By obtaining and analyzing the gate work information and external road congestion at each exit of the parking lot, determining the busyness of traffic, solving the problem of uneven traffic flow at the parking lot exit, improving the departure efficiency and user experience, and providing the transportation system with Provides more accurate travel advice.

CN115909802BActive Publication Date: 2024-11-01SHANGHAI QINGGAN INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111158683.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-30
Publication Date
2024-11-01
Estimated Expiration
2041-09-30

AI Technical Summary

Technical Problem

Uneven traffic flow at each exit of the parking lot leads to low departure efficiency and long waiting time, which affects user experience, especially after the large-scale event has ended, the exit congestion is complicated.

Method used

By obtaining gate work information for each exit, external road congestion and expected number of vehicles leaving the site, determine the busyness of each exit and push it to the user or management system, so as to select the most idle exit, optimize the departure process and warn of the possibility of road congestion.

Benefits of technology

It improves the overall departure efficiency of the parking lot, reduces the average departure time of the vehicle, reduces the waiting time, improves the user experience, and provides more accurate travel route suggestions for dynamic traffic adjustments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115909802B_ABST
    Figure CN115909802B_ABST
Patent Text Reader

Abstract

The present invention provides a parking lot drainage system, a parking lot drainage processing method and a control device. The above-mentioned parking lot drainage processing method includes the following steps: obtaining gate working information of each exit of the parking lot, the gate working information indicating the opening and closing status of the gate of each exit in the past first preset time period; determining the busyness of each exit at least according to the gate working information; and pushing the busyness of each exit so that the user can determine the target exit based on the busyness of each exit. The parking lot drainage processing method provided by the present invention and the parking lot drainage system and control device for implementing the above-mentioned method can solve the problem of uneven vehicle flow at each exit of the parking lot, thereby improving the overall departure efficiency of the parking lot, reducing the average departure time of vehicles, and reducing waiting time to improve user experience.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of big data processing, and in particular to flow data processing in parking lot drainage and a parking lot drainage system. Background Art

[0002] With the development of economy, especially the development of automobile industry, the number of cars in society is increasing. With the improvement of people's living standards, it is very common to use cars as a means of transportation. Although cars can facilitate people's travel, the parking problem of cars has always been a concern for many car owners. Sometimes, considering the parking problem, car owners may even give up driving.

[0003] The parking problem is that it is difficult to find parking spaces near the destination, but this problem has been alleviated with the development of the automobile industry and its supporting facilities. Today's parking lots are gradually being transformed in the direction of high capacity and intelligence, which can alleviate the problem of difficulty in finding parking spaces to a certain extent.

[0004] Although the problem of finding parking spaces has been alleviated, it has led to the problem of long parking times. This is partly because the parking lot has a large capacity, and it takes a long time to drive to the target parking space and then walk out of the target parking space. Although the above problems lead to the problem of long parking times, since there is no waiting time, it will not cause users to be disgusted.

[0005] Another aspect of long parking time is that when users need to leave the parking lot, it takes time for each exit of the parking lot to process each vehicle leaving the lot. For example, the vehicle stops for the parking system to scan the license plate number, the gate opens, the vehicle slowly leaves, and the gate closes. This will cause congestion at the parking lot exit.

[0006] Due to the congestion at the parking lot exits, users need to wait in the car. This waiting process will cause users to feel irritated and the user experience is poor, especially after some large-scale events (such as concerts, dramas, movies, etc.), the exits of the parking lot will be severely congested, and even affect the roads outside the parking lot.

[0007] However, in the case of a parking lot with multiple exits, sometimes congestion at one exit does not mean congestion at all exits. In other words, when a large number of vehicles need to leave the lot, if these vehicles can leave the lot evenly from each exit, the departure efficiency of the entire parking lot can be eased to a certain extent.

[0008] In view of this, it is hoped to provide a method and device that can help to divert traffic to the parking lot, so as to solve the problem of uneven traffic flow at various exits of the parking lot, thereby improving the overall departure efficiency of the parking lot, reducing the average departure time of vehicles, and reducing waiting time to improve user experience. Summary of the invention

[0009] A brief summary of one or more aspects is given below to provide a basic understanding of these aspects. This summary is not an exhaustive overview of all conceived aspects, and is neither intended to identify the key or critical elements of all aspects nor to define the scope of any or all aspects. Its only purpose is to give some concepts of one or more aspects in a simplified form as a prelude to a more detailed description that will be given later.

[0010] An object of the present invention is to provide a parking lot drainage system, a parking lot drainage processing method and a control device. The advantages of the present invention are that the present invention can solve the problem of uneven vehicle flow at various exits of the parking lot, thereby improving the overall departure efficiency of the parking lot, reducing the average departure time of vehicles, and reducing waiting time to improve user experience.

[0011] Another object of the present invention is to provide a parking lot diversion system, a parking lot diversion processing method and a control device. The advantage of the present invention is that the present invention not only takes into account the congestion inside the parking lot, but also combines the congestion of external roads corresponding to each exit of the parking lot, thereby making the prediction of the busyness of each exit more accurate.

[0012] Another object of the present invention is to provide a parking lot drainage system, a parking lot drainage processing method and a control device, the advantage of which is that the present invention can also combine the vehicle departure situation inside the parking lot to give early warning of possible congestion on external roads, and provide the possibility for users who need to pass through the area to plan more accurate and convenient travel routes under the background of big data. That is, it is possible to dynamically adjust the overall traffic flow according to the exit data of the parking lot.

[0013] Another object of the present invention is to provide a method, the advantage of which is that the present invention combines the working conditions of the gates at each exit and the number of vehicles, and uses waiting time to quantify the busyness of each exit, so that users can understand the traffic flow and congestion of the parking lot in a more intuitive way.

[0014] The advantages and features of the present invention can be fully reflected by the following detailed description and can be realized by the accompanying illustrative embodiments.

[0015] One aspect of the present invention provides a method for processing parking lot diversion, comprising the following steps: obtaining gate working information of each exit of the parking lot, the gate working information indicating the opening and closing status of the gate of each exit within a first preset time period in the past; determining the busyness of each exit at least based on the gate working information; and pushing the busyness of each exit so that a user can determine a target exit based on the busyness of each exit.

[0016] According to one embodiment of the present invention, before the step of determining the busyness of each of the exits at least based on the gate working information, the processing method further includes the step of: obtaining the road congestion conditions of the external roads corresponding to each of the exits of the parking lot; wherein, the step of determining the busyness of each of the exits at least based on the gate working information further includes the step of: determining the busyness of each of the exits at least based on the gate working information and the road congestion conditions.

[0017] According to one embodiment of the present invention, before the step of determining the busyness of each of the exits at least based on the gate working information, the processing method further includes the step of: obtaining the number of vehicles expected to leave the parking lot via each of the exits within a second preset time period in the future; wherein the step of determining the busyness of each of the exits at least based on the gate working information further includes the step of: determining the busyness of each of the exits based on the gate working information and the number of vehicles.

[0018] According to one embodiment of the present invention, determining the busyness of each of the exits based on the gate working information and the number of vehicles further includes the steps of: determining the expected waiting time of each of the exits based on the gate working information and the number of vehicles; and determining the busyness of each of the exits based on the expected waiting time.

[0019] According to one embodiment of the present invention, in response to the existence of an exit whose gate opening interval is less than a preset time, and the number of vehicles expected to leave the parking lot through the exit is greater than a preset number, the processing method also includes the step of: outputting congestion warning information to timely update the road congestion situation of the external road corresponding to the exit.

[0020] Another aspect of the present invention also provides a parking lot drainage system, characterized in that the parking lot drainage system includes a control device and a communication module communicatively connected to the control device, wherein the control device is configured to: obtain gate working information of each exit of the parking lot through the communication module, the gate working information indicating the opening and closing status of the gate of each exit within a first preset time period in the past; determine the busyness of each exit at least based on the gate working information; and push the busyness of each exit through the communication module, so that the user can determine the target exit based on the busyness of each exit.

[0021] Another aspect of the present invention also provides a control device for parking lot diversion, comprising: at least one processor; and a memory coupled to the at least one processor, the memory containing instructions stored therein, and when the instructions are executed by the at least one processor, the control device executes the processing method for parking lot diversion provided by the present invention.

[0022] Another aspect of the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the parking lot diversion processing method provided by the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The above features and advantages of the present invention can be better understood after reading the detailed description of the embodiments of the present disclosure in conjunction with the following drawings. In the drawings, the components are not necessarily drawn to scale, and components with similar related properties or features may have the same or similar reference numerals.

[0024] Figure 1 A schematic structural diagram of an embodiment of a parking lot drainage system provided in one aspect of the present invention is shown.

[0025] Figure 2 A schematic structural diagram of an embodiment of a parking lot drainage control device provided by another aspect of the present invention is shown.

[0026] Figure 3 A flow chart showing an embodiment of a method for processing parking lot diversion provided by another aspect of the present invention is shown.

[0027] Figure 4 Shows Figure 3 FIG. 1 is a flow chart of a specific implementation method of step S200.

[0028] Figure 5 Shows Figure 3 A flow chart of another embodiment of a method for processing parking lot diversion.

[0029] Figure 6 Shows Figure 3 A flow chart of another embodiment of a method for processing parking lot diversion.

[0030] Reference numerals

[0031] 100 Parking lot drainage system;

[0032] 110 Control device;

[0033] 120 communication module;

[0034] 130 Camera device;

[0035] 140 interactive devices;

[0036] 1101 memory;

[0037] 1102 processor;

[0038] 1103 bus;

[0039] 1104 Random Access Memory;

[0040] 1105 cache memory;

[0041] 1106 Storage system;

[0042] 1107 program module;

[0043] 1108 external devices;

[0044] 1109 display;

[0045] 1110 Input / output (I / O) interface;

[0046] 1111 Network adapter. DETAILED DESCRIPTION

[0047] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. Note that the aspects described below in conjunction with the accompanying drawings and specific embodiments are only exemplary and should not be construed as limiting the scope of protection of the present invention in any way.

[0048] The following description is given to enable those skilled in the art to implement and use the invention and incorporate it into a specific application context. Various modifications, as well as various uses in different applications will be readily apparent to those skilled in the art, and the general principles defined herein are applicable to a wide range of embodiments. Thus, the present invention is not limited to the embodiments given herein, but should be granted the broadest scope consistent with the principles and novel features disclosed herein.

[0049] In the following detailed description, many specific details are set forth to provide a more thorough understanding of the present invention. However, it will be apparent to those skilled in the art that the practice of the present invention need not be limited to these specific details. In other words, known structures and devices are shown in block diagram form without detailed display to avoid obscuring the present invention.

[0050] The reader is reminded of all documents and literature filed simultaneously with this specification and open to public inspection, and the contents of all such documents and literature are incorporated herein by reference. Unless otherwise directly stated, all features disclosed in this specification (including any attached claims, abstracts and drawings) can be replaced by alternative features for achieving the same, equivalent or similar purposes. Therefore, unless otherwise explicitly stated, each feature disclosed is only an example of a group of equivalent or similar features.

[0051] Note that, where used, the symbols left, right, front, back, top, bottom, forward, reverse, clockwise and counterclockwise are used only for convenience and do not imply any specific fixed direction. In fact, they are used to reflect the relative position and / or direction between the various parts of the object. In addition, the terms "first" and "second" are used only for descriptive purposes and should not be understood as indicating or implying relative importance.

[0052] Note that, in the case of use, further, preferably, further and more preferably are simple beginnings for explaining another embodiment based on the previous embodiment, and the content of further, preferably, further or more preferably followed by the above embodiment is combined with the previous embodiment as a complete composition of another embodiment. Several further, preferably, further or more preferably settings followed by the same embodiment can be arbitrarily combined to form another embodiment.

[0053] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. Note that the aspects described below in conjunction with the accompanying drawings and specific embodiments are only exemplary and should not be construed as limiting the scope of protection of the present invention in any way.

[0054] As described above, in order to solve the problem of uneven vehicle flow at each exit of a parking lot, the present invention provides a parking lot diversion system, a parking lot diversion processing method and a control device, thereby improving the overall departure efficiency of the parking lot, reducing the average departure time of vehicles, and reducing waiting time to improve user experience.

[0055] First, please understand the application scenarios of the present invention. The parking lot drainage system, parking lot drainage processing method and control device provided by the present invention can have a variety of application scenarios. The following examples will illustrate the scenarios in which the present invention can be applied. It should be noted that the following examples are only illustrative and not exhaustive. Those skilled in the art can apply the parking lot drainage system, parking lot drainage processing method and control device provided by the present invention in different application scenarios according to actual needs.

[0056] In one application scenario, the parking lot drainage system, parking lot drainage processing method and control device provided by the present invention focus on the personalized use of users. In this application scenario, the parking lot drainage system and the parking lot drainage control device mainly point to the user's smart device. The above-mentioned smart device can be the user's smart phone, tablet computer or smart car system.

[0057] Those skilled in the art should know that the vehicle-mounted system described in the present invention refers to an operating system that is installed in an embedded system in the early stage or installed in the vehicle later, and can realize one or more of the functions of controlling the vehicle, feedback of vehicle status data, navigation function, entertainment audio and video function, existing or future functions that may be carried on the vehicle, so as to effectively improve the level of electrification, networking and intelligence of the vehicle. For example, the in-vehicle infotainment system (IVI) in the prior art. It can be understood that the above examples of the vehicle-mounted system are only illustrative and should not unduly limit the scope of protection of the present invention.

[0058] The parking lot diversion system and the parking lot diversion control device start executing the parking lot diversion processing method in response to the user getting on the car in the parking lot. For example, when it is determined that the user needs to leave the parking lot, the gate operation information of each exit of the parking lot is requested and obtained, so that the busyness of each exit can be determined at least according to the gate operation information, and the busyness of each exit can be pushed.

[0059] In this application scenario, the push object is the user's smart device, that is, the user can view the busyness of each exit on the smart device, and thus select a relatively idle exit as the target exit.

[0060] In another application scenario, the parking lot drainage system, parking lot drainage processing method and control device provided by the present invention focus on the management of the parking lot. In this application scenario, the parking lot drainage system and the parking lot drainage control device mainly point to the management equipment of the parking lot.

[0061] The above-mentioned parking lot drainage system and parking lot drainage control device need to continuously request and obtain the gate working information of each exit of the parking lot in the working state, and at least determine the busyness of each exit based on the gate working information, and push the busyness of each exit.

[0062] In this application scenario, the objects pushed above refer to various interactive devices with interactive interfaces set up in the parking lot, such as various displays in the parking lot (hanging road sign-type, parking payment machines, etc.). Users in the parking lot can promptly see the busyness of each exit displayed on the display, so that they can know the traffic flow of each exit of the parking lot in time, and can selectively select a relatively idle exit as the target exit for departure.

[0063] The parking lot drainage system 100 of the present invention mainly includes a control device 110 and a communication module 120 connected to the controlled device for communication. Figure 1The control device 110 is configured to: obtain gate operation information of each exit of the parking lot through the communication module 120, the gate operation information indicating the opening and closing status of the gate of each exit in the past first preset time period; determine the busyness of each exit at least according to the gate operation information; and push the busyness of each exit through the communication module, so that the user can determine the target exit based on the busyness of each exit.

[0064] The communication module 120 mentioned above may refer to a module that implements existing or future communication technologies, including but not limited to a Bluetooth module, a UWB module, a mobile data module, a wireless wifi module, and the like.

[0065] In other embodiments, the parking lot flow diversion system 100 may further include at least one camera device 130 disposed inside the parking lot, and the camera device 130 is used to capture passing vehicles, so that the control device 110 can estimate the number of vehicles leaving the parking lot through each exit based on the camera device 130.

[0066] In other embodiments, the parking lot diversion system 100 may further include at least one interactive device 140, which may be arranged on the route from the parking space to each exit, and may be a display screen in the form of a hanging road sign, or may be a parking fee payment machine in the parking lot. The interactive device 140 is used to receive and display the busyness of each exit pushed by the control device 110, so that the user can selectively select a relatively idle exit as the target exit for departure based on the interactive device 140.

[0067] like Figure 2 As shown, the control device 110 can be expressed in the form of a general computer device, and is used to implement the steps of the parking lot diversion processing method provided in one aspect of the present invention. The components of the control device 110 may include one or more memories 1101, one or more processors 1102, and a bus 1103 connecting different system components (including the memory 1101 and the processor 1102).

[0068] The bus 1103 includes a data bus, an address bus, and a control bus. The product of the number of bits of the data bus and the operating frequency is proportional to the data transmission rate, the number of bits of the address bus determines the maximum addressable memory space, and the control bus (read / write) indicates the type of bus cycle and the time when the input / output operation is completed. The processor 1102 is connected to the memory 1101 via the bus 1103, and is configured to implement the parking lot diversion processing method provided by any one of the embodiments described below.

[0069] The processor 1102 is the computing and control core of the control device 110 and is the final execution unit for information processing and program operation. All software layer operations in the computer system will eventually be mapped to the operations of the processor 1102 through the instruction set. The functions of the processor 1102 are mainly to process instructions, execute operations, control time, and process data.

[0070] The memory 1101 refers to various storage devices in a computer for storing programs and data. The memory 1101 may include a computer system readable medium in the form of a volatile memory, such as a random access memory (RAM) 1104 and / or a cache memory 1105 .

[0071] Random Access Memory (RAM) 1104 is an internal memory that directly exchanges data with the processor 1102. It can be read and written at any time (except when refreshed) and is very fast. It is usually used as a temporary data storage medium for the operating system or other running programs. Once the power is off, the data stored in it will be lost. Cache Memory (Cache) 1105 is a primary memory between the main memory and the processor 1102. Its capacity is relatively small but its speed is much higher than the main memory, close to the speed of the processor 1102.

[0072] It should be noted that, when the control device 110 includes multiple memories 1101 and multiple processors 1102, the multiple memories 1101 and the multiple processors 1102 can have a distributed structure, for example, it can include memories and processors located at the local end and the backend cloud, respectively, and the local end and the backend cloud jointly implement the parking lot diversion processing method provided by the present invention. Furthermore, in the embodiment adopting a distributed structure, each step can adjust the specific execution terminal according to the actual situation, and the specific scheme of each step implemented in a specific terminal should not unduly limit the protection scope of the present invention.

[0073] The control device 110 may further include other removable / immovable, volatile / non-volatile computer system storage media. In this embodiment, the storage system 1106 may be used to read and write immovable, non-volatile magnetic media.

[0074] The memory 1101 may also include at least one set of program modules 1107. The program modules 1107 may be stored in the memory 1101. The program modules 1107 include, but are not limited to, an operating system, one or more application programs, other program modules, and program data, each of which or some combination thereof may include an implementation of a network environment. The program modules 1107 generally perform the functions and / or methods of the embodiments described herein.

[0075] The control device 110 may also communicate with one or more external devices 1108. The external device 1108 in this embodiment includes a camera device arranged in the parking lot for photographing passing vehicles. The external device 1108 also includes an interactive device such as a display 1109. When implementing the parking lot diversion processing method, the control device 110 may push the busyness of each exit to the display 1109, so that the user can determine a relatively idle exit as the target exit based on the busyness displayed on the display 1109.

[0076] The control device 110 may also communicate with one or more devices that enable a user to interact with the control device 110, and / or with any device that enables the control device 110 to communicate with one or more other computing devices (e.g., a network card, a modem, etc.). Such communication may occur through an input / output (I / O) interface 1110.

[0077] The control device 110 can also communicate with one or more networks (such as a local area network (LAN), a wide area network (WAN) and / or a public network, such as the Internet) through a network adapter 1111. Figure 2 As shown, the network adapter 1111 communicates with other modules of the control device 110 via the bus 1103. It should be understood that, although not shown in the figure, other hardware and / or software modules can be used in conjunction with the control device 110, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.

[0078] Please combine the following Figure 3-6 To understand the method for handling parking lot diversion provided by one aspect of the present invention in detail, please refer to Figure 3 The method for processing parking lot drainage provided by the present invention comprises the following steps:

[0079] Step S100: Obtaining gate operation information of each exit of the parking lot, where the gate operation information indicates the opening and closing status of the gates of each exit in the past first preset time period;

[0080] Step S200: determining the busyness of each exit at least according to the gate operation information; and

[0081] Step S300: Pushing the busyness of each exit so that the user can determine the target exit based on the busyness of each exit.

[0082] In the above step S100, the gate working information of each exit of the parking lot can be obtained by directly communicating with the gate or communicating with the server. It is understandable that the gates installed at each exit of the existing parking lot will lift or lower the bars under the control of their control devices. Therefore, the control devices of each gate will save the working log of the gate, that is, the data recording the time of gate opening and gate closing. The control devices of these gates can communicate with the outside through wired or wireless connections, so that the gate working information can be obtained based on the gate. Or the gate transmits the working information to the server, so as to obtain the gate working information based on the server.

[0083] The amount of data in the working log stored in the gate machine may be very large. The gate machine working information obtained in the above step S100 of the present invention may be the working status of the gate machine in the past first preset time period. The above first preset time period may be set to 10 minutes, 15 minutes or half an hour as needed. Since the purpose of obtaining the working status of the auxiliary gate machine in this application is to predict the upcoming or current busyness of each exit of the parking lot, it is not necessary to obtain too much data.

[0084] The above-mentioned first preset time period in the past can refer to the first preset time period past the current time in one embodiment. For example, assuming that the current time is 16:00 on September 27 (Monday), the first preset time period is 15 minutes, and the data obtained is the gate working information between 15:45 and 16:00 on September 27, so as to estimate the busyness of each exit based on the current actual situation.

[0085] In another embodiment, in addition to obtaining the gate working information within the first preset time period from the current time, the gate working information of the first preset time period from at least one past time point with a corresponding relationship can also be obtained. For example, assuming that the current time is 16:00 p.m. on September 27 (Monday), and the first preset time period is 15 minutes, the acquired data includes not only the gate working information between 15:45-16:00 p.m. on September 27, but also the gate working information between 16:00-16:15 p.m. on September 20 (Monday last week). It can be understood that 16:15 p.m. on September 20 (Monday last week) can be regarded as a past time point with a corresponding relationship with the current time 16:00 p.m. on September 27 (Monday). According to this embodiment, it is possible to not only consider the current actual situation, but also refer to past experience to more accurately predict the busyness of each exit.

[0086] After obtaining the opening and closing status of the gates of each of the exits in the past first preset time period in step S100, Figure 4 As shown, an embodiment of step S200 includes the steps of:

[0087] Step S211: determining a single opening duration and / or an opening interval of the gates of each of the exits according to the opening and closing conditions of the gates of each of the exits in the past first preset time period; and

[0088] Step S212: determining the busyness of each of the exits at least according to a single opening duration of the gate of each of the exits and / or an opening interval time.

[0089] In one aspect of step S211, since the opening time and closing time of the gate are known, the single opening duration of the gate can be determined. For example, if the opening time of the gate is 15:45:30 and the closing time is 15:46:15, the single opening duration of the gate is 45 seconds. In one aspect of step S212, the longer the single opening duration of the gate of each exit is, the busier the exit is. It is understandable that when the gate is already opened, the user can usually drive away, and the gate falls after the user drives away, but if the user does not drive away after the gate is opened (the single opening duration of the gate is particularly long), it means that the user has encountered various situations where he cannot drive away, including but not limited to congestion ahead, failure of his own vehicle, etc. At this time, if the vehicle at the gate does not leave for a long time, it will block the passage of the exit, causing subsequent congestion. Those skilled in the art can qualitatively describe the busyness of each exit. For example, if the single opening duration exceeds a preset value, the exit is considered busy. Alternatively, those skilled in the art may also compare the busyness of each exit and give a relative busyness result, that is, exit A is busier than exit B, etc. The busyness may be represented in different forms.

[0090] In another aspect of step S211, since the opening time and closing time of the gate are already known, the opening interval time of two adjacent openings of the gate can be determined. For example, if the opening time of the gate is 15:45:30, and the adjacent opening time is 15:48:45, the opening duration of a single gate is 195 seconds. In one aspect of step S212, the shorter the opening interval time of the gates of each of the exits, the busier the exit is. It is understandable that the large volume of exit traffic is reflected in that the front vehicle that has just left the gate needs to pass through the gate, which is reflected in the very short opening time of two adjacent gates. In particular, if multiple adjacent opening intervals are very short, it means that there are already a large number of vehicles queuing up at the exit. Those skilled in the art can qualitatively describe the busyness of each exit. For example, if the opening interval time of two adjacent openings of the gate is shorter than a preset value, the exit is considered to be busy. Alternatively, those skilled in the art can also compare the busyness of each exit and give a relative busy result, that is, exit A is busier than exit B, etc. Busyness can be represented in different ways.

[0091] In one aspect of step S212, the busyness of the exit can be determined based on the duration of a single opening of the gate, or the opening interval time. Preferably, in another embodiment of step S212, the busyness of the exit can be determined based on the duration of a single opening of the gate, and the opening interval time. That is, the busyness of an exit with a long single opening duration and a short opening interval time can be considered to be very busy and congested. Its busyness is greater than the busyness of an exit with only a long single opening duration or only a short opening interval time.

[0092] The busyness of each exit can be characterized by describing a single exit, or by ranking multiple exits in terms of busyness. The description of a single exit includes, but is not limited to, text (such as free, normal, busy, congested, busy and congested, etc.), color (green, yellow, orange, red, etc.), estimated passing time (which can be converted through big data or preset rules), etc.

[0093] The ranking of the busyness of multiple exits can be determined qualitatively, that is, the busyness of an exit with a long single opening duration and a short opening interval is greater than the busyness of an exit with a long single opening duration or a short opening interval. Alternatively, it can be determined quantitatively. For example, for each exit with a long single opening duration, the busyness of each exit can be ranked by comparing the length of the single opening duration of each exit pair. For another example, for an exit with a long single opening duration and an exit with a short opening interval, the busyness of each exit can be ranked by setting a comparison benchmark value.

[0094] In another embodiment, if Figure 5 As shown, before step S200, the present invention further includes step S110: obtaining the road congestion conditions of the external roads corresponding to each of the exits of the parking lot. In this embodiment, step S200 further includes step S220: determining the busyness of each of the exits at least based on the gate working information and the road congestion conditions.

[0095] In step S110, the road congestion situation of the external roads corresponding to each exit can be requested and obtained from a server storing real-time external road congestion situation data through various communication means. These servers can be servers provided by the government to reflect the congestion situation of municipal roads, or servers storing road condition information involved in navigation calculation, etc. Therefore, the road congestion situation of the external roads can be used as one of the factors for determining the busyness of each exit in step S220, so as to more accurately determine the busyness of each exit.

[0096] It is understandable that the external road corresponding to the exit of the parking lot is where the vehicle needs to enter after leaving the parking lot. If the external road is congested, the vehicle will not be able to enter the external road in time and will be stranded between the exit of the parking lot and the external road. Therefore, the road congestion of the external road corresponding to the exit of the parking lot can be used as one of the factors to determine the busyness of the exit.

[0097] On the one hand, this can prove that the long duration of a single opening of the gate is indeed caused by congestion ahead. On the other hand, for some parking lot exit gates that are set far away from the external road, if the external road is already congested, it will gradually affect the exit. However, since the exit is some distance away from the external road, in the early stage of congestion on the external road, the duration of a single opening of the gate may not be very long. Relying solely on the duration of a single opening of the gate, it is impossible to timely and accurately predict the busyness of the exit. If the road congestion of the external road corresponding to the exit of the parking lot can be used as one of the factors to determine the busyness of the exit, this problem can be effectively solved.

[0098] In another embodiment, if Figure 6 As shown, before step S200, the present invention further includes step S120: obtaining the number of vehicles expected to leave the parking lot via each of the exits in a second preset time period in the future. In this embodiment, step S200 further includes step S230: determining the busyness of each of the exits based at least on the gate operation information and the number of vehicles.

[0099] In the above step S120, the number of vehicles expected to leave the parking lot via each of the exits within a second preset time period in the future can be obtained based on at least one camera device inside the parking lot and / or vehicle prepayment information.

[0100] Specifically, the above-mentioned camera device can be installed at each exit to directly monitor the number of vehicles currently waiting at the exit. Furthermore, in order to estimate the number of vehicles leaving the parking lot through each exit, a camera device can be installed on the road that must be passed from parking spaces in different areas to each exit, and the exit from which the vehicle will leave the parking lot can be predicted based on the direction of the vehicle. In this embodiment, the camera device can also be combined with the vehicle prepayment information to assist in determining the number of vehicles leaving the parking lot, thereby more accurately estimating the number of vehicles leaving the parking lot through each exit.

[0101] The above-mentioned vehicle prepayment information can be obtained from the management platform of the parking lot through the communication module. It is understandable that if the vehicle has completed the prepayment, it is assumed that the vehicle needs to leave the parking lot within a preset time. In one embodiment, it can be considered that these prepaid vehicles leave from each exit on average. In another embodiment, when the user makes a prepayment, the user's expected exit can be obtained through human-computer interaction, so that the number of vehicles leaving the parking lot through each exit can be estimated.

[0102] In such Figure 6 In the illustrated embodiment, the number of vehicles acquired in step S120 is also used in combination with the gate operation information to more accurately determine the busyness of each exit.

[0103] In another preferred embodiment, in step S200, the busyness of each exit is comprehensively determined based on gate operation information, traffic congestion conditions of external roads corresponding to each exit, and the number of vehicles leaving the parking lot via each exit.

[0104] As described above, it can be characterized by describing a single exit, or by ranking multiple exits according to their busyness. If it is characterized by ranking multiple exits according to their busyness, the above ranking can be judged in a qualitative way, that is, the more items of single opening duration, short opening interval, external road congestion, and a large number of vehicles leaving the exit, the busier the exit is. Or it can be judged in a quantitative way. For example, for each exit with only a long single opening duration, the busyness of each exit can be ranked by comparing the length of the single opening duration of each exit pair. For another example, for exits with only a long single opening duration and exits with only a short opening interval, the busyness of each exit can be ranked by setting a comparison benchmark value.

[0105] Quantitative judgment can also be reflected in determining the time required for a vehicle to leave a certain exit, and ranking the busyness of each exit by time.

[0106] For example, the estimated waiting time of each of the exits can be determined based on the gate working information and the number of vehicles, and then the busyness of each of the exits can be determined based on the estimated waiting time. When the gate working information has been obtained, the average time required for each vehicle to pass through the target exit can be estimated, and then the estimated waiting time can be multiplied by the number of vehicles to determine the estimated waiting time. By outputting the estimated waiting time, the car owner who is about to exit the target exit can be reminded to pay attention to the estimated waiting time. On the one hand, the user can change the target exit according to the actual situation after seeing the busyness of each exit. On the other hand, since the user has already anticipated the waiting time, the user's irritability can be reduced during the waiting process.

[0107] In another embodiment, when the busyness of each exit is determined by comprehensively considering the gate operation information and the number of vehicles leaving the parking lot through each exit, if there is an exit whose gate opening interval is less than a preset time, and the number of vehicles expected to leave the parking lot through the exit is greater than a preset number, the method provided by the present invention further includes:

[0108] Step S400: output congestion warning information to timely update the road congestion situation of the external road corresponding to the exit.

[0109] It is understandable that, according to one aspect of the present invention, the road congestion situation of the external road is obtained from the server in step 110. In the above embodiment, the congestion warning information of possible congestion is outputted to the external server in reverse, so that the external server can predict the upcoming congestion data, thereby providing warnings for some navigation route planning and overall traffic scheduling based on the server.

[0110] In addition, the above-mentioned congestion warning information can also be combined with the single opening duration of the gate to determine the busyness of each exit. That is to say, congestion warning information can be formed based on the gate opening interval time and the number of vehicles, and then combined with the single opening duration of the gate to achieve a closed loop for determining the busyness of each exit, making the determination of the busyness of each exit more accurate.

[0111] In step S300, as described above, the busyness of each exit can be pushed to the user's smart device or to the display screen in the parking lot, so that the user can view the busyness of each exit. It is understandable that if the busyness determined in step S200 is a description of a single exit, it is necessary to push the description of all exits so that the user can determine the target exit based on the corresponding description. If the busyness determined in step S200 is a ranking of the busyness of each exit, the most idle exit is displayed first to facilitate the user to view.

[0112] So far, the specific implementation of the parking lot diversion processing method provided by one aspect of the present invention has been described. The parking lot diversion system and the parking lot diversion control device provided by another aspect of the present invention can implement the parking lot diversion processing method described in any of the above embodiments.

[0113] Another aspect of the present invention further provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the steps of the method for processing parking lot diversion as described in any of the above embodiments. For details, please refer to the above description, which will not be repeated here. In addition, it can be understood that the above-mentioned computer-readable storage medium can also be in the form of a system, that is, including multiple computer-readable storage sub-media, so as to jointly implement the steps of the method for processing parking lot diversion described above through multiple computer-readable storage media.

[0114] The parking lot diversion processing method provided by the present invention and the parking lot diversion system and control device for implementing the above method can solve the problem of uneven vehicle flow at various exits of the parking lot, thereby improving the overall departure efficiency of the parking lot, reducing the average departure time of vehicles, and reducing waiting time to improve user experience.

[0115] The various illustrative logic modules and circuits described in conjunction with the embodiments disclosed herein may be implemented or executed with a general purpose processor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic device, discrete gate or transistor logic, discrete hardware components, or any combination thereof designed to perform the functions described herein. A general purpose processor may be a microprocessor, but in the alternative, the processor may be any conventional processor, controller, microcontroller, or state machine. The processor may also be implemented as a combination of computing devices, such as a combination of a DSP and a microprocessor, a plurality of microprocessors, one or more microprocessors in cooperation with a DSP core, or any other such configuration.

[0116] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be embodied directly in hardware, in a software module executed by a processor, or in a combination of the two. The software module may reside in a RAM memory, a flash memory, a ROM memory, an EPROM memory, an EEPROM memory, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art. An exemplary storage medium is coupled to a processor so that the processor can read and write information from / to the storage medium. In an alternative, a storage medium may be integrated into a processor. The processor and the storage medium may reside in an ASIC. The ASIC may reside in a user terminal. In an alternative, the processor and the storage medium may reside in a user terminal as discrete components.

[0117] In one or more exemplary embodiments, the functions described may be implemented in hardware, software, firmware, or any combination thereof. If implemented as a computer program product in software, each function may be stored on or transmitted by a computer-readable medium as one or more instructions or codes. Computer-readable media include both computer storage media and communication media, including any medium that facilitates the transfer of a computer program from one place to another. Storage media may be any available medium that can be accessed by a computer. As an example and not limitation, such a computer-readable medium may include RAM, ROM, EEPROM, CD-ROM or other optical disk storage, disk storage or other magnetic storage device, or any other medium that can be used to carry or store the desired program code in the form of an instruction or data structure and can be accessed by a computer. Any connection is also properly referred to as a computer-readable medium. For example, if the software is transmitted from a website, a server, or other remote source using a coaxial cable, a fiber optic cable, a twisted pair, a digital subscriber line (DSL), or wireless technologies such as infrared, radio, and microwaves, the coaxial cable, fiber optic cable, twisted pair, DSL, or wireless technologies such as infrared, radio, and microwaves are included in the definition of the medium. Disk and disc as used herein include compact disc (CD), laser disc, optical disc, digital versatile disc (DVD), floppy disk and Blu-ray disc, wherein disk often reproduces data magnetically, while disc reproduces data optically with lasers. Combinations of the above should also be included within the scope of computer-readable media.

[0118] The foregoing description is provided to enable any person skilled in the art to practice the various aspects described herein. However, it should be understood that the scope of protection of the present invention shall be subject to the appended claims and shall not be limited to the specific structures and components of the above-described embodiments. Those skilled in the art may make various changes and modifications to the embodiments within the spirit and scope of the present invention, and these changes and modifications also fall within the scope of protection of the present invention.

Claims

1. A method for processing parking lot diversion, characterized in that: The following steps are involved: Obtaining gate operation information of each exit of the parking lot, wherein the gate operation information indicates the opening and closing status of the gates of each exit in the past first preset time period; Determining the busyness of each of the exits at least according to the gate operation information includes: Determine a single opening duration and / or an opening interval of the gate of each of the exits according to the opening and closing conditions of the gate of each of the exits in the past first preset time period; and The busyness of each of the exits is determined at least according to the single opening duration of the gate of each of the exits and / or the opening interval time; wherein, The longer the single opening duration of the gate at each of the exits is, the busier the exit is; The shorter the opening interval of the gates at each of the exits is, the busier the exit is; and The busyness of each of the exits is pushed so that the user can determine a target exit based on the busyness of each of the exits.

2. The processing method according to claim 1, before the step of determining the busyness of each of the exits at least according to the gate operation information, the processing method further comprises the steps of: Obtaining the road congestion situation of the external roads corresponding to each exit of the parking lot; wherein, The step of determining the busyness of each of the exits at least based on the gate operation information further comprises the following steps: The busyness of each of the exits is determined at least based on the gate operation information and the road congestion situation.

3. The processing method according to any one of claims 1 to 2, before the step of determining the busyness of each of the exits at least according to the gate operation information, the processing method further comprises the steps of: Obtaining the number of vehicles expected to leave the parking lot via each of the exits within a second preset time period in the future; The step of determining the busyness of each of the exits at least based on the gate operation information further comprises the following steps: The busyness of each of the exits is determined at least based on the gate operation information and the number of vehicles.

4. The processing method according to claim 3, wherein the step of obtaining the number of vehicles expected to leave the parking lot via each of the exits within a second preset time period in the future further comprises the steps of: The number of vehicles expected to leave the parking lot via each of the exits within a second preset time period in the future is obtained based on at least one camera device inside the parking lot and / or vehicle prepayment information.

5. The processing method according to claim 3, wherein the step of determining the busyness of each of the exits at least based on the gate operation information and the number of vehicles further comprises the steps of: Determine the estimated waiting time for each of the exits according to the gate operation information and the number of vehicles; and The busyness of each of the exits is determined according to the estimated waiting time.

6. The processing method according to claim 3, in response to the presence of an exit whose gate opening interval is less than a preset time, and the number of vehicles expected to leave the parking lot through the exit is greater than a preset number, the processing method further comprises the steps of: Output congestion warning information and timely update the road congestion situation of the external road corresponding to the exit.

7. A parking lot drainage system, characterized in that: The parking lot drainage system includes a control device and a communication module connected to the control device for communication, wherein: The control device is configured to: Obtaining gate operation information of each exit of the parking lot through the communication module, wherein the gate operation information indicates the opening and closing status of the gates of each exit in the past first preset time period; Determining the busyness of each of the exits at least according to the gate operation information includes: Determine a single opening duration and / or an opening interval of the gate of each of the exits according to the opening and closing conditions of the gate of each of the exits in the past first preset time period; and The busyness of each of the exits is determined at least according to the single opening duration of the gate of each of the exits and / or the opening interval time; wherein, The longer the single opening duration of the gate at each of the exits is, the busier the exit is; The shorter the opening interval of the gates at each of the exits is, the busier the exit is; and The busyness of each of the exits is pushed through the communication module, so that the user can determine the target exit based on the busyness of each of the exits.

8. The parking lot drainage system according to claim 7, before the step of determining the busyness of each of the exits at least according to the gate operation information, the control device is further configured to: The communication module is used to obtain the road congestion situation of the external roads corresponding to each exit of the parking lot based on the server; wherein The control device further comprises the steps of determining the busyness of each of the exits at least according to the gate operation information: The busyness of each of the exits is determined at least based on the gate operation information and the road congestion situation.

9. The parking lot diversion system according to any one of claims 7 to 8, before the step of determining the busyness of each of the exits at least according to the gate operation information, the control device is further configured to: Obtaining the number of vehicles expected to leave the parking lot via each of the exits within a second preset time period in the future; The control device further comprises the steps of determining the busyness of each of the exits at least according to the gate operation information: The busyness of each exit is determined according to the gate operation information and the number of vehicles.

10. The parking lot drainage system according to claim 9, wherein the control device obtains the number of vehicles expected to leave the parking lot via each of the exits within a second preset time period in the future, further comprising the steps of: According to at least one camera device arranged inside the parking lot of the parking lot drainage system, and / or the vehicle prepayment information obtained by the communication module, the number of vehicles expected to leave the parking lot through each of the exits in a second preset time period in the future is obtained.

11. The parking lot diversion system according to claim 10, in response to the presence of an exit whose gate opening interval is less than a preset time, and the number of vehicles expected to leave the parking lot through the exit is greater than a preset number, the control device is further configured to: The congestion warning information is output to the server through the communication module, so as to timely update the road congestion situation of the external road corresponding to the exit.

12. The parking lot diversion system according to claim 7, wherein the control device pushes the busyness of each of the exits to the user's mobile device through the communication module; or The control device pushes the busyness of each of the exits to at least one interactive device of the parking lot drainage system through the communication module, and the at least one interactive device is arranged on the route from the parking space to each of the exits.

13. A parking lot drainage control device, comprising: at least one processor; as well as A memory coupled to the at least one processor, the memory containing instructions stored therein, and when the instructions are executed by the at least one processor, the control device executes the parking lot diversion processing method as described in any one of claims 1-6.