System data conversion methods, systems and electronic equipment

By configuring the platform and data conversion equipment to identify and convert the difference data tables of the old and new core business systems, the problem of long adaptation time for downstream business processing devices during the core system upgrade process was solved, enabling business processing during the upgrade transition period and improving the efficiency of system upgrade.

CN115934131BActive Publication Date: 2026-11-17BEIJING PACTERA JINXIN TECH LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211658922.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-22
Publication Date
2026-11-17
Estimated Expiration
2042-12-22

AI Technical Summary

Technical Problem

During the core system upgrade process, the adaptation time of downstream business processing devices is long, resulting in a long system upgrade gap and low upgrade efficiency.

Method used

By configuring the platform and data conversion equipment, the differences in business data tables between the old and new core business systems are identified and converted, generating business files that can be recognized by downstream business processing equipment, ensuring normal business processing during the upgrade transition period.

Benefits of technology

This reduced the downtime for system upgrades and improved the efficiency of system upgrades.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115934131B_ABST
    Figure CN115934131B_ABST
Patent Text Reader

Abstract

This application provides a data conversion method, system, and electronic device. After upgrading to a new business core system, based on the business processing requests sent by downstream business processing devices, at least one differing business data table is identified where multiple original business data tables in the old business core system and multiple upgraded business data tables in the new business core system differ when responding to the business processing requests. The data conversion device then converts the at least one differing business data table into an original business data table that can be recognized by the downstream business processing devices before sending it to the downstream business processing devices. This ensures that business processing can continue during the transition period when the downstream business processing devices adapt to the new business core system, reducing the business processing downtime during system upgrades and helping to improve the efficiency of system upgrades.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of data processing technology, and in particular to data conversion methods, systems, and electronic devices. Background Technology

[0002] With business development, market changes, and ever-increasing customer experience demands, core systems frequently require functional upgrades. However, during the upgrade process of a new core system, a large number of downstream business processing devices need to be adapted for the upgrade. The time required for normal business processing before all downstream business processing devices can be upgraded is also relatively long, resulting in a long system upgrade window and low upgrade efficiency. Summary of the Invention

[0003] In view of this, the purpose of this application is to provide a data conversion method, system, configuration platform and data conversion device for the system, which ensures that business processing can be carried out during the transition period when downstream business processing equipment is adapted to the new business core system, reduces the business processing gap during system upgrade, and helps to improve the efficiency of system upgrade.

[0004] In a first aspect, embodiments of this application provide a data conversion method for a system, applied to a data conversion system for upgrading a system. The data conversion system includes a configuration platform, downstream business processing equipment, and data conversion equipment. The data conversion method includes: The configuration platform is controlled to receive service processing requests sent by the downstream service processing equipment. Based on the business processing request, the configuration platform determines multiple upgraded business data tables and multiple original business data tables in response to the business processing request from the new business core system and the old business core system. It then compares the multiple upgraded business data tables and multiple original business data tables to determine at least one different business data table that differs from the multiple original business data tables. The configuration platform is controlled to convert the at least one differential business data table into a data file and send it to the data conversion device. The data conversion device is controlled to convert the at least one differential business data table into a corresponding original business data table, and to generate a business file that can be recognized by the downstream business processing device and send it to the downstream business processing device.

[0005] In one possible implementation, the at least one differential business data table is converted into a data file through the following steps: Based on the file encoding method and file delimiter indicated by the data conversion device, the format of the at least one differential business data table is converted to generate the data file.

[0006] In one possible implementation, converting the at least one differential business data table into a data file and sending it to the data conversion device includes: Check whether there are runtime files and text files in the runtime execution data directory of the configuration platform that perform the format conversion process of the differential business data table; If both executable files and text files exist in the data directory of the configuration platform, the at least one differential business data table is converted into a data file and sent to the data conversion device.

[0007] In one possible implementation, after detecting whether the runtime file and text file for the format conversion process of the differential business data table exist in the runtime execution data directory of the configuration platform, the data conversion method further includes: If the executable file or text file does not exist in the data directory of the configuration platform, determine that the data in at least one differential business data table is abnormal, and generate the corresponding data error message; If the number of data error messages generated within a preset time period exceeds a preset threshold, an abnormal alarm message will be generated.

[0008] In one possible implementation, the data conversion method further includes: By comparing multiple upgrade business data tables and multiple original business data tables, at least one target business data table that is identical to the multiple original business data tables is identified. At least one target business data table included in the upgrade business data table is converted into a business file that can be recognized by the downstream business processing device, and then sent to the downstream business processing device so that the downstream business processing device can use the corresponding business data to process the target business.

[0009] In one possible implementation, controlling the data conversion device to convert the at least one differential business data table into a corresponding original business data table, generating a business file recognizable by the downstream business processing device, and sending it to the downstream business processing device includes: The data conversion device is controlled to receive the data file determined by the configuration platform based on the service requirements sent by the downstream service processing device; The data conversion device is controlled to convert at least one differential business data table included in the data file into a corresponding original business data table, and then converts the original business data table into a business file that can be recognized by the downstream business processing device, and sends it to the downstream business processing device so that the downstream business processing device processes the target business based on the business data converted from the business file.

[0010] In one possible implementation, the step of converting at least one differential business data table included in the data file into a corresponding original business data table, and converting the original business data table into a business file recognizable by the downstream business processing equipment, includes: Receive the data file sent by the configuration platform and convert the data file back into at least one differential business data table; Convert the at least one differential business data table into the corresponding original business data table; The original business data table is converted into the business file according to the data conversion rules indicated by the downstream business processing equipment.

[0011] In one possible implementation, converting the at least one differential business data table into a corresponding original business data table includes: Determine the table differences between the differential business data table and the corresponding original business data table, and determine the data writing location of the data in the differential business data table in the original business data table; The data in the differential business data table is written according to the write data position to obtain the original business data table.

[0012] Secondly, embodiments of this application provide a data conversion system for upgrading a system, the data conversion system including a configuration platform, a data conversion device, and a downstream business processing device; The configuration platform is used to receive service processing requests sent by the downstream service processing equipment; based on the service processing requests, it determines multiple upgraded service data tables and multiple original service data tables in response to the service processing requests from the new service core system and the old service core system, compares the multiple upgraded service data tables and multiple original service data tables, determines at least one different service data table that differs from the multiple original service data tables, and converts the at least one different service data table into a data file and sends it to the data conversion equipment; The data conversion device is used to receive a data file sent by the configuration platform, convert at least one differential business data table included in the data file into a corresponding original business data table, convert the original business data table into a business file that can be recognized by the downstream business processing device, and then send it to the downstream business processing device. The downstream service processing device is used to generate a service processing request and send it to the configuration platform after receiving the target service. After receiving the service file sent by the data conversion device, it converts the service file into corresponding service data and applies the service data to process the target service.

[0013] Thirdly, embodiments of this application also provide an electronic device, including: a processor, a storage medium, and a bus, wherein the storage medium stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor communicates with the storage medium via the bus, and the processor executes the machine-readable instructions to perform the steps of the data conversion method of the system as described in any of the first aspects.

[0014] Fourthly, embodiments of this application also provide a computer-readable storage medium storing a computer program, which, when executed by a processor, performs the steps of the data conversion method of the system as described in any of the first aspects.

[0015] The data conversion method, system, and electronic device provided in this application embodiment control configuration platform to receive service requests sent by downstream service processing equipment, determine multiple upgraded service data tables and multiple original service data tables in response to the service processing request from the new service core system and the old service core system, compare the multiple upgraded service data tables and multiple original service data tables, determine at least one difference service data table that differs from the multiple original service data tables, convert the at least one difference service data table into the corresponding original service data table through a data conversion device, and then send it to the downstream service processing equipment for service processing.

[0016] In this application, after upgrading to the new business core system, based on the business processing requests sent by downstream business processing devices, at least one differing business data table is identified among the multiple original business data tables included in the old business core system and the multiple upgraded business data tables included in the new business core system when responding to the business requirements. This differing business data table is then converted into a file recognizable by the downstream business processing devices, which can be a recognizable original business data table, and sent to the downstream business processing devices. This process converts the differing business data tables in the upgraded new business core system into original business data tables recognizable by the downstream business processing devices, preventing situations where the downstream business processing devices cannot recognize the business data tables in the upgraded new business core system. This ensures that business processing can continue during the transition period when the downstream business processing devices adapt to the new business core system, reducing the business processing downtime during system upgrades and improving the efficiency of system upgrades.

[0017] To make the above-mentioned objectives, features and advantages of this application more apparent and understandable, preferred embodiments are described below in detail with reference to the accompanying drawings. Attached Figure Description

[0018] To more clearly illustrate the technical solutions of the embodiments of this application, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this application and should not be regarded as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 A flowchart illustrating a data conversion method for a system provided in this application embodiment; Figure 2 This is a flowchart illustrating the execution of a scheduler job during the data conversion process provided in an embodiment of this application. Figure 3 This is a flowchart illustrating an example of scheduling a job during the data conversion process provided in an embodiment of this application. Figure 4 This is a schematic diagram of the structure of a data conversion device for a system provided in an embodiment of this application; Figure 5 This is one of the structural schematic diagrams of the data conversion system of the upgrade system provided in the embodiments of this application; Figure 6 This is a second schematic diagram of the structure of the data conversion system of the upgrade system provided in the embodiments of this application; Figure 7 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this application. Detailed Implementation

[0020] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. The components of the embodiments of this application described and shown in the accompanying drawings can generally be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of this application provided in the accompanying drawings is not intended to limit the scope of the claimed application, but merely represents selected embodiments of this application. Based on the embodiments of this application, every other embodiment obtained by those skilled in the art without inventive effort falls within the scope of protection of this application.

[0021] With business development, market changes, and ever-increasing customer experience demands, core systems frequently require functional upgrades. During these upgrades, changes to the existing table structures within the core system are often necessary. For example, the business data in the old core system may be changed from multiple tables to a single table, or vice versa. Furthermore, the upgrade process for a new core system involves adapting to a large number of downstream business processing devices. The time required for normal business processing to resume only after all downstream business processing devices have been upgraded is also quite long, resulting in a long system upgrade window and low upgrade efficiency.

[0022] Based on this, embodiments of this application provide a system data conversion method to reduce the business processing downtime during system upgrades and improve the efficiency of system upgrades.

[0023] First, the architecture of the data conversion system applicable to the upgrade system in the embodiments of this application will be described. Specifically, the data conversion system includes a configuration platform, data conversion equipment, and downstream business processing equipment.

[0024] In this embodiment, when a downstream service processing device needs to process a target service, it generates a service processing request and sends it to the configuration platform. Upon receiving the service request from the downstream service processing device, the configuration platform analyzes the service data required to respond to the request. It identifies multiple upgraded service data tables from the new service core system and obtains these tables. It then analyzes the upgraded service data tables to identify at least one differing service data table that differs from the original service data tables in the old service core system. This differing service data table is then converted into a data file in the format required by the data conversion device and sent to the data conversion device. Upon receiving the data file from the configuration platform, the data conversion device converts the at least one differing service data table contained in the data file into a corresponding original service data table. After conversion, it packages the original service data table into a service file that the downstream service processing device can recognize and sends it to the downstream service processing device. Upon receiving the service file from the data conversion device, the downstream service processing device converts the service file into corresponding service data and applies the service data to process the target service. In this way, during the transition period when downstream business processing equipment is not fully adapted to the upgraded new business core system, it can be ensured that the downstream business processing equipment can recognize the business data in the new business core system, and the downstream business processing equipment can perform business processing normally during the transition period of the core system upgrade.

[0025] Please see Figure 1 , Figure 1This is a flowchart illustrating a data conversion method for a system provided in an embodiment of this application. The data conversion system, applied to an upgrade system, includes a configuration platform, downstream business processing equipment, and data conversion equipment, such as... Figure 1 As shown in the embodiments of this application, the data conversion method of the system includes: S101. Control the configuration platform to receive the service processing request sent by the downstream service processing device.

[0026] S102. The configuration platform is controlled to determine, based on the business processing request, multiple upgraded business data tables and multiple original business data tables responding to the business processing request from the new business core system and the old business core system, compare the multiple upgraded business data tables and multiple original business data tables, and determine at least one difference business data table in the multiple original business data tables that differs from the multiple original business data tables.

[0027] S103. Control the configuration platform to convert the at least one differential business data table into a data file and send it to the data conversion device.

[0028] S104. Control the data conversion device to convert the at least one differential business data table into a corresponding original business data table, and generate a business file that can be recognized by the downstream business processing device and send it to the downstream business processing device.

[0029] The exemplary steps of the embodiments of this application are described below: S101. Control the configuration platform to receive the service processing request sent by the downstream service processing device.

[0030] In this embodiment of the application, a business system may have a core system and downstream business processing devices. The core business system stores business data of the downstream business processing devices when processing business. Generally, this business data is stored in the core system in the form of data tables. When the downstream business processing device needs to perform business processing, it generates a corresponding business processing request for the target business and feeds the business processing request back to the configuration platform. The configuration platform analyzes the business processing request, determines the business data table that responds to the business processing request, and then obtains the corresponding business data table from the core system so that the downstream business data processing device processes the target business according to the data in the obtained business data table.

[0031] For example, in a bank's data processing system, the core business system stores multiple business data tables (e.g., User A - Business Type: Loan - Business Term: X years, etc.) containing user data from various bank branches. The downstream business processing equipment can be the data processing systems of each bank branch. If a branch of Bank Y receives a change in user A's loan data, it can generate a loan processing business request and send it to the configuration platform. The configuration platform can then determine the business data table that responds to the loan processing business request from the core business system.

[0032] It is worth noting that when different downstream business processing devices send business processing requests to the configuration platform, they need to carry the identifier of the downstream business processing device (in the above example, it could be the bank branch number) and business type information, so that the configuration platform can accurately analyze the business data table that needs to be obtained from the core system through business processing.

[0033] S102. The configuration platform is controlled to determine, based on the business processing request, multiple upgraded business data tables and multiple original business data tables responding to the business processing request from the new business core system and the old business core system, compare the multiple upgraded business data tables and multiple original business data tables, and determine at least one difference business data table in the multiple original business data tables that differs from the multiple original business data tables.

[0034] In this embodiment of the application, the construction of the new business core system project is an upgrade and transformation project based on the old core business system. The business data of the old business core system may be changed from multiple tables to one table, or it may be changed from one table to multiple tables. Therefore, when receiving the same business processing request from the downstream business processing equipment, the business data table responding to the business requirements may have certain differences for the new core system and the old core system.

[0035] In this embodiment, after receiving a business processing request, it is necessary to determine the business data required to process the request, based on the received request. Multiple upgraded business data tables in the new core business system responding to the request are determined based on the upgraded business data tables containing the different business data. These upgraded business data tables are then obtained from the new core business system. Simultaneously, based on business requirements, the required business data for processing the request is determined, and multiple original business data tables in the old core business system responding to the business requirements are determined based on the original business data tables containing the different business data. These upgraded and original business data tables may contain completely identical tables (business data tables that have not changed during the core system upgrade) or differing tables. In this embodiment, the conversion required is of at least one differing business data table between the new and old core business systems.

[0036] For example, a business processing request from a downstream business processing device requires processing data A, data B, and data C. In the new business core system, data A, data B, and data C are stored in upgraded business data table A, upgraded business data table B, and upgraded business data table C, respectively. However, in the old business core system, data A, data B, and data C also exist in the original business data table M. In this case, upgraded business data table A, upgraded business data table B, and upgraded business data table C are the difference business data tables between the new business core system and the old business core system when responding to business needs.

[0037] In one possible implementation, for multiple upgraded business data tables and multiple original business data tables that are completely identical, the old business core system direct supply mode can be compatible. During data initialization, the data is directly converted into a business file that can be recognized by the downstream business processing equipment and unloaded to the corresponding transfer machine. The downstream business processing equipment directly obtains the corresponding business file from the transfer machine.

[0038] Specifically, the data conversion method further includes: a1: Compare multiple upgrade business data tables and multiple original business data tables to determine at least one target business data table that is identical to the multiple original business data tables.

[0039] a2: Convert at least one target business data table included in the upgrade business data table into a business file that can be recognized by the downstream business processing device, and send it to the downstream business processing device so that the downstream business processing device can use the corresponding business data to process the target business.

[0040] In this embodiment, from multiple upgraded business data tables of the new business core system responding to business processing requests, at least one target business data table that is identical to multiple original business data tables of the old business core system responding to business needs is determined. Based on the encoding format, delimiter, file name, etc. specified by the downstream business processing equipment, a business file is generated based on the at least one target business data table. The business file is then unloaded to the transfer machine, and the downstream business processing equipment can directly obtain the business file for processing the target business from the transfer machine.

[0041] The standard for upgrading the business data table to be the same as the original business data table is that the field attributes and the number of fields contained in the two tables are completely identical.

[0042] In one possible implementation, the configuration platform can also initialize the upgrade business data table in the new business core system. Specifically, it obtains and initializes the upgrade business data table corresponding to the business processing request from the new business core system; when a corresponding scheduling database script exists, it executes the scheduling database script to generate a data table file corresponding to the upgrade business data table and stores the data table file.

[0043] It is worth noting that when initializing multiple upgrade business data tables in the new core business system, it is necessary to call the corresponding SQL scripts for initialization and storage. First, it is necessary to check whether the SQL script exists. If the SQL script exists, it is executed. When storing the business data tables, it is necessary to read the SQL script, and then generate multiple TXT files based on the result set of the data table selection. The TXT files are then concatenated, and the data is imported into the database for storage by importing the TXT files.

[0044] S103. Control the configuration platform to convert the at least one differential business data table into a data file and send it to the data conversion device.

[0045] In this embodiment of the application, after identifying at least one difference business data table that differs between the new core business system and the old core business system, it is necessary to convert the at least one difference business data table into a data file in a format specified by the data conversion device, and then send it to the data conversion device.

[0046] In one possible implementation, the configuration platform sends one less differential business data table obtained from the new business core system to the data conversion device via a transfer machine. The configuration platform unloads the data file to the transfer machine, and the data conversion device obtains the data file from the transfer machine for data conversion.

[0047] The data file sending process is carried out through the data loading script (shell script) in the configuration platform. The data loading script (shell script) is invoked to obtain the data file from the transfer machine and load the data into the source layer data table of the data conversion device.

[0048] In one possible implementation, the data flowing through the configuration platform, data conversion equipment, and downstream business processing equipment is stored in the form of files, and the process of loading it into the database is also completed by reading the files.

[0049] Specifically, the at least one differential business data table is converted into a data file through the following steps: b1: Based on the file encoding method and file delimiter indicated by the data conversion device, convert the format of the at least one differential business data table to generate the data file; In this embodiment, at least one piece of differentiated business data is converted into a data file according to the specific requirements of the data conversion device, such as the file encoding method and file delimiter. The data is then transferred to the transfer machine in text or compressed file format and sent to the data conversion device via the transfer machine.

[0050] In one possible implementation, sending data files from the configuration platform to the data conversion device requires retrieving different files for processing. Therefore, during processing, it is necessary to check whether all files exist on the configuration platform.

[0051] Specifically, the step "converting the at least one differential business data table into a data file and sending it to the data conversion device" includes: c1: Check if there are any running files and text files in the execution data directory of the configuration platform that perform the format conversion process of the differential business data table.

[0052] c2: If both the executable file and the text file exist in the data directory of the configuration platform, convert the at least one differential business data table into a data file and send it to the data conversion device.

[0053] In one possible implementation, when importing data into the database, it is necessary to check whether there are runtime files and text files in the execution data directory that perform the format conversion process of the differential business data table. If they exist, at least one differential business data table is converted into a data file and sent to the data conversion device, which can then load data from the database.

[0054] Specifically, the corresponding .ok file is automatically detected in the specified directory. If the .ok file exists, the .txt file is detected. If the .txt file exists, the data is loaded.

[0055] In one possible implementation, a warning should be issued if the executable file and text file are missing.

[0056] Specifically, after the step of "detecting whether there are runtime files and text files for the format conversion process of the execution difference business data table in the runtime execution data directory of the configuration platform", the data conversion method further includes: d1: If the executable file or text file does not exist in the data directory of the configuration platform, determine that the data in at least one differential business data table is abnormal, and generate the corresponding data error message.

[0057] d2: If the number of times data error messages are generated within a preset time period exceeds a preset threshold, an abnormal alarm message will be generated.

[0058] In this embodiment of the application, if it is determined that there is no running file or text file in the corresponding data directory, and the data is found to have a problem, a data error message will be generated to indicate that the data loading has failed, and the data loading file detection process will be re-attempted. If the number of times the data error message is generated continuously within a preset time period exceeds a preset threshold, an abnormal alarm message will be generated to remind the staff to intervene and handle the situation.

[0059] Specifically, if the ok file or txt file is missing, or if there is a problem with the data, the job will report an error, the data loading will fail, and after 3 retries, an error will be reported, requiring manual intervention.

[0060] It is worth noting that the data is stored in the database in the following way: import the entire file and import the data into the database using the `import txt` command.

[0061] The data conversion process of the system in this application embodiment will be illustrated below with specific examples. Please refer to [link / reference]. Figure 2 , Figure 2 The following is a flowchart of the scheduler job execution process during the data conversion process provided in the embodiments of this application: Step 1 T1→T2: The virtual parent job (V_LIA_START) is automatically triggered by time.

[0062] Step 2 T2→T3: The virtual parent startup job is completed, triggering the data loading layer job.

[0063] Step 3 (T3→T4): Importing the data source into the database. The system automatically checks for corresponding "ok" files in the specified directory. If an "ok" file exists, it starts checking for "txt" files. If a "txt" file exists, it begins loading the data. If neither the "ok" nor the "txt" file exists, or if there is a data problem, the job will report an error, data loading will fail, and after three retries, a manual intervention will be required. Data storage mode: Full clear, full insert; import the "txt" file to import the data into the database.

[0064] Step 4 (T4→T5): Initialization of the data loading layer. An SQL script is designed here. After the data loading layer completes, the data initialization layer is automatically triggered, checking if the SQL script exists. If it does, the SQL script is executed. Data storage mode: Read the SQL script, select the result set to generate multiple TXT files, concatenate the TXT files, and import the data into the database using `import TXT files`.

[0065] Step 5 (T5→T6): After transforming the initialization layer data using the designed SQL script logic, load the data into the transformation layer. The data transformation layer is automatically triggered after the initialization layer finishes loading. It checks if the SQL script exists; if it does, it executes the SQL script; otherwise, it returns an error message. Data loading mode: Read the SQL script, select the result set to generate multiple TXT files, concatenate the TXT files, and import the data into the database using the `import` function.

[0066] Step 6 (T6→T7): The transformation layer is loaded, and the unloading layer automatically triggers the job. Count the amount of data in the transformation layer and generate an OK file; obtain data from different periods using the time parameter, export the data, and generate a TXT file.

[0067] Step 7 (T7→T8): After unloading the layers, the OK file and TXT file are automatically uploaded to the shuttle machine.

[0068] Step 8 (T5, T6 → T9): After the initialization and transformation layers are loaded, the job of transferring data to the historical database is automatically triggered. Data loading mode: If the data is incremental, the incremental data is loaded into the historical database table using the INSERT method; if the data is full data, the designed SQL script is read, the result set is selected to generate multiple TXT files, and the data is imported into the database by importing the TXT files.

[0069] For further details, please refer to Figure 3 , Figure 3 This is a flowchart illustrating an example of scheduling jobs during the data conversion process provided in an embodiment of this application. Figure 3 The examples of scheduled jobs during the data transformation process shown include: Step 1: The virtual parent job (V_LIA_START) is automatically triggered at time; Step 2: The virtual task for the liability group started successfully, triggering the data loading layer operation.

[0070] Step 3: The ALI_LIA model checks if the OK file is ready. If the OK file is ready, it initializes the data loading layer.

[0071] Step 4: The ALI_LIA model executes the initialization logic. If the initialization logic is successful, the data conversion logic is performed. If the data conversion fails, an error is reported after 3 retries, requiring manual intervention.

[0072] Step 5: If the BLI_LIA model is confirmed to have an initialization error, it needs to be debugged and then re-executed.

[0073] Step 6: Once the conversion layer is loaded, if the conversion logic executes successfully, the unloading layer will automatically trigger a job and generate an OK file; if the conversion logic reports an error, troubleshoot and re-execute.

[0074] Step 7: Once the data unloading is complete, the OK file and TXT file will be automatically uploaded to the transfer machine. If there is an error during data unloading, troubleshoot and re-execute the process.

[0075] Step 8: Synchronize data. Successfully synchronize data and OK files to the transfer machine. If a synchronization error occurs, troubleshoot and re-execute.

[0076] Step 9: Once the initialization layer and transformation layer are loaded, the job of transferring data to the historical database is automatically triggered, and the data in the new core initialization layer table is synchronized to the historical table; the data in the new core initialization layer table is synchronized to the historical table; and the data in the historical table is transferred to the data warehouse transformation layer table.

[0077] S104. Control the data conversion device to convert the at least one differential business data table into a corresponding original business data table, and generate a business file that can be recognized by the downstream business processing device and send it to the downstream business processing device.

[0078] In this embodiment, after receiving a data file sent by the configuration platform, the data device parses at least one difference data table from the data file, controls the data conversion device to convert the upgrade business data table into an original business data table that can be recognized by the downstream business processing device, and sends it to the downstream business processing device so that the downstream business processing device processes the target business according to the business data in the business file.

[0079] Specifically, the step "controlling the data conversion device to convert the at least one differential business data table into a corresponding original business data table, generating a business file recognizable by the downstream business processing device and sending it to the downstream business processing device" includes: e1: Control the data conversion device to receive the data file determined by the configuration platform based on the service requirements sent by the downstream service processing device.

[0080] e2: Control the data conversion device to convert at least one differential business data table included in the data file into a corresponding original business data table, and convert the original business data table into a business file that can be recognized by the downstream business processing device, and then send it to the downstream business processing device so that the downstream business processing device can process the target business based on the business data converted from the business file.

[0081] In one possible implementation, the data conversion device also obtains data from the ferry and schedules it through a data loading script (shell script) in the configuration platform to load the data into the data table of the data source layer of the data conversion device.

[0082] In one possible implementation, the data conversion device includes a data source layer, a data conversion layer, and a data delivery layer. The data source layer, data conversion layer, and data delivery layer convert the difference business data tables in the new business core system and the old business core system into the corresponding original business data tables.

[0083] Specifically, the step "converting at least one differential business data table included in the data file into a corresponding original business data table, and converting the original business data table into a business file recognizable by the downstream business processing device" includes: f1: Receive the data file sent by the configuration platform and convert the data file back into at least one differential business data table.

[0084] f2: Convert the at least one differential business data table into the corresponding original business data table.

[0085] f3: Convert the original business data table into the business file according to the data conversion rules indicated by the downstream business processing equipment.

[0086] In this embodiment, a data file sent by a configuration platform is received, and the data file is converted into at least one differential business data table that can be recognized by a data conversion device. The data in the at least one differential business data table is written into the data source layer in the data conversion device, and then the at least one differential business data table is converted into a corresponding original business data table. The original data table is then used to generate a business file according to the encoding format, delimiter, file name and other requirements specified by the downstream business processing device. The data is then unloaded to the transfer machine, and the downstream business processing device obtains the corresponding business file from the transfer machine for business processing.

[0087] In one possible implementation, converting the difference business data table into the corresponding original business data table involves writing the business data from the difference business data table into the original business data table.

[0088] Specifically, the step "converting the at least one differential business data table into a corresponding original business data table" includes: g1: Determine the table differences between the difference business data table and the corresponding original business data table, and determine the write data location of the data in the difference business data table in the original business data table.

[0089] g2: Write the data in the difference business data table according to the write data position to obtain the original business data table.

[0090] In this embodiment of the application, after determining the difference business data table, it is necessary to determine the table differences between each difference business data table and the original business data table. Here, the table differences include, but are not limited to, different writing positions of the same business data, different number of fields included in the table, and different positions of the same field in the business data table.

[0091] For example, the differences between each differential business data table and the original business data table could be that business data A and business data B exist in the same original business data table, but in the new core business system, business data A and business data B exist in two separate upgraded business data tables; or, the differential business data table includes 4 fields, while the original business data table has 5 fields; or, field W is in the third column of the differential business data table, while field W is in the fifth column of the original business data table.

[0092] In one possible implementation, after determining the differences between the difference business data table and the original business data table, it is necessary to determine the position of the business data in the difference business data table in the original business data table, and then write the business data in the difference business data table into the original business data table to complete the conversion from the difference business data table to the original business data table.

[0093] For example, business data A and business data B exist in the same original business data table. However, in the new core business system, business data A and business data B exist in two separate upgraded business data tables. In this case, it is determined that business data A is located in row X and column Y of the original business data table, and business data B is located in row M and column N of the original business data table. Business data A is written to row X and column Y of the original business data table, and business data B is written to row M and column N of the original business data table. Then, business data A and business data B are written into the same business data table, completing the transformation from the differentiated business data table to the original business data table.

[0094] It is worth noting that, for the embodiments of this application, the consideration is the writing and conversion of the same part of the business data in the new business core system and the old business core system. For business data added in the new business core system that does not exist in the old business core system, it does not participate in the data table conversion process (the business data added after the upgrade of the new business core system will not be processed by the downstream business processing equipment after it has not been adapted to the upgrade and update of the new business core system, so it does not need to be considered during the conversion).

[0095] In this embodiment, after converting the difference business data table to the original business data table, the data conversion device generates the corresponding business file according to the file encoding method, file delimiter, etc. required by the downstream business processing device and sends it to the downstream business processing device for business processing. In this way, during the transition period when the business core system is upgraded and the downstream business processing device has not been fully upgraded to adapt to the new business core system, the normal business processing of the downstream business processing device can be guaranteed.

[0096] The data conversion system and data conversion method provided in this application embodiment control configuration platform to receive business requests sent by downstream business processing equipment, determine multiple upgraded business data tables and multiple original business data tables in response to business processing requests from the new business core system and the old business core system, compare the multiple upgraded business data tables and multiple original business data tables, determine at least one difference business data table that differs from the multiple original business data tables, convert the at least one difference business data table into the corresponding original business data table through data conversion equipment, and then send it to the downstream business processing equipment for business processing.

[0097] In this application, after upgrading to the new business core system, based on the business processing requests sent by downstream business processing devices, at least one differing business data table is identified among the multiple original business data tables included in the old business core system and the multiple upgraded business data tables included in the new business core system when responding to the business requirements. This differing business data table is then converted into an original business data table recognizable by the downstream business processing devices using a data conversion device before being sent to them. This process converts the differing business data tables in the upgraded new business core system into original business data tables recognizable by the downstream business processing devices, preventing situations where the downstream business processing devices cannot recognize the business data tables in the upgraded new business core system. This ensures that business processing can continue during the transition period when the downstream business processing devices adapt to the new business core system, reducing the business processing downtime during system upgrades and improving the efficiency of system upgrades.

[0098] Based on the same inventive concept, this application also provides a system data conversion device corresponding to the system data conversion method. Since the principle of solving the problem by the system data conversion device in this application is similar to the data conversion device method of the system described above in this application, the implementation of the configuration platform can refer to the implementation of the method, and the repeated parts will not be described again.

[0099] Please see Figure 4 , Figure 4 This is a schematic diagram of the structure of a data conversion device for a system provided in an embodiment of this application, as shown below. Figure 4 As shown, the data conversion device 400 includes: Request receiving module 410 controls the configuration platform to receive service processing requests sent by the downstream service processing equipment; The difference data table determination module 420 controls the configuration platform to determine multiple upgraded business data tables and multiple original business data tables in response to the business processing request from the new business core system and the old business core system based on the business processing request, compare the multiple upgraded business data tables and multiple original business data tables, and determine at least one difference business data table that differs from the multiple original business data tables. The file sending module 430 controls the configuration platform to convert the at least one differential business data table into a data file and send it to the data conversion device. The data conversion module 440 controls the data conversion device to convert the at least one differential business data table into a corresponding original business data table, and generates a business file that can be recognized by the downstream business processing device and sends it to the downstream business processing device.

[0100] In one possible implementation, the file sending module 430 is used to convert the at least one differential business data table into a data file through the following steps: Based on the file encoding method and file delimiter indicated by the data conversion device, the format of the at least one differential business data table is converted to generate the data file.

[0101] In one possible implementation, when the file sending module 430 is used to convert the at least one differential business data table into a data file and send it to the data conversion device, the file sending module 430 is used to: Check whether there are runtime files and text files in the runtime execution data directory of the configuration platform that perform the format conversion process of the differential business data table; If both executable files and text files exist in the data directory of the configuration platform, the at least one differential business data table is converted into a data file and sent to the data conversion device.

[0102] In one possible implementation, the file sending module 430 is further configured to: If the executable file or text file does not exist in the data directory of the configuration platform, determine that the data in at least one differential business data table is abnormal, and generate the corresponding data error message; If the number of data error messages generated within a preset time period exceeds a preset threshold, an abnormal alarm message will be generated.

[0103] In one possible implementation, such as Figure 4 As shown, the data conversion device 400 further includes a file direct supply module 450, which is used for: By comparing multiple upgrade business data tables and multiple original business data tables, at least one target business data table that is identical to the multiple original business data tables is identified. At least one target business data table included in the upgrade business data table is converted into a business file that can be recognized by the downstream business processing device, and then sent to the downstream business processing device so that the downstream business processing device can use the corresponding business data to process the target business.

[0104] In one possible implementation, when the data conversion module 440 controls the data conversion device to convert the at least one differential business data table into a corresponding original business data table, and generates a business file recognizable by the downstream business processing device for transmission to the downstream business processing device, the data conversion module 440 is configured to: The data conversion device is controlled to receive the data file determined by the configuration platform based on the service requirements sent by the downstream service processing device; The data conversion device is controlled to convert at least one differential business data table included in the data file into a corresponding original business data table, and then converts the original business data table into a business file that can be recognized by the downstream business processing device, and sends it to the downstream business processing device so that the downstream business processing device processes the target business based on the business data converted from the business file.

[0105] In one possible implementation, when the data conversion module 440 converts at least one differential business data table included in the data file into a corresponding original business data table, and converts the original business data table into a business file recognizable by the downstream business processing device, the data conversion module 440 is configured to: Receive the data file sent by the configuration platform and convert the data file back into at least one differential business data table; Convert the at least one differential business data table into the corresponding original business data table; The original business data table is converted into the business file according to the data conversion rules indicated by the downstream business processing equipment.

[0106] In one possible implementation, when the data conversion module 440 is used to convert the at least one differential business data table into a corresponding original business data table, the data conversion module 440 is used to: Determine the table differences between the differential business data table and the corresponding original business data table, and determine the data writing location of the data in the differential business data table in the original business data table; The data in the differential business data table is written according to the write data position to obtain the original business data table.

[0107] In another possible implementation, this application also provides a data conversion system for upgrading the system; please refer to [link to relevant documentation]. Figure 5 , Figure 5 This is one of the structural diagrams of the data conversion system of the upgrade system provided in the embodiments of this application, such as... Figure 5 As shown, the data conversion system 500 includes a configuration platform 510, a data conversion device 520, and a downstream business processing device 530; The configuration platform 510 is used to receive service processing requests sent by the downstream service processing equipment; based on the service processing requests, it determines multiple upgraded service data tables and multiple original service data tables in response to the service processing requests from the new service core system and the old service core system, compares the multiple upgraded service data tables and multiple original service data tables, determines at least one different service data table that differs from the multiple original service data tables, and converts the at least one different service data table into a data file and sends it to the data conversion device; The data conversion device 520 is used to receive the data file sent by the configuration platform, convert at least one differential business data table included in the data file into the corresponding original business data table, convert the original business data table into a business file that can be recognized by the downstream business processing device, and then send it to the downstream business processing device. The downstream service processing device 530 is used to generate a service processing request and send it to the configuration platform after receiving the target service, and after receiving the service file sent by the data conversion device, convert the service file into corresponding service data and apply the service data to process the target service.

[0108] In one possible implementation, the configuration platform 510 is also used for: Based on the file encoding method and file delimiter indicated by the data conversion device, the format of the at least one differential business data table is converted to generate the data file.

[0109] In one possible implementation, the configuration platform 510 is also used for: Check if there are any executable files and text files in the execution data directory that perform the format conversion process for the differential business data tables; If both the executable file and the text file exist in the corresponding data directory, the at least one differential business data table is converted into a data file and sent to the data conversion device 520. If the corresponding data directory does not contain the executable file or the text file, determine that at least one of the difference business data tables is abnormal and generate the corresponding data error message; If the number of data error messages generated within a preset time period exceeds a preset threshold, an abnormal alarm message will be generated.

[0110] In one possible implementation, the configuration platform 510 includes a data initialization layer, the data initialization layer being used for: Obtain and initialize the upgrade business data table corresponding to the business requirements from the new business core system; When a corresponding scheduling database script exists, the scheduling database script is executed to generate a data table file corresponding to the upgrade business data table, and the data table file is stored.

[0111] In one possible implementation, the data initialization layer is further configured to: By comparing multiple upgrade business data tables and multiple original business data tables, at least one target business data table that is identical to the multiple original business data tables is identified. At least one target business data table included in the upgrade business data table is converted into a business file that can be recognized by the downstream business processing device 530 and sent to the downstream business processing device 530 so that the downstream business processing device 530 can use the corresponding business data to process the target business.

[0112] The specific processing steps for business data by the configuration platform 510 are described in detail in the embodiment of the system's data conversion method, and will not be repeated here.

[0113] In one possible implementation, please refer to Figure 6 , Figure 6 This is a second schematic diagram of the structure of the data conversion system of the upgrade system provided in the embodiments of this application, as shown below. Figure 6 As shown, the data conversion system 500 also includes a first shuttle 540 and a second shuttle 550; The first shuttle machine 540 is used to receive the data file sent by the configuration platform 510 and convert the data file to the data conversion device 520; The second shuttle 550 is used to receive the service file sent by the data conversion device 520 and forward the service file to the downstream service processing device 530.

[0114] Specifically, the configuration platform 510 sends at least one differential business data table obtained from the new business core system to the data conversion device via the first transfer machine 540. The configuration platform 510 unloads the data file to the first transfer machine 540, and the data conversion device 520 obtains the data file from the first transfer machine 540 for data conversion. The data file is converted into at least one differential business data table that the data conversion device 520 can recognize, and the data in the at least one differential business data table is written into the data pasting source layer in the data conversion device 520. Then, the at least one differential business data table is converted into the corresponding original business data table. The original data table is then used to generate a business file according to the encoding format, delimiter, file name, and other requirements specified by the downstream business processing device 530, and unloaded to the second transfer machine 550. The downstream business processing device 530 obtains the corresponding business file from the second transfer machine 550 for business processing.

[0115] In one possible implementation, such as Figure 7 As shown, the data conversion device 520 includes a data source layer, a data conversion layer, and a data delivery layer; The data source layer is used to receive data files sent by the configuration platform 510, convert the data files back into at least one differential service data table, and send the at least one differential service data table to the data conversion layer. The data conversion layer is used to convert the at least one differential business data table into a corresponding original business data table, and send the original business data table to the data delivery layer. The data delivery layer is used to convert the original business data table into the business file according to the data conversion rules indicated by the downstream business processing device, and send the business file to the downstream business processing device 530.

[0116] The data conversion layer is specifically used for: Determine the table differences between the differential business data table and the corresponding original business data table, and determine the data writing location of the data in the differential business data table in the original business data table; The data in the differential business data table is written according to the write data position to obtain the original business data table.

[0117] The specific processing steps for business data in the data source layer, data conversion layer, and data distribution layer of the data conversion device 520 are described in detail in the embodiment of the system's data conversion method, and will not be repeated here.

[0118] In one possible implementation, the data transformation system 500 further includes a historical database (not shown in the figure), which is used for: The storage includes the original business data table converted by the data conversion device 520 and the upgraded business data table initialized by the data initialization storage layer; or; After restoring the initialized upgrade business data table, it is sent to the configuration platform 510 in the process of initializing the upgrade business data table in the new business core system.

[0119] Specifically, the historical table database stores the original business data tables in the old business core system and the upgraded business data tables in the newly initialized business core system. This allows for direct retrieval of the processed business data tables later (avoiding the need to request data from the new business core system when encountering the same business request). Simultaneously, the historical table database can restore the initialized business data in the tables of the upgraded new business core system. When retrieving the same business data from the historical table database, the initialized business data in the tables of the new business core system is restored and returned to the data initialization layer for subsequent transformation processing.

[0120] The data conversion system and data conversion device provided in this application embodiment control configuration platform to receive service requests sent by downstream service processing equipment, determine multiple upgraded service data tables and multiple original service data tables in response to the service processing requests from the new service core system and the old service core system, compare the multiple upgraded service data tables and multiple original service data tables, determine at least one difference service data table that differs from the multiple original service data tables, convert the at least one difference service data table into the corresponding original service data table through the data conversion device, and then send it to the downstream service processing equipment for service processing.

[0121] In this application, after upgrading to the new business core system, based on the business processing requests sent by downstream business processing devices, at least one differing business data table is identified among the multiple original business data tables included in the old business core system and the multiple upgraded business data tables included in the new business core system when responding to the business requirements. This differing business data table is then converted into an original business data table recognizable by the downstream business processing devices using a data conversion device before being sent to them. This process converts the differing business data tables in the upgraded new business core system into original business data tables recognizable by the downstream business processing devices, preventing situations where the downstream business processing devices cannot recognize the business data tables in the upgraded new business core system. This ensures that business processing can continue during the transition period when the downstream business processing devices adapt to the new business core system, reducing the business processing downtime during system upgrades and improving the efficiency of system upgrades.

[0122] Please see Figure 7 , Figure 7 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this application. Figure 7 As shown, the electronic device 700 includes a processor 710, a memory 720, and a bus 730.

[0123] The memory 720 stores machine-readable instructions executable by the processor 710. When the electronic device 700 is running, the processor 710 communicates with the memory 720 via the bus 730. When the machine-readable instructions are executed by the processor 710, they can perform the operations described above. Figure 1 The steps of the data conversion method of the system in the method embodiment shown are described in detail in the method embodiment, and will not be repeated here.

[0124] This application also provides a computer-readable storage medium storing a computer program, which, when executed by a processor, can perform the above-described actions. Figure 1The steps of the data conversion method of the system in the method embodiment shown are described in detail in the method embodiment, and will not be repeated here.

[0125] Those skilled in the art will understand that, for the sake of convenience and brevity, the specific working processes of the systems, devices, and units described above can be referred to the corresponding processes in the foregoing method embodiments, and will not be repeated here.

[0126] In the several embodiments provided in this application, it should be understood that the disclosed systems, apparatuses, and methods can be implemented in other ways. The apparatus embodiments described above are merely illustrative. For example, the division of units is only a logical functional division, and in actual implementation, there may be other division methods. Furthermore, multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Additionally, the shown or discussed mutual couplings, direct couplings, or communication connections may be through some communication interfaces; indirect couplings or communication connections between devices or units may be electrical, mechanical, or other forms.

[0127] The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the units can be selected to achieve the purpose of this embodiment according to actual needs.

[0128] In addition, the functional units in the various embodiments of this application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit.

[0129] If the aforementioned functions are implemented as software functional units and sold or used as independent products, they can be stored in a processor-executable, non-volatile, computer-readable storage medium. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, or a portion of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of this application. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.

[0130] Finally, it should be noted that the above-described embodiments are merely specific implementations of this application, used to illustrate the technical solutions of this application, and not to limit them. The scope of protection of this application is not limited thereto. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that any person skilled in the art can still modify or easily conceive of changes to the technical solutions described in the foregoing embodiments, or make equivalent substitutions for some of the technical features, within the scope of the technology disclosed in this application. Such modifications, changes, or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this application, and should all be covered within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

Claims

1. A systematic data conversion method, characterized in that, A data conversion system applied to an upgrade system, the data conversion system including a configuration platform, downstream business processing equipment, and data conversion equipment; the data conversion method includes: The configuration platform is controlled to receive service processing requests sent by the downstream service processing equipment. Based on the business processing request, the configuration platform determines multiple upgraded business data tables and multiple original business data tables in response to the business processing request from the new business core system and the old business core system. It then compares the multiple upgraded business data tables and multiple original business data tables to determine at least one differing business data table that differs from the multiple original business data tables. The configuration platform is controlled to convert the at least one differential business data table into a data file and send it to the data conversion device. The data conversion device is controlled to convert the at least one differential business data table into a corresponding original business data table, and to generate a business file that can be recognized by the downstream business processing device and send it to the downstream business processing device.

2. The data conversion method according to claim 1, characterized in that, The at least one differential business data table is converted into a data file using the following steps: Based on the file encoding method and file delimiter indicated by the data conversion device, the format of the at least one differential business data table is converted to generate the data file.

3. The data conversion method according to claim 1, characterized in that, The step of converting the at least one differential business data table into a data file and sending it to the data conversion device includes: Check whether there are runtime files and text files in the runtime execution data directory of the configuration platform that perform the format conversion process of the differential business data table; If both executable files and text files exist in the data directory of the configuration platform, the at least one differential business data table is converted into a data file and sent to the data conversion device.

4. The data conversion method according to claim 3, characterized in that, After detecting whether the runtime file and text file for the format conversion process of the differential business data table exist in the runtime execution data directory of the configuration platform, the data conversion method further includes: If the executable file or text file does not exist in the data directory of the configuration platform, determine that the data in at least one differential business data table is abnormal, and generate the corresponding data error message; If the number of data error messages generated within a preset time period exceeds a preset threshold, an abnormal alarm message will be generated.

5. The data conversion method according to claim 1, characterized in that, The data conversion method further includes: By comparing multiple upgrade business data tables and multiple original business data tables, at least one target business data table is identified that is identical to the multiple original business data tables in the multiple upgrade business data tables. At least one target business data table included in the upgrade business data table is converted into a business file that can be recognized by the downstream business processing device, and then sent to the downstream business processing device so that the downstream business processing device can use the corresponding business data to process the target business.

6. The data conversion method according to claim 1, characterized in that, The process of controlling the data conversion device to convert the at least one differential business data table into a corresponding original business data table, generating a business file recognizable by the downstream business processing device, and sending it to the downstream business processing device includes: The data conversion device is controlled to receive the data file determined by the configuration platform based on the service requirements sent by the downstream service processing device; The data conversion device is controlled to convert at least one differential business data table included in the data file into a corresponding original business data table, and then converts the original business data table into a business file that can be recognized by the downstream business processing device, and sends it to the downstream business processing device so that the downstream business processing device processes the target business based on the business data converted from the business file.

7. The data conversion method according to claim 6, characterized in that, The step of converting at least one differential business data table included in the data file into a corresponding original business data table, and converting the original business data table into a business file recognizable by the downstream business processing equipment, includes: Receive the data file sent by the configuration platform and convert the data file back into at least one differential business data table; Convert the at least one differential business data table into the corresponding original business data table; The original business data table is converted into the business file according to the data conversion rules indicated by the downstream business processing equipment.

8. The data conversion method according to claim 7, characterized in that, The step of converting the at least one differential business data table into a corresponding original business data table includes: Determine the table differences between the differential business data table and the corresponding original business data table, and determine the data writing location of the data in the differential business data table in the original business data table; The data in the differential business data table is written according to the write data position to obtain the original business data table.

9. A data conversion system for an upgrade system, characterized in that, The data conversion system includes a configuration platform, data conversion equipment, and downstream business processing equipment. The configuration platform is used to receive service processing requests sent by the downstream service processing equipment; based on the service processing requests, it determines multiple upgraded service data tables and multiple original service data tables in response to the service processing requests from the new service core system and the old service core system, compares the multiple upgraded service data tables and multiple original service data tables, determines at least one difference service data table in the multiple upgraded service data tables that differs from the multiple original service data tables, and converts the at least one difference service data table into a data file and sends it to the data conversion equipment; The data conversion device is used to receive a data file sent by the configuration platform, convert at least one differential business data table included in the data file into a corresponding original business data table, convert the original business data table into a business file that can be recognized by the downstream business processing device, and then send it to the downstream business processing device. The downstream service processing device is used to generate a service processing request and send it to the configuration platform after receiving the target service. After receiving the service file sent by the data conversion device, it converts the service file into corresponding service data and applies the service data to process the target service.

10. An electronic device, characterized in that, include: The system includes a processor, a storage medium, and a bus, wherein the storage medium stores machine-readable instructions executable by the processor, and when the electronic device is in operation, the processor communicates with the storage medium via the bus, and the processor executes the machine-readable instructions to perform the steps of the data conversion method of the system as described in any one of claims 1 to 8.

Citation Information

Patent Citations

  • Method and device for processing data in real-time memory database system

    CN102722540A

  • Data synchronization method, system and device and computer readable storage medium

    CN115062090A