle, and proposes an association between the average travel time of the vehicle and the signal timing scheme, thereby improving the calculation efficiency and facilitating practical application.
[0019] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0021] Figure 1 The flow chart of the signal timing scheme calculation of the dynamic programming model disclosed in Example 1;
[0022] Figure 2 This is a schematic diagram of a typical intersection layout;
[0023] Figure 3 The intersection signal timing scheme disclosed in Example 1;
[0024] Figure 4 This is a schematic diagram of the relationship between decision stages disclosed in Example 1;
[0025] Figure 5 This is the signal timing scheme optimization result disclosed in Example 1. DETAILED DESCRIPTION
[0026] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0027] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0028] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0029] Example 1
[0030] In this embodiment, a method for adaptively controlling intersection signals based on a dynamic programming model is disclosed, comprising:
[0031] S1: The control cycle duration is H. At the beginning of the control cycle c, the vehicles on each lane considered in the next control cycle are screened out, and the initial state of the screened vehicles entering the control area is obtained.
[0032] like Figure 2 As shown in the figure, a typical four-entry intersection is implemented. Each entrance has left-turn, straight-ahead, left-turn plus straight-ahead, and right-turn lanes. The signal timing scheme adopts Figure 3 The scheme shown.
[0033] Based on the control upstream detector data, predict and filter the vehicle set on each lane to be considered in the next control cycle And get the initial status of the filtered vehicles entering the control area
[0034] The screened vehicles include vehicles that have entered the control area and vehicles that have not entered the control area but can enter the control area in the next control cycle.
[0035] Specifically,
[0036] At the beginning of control cycle c, according to the upstream detector data, the vehicles that enter the control area in the next control cycle time interval [(c+1)H, (c+2)H) are divided into the vehicle set to be considered in the next control cycle, denoted as
[0037] Get the initial state B of the filtered vehicles entering the control area c+1 The process is:
[0038] Obtain the time and speed of the filtered vehicles when they arrive at the upstream of the control area;
[0039] The initial state of the vehicles entering the control area is determined based on the time and speed when they arrive at the upstream of the control area.
[0040] When calculating and screening the initial state of vehicles entering the control area, when there are no vehicles queuing in the control area and the headway between adjacent vehicles is greater than the set value, the initial speed of the vehicle entering the control area is the speed of the vehicle when it arrives upstream of the control area; when there are vehicles queuing in the control area and the headway between adjacent vehicles is less than or equal to the set value, the initial speed of the vehicle when it arrives at the control area is determined according to the following model.
[0041] The preset intersection control area length is L, and the intersection vehicle speed limit is A set of vehicle detectors is installed at the upstream of the control area and at the boundary of the control area. The distance between the upstream vehicle detector and the stop line is The upstream detector is used to collect the time when vehicle n arrives at the upstream detector position and its driving speed The downstream vehicle detector is used to detect whether the vehicle queue is overflowing.
[0042] The Newell car-following model is used to briefly describe the car-following behavior of vehicles. It is assumed that the trajectory x of the following vehicle n is n (t) can be obtained by transforming the trajectory x of the preceding vehicle n-1 n-1 (t) is obtained by translating τ and d in time and space respectively, satisfying x n (t+τ)=x n-1 (t)-d, where τ and d are the vehicle reaction time and minimum parking distance, respectively, using the tuple Indicates the initial state of the vehicle entering the control area, including the time when the vehicle enters the control area and speed
[0043] When the downstream detector does not detect a queue of vehicles, the vehicle's driving state is not affected by the queue of vehicles in front. If the headway of the adjacent vehicles satisfies Assuming that vehicle n is not affected by the preceding vehicle and maintains its current motion state, the initial time and speed of the vehicle entering the control area can be predicted as:
[0044]
[0045] when When vehicle n drives according to the Newell following model, the initial time and speed of the vehicle entering the control area can be predicted as:
[0046]
[0047] When the downstream detector detects that the vehicle is queuing, the vehicle will join the vehicle queue and wait. It is considered that the vehicle queue begins to evacuate at the beginning of the next control cycle. To simplify the calculation, the vehicle acceleration process is ignored here. The initial time and speed of the vehicle entering the control area can be predicted as:
[0048]
[0049] S2: Determine the signal timing plan for the next control cycle based on the initial state of the selected vehicles entering the control area and the dynamic programming model, wherein the dynamic programming model uses the green light duration allocated at a certain decision stage as the control variable and the duration that has been allocated at the end of a certain decision stage as the state variable. In each decision stage, the average travel time of the selected vehicles is calculated based on the control variable value and the initial state of the vehicles entering the control area, and the performance function is calculated based on the average travel time of the vehicles. With the goal of minimizing the average travel time of the vehicles, the dynamic programming model is solved to obtain the signal timing plan for the next control cycle.
[0050] Based on the dynamic programming model, dynamic control of the intersection is achieved through a rolling control cycle. A control cycle contains multiple decision stages, and therefore multiple phases. The control cycle length is set to H, the dynamic programming time step is ε, and each decision stage i in the dynamic programming model corresponds to a phase φ. The phase set is H, the minimum green light duration is γ, the clearing time is r, and the control variable x i represents the green light duration allocated in decision stage i, and the state variable s i Indicates that the duration has been allocated at the end of decision stage i.
[0051] When obtaining the effective set of control variables based on the state variables, set the clearing time when the signal is switched in phase, such as Figure 4 shown.
[0052] When the traffic signal switches phase, a certain clearing time should be reserved. For a given state variable s i , the effective set of control variables X i (s i )for:
[0053]
[0054] The state variable s in the continuous decision stage i and i-1 Satisfaction relationship i-1 =s i -h i (x i ), where h i (x i )satisfy:
[0055]
[0056] In each decision stage, the average travel time of the vehicles is calculated and screened according to the control variable values and the initial state of the vehicles entering the control area, and the performance function is calculated based on the average travel time of the vehicles.
[0057] The process of calculating the average travel time is as follows: the convoy on lane k of entrance lane i As the basic unit, obtain the signal light status when the convoy arrives at the stop line of the intersection. When arriving during the red light period, the time when the first vehicle of the convoy passes through the intersection is the green light start time. For the following vehicle, the time to pass the intersection is the sum of the time when the front vehicle passes through the intersection and the time distance of the first vehicle; when the lane traffic arrives during the green light period, the time when the first vehicle passes through the intersection is the time when the first vehicle arrives at the intersection. For the following vehicle, the time to pass the intersection is the sum of the time when the front vehicle passes through the intersection and the time distance of the first vehicle, and the maximum value of the time when the following vehicle arrives at the intersection; calculate the difference between the time when each vehicle passes through the intersection and the initial time of arriving at the control area as the travel time of each vehicle, and average the travel time of all filtered vehicles to obtain the average travel time of the vehicle. Specifically:
[0058] is the green light start time of phase φ (decision stage i) in control cycle c, is the green light duration of phase φ in control cycle c, Among them, the phase includes the straight phase and the left turn phase, such as Figure 3 As shown, 2, 4, 6, and 8 represent the straight-ahead phases in different directions of the intersection, and 1, 3, 5, and 7 represent the left-turn phases in different directions of the intersection.
[0059] T n It is a vehicle The travel time, is the time it takes for vehicle n to pass the stop line at the intersection, Taking lane traffic as the basic unit, the lane traffic is divided into two situations: arriving during a red light and arriving during a green light according to the signal light status when the head vehicle of the convoy arrives at the stop line of the intersection.
[0060] For a convoy arriving at an intersection during a red light, vehicles need to stop and wait and pass through the intersection after the green light starts. The time it takes for the first vehicle in the convoy to pass through the intersection is is the green light start time, i.e. For the following vehicle n, the time it takes to pass the intersection is The time it takes for the vehicle ahead to pass the intersection and the headway time, that is By recursion, we can get
[0061] For a platoon that arrives at an intersection during a green light, the time it takes for the first vehicle in the platoon to pass through the intersection Equal to the time it arrives at the intersection, that is, the time it enters the control area and driving time in the control area of For the following vehicle, the time it takes to pass the intersection depends on whether it is affected by the preceding vehicle when it reaches the stop line of the intersection. The time it takes to pass the intersection can be calculated recursively, that is,
[0062] Given the initial state information of the vehicle Calculate the average travel time of the fleet on each lane under the signal timing scheme (denoted by the symbol S)
[0063]
[0064] Construct a performance function f based on the average travel time of the vehicle i (s i ,x i ):
[0065]
[0066] Among them, N a and are the number of lanes at the intersection and the number of entry lanes in entrance lane i, respectively.
[0067] The signal timing scheme S with the minimum average vehicle travel time is solved through the two processes of forward iteration and backward iteration. c+1 In the process of forward iteration, the minimum cumulative performance function of each iteration stage is solved. When the difference between the minimum cumulative performance function of the current decision stage and the minimum cumulative performance function of the previous decision stage is less than the set value, the control variables and state variables corresponding to the current decision stage are output; for the output state variables, the backward iteration process is performed to the initial iteration stage to obtain the final state variables, and then the signal timing plan for the next control cycle can be extracted.
[0068] The specific steps are as follows:
[0069] Forward iterative process:
[0070] S1: Initialization decision stage i=1, initial minimum cumulative performance function v i =0.
[0071] S2: traverse the state variable value range s i =r,r+ε,...,H, for any s i , give a reasonable set of control variables Xi (s i ).
[0072] S3: Traverse the set of control variables, for any x i ∈X i (s i ), and obtain the corresponding signal timing scheme S(x i ), and calculate the average travel time of the vehicle. According to the average travel time, the performance function f is finally obtained. i (s i ,x i ).
[0073] S4: Calculate the minimum cumulative performance function v i (s i ), v i (s i )=Min xi {f i (s i ,x i )+v i-1 (s i-1 )}, and record the control variables and state variables corresponding to the minimum cumulative performance function, recorded as and
[0074] S5: Evaluate the improvement of the minimum cumulative performance function between the current decision stage and the previous decision stage. If there is no obvious improvement, and the difference between the minimum cumulative performance function between the current decision stage and the previous decision stage is less than the set value, then This indicates that there is no significant improvement, and the forward iteration ends; otherwise, the decision stage i=i+1 is updated and S2 is executed.
[0075] S6: records the final decision stage in the forward iteration process, denoted as And perform the backward iteration process:
[0076] S7: From the decision-making stage Start by going forward in the order of J, J-1..., 1, referring to Figure 1 Calculate in sequence Finally, the optimal signal timing scheme is obtained, which is the signal timing scheme for the next control cycle.
[0077] When a new control cycle begins, the controller executes the signal timing scheme that has been obtained and simultaneously calculates the signal timing scheme for the next control cycle.
[0078] The example intersection uses the traffic flow shown in Table 1 as the basic traffic flow, the control cycle length H is fixed and is set to H = 60s, the dynamic programming model decision step is set to ε = 1s, the shortest green light duration is set to γ = 10s, and the clearing time r = 2s. The implementation process of this embodiment is as follows Figure 1 As shown in Figure 2, the signal timing scheme in the 20 test cycles is as follows: Figure 5 As shown, when this timing scheme is applied to intersections, it can better adapt to the dynamic changes of traffic conditions.
[0079] Table 1 Basic traffic flow
[0080]
[0081] The signal adaptive control method disclosed in this embodiment takes into account the impact of traffic signals and vehicle following behavior on vehicle travel time when controlling signals, and can accurately obtain the initial state of each vehicle entering the control area. By establishing an analytical relationship between vehicle travel time and signal timing scheme, the calculation efficiency is significantly improved, and it is easy to apply in practice.
[0082] Example 2
[0083] In this embodiment, an intersection signal adaptive control system based on a dynamic programming model is disclosed, including:
[0084] The vehicle initial state acquisition module is used to screen out the vehicles on each lane to be considered in the next control cycle at the beginning of the control cycle c, and obtain the initial state of the screened vehicles entering the control area;
[0085] The signal timing acquisition module is used to determine the signal timing plan for the next control cycle based on the initial state of the selected vehicles entering the control area and the dynamic programming model. The dynamic programming model uses the green light duration allocated at a certain decision stage as the control variable and the duration that has been allocated at the end of a certain decision stage as the state variable. In each decision stage, the average travel time of the selected vehicles is calculated based on the control variable value and the initial state of the vehicles entering the control area, and the performance function is calculated based on the average travel time of the vehicles. With the goal of minimizing the average travel time of the vehicles, the dynamic programming model is solved to obtain the signal timing plan for the next control cycle.
[0086] Example 3
[0087] In this embodiment, an electronic device is disclosed, including a memory and a processor, and computer instructions stored in the memory and running on the processor. When the computer instructions are executed by the processor, the steps described in the intersection signal adaptive control method based on the dynamic programming model disclosed in Example 1 are completed.
[0088] Example 4
[0089] In this embodiment, a computer-readable storage medium is disclosed for storing computer instructions. When the computer instructions are executed by a processor, the steps of the intersection signal adaptive control method based on a dynamic programming model disclosed in Example 1 are completed.
[0090] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. The adaptive control method of intersection signals based on dynamic programming model is characterized by: include: At the beginning of control cycle c, the vehicles on each lane considered in the next control cycle are screened out according to the upstream detector data, and the initial state of the screened vehicles entering the control area is obtained, including the initial time and initial speed; According to the initial state of the selected vehicles entering the control area and the dynamic programming model, the signal timing plan for the next control cycle is determined, wherein the dynamic programming model uses the green light duration allocated at a certain decision stage as the control variable and the duration that has been allocated at the end of a certain decision stage as the state variable. In each decision stage, the average travel time of the selected vehicles is calculated according to the control variable value and the initial state of the vehicles entering the control area, and the performance function is calculated according to the average travel time of the vehicles. With the minimum average travel time of the vehicles as the goal, the dynamic programming model is solved to obtain the signal timing plan for the next control cycle; When calculating and filtering out the initial state of vehicles entering the control area, if there are no vehicles queuing in the control area and the headway between adjacent vehicles is greater than the set value, the initial speed of the vehicle entering the control area is the speed of the vehicle when it arrives upstream of the control area; when there are vehicles queuing in the control area and the headway between adjacent vehicles is less than or equal to the set value, the initial speed of the vehicle when it arrives at the control area is determined according to the car-following model; Taking lane traffic as the basic unit, obtain the signal light status when the convoy arrives at the stop line of the intersection. When the lane traffic arrives during the red light period, the time when the head vehicle of the convoy passes through the intersection is the green light start time. For the following vehicle, the time to pass the intersection is the sum of the time when the front vehicle passes through the intersection and the time distance of the head vehicle; when the lane traffic arrives during the green light period, the time when the head vehicle passes through the intersection is the time when the head vehicle arrives at the intersection. For the following vehicle, the time to pass the intersection is the sum of the time when the front vehicle passes through the intersection and the time distance of the head vehicle, and the maximum value is selected from the time when the following vehicle arrives at the intersection. Calculate the difference between the time when each vehicle passes through the intersection and the initial time of arriving at the control area, which is the travel time of each vehicle. Average the travel time of all filtered vehicles to obtain the average vehicle travel time. The signal timing scheme with the minimum average travel time of vehicles is solved through the two processes of forward iteration and backward iteration. In the process of forward iteration, the minimum cumulative performance function of each iteration stage is solved. When the difference between the minimum cumulative performance function of the iteration to the current decision stage and the minimum cumulative performance function between the previous decision stage is less than the set value, the control variables and state variables corresponding to the current decision stage are output; for the output state variables, the backward iteration process is performed to the initial stage to obtain the final state variables, and then the signal timing scheme for the next control cycle can be extracted; Performance function f i (s i ,x i )for: In the formula, is the average travel time of the convoy on each lane, N a and are the number of lanes at the intersection and the number of entry lanes in entrance lane i respectively; is the convoy on lane k of import lane i, is the time it takes for vehicle n to pass the stop line at the intersection, is the time when vehicle n enters the control area.
2. The intersection signal adaptive control method based on the dynamic programming model as claimed in claim 1, characterized in that: The screened vehicles include vehicles that have entered the control area and vehicles that have not entered the control area but can enter the control area in the next control cycle.
3. The adaptive control method for intersection signals based on a dynamic programming model as claimed in claim 1, characterized in that: The process of obtaining the initial state of filtering out vehicles entering the control area is: Obtain the time and speed of the filtered vehicles when they arrive at the upstream of the control area; The initial state of the vehicles entering the control area is determined based on the time and speed when they arrive at the upstream of the control area.
4. The intersection signal adaptive control method based on dynamic programming model as claimed in claim 1, characterized in that: When obtaining a valid set of control variables according to the state variables, a clearing time is set when the signal is set to switch phases.
5. The intersection signal adaptive control system based on dynamic programming model is characterized by: include: The vehicle initial state acquisition module is used to screen out the vehicles on each lane considered in the next control cycle at the beginning of the control cycle c, and obtain the initial state of the screened vehicles entering the control area, wherein, when calculating the initial state of the screened vehicles entering the control area, when there are no vehicles queuing in the control area and the headway between adjacent vehicles is greater than a set value, the initial speed of the vehicle entering the control area is the speed of the vehicle when it arrives at the upstream of the control area; when it is detected that there are vehicles queuing in the control area and the headway between adjacent vehicles is less than or equal to the set value, the initial speed of the vehicle when it arrives at the control area is determined according to the following model; The signal timing acquisition module is used to determine the signal timing scheme for the next control cycle based on the initial state of the selected vehicles entering the control area and the dynamic programming model, wherein the dynamic programming model uses the green light duration allocated at a certain decision stage as the control variable and the duration that has been allocated at the end of a certain decision stage as the state variable. In each decision stage, the average travel time of the selected vehicles is calculated based on the control variable value and the initial state of the vehicles entering the control area, and the performance function is calculated based on the average travel time of the vehicles. With the minimum average travel time of the vehicles as the goal, the dynamic programming model is solved to obtain the signal timing scheme for the next control cycle; Taking lane traffic as the basic unit, obtain the signal light status when the convoy arrives at the stop line of the intersection. When the lane traffic arrives during the red light period, the time when the head vehicle of the convoy passes through the intersection is the green light start time. For the following vehicle, the time to pass the intersection is the sum of the time when the front vehicle passes through the intersection and the time distance of the head vehicle; when the lane traffic arrives during the green light period, the time when the head vehicle passes through the intersection is the time when the head vehicle arrives at the intersection. For the following vehicle, the time to pass the intersection is the sum of the time when the front vehicle passes through the intersection and the time distance of the head vehicle, and the maximum value is selected from the time when the following vehicle arrives at the intersection. Calculate the difference between the time when each vehicle passes through the intersection and the initial time of arriving at the control area, which is the travel time of each vehicle. Average the travel time of all filtered vehicles to obtain the average vehicle travel time. The signal timing scheme with the minimum average travel time of vehicles is solved through the two processes of forward iteration and backward iteration. In the process of forward iteration, the minimum cumulative performance function of each iteration stage is solved. When the difference between the minimum cumulative performance function of the iteration to the current decision stage and the minimum cumulative performance function between the previous decision stage is less than the set value, the control variables and state variables corresponding to the current decision stage are output; for the output state variables, the backward iteration process is performed to the initial stage to obtain the final state variables, and then the signal timing scheme for the next control cycle can be extracted; Performance function f i (s i ,x i )for: In the formula, is the average travel time of the convoy on each lane, N a and are the number of lanes at the intersection and the number of entry lanes in entrance lane i respectively; is the convoy on lane k of import lane i, is the time it takes for vehicle n to pass the stop line at the intersection, is the time when vehicle n enters the control area.
6. An electronic device, characterized in that: The invention comprises a memory and a processor and computer instructions stored in the memory and executed on the processor. When the computer instructions are executed by the processor, the steps of the intersection signal adaptive control method based on the dynamic programming model described in any one of claims 1 to 4 are completed.
7. A computer-readable storage medium, characterized in that: Used to store computer instructions, which, when executed by a processor, complete the steps of the intersection signal adaptive control method based on a dynamic programming model as described in any one of claims 1 to 4.
