Link cutover simulation method and system

The existing network twin technology is used to simulate and verify link cutover and generate switching routes, which solves the problem of insufficient timeliness and stability of link cutover in traditional methods, and achieves rapid response to service switching and efficient automation of the network.

CN115913985BActive Publication Date: 2024-10-25FIBERHOME TELECOMMUNICATION TECHNOLOGIES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211261112.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-14
Publication Date
2024-10-25
Estimated Expiration
2042-10-14

AI Technical Summary

Technical Problem

Traditional link cutover methods cannot effectively improve timeliness and stability during network upgrade and expansion, leading to the risk of service migration failure and affecting user experience and network stability.

Method used

The existing network twin technology is used to simulate and verify the link cutover process, generate switching routes, and perform service switching according to the simulation results when necessary, improving the timeliness of service switching and network stability.

Benefits of technology

It improves the timeliness of service switching during the link cutover process, reduces labor costs, improves the automation and intelligence level of the network, avoids cutover risks, and ensures the stability and reliability of the network.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115913985B_ABST
    Figure CN115913985B_ABST
Patent Text Reader

Abstract

The present application relates to a link cutover simulation method and system, the method comprising: simulating the switching routes of the affected services during the link cutover of the existing network based on the network topology of the existing network equipment and the cutover plan corresponding to the user cutover task and obtaining the simulation results; verifying whether the simulation results can be successfully switched through the existing network twin technology; storing the simulation results that are verified to be able to switch successfully and performing service switching according to the stored simulation results when cutover is required. The present invention can improve the timeliness and stability of service switching during link cutover.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of communication technology, and in particular to a link cutover simulation method and system. Background Art

[0002] With the continuous development of modern communication technology, in order to maintain the normal operation of the communication network, it is usually necessary to regularly maintain the network, including but not limited to improving network performance, updating network equipment, expanding the capacity of the existing network, etc. In the process of network upgrade, equipment update and network expansion, it is usually necessary to cut over the network.

[0003] The traditional cutover method directly operates on the existing network after manual evaluation or simple testing. After a network failure occurs during the cutover, the services affected by the network cutover point are at risk of migration failure. In the event of service migration failure, the route recalculation capability of the existing network PCE (Path Computation Element) unit is used to recalculate the routes of the affected existing network services. Since route recalculation requires a certain amount of time and resources, it cannot meet the requirements of rapid service recovery and affects the user experience. Once the PCE path finding fails, it may cause the service to be paralyzed for a long time, which is a great challenge to the stable operation of the existing network.

[0004] In order to avoid manual operation, related technologies deploy optical switches between all adjacent network elements in the network topology and use state machines to control the on and off of the optical switches to achieve automated testing. Other technologies provide engineering implementation decisions after a comprehensive and accurate understanding of the physical and logical data related to the optical cable splicing before splicing. By deleting the original old physical fiber core, a new splicing point and two new physical fiber cores are generated on both sides of the splicing point, and the services saved on the original fiber core are assigned to the two new physical fiber cores at the same time.

[0005] However, the relevant technology is still limited to simulation on physical devices and cannot effectively improve the timeliness and stability of the existing network when performing link cutover operations. Summary of the invention

[0006] The embodiment of the present invention provides a link cutover simulation method and system, which can improve the timeliness of service switching during the link cutover process.

[0007] On the one hand, an embodiment of the present invention provides a link cutover simulation method, characterized in that it includes:

[0008] Based on the network topology of the existing network equipment and the cutover plan corresponding to the user cutover task, the switching route of the affected services when the existing network link is cutover is simulated and the simulation results are obtained;

[0009] Verify whether the simulation results can be successfully switched by using the live network twin technology;

[0010] The simulation results verified to be successful in switching are stored, and when cutover is required, service switching is performed according to the stored simulation results.

[0011] In some embodiments, the network topology of the existing network equipment and the cutover solution corresponding to the user cutover task simulate the switching route of the affected service when the existing network link is cutover and obtain the simulation result, including:

[0012] Acquire network topology data of existing network devices according to user requests, wherein the network topology data includes existing network nodes, links, and corresponding service routes;

[0013] Initiate simulation analysis according to the cutover plan input by the user to obtain corresponding analysis results, wherein one or more of the cutover plans correspond to a cutover task;

[0014] Determine the final simulation result according to the analysis result;

[0015] The cutover plan includes one or more links to be cutover and the execution order between the links during the cutover;

[0016] The analysis result includes the affected services corresponding to the cutover solution and the switching routes calculated based on the affected services.

[0017] In some embodiments, determining the final simulation result according to the analysis result includes:

[0018] If there are multiple cutover plans, an optimal cutover plan is determined from all the cutover plans according to the analysis results corresponding to each cutover plan;

[0019] If there is only one cutover plan, the cutover plan is directly used as the best cutover plan;

[0020] The analysis results corresponding to the best cutover solution are taken as the final simulation results.

[0021] In some embodiments, the step of verifying whether the simulation result can be successfully switched by using the existing network twin technology includes the following steps:

[0022] Verify on the virtual twin network model whether the service path is connected from the service source node to the sink node. If so:

[0023] Verify in turn whether the switching routing service channel resources are idle, whether they do not conflict with other service resources in the existing network, and whether the service signal-to-noise ratio meets the preset conditions. If all of them are true, it is determined that the service can be switched successfully.

[0024] In a second aspect, an embodiment of the present invention further provides a link cutover simulation system, characterized in that it includes:

[0025] The cutover simulation subsystem is used to simulate the switching routes of the affected services when the existing network link is cutover according to the network topology of the existing network equipment and the cutover plan corresponding to the user cutover task;

[0026] The twin subsystem of the existing network equipment is used to verify whether the simulation results can be successfully switched through the existing network twin technology;

[0027] The existing network equipment management subsystem is used to store simulation results that are verified to be able to switch successfully and enable the existing network equipment to perform service switching according to the stored simulation results when cutover is required.

[0028] In some embodiments, the existing network device management subsystem is further used to obtain network topology data from the existing network device according to a user request, and the network topology data includes: existing network nodes, links and corresponding service routes;

[0029] The cutover simulation subsystem is also used for:

[0030] Initiate simulation analysis according to the cutover plan input by the user to obtain corresponding analysis results, wherein one or more of the cutover plans correspond to a cutover task;

[0031] Determine the final simulation result according to the analysis result;

[0032] The cutover plan includes one or more links to be cutover and the execution order between the links during the cutover;

[0033] The analysis result includes the affected services corresponding to the cutover solution and the switching routes calculated based on the affected services.

[0034] In some embodiments, the cutover simulation subsystem is further used for:

[0035] If there are multiple cutover plans, an optimal cutover plan is determined from all the cutover plans according to the analysis results corresponding to each cutover plan;

[0036] If there is only one cutover plan, the cutover plan is directly used as the best cutover plan;

[0037] The analysis results corresponding to the best cutover solution are taken as the final simulation results.

[0038] In some embodiments, the existing network device management subsystem is further used to synchronize the network topology data to the existing network device twin subsystem;

[0039] The existing network twin subsystem is provided with an existing network message receiver, which is used to generate twin devices, twin topologies and twin services based on the received network topology data.

[0040] In some embodiments, the existing network twin subsystem is also used for:

[0041] The simulation results output by the existing network equipment management subsystem are verified based on the twin devices, twin topology and twin services, and whether the corresponding affected service simulation routing can be successfully switched on the twin devices is used as the verification result.

[0042] In some embodiments, the existing network twin subsystem is also used for:

[0043] Verify whether the service path is connected from the service source node to the sink node based on the twin device, twin topology and twin service. If so:

[0044] Verify in turn whether the switching routing service channel resources are idle, whether they do not conflict with other service resources in the existing network, and whether the service signal-to-noise ratio meets the preset conditions. If all of them are true, it is determined that the service can be switched successfully.

[0045] The embodiment of the present invention provides a link cutover simulation method and system, which simulates the affected services and service switching routes according to the user's cutover plan and cutover parameters, verifies the simulation results through the twin mode of the existing network, and then presets the verified cutover parameters and plans, and performs the cutover according to the preset plans and parameters when cutover is needed. It can help customers predict and avoid possible risks of cutover in advance, help the network achieve low-cost trial and error, and improve the automation and intelligence level of the network. At the same time, it greatly improves the stability and reliability of the existing network when performing link cutover operations. The cutover plan simulated and verified by this system can realize batch cutover of existing network links, greatly improve cutover efficiency, and reduce labor costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0047] Figure 1 A schematic diagram of a link cutover simulation method flow provided by an embodiment of the present invention;

[0048] Figure 2 A schematic diagram of a link cutover simulation structure provided by an embodiment of the present invention;

[0049] Figure 3 A schematic diagram of the structure of a cutover simulation subsystem provided in an embodiment of the present invention;

[0050] Figure 4A schematic diagram of the structure of an existing network device management subsystem provided by an embodiment of the present invention;

[0051] Figure 5 A schematic diagram of the structure of a twin subsystem of an existing network device provided in an embodiment of the present invention;

[0052] Figure 6 This is an example of an existing network topology provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0053] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0054] like Figure 1 As shown, an embodiment of the present invention provides a link cutover simulation method, which includes:

[0055] S100: Based on the network topology of the existing network equipment and the cutover plan corresponding to the user cutover task, simulate the switching route of the affected services when the existing network link is cutover;

[0056] S200: Verify whether the simulation result can be successfully switched by using the existing network twin technology;

[0057] S300: The simulation results verified to be successful are stored and when cutover is required, service switching is performed according to the stored simulation results.

[0058] The embodiment of the present invention simulates the affected services and service switching routes according to the user's cutover task, verifies the simulation results through the twin mode of the existing network, and then presets the verified cutover parameters and solutions, and performs the cutover according to the preset solutions and parameters when cutover is required. It can help customers predict and avoid possible risks of cutover in advance, help the network to achieve low-cost trial and error, and improve the automation and intelligence level of the network. At the same time, it greatly improves the stability and reliability of the existing network when performing link cutover operations. The cutover solution simulated and verified by this system can realize batch cutover of existing network links, greatly improve the cutover efficiency, and reduce labor costs.

[0059] In some embodiments, step S100 further includes:

[0060] S110: Obtain network topology data of existing network devices according to user request, wherein the network topology data includes: existing network nodes, links and corresponding service routes;

[0061] S120: starting simulation analysis according to the cutover plan input by the user to obtain corresponding analysis results, wherein one or more of the cutover plans correspond to one cutover task;

[0062] S130: Determine the final simulation result according to the analysis result;

[0063] It should be noted that, the service routing also includes service paths and wavelengths; the cutover plan includes one or more links to be cutover and the execution order between the links during cutover; the analysis results include the affected services corresponding to the cutover plan and the switching routes calculated based on the affected services.

[0064] In some embodiments, S130 includes:

[0065] S131: If there are multiple cutover schemes, determine an optimal cutover scheme from all the cutover schemes according to the analysis results corresponding to each cutover scheme;

[0066] S132: Taking the analysis result corresponding to the best cutover solution as the final simulation result.

[0067] In some embodiments, S130 includes:

[0068] S133: If there is only one cutover solution, directly use the cutover solution as the best cutover solution;

[0069] S134: Taking the analysis result corresponding to the best cutover solution as the final simulation result.

[0070] In some embodiments, S200 includes:

[0071] S210: Verify on the virtual twin network model whether the service path is connected from the service source node to the sink node. If so:

[0072] S220: Verify in sequence whether the switching routing service channel resources are idle, whether they do not conflict with other service resources in the existing network, and whether the service signal-to-noise ratio meets the preset conditions. If so, determine that the service can be switched successfully.

[0073] It can be understood that on the virtual twin network model, the affected service switching routes are verified in turn, including whether the service path is connected from the service source node to the destination node, whether the switching route service channel resources are idle, whether there is a conflict with other service resources in the existing network (no conflict is a condition that is met), and whether the service signal-to-noise ratio meets the requirements. For each affected service, if the simulated switching route meets the above conditions, it is determined that the service can be switched successfully.

[0074] like Figure 2As shown, an embodiment of the present invention further provides a link cutover simulation system, which includes:

[0075] The cutover simulation subsystem is used to simulate the switching routes of the affected services when the existing network link is cutover according to the network topology of the existing network equipment and the cutover plan corresponding to the user cutover task;

[0076] The twin subsystem of the existing network equipment is used to verify whether the simulation results can be successfully switched through the existing network twin technology;

[0077] The existing network equipment management subsystem is used to store simulation results that are verified to be able to switch successfully and enable the existing network equipment to perform service switching according to the stored simulation results when cutover is required.

[0078] It should be noted that the cutover simulation subsystem can analyze the routes of services in the system based on the cutover link group configured in the cutover plan. If all routes of a service pass through one of the links included in the cutover link group, the service is determined to be affected, thereby finding all services affected by the cutover plan in the system. The simulation results of the cutover simulation subsystem include using routing algorithms (such as dynamic programming, Dijkstra, etc.) to calculate a new route for all affected services that does not pass through the cutover link group.

[0079] The twin subsystem of the existing network equipment is based on real physical equipment, and 1:1 reverse construction of the physical configuration of the twin network element, including the physical entity data, space data, resource data, and the port information of the sub-card in the frame slot of the network element, the fiber connection information between network elements, etc., and generates a virtual twin network data model based on these data. The twin subsystem can verify whether the simulation results (reverse routing) can ensure the normal operation of the business on the virtual twin network model, and return verification success if the business can run normally.

[0080] The embodiments of the present invention can simulate fully automated link cutover based on different existing network topologies, different cutover parameters of the same existing network topology, and different cutover schemes with the same existing network topology and the same cutover parameters, verify the simulation results, compare the verification results, and preset the simulation results.

[0081] In some embodiments, the existing network device management subsystem is further used to obtain network topology data from the existing network device according to a user request, and the network topology data includes: existing network nodes, links and corresponding service routes;

[0082] The cutover simulation subsystem is also used to:

[0083] Initiate simulation analysis according to the cutover plan input by the user to obtain corresponding analysis results, wherein one or more of the cutover plans correspond to a cutover task;

[0084] Determine the final simulation result according to the analysis result;

[0085] The cutover plan includes one or more links to be cutover and the execution order between the links during the cutover; the analysis result includes the affected services corresponding to the cutover plan and the switching routes calculated based on the affected services.

[0086] In some embodiments, the cutover simulation subsystem is further configured to:

[0087] When there are multiple cutover plans, determine an optimal cutover plan from all the cutover plans according to the analysis results corresponding to each cutover plan;

[0088] The analysis results corresponding to the best cutover solution are taken as the final simulation results.

[0089] In some embodiments, the cutover simulation subsystem is further configured to:

[0090] When there is only one cutover solution, directly taking the cutover solution as the best cutover solution;

[0091] The analysis results corresponding to the best cutover solution are taken as the final simulation results.

[0092] In some embodiments, the existing network device management subsystem is also used to synchronize the network topology data to the existing network device twin subsystem; the existing network twin subsystem is provided with an existing network message receiver, which is used to generate twin devices, twin topologies and twin services based on the received network topology data.

[0093] Furthermore, the existing network twin subsystem is also used to verify the simulation results output by the existing network device management subsystem based on the twin device, twin topology and twin service, and whether the corresponding affected service simulation route can be successfully switched on the twin device is used as the verification result.

[0094] In some embodiments, the existing network twin subsystem is also used for:

[0095] Verify whether the service path is connected from the service source node to the sink node based on the twin device, twin topology and twin service. If so:

[0096] Verify in turn whether the switching routing service channel resources are idle, whether they do not conflict with other service resources in the existing network, and whether the service signal-to-noise ratio meets the preset conditions. If all of them are true, it is determined that the service can be switched successfully.

[0097] like Figure 2 As shown, in a specific embodiment, the link cutover simulation system is composed of three subsystems, wherein the internal structure of the cutover simulation subsystem is as follows: Figure 3 The internal structure of the existing network equipment management subsystem is shown in Figure 4As shown in the figure, the internal structure of the twin subsystem of the existing network equipment is as follows Figure 5 The user interacts with the entire system by cutting over the simulation subsystem. The specific processing flow is as follows:

[0098] S1: When the user receives a cutover task, the user enters the IP address of the existing network device management subsystem of the existing network device to be cutover through the cutover simulation subsystem interface, and connects to the existing network device management subsystem that needs to be cutover through the cutover simulation subsystem;

[0099] S2: The user requests the existing network equipment topology data (including existing network nodes, links, service routes, etc.) from the existing network equipment management subsystem through the cutover simulation subsystem. At the same time, the existing network equipment management subsystem synchronizes the existing network topology data to the existing network equipment twin subsystem.

[0100] S3: The user creates a cutover task through the cutover simulation subsystem interface;

[0101] S4: The user inputs a cutover plan based on the cutover task created in step S3; wherein the cutover plan is a group of links to be cutover, each cutover link group contains one or more links to be cutover, and the order of the links in the cutover link group represents the order of the links during cutover. One or more cutover plans can be created under the same task;

[0102] S5: Based on the cutover plan created in step S4, start simulation analysis of the cutover plan;

[0103] S6: After the cutover simulation subsystem analysis is completed, the analysis results are obtained (mainly including the affected services under each cutover solution, and the cutover switching routes are calculated for these affected services);

[0104] S7: If multiple cutover plans are input in step S4, the analysis results of each cutover plan analyzed in step S6 are compared, and the user selects the best cutover plan according to the comparison results; if only one cutover plan is input in step S4, step S7 is skipped, and the analysis result of this cutover plan is directly selected as the best plan;

[0105] S8: The cutover simulation subsystem documents the best solution analysis results and sends them to the equipment twin subsystem to verify the service cutover simulation switching results;

[0106] S9: The device twin subsystem returns the verification result to the cutover simulation subsystem. The cutover simulation subsystem obtains the verification result returned by the twin subsystem;

[0107] S10: If the verification result is passed, the result file of the simulation analysis of the cutover simulation subsystem is sent to the existing network equipment management subsystem;

[0108] S11: After parsing the simulation analysis result file, the existing network equipment management subsystem saves the simulated link cut-affected service switching route to the existing network preset.

[0109] At this point, the entire system has completed the creation of cutover scenarios and plans by users, simulation calculation of cutover plans, verification of simulation calculation results, and discovery of network pre-set processes under verification results. When users perform link cutover operations in the existing network according to the cutover plan corresponding to the preset service switching data, the affected services during the link cutover process can be quickly switched according to the preset results, greatly improving the timeliness of service switching during the link cutover process.

[0110] In a specific embodiment, Figure 6 The current network topology shown in the figure includes four sites node1, node2, node3, node4, four links section1, section2, section3, section4, and six services: the service paths of biz1, biz2, and biz3 are node1-section1-node2-section2-node3, and the service paths of biz4, biz5, and biz6 are node1-section4-node4-section3-node3. Due to line upgrade, it is necessary to perform cutover operation on the two links of section2 and section3 of the current network. Before performing the cutover operation on the current network, the system is used to simulate and verify the cutover task, and the verified simulation results are sent to the current network preset.

[0111] Based on the link cutover simulation system provided by the present invention, the user can Figure 3 The existing network message processor module of the cutover simulation subsystem and Figure 4 The topology resource reporting module of the existing network equipment management subsystem is connected to obtain the existing network topology and service information; Figure 4 The topology resource reporting module of the existing network device management subsystem synchronizes the existing network topology and device resources to Figure 5 In the live twin system of the live network, the live network message receiver is Figure 5 The topology message processor and device message processor in the generate twin devices, twin topologies, and twin services; users can Figure 3 The cutover task and plan generation module of the cutover simulation subsystem generates the cutover task and cutover plan. The cutover task includes the two links section2 and section3 to be cutover. In cutover plan 1, section2 and section3 are divided into two groups for cutover. In cutover plan 2, section2 and section3 are divided into the same group for cutover. After the cutover task and plan are generated, call Figure 3The cutover scheme simulation calculation module of the cutover simulation subsystem performs simulation calculations on the cutover scheme.

[0112] pass Figure 3 The multiple cutover scheme comparison and analysis module in the cutover scheme 1 found that 3 services in each group were affected in the cutover scheme 1, and all of them could be restored normally. In the cutover scheme 2, all 6 affected services could not be restored. The cutover scheme 1 was selected; the simulation results of scheme 1 were saved, and the Figure 3 The twin verification module is sent to Figure 5 The cutover simulation result receiving parser in the existing twin subsystem.

[0113] Figure 5 The cutover simulation verification module in the twin subsystem of the Zhongxian network uses the generated twin devices, twin topologies, twin services and the received cutover simulation results to verify whether the affected service simulation routes can be successfully switched on the twin devices. Figure 5 The verification message feedback module feeds back to Figure 3 The verification result display and the cutover simulation result receiving preset module are shown in Table 1 and Table 2.

[0114] Table 1

[0115]

[0116] Table 2

[0117]

[0118]

[0119] Table 1 shows the simulation and verification of the cutover of section2. The affected services in this cutover group are biz1, biz2, and biz3. Their original routes are node1-section1-node2-section2-node3, and the simulated switching route is node1-section4-node4-section3-node3. This simulated switching route has been verified and passed in the twin subsystem of the existing network.

[0120] Table 2 shows the simulation and verification of the cutover of section3. The affected services in this cutover group are biz4, biz5, and biz6. Their original routes are node1-section4-node4-section3-node3, and the simulated switching route is node1-section1-node2-section2-node3. This simulated switching route has been verified and switched successfully in the twin subsystem of the existing network.

[0121] Finally, the user checks the displayed verification results by cutting over the simulation sub-module, and sends the verified simulation results to Figure 4 The cutover simulation result receiving and presetting module of the existing network equipment management subsystem presets the cutover simulation result into the existing network equipment management subsystem.

[0122] The beneficial effects of the embodiments of the present invention include:

[0123] For any physical network, it provides users with a method to build a cutover scenario and simulate the affected service paths in the cutover scenario. It also provides a method to connect the cutover simulation result system and the simulation result verification system to achieve the purpose of fully automating the cutover simulation, simulation result verification, and simulation result presetting. It is convenient for customers to predict and avoid possible risks of cutover in advance, help the network achieve low-cost trial and error, intelligent decision-making and high-efficiency innovation, and improve the automation and intelligence level of the network. It can effectively improve the stability and reliability of the existing network when performing link cutover operations.

[0124] It will be appreciated by those skilled in the art that all or some of the steps, systems, and functional modules / units in the methods disclosed above may be implemented as software, firmware, hardware, and appropriate combinations thereof. In a hardware implementation, the division between the functional modules / units mentioned in the above description does not necessarily correspond to the division of physical components; for example, a physical component may have multiple functions, or a function or step may be performed by several physical components in cooperation. Some or all physical components may be implemented as software executed by a processor, such as a central processing unit, a digital signal processor, or a microprocessor, or may be implemented as hardware, or may be implemented as an integrated circuit, such as an application-specific integrated circuit. Such software may be distributed on a computer-readable storage medium, which may include a computer-readable storage medium (or a non-transitory medium) and a communication medium (or a temporary medium).

[0125] It should be noted that, in the present invention, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0126] The foregoing is merely a specific embodiment of the present invention, which enables those skilled in the art to understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features claimed herein.

Claims

1. A link cutover simulation method, characterized in that: It includes: Acquire network topology data of existing network devices according to user requests, wherein the network topology data includes existing network nodes, links, and corresponding service routes; initiate simulation analysis according to the cutover plan input by the user to obtain corresponding analysis results, wherein one or more of the cutover plans correspond to one cutover task; Determine the final simulation result according to the analysis result; the cutover plan includes one or more links to be cutover and the execution order between the links during the cutover; the analysis result includes the affected services corresponding to the cutover plan and the switching route calculated based on the affected services; Verify whether the simulation results can be successfully switched by using the live network twin technology; The simulation results verified to be successful in switching are stored, and when cutover is required, service switching is performed according to the stored simulation results.

2. The link cutover simulation method according to claim 1, characterized in that: Determining the final simulation result according to the analysis result includes: If there are multiple cutover plans, an optimal cutover plan is determined from all the cutover plans according to the analysis results corresponding to each cutover plan; If there is only one cutover plan, the cutover plan is directly used as the best cutover plan; The analysis results corresponding to the best cutover solution are taken as the final simulation results.

3. The link cutover simulation method according to claim 1, characterized in that: The method of verifying whether the simulation result can be successfully switched by using the existing network twin technology includes the following steps: Verify on the virtual twin network model whether the service path is connected from the service source node to the sink node. If so: Verify in turn whether the switching routing service channel resources are idle, whether they do not conflict with other service resources in the existing network, and whether the service signal-to-noise ratio meets the preset conditions. If all of them are true, it is determined that the service can be switched successfully.

4. A link cutover simulation system, characterized in that: It includes: The cutover simulation subsystem is used to simulate the switching routes of the affected services when the existing network link is cutover according to the network topology of the existing network equipment and the cutover plan corresponding to the user cutover task; The cutover simulation subsystem is further used to: start simulation analysis according to the cutover plan input by the user to obtain corresponding analysis results, wherein one or more of the cutover plans correspond to one cutover task; determine the final simulation result according to the analysis result; the cutover plan includes one or more links to be cutover and the execution order between the links during the cutover; the analysis result includes the affected services corresponding to the cutover plan and the switching route calculated based on the affected services; The twin subsystem of the existing network equipment is used to verify whether the simulation results can be successfully switched through the existing network twin technology; The existing network equipment management subsystem is used to store the simulation results that are verified to be able to switch successfully and make the existing network equipment perform service switching according to the stored simulation results when cutover is required; The existing network device management subsystem is also used to obtain network topology data from the existing network devices according to user requests. The network topology data includes: existing network nodes, links and corresponding service routes.

5. The link cutover simulation system according to claim 4, characterized in that: The cutover simulation subsystem is also used for: If there are multiple cutover plans, an optimal cutover plan is determined from all the cutover plans according to the analysis results corresponding to each cutover plan; If there is only one cutover plan, the cutover plan is directly used as the best cutover plan; The analysis results corresponding to the best cutover solution are taken as the final simulation results.

6. The link cutover simulation system according to claim 4, characterized in that: The existing network device management subsystem is also used to synchronize the network topology data to the existing network device twin subsystem; The existing network twin subsystem is provided with an existing network message receiver, which is used to generate twin devices, twin topologies and twin services based on the received network topology data.

7. The link cutover simulation system according to claim 6, characterized in that: The existing twin subsystem is also used for: The simulation results output by the existing network equipment management subsystem are verified based on the twin devices, twin topology and twin services, and whether the corresponding affected service simulation routing can be successfully switched on the twin devices is used as the verification result.

8. The link cutover simulation system according to claim 7, characterized in that: The existing twin subsystem is also used for: Verify whether the service path is connected from the service source node to the sink node based on the twin device, twin topology and twin service. If so: Verify in turn whether the switching routing service channel resources are idle, whether they do not conflict with other service resources in the existing network, and whether the service signal-to-noise ratio meets the preset conditions. If all of them are true, it is determined that the service can be switched successfully.