A construction method for steel structure + ECC panel decorative components
By using the prefabrication and overall installation method of steel structure + ECC panel decorative components, the complexity and safety risks of bridge decorative section construction have been solved, achieving efficient and safe construction results and optimizing the structural self-weight and aesthetics.
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- THE 2ND ENG CO LTD MBEC
- Filing Date
- 2023-05-06
- Publication Date
- 2026-05-26
AI Technical Summary
The existing bridge decoration section construction has problems such as complex structure and process, requiring a large investment of personnel, machinery and temporary measures, high safety risks and long construction period, especially in complex environments where construction is difficult.
The project adopts a prefabrication process and overall installation method using steel structure + ECC panel decorative components, including site leveling, frame fabrication, rebar tying, ECC concrete pouring, hoisting and connection. It utilizes steel structure and high-ductility concrete to replace conventional dense reinforced concrete structure, and adopts mature prefabrication and installation technology.
It reduced construction difficulty and safety risks, decreased the input of personnel, machinery and temporary measures, improved construction quality and efficiency, and optimized the structure's self-weight and aesthetics.