A method for constructing large-area floor tiles with compartment seams that can be constructed continuously

By setting up thickened layers and staggered reinforcement on large-area floors, using channel steel to separate and fill joints, the problems of discontinuous and cracks in floor construction in traditional processes are solved, and high-quality continuous construction and extended service life are achieved.

CN116378356BActive Publication Date: 2025-05-02YUNNAN CONSTR ENG CORP THE SIXTH CONSTR CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310398189.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-14
Publication Date
2025-05-02
Estimated Expiration
2043-04-14

AI Technical Summary

Technical Problem

Large-area floors are prone to temperature shrinkage cracks during construction. Traditional processes such as "snap warehouse construction" cannot achieve continuous construction, and corner damage is easily caused when dismantling the mold, which increases the construction cycle and labor costs.

Method used

The construction method of split-store joints is adopted, by setting thickened layers on the floor and laying reinforcements staggeredly, the floor is separated by channel steel, and the joints are filled with flexible high-strength epoxy resin, and the binding force is reduced and continuous casting is achieved.

Benefits of technology

Continuous construction of large-area floors is achieved, cracks caused by temperature changes are avoided, the service life of the floor is extended, the quality of concrete forming is improved, costs are saved, and construction period is shortened.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116378356B_ABST
    Figure CN116378356B_ABST
Patent Text Reader

Abstract

A method for constructing compartment joints for continuous construction of large-area flooring, the invention first plans the position of the compartment joints according to the block size and area of ​​the flooring; sets a floor thickening layer at the compartment joint position of the flooring, and staggers the thickening layer reinforcement in the floor thickening layer and the flooring area; staggers the transverse reinforcement and the longitudinal reinforcement on the flooring and the floor thickening layer; after the construction of the floor thickening layer is completed, a pair of channel steels with the same thickness as the flooring are used to separate the flooring; the channel steels are fixed by steel bar diagonal braces; the flatness and straightness of the channel steels are adjusted to ensure the flatness and straightness of the floor concrete; after the compartment joints are set with the channel steels, the adjacent compartment concretes can be continuously poured; after the pouring is completed, the compartment joints are filled with flexible high-strength epoxy resin. The invention avoids damage to the corners at the junction of the floor compartments by wrapping the compartment joints with channel steels, thereby extending the service life of the floor concrete.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of ground engineering construction in building construction, and specifically relates to a compartment seam construction method for continuous construction of a large-area floor. Background Art

[0002] With the rapid development of emerging industries such as new energy, medicine, biotechnology, and prefabricated construction in recent years, large-area flooring is widely used in industrial plants, parking buildings, commercial plazas and other construction fields. Large-area flooring has high requirements for crack control and flatness. It is particularly important to take effective technical measures during the construction process to avoid ground cracks, ensure flatness and meet functional requirements.

[0003] In order to solve the problem of temperature shrinkage cracks in large-area floor concrete, traditional processes mainly adopt the method of extending the interval time or "skipping construction". The large-area floor is divided by formwork, and the concrete is poured in each bin. After the concrete has been cured for a period of time, the concrete of the adjacent bins is poured. The use of formwork not only prevents continuous construction, but also easily causes damage to the edges and corners during the demolding process. Before pouring adjacent bins, roughening treatment is required. The chiseled concrete slag is difficult to clean, and there are still construction joints between adjacent bins caused by the first poured concrete and the later poured concrete. There are shortcomings such as affecting the quality of concrete molding, increasing labor costs and a long construction period.

[0004] The application number is "201910738222.6" and the name is "A method for floor construction in a building project". This patent adopts the method of "skip-bin construction" (casting in alternate spans). This method uses wooden planks as templates to divide the strips into sections. It has disadvantages such as damage to corners and the formation of construction joints when the template is removed. Summary of the invention

[0005] In view of the above-mentioned deficiencies in the prior art, the object of the present invention is to provide a compartment seam construction method for continuous construction of large-area floors. In this method, adjacent compartments do not need to wait for concrete curing to reach a specified time, thereby ensuring the continuity of the large-area floor concrete structure without demolding, and avoiding cracks caused by temperature changes between the first poured concrete and the later poured concrete.

[0006] In order to achieve the above-mentioned purpose, the present invention provides the following technical solution: a method for constructing a large-area floor with compartment seams that can be constructed continuously, the steps are as follows:

[0007] Step 1: Plan the location of the compartment seams according to the size and area of ​​the floor blocks;

[0008] Step 2: Set up a floor thickening layer at the location of the floor compartment joint, and lay the thickening layer reinforcement alternately in the floor thickening layer and the floor area; alternately arrange transverse reinforcement and longitudinal reinforcement on the floor and the floor thickening layer;

[0009] Step 3: After the construction of the floor thickening layer is completed, a pair of channel steels with the same thickness as the floor are used to separate the floor; the channel steels are fixed by steel bar diagonal braces;

[0010] Step 4: Adjust the flatness and straightness of the channel steel to ensure the flatness of the floor concrete and the straightness of the corners;

[0011] Step 5: After the channel steel is set in the compartment joints, the concrete of adjacent compartments can be poured continuously; after pouring, the joints between the compartments are filled with flexible high-strength epoxy resin to reduce the mutual restraint force.

[0012] Furthermore, mortar is used to level the floor and the channel steel.

[0013] Furthermore, the steel bar brace is composed of a brace and two support rods, the two support rods are arranged in parallel, one support rod is vertically arranged on one side of the channel steel, and the other support rod is vertically arranged on the floor thickening layer, and the brace is obliquely fixed between the two support rods.

[0014] Furthermore, the thickened layer reinforcement is a Z-shaped structure, and fixing hooks are provided at both ends of the thickened layer reinforcement.

[0015] Furthermore, fixing hooks are provided at both ends of the transverse ribs.

[0016] On the one hand, the present invention ensures the flatness and straightness of the floor concrete by adjusting the flatness and straightness of the channel steel, and on the other hand, by wrapping the compartment seams with channel steel, damage to the corners at the junction of the floor compartments is avoided, thereby extending the service life of the floor concrete. The present invention can ensure the quality of concrete molding, save costs, and greatly shorten the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is the position diagram of the compartment seam of the present invention;

[0018] Figure 2 This is the connection diagram between the steel bar brace and the channel steel. Implementation

[0019] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0020] Those skilled in the art will understand that the following examples are only used to illustrate the present invention and should not be considered to limit the scope of the present invention. If no specific technology, connection relationship or condition is specified in the examples, the technology, connection relationship, condition described in the literature in the field or the product specification is used. If the manufacturer of the materials, instruments or equipment used is not specified, they are all conventional products that can be purchased.

[0021] Combination Figure 1 and Figure 2 As shown, the present invention provides a method for constructing compartment seams for continuous construction of a large-area floor, and the steps are as follows:

[0022] Step 1: Plan the location of the partition seams in advance according to the size and area of ​​the floor blocks;

[0023] Step 2: Set the floor thickening layer 1 at the compartment joint position of the floor 3 (the floor thickening layer 1 is located below the compartment joint), and lay the thickening layer reinforcement 2 alternately in the floor thickening layer 1 and the floor 3 area; the reinforcement and thickness of the thickening layer are the same as the floor to ensure the continuity of the floor structure; transverse reinforcement 4 and longitudinal reinforcement 5 are alternately arranged on the floor 3 and the floor thickening layer 1;

[0024] Step 3: After the construction of the floor thickening layer 1 is completed, a pair of channel steels 6 with the same thickness as the floor 3 are used to separate the floor 3 (the channel steels are symmetrically arranged), and the mortar 10 is used to level the floor 3 and the channel steels 6 in advance; the channel steels 6 are fixed by steel bar braces 8, which can play a supporting role when pouring concrete, and can be connected with the concrete as a whole to avoid emptying; after the compartment seams are wrapped with channel steels, the corners of the floor compartment junctions can be avoided from being damaged, the service life of the floor concrete can be extended, the molding effect is good, and it is beautiful and practical;

[0025] Step 4: Adjust the flatness and straightness of the channel steel 6 to ensure the flatness of the floor concrete and the straightness of the corners;

[0026] Step 5: After the channel steel is set in the compartment joints, the concrete of adjacent compartments can be poured continuously; after pouring, the compartment joints are filled with flexible high-strength epoxy resin 7 to reduce the mutual restraint force, effectively reducing cracks caused by concrete strain while ensuring the continuity of the floor structure.

[0027] Specifically, the steel bar brace 8 is composed of a brace and two support rods, the two support rods are arranged in parallel, one support rod is vertically arranged on one side of the channel steel 6, and the other support rod is vertically arranged on the floor thickening layer 1, and the brace is obliquely fixed between the two support rods.

[0028] According to a further optimization scheme, the thickened layer reinforcement 2 is a Z-shaped structure, and fixing hooks 9 are provided at both ends of the thickened layer reinforcement 2; fixing hooks 9 are also provided at both ends of the transverse reinforcement 4, and the fixing hooks 9 are hooked on the longitudinal reinforcement to increase the overall stability.

[0029] The above is only a preferred embodiment of the present invention, and the present invention is not limited to the above embodiment. There may be local minor structural changes during the implementation process. If the various changes or modifications of the present invention do not depart from the spirit and scope of the present invention and fall within the scope of the claims and equivalent technologies of the present invention, the present invention is also intended to include these changes and modifications.

Claims

1. A method for constructing large-area floor tiles with compartment seams that can be constructed continuously, characterized in that: Here are the steps: Step 1: Plan the location of the compartment seams according to the size and area of ​​the floor blocks; Step 2: a floor thickening layer (1) is provided at the compartment joint position of the floor (3), and thickening layer reinforcement (2) is alternately laid in the floor thickening layer (1) and the floor (3) area; transverse reinforcement (4) and longitudinal reinforcement (5) are alternately arranged on the floor (3) and the floor thickening layer (1); Step 3: After the construction of the floor thickening layer (1) is completed, a pair of channel steels (6) having the same thickness as the floor (3) is used to separate the floor (3); the channel steels (6) are fixed by steel bar braces (8); Step 4: Adjust the flatness and straightness of the channel steel (6) to ensure the flatness of the floor concrete and the straightness of the corners; Step 5: After the channel steel is set in the compartment joints, the concrete of adjacent compartments can be poured continuously; after the pouring is completed, the compartment joints are filled with flexible high-strength epoxy resin (7) to reduce the restraining force between them.

2. The method for constructing a large-area floor with compartment seams that can be constructed continuously according to claim 1 is characterized in that: Mortar (10) is used to level the floor (3) and the channel steel (6).

3. The method for constructing a large-area floor with compartment seams that can be constructed continuously according to claim 1 is characterized in that: The steel bar brace (8) is composed of a brace and two support rods. The two support rods are arranged in parallel, one of which is vertically arranged on one side of the channel steel (6), and the other is vertically arranged on the floor thickening layer (1). The brace is fixed obliquely between the two support rods.

4. The method for constructing a large-area floor with compartment seams that can be constructed continuously according to claim 1 is characterized in that: The thickened layer reinforcement (2) is a Z-shaped structure, and fixing hooks (9) are provided at both ends of the thickened layer reinforcement (2).

5. The method for constructing a large-area floor with compartment seams that can be constructed continuously according to claim 1 is characterized in that: Fixing hooks (9) are provided at both ends of the transverse rib (4).

Citation Information

Patent Citations

  • Building engineering floor construction method

    CN110607894A

  • Height adjustable type super flat floor divided seam protective formwork system

    CN101265749A

  • Concrete side mold and mold support method thereof

    CN105239495A