A kind of ore sintering experimental device

By designing an ore sintering experimental device including a combustion part, a heat storage chamber, a sintering box and a sealed sleeve, the problem that traditional devices cannot achieve full sealed sintering is solved, and the accurate determination of sintering time and temperature and effective cooling of flue gas is achieved.

CN116858985BActive Publication Date: 2025-03-28BEIJING CHANGAN IRON & STEEL DEVELOPMENT CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311081991.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-26
Publication Date
2025-03-28
Estimated Expiration
2043-08-26

AI Technical Summary

Technical Problem

Traditional ore sintering experimental devices cannot achieve fully sealed sintering, resulting in inaccurate determination of sintering time and temperature.

Method used

An ore sintering experimental device is designed, including a combustion part, a heat storage chamber, a sintering box and a sealing sleeve. The heating is supplied through the combustion part, and the heat storage chamber is sealed with a sintering furnace. The liquid is used for sealing and flue gas heat exchange, so as to achieve sealing sintering and flue gas cooling.

Benefits of technology

The closed state of ore sintering is achieved, the sintering time and temperature are accurately determined, and the cooling is reduced through flue gas heat exchange to reduce high-temperature flue gas emissions and improve combustion efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116858985B_ABST
    Figure CN116858985B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of ore sintering experimental equipment, and discloses an ore sintering experimental device, including: a combustion part for gas combustion heating; a heat storage chamber connected to the combustion part; a sintering box movably arranged at the lower part of the heat storage chamber; and a sealing sleeve fixedly arranged at the lower part of the heat storage chamber. The following technical effects can be achieved: the sealing of the heat storage chamber and the sintering furnace can achieve a closed state during ore sintering, and while the heat storage chamber and the sintering furnace are sealed by liquid, the flue gas generated after sintering can also be heat exchanged and cooled to reduce the emission of high-temperature flue gas, and the reciprocating movement of the sintering box can achieve the preheating of the heat storage chamber and the sintering of the sintering furnace, and during preheating, the flue gas during preheating can be cooled by heat storage stones, and the heat storage stones can be heated while cooling, and the air can be heated by heat storage stones during ore sintering to increase the temperature of the air input into the combustion furnace and increase the combustion efficiency of the combustion furnace.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ore sintering experimental equipment, for example, to an ore sintering experimental device. Background Art

[0002] At present, ore sintering generally adopts a trolley to carry out sealed heating sintering in a kiln. However, since different ores and ores with different contents require different sintering times and sintering temperatures during sintering, it is necessary to conduct sintering experiments on the sintered ores to determine the sintering temperature and time of the ore.

[0003] In the process of implementing the embodiments of the present disclosure, it is found that there are at least the following problems in the related art:

[0004] Traditional ore sintering experiments all use coal combustion sintering experiments, and open sintering is used during sintering. It is impossible to carry out fully enclosed sintering of ore, which is different from the environment inside the ore sintering furnace and cannot accurately determine the sintering time and temperature. Summary of the invention

[0005] In order to provide a basic understanding of some aspects of the disclosed embodiments, a brief summary is given below. The summary is not an extensive review, nor is it intended to identify key / critical components or delineate the scope of protection of these embodiments, but rather serves as a prelude to the detailed description that follows.

[0006] The disclosed embodiment provides an ore sintering experimental device to solve the problem of poor sealing during sintering caused by the ore sintering experimental device opening and closing repeatedly during sintering and preheating.

[0007] In some embodiments, the ore sintering experimental device includes: a combustion part, which is used for gas combustion to provide heat; a heat storage chamber, which is connected to the combustion part and is used to receive the hot air supplied by the combustion part, and the combustion part is arranged on both sides of the heat storage chamber; a sintering box, which is movably arranged at the lower part of the heat storage chamber; a sealing sleeve, which is fixedly arranged at the lower part of the heat storage chamber, and the sealing sleeve is connected to the interior of the heat storage chamber; a first sealing cylinder connected to the interior of the sintering box is provided on one side of the upper part of the sintering box, and a heat exchange flue is provided inside the sintering box, one end of the heat exchange flue extends out of the side wall of the sintering box, and the other end of the heat exchange flue is connected to a sintering furnace, the sintering furnace is arranged in the first sealing cylinder, and the interior of the sintering box carries liquid, and the sealing sleeve can be movably inserted into the liquid between the first sealing cylinder and the sintering furnace; a trolley is provided at the bottom of the sintering box, and a lifting device is provided between the sintering box and the trolley.

[0008] In some embodiments, the combustion part includes: two combustion furnaces, divided into furnace A and furnace B, which are respectively arranged on both sides of the heat storage chamber, and the combustion furnace is connected to the heat storage chamber; two gas pipelines, which are respectively connected to the furnace A and furnace B, and the two gas pipelines are respectively provided with a gas valve; two blast pipes, which are respectively connected to the furnace A and furnace B, and the two blast pipes are respectively provided with a blast valve; three induced draft pipes, two of which are respectively connected to the furnace A and furnace B, and the other one can be connected to the heat exchange flue, and the three induced draft pipes are respectively provided with induced draft valves.

[0009] In some embodiments, a second sealing cylinder is opened on the other side of the upper part of the sintering box, and the second sealing cylinder is flush with the height of the first sealing cylinder, and the first sealing cylinder and the second sealing cylinder are connected through the sintering box; and a sealing platform is provided in the second sealing cylinder, and the height of the sealing platform is flush with the upper part of the second sealing cylinder; a circulating water tank is provided on the upper part of the sintering box, and a circulating water pump is provided in the circulating water tank, and the circulating water pump is connected to the first sealing cylinder; a return water tank is provided on the side wall of the second sealing cylinder, and an overflow port is provided between the second sealing cylinder and the return water tank, and the return water tank is connected to the circulating water tank.

[0010] In some embodiments, it is characterized in that the lifting device includes: four lifting wheels, which are fixedly arranged on two sides of the trolley respectively; a lifting frame, which is fixedly arranged on both sides of the sintering box, and the lifting frame and the lifting wheel are matched and connected; a limit part, which is fixedly arranged on both sides of the bottom of the heat storage chamber; two groups of baffles, two in a group, one group of baffles is fixedly arranged on one side of the sintering box, and the limit part is arranged between the two baffles, and the two groups of baffles are respectively arranged on both sides of the sintering box; a track, which is arranged at the bottom of the trolley, and the trolley is slidably arranged on the track; limit switches, which are fixedly arranged on both sides of the track, and the limit switches are arranged on the tracks on both sides of the trolley.

[0011] In some embodiments, it is characterized in that an explosion-proof sealing valve is provided on the upper portion of the heat storage chamber, and the explosion-proof sealing valve is connected to the heat storage chamber.

[0012] In some embodiments, the combustion furnace includes: furnace A and furnace B, and a breathable partition is provided at the bottom of the combustion furnace, and heat storage stones are provided on the upper part of the partition.

[0013] In some embodiments, the liquid in the sintering box is water, and the height of the liquid is flush with the height of the overflow port.

[0014] In some embodiments, a rubber connecting sleeve is provided at one end of the heat exchange flue extending out of the sintering box, the opening of the rubber connecting sleeve faces upward, and the rubber connecting sleeve can be connected to the induced draft duct.

[0015] In some embodiments, the interior of the heat storage chamber is hollow, and an air duct is provided on the inner side of the bottom of the heat storage chamber, and the air duct is connected to the sealing sleeve.

[0016] In some embodiments, the lifting frame is an inverted V-shaped structure with a groove on one side, and the lifting wheel is slidably disposed in the groove of the lifting frame.

[0017] The ore sintering experimental device provided in the embodiment of the present disclosure can achieve the following technical effects:

[0018] The sealing of the heat storage chamber and the sintering furnace can achieve a closed state during ore sintering, and while the heat storage chamber and the sintering furnace are sealed by liquid, the flue gas generated after sintering can also be cooled by heat exchange, thereby reducing the emission of high-temperature flue gas, and the reciprocating movement of the sintering box can achieve the preheating of the heat storage chamber and the sintering of the sintering furnace, and during preheating, the flue gas during preheating can be cooled by the heat storage stone, and the heat storage stone can be heated while cooling, and the air can also be heated by the heat storage stone during ore sintering, thereby increasing the temperature of the air input into the combustion furnace and increasing the combustion efficiency of the combustion furnace.

[0019] The above general description and the following description are exemplary and explanatory only and are not intended to limit the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] One or more embodiments are exemplarily described by corresponding drawings, which do not limit the embodiments. Elements with the same reference numerals in the drawings are shown as similar elements, and the drawings do not constitute a scale limitation, and wherein:

[0021] Figure 1 It is a schematic diagram of the structure of an ore sintering experimental device provided in an embodiment of the present disclosure;

[0022] Figure 2 It is a schematic diagram of the top view of the structure of the ore sintering experimental device provided in an embodiment of the present disclosure;

[0023] Figure 3 It is a schematic diagram of the sintering box and trolley structure provided by an embodiment of the present disclosure;

[0024] Figure 4 It is a schematic diagram of the structure of a sintering box lifting device provided in an embodiment of the present disclosure;

[0025] Figure 5 It is a schematic diagram of the cross-sectional structure of the connection between the sintering box and the regenerator provided in an embodiment of the present disclosure;

[0026] Figure 6 is a schematic diagram of the cross-sectional structure of a combustion furnace and a heat storage chamber provided in an embodiment of the present disclosure;

[0027] Figure 7 It is a schematic diagram of the lifting wheel and lifting frame structure provided in an embodiment of the present disclosure.

[0028] Reference numerals:

[0029] 100, heat storage chamber; 101, sealing sleeve; 102, air duct; 200, sintering box; 201, first sealing cylinder; 202, heat exchange flue; 203, sintering furnace; 204, second sealing cylinder; 205, sealing platform; 206, circulating water tank; 207, circulating water pump; 208, return water tank; 209, overflow port; 210, rubber connecting sleeve; 300, trolley; 401, lifting wheel; 402, lifting frame; 403, limit part; 404, baffle; 405, track; 406, limit switch; 501, furnace A; 502, furnace B; 503, partition; 504, heat storage stone; 600, gas pipeline; 601, gas valve; 602, blast pipeline; 603, blast valve; 604, induced draft pipeline; 605, induced draft valve. DETAILED DESCRIPTION

[0030] In order to be able to understand the features and technical contents of the embodiments of the present disclosure in more detail, the implementation of the embodiments of the present disclosure is described in detail below in conjunction with the accompanying drawings. The attached drawings are for reference only and are not used to limit the embodiments of the present disclosure. In the following technical description, for the convenience of explanation, a full understanding of the disclosed embodiments is provided through multiple details. However, one or more embodiments can still be implemented without these details. In other cases, to simplify the drawings, well-known structures and devices can be simplified for display.

[0031] The terms "first", "second", etc. in the specification and claims of the embodiments of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchanged where appropriate, so that the embodiments of the embodiments of the present disclosure described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.

[0032] In the embodiments of the present disclosure, the terms "upper", "lower", "inside", "middle", "outside", "front", "back" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. These terms are mainly intended to better describe the embodiments of the present disclosure and their embodiments, and are not intended to limit the indicated devices, elements or components to have a specific direction, or to be constructed and operated in a specific direction. Moreover, in addition to being used to indicate directions or positional relationships, some of the above terms may also be used to indicate other meanings. For example, the term "upper" may also be used to indicate a certain dependency or connection relationship in certain circumstances. For those of ordinary skill in the art, the specific meanings of these terms in the embodiments of the present disclosure can be understood according to specific circumstances.

[0033] In addition, the terms "disposed", "connected", and "fixed" should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present disclosure can be understood according to specific circumstances.

[0034] Unless otherwise stated, the term "plurality" means two or more.

[0035] In the embodiment of the present disclosure, the character " / " indicates that the preceding and following objects are in an "or" relationship. For example, A / B indicates: A or B.

[0036] The term "and / or" is a description of the association relationship between objects, indicating that three relationships can exist. For example, A and / or B means: A or B, or, A and B.

[0037] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present disclosure may be combined with each other.

[0038] Combination Figure 1-7As shown, the embodiment of the present disclosure provides an ore sintering experimental device, including: a combustion part, which is used for gas combustion and heat supply; a heat storage chamber 100, which is connected to the combustion part and is used to receive the hot air supplied by the combustion part, and the combustion part is arranged on both sides of the heat storage chamber 100; a sintering box 200, which is movably arranged at the lower part of the heat storage chamber 100; a sealing sleeve 101, which is fixedly arranged at the lower part of the heat storage chamber 100, and the sealing sleeve 101 is connected to the inside of the heat storage chamber 100; a first sealing sleeve 101 is provided on one side of the upper part of the sintering box 200, which is connected to the inside of the sintering box 200. The sintering box 200 has a heat exchange flue 202 disposed inside, one end of the heat exchange flue 202 extends out of the side wall of the sintering box 200, and the other end of the heat exchange flue 202 is connected to a sintering furnace 203. The sintering furnace 203 is disposed in the first sealing cylinder 201, and the sintering box 200 carries liquid inside, and the sealing sleeve 101 can be movably inserted into the liquid between the first sealing cylinder 201 and the sintering furnace 203; a trolley 300 is disposed at the bottom of the sintering box 200, and a lifting device is disposed between the sintering box 200 and the trolley 300.

[0039] In an ore sintering experimental device provided by an embodiment of the present disclosure, the combustion part can perform combustion heating, and the smoke and hot air burned in the combustion part can heat the heat storage chamber 100, and the combustion parts are two respectively arranged on both sides of the heat storage chamber 100, and the combustion heat is increased by the combustion parts on both sides, and the heat is supplied simultaneously by the combustion parts on both sides, so that the heat storage chamber 100 can be heated together by the combustion parts on both sides, so that the heat storage chamber 100 can be fully heated, and the hot air enters the heat storage chamber 100 from both sides, and the hot air then enters the sintering furnace 203 from the heat storage chamber 100, and the heat storage chamber 10 The lower part of the heat storage chamber 100 is provided with a sealing sleeve 101, which is connected to the inside of the heat storage chamber 100. The sealing sleeve 101 is inserted between the first sealing cylinder 201 and the sintering furnace 203. The sealing between the sealing sleeve 101 and the sintering furnace 203 allows the hot air in the heat storage chamber 100 to enter the sintering furnace 203 after the sintering furnace 203 is connected to the sealing sleeve 101. In this way, the ore powder in the sintering furnace 203 can be heated and sintered. The sintering box 200 is movably arranged at the bottom of the heat storage chamber 100. The sintering box 200 and the heat storage chamber 100 are movably connected. By moving the sintering box 200, the sintering box 200 can be In order to facilitate the placement and removal of materials in the sintering furnace 203, the heat exchange flue 202 in the sintering box 200 can discharge the flue gas entering the sintering furnace 203. Liquid is injected between the heat exchange flue 202 and the sintering box 200 to exchange heat with the heat exchange flue 202, and the flue gas discharged from the sintering furnace 203 can be cooled to prevent the temperature discharged from the sintering furnace 203 from being too high. The liquid in the sintering box 200 enters between the first sealing cylinder 201 and the sintering furnace 203, and the sealing sleeve 101 can be inserted into the liquid between the first sealing cylinder 201 and the sintering furnace 203. Through the liquid, The sintering furnace 203 is sealedly connected to the sealing sleeve 101, which can prevent the flue gas and hot air in the sintering furnace 203 from being discharged from between the sintering furnace 203 and the sealing sleeve 101. One end of the heat exchange flue 202 is connected to the sintering furnace 203 to absorb the flue gas in the sintering furnace 203, and the other end of the heat exchange flue 202 extends out of the sintering box 200 to discharge the flue gas. The trolley 300 at the bottom of the sintering box 200 can drive the sintering box 200 to move at the bottom of the heat storage chamber 100, and the sintering box 200 can be raised and lowered on the trolley 300, which can facilitate the connection between the sintering furnace 203 and the sealing sleeve 101.

[0040] Combination Figure 1-2As shown, preferably, the combustion part includes: two combustion furnaces, which are divided into furnace A 501 and furnace B 502, which are respectively arranged on both sides of the heat storage chamber 100, and the combustion furnace is connected to the heat storage chamber 100; two gas pipelines 600, which are respectively connected to the furnace A 501 and the furnace B 502, and the two gas pipelines 600 are respectively provided with a gas valve 601; two blast pipelines 602, which are respectively connected to the furnace A 501 and the furnace B 502, and the two blast pipelines 602 are respectively provided with a blast valve 603; three induced draft pipelines 604, two of which are respectively connected to the furnace A 501 and the furnace B 502, and the other one can be connected to the heat exchange flue 202, and the three induced draft pipelines 604 are respectively provided with induced draft valves 605.

[0041] In this way, the combustion part is composed of two combustion furnaces, and the two combustion furnaces are divided into A furnace 501 and B furnace 502. Furnace A 501 and furnace B 502 are respectively connected with gas pipelines 600, and the gas pipelines 600 can be connected to the upper part of the combustion furnaces to supply gas to the combustion furnaces so that the combustion furnaces can burn. Furnace A 501 and furnace B 502 are respectively connected with blast ducts 602, and the blast ducts 602 can supply gas to furnace A 501 and furnace B 502, thereby increasing the air in furnace A 501 and furnace B 502, so that furnace A 501 and furnace B 502 can burn better. The bottom of furnace A 501 and furnace B 502 are respectively connected with induced draft ducts 604, and There are three induced draft ducts 604, and another one can be connected to the heat exchange flue 202. The flue gas in the combustion furnace can be extracted and discharged through the heat exchange flue 202. The induced draft duct 604 is connected to an induced draft fan, which can extract the induced draft duct 604 to facilitate the extraction of flue gas. Gas valves 601 are respectively installed on the gas pipeline 600, and the gas intake of gas can be controlled by the gas valve 601. Blower valves 603 are respectively installed on the blast duct 602, and the air intake can be respectively controlled by the blast valve 603. Induction valves 605 are respectively installed on the induced draft duct 604, and the extraction of flue gas from the induced draft duct 604 can be controlled by the induced draft valve 605.

[0042] The heat storage chamber 100 can be heated by hot air and flue gas through the two combustion furnaces.

[0043] Combination Figure 3-4As shown, preferably, a second sealing cylinder 204 is opened on the other side of the upper part of the sintering box 200, and the second sealing cylinder 204 is flush with the first sealing cylinder 201 in height, and the first sealing cylinder 204 is connected to the second sealing cylinder 204 through the sintering box 200; and a sealing platform 205 is provided in the second sealing cylinder 204, and the height of the sealing platform 205 is flush with the upper height of the second sealing cylinder 204; a circulating water tank 206 is provided on the upper part of the sintering box 200, and a circulating water pump 207 is provided in the circulating water tank 206, and the circulating water pump 207 is connected to the first sealing cylinder 201; a return water tank 208 is provided on the side wall of the second sealing cylinder 204, an overflow port 209 is provided between the second sealing cylinder 204 and the return water tank 208, and the return water tank 208 is connected to the circulating water tank 206.

[0044] In this way, a second sealing cylinder 204 is arranged on the other side of the upper part of the sintering box 200, and the height of the second sealing cylinder 204 is the same as that of the first sealing cylinder 201, so that the liquid can be prevented from flowing out of the lower sealing cylinder when the heights of the second sealing cylinder 204 and the first sealing cylinder 201 are different, and the first sealing cylinder 201 and the second sealing cylinder 204 are connected through the sintering box 200, and a sealing platform 205 is installed in the second sealing cylinder 204, and a gap is formed between the second sealing cylinder 204 and the sealing platform 205, and the gap is filled with liquid. When preheating, the sealing sleeve 101 can be inserted into the liquid between the second sealing cylinder 204 and the sealing platform 205, so that the heat storage chamber 100 can be sealed and preheated, and the height of the sealing platform 205 is flush with the upper part of the second sealing cylinder 204, and a circulating water tank 206 is also installed on the sintering box 200, and the circulating water tank 206 can store liquid, so that the water in the sintering box 200 can be circulated. Thereby, it plays a role in cooling the heat exchange flue 202. A return water tank 208 is arranged on the outer side of the second sealing cylinder 204. The second seal discharges water into the return water tank 208 through the overflow port 209 between the second seal and the return water tank 208. Then the circulating water pump 207 in the circulating water tank 206 circulates water to the sintering box 200, and the water flowing out of the return water tank 208 can flow back into the circulating water tank 206. The circulating water pump 207 is connected to the first sealing cylinder 201, and the circulating water pump 207 supplies water to the first sealing cylinder 201. The water in the first sealing cylinder 201 is connected with the second sealing cylinder 204 through the sintering box 200, so that the water surface in the first sealing cylinder 201 and the second sealing cylinder 204 can be flush, so that the water in the first sealing cylinder 201 and the second sealing cylinder 204 can be prevented from evaporating due to heating, resulting in a reduction of water. In addition, due to the circulation of water, the heat exchange flue 202 can be circulated for heat exchange to prevent the temperature of the heat exchange flue 202 from being too high.

[0045] Combination Figure 1 and 3-4, preferably, the lifting device includes: four lifting wheels 401, which are fixedly arranged on two sides of the trolley 300 respectively; a lifting frame 402, which is fixedly arranged on both sides of the sintering box 200, and the lifting frame 402 is matched with the lifting wheel 401; a limit part 403, which is fixedly arranged on both sides of the bottom of the heat storage chamber 100; baffles 404, which are two groups, one group of two, one group of baffles 404 is fixedly arranged on one side of the sintering box 200, and the limit part 403 is arranged between the two baffles 404, and the two groups of baffles 404 are respectively arranged on both sides of the sintering box 200; a track 405, which is arranged at the bottom of the trolley 300, and the trolley 300 is slidably arranged on the track 405; a limit switch 406, which is fixedly arranged on both sides of the track 405, and the limit switch 406 is arranged on the track 405 on both sides of the trolley 300.

[0046] In this way, the lifting wheels 401 arranged on both sides of the trolley 300 can play the role of supporting the lifting frame 402. The lifting frame 402 is slidably arranged on the lifting wheels 401. The sintering box 200 slides on the lifting wheels 401 through the lifting frames 402 on both sides. When preheating is performed, the trolley 300 moves to the side of the sintering box 200 with the sintering furnace 203, so that the sealing platform 205 is aligned and connected with the heat storage chamber 100. When the sealing platform 205 moves to the bottom of the heat storage chamber 100, the sintering box 200 rises, so that the sealing platform 205 is connected with the sealing sleeve 101 at the bottom of the heat storage chamber 100. The lifting frame 402 is an inverted V-shaped structure. When the trolley 300 drives the sintering box 200 to move When the sealing platform 205 and the sealing sleeve 101 are on the same central axis line, the baffle 404 on one side of the sealing platform 205 contacts the limiting part 403, and the limiting part 403 blocks the movement of the sintering box 200. Since the sintering box 200 is not subjected to force on the side of the trolley 300, the middle part of the lifting frame 402 is pressed on the lifting wheel 401. When the trolley 300 continues to move forward, the sintering box 200 is subjected to a blocking force, which causes the lifting wheel 401 to slide in the lifting frame 402. Since the two ends of the lifting frame 402 are respectively inclined downward, when the lifting frame 402 moves on the lifting wheel 401, the sintering furnace 203 is lifted, so that the sealing sleeve 101 can be inserted into the second sealing cylinder 204. The trolley 300 is placed on the sealing platform 205. When the sintering furnace 203 is raised to a suitable position, the trolley 300 touches the limit switch 406 on the track 405, and the trolley 300 stops moving, which can prevent the lifting frame 402 from being separated from the lifting wheel 401. The track 405 can make the trolley 300 slide smoothly to prevent vibration during movement. In this way, the heat storage chamber 100 can be sealed when it is preheated. After the preheating is completed, the trolley 300 moves in the opposite direction. Since the lifting frame 402 is tilted, the baffle 404 will still be pressed on the limit portion 403. When the trolley 300 moves, the lifting frame 402 on the side of the sintering box 200 will move when the lifting wheel 401 moves. The sintering box 200 is made to fall. When the sintering box 200 falls completely, the sintering box 200 will move with the trolley 300. The trolley 300 continues to move. After the sintering box 200 falls completely, the baffle 404 will be separated from the limiting part 403. The baffle 404 on the side of the sintering furnace 203 will lean against the limiting part 403. The trolley 300 continues to move to the limit switch 406 on the other side. Through the restriction of the baffle 404 by the limiting part 403, the sintering box 200 can be lifted up under the push of the trolley 300, so that the sealing sleeve 101 can be inserted into the liquid between the first sealing tube 201 and the sintering furnace 203 for sealing, thereby preventing gas leakage during ore sintering.

[0047] Combination Figure 1 As shown, preferably, an explosion-proof sealing valve is provided on the upper portion of the heat storage chamber 100 , and the explosion-proof sealing valve is in communication with the heat storage chamber 100 .

[0048] In this way, by installing an explosion-proof sealing valve in the heat storage chamber 100, the pressure in the heat storage chamber 100 can be prevented from increasing, and the pressure in the heat storage chamber 100 can be stabilized. In addition, the depth of the explosion-proof sealing valve inserted into the liquid is less than the depth of the sealing sleeve 101 inserted into the liquid, thereby preventing the high-pressure gas from being discharged from the sealing sleeve 101, thereby facilitating the high-pressure gas to be discharged from the explosion-proof sealing valve.

[0049] Combination Figure 6 As shown, preferably, the combustion furnace comprises: furnace A 501 and furnace B 502 , an air-permeable partition 503 is provided at the bottom of the combustion furnace, and heat storage stones 504 are provided on the upper part of the partition 503 .

[0050] In this way, the combustion furnace is divided into two furnaces A 501 and B 502. The partition 503 installed on the inner side of the bottom of the combustion furnace can support the heat storage stone 504 in the combustion furnace, so that a cavity can be formed at the bottom of the combustion furnace, which can facilitate the circulation of flue gas and air. During preheating, the flue gas will pass through the heat storage stone 504, and the flue gas can heat the heat storage stone 504, and the heat storage stone 504 can also cool the flue gas. When the heat storage stone 504 is heated and the ore is sintered, air enters from the bottom of the combustion furnace and flows through the heat storage stone 504. The heat storage stone 504 can heat the air. The heated air can directly supply gas combustion, which can increase the temperature generated by gas combustion.

[0051] Preferably, the liquid in the sintering box 200 is water, and the height of the liquid is flush with the height of the overflow port 209 .

[0052] In this way, the liquid in the sintering box 200 is water and can be easily replaced, and the height of the liquid can be controlled through the overflow port 209, so that the liquid level in the first sealing cylinder 201 and the second sealing cylinder 204 can be flush.

[0053] Combination Figure 3-4 As shown, preferably, a rubber connecting sleeve 210 is provided at one end of the heat exchange flue 202 extending out of the sintering box 200 , the opening of the rubber connecting sleeve 210 faces upward, and the rubber connecting sleeve 210 can be connected to the induced draft duct 604 .

[0054] In this way, a rubber connecting sleeve 210 is provided on the heat exchange flue 202 extending out of the sintering box 200, and the opening of the rubber connecting sleeve 210 is upward, and the opening of the induced draft duct 604 is downward. When the rubber connecting sleeve 210 rises, it can be pressed on the induced draft duct 604, so that the induced draft duct 604 can be tightly connected with the rubber connecting sleeve 210, which makes it convenient for the induced draft duct 604 to extract the flue gas in the heat exchange duct.

[0055] Combination Figure 5-6As shown, preferably, the interior of the heat storage chamber 100 is hollow, and an air duct 102 is provided on the inner side of the bottom of the heat storage chamber 100 , and the air duct 102 is communicated with the sealing sleeve 101 .

[0056] In this way, the heat storage chamber 100 is hollow, which can facilitate the mixing of hot air in the combustion furnaces on both sides so as to facilitate the entry into the sintering furnace 203. In addition, there is an air duct 102 extending upward from the bottom of the heat storage chamber 100. The air duct 102 can prevent the flame in the combustion furnace from directly entering the sealed connecting sleeve. In addition, by separately arranging the heat storage chamber 100, it is convenient to adjust and monitor the temperature output in the heat storage chamber 100, so as to prevent the flame from directly entering the sintering furnace 203, causing the problem that the sintering temperature cannot be controlled.

[0057] Combination Figure 7 As shown, preferably, the lifting frame 402 is an inverted V-shaped structure with a groove on one side, and the lifting wheel 401 is slidably disposed in the groove of the lifting frame 402 .

[0058] When the lifting frame 402 is set to an inverted V shape, the lifting frame 402 will drop under the action of gravity, and the highest bent part of the lifting frame 402 will be pressed on the lifting pulley. At this time, the sintering box 200 is at the lowest position. When the baffle plate 404 on the side of the sintering box 200 is blocked by the limiting part 403, the sintering box 200 stops moving, and the trolley 300 drives the lifting pulley to continue moving. At this time, the lifting pulley will move to one side of the lifting frame 402. Since the side of the V-shaped lifting frame 402 extends downward at an angle, when the height of the lifting wheel 401 remains unchanged, the lifting frame 402 will be pushed up by the lifting wheel 401, thereby driving the sintering box 200 to rise through the rise of the lifting frame 402, thereby achieving a sealing effect between the sintering box 200 and the heat storage chamber 100.

[0059] How to use the ore sintering experimental device:

[0060] Preheating: through the sealing connection between the second sealing cylinder 204 and the sealing sleeve 101, the A furnace 501 starts to burn, and the B furnace 502 does not burn and smoke is sucked. The smoke and hot air from the A furnace 501 enter the B furnace 502 through the regenerator 100, heat the regenerator 100 and the heat storage stone 504 in the B furnace 502, and then are discharged from the B furnace 502;

[0061] The B furnace 502 starts to burn, and the A furnace 501 is closed. The smoke and hot air from the B furnace 502 enter the A furnace 501 from the regenerator 100, heat the regenerator 100 and the heat storage stones 504 in the A furnace 501, and then are discharged from the A furnace 501. The temperature of the smoke discharged from the regenerator 100 can be reduced by filtering the heat storage stones 504.

[0062] When furnace A 501 is burning, the gas pipeline 600 and the blast pipeline 602 connected to furnace A 501 are opened, and only the induced draft pipeline 604 connected to furnace B 502 is opened, and the gas pipeline 600 and the blast pipeline 602 connected to furnace B 502 are closed;

[0063] When the B furnace 502 is burning, the gas pipeline 600 and the blast pipeline 602 connected to the B furnace 502 are opened, and only the induced draft pipeline 604 connected to the A furnace 501 is opened, and the gas pipeline 600 and the blast pipeline 602 connected to the B furnace 502 are closed;

[0064] The A furnace 501 and the B furnace 502 are alternately ignited and burned to heat the regenerator 100 and the regenerator stones 504 in the A furnace 501 and the B furnace 502;

[0065] Sintering: The first sealing cylinder 201 is sealed and connected with the sealing sleeve 101, the sintering furnace 203 is connected with the heat storage chamber 100, the A furnace 501 and the B furnace 502 are started at the same time, and the air flows through the heat storage stone 504, and the heat storage stone 504 preheats the air; the air enters the A furnace 501 and the B furnace 502 for combustion, the flue gas and hot air enter the heat storage chamber 100, and then enter the sintering furnace 203 from the heat storage chamber 100 for heating and sintering, and the hot air after sintering is discharged from the heat exchange pipe, and the liquid in the sintering box 200 can cool the flue gas and hot air. When the sintering box 200 rises, the rubber connecting sleeve 210 on the heat exchange flue 202 is sealedly connected with the induced draft duct 604, so that the induced draft duct 604 can extract the flue gas in the heat exchange flue 202, reduce the pressure in the heat storage chamber 100, and transport the flue gas to the dust removal equipment for dust removal before discharge.

[0066] The above description and the accompanying drawings sufficiently illustrate the embodiments of the present disclosure to enable those skilled in the art to practice them. Other embodiments may include structural and other changes. The embodiments represent only possible variations. Unless explicitly required, individual components and functions are optional, and the order of operations may vary. Portions and features of some embodiments may be included in or replace portions and features of other embodiments. The embodiments of the present disclosure are not limited to the structures described above and shown in the accompanying drawings, and various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.

Claims

1. An ore sintering experimental device, characterized in that: include: The combustion part is used for gas combustion and heating; A heat storage chamber (100) connected to the combustion section and used for receiving hot air supplied by the combustion section, and the combustion section is arranged on both sides of the heat storage chamber (100); A sintering box (200) is movably arranged at the lower part of the heat storage chamber (100); A sealing sleeve (101) is fixedly arranged at the lower part of the heat storage chamber (100), and the sealing sleeve (101) is communicated with the interior of the heat storage chamber (100); A first sealing cylinder (201) communicating with the interior of the sintering box (200) is provided on one side of the upper portion of the sintering box (200); a heat exchange flue (202) is provided inside the sintering box (200); one end of the heat exchange flue (202) extends out of the side wall of the sintering box (200); the other end of the heat exchange flue (202) is connected to a sintering furnace (203); the sintering furnace (203) is arranged in the first sealing cylinder (201); and liquid is carried inside the sintering box (200); the sealing sleeve (101) can be movably inserted into the liquid between the first sealing cylinder (201) and the sintering furnace (203); A trolley (300) is provided at the bottom of the sintering box (200), and a lifting device is provided between the sintering box (200) and the trolley (300); The combustion unit comprises: There are two combustion furnaces, namely furnace A (501) and furnace B (502), which are respectively arranged on both sides of the regenerator (100), and the combustion furnaces are connected to the regenerator (100); There are two gas pipelines (600), which are respectively connected to the A furnace (501) and the B furnace (502), and the two gas pipelines (600) are respectively provided with gas valves (601); There are two blast pipes (602), which are respectively connected to the A furnace (501) and the B furnace (502), and blast valves (603) are respectively provided on the two blast pipes (602); There are three induced air ducts (604), two of which are connected to the A furnace (501) and the B furnace (502) respectively, and the other one can be connected to the heat exchange flue (202), and the three induced air ducts (604) are respectively provided with induced air valves (605); A second sealing cylinder (204) is provided on the other side of the upper portion of the sintering box (200), the second sealing cylinder (204) is flush with the first sealing cylinder (201), and the first sealing cylinder (201) and the second sealing cylinder (204) are connected through the sintering box (200); A sealing platform (205) is provided inside the second sealing cylinder (204), and the height of the sealing platform (205) is flush with the height of the upper portion of the second sealing cylinder (204); A circulating water tank (206) is provided on the upper part of the sintering box (200), a circulating water pump (207) is provided in the circulating water tank (206), and the circulating water pump (207) is connected to the first sealing cylinder (201); A return water tank (208) is provided on the side wall of the second sealing cylinder (204), an overflow port (209) is provided between the second sealing cylinder (204) and the return water tank (208), and the return water tank (208) is connected to the circulating water tank (206).

2. The ore sintering experimental device according to claim 1, characterized in that: The lifting device comprises: There are four lifting wheels (401), which are respectively fixedly arranged on two sides of the trolley (300); The lifting frame (402) is fixedly arranged on both sides of the sintering box (200), and the lifting frame (402) is matched and connected with the lifting wheel (401); Limiting parts (403) are fixedly arranged on both sides of the bottom of the heat storage chamber (100); The baffles (404) are provided in two groups, each group having two baffles. The baffles (404) in one group are fixedly arranged on one side of the sintering box (200), and the limiting portion (403) is arranged between the two baffles (404). The two groups of baffles (404) are respectively arranged on both sides of the sintering box (200); A track (405) is arranged at the bottom of the trolley (300), and the trolley (300) is slidably arranged on the track (405); The limit switches (406) are fixedly arranged on both sides of the track (405), and the limit switches (406) are arranged on the tracks (405) on both sides of the trolley (300).

3. The ore sintering experimental device according to claim 1, characterized in that: An explosion-proof sealing valve (700) is provided on the upper portion of the heat storage chamber (100), and the explosion-proof sealing valve (700) is in communication with the heat storage chamber (100).

4. The ore sintering experimental device according to claim 1, characterized in that: The combustion furnace comprises: furnace A (501) and furnace B (502). An air-permeable partition (503) is provided at the bottom of the combustion furnace, and heat storage stones (504) are provided on the upper part of the partition (503).

5. The ore sintering experimental device according to claim 1, characterized in that: The liquid in the sintering box (200) is water, and the height of the liquid is flush with the height of the overflow port (209).

6. The ore sintering experimental device according to claim 1, characterized in that: One end of the heat exchange flue (202) extending out of the sintering box (200) is provided with a rubber connecting sleeve (210), the opening of the rubber connecting sleeve (210) faces upward, and the rubber connecting sleeve (210) can be connected to the induced draft duct (604).

7. The ore sintering experimental device according to claim 1, characterized in that: The interior of the heat storage chamber (100) is hollow, and an air guide pipe (102) is provided on the inner side of the bottom of the heat storage chamber (100), and the air guide pipe (102) is connected to the sealing sleeve (101).

8. The ore sintering experimental device according to claim 2, characterized in that: The lifting frame (402) is an inverted V-shaped structure with a groove on one side, and the lifting wheel (401) is slidably arranged in the groove of the lifting frame (402).

Citation Information

Patent Citations

  • Ore sintering experiment device

    CN220730144U