A loss-reducing power generation system for a wind and solar power station
By designing a loss-reducing power generation system in a wind and photovoltaic power station, controlling the start and stop of the photovoltaic inverter using time and light intensity, and allocating the scheduling of the fan and photovoltaic inverter according to the operating state, it is solved that it is difficult for wind and photovoltaic power stations to achieve high levels in the existing technology. The problem of cost-effective loss reduction has achieved coordinated loss reduction in wind and solar and improved power generation efficiency.
Patent Information
- Application Number
- CN202310226869.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-08
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2043-03-08
AI Technical Summary
It is difficult for the existing technology to achieve cost-effective loss reduction in wind and photovoltaic power stations by reducing the energy consumption of main equipment such as new energy transformers in a short period of time, resulting in high power generation losses.
Design a loss reduction power generation system for wind and photovoltaic power stations, including loss reduction devices and automatic power generation control devices, and stop unnecessary photovoltaic inverters by obtaining time, light intensity, voltage and current values of photovoltaic inverters, and Scheduling instructions are allocated according to the operating status of the fan and photovoltaic inverters, and operate in groups to reduce no-load losses.
Effectively reduce the no-load loss during wind and light combined power generation, improve the power generation efficiency of photovoltaic inverters, achieve coordinated loss reduction in wind and light, and reduce unnecessary line losses.
Smart Images

Figure CN116418045B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the field of electric power technology, and in particular to a loss-reducing power generation system of a wind and solar power station. Background Art
[0002] As the intensity of new energy resource development intensifies, it is becoming increasingly difficult to obtain them. According to statistics, losses at new energy sites account for about 3% of power generation. Therefore, developing loss reduction technologies is a must for the high-quality development of new energy.
[0003] In the existing technology, the power generation loss can be reduced by reducing the energy consumption level of the main equipment such as new energy transformers. However, reducing the loss of the main equipment itself to achieve system loss reduction is subject to breakthroughs in multiple sciences such as materials, electromagnetic design, and cooling. The loss reduction technology of the main equipment such as transformers itself is difficult to achieve a high cost-effective breakthrough in a short period of time, and the loss reduction effect is not obvious. Summary of the invention
[0004] In order to reduce the system loss of wind and solar power stations and achieve coordinated loss reduction of wind and solar power, the present invention proposes a loss reduction power generation system for wind and solar power stations.
[0005] The system includes: a loss reduction device and an automatic power generation control device;
[0006] The loss reduction device is used to obtain time, light intensity, voltage value of each photovoltaic inverter and current value of each photovoltaic inverter; within a first preset time range, when the light intensity is less than the preset light intensity, the photovoltaic inverter whose voltage value is less than the first preset voltage value and current value is less than the first preset current value is shut down; and the operating status of the shut down photovoltaic inverter is sent to the automatic power generation control device;
[0007] The automatic power generation control device is used to obtain the operating status of each photovoltaic inverter, the operating status of each wind turbine, the dispatching instructions and the wind-solar power forecast data; according to the operating status of each photovoltaic inverter, the operating status of each wind turbine, the dispatching instructions and the wind-solar power forecast data, each wind turbine and each photovoltaic inverter is divided into an operating group, a hot standby group, a cold standby group and a fault group.
[0008] Through the above system, the loss reduction device shuts down the photovoltaic inverters that meet the conditions based on time, light intensity, voltage value of each photovoltaic inverter and current value of each photovoltaic inverter, thereby reducing no-load losses and improving the power generation efficiency of each photovoltaic inverter; the automatic power generation control device distributes scheduling instructions according to the operating status of each photovoltaic inverter and each wind turbine, and divides each wind turbine and each photovoltaic inverter into an operating group, a hot standby group, a cold standby group and a fault group, so as to respond to the scheduling instructions, and further reduce the no-load losses in the process of wind-solar combined power generation by shutting down each wind turbine and each photovoltaic inverter in the cold standby group.
[0009] In combination with the first aspect, in the first embodiment of the first aspect, the loss reduction device is also used to obtain the voltage value on the low-voltage side of each photovoltaic array box transformer and the current value on the low-voltage side of each photovoltaic array box transformer; when the low-voltage side voltage value of the photovoltaic array box transformer is less than the second preset voltage value, and the low-voltage side current value of the photovoltaic array box transformer is less than the second preset current value, and the number of photovoltaic inverters that are shut down in the photovoltaic array box transformer is greater than the preset number, the high-voltage side circuit breaker of the photovoltaic array box transformer is disconnected.
[0010] In combination with the first embodiment of the first aspect, in the second embodiment of the first aspect, when all high-voltage side circuit breakers of the photovoltaic array box-type transformers in the same array are disconnected, the loss reduction device is also used to disconnect the corresponding photovoltaic collector line circuit breakers.
[0011] In combination with the second embodiment of the first aspect, in a third embodiment of the first aspect, the loss reduction device is further used to close the photovoltaic collector line breaker within a second preset time range.
[0012] In combination with the third embodiment of the first aspect, in the fourth embodiment of the first aspect, the loss reduction device is also used to delay for a first time period after closing the photovoltaic collector line circuit breaker and close the high-voltage side circuit breaker of the corresponding photovoltaic array box transformer.
[0013] After closing the photovoltaic collector line circuit breaker, delay for the first time, and then close the high-voltage side circuit breaker of the corresponding photovoltaic array box transformer after the photovoltaic collection line is stable, which is beneficial to the stability of the photovoltaic collection line.
[0014] In combination with the fourth embodiment of the first aspect, in the fifth embodiment of the first aspect, the loss reduction device is also used to delay for a second time period after closing the high-voltage side circuit breaker of the corresponding photovoltaic array box transformer, and start the photovoltaic inverter with a sunlight intensity greater than a preset light intensity.
[0015] In combination with the first aspect, in a sixth embodiment of the first aspect, in the automatic power generation control device, each wind turbine and each photovoltaic inverter in the operating group and the hot standby group are started in a sequence from near to far from the booster station.
[0016] The closer the distance between each wind turbine and each photovoltaic inverter and the booster station, the smaller the line loss. Start each wind turbine and each photovoltaic inverter in the operating group and hot standby group in the order from closest to the booster station to farthest, to reduce unnecessary line loss.
[0017] In combination with the sixth embodiment of the first aspect, in a seventh embodiment of the first aspect, the wind turbines and photovoltaic inverters located on a collector line are started in a sequence from near to far from a grid connection point of the collector line.
[0018] The closer the distance between each wind turbine and each photovoltaic inverter and the grid connection point of the collector line, the smaller the line loss. Start each wind turbine and each photovoltaic inverter on a collector line in the order from closest to the grid connection point to farthest, so as to reduce unnecessary line loss.
[0019] In combination with the first aspect, in the eighth embodiment of the first aspect, when the dispatch instruction changes, the wind turbines and photovoltaic inverters in the operating group will respond first, the shortfall will be supplemented by the wind turbines and photovoltaic inverters in the hot standby group, and the wind turbines and photovoltaic inverters in the cold standby group and the fault group will be shut down. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 is a structural schematic diagram of a loss reduction power generation system of a wind-solar power station proposed according to an exemplary embodiment;
[0022] Figure 2 In an example, it is a schematic diagram of a scenario of a loss reduction power generation system of a wind and solar power station. DETAILED DESCRIPTION
[0023] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0025] In order to reduce the system loss of wind and solar power stations and achieve coordinated loss reduction of wind and solar power, the present invention proposes a loss reduction power generation system for wind and solar power stations. Figure 1 The structure diagram of a loss reduction power generation system of a wind-solar power station proposed according to an exemplary embodiment. The system comprises: a loss reduction device 1 and an automatic generation control device (Automatic Generation Control, AGC) 2.
[0026] The loss reduction device 1 is used to obtain time, light intensity, voltage value of each photovoltaic inverter and current value of each photovoltaic inverter; within a first preset time range, when the light intensity is less than the preset light intensity, the photovoltaic inverter with a voltage value less than the first preset voltage value and a current value less than the first preset current value is shut down; the operating status of the shut-down photovoltaic inverter is sent to the automatic power generation control device 2.
[0027] In an optional embodiment, the first preset time range can be set according to the sunset time, or according to actual conditions such as weather, and no specific limitation is made here. The sunset time can be obtained by a sun rise and set time acquisition device.
[0028] In an optional embodiment, the light intensity can be obtained by a light intensity collection device.
[0029] In an optional embodiment, the voltage value and the current value can be obtained by a voltage and current acquisition device of the photovoltaic power generation system.
[0030] The automatic power generation control device 2 is used to obtain the operating status of each photovoltaic inverter, the operating status of each wind turbine, the dispatching instructions and the wind-solar power forecast data; according to the operating status of each photovoltaic inverter, the operating status of each wind turbine, the dispatching instructions and the wind-solar power forecast data, each wind turbine and each photovoltaic inverter are divided into an operating group, a hot standby group, a cold standby group and a fault group.
[0031] In an optional embodiment, the operating status includes but is not limited to operating, shut down, fault, etc.
[0032] In an optional embodiment, the operating status of each photovoltaic inverter is obtained by the loss reduction device 1 .
[0033] In an optional embodiment, the operating status of each wind turbine can be obtained through the wind power management platform.
[0034] In an optional embodiment, the dispatching instruction includes a dispatching instruction of a photovoltaic station and a dispatching instruction of a wind farm.
[0035] In an optional embodiment, the wind and solar power prediction data includes the predicted power generation of the photovoltaic station and the predicted power generation of the wind farm.
[0036] In an optional embodiment, the operating group consists of wind turbines and photovoltaic inverters in operation.
[0037] In an optional embodiment, when an emergency such as a failure occurs in a running wind turbine or photovoltaic inverter, or when the power generation of the running wind turbine or photovoltaic inverter is insufficient, the wind turbine and photovoltaic inverter in the hot standby group are used to supplement the power.
[0038] In an optional embodiment, when sudden situations such as failures occur in the wind turbines and photovoltaic inverters in the operating group and the hot standby group, or when the power generation of the wind turbines and photovoltaic inverters in operation is insufficient, the wind turbines and photovoltaic inverters in the cold standby group are used to supplement this part of the electricity.
[0039] In an optional embodiment, the wind turbines and photovoltaic inverters in the hot standby group and the cold standby group are wind turbines and photovoltaic inverters that are in a shutdown state.
[0040] Through the above system, the loss reduction device 1 shuts down the photovoltaic inverters that meet the conditions based on time, light intensity, voltage value of each photovoltaic inverter and current value of each photovoltaic inverter, reduces no-load loss and improves the power generation efficiency of each photovoltaic inverter; the automatic power generation control device 2 distributes scheduling instructions according to the operating status of each photovoltaic inverter and each wind turbine, divides each wind turbine and each photovoltaic inverter into an operating group, a hot standby group, a cold standby group and a fault group, so as to respond to the scheduling instructions, and further reduce the no-load loss in the process of wind-solar combined power generation by shutting down each wind turbine and each photovoltaic inverter in the cold standby group.
[0041] In one example, when the dispatch instruction changes, the wind turbines and photovoltaic inverters in the operating group respond first, the shortfall is supplemented by the wind turbines and photovoltaic inverters in the hot standby group, and the wind turbines and photovoltaic inverters in the cold standby group and the faulty group are shut down.
[0042] In one example, the loss reduction device 1 is also used to obtain the voltage value on the low-voltage side of each photovoltaic array box transformer and the current value on the low-voltage side of each photovoltaic array box transformer; when the low-voltage side voltage value of the photovoltaic array box transformer is less than the second preset voltage value, and the low-voltage side current value of the photovoltaic array box transformer is less than the second preset current value, and the number of photovoltaic inverters shut down in the photovoltaic array box transformer is greater than the preset number, the high-voltage side circuit breaker of the photovoltaic array box transformer is disconnected to reduce unnecessary power loss on the photovoltaic array box transformer line.
[0043] In one example, when all high-voltage side circuit breakers of photovoltaic array box-type transformers in the same array are disconnected, the loss reduction device 1 is also used to disconnect the corresponding photovoltaic collector line circuit breakers to reduce unnecessary line losses on the photovoltaic collector line.
[0044] In one example, the loss reduction device 1 is further used to close the photovoltaic collector circuit breaker within a second preset time range.
[0045] In an optional embodiment, the second preset time range can be set according to the sunrise time, or according to actual conditions such as weather, and no specific limitation is made here. The sunrise time can be obtained by a sun rise and set time acquisition device.
[0046] In one example, the loss reduction device 1 is also used to delay for a first time period after closing the photovoltaic collector circuit breaker, and close the high-voltage side circuit breaker of the corresponding photovoltaic array box transformer.
[0047] After closing the photovoltaic collector line circuit breaker, delay for the first time, and then close the high-voltage side circuit breaker of the corresponding photovoltaic array box transformer after the photovoltaic collection line is stable, which is beneficial to the stability of the operation of the photovoltaic collection line.
[0048] In one example, the loss reduction device 1 is also used to delay for a second time period after closing the high-voltage side circuit breaker of the corresponding photovoltaic array box transformer, and start the photovoltaic inverter with a sunlight intensity greater than a preset light intensity.
[0049] After closing the high-voltage side circuit breaker of the photovoltaic array box-type transformer, delay for a second time, and wait until the high-voltage side line of the photovoltaic array box-type transformer is stable, and then start the photovoltaic inverter with a sunlight intensity greater than the preset light intensity, which is beneficial to the stability of the high-voltage side line of the photovoltaic array box-type transformer.
[0050] In one example, in the automatic power generation control device 2, each wind turbine and each photovoltaic inverter in the operating group and the hot standby group are started in the order from near to far from the boosting station.
[0051] The closer the distance between each wind turbine and each photovoltaic inverter and the booster station, the smaller the line loss. Start each wind turbine and each photovoltaic inverter in the operating group and hot standby group in the order from closest to the booster station to farthest, to reduce unnecessary line loss.
[0052] In one example, each wind turbine and each photovoltaic inverter located on a collector line is started in the order from near to far from the grid connection point of the collector line.
[0053] The closer the distance between each wind turbine and each photovoltaic inverter and the grid connection point of the collector line, the smaller the line loss. Start each wind turbine and each photovoltaic inverter on a collector line in the order from closest to the grid connection point to farthest, so as to reduce unnecessary line loss.
[0054] Figure 2 It is a scenario schematic diagram of a loss reduction power generation system of a wind and solar power station proposed according to an exemplary embodiment.
[0055] The loss reduction device 1 obtains the time, the voltage value of each photovoltaic inverter, the current value of each photovoltaic inverter, and the light intensity through the sun rise and set time acquisition device, the photovoltaic power generation system voltage and current acquisition device, and the light intensity acquisition device. The loss reduction device 1 determines the start and stop of each photovoltaic inverter, the closing of the high-voltage side circuit breaker of the photovoltaic array box transformer and the photovoltaic collector circuit breaker through the acquired time, voltage value, current value, and light intensity, and sends the status of each photovoltaic inverter to the automatic power generation control device 2.
[0056] The automatic power generation control device 2 controls the wind power management platform and the photovoltaic inverter through the operating status of each photovoltaic inverter, the operating status of each wind turbine, the dispatching instruction and the wind and solar power prediction system. The operating status of each wind turbine can be obtained through the wind power management platform. The wind power management platform controls the operation of the wind turbine cluster and the corresponding wind turbine yaw system, and the photovoltaic inverter controls the operation of the corresponding photovoltaic array.
[0057] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0058] The above is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features applied herein.
Claims
1. A loss-reducing power generation system for a wind and solar power station, characterized in that: The system comprises: a loss reduction device and an automatic power generation control device; The loss reduction device is used to obtain time, light intensity, voltage value of each photovoltaic inverter and current value of each photovoltaic inverter; within a first preset time range, when the light intensity is less than the preset light intensity, the photovoltaic inverter with a voltage value less than the first preset voltage value and a current value less than the first preset current value is shut down; and the operating status of the shut down photovoltaic inverter is sent to the automatic power generation control device; The automatic power generation control device is used to obtain the operating status of each photovoltaic inverter, the operating status of each wind turbine, the dispatching instruction and the wind-solar power prediction data; according to the operating status of each photovoltaic inverter, the operating status of each wind turbine, the dispatching instruction and the wind-solar power prediction data, each wind turbine and each photovoltaic inverter are divided into an operating group, a hot standby group, a cold standby group and a fault group; When the dispatch instruction changes, the wind turbines and photovoltaic inverters in the operating group will respond first, the insufficient part will be supplemented by the wind turbines and photovoltaic inverters in the hot standby group, and the wind turbines and photovoltaic inverters in the cold standby group and the fault group will be shut down.
2. The system according to claim 1, characterized in that The loss reduction device is also used to obtain the voltage value on the low-voltage side of each photovoltaic array box transformer and the current value on the low-voltage side of each photovoltaic array box transformer; when the low-voltage side voltage value of the photovoltaic array box transformer is less than a second preset voltage value, and the low-voltage side current value of the photovoltaic array box transformer is less than the second preset current value, and the number of photovoltaic inverters that are shut down in the photovoltaic array box transformer is greater than a preset number, the high-voltage side circuit breaker of the photovoltaic array box transformer is disconnected.
3. The system according to claim 2, characterized in that When all high-voltage side circuit breakers of the photovoltaic array box-type transformers in the same array are disconnected, the loss reduction device is also used to disconnect the corresponding photovoltaic collector line circuit breakers.
4. The system according to claim 3, characterized in that The loss reduction device is also used to close the photovoltaic collector circuit breaker within a second preset time range.
5. The system according to claim 4, characterized in that The loss reduction device is also used to delay for a first time period after closing the photovoltaic collector line circuit breaker, and close the high-voltage side circuit breaker of the corresponding photovoltaic array box transformer.
6. The system according to claim 5, characterized in that The loss reduction device is also used to delay for a second time period after closing the high-voltage side circuit breaker of the corresponding photovoltaic array box transformer, and start the photovoltaic inverter with a sunlight intensity greater than a preset light intensity.
7. The system according to claim 1, characterized in that In the automatic power generation control device, each wind turbine and each photovoltaic inverter in the operating group and the hot standby group are started in the order from near to far from the boosting station.
8. The system according to claim 7, characterized in that The wind turbines and photovoltaic inverters on a collector line are started in order from near to far from the grid connection point of the collector line.