A food production planning management method and system
Through the food production planning management methods and systems, and the use of modules such as inventory databases and capacity analysis units, the problem of difficulty in managing large-scale composite food production plans in the traditional food production industry is solved, and the effective management of production plans and the improvement of production efficiency is achieved.
Patent Information
- Application Number
- CN202310004285.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-01-03
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-01-03
AI Technical Summary
It is difficult for the traditional food production industry to effectively manage large-scale composite food production plans, especially when the types of raw materials and order requirements are complicated, relying solely on experience operations cannot meet production needs.
Adopt a food production planning management method and system, including inventory database, order input unit, capacity analysis unit, complete analysis unit and dispatch unit, and use barcode or two-dimensional Codes are monitored and verified in real time to ensure production order and planning.
It realizes effective management of food production plans, ensures production order and planning arrangements, improves production efficiency and inventory monitoring, reduces negotiation needs with customers, and improves the quantifiable reference and real-time monitoring capabilities of production.
Smart Images

Figure CN116128419B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent food manufacturing, and in particular to a food production plan management method and system. Background Art
[0002] In traditional food production industries, production plans are controlled by the experience of managers. However, for large-scale complex food production companies, there are many products to be processed, the types of raw materials required for processing products are complicated, and the requirements contained in the orders are also very messy. Simply relying on experience can no longer meet the management of large-scale and multi-variety food processing plans of existing food companies. Summary of the invention
[0003] The purpose of the present invention is to provide a food production plan management method, which has the effect of facilitating the formulation of production plans.
[0004] The above technical objectives of the present invention are achieved through the following technical solutions: A food production plan management method, characterized in that it includes the following steps:
[0005] S1: Get orders from customers;
[0006] S2: Check product inventory;
[0007] S3: If the product inventory meets the order requirements, the product will be shipped directly; if the product inventory cannot meet the order, a production list will be made based on the difference;
[0008] S4: Analyze production capacity based on production lists and customer order deadlines;
[0009] S5: If the factory's production capacity cannot meet the production list requirements within the specified time limit, negotiate with the customer through the business department; if the factory's production capacity can meet the production list requirements within the specified time limit, conduct pre-production preparations and formulate a production plan;
[0010] S6: Pre-production preparation includes raw material procurement and raw material quality inspection;
[0011] S7: Production planning includes making a dispatch list and dispatching work;
[0012] S8: Follow up and urge the order.
[0013] The present application also provides a system for implementing a food production planning management method, comprising an inventory database, an order input unit, a capacity analysis unit, a complete set analysis unit, and a dispatch unit;
[0014] The inventory database includes an inventory information storage unit and a product production information unit; the inventory information storage unit is used to store real-time inventory material information, the inventory material information includes product inventory information and raw material inventory information; the product production information unit is used to store and update product data, the product data includes product name, type and quantity of raw materials required for unit quantity of products, and time required to produce unit product;
[0015] The order input unit is used to input order information, the order information includes product name, order quantity and required delivery date, and the order input unit is connected to the capacity analysis unit;
[0016] The capacity analysis unit is connected to the inventory information storage unit. The capacity analysis unit is used to determine whether the capacity of the factory can meet the production list requirements within the specified time limit and generate an order list. The judgment formula is: Q = (shipping date - ordering date - replenishment time) * time required to produce a unit product + product inventory - order quantity. If the Q value is a positive number, the capacity of the factory can meet the production list requirements within the specified time limit, and the order list is sent to the complete set analysis unit. The order list includes product name, order quantity, shipping date, product unit price, product total price and order date. The order date is the date of the day; if the Q value is a negative number, the capacity of the factory cannot meet the production list requirements within the specified time limit.
[0017] The complete set analysis unit is connected to the capacity analysis unit and the inventory information storage unit, and the complete set analysis unit is used to analyze whether the product inventory meets the delivery requirements and whether the raw material inventory is sufficient to produce the number of products required by the order; at the same time, a list of pending work is generated and sent to the dispatching unit, the list of pending work includes material name, material status, inventory quantity and order difference, and the material status includes order to be shipped, full material to be produced and shortage of material to be supplemented;
[0018] The dispatching unit is used to generate a delivery order by selecting products in the list to be dispatched that are sufficient, generate a production order by selecting products in the list to be dispatched that are insufficient but have sufficient raw materials, and generate a purchase order by selecting products in the list to be dispatched that are insufficient and have insufficient raw materials.
[0019] By adopting the above technical solution, the setting includes an inventory database to automatically count material inventory information and various production factors, an order input unit to collect customer order information, and a capacity analysis unit and a complete set analysis unit to automatically sort out which products can be shipped directly and which orders can be met by the factory's production capacity, so as to arrange production; which orders cannot be met by the factory's production capacity, and require negotiation between the business department and the customer, so as to provide a quantitative reference for the production sequence and plan arrangement; and the dispatching unit dispatches the delivery order, production work order and purchase work order.
[0020] The present invention is further configured as follows: a barcode or a two-dimensional code is provided on the packaging of the unit raw materials and the unit product, and a code reader connected to the inventory information storage unit is provided in the warehouse.
[0021] By adopting the above technical solution, barcodes or QR codes are set on the packaging of raw materials and unit products. Whenever raw materials and products enter or leave the warehouse, they are scanned by a barcode reader, so that the inventory information of raw materials and products can be monitored in real time, thereby providing a quantitative reference for product delivery and production order dispatch.
[0022] The present invention is further configured as follows: a second code reader and a third code reader are respectively provided at the raw material entry end and the finished product discharge end of the production line, and the second code reader and the third code reader are respectively connected to the complete set of analysis units.
[0023] By adopting the above technical solution, the raw materials are verified by comparing the difference between code reader one and code reader two, and the verification of the products after the implantation of the products is completed. The raw materials scanned by code reader two indicate that the corresponding products are in production; the products passed by code reader three indicate that the corresponding products have completed production, thereby realizing real-time monitoring of product production efficiency and facilitating timely order reminders.
[0024] The present invention is further configured as follows: the material status also includes a production order has been issued and production is in progress.
[0025] The beneficial effects of the present invention are:
[0026] 1. The settings include the inventory database to automatically count the material inventory information and various production factors, and the order input unit to collect customer order information;
[0027] 2. Set up the capacity analysis unit and the complete set analysis unit to automatically sort out which products can be shipped directly and which orders can be met by the factory's capacity, so as to arrange production; for which orders cannot be met by the factory's capacity, the business department needs to negotiate with the customer, so as to provide quantitative reference for the production sequence and plan arrangement;
[0028] 3. Set barcodes or QR codes on the packaging of raw materials and unit products. Whenever raw materials and products enter or leave the warehouse, they are scanned by a barcode reader, so that the inventory information of raw materials and products can be monitored in real time, thereby providing a quantitative reference for product delivery and production order dispatch. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0030] Figure 1 It is a flow chart of the food production planning management method of this embodiment. DETAILED DESCRIPTION
[0031] The technical solution of the present invention will be clearly and completely described below in conjunction with specific embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] Embodiment, a food production plan management method, comprising the following steps:
[0033] S1: Get orders from customers;
[0034] S2: Check product inventory;
[0035] S3: If the product inventory meets the order requirements, the product will be shipped directly; if the product inventory cannot meet the order, a production list will be made based on the difference;
[0036] S4: Analyze production capacity based on production lists and customer order deadlines;
[0037] S5: If the factory's production capacity cannot meet the production list requirements within the specified time limit, negotiate with the customer through the business department; if the factory's production capacity can meet the production list requirements within the specified time limit, conduct pre-production preparations and formulate a production plan;
[0038] S6: Pre-production preparation includes raw material procurement and raw material quality inspection;
[0039] S7: Production planning includes making a dispatch list and dispatching work;
[0040] S8: Follow up and urge the order.
[0041] The present application also provides a food production planning management system, including an inventory database, an order input unit, a capacity analysis unit, a complete set analysis unit and a dispatch unit;
[0042] The inventory database includes an inventory information storage unit and a product production information unit; the inventory information storage unit is used to store real-time inventory material information, and the inventory material information includes product inventory information and raw material inventory information; the product production information unit is used to store and update product data, and the product data includes product name, type and quantity of raw materials required for unit quantity of products, and time required to produce unit product;
[0043] The order input unit is used to input order information, including product name, order quantity and required delivery date. The order input unit is connected to the capacity analysis unit;
[0044] The capacity analysis unit is connected to the inventory information storage unit. The capacity analysis unit is used to determine whether the factory's capacity can meet the production list requirements within the specified time limit and generate an order list. The judgment formula is: Q = (shipping date - ordering date - replenishment time) * time required to produce a unit product + product inventory - order quantity. If the Q value is a positive number, the factory's capacity can meet the production list requirements within the specified time limit, and the order list is sent to the complete set analysis unit. The order list includes product name, order quantity, shipping date, product unit price, product total price and order date, and the order date is the date of the day; if the Q value is a negative number, the factory's capacity cannot meet the production list requirements within the specified time limit;
[0045] The complete set analysis unit is connected with the capacity analysis unit and the inventory information storage unit. The complete set analysis unit is used to analyze whether the product inventory meets the delivery requirements and whether the raw material inventory is sufficient to produce the number of products required by the order; at the same time, a work list to be dispatched is generated and sent to the dispatch unit. The work list to be dispatched includes material name, material status, inventory quantity and order difference. The material status includes order to be shipped, full material to be produced, shortage of material to be supplemented, production order has been dispatched and production is in progress;
[0046] The dispatch unit is used to generate and dispatch delivery orders for products that are sufficient in the list to be dispatched, generate and dispatch production orders for products that are insufficient but have sufficient raw materials, and generate and dispatch purchase orders for products that are insufficient and have insufficient raw materials in the list to be dispatched.
[0047] The packaging of unit raw materials and unit products are both provided with barcodes or QR codes, and a code reader 1 connected to the inventory information storage unit is provided in the warehouse. Code readers 2 and 3 are provided at the raw material inlet and finished product outlet of the production line, respectively, and code readers 2 and 3 are respectively connected to the complete set analysis unit.
[0048] When using the food production planning management system, enter the product order through the order input unit, enter the product name, order quantity and required delivery date, the capacity analysis unit and the complete set analysis unit automatically calculate which products can be shipped directly, for products that can be shipped directly, send a signal to the complete set analysis unit, dispatch the delivery order in the dispatch list and display the order to be shipped in the status bar; for which orders the production capacity of the factory can meet the requirements, for raw materials that meet the production capacity of the factory, the complete set analysis unit generates a list of pending dispatches, and distributes it to the mobile receiving end of each production personnel through the dispatch unit to arrange production; for which orders the production capacity of the factory cannot meet the requirements, the business department and the customer will negotiate for the orders that cannot meet the requirements. By comparing the difference between the raw materials of barcode reader 1 and barcode reader 2, the raw materials are verified, and the products that have been completed are verified. The raw materials scanned by barcode reader 2 indicate that the corresponding products are in production; the products that pass through barcode reader 3 indicate that the corresponding products have completed production, thereby realizing real-time monitoring of product production efficiency and facilitating timely order reminders.
Claims
1. A food production planning management method, characterized in that: The following steps are involved: S1: Get orders from customers; S2: Check product inventory; S3: If the product inventory meets the order requirements, the delivery order is directly issued; If the product inventory cannot meet the order, a production list will be made based on the difference; S4: Analyze production capacity based on production lists and customer order deadlines; S5: If the factory's production capacity cannot meet the production list requirements within the specified time limit, negotiate with the customer through the business department; If the factory's production capacity can meet the production list requirements within the specified time limit, pre-production preparations will be carried out and a production plan will be formulated; S6: Pre-production preparation includes raw material procurement and raw material quality inspection; S7: Production planning includes making a dispatch list and dispatching work; S8: Follow up and urge the order; It includes inventory database, order input unit, capacity analysis unit, complete set analysis unit, dispatch unit and mobile receiving terminal; The inventory database includes an inventory information storage unit and a product production information unit; The inventory information storage unit is used to store real-time inventory material information, and the inventory material information includes product inventory information and raw material inventory information; The product production information unit is used to store and update product data, wherein the product data includes product name, type and quantity of raw materials required for a unit quantity of the product, and time required to produce a unit of the product; The order input unit is used to input order information, the order information includes product name, order quantity and required delivery date, and the order input unit is connected to the capacity analysis unit; The capacity analysis unit is connected to the inventory information storage unit. The capacity analysis unit is used to determine whether the capacity of the factory can meet the production list requirements within the specified time limit and generate an order list. The judgment formula is: Q = (shipping date - ordering date - replenishment time) * time required to produce a unit product + product inventory - order quantity. If the Q value is a positive number, the capacity of the factory can meet the production list requirements within the specified time limit, and the order list is sent to the complete set analysis unit. The order list includes product name, order quantity, shipping date, product unit price, product total price and order date. The order date is the date of the day; if the Q value is a negative number, the capacity of the factory cannot meet the production list requirements within the specified time limit; The complete set analysis unit is connected with the capacity analysis unit and the inventory information storage unit, and the complete set analysis unit is used to analyze whether the product inventory meets the delivery requirements and whether the raw material inventory is sufficient to produce the number of products required by the order; at the same time, a work list to be dispatched is generated and sent to the dispatch unit, and the work list to be dispatched includes material name, material status, inventory quantity, order difference and remaining time, and the material status includes order to be shipped, full material to be produced and shortage of material to be supplemented; The dispatching unit is used to select products in the to-be-dispatched list that are sufficient to generate and dispatch a delivery order, select products in the to-be-dispatched list that are insufficient but raw materials are sufficient to generate and dispatch a production order, and select products in the to-be-dispatched list that are insufficient and raw materials are insufficient to generate and dispatch a purchase order; The packaging of the unit raw materials and the packaging of the unit products are both provided with a barcode or a QR code, and a barcode reader 1 connected to the inventory information storage unit is provided in the warehouse; The raw material entry end and the finished product discharge end of the production line are respectively provided with code reader two and code reader three.
2. The system of the food production plan management method according to claim 1, characterized in that: The material status also includes the production order has been dispatched and production is in progress.
