A method and system for automatically generating dispatch logs in a networked command and control process.

By adopting a networked platform to automatically generate dispatch logs in the power system, the problem of ineffective processing of dispatch logs has been solved, thereby improving the operational safety and stability of the power system and the efficiency of information management.

CN116362517BActive Publication Date: 2026-11-10STATE GRID HEBEI ELECTRIC POWER CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310351458.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-04
Publication Date
2026-11-10
Estimated Expiration
2043-04-04

AI Technical Summary

Technical Problem

In the process of networked command and control of power systems, dispatch logs and recorded information cannot be effectively distinguished and processed, resulting in reduced operational safety and stability.

Method used

By automatically generating scheduling logs, a networked platform is used for setting up, reviewing, pre-issuing, and executing tickets, recording the number of expedited flags, and storing them hierarchically in conjunction with risk flags, thus achieving automated management of scheduling logs and recorded information.

Benefits of technology

Effectively distinguishing and processing dispatch logs improves the operational safety and stability of the power system and enhances information management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116362517B_ABST
    Figure CN116362517B_ABST
Patent Text Reader

Abstract

This invention relates to the field of electrical and electronic equipment technology, and more specifically, to a method and system for automatically generating dispatch logs in a networked command and control process. The solution includes initiating a dispatch process, setting up a draft ticket on a networked platform, starting the execution of the draft ticket, generating a dispatch log, recording information during execution, recording the number of expedited execution markers, and setting upper-level, middle-level, and lower-level risk markers. Based on the number of drafted expedited markers, the number of reviewed expedited markers, the number of pre-issued expedited markers, the number of arrival expedited markers, and the number of execution expedited markers, combined with the upper-level, middle-level, and lower-level risk markers, the corresponding dispatch logs and recorded information are automatically stored. This solution adaptively manages a large amount of dispatch logs and recorded information, improving the operational safety and stability of the low-power system through effective differentiation and processing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of electrical and electronic equipment technology, and more specifically, to a method and system for automatically generating scheduling logs for networked command processes. Background Technology

[0002] The power system is a vast system. In recent years, with the improvement of people's living standards, the demand for a more abundant and stable power supply has been constantly rising. In order to achieve safe and stable control of the power system, a large number of advanced technologies have been applied to the operation and management of the power system. The development of information technology, Internet technology, and power electronics technology has enabled the recording of events to no longer rely on manual and inefficient paper materials, but to be transformed into electronic documents and storage devices, greatly improving the efficiency of event recording.

[0003] Prior to the present invention, existing technologies have gradually shifted towards managing the operation and control of power systems based on digital and intelligent equipment. However, the power system is a huge system with complex and diverse internal equipment. During the networked command process, a large number of dispatch logs and recorded information will be generated. If they cannot be effectively distinguished and processed, they may hinder various dispatch and control operations and reduce the operational safety and stability of the power system. Summary of the Invention

[0004] In view of the above problems, this invention proposes a method and system for automatically generating scheduling logs in a networked command process, which adaptively manages a large amount of scheduling logs and record information, and improves the operational safety and stability of the low-power system through effective differentiation and processing.

[0005] According to a first aspect of the present invention, a method for automatically generating scheduling log records for networked command processes is provided.

[0006] In one or more embodiments, preferably, the method for automatically generating scheduling log records in a networked command process includes:

[0007] Initiate the scheduling process, set up the draft ticket on the networked platform, and record the number of draft expedited flags;

[0008] Review the content of the draft ticket, issue a review completion order, and record the number of expedited review markers;

[0009] After receiving the approval completion order, the network platform will pre-issue the draft ticket content to the substation and record the number of expedited pre-issue markers;

[0010] The substation completes the receipt of the draft ticket through a networked platform, automatically reports the arrival status, and records the number of urgent arrival markers.

[0011] The execution of the drafted ticket begins, a scheduling log is generated, and information records are kept during the execution process. The number of expedited execution flags is recorded, and upper-level risk flags, middle-level risk flags, and lower-level risk flags are set.

[0012] Based on the proposed number of expedited flags, the number of expedited review flags, the number of expedited pre-issuance flags, the number of expedited arrival flags, and the number of expedited execution flags, combined with the upper-layer risk flags, the middle-layer risk flags, and the lower-layer risk flags, the corresponding scheduling logs and record information are automatically stored.

[0013] In one or more embodiments, preferably, the initiation of the scheduling process, which involves setting up ticket drafting on a networked platform and recording the number of draft expedited flags, specifically includes:

[0014] Set the operation ticket information on the ticket drafting interface;

[0015] On the network platform, set the number of expedited flags for the already configured operation ticket information.

[0016] In one or more embodiments, preferably, the step of reviewing the content of the proposed ticket, issuing a review completion command, and recording the number of expedited review markers specifically includes:

[0017] The shift leader obtains the draft ticket content through the review interface on the online platform and conducts online review.

[0018] After the review is approved, set the number of expedited review flags.

[0019] In one or more embodiments, preferably, after receiving the review completion command, the network platform pre-issues the content of the draft invoice to the substation and records the number of expedited pre-issue markers, specifically including:

[0020] After the review is approved, the shift leader can click the pre-issue button on the online platform;

[0021] Within the networked platform, the ticket execution status is automatically changed from "not pre-issued" to "in pre-issued";

[0022] The shift leader sets the number of expedited pre-issuance markers for the draft tickets in the pre-issuance process by clicking on the network platform.

[0023] In one or more embodiments, preferably, the substation completes the receipt of the draft ticket content through a networked platform, automatically reports arrival status, and records the number of expedited arrival markers, specifically including:

[0024] Within the factory / station, the contents of the draft tickets in the pre-issuance status are signed and received through a networked platform;

[0025] The person in charge of the plant / station changed the status of the draft ticket to "pending order".

[0026] The plant / station manager sets the number of urgent arrival markers and sets the pending order status to "forward to execution" one by one as needed;

[0027] After the execution is completed, the content of the draft ticket is automatically reported to the destination through a network platform.

[0028] In one or more embodiments, preferably, the execution of the initial drafting of the ticket forms a scheduling log, records information during the execution process, records the number of expedited execution markers, and sets upper-level risk markers, middle-level risk markers, and lower-level risk markers, specifically including:

[0029] The process of drafting the ballot begins. An execution method is selected, including telephone execution and online execution.

[0030] Obtain all operational data from the drafting of the ticket to its execution to form a scheduling log;

[0031] Record information during the execution process and record the number of expedited execution markers;

[0032] The dispatcher sets the upper-level risk marker;

[0033] Mid-level risk markers are set by on-site operations monitoring personnel;

[0034] Lower-level risk markers are set up by station personnel.

[0035] In one or more embodiments, preferably, the step of automatically storing the corresponding scheduling logs and record information based on the proposed expedited flag count, the reviewed expedited flag count, the pre-issued expedited flag count, the arriving expedited flag count, and the execution expedited flag count, combined with the upper-layer risk flag, the middle-layer risk flag, and the lower-layer risk flag, specifically includes:

[0036] The number of expedited tags is calculated using the first calculation formula based on the proposed number of expedited tags, the reviewed number of expedited tags, the pre-issued number of expedited tags, the arriving expedited tags, and the executed expedited tags.

[0037] Based on the upper-level risk marker, the middle-level risk marker, and the lower-level risk marker, the risk marker is calculated using the second calculation formula;

[0038] The expedited normalized index is calculated using the third formula, and the risk normalized index is calculated using the fourth formula.

[0039] The composite index is calculated using the fifth calculation formula, and the composite marker is set using the sixth calculation formula;

[0040] If the risk normalization index is greater than 50, the risk flag is set to 1; otherwise, the risk flag is set to 0.

[0041] When the risk flag is set to 1 and the comprehensive flag is 2, the corresponding scheduling log and record information are set to the first priority. When the risk flag is set to 0 and the comprehensive flag is 2, the corresponding scheduling log and record information are set to the second priority. Both the first and second priorities are stored, with the first priority being stored first.

[0042] When the risk flag is set to 1 and the comprehensive flag is not 2, the corresponding scheduling log and record information are set to the third priority, and the information marked as emergency in the scheduling log and record information corresponding to the third priority is stored first.

[0043] When the risk flag is set to not be 1 and the comprehensive flag is not 2, the corresponding scheduling log and record information are set to the fourth priority, and the data in the fourth priority are stored in descending order of the comprehensive flag.

[0044] The first calculation formula is:

[0045] ZB = B1 + B2 + B3 + B4 + B5

[0046] Wherein, ZB is the number of expedited tags, B1 is the number of proposed expedited tags, B2 is the number of reviewed expedited tags, B3 is the number of pre-issued expedited tags, B4 is the number of arriving expedited tags, and B5 is the number of executed expedited tags.

[0047] The second calculation formula is:

[0048] F = K1 × S + K2 × Z + K3 × X

[0049] Wherein, F is the risk marker, S is the upper-level risk marker, Z is the middle-level risk marker, X is the lower-level risk marker, K1 is the upper-level correction coefficient, K2 is the middle-level correction coefficient, and K3 is the lower-level correction coefficient;

[0050] The third calculation formula is:

[0051] ZBz=100×(ZB-ZB MIN ) / (ZB MAX -ZB MIN )

[0052] Where ZBz is the expedited normalization exponent, ZB MAX ZB is the maximum number of urgent markers. MIN This represents the minimum number of urgent markings.

[0053] The fourth calculation formula is:

[0054] Fz = 100 × (F - Fz) MIN ) / (Fz MAX -Fz MIN )

[0055] Where Fz is the risk normalization index, Fz MAX Fz represents the maximum value of the risk marker. MIN The minimum value for risk labeling;

[0056] The fifth calculation formula is:

[0057] ZH=ZBz+Fz

[0058] Wherein, ZH is the comprehensive index;

[0059] The sixth calculation formula is:

[0060]

[0061] Where d is the composite marker;

[0062] The seventh calculation formula is:

[0063] Fz>50.

[0064] According to a second aspect of the present invention, a networked command process automatic generation and scheduling log recording system is provided.

[0065] In one or more embodiments, preferably, the networked command process automatic generation and scheduling log recording system includes:

[0066] The drafting module is used to initiate the scheduling process, set up draft tickets on the networked platform, and record the number of draft expedited flags;

[0067] The review module is used to review the content of the draft ticket, issue a review completion command, and record the number of expedited review markers.

[0068] The pre-issuance module is used to pre-issue the content of the draft invoice to the substation from the network platform after receiving the review completion command, and to record the number of pre-issuance expedited markers;

[0069] The arrival module is used by substations to complete the receipt of the draft ticket through a networked platform, and to automatically report the arrival status and record the number of urgent arrival markers.

[0070] The execution module is used to start executing the content of the draft ticket, generate a scheduling log, record information during the execution process, record the number of expedited execution flags, and set upper-level risk flags, middle-level risk flags, and lower-level risk flags;

[0071] The archiving module is used to automatically store the corresponding scheduling logs and record information based on the number of planned expedited markers, the number of audited expedited markers, the number of pre-issued expedited markers, the number of arrival expedited markers, and the number of execution expedited markers, combined with the upper-layer risk markers, the middle-layer risk markers, and the lower-layer risk markers.

[0072] According to a third aspect of the present invention, a computer-readable storage medium is provided that stores computer program instructions thereon, which, when executed by a processor, implement the method as described in any one of the first aspects of the present invention.

[0073] According to a fourth aspect of the present invention, an electronic device is provided, including a memory and a processor, wherein the memory is used to store one or more computer program instructions, wherein the one or more computer program instructions are executed by the processor to implement the method described in any one aspect of the present invention.

[0074] The technical solutions provided by the embodiments of the present invention may include the following beneficial effects:

[0075] In this invention, the control information is adaptively classified, and then the log information sent at each level is processed accordingly.

[0076] In this invention, by effectively differentiating at different levels, adaptively identifying timeliness, and maintaining log information from multiple dimensions, efficient and reliable automatic management of command process log information is effectively ensured.

[0077] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention may be realized and obtained by means of the structures particularly pointed out in the written description, claims, and drawings.

[0078] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0079] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0080] Figure 1 This is a flowchart of a method for automatically generating scheduling log records in a networked command process, according to an embodiment of the present invention.

[0081] Figure 2 This is a flowchart of the automatic generation and recording of scheduling logs for a networked command process according to an embodiment of the present invention, which involves starting the scheduling process, setting up the draft tickets on the networked platform, and recording the number of draft expedited flags.

[0082] Figure 3 This is a flowchart of a method for automatically generating scheduling logs in a networked command process according to an embodiment of the present invention, which involves reviewing the content of a proposed ticket, issuing a review completion command, and recording the number of expedited review markers.

[0083] Figure 4 This is a flowchart illustrating a method for automatically generating dispatch logs in a networked command process according to an embodiment of the present invention. After receiving the approval completion command, the networked platform pre-issues the content of the draft ticket to the substation and records the number of pre-issued expedited markers.

[0084] Figure 5 This is a flowchart illustrating a method for automatically generating dispatch logs in a networked command process according to an embodiment of the present invention. In this method, the substation completes the receipt of the draft ticket content through a networked platform, automatically reports arrivals, and records the number of urgent arrival markers.

[0085] Figure 6 This is a flowchart of an automatic generation and recording method for networked command process scheduling logs according to an embodiment of the present invention, which includes the execution of the initial drafting of tickets, the formation of scheduling logs, the recording of information records during the execution process, the recording of the number of expedited execution markers, and the setting of upper-level risk markers, middle-level risk markers, and lower-level risk markers.

[0086] Figure 7 This is a flowchart illustrating an embodiment of the present invention of a method for automatically generating scheduling logs in a networked command process. The method automatically stores corresponding scheduling logs and record information based on the number of planned expedited flags, the number of reviewed expedited flags, the number of pre-issued expedited flags, the number of arrived expedited flags, and the number of executed expedited flags, combined with the upper-layer risk flags, the middle-layer risk flags, and the lower-layer risk flags.

[0087] Figure 8 This is a structural diagram of a networked command process automatic generation and scheduling log recording system according to an embodiment of the present invention.

[0088] Figure 9 This is a structural diagram of an electronic device according to one embodiment of the present invention. Detailed Implementation

[0089] In some of the processes described in the specification, claims, and accompanying drawings of this invention, multiple operations appearing in a specific order are included. However, it should be clearly understood that these operations may not be executed in the order they appear herein, or may be executed in parallel. The operation numbers, such as 101, 102, etc., are merely used to distinguish different operations and do not represent any execution order. Furthermore, these processes may include more or fewer operations, and these operations may be executed sequentially or in parallel. It should be noted that the descriptions such as "first," "second," etc., in this document are used to distinguish different messages, devices, modules, etc., and do not represent a sequential order, nor do they limit "first" and "second" to different types.

[0090] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0091] The power system is a vast system. In recent years, with the improvement of people's living standards, the demand for a more abundant and stable power supply has been constantly rising. In order to achieve safe and stable control of the power system, a large number of advanced technologies have been applied to the operation and management of the power system. The development of information technology, Internet technology, and power electronics technology has enabled the recording of events to no longer rely on manual and inefficient paper materials, but to be transformed into electronic documents and storage devices, greatly improving the efficiency of event recording.

[0092] Prior to the present invention, existing technologies have gradually shifted towards managing the operation and control of power systems based on digital and intelligent equipment. However, the power system is a huge system with complex and diverse internal equipment. During the networked command process, a large number of dispatch logs and recorded information will be generated. If they cannot be effectively distinguished and processed, they may hinder various dispatch and control operations and reduce the operational safety and stability of the power system.

[0093] This invention provides a method and system for automatically generating dispatch logs for networked command processes. This solution adaptively manages large amounts of dispatch logs and recorded information, improving the operational safety and stability of low-voltage power systems through effective differentiation and processing.

[0094] According to a first aspect of the present invention, a method for automatically generating scheduling log records for networked command processes is provided.

[0095] Figure 1This is a flowchart of a method for automatically generating scheduling log records in a networked command process, according to an embodiment of the present invention.

[0096] In one or more embodiments, preferably, the method for automatically generating scheduling log records in a networked command process includes:

[0097] S101. Start the scheduling process, set up the ticket proposal on the networked platform, and record the number of proposed expedited flags;

[0098] S102. Review the content of the draft ticket, issue a review completion order, and record the number of expedited review markers;

[0099] S103. After receiving the review completion order, the network platform will pre-issue the content of the draft ticket to the substation and record the number of expedited pre-issue markers.

[0100] S104. The substation completes the receipt of the draft ticket through the network platform, and automatically reports the arrival time and records the number of urgent arrival markers.

[0101] S105. Begin executing the draft ticket content, generate a scheduling log, record information during the execution process, record the number of expedited execution flags, and set upper-level risk flags, middle-level risk flags, and lower-level risk flags;

[0102] S106. Based on the proposed number of expedited flags, the number of expedited review flags, the number of expedited pre-issuance flags, the number of expedited arrival flags, and the number of expedited execution flags, and in conjunction with the upper-layer risk flags, the middle-layer risk flags, and the lower-layer risk flags, the corresponding scheduling logs and record information are automatically stored.

[0103] In this embodiment of the invention, in order to achieve efficient and reliable automated storage of scheduling logs and record information, online calculations are performed based on the proposed number of expedited flags, the approved number of expedited flags, the pre-issued number of expedited flags, the arrival number of expedited flags, and the execution number of expedited flags, combined with the upper-layer risk flags, the middle-layer risk flags, and the lower-layer risk flags, thereby automatically generating scheduling log records in an online networked command process.

[0104] Figure 2 This is a flowchart of the automatic generation and recording of scheduling logs for a networked command process according to an embodiment of the present invention, which involves starting the scheduling process, setting up the draft tickets on the networked platform, and recording the number of draft expedited flags.

[0105] like Figure 2 As shown, in one or more embodiments, preferably, the initiation of the scheduling process involves setting up ticket drafting on a networked platform and recording the number of draft expedited flags, specifically including:

[0106] S201. Set the operation ticket information on the ticket drafting interface;

[0107] S202. On the network platform, set the number of expedited flags for the already set operation ticket information.

[0108] In this embodiment of the invention, the dispatcher can fill in various information of the operation ticket on the ticket drafting interface of the network platform, or import the data of historical operation tickets into the current ticket drafting interface by using the import historical ticket button, or automatically generate operation tickets by changing the equipment status. When setting up the ticket drafting operation, the dispatcher can mark the urgency level of this ticket drafting, and set the number of urgency marks based on experience as the number of urgency marks.

[0109] Figure 3 This is a flowchart of a method for automatically generating scheduling logs in a networked command process according to an embodiment of the present invention, which involves reviewing the content of a proposed ticket, issuing a review completion command, and recording the number of expedited review markers.

[0110] like Figure 3 As shown, in one or more embodiments, preferably, the step of reviewing the content of the proposed ticket, issuing a review completion command, and recording the number of expedited review markers specifically includes:

[0111] S301. The shift leader obtains the content of the draft ticket through the review interface on the online platform and conducts online review.

[0112] S302. After the review is approved, set the number of expedited review flags.

[0113] In this embodiment of the invention, when the duty officer or the shift leader conducts the review process, the duty officer or the shift leader can edit the document. If the review is approved after editing, the document will proceed to the pre-release stage. The number of expedited review markers is manually set online based on experience.

[0114] Figure 4 This is a flowchart illustrating a method for automatically generating dispatch logs in a networked command process according to an embodiment of the present invention. After receiving the approval completion command, the networked platform pre-issues the content of the draft ticket to the substation and records the number of pre-issued expedited markers.

[0115] like Figure 4 As shown, in one or more embodiments, preferably, after receiving the review completion command, the network platform pre-issues the content of the draft invoice to the substation and records the number of pre-issue expedited markers, specifically including:

[0116] S401. After the review is approved, the shift leader can click the pre-issue button on the online platform;

[0117] S402. Automatically change the ticket execution status from "not pre-issued" to "in pre-issued" within the networked platform;

[0118] S403. The shift leader sets the number of expedited pre-issuance markers for the content of the draft tickets in the pre-issuance process by clicking on the network platform.

[0119] In this embodiment of the invention, the process of transferring the ticket to pre-issue will lead to this menu. Double-click the ticket information, and the shift leader or the person on duty will click the pre-issue button to change the execution status of the ticket from "not pre-issued" to "pre-issued". The number of expedited pre-issue markers is manually set online based on experience.

[0120] Figure 5 This is a flowchart illustrating a method for automatically generating dispatch logs in a networked command process according to an embodiment of the present invention. In this method, the substation completes the receipt of the draft ticket content through a networked platform, automatically reports arrivals, and records the number of urgent arrival markers.

[0121] like Figure 5 As shown, in one or more embodiments, preferably, the substation completes the receipt of the draft ticket content through a networked platform, automatically reports arrival status, and records the number of expedited arrival markers, specifically including:

[0122] S501. The contents of the draft ticket in the pre-issuance status are signed and received through the network platform within the factory;

[0123] S502, The person in charge of the plant / station changes the content of the draft ticket to a pending order status;

[0124] S503, The person in charge of the plant or station sets the number of urgent arrival markers and sets the pending order status to "forward to execution" one by one as needed;

[0125] S504. After the execution is completed, the content of the proposed ticket will be automatically reported to the destination through a network platform.

[0126] In this embodiment of the invention, after the plant and station sign for the receipt, the ticket is transferred to the pending execution stage by clicking "Transfer to Execution". The operation ticket transferred to the pending execution stage can be transferred to execution by clicking "Transfer to Execution". The number of arrival expedited markers is manually set online based on experience.

[0127] Figure 6 This is a flowchart of an automatic generation and recording method for networked command process scheduling logs according to an embodiment of the present invention, which includes the execution of the initial drafting of tickets, the formation of scheduling logs, the recording of information records during the execution process, the recording of the number of expedited execution markers, and the setting of upper-level risk markers, middle-level risk markers, and lower-level risk markers.

[0128] like Figure 6As shown, in one or more embodiments, preferably, the execution of the initial drafting of the ticket forms a scheduling log, records information during the execution process, records the number of expedited execution markers, and sets upper-level risk markers, middle-level risk markers, and lower-level risk markers, specifically including:

[0129] S601. Begin executing the drafted bill, and select the execution method, which includes telephone execution and online execution;

[0130] S602. Obtain all operation data from the drafting of the ticket to its execution and form a scheduling log;

[0131] S603. Record information during the execution process and record the number of expedited execution markers;

[0132] S604. The dispatcher sets the upper-level risk marker;

[0133] S605. Mid-level risk markers are set by on-site operation monitoring personnel;

[0134] S606, Lower-level risk markers are set by station personnel.

[0135] In this embodiment of the invention, the execution of the draft ticket is formally initiated. During the execution process, the selected execution methods include telephone execution and network execution. Finally, a scheduling log is generated, which records the information recorded during the execution process, records the number of expedited execution markers, and sets upper-level risk markers, middle-level risk markers, and lower-level risk markers. The upper-level risk markers are set by the dispatcher, the middle-level risk markers are set by the on-site operation monitoring personnel, and the lower-level risk markers are set by the station personnel. The number of expedited execution markers is manually set online based on experience.

[0136] Figure 7 This is a flowchart illustrating an embodiment of the present invention of a method for automatically generating scheduling logs in a networked command process. The method automatically stores corresponding scheduling logs and record information based on the number of planned expedited flags, the number of reviewed expedited flags, the number of pre-issued expedited flags, the number of arrived expedited flags, and the number of executed expedited flags, combined with the upper-layer risk flags, the middle-layer risk flags, and the lower-layer risk flags.

[0137] like Figure 7 As shown, in one or more embodiments, preferably, the step of automatically storing the corresponding scheduling logs and record information based on the proposed expedited flag count, the reviewed expedited flag count, the pre-issued expedited flag count, the arriving expedited flag count, and the execution expedited flag count, combined with the upper-layer risk flag, the middle-layer risk flag, and the lower-layer risk flag, specifically includes:

[0138] S701. Calculate the number of expedited tags using the first calculation formula based on the proposed number of expedited tags, the reviewed number of expedited tags, the pre-issued number of expedited tags, the arriving expedited tags, and the executed expedited tags.

[0139] S702. Calculate the risk mark using the second calculation formula based on the upper-layer risk mark, the middle-layer risk mark, and the lower-layer risk mark;

[0140] S703. Calculate the expedited normalization index using the third calculation formula, and calculate the risk normalization index using the fourth calculation formula.

[0141] S704. Calculate the composite index using the fifth calculation formula and set the composite marker using the sixth calculation formula;

[0142] S705. If the risk normalization index is greater than 50, use the seventh calculation formula to set the risk flag to 1; otherwise, set the risk flag to 0.

[0143] S706. When the risk flag is set to 1 and the comprehensive flag is 2, the corresponding scheduling log and record information are set to the first priority. When the risk flag is set to 0 and the comprehensive flag is 2, the corresponding scheduling log and record information are set to the second priority. Both the first and second priorities are stored, and the first priority is stored first.

[0144] S707. When the risk flag is set to 1 and the comprehensive flag is not 2, the corresponding scheduling log and record information are set to the third priority, and the information marked as emergency in the scheduling log and record information corresponding to the third priority is stored first.

[0145] S708. When the risk flag is not set to 1 and the comprehensive flag is not 2, the corresponding scheduling log and record information are set to the fourth priority, and the data in the fourth priority are stored in descending order of the comprehensive flag.

[0146] The first calculation formula is:

[0147] ZB = B1 + B2 + B3 + B4 + B5

[0148] Wherein, ZB is the number of expedited tags, B1 is the number of proposed expedited tags, B2 is the number of reviewed expedited tags, B3 is the number of pre-issued expedited tags, B4 is the number of arriving expedited tags, and B5 is the number of executed expedited tags.

[0149] The second calculation formula is:

[0150] F = K1 × S + K2 × Z + K3 × X

[0151] Wherein, F is the risk marker, S is the upper-level risk marker, Z is the middle-level risk marker, X is the lower-level risk marker, K1 is the upper-level correction coefficient, K2 is the middle-level correction coefficient, and K3 is the lower-level correction coefficient;

[0152] The third calculation formula is:

[0153] ZBz=100×(ZB-ZB MIN ) / (ZB MAX -ZB MIN )

[0154] Where ZBz is the expedited normalization exponent, ZB MAX ZB is the maximum number of urgent markers. MIN This represents the minimum number of urgent markings.

[0155] The fourth calculation formula is:

[0156] Fz = 100 × (F - Fz) MIN ) / (Fz MAX -Fz MIN )

[0157] Where Fz is the risk normalization index, Fz MAX Fz represents the maximum value of the risk marker. MIN The minimum value for risk labeling;

[0158] The fifth calculation formula is:

[0159] ZH=ZBz+Fz

[0160] Wherein, ZH is the comprehensive index;

[0161] The sixth calculation formula is:

[0162]

[0163] Where d is the composite marker;

[0164] The seventh calculation formula is:

[0165] Fz>50.

[0166] In this embodiment of the invention, in order to cope with the complexity and diversity of equipment within the power system, the large amount of dispatch logs and record information generated during the networked command process are effectively distinguished and processed to improve the operational safety and stability of the power system.

[0167] According to a second aspect of the present invention, a networked command process automatic generation and scheduling log recording system is provided.

[0168] Figure 8 This is a structural diagram of a networked command process automatic generation and scheduling log recording system according to an embodiment of the present invention.

[0169] In one or more embodiments, preferably, the networked command process automatic generation and scheduling log recording system includes:

[0170] The drafting module 801 is used to initiate the scheduling process, set up the drafting of tickets on the networked platform, and record the number of drafted expedited flags;

[0171] The review module 802 is used to review the content of the draft ticket, issue a review completion command, and record the number of expedited review markers;

[0172] The pre-issuance module 803 is used to pre-issue the content of the draft ticket to the substation from the network platform after receiving the review completion command, and to record the number of pre-issuance expedited markers;

[0173] The arrival module 804 is used by substations to complete the receipt of the draft ticket through the network platform, and to automatically report the arrival and record the number of urgent arrival markers.

[0174] The execution module 805 is used to start the execution of the drafted content, generate a scheduling log, record information during the execution process, record the number of expedited execution flags, and set upper-level risk flags, middle-level risk flags, and lower-level risk flags;

[0175] The archiving module 806 is used to automatically store the corresponding scheduling logs and record information based on the proposed expedited marker count, the audit expedited marker count, the pre-issue expedited marker count, the arrival expedited marker count, and the execution expedited marker count, combined with the upper-layer risk marker, the middle-layer risk marker, and the lower-layer risk marker.

[0176] In this embodiment of the invention, a system suitable for different structures is realized through a series of modular designs. This system can achieve closed-loop, reliable, and efficient execution through data acquisition, analysis, and control.

[0177] According to a third aspect of the present invention, a computer-readable storage medium is provided that stores computer program instructions thereon, which, when executed by a processor, implement the method as described in any one of the first aspects of the present invention.

[0178] According to a fourth aspect of the present invention, an electronic device is provided. Figure 9 This is a structural diagram of an electronic device according to one embodiment of the present invention. Figure 9 The electronic device shown is a general-purpose networked command and control process automatic dispatch log recording device. (Refer to...) Figure 9The electronic device can be a smartphone, tablet computer, or other similar device. The electronic device 900 includes a processor 901 and a memory 902. The processor 901 and the memory 902 are electrically connected.

[0179] The processor 901 is the control center of the electronic device 900. It connects various parts of the electronic device through various interfaces and lines. By running or calling computer programs stored in the memory 902, and calling data stored in the memory 902, it performs various functions of the electronic device and processes data, thereby monitoring the electronic device as a whole.

[0180] In this embodiment, the processor 901 in the electronic device 900 loads the instructions corresponding to the processes of one or more computer programs into the memory 902 according to the following steps, and the processor 901 runs the computer programs stored in the memory 902 to realize various functions, such as: starting the scheduling process, setting up the draft ticket on the network platform, and recording the number of draft expedited flags; reviewing the content of the draft ticket, issuing a review completion command, and recording the number of review expedited flags; after receiving the review completion command, the network platform pre-issues the content of the draft ticket to the substation and records the number of pre-issue expedited flags. The substation completes the receipt of the draft ticket content through a networked platform, automatically reports arrival status, and records the number of expedited arrival markers. Execution of the draft ticket content begins, generating a scheduling log and recording information during execution, including the number of expedited execution markers, and setting upper-level, middle-level, and lower-level risk markers. Based on the draft expedited marker count, the approved expedited marker count, the pre-issued expedited marker count, the arrival expedited marker count, and the execution expedited marker count, combined with the upper-level, middle-level, and lower-level risk markers, the corresponding scheduling logs and recorded information are automatically stored.

[0181] In some embodiments, the electronic device 900 may further include: a display 903, a radio frequency circuit 904, an audio circuit 905, a wireless fidelity module 906, and a power supply 907. The display 903, radio frequency circuit 904, audio circuit 905, wireless fidelity module 906, and power supply 907 are electrically connected to the processor 901.

[0182] The display 903 can be used to display information input by the user or information provided to the user, as well as various graphical user interfaces, which can be composed of graphics, text, icons, video, and any combination thereof. The display 903 may include a display panel, which in some embodiments may be configured as a liquid crystal display (LCD) or an organic light-emitting diode (OLED).

[0183] The radio frequency circuit 904 can be used to transmit and receive radio frequency signals to establish wireless communication with network devices or other electronic devices, and to transmit and receive signals with network devices or other electronic devices.

[0184] The audio circuit 905 can be used to provide an audio interface between a user and an electronic device through a speaker or microphone.

[0185] The wireless fidelity module 906 can be used for short-range wireless transmission, helping users send and receive emails, browse websites, and access streaming media, providing users with wireless broadband internet access.

[0186] The power supply 907 can be used to power various components of the electronic device 900. In some embodiments, the power supply 907 can be logically connected to the processor 901 through a power management system, thereby enabling functions such as charging, discharging, and power consumption management through the power management system.

[0187] although Figure 9 As not shown in the diagram, the electronic device 900 may also include a camera, Bluetooth module, etc., which will not be described in detail here.

[0188] The technical solutions provided by the embodiments of the present invention may include the following beneficial effects:

[0189] In this invention, the control information is adaptively classified, and then the log information sent at each level is processed accordingly.

[0190] In this invention, by effectively differentiating at different levels, adaptively identifying timeliness, and maintaining log information from multiple dimensions, efficient and reliable automatic management of command process log information is effectively ensured.

[0191] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage and optical storage) containing computer-usable program code.

[0192] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0193] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0194] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0195] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, this invention also intends to include these modifications and variations.

Claims

1. A method for automatically generating scheduling logs in a networked command and control process, characterized in that, The method includes: Initiate the scheduling process, set up the draft ticket on the networked platform, and record the number of draft expedited flags; Review the content of the draft ticket, issue a review completion order, and record the number of expedited review markers; After receiving the approval completion order, the network platform will pre-issue the draft ticket content to the substation and record the number of expedited pre-issue markers; The substation completes the receipt of the draft ticket through a networked platform, automatically reports the arrival status, and records the number of urgent arrival markers. The execution of the drafted ticket begins, a scheduling log is generated, and information records are kept during the execution process. The number of expedited execution flags is recorded, and upper-level risk flags, middle-level risk flags, and lower-level risk flags are set. Based on the proposed expedited flag count, the approved expedited flag count, the pre-issued expedited flag count, the arrival expedited flag count, and the execution expedited flag count, combined with the upper-layer risk flag, the middle-layer risk flag, and the lower-layer risk flag, the corresponding scheduling logs and record information are automatically stored, specifically including: The number of expedited tags is calculated using the first calculation formula based on the proposed number of expedited tags, the reviewed number of expedited tags, the pre-issued number of expedited tags, the arriving expedited tags, and the executed expedited tags. Based on the upper-level risk marker, the middle-level risk marker, and the lower-level risk marker, the risk marker is calculated using the second calculation formula; The expedited normalized index is calculated using the third formula, and the risk normalized index is calculated using the fourth formula. The composite index is calculated using the fifth calculation formula, and the composite marker is set using the sixth calculation formula; If the risk normalization index is greater than 50, the risk flag is set to 1; otherwise, the risk flag is set to 0. When the risk flag is set to 1 and the comprehensive flag is 2, the corresponding scheduling log and record information are set to the first priority. When the risk flag is set to 0 and the comprehensive flag is 2, the corresponding scheduling log and record information are set to the second priority. Both the first and second priorities are stored, with the first priority being stored first. When the risk flag is set to 1 and the comprehensive flag is not 2, the corresponding scheduling log and record information are set to the third priority, and the information marked as emergency in the scheduling log and record information corresponding to the third priority is stored first. When the risk flag is set to not be 1 and the comprehensive flag is not 2, the corresponding scheduling log and record information are set to the fourth priority, and the data in the fourth priority are stored in descending order of the comprehensive flag. The first calculation formula is: , Wherein, ZB is the number of expedited tags, B1 is the number of proposed expedited tags, B2 is the number of reviewed expedited tags, B3 is the number of pre-issued expedited tags, B4 is the number of arriving expedited tags, and B5 is the number of executed expedited tags. The second calculation formula is: , Wherein, F is the risk marker, S is the upper-level risk marker, Z is the middle-level risk marker, X is the lower-level risk marker, K1 is the upper-level correction coefficient, K2 is the middle-level correction coefficient, and K3 is the lower-level correction coefficient; The third calculation formula is: , Where ZBz is the expedited normalization exponent, ZB MAX ZB is the maximum number of urgent markers. MIN This represents the minimum number of urgent markings. The fourth calculation formula is: , Where Fz is the risk normalization index, Fz MAX Fz represents the maximum value of the risk marker. MIN The minimum value for risk labeling; The fifth calculation formula is: , Wherein, ZH is the comprehensive index; The sixth calculation formula is: , Where d is the composite marker; The seventh calculation formula is: 。 2. The method for automatically generating scheduling logs in a networked command process as described in claim 1, characterized in that, The initiation of the scheduling process involves setting up ticket drafting on a networked platform and recording the number of draft expedited flags, specifically including: Set the operation ticket information on the ticket drafting interface; On the network platform, set the number of expedited flags for the already configured operation ticket information.

3. The method for automatically generating scheduling logs in a networked command process as described in claim 1, characterized in that, The process of reviewing the content of the draft ticket, issuing a review completion command, and recording the number of expedited review markers includes: The shift leader obtains the draft ticket content through the review interface on the online platform and conducts online review. After the review is approved, set the number of expedited review flags.

4. The method for automatically generating scheduling logs in a networked command process as described in claim 1, characterized in that, Upon receiving the review completion order, the network platform pre-issues the draft ticket content to the substation, recording the number of expedited pre-issue markers, specifically including: After the review is approved, the shift leader can click the pre-issue button on the online platform; Within the networked platform, the ticket execution status is automatically changed from "not pre-issued" to "in pre-issued"; The shift leader sets the number of expedited pre-issuance markers for the draft tickets in the pre-issuance process by clicking on the network platform.

5. The method for automatically generating scheduling logs in a networked command process as described in claim 1, characterized in that, The substation completes the receipt of the draft ticket through a networked platform, automatically reports arrival times, and records the number of expedited arrival markers, specifically including: Within the factory / station, the contents of the draft tickets in the pre-issuance status are signed and received through a networked platform; The person in charge of the plant / station changed the status of the draft ticket to "pending order". The plant / station manager sets the number of urgent arrival markers and sets the pending order status to "forward to execution" one by one as needed; After the execution is completed, the content of the draft ticket is automatically reported to the destination through a network platform.

6. The method for automatically generating scheduling logs in a networked command process as described in claim 1, characterized in that, The execution of the initial drafting process generates a scheduling log, records information during execution, records the number of expedited execution flags, and sets upper-level, middle-level, and lower-level risk flags, specifically including: The process of drafting the ballot begins. An execution method is selected, including telephone execution and online execution. Obtain all operational data from the drafting of the ticket to its execution to form a scheduling log; Record information during the execution process and record the number of expedited execution markers; The dispatcher sets the upper-level risk marker; Mid-level risk markers are set by on-site operations monitoring personnel; Lower-level risk markers are set up by station personnel.

7. A networked command process automatic generation and scheduling log recording system, characterized in that, The system is used to implement the method as described in any one of claims 1-6, the system comprising: The drafting module is used to initiate the scheduling process, set up draft tickets on the networked platform, and record the number of draft expedited flags; The review module is used to review the content of the draft ticket, issue a review completion command, and record the number of expedited review markers. The pre-issuance module is used to pre-issue the content of the draft invoice to the substation from the network platform after receiving the review completion command, and to record the number of pre-issuance expedited markers; The arrival module is used by substations to complete the receipt of the draft ticket through a networked platform, and to automatically report the arrival status and record the number of urgent arrival markers. The execution module is used to start executing the content of the draft ticket, generate a scheduling log, record information during the execution process, record the number of expedited execution flags, and set upper-level risk flags, middle-level risk flags, and lower-level risk flags; The archiving module is used to automatically store the corresponding scheduling logs and record information based on the number of planned expedited markers, the number of audited expedited markers, the number of pre-issued expedited markers, the number of arrival expedited markers, and the number of execution expedited markers, combined with the upper-layer risk markers, the middle-layer risk markers, and the lower-layer risk markers.

8. A computer-readable storage medium storing computer program instructions thereon, characterized in that, The computer program instructions, when executed by a processor, implement the method as described in any one of claims 1-6.

9. An electronic device comprising a memory and a processor, characterized in that, The memory is used to store one or more computer program instructions, wherein the one or more computer program instructions are executed by the processor to implement the method as described in any one of claims 1-6.

Citation Information

Patent Citations

  • Intelligent dispatching and mis-operation preventing management system and method

    CN104600840A

  • Power distribution network dispatching management statistical analysis system

    CN105184442A