An intelligent emergency power protection system and method based on PLC control

Through the intelligent emergency power maintenance system based on PLC control, the power maintenance control strategy is automatically determined and executed, which solves the problem of low efficiency of manual strategy formulation in the existing technology, achieves the effect of quickly adapting to changes in power demand, and reduces labor costs. And improve the level of power grid management.

CN116799940BActive Publication Date: 2024-10-08EMERGENCY MANAGEMENT CENT OF STATE GRID SHANDONG ELECTRIC POWER +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310683236.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-09
Publication Date
2024-10-08
Estimated Expiration
2043-06-09

AI Technical Summary

Technical Problem

The existing emergency power maintenance system requires manual power maintenance control strategies, resulting in low efficiency and high labor costs. Especially when power demand changes frequently, it is difficult to adapt quickly.

Method used

An intelligent emergency power protection system based on PLC control is used to obtain power demand and power reserve information through the information acquisition module, and the power maintenance control strategy determination module is used to automatically determine and execute the power maintenance control strategy, including feature extraction, prioritization and series connection. Generate search conditions, dynamically select and transform power supply control experience, and realize automated decision-making.

Benefits of technology

It realizes the automatic determination and execution of power maintenance control strategies when emergency backup power supplies power, reduces labor costs, improves the efficiency of formulating power maintenance control strategies, can adapt to changes in power demand, and improves the level of power grid emergency management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116799940B_ABST
    Figure CN116799940B_ABST
Patent Text Reader

Abstract

The present invention provides an intelligent emergency power protection system and method based on PLC control, wherein the system includes: an information acquisition module, which is used to respectively obtain the power demand information of the power consumption site and the electric energy reserve information of the emergency backup power supply when the power consumption site switches to the emergency backup power supply; a power protection control strategy determination module, which is used to determine the power protection control strategy based on the power demand information and the electric energy reserve information; a command issuance module, which is used to issue a command to execute the power protection control strategy to the preset PLC power supply control platform corresponding to the power consumption site. When the power consumption site switches to the emergency backup power supply, the present invention immediately determines and executes the power protection control strategy based on the power demand information and the electric energy reserve information, without the need for manual completion by management personnel, thereby reducing labor costs and improving the efficiency of formulating the power protection control strategy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power supply protection at power consumption sites, and in particular to an intelligent emergency power supply protection system and method based on PLC control. Background Art

[0002] At present, with the development of social economy, users have higher and higher demands for power supply reliability. The increase in power supply tasks for various important activities, examinations and conferences has put higher and higher requirements on power supply. In order to ensure the safety of the power grid and maintain social stability, emergency power supply is particularly urgent.

[0003] Important power consumption sites in the city are equipped with emergency backup power supplies. When the main power supply line supplying power to the power consumption site is cut off due to faults or other reasons, the power consumption site needs to immediately switch to the emergency backup power supply.

[0004] The power reserve of the emergency backup power supply is limited. Therefore, it is necessary to reasonably determine the power control strategy (for example, which equipment needs to be powered immediately and which equipment does not need to be powered temporarily) and execute it according to the power demand of the power consumption site (for example, what production tasks are the power equipment in the power consumption site performing, the importance of the production tasks performed, etc.). However, the power demand of the power consumption site is not fixed (for example, the production tasks assigned to the power equipment in the power consumption site will change, and the importance of the production tasks performed will also change). Therefore, the formulation of the power control strategy needs to be completed manually by the management personnel in the power consumption site at that time. However, it takes a certain amount of time for the management personnel to manually formulate the power control strategy, especially when the power demand in the power consumption site changes many times during the period when the power consumption site switches to the emergency backup power supply, the management personnel need to re-formulate the power control strategy every time. Therefore, the labor cost is large and the efficiency of formulating the power control strategy is insufficient.

[0005] A solution is urgently needed for this. Summary of the invention

[0006] One of the purposes of the present invention is to provide an intelligent emergency power protection system based on PLC control, which provides a guarantee for the emergency repair work of the power company, and at the same time improves the emergency management level of the power grid and optimizes the emergency resource allocation. When the power consumption site is switched to the emergency backup power supply, the power protection control strategy is immediately determined and executed according to the power demand information and the power reserve information, without the need for management personnel to complete it manually, thus reducing labor costs and improving the efficiency of formulating the power protection control strategy. In addition, during the period when the power consumption site is switched to the emergency backup power supply, when the power demand in the power consumption site changes multiple times, the system can simply re-formulate the power protection control strategy multiple times, which is particularly applicable.

[0007] An embodiment of the present invention provides an intelligent emergency power protection system based on PLC control, comprising:

[0008] An information acquisition module is used to obtain the power demand information of the power consumption site and the power reserve information of the emergency backup power supply when the power consumption site switches to the emergency backup power supply;

[0009] A power supply control strategy determination module is used to determine the power supply control strategy based on power demand information and power reserve information;

[0010] A command issuing module is used to issue a command to execute a power protection control strategy to the preset PLC power supply control platform corresponding to the power consumption site;

[0011] The power supply control strategy determination module determines the power supply control strategy based on the power demand information and the power reserve information, and performs the following operations:

[0012] Determine the experience selection strategy based on electricity demand information and power reserve information;

[0013] Based on the experience selection strategy, target power conservation control experience is selected from the preset power conservation control experience pool;

[0014] Determine the power supply control strategy based on the target power supply control experience.

[0015] Preferably, the power conservation control strategy determination module determines the experience selection strategy based on the power demand information and the power reserve information, and performs the following operations:

[0016] Based on a preset first feature extraction template, feature extraction is performed on the power demand information and the power reserve information to obtain a plurality of information features;

[0017] Determine the priority corresponding to the feature type of the information feature from a preset ranking priority library;

[0018] When the priority is 1, the corresponding information feature is included in the first-level feature set;

[0019] When the priority is M, the corresponding information feature is included in the Mth level feature set; where M is an integer greater than 1;

[0020] Copy the information features in the M-1th level feature set and include them in the Mth level feature set;

[0021] Based on the preset serial search condition generation template, the Nth level serial search condition is generated according to the Nth level feature set; wherein N is an integer from 1 to M;

[0022] The generated experience selection strategy is:

[0023] Traverse the Nth level of concatenated search conditions in order of levels;

[0024] During each traversal, the power conservation control experience that meets the traversed Nth level series search condition is tried to be determined from the power conservation control experience pool;

[0025] When the attempt is made to determine, continue to traverse the next N-th level of serial retrieval conditions; otherwise, stop traversing the N-th level of serial retrieval conditions, and at the same time, select the power conservation control experience determined by the last attempt as the target power conservation control experience.

[0026] Preferably, the power conservation control strategy determination module determines the power conservation control strategy based on the target power conservation control experience and performs the following operations:

[0027] Based on the preset information extraction template, the power supply control execution experience is extracted from the target power supply control experience;

[0028] Based on the preset experience conversion rules, the power conservation control execution experience is converted into power conservation control strategy items;

[0029] Integrate the power conservation control strategy items to obtain the power conservation control strategy.

[0030] Preferably, the intelligent emergency power protection system based on PLC control also includes:

[0031] Experience pool expansion module, used to expand the power protection control experience pool;

[0032] The experience pool expansion module expands the power protection control experience pool and performs the following operations:

[0033] Get the preset expansion experience requirements;

[0034] Obtain the power supply control experience to be evaluated that meets the expansion experience requirements through the preset expansion sources;

[0035] Evaluate the first confidence level of the power supply control experience to be evaluated;

[0036] When the first confidence level is greater than or equal to a preset first threshold, the power supply control experience to be evaluated is stored in the power supply control experience pool; otherwise, when the first confidence level is greater than or equal to a preset second threshold, the second confidence level of the source scenario providing the power supply control experience to be evaluated in the expansion source is evaluated;

[0037] When the difference between the second confidence level and the first confidence level is greater than or equal to a preset third threshold, the power conservation control experience to be evaluated is stored in a power conservation control experience pool;

[0038] The first threshold is greater than the second threshold; and the difference between the first threshold and the second threshold is less than the third threshold.

[0039] Preferably, the experience pool expansion module evaluates the first confidence level of the power protection control experience to be evaluated and performs the following operations:

[0040] Based on a preset second feature extraction template, feature extraction is performed on the power conservation control experience to be evaluated to obtain at least one experience feature;

[0041] Perform feature matching of the experience feature with the trigger experience feature in a preset trigger experience feature library;

[0042] When none of the matches are in compliance, the first confidence level is calculated using a preset first standard value; otherwise, a trigger experience feature set consisting of trigger experience features that are in compliance with the matches is obtained;

[0043] Obtaining a preset confidence evaluation library corresponding to the trigger experience feature set, the confidence evaluation library including: multiple groups of one-to-one corresponding confidence evaluation strategies and strategy weights;

[0044] Traverse the confidence evaluation strategies in sequence;

[0045] Each time the traversal is performed, the confidence evaluation of the power supply control experience to be evaluated is performed based on the confidence evaluation strategy traversed, and the evaluation value is obtained. At the same time, based on the strategy weight corresponding to the confidence evaluation strategy traversed in history, a weight curve is drawn; the horizontal axis of the weight curve is the generation time of the strategy weight, and the vertical axis is the strategy weight;

[0046] The weight curve is matched with a preset standard weight curve to obtain a matching degree;

[0047] When the matching degree is greater than or equal to the preset matching degree threshold, stop traversing the next confidence evaluation strategy, accumulate and calculate the evaluation value, and use the accumulated calculation sum as the first confidence; otherwise, continue to traverse the next confidence evaluation strategy;

[0048] Among them, the first standard value is smaller than the second threshold value.

[0049] Preferably, the experience pool expansion module evaluates the second confidence level of the source scenario providing the power protection control experience to be evaluated in the expansion source, and performs the following operations:

[0050] Get the scene ID of the source scene;

[0051] Based on the preset credit inquiry template and the scenario identifier, the credit value of the source scenario is inquired from the expansion source;

[0052] When the credit value is less than or equal to the preset credit threshold, the second confidence level is calculated based on the preset second standard value; otherwise, the preset confidence level library is queried to determine the second confidence level corresponding to the credit value;

[0053] The second standard value is an average value of the first threshold value and the second threshold value.

[0054] An embodiment of the present invention provides an intelligent emergency power protection method based on PLC control, comprising:

[0055] Step S1: When the power consumption site is switched to the emergency backup power supply, the power demand information of the power consumption site and the power reserve information of the emergency backup power supply are respectively obtained;

[0056] Step S2: Determine a power conservation control strategy based on power demand information and power reserve information;

[0057] Step S3: issuing a command to execute the power protection control strategy to the preset PLC power supply control platform corresponding to the power consumption site;

[0058] Wherein, step S2: based on the power demand information and the power reserve information, determine the power protection control strategy, including:

[0059] Determine the experience selection strategy based on electricity demand information and power reserve information;

[0060] Based on the experience selection strategy, target power conservation control experience is selected from the preset power conservation control experience pool;

[0061] Determine the power supply control strategy based on the target power supply control experience.

[0062] Preferably, based on the electricity demand information and the electric energy reserve information, an experience selection strategy is determined, including:

[0063] Based on a preset first feature extraction template, feature extraction is performed on the power demand information and the power reserve information to obtain a plurality of information features;

[0064] Determine the priority corresponding to the feature type of the information feature from a preset ranking priority library;

[0065] When the priority is 1, the corresponding information feature is included in the first-level feature set;

[0066] When the priority is M, the corresponding information feature is included in the Mth level feature set; where M is an integer greater than 1;

[0067] Copy the information features in the M-1th level feature set and include them in the Mth level feature set;

[0068] Based on the preset serial search condition generation template, the Nth level serial search condition is generated according to the Nth level feature set; wherein N is an integer from 1 to M;

[0069] The generated experience selection strategy is:

[0070] Traverse the Nth level of concatenated search conditions in order of levels;

[0071] During each traversal, the power conservation control experience that meets the traversed Nth level series search condition is tried to be determined from the power conservation control experience pool;

[0072] When the attempt is made to determine, continue to traverse the next N-th level of serial retrieval conditions; otherwise, stop traversing the N-th level of serial retrieval conditions, and at the same time, select the power conservation control experience determined by the last attempt as the target power conservation control experience.

[0073] Preferably, based on the target power conservation control experience, a power conservation control strategy is determined, including:

[0074] Based on the preset information extraction template, the power supply control execution experience is extracted from the target power supply control experience;

[0075] Based on the preset experience conversion rules, the power conservation control execution experience is converted into power conservation control strategy items;

[0076] Integrate the power conservation control strategy items to obtain the power conservation control strategy.

[0077] Preferably, the intelligent emergency power protection method based on PLC control also includes:

[0078] Expand the power protection control experience pool;

[0079] Among them, the power protection control experience pool is expanded, including:

[0080] Get the preset expansion experience requirements;

[0081] Obtain the power supply control experience to be evaluated that meets the expansion experience requirements through the preset expansion sources;

[0082] Evaluate the first confidence level of the power supply control experience to be evaluated;

[0083] When the first confidence level is greater than or equal to a preset first threshold, the power supply control experience to be evaluated is stored in the power supply control experience pool; otherwise, when the first confidence level is greater than or equal to a preset second threshold, the second confidence level of the source scenario providing the power supply control experience to be evaluated in the expansion source is evaluated;

[0084] When the difference between the second confidence level and the first confidence level is greater than or equal to a preset third threshold, the power conservation control experience to be evaluated is stored in a power conservation control experience pool;

[0085] The first threshold is greater than the second threshold; and the difference between the first threshold and the second threshold is less than the third threshold.

[0086] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.

[0087] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0088] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0089] Figure 1 Schematic diagram of an intelligent emergency power protection system based on PLC control in an embodiment of the present invention;

[0090] Figure 2 Schematic diagram of an intelligent emergency power protection method based on PLC control in an embodiment of the present invention. DETAILED DESCRIPTION

[0091] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0092] The embodiment of the present invention provides an intelligent emergency power protection system based on PLC control, such as Figure 1 As shown, including:

[0093] The information acquisition module 1 is used to obtain the power demand information of the power consumption site and the power reserve information of the emergency backup power supply when the power consumption site switches to the emergency backup power supply; the power demand information includes: the model of the power consumption equipment that needs to be powered at the power consumption site, the task performed by the power consumption equipment, the importance of the task performed, etc.; the power reserve information includes: the remaining power of the emergency backup power supply, etc.;

[0094] A power supply control strategy determination module 2 is used to determine a power supply control strategy based on power demand information and power reserve information;

[0095] The command issuing module 3 is used to issue a command to execute the power protection control strategy to the preset PLC power supply control platform corresponding to the power consumption site; wherein the PLC power supply control platform is a server, which is connected to the emergency backup power supply and the power consumption equipment in the power consumption site through PLC wiring to realize power supply control; the specific wiring method of the PLC wiring can be determined by the technical personnel in the power consumption site according to the specific needs; relying on the high reliability and strong anti-interference ability of the PLC wiring itself, the stability of the power supply control can be improved;

[0096] The power conservation control strategy determination module 2 determines the power conservation control strategy based on the power demand information and the power reserve information, and performs the following operations:

[0097] Based on the power demand information and the power reserve information, an experience selection strategy is determined; wherein the power demand information and the power reserve information reflect the current power supply status of the equipment at the power consumption site, and the experience selection strategy is a strategy for selecting the target power protection control experience that meets the power supply status of the equipment; the specific determination process of the experience selection strategy is introduced in the following embodiment;

[0098] Based on the experience selection strategy, the target power conservation control experience is selected from the preset power conservation control experience pool; there are a large number of power conservation control experiences in the power conservation control experience pool, which are suitable for different equipment waiting for power supply; for example: the equipment waiting for power supply is that the A-type equipment is loading materials for 30 minutes, and the B-type equipment is charging the workshop vehicle for 60 minutes, and the remaining power is 50%. The power conservation control experience is that 50% of the power is only enough for the A-type equipment to load materials for 30 minutes and the loading task has a higher priority than the charging task, so the emergency backup power supply is controlled to supply power to the A-type equipment only;

[0099] Based on the target power conservation control experience, the power conservation control strategy is determined. The specific determination process of the power conservation control strategy is introduced in the following embodiment.

[0100] The working principle and beneficial effects of the above technical solution are:

[0101] When the power consumption site is switched to the emergency backup power supply, the present application immediately determines and executes the power protection control strategy based on the power demand information and the power reserve information, without the need for management personnel to complete it manually, thus reducing labor costs and improving the efficiency of formulating the power protection control strategy. In addition, during the period when the power consumption site is switched to the emergency backup power supply, when the power demand in the power consumption site changes multiple times, the system can re-formulate the power protection control strategy multiple times, which is particularly applicable. Secondly, the power protection control experience pool is introduced so that the system can adaptively formulate power protection control strategies when used in different power consumption sites.

[0102] In specific applications, the system is implemented in the form of a processor, which connects with the information background of the power consumption site to obtain power demand information, then connects with the emergency backup power supply to obtain power reserve information, and also connects with the PLC power supply control platform to issue commands to execute power protection control strategies.

[0103] In one embodiment, the power conservation control strategy determination module 2 determines the experience selection strategy based on the power demand information and the power reserve information, and performs the following operations:

[0104] Based on the preset first feature extraction template, feature extraction is performed on the power demand information and the power reserve information to obtain multiple information features; wherein the information features include: the model of the power-consuming equipment, the task performed by the power-consuming equipment, the importance of the task performed, the remaining power of the emergency backup power supply, etc.; the first feature extraction template is set to limit the target of feature extraction to a template of such information features, which can be set in advance by the technical personnel according to the needs;

[0105] Determine the priority corresponding to the feature type of the information feature from a preset ranking priority library; wherein the ranking priority library has priorities corresponding to feature types of different information features, and the higher the priority, the more applicable the selected target power conservation control experience should be to the corresponding information feature, for example: the target power conservation control experience must be applicable to the power-consuming equipment of the power-consuming equipment model, and the power-consuming equipment model has the highest priority; the highest priority is 1, and the closer the other priorities are to 1, the higher they are;

[0106] When the priority is 1, the corresponding information feature is included in the first-level feature set;

[0107] When the priority is M, the corresponding information feature is included in the Mth level feature set; where M is an integer greater than 1;

[0108] Copy the information features in the M-1th level feature set and include them in the Mth level feature set;

[0109] Based on the preset serial retrieval condition generation template, the Nth level serial retrieval condition is generated according to the Nth level feature set; wherein N is an integer from 1 to M; wherein the Nth level serial retrieval condition is a condition for retrieving the target power protection control experience applicable to all information features in the Nth level feature set, for example: the information features in the Nth level feature set are respectively the model of the power equipment is QH17, the loading task is performed for 30 minutes, etc., then the generated Nth level serial retrieval condition is that the applicable power equipment of the target power protection control experience includes the power equipment of the model QH17 and the applicable power equipment of the target power protection control experience performs the task of loading for 30 minutes; the serial retrieval condition generation template is a template for executing this type of Nth level serial retrieval condition generation according to the Nth level serial retrieval condition, which can be set in advance by the technical personnel according to the needs;

[0110] The generated experience selection strategy is:

[0111] Traverse the Nth level of serial search conditions in order of level; among them, the first level of serial search conditions are traversed first, the second level of serial search conditions are traversed second, and so on;

[0112] During each traversal, the power conservation control experience that meets the traversed Nth level series search condition is tried to be determined from the power conservation control experience pool;

[0113] When the attempt is confirmed, continue to traverse the next N-level series search conditions; otherwise, stop traversing the N-level series search conditions, and at the same time, select the power control experience determined by the last attempt as the target power control experience. Among them, the more the traversal is done, the more information features the retrieved power control experience needs to apply, and the more stringent the search conditions are. Therefore, if the attempt is confirmed, the retrieval is obtained and the traversal is continued, otherwise, the last retrieved power control experience is used as the target power control experience.

[0114] The working principle and beneficial effects of the above technical solution are:

[0115] Generally, the power control experience pool may not contain power control experience that is completely applicable to the current equipment power supply situation at the power consumption site, that is, it is not completely applicable to every information feature. However, using emergency backup power to control power consumption at the power consumption site is mostly a temporary process, and the main power supply line at the power consumption site may resume power supply at any time. Therefore, the target power control experience used does not necessarily need to be completely applicable to every information feature, that is, there is a certain allowable error space. The embodiment of the present invention introduces an arrangement priority library, assigns priorities to information features, generates N-th level series search conditions according to the priorities, and traverses the power control experience pool in sequence to search, so that the retrieved target power control experience is applicable to the most applicable information features, and is applicable to more information features to the maximum extent, which improves the rationality of the selection of target power control experience and is more in line with actual applications.

[0116] In one embodiment, the power conservation control strategy determination module 2 determines the power conservation control strategy based on the target power conservation control experience and performs the following operations:

[0117] Based on the preset information extraction template, the power supply control execution experience is extracted from the target power supply control experience; wherein, the power supply control execution experience is the execution process in the target power supply control experience, such as: controlling the emergency backup power supply to supply power to which equipment, how long the power supply lasts, etc.; the information extraction template is set to limit the information extraction target to the template of this type of power supply control execution experience, which can be set in advance by the technical personnel according to the needs;

[0118] Based on the preset experience conversion rules, the power protection control execution experience is converted into power protection control strategy items; the experience conversion rules are rules for converting the power protection control execution experience into power protection control strategy items executable by the PLC power supply control platform. For example, if the power protection control execution experience is to supply power to device A for 20 minutes, the converted power protection control strategy item is to control the emergency backup power supply to continuously supply power to device A for 20 minutes; the experience conversion rules can also be set in advance by technical personnel according to needs;

[0119] The power conservation control strategy items are integrated to obtain the power conservation control strategy. During integration, the power conservation control strategy items are arranged and combined one by one to obtain the power conservation control strategy.

[0120] In one embodiment, the intelligent emergency power protection system based on PLC control further includes:

[0121] Experience pool expansion module, used to expand the power protection control experience pool;

[0122] The experience pool expansion module expands the power protection control experience pool and performs the following operations:

[0123] Obtain preset expanded experience requirements; wherein, the expanded experience requirements include: experience should be experience in using emergency backup power supply to control power supply protection at power consumption sites;

[0124] Obtain the power supply control experience to be evaluated that meets the requirements of the expansion experience through the preset expansion sources; the expansion sources include: the expert platform (where there are a large number of experts with experience in power supply control for different power consumption sites using emergency backup power supplies), the public experience sharing platform (where there are experiences of power supply control for different power consumption sites using emergency backup power supplies shared by staff at different power consumption sites), etc.;

[0125] Evaluate the first confidence level of the power supply control experience to be evaluated; wherein the first confidence level represents the credibility of the power supply control experience to be evaluated, and the higher the first confidence level, the higher the credibility;

[0126] When the first confidence is greater than or equal to the preset first threshold, the power supply control experience to be evaluated is stored in the power supply control experience pool; otherwise, when the first confidence is greater than or equal to the preset second threshold, the second confidence of the source scenario of the extended source that provides the power supply control experience to be evaluated is evaluated; wherein, when the first confidence is greater than or equal to the first threshold, it means that the power supply control experience to be evaluated itself has a high degree of credibility and can be directly included in the pool; otherwise, when the first confidence is greater than or equal to the second threshold, it means that the power supply control experience to be evaluated itself has a high degree of credibility, and whether the power supply control experience to be evaluated can be included in the pool is determined in combination with the second confidence of the source scenario; the specific source scenario is, for example: an expert in an expert platform, a sharer in a public experience sharing platform, etc.;

[0127] When the difference between the second confidence level and the first confidence level is greater than or equal to a preset third threshold, the power supply control experience to be evaluated is stored in the power supply control experience pool; wherein, when the difference is greater than or equal to the third threshold, it indicates that the credibility of the source scenario itself is far greater than the credibility of the power supply control experience to be evaluated itself, and it can be included in the pool;

[0128] Among them, the first threshold is greater than the second threshold; in order to meet the above process of determining whether the power protection control experience to be evaluated is included in the pool, it is necessary to set the first threshold to be greater than the second threshold, for example: the first threshold is 80, and the second threshold is 70;

[0129] The difference between the first threshold and the second threshold is less than the third threshold. This condition is set so that when the difference between the second confidence level and the first confidence level is greater than or equal to the preset third threshold, the credibility of the source scenario itself far exceeds the credibility of the power protection control experience to be evaluated, for example: the third threshold is 30.

[0130] The working principle and beneficial effects of the above technical solution are:

[0131] In order to ensure that the power control experience pool has better ability to determine power control strategies, the power control experience pool needs to be expanded. However, the power control experience entering the pool needs to be quality controlled to avoid the problem of inaccurate power control strategy formulation caused by poor quality power control strategies entering the pool. The embodiment of the present invention introduces the requirement of expanding experience. First, the power control experience to be evaluated is screened out. Based on the first confidence of the power control experience to be evaluated and the second confidence of the source scenario, it is comprehensively determined whether the power control experience to be evaluated is entered into the pool. The power control experience entering the pool is quality controlled, which improves the ability of the power control experience pool to determine power control strategies. In addition, the introduction of different expansion sources improves the comprehensiveness of the expansion of the power control experience pool.

[0132] In one embodiment, the experience pool expansion module expands the power protection control experience pool and performs the following operations:

[0133] Based on the first confidence level and the second confidence level, the evaluation value of the power supply control experience to be evaluated is calculated. The calculation formula is as follows:

[0134] eva=Q1·C1+Q2·C2

[0135] Where, eva is the evaluation value, C1 is the first confidence level, C2 is the second confidence level, Q1 and Q2 are preset weight values; the weight values ​​can be set in advance by the technicians according to the requirements;

[0136] When the evaluation value is greater than or equal to the preset evaluation threshold, the power control experience to be evaluated is stored in the power control experience pool. The evaluation threshold is, for example, 80; when the evaluation value is greater than or equal to the evaluation threshold, it means that the comprehensive credibility of the power control experience to be evaluated is high enough after comprehensive comparison with the first confidence level and the second confidence level, and it is directly added to the pool. This solution is parallel to the above solution. Improve the efficiency of judging whether the power control experience to be evaluated enters the pool.

[0137] In one embodiment, the experience pool expansion module evaluates the first confidence level of the power protection control experience to be evaluated and performs the following operations:

[0138] Based on the preset second feature extraction template, feature extraction is performed on the power supply control experience to be evaluated to obtain at least one experience feature; wherein the experience feature includes: whether the power supply control experience to be evaluated has been historically applied to the power consumption site, the content and size of the power supply control experience to be evaluated, etc.;

[0139] The experience feature is matched with the trigger experience feature in the preset trigger experience feature library; wherein the trigger experience feature is an experience feature representing that the power supply control experience to be evaluated may have value in the pool, for example: the power supply control experience to be evaluated has a power consumption site where it has been historically applied (application indicates that the authenticity of the power supply control experience to be evaluated is guaranteed), etc.;

[0140] When none of the matches are in compliance, the first confidence is calculated using a preset first standard value; otherwise, a trigger experience feature set consisting of trigger experience features that match the matches is obtained; wherein, if none of the experience features and the trigger experience feature matches are in compliance, it means that the power protection control experience to be evaluated has no value in the pool, and the first confidence is calculated using a first standard value less than a second threshold, so that the power protection control experience to be evaluated does not enter the pool;

[0141] Obtain a preset confidence assessment library corresponding to the trigger experience feature set, the confidence assessment library includes: multiple groups of one-to-one corresponding confidence assessment strategies and strategy weights; wherein, the confidence assessment strategy is a strategy for evaluating the credibility of the power supply control experience to be evaluated by evaluating the content related to the trigger experience feature in the power supply control experience to be evaluated. Specifically, for example: if the trigger experience feature is that the power supply control experience to be evaluated has a power consumption site where the power supply control experience to be evaluated has been historically applied, then the credibility of the power supply control experience to be evaluated is evaluated based on the number of power consumption sites that have been historically applied in the power supply control experience to be evaluated. The larger the number of sites, the higher the credibility. The strategy weight reflects the degree to which the evaluation result using the confidence assessment strategy can be used to determine whether the power supply control experience to be evaluated should be included in the library. The larger the strategy weight, the higher the degree of credibility.

[0142] Traverse the confidence evaluation strategies in sequence;

[0143] Each time the traversal is performed, the confidence evaluation of the power supply control experience to be evaluated is performed based on the confidence evaluation strategy traversed, and the evaluation value is obtained. At the same time, a weight curve is drawn based on the strategy weight corresponding to the confidence evaluation strategy traversed in history; the horizontal axis of the weight curve is the generation time of the strategy weight, and the vertical axis is the strategy weight; the larger the evaluation value, the better the result of the confidence evaluation of the power supply control experience to be evaluated based on the confidence evaluation strategy;

[0144] The weight curve is matched with the preset standard weight curve to obtain the matching degree; wherein, the standard weight curve reflects that the confidence assessment strategy used is sufficient to determine whether the power protection control experience to be assessed is stored in the database, for example: the strategy weights of the confidence assessment strategies used in the early stage in the standard weight curve are all relatively high; curve matching belongs to the scope of the existing technology and will not be elaborated;

[0145] When the matching degree is greater than or equal to the preset matching degree threshold, stop traversing the next confidence evaluation strategy, accumulate and calculate the evaluation value, and use the accumulated calculation sum as the first confidence; otherwise, continue to traverse the next confidence evaluation strategy; Among them, when the matching degree is greater than or equal to the matching degree threshold, it means that the used confidence evaluation strategy is sufficient to determine whether the power protection control experience to be evaluated is stored, and the evaluation value is accumulated and calculated;

[0146] The first standard value is less than the second threshold value. This condition is set so that when the experience feature does not match the trigger experience feature, the power protection control experience to be evaluated will not be included in the pool.

[0147] The working principle and beneficial effects of the above technical solution are:

[0148] The trigger experience feature library is introduced to determine whether the power supply control experience to be evaluated may have value in the pool. If not, the power supply control experience to be evaluated will not be included in the pool, thereby improving the evaluation efficiency of the first confidence level. In addition, the confidence evaluation library is introduced to conduct targeted evaluations on the content related to the trigger experience features in the power supply control experience to be evaluated, further improving the evaluation efficiency of the first confidence level. Finally, the standard weight curve is introduced, and the weight curve is compared with the standard weight curve to determine whether the used confidence evaluation strategy is sufficient to determine whether the power supply control experience to be evaluated should be included in the library. If so, the evaluation value is directly accumulated and calculated as the first confidence level, further improving the evaluation efficiency of the first confidence level.

[0149] In one embodiment, the experience pool expansion module evaluates the second confidence level of the source scenario providing the power protection control experience to be evaluated in the expansion source, and performs the following operations:

[0150] Obtain the scene identifier of the source scene; wherein the scene identifier is an identifier representing the identity of the source scene, such as: expert code, contributor signature, etc.;

[0151] Based on the preset credit inquiry template, according to the scenario identifier, the credit value of the source scenario is inquired from the expansion source; wherein, the expansion source will evaluate the credit value of the source scenario, and the higher the credit value, the more authentic the experience sharing provided by the source scenario in history, and the more effective the feedback; the credit inquiry template is a template used by the system to perform the operation of inquiring the credit value of the source scenario from the expansion source, and can be set in advance by the technical staff according to the needs;

[0152] When the credit value is less than or equal to the preset credit threshold, the second confidence is calculated based on the preset second standard value; otherwise, the preset confidence library is queried to determine the second confidence corresponding to the credit value; wherein the confidence library has second confidences corresponding to different credit values, and the larger the credit value, the higher the second confidence; the credit threshold is, for example: 70;

[0153] The second standard value is the average of the first threshold and the second threshold. The purpose of setting the second standard value to the average of the first threshold and the second threshold is that when the credit value is less than or equal to the credit threshold, the credit performance of the source scene is poor, and the second confidence level will not exceed the first confidence level by much, which limits the power control experience to be evaluated provided by the source scene from entering the pool to a certain extent.

[0154] The embodiment of the present invention provides an intelligent emergency power protection method based on PLC control, such as Figure 2 As shown, including:

[0155] Step S1: When the power consumption site is switched to the emergency backup power supply, the power demand information of the power consumption site and the power reserve information of the emergency backup power supply are respectively obtained;

[0156] Step S2: Determine a power conservation control strategy based on power demand information and power reserve information;

[0157] Step S3: issuing a command to execute the power protection control strategy to the preset PLC power supply control platform corresponding to the power consumption site;

[0158] Wherein, step S2: based on the power demand information and the power reserve information, determine the power protection control strategy, including:

[0159] Determine the experience selection strategy based on electricity demand information and power reserve information;

[0160] Based on the experience selection strategy, target power conservation control experience is selected from the preset power conservation control experience pool;

[0161] Determine the power supply control strategy based on the target power supply control experience.

[0162] In one embodiment, based on the power demand information and the power reserve information, an experience selection strategy is determined, including:

[0163] Based on a preset first feature extraction template, feature extraction is performed on the power demand information and the power reserve information to obtain a plurality of information features;

[0164] Determine the priority corresponding to the feature type of the information feature from a preset ranking priority library;

[0165] When the priority is 1, the corresponding information feature is included in the first-level feature set;

[0166] When the priority is M, the corresponding information feature is included in the Mth level feature set; where M is an integer greater than 1;

[0167] Copy the information features in the M-1th level feature set and include them in the Mth level feature set;

[0168] Based on the preset serial search condition generation template, the Nth level serial search condition is generated according to the Nth level feature set; wherein N is an integer from 1 to M;

[0169] The generated experience selection strategy is:

[0170] Traverse the Nth level of concatenated search conditions in order of levels;

[0171] During each traversal, the power conservation control experience that meets the traversed Nth level series search condition is tried to be determined from the power conservation control experience pool;

[0172] When the attempt is made to determine, continue to traverse the next N-th level of serial retrieval conditions; otherwise, stop traversing the N-th level of serial retrieval conditions, and at the same time, select the power conservation control experience determined by the last attempt as the target power conservation control experience.

[0173] In one embodiment, based on the target power conservation control experience, determining the power conservation control strategy includes:

[0174] Based on the preset information extraction template, the power supply control execution experience is extracted from the target power supply control experience;

[0175] Based on the preset experience conversion rules, the power conservation control execution experience is converted into power conservation control strategy items;

[0176] Integrate the power conservation control strategy items to obtain the power conservation control strategy.

[0177] In one embodiment, the intelligent emergency power protection method based on PLC control further includes:

[0178] Expand the power protection control experience pool;

[0179] Among them, the power protection control experience pool is expanded, including:

[0180] Get the preset expansion experience requirements;

[0181] Obtain the power supply control experience to be evaluated that meets the expansion experience requirements through the preset expansion sources;

[0182] Evaluate the first confidence level of the power supply control experience to be evaluated;

[0183] When the first confidence level is greater than or equal to a preset first threshold, the power supply control experience to be evaluated is stored in the power supply control experience pool; otherwise, when the first confidence level is greater than or equal to a preset second threshold, the second confidence level of the source scenario providing the power supply control experience to be evaluated in the expansion source is evaluated;

[0184] When the difference between the second confidence level and the first confidence level is greater than or equal to a preset third threshold, the power conservation control experience to be evaluated is stored in a power conservation control experience pool;

[0185] The first threshold is greater than the second threshold; and the difference between the first threshold and the second threshold is less than the third threshold.

[0186] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. An intelligent emergency power protection system based on PLC control, characterized in that: include: An information acquisition module is used to obtain the power demand information of the power consumption site and the power reserve information of the emergency backup power supply when the power consumption site switches to the emergency backup power supply; A power conservation control strategy determination module, used to determine a power conservation control strategy based on the power demand information and the electric energy reserve information; A command issuing module, used to issue a command to execute the power conservation control strategy to a preset PLC power supply control platform corresponding to the power consumption site; The power conservation control strategy determination module determines the power conservation control strategy based on the power demand information and the power reserve information, and performs the following operations: Determining an experience selection strategy based on the electricity demand information and the electric energy reserve information; Based on the experience selection strategy, target power conservation control experience is selected from a preset power conservation control experience pool; Based on the target power conservation control experience, determine the power conservation control strategy, The power conservation control strategy determination module determines the experience selection strategy based on the power demand information and the power reserve information, and performs the following operations: Based on a preset first feature extraction template, feature extraction is performed on the power demand information and the power reserve information to obtain a plurality of information features; Determine the priority corresponding to the feature type of the information feature from a preset ranking priority library; When the priority is 1, the corresponding information feature is included in the first-level feature set; When the priority is M, the corresponding information feature is included in the Mth level feature set; wherein M is an integer greater than 1; Copying the information features in the M-1th level feature set and adding them to the Mth level feature set; Based on the preset serial search condition generation template, the Nth level serial search condition is generated according to the Nth level feature set; wherein N is an integer from 1 to M; The experience selection strategy is generated as follows: Traversing the Nth level of serial search conditions in order of levels; During each traversal, the power conservation control experience that meets the traversed N-th level series search condition is attempted to be determined from the power conservation control experience pool; When the attempt is made to determine, continue to traverse the next N-th level series search condition; otherwise, stop traversing the N-th level series search condition, and at the same time, select the power conservation control experience determined by the last attempt as the target power conservation control experience.

2. The intelligent emergency power protection system based on PLC control as claimed in claim 1 is characterized in that: The power conservation control strategy determination module determines the power conservation control strategy based on the target power conservation control experience and performs the following operations: Extracting power conservation control execution experience from the target power conservation control experience based on a preset information extraction template; Based on a preset experience conversion rule, the power conservation control execution experience is converted into a power conservation control strategy item; The power conservation control strategy items are integrated to obtain the power conservation control strategy.

3. The intelligent emergency power protection system based on PLC control as claimed in claim 1 is characterized in that: Also includes: An experience pool expansion module, used to expand the power protection control experience pool; The experience pool expansion module expands the power protection control experience pool and performs the following operations: Get the preset expansion experience requirements; Obtain the power supply control experience to be evaluated that meets the requirements of the expansion experience through the preset expansion source; Evaluating the first confidence level of the power protection control experience to be evaluated; When the first confidence level is greater than or equal to a preset first threshold, the power conservation control experience to be evaluated is stored in the power conservation control experience pool; otherwise, when the first confidence level is greater than or equal to a preset second threshold, the second confidence level of the source scenario of the expanded source providing the power conservation control experience to be evaluated is evaluated; When the difference between the second confidence level and the first confidence level is greater than or equal to a preset third threshold, storing the power conservation control experience to be evaluated in the power conservation control experience pool; The first threshold is greater than the second threshold; and a difference between the first threshold and the second threshold is less than the third threshold.

4. The intelligent emergency power protection system based on PLC control as claimed in claim 3 is characterized in that: The experience pool expansion module evaluates the first confidence level of the power protection control experience to be evaluated and performs the following operations: Based on a preset second feature extraction template, feature extraction is performed on the power conservation control experience to be evaluated to obtain at least one experience feature; Performing feature matching on the experience feature with trigger experience features in a preset trigger experience feature library; When none of the matches are met, the first confidence level is calculated as a preset first standard value; otherwise, a trigger experience feature set consisting of the trigger experience features that meet the matches is obtained; Obtaining a preset confidence evaluation library corresponding to the trigger experience feature set, the confidence evaluation library comprising: a plurality of groups of one-to-one corresponding confidence evaluation strategies and strategy weights; Traversing the confidence assessment strategies in sequence; During each traversal, based on the traversed confidence assessment strategy, the power protection control experience to be evaluated is confidence assessed to obtain an evaluation value. At the same time, based on the strategy weight corresponding to the confidence assessment strategy traversed in history, a weight curve is drawn; the horizontal axis of the weight curve is the generation time of the strategy weight, and the vertical axis is the strategy weight; Performing curve matching between the weight curve and a preset standard weight curve to obtain a matching degree; When the matching degree is greater than or equal to the preset matching degree threshold, stop traversing the next confidence evaluation strategy, accumulate and calculate the evaluation value, and use the accumulated sum as the first confidence; otherwise, continue traversing the next confidence evaluation strategy; Wherein, the first standard value is smaller than the second threshold value.

5. The intelligent emergency power protection system based on PLC control as claimed in claim 3 is characterized in that: The experience pool expansion module evaluates the second confidence level of the source scenario of the expansion source that provides the power protection control experience to be evaluated, and performs the following operations: Obtaining a scene identifier of the source scene; Based on a preset credit inquiry template and according to the scenario identifier, inquiring the extended source about the credit value of the source scenario; When the credit value is less than or equal to a preset credit threshold, the second confidence level is calculated based on a preset second standard value; otherwise, a preset confidence level library is queried to determine the second confidence level corresponding to the credit value; The second standard value is an average value of the first threshold value and the second threshold value.

6. An intelligent emergency power protection method based on PLC control, characterized in that: include: Step S1: When the power consumption site is switched to the emergency backup power supply, the power demand information of the power consumption site and the power reserve information of the emergency backup power supply are respectively obtained; Step S2: determining a power conservation control strategy based on the power demand information and the power reserve information; Step S3: issuing a command to execute the power conservation control strategy to the preset PLC power supply control platform corresponding to the power consumption site; Wherein, the step S2: determining a power conservation control strategy based on the power demand information and the power reserve information includes: Determining an experience selection strategy based on the electricity demand information and the electric energy reserve information; Based on the experience selection strategy, target power conservation control experience is selected from a preset power conservation control experience pool; Based on the target power conservation control experience, determine the power conservation control strategy, Wherein, determining the experience selection strategy based on the electricity demand information and the electric energy reserve information includes: Based on a preset first feature extraction template, feature extraction is performed on the power demand information and the power reserve information to obtain a plurality of information features; Determine the priority corresponding to the feature type of the information feature from a preset ranking priority library; When the priority is 1, the corresponding information feature is included in the first-level feature set; When the priority is M, the corresponding information feature is included in the Mth level feature set; wherein M is an integer greater than 1; Copying the information features in the M-1th level feature set and adding them to the Mth level feature set; Based on the preset serial search condition generation template, the Nth level serial search condition is generated according to the Nth level feature set; wherein N is an integer from 1 to M; The experience selection strategy is generated as follows: Traversing the Nth level of serial search conditions in order of levels; During each traversal, the power conservation control experience that meets the traversed N-th level series search condition is attempted to be determined from the power conservation control experience pool; When the attempt is made to determine, continue to traverse the next N-th level series search condition; otherwise, stop traversing the N-th level series search condition, and at the same time, select the power conservation control experience determined by the last attempt as the target power conservation control experience.

7. The intelligent emergency power protection method based on PLC control as claimed in claim 6 is characterized in that: The determining the power conservation control strategy based on the target power conservation control experience includes: Extracting power conservation control execution experience from the target power conservation control experience based on a preset information extraction template; Based on a preset experience conversion rule, the power conservation control execution experience is converted into a power conservation control strategy item; The power conservation control strategy items are integrated to obtain the power conservation control strategy.

8. The intelligent emergency power protection method based on PLC control as claimed in claim 6 is characterized in that: Also includes: Expanding the power protection control experience pool; The step of expanding the power protection control experience pool includes: Get the preset expansion experience requirements; Obtain the power supply control experience to be evaluated that meets the requirements of the expansion experience through the preset expansion source; Evaluating the first confidence level of the power protection control experience to be evaluated; When the first confidence level is greater than or equal to a preset first threshold, the power conservation control experience to be evaluated is stored in the power conservation control experience pool; otherwise, when the first confidence level is greater than or equal to a preset second threshold, the second confidence level of the source scenario of the expanded source providing the power conservation control experience to be evaluated is evaluated; When the difference between the second confidence level and the first confidence level is greater than or equal to a preset third threshold, storing the power conservation control experience to be evaluated in the power conservation control experience pool; The first threshold is greater than the second threshold; and a difference between the first threshold and the second threshold is less than the third threshold.