Ground potential charged replacement or reset combination device and method of a conductor anti-vibration hammer

CN116914624BActive Publication Date: 2026-11-03STATE GRID JIBEI ELECTRIC POWER CO LTD TANGSHAN POWER SUPPLY CO +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310902587.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-21
Publication Date
2026-11-03
Estimated Expiration
2043-07-21

AI Technical Summary

Technical Problem

In the existing technology, after the vibration damper of the overhead transmission line is damaged or displaced, it is difficult to replace or reset the ground potential while the power is cut off and without manual intervention, which leads to reduced power supply reliability and operational difficulties.

Method used

A combined device for energized replacement or reset of ground potential of a conductor vibration damper was designed. It includes a bolt tightening device, a screw removal or insertion device, and a vibration damper removal or installation device. Utilizing components such as sleeves, adapters, commutators, connecting rods, push-pull rods, suction rods, magnetic pull rods, and hanging plates, it enables the operation of energized tightening and loosening of nuts, removal or insertion of screws, and installation or removal of vibration dampers.

Benefits of technology

While meeting the safety distance requirements for live-line work, it enables the replacement or reset of vibration dampers without power outages or manual wiring, thus improving power supply reliability and operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116914624B_ABST
    Figure CN116914624B_ABST
Patent Text Reader

Abstract

The present application relates to a kind of ground potential charged replacement or reset combination device and method of wire anti-vibration hammer, belong to wire anti-vibration hammer technical field.The technical scheme: loosen the anti-vibration hammer nut by bolt loose device, the anti-vibration hammer nut is removed;Anti-vibration hammer screw is removed by screw rod or inserted device;The clamp plate of wire anti-vibration hammer and wire anti-vibration hammer are removed in the ground potential charged environment by anti-vibration hammer removal or installation device.The wire anti-vibration hammer is reset by anti-vibration hammer removal or installation device;Anti-vibration hammer screw is inserted by screw rod or inserted device;Anti-vibration hammer nut is fastened by bolt loose device, and the installation of wire anti-vibration hammer in the ground potential charged environment is completed.The present application meets the safety distance between the person and the live body in the live working requirement, simultaneously, wire anti-vibration hammer is replaced or reset without power off and without manual out line, avoid line power off, improve power supply reliability, the overall operation process is safe and efficient, and the applicability is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a combination device and method for replacing or resetting the ground potential of a conductor vibration damper, belonging to the technical field of conductor vibration dampers. Background Technology

[0002] Most vibration dampers on overhead transmission line conductors are bolt-type. These dampers are easily damaged and displaced due to various weather conditions and long-term line operation. Once damaged or displaced, they lose their vibration damping function and may damage the conductors, seriously threatening the safe operation of the transmission line. Currently, vibration damper replacement and recovery work often involves power outages or equipotential live-line work. However, power outages are subject to various constraints and cannot be approved in a timely manner. Equipotential live-line work has high safety requirements, making it difficult to perform in some situations, necessitating power outages, which significantly reduces power supply reliability. If replacing or resetting damaged bolt-type vibration dampers under equipotential conditions, the distance between the damper and the tension or suspension clamp varies depending on voltage level, line span, and other conditions. Workers operating under equipotential conditions must also meet live-line work distance requirements. Without specialized tools, replacing or resetting vibration dampers under equipotential conditions is extremely difficult and inconvenient. Summary of the Invention

[0003] The purpose of this invention is to provide a combination device and method for replacing or resetting the ground potential of a conductor vibration damper. While meeting the safety distance requirements between personnel and live parts for live-line work, it achieves the purpose of replacing or resetting the conductor vibration damper without power interruption or manual wiring, thus avoiding power outages, improving power supply reliability, and ensuring that the overall operation process is safe, efficient, and highly applicable. This invention solves the aforementioned technical problems existing in the prior art.

[0004] The technical solution of this invention is: A live-line replacement or reset device for a conductor vibration damper includes a bolt tightening device, a screw removal or insertion device, and a vibration damper removal or installation device. The bolt tightening device, used to loosen or tighten the vibration damper nut while energized, includes a sleeve, an adapter, a commutator, a connecting rod, and a push-pull rod. One end of the sleeve matches the vibration damper nut, and the other end of the sleeve has a groove and is connected to the commutator via the adapter. One end of the connecting rod is hinged to the commutator, and the other end is connected to the push-pull rod. The adapter consists of a sleeve connector, a gate post, and an anti-detachment slot. A spring ball on the sleeve connector is pressed into the groove inside the sleeve to hold it in place. The gate post and the anti-detachment slot are connected via a rotating shaft. The anti-detachment slot can rotate 180° around the rotating shaft within the gate post to change direction. The anti-detachment slot has a square hollow groove inside, with a recess on each of its four sides. The screw removal or insertion device is used to remove or insert the screw of the conductor vibration damper while it is energized. It includes a suction device and a magnetic pull rod. The suction device includes a housing and a first rotary joint. The housing is cylindrical, with a hollow groove at one end containing a magnet. The magnet has a suction head, which matches the vibration damper screw on the bolt-type vibration damper. The other end of the cylinder has a first rotary joint, which is directly or indirectly connected to the magnetic pull rod. The magnetic pull rod includes a second rotary joint, an insulating tube, and a threaded joint. The second rotary joint and the threaded joint are fixed to both ends of the insulating tube by their respective fixing pins. The first and second rotary joints have the same structure, both being annularly arranged toothed structures that match each other and are connected by bolts. The vibration damper removal or installation device is used to remove or install the conductor vibration damper while it is energized. It includes a hanging plate, an adjusting plate, and insulating hooks. The top of the hanging plate is provided with a rope hole, and the bottom is connected to the adjusting plate. Insulating hooks are provided on both sides of the adjusting plate. The distance between the two insulating hooks is greater than the width of the clamping plate on the conductor vibration damper and less than the minimum distance between the two hammers on the conductor vibration damper. The two insulating hooks hook and lift the steel strand of the conductor vibration damper. The commutator consists of an adapter connector, a second gatepost, and a second rotating shaft. A steel ball is provided on one side of the square column of the adapter connector, which matches the groove inside the anti-disengagement slot of the adapter, and can lock the adapter connector in any direction depending on the angle of operation of the operator.

[0005] The connecting rod consists of a locking pin, a rotating body, and an extension arm. The locking pin and the rotating body at one end of the extension arm are connected by a rotating shaft. The rotating body has a screw hole, into which the rotating shaft of the commutator is inserted. The other end of the extension arm is provided with a connecting hole.

[0006] The push-pull rod consists of a connecting plate, a locking platform, and an operating rod connector. The connecting plate has a hole at its end, which is connected to the connecting hole on the connecting rod by bolts. There is a locking platform on each side of the connecting plate, and the locking platform has a 120° curved step in the middle to limit the rotation angle of the extension arm on the locking platform. One end of the operating rod connector is connected to the connecting plate, and the other end is connected to the insulated operating rod.

[0007] The suction rod device has a cylindrical magnet installed inside its housing. Its function is to remove or insert the anti-vibration hammer screw by means of the magnetic attraction. The magnet is equipped with a suction head for protection to prevent damage to the magnet from impact at the moment of contact with the anti-vibration hammer screw. The housing and the rotary joint are welded together.

[0008] The toothed structure of rotary joint one and rotary joint two consists of a cylindrical body with slots and multiple trapezoidal bosses on its sides. Gaps are left between the trapezoidal bosses to form the toothed structure, and the slots facilitate bolt assembly. The toothed structures mesh together, and bolts are passed through the central slots for connection, thus changing the direction of rotation.

[0009] The threaded joint of the magnetic pull rod is connected to the insulated operating link, extending the rotating arm.

[0010] The rotary joint one of the suction rod and the rotary joint two of the magnetic pull rod are indirectly connected via a portal bend to accommodate different rotation angles. The portal bend includes a portal rod, a short rotary joint, and a long rotary joint. The two ends of the portal rod are connected to the short and long rotary joints respectively. The short rotary joint is connected to the rotary joint one on the suction rod via bolt one, and the long rotary joint is connected to the rotary joint two on the magnetic pull rod via bolt two. In actual working conditions, the anti-vibration hammer screw may be installed inside or outside the conductor. If the anti-vibration hammer screw is on the outside of the conductor, the portal bend connects the rotary joint one of the suction rod and the rotary joint two of the magnetic pull rod for easier operation.

[0011] The short rod rotary joint, long rod rotary joint, rotary joint one, and rotary joint two have the same structure and can all be matched with each other.

[0012] The lower part of the mounting plate is provided with a boss, and the adjustment plate is provided with a matching groove. The mounting plate and the adjustment plate are positioned by the boss matching the groove and are connected by locking screws.

[0013] The adjustment plate and the insulating hook are connected by locking screws.

[0014] The hanging plate has a rope hole that matches the insulating rope. The insulating rope can pass through the rope hole. Its function is to allow the operator to apply force to the hanging plate through the insulating rope, so as to move and raise the conductor vibration damper.

[0015] The length of the adjustment plate can be adjusted or replaced by unscrewing the locking screws to suit various models of conductor vibration dampers, depending on the actual situation.

[0016] The two insulating hooks are used to hook the steel strands in the middle of both ends of the conductor vibration damper, thereby supporting the entire conductor vibration damper.

[0017] A method for replacing or resetting the ground potential of a vibration damper for a transmission line conductor while it is energized, comprising: Remove the conductor vibration damper: Loosen the vibration damper nut using the bolt tightening device and remove the vibration damper nut; remove the vibration damper screw using the screw removal or insertion device; remove the conductor vibration damper clamp and conductor vibration damper under ground potential energized environment using the vibration damper removal or installation device. Replace or reset the conductor vibration damper: Reset the conductor vibration damper using the vibration damper removal or installation device; insert the vibration damper screw using the screw removal or insertion device; tighten the vibration damper nut using the bolt tightening device to complete the installation of the conductor vibration damper in an environment with ground potential.

[0018] The positive effects of this invention are: while meeting the safety distance requirements between personnel and live parts for live-line work, it achieves the purpose of replacing or resetting the conductor vibration damper without power interruption or manual wiring, avoiding power outages, improving power supply reliability, and the overall operation process is safe, efficient, and highly applicable. Attached Figure Description

[0019] Figure 1 This is a schematic diagram of the operation structure of the bolt tightening and loosening device when the anti-vibration hammer nut is inside the conductor. Figure 2 This is a schematic diagram of the operation structure of the bolt tightening device when the anti-vibration hammer nut is on the outside of the conductor; Figure 3 This is a schematic diagram of the sleeve structure of the bolt tightening device; Figure 4 This is a schematic diagram of the adapter structure for the bolt tightening device; Figure 5 This is a schematic diagram of the commutator structure with a bolt tightening device; Figure 6 This is a schematic diagram of the connecting rod structure of the bolt tightening device; Figure 7 This is a schematic diagram of the push-pull rod structure of the bolt tightening device; Figure 8 This is a schematic diagram of the operation structure of the device for removing or inserting the anti-vibration hammer screw when it is inside the conductor. Figure 9 This is a schematic diagram of the operation structure of the device for removing or inserting the anti-vibration hammer screw when it is outside the conductor. Figure 10 This is a schematic diagram of the suction device structure for a screw removal or insertion device; Figure 11 This is a schematic diagram of the magnetic pull rod structure of the screw removal or insertion device; Figure 12 This is a schematic diagram of a portal-type corner device for screw removal or insertion. Figure 13 This is a structural diagram of the vibration damper installation or removal device; Figure 14 This is a schematic diagram of the operation structure of the vibration damper installation or removal device; Figure 15 This is a schematic diagram of the bolt tightening device in the field according to an embodiment of the present invention; Figure 16This is a schematic diagram of the bolt tightening device in use in an embodiment of the present invention. Figure 17 This is a schematic diagram of the on-site vibration damper installation or removal device and the bolt tightening device according to an embodiment of the present invention; Figure 18 This is a schematic diagram illustrating the use of the on-site screw removal or insertion device and the vibration damper installation or removal device in conjunction with an embodiment of the present invention. Figure 19 This is a schematic diagram of the installation or removal device for the anti-vibration hammer in the field according to an embodiment of the present invention; In the diagram: 1. Vibration damper nut; 2. Wire; 3. Sleeve; 4. Adapter; 5. Sleeve connector; 5-1. Spring ball; 5-2. Door post one; 5-3. Rotating shaft one; 5-4. Anti-detachment slot; 5-5. Reversing device; 6. Adapter connector; 6-1. Steel ball; 6-2. Pressing post; 6-3. Spring post; 6-4. Spring; 6-5. Door post two; 6-6. Rotating shaft two; 6-7. Connecting rod; 7. Locking post; 7-1. Rotating shaft; 7-2. Rotating body; 7-3. Screw hole; 7-4. Extension arm; 7-5. Bolt three; 36. Push-pull rod; 9. Connecting plate; 9-1. Locking platform; 9-2. Operating rod connector; 9-3. Insulated operating rod; 14. Bolt one. 8. Anti-vibration hammer screw 10. Suction rod device 11. Housing 11-1. Suction head 11-2. Magnet 11-3. Rotary joint one 11-4. Magnetic pull rod 12. Fixing pin 12-1. Insulating tube 12-2. Threaded joint 12-3. Rotary joint two 12-4. Door-shaped corner device 13. Short rod rotary joint 13-1. Door-shaped rod 13-2. Long rod rotary joint 13-3. Insulated operating connecting rod 31. Bolt two 32. Groove 33. Trapezoidal boss 34. Gap 35. Rope hole 15. Hanging plate 16. Adjusting plate 17. Insulated hook 18. Locking screw 19. Insulating rope 20. Clamping plate 21. Steel strand 22. Detailed Implementation

[0020] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0021] A live-line replacement or reset device for a conductor vibration damper includes a bolt tightening device, a screw removal or insertion device, and a vibration damper removal or installation device. The bolt tightening device, used to loosen or tighten the vibration damper nut while energized, includes a sleeve 4, an adapter 5, a commutator 6, a connecting rod 7, and a push-pull rod 9. One end of the sleeve 4 matches the vibration damper nut 2, and the other end of the sleeve 4 has a groove and is connected to the commutator 6 via the adapter 5. One end of the connecting rod 7 is hinged to the commutator 6, and the other end... The end is connected to the push-pull rod 9; the adapter 5 consists of a sleeve joint 5-1, a door post 5-3, and an anti-detachment groove 5-5. A spring ball 5-2 on the sleeve joint 5-1 is pressed into the groove inside the sleeve 4 to lock the sleeve 4. The door post 5-3 and the anti-detachment groove 5-5 are connected by a rotating shaft 5-4. The anti-detachment groove 5-5 can rotate 180° around the rotating shaft 5-4 inside the door post 5-3 to change direction. The anti-detachment groove 5-5 has a square slot inside, and each of the four sides of the square slot has a groove. The screw removal or insertion device is used to remove or insert the screw of the anti-vibration hammer while it is energized. It includes a suction device 11 and a magnetic pull rod 12. The suction device 11 includes a housing 11-1 and a rotary joint 11-4. The housing is cylindrical, with a hollow groove at one end containing a magnet 11-3. A suction head 11-2 is mounted on the magnet, and the magnet and suction head match the anti-vibration hammer screw 10 on the bolt-type anti-vibration hammer. The other end of the cylinder is equipped with the rotary joint 11-4. Rotary joint 11-4 of 11 is directly or indirectly connected to magnetic pull rod 12; magnetic pull rod 12 includes rotary joint 12-4, insulating tube 12-2 and threaded joint 12-3, rotary joint 12-4 and threaded joint 12-3 are respectively fixed to both ends of insulating tube 12-2 by their respective fixing pins 12-1; rotary joint 11-4 and rotary joint 12-4 have the same structure, both are annular toothed structures, matched with each other, and connected by bolts; The vibration damper removal or installation device is used to remove or install the conductor vibration damper while it is energized. It includes a hanging plate 16, an adjusting plate 17, and insulating hooks 18. The top of the hanging plate 16 is provided with a rope hole 15, and the bottom is connected to the adjusting plate 17. Insulating hooks 18 are provided on both sides of the adjusting plate 17. The distance between the two insulating hooks 18 is greater than the width of the clamping plate 21 on the conductor vibration damper 1 and less than the minimum distance between the two hammer bodies on the conductor vibration damper 1. The two insulating hooks 18 hook and lift the steel strand 22 of the conductor vibration damper 1. The commutator 6 consists of an adapter connector 6-1, a second gatepost 6-6, and a second rotating shaft 6-7. A steel ball 6-2 is provided on one side of the square column of the adapter connector 6-1, which matches the internal groove of the anti-disengagement slot 5-5 of the adapter 5, and can lock the adapter connector 6-1 in any direction according to the different operating angles of the personnel.

[0022] The connecting rod 7 consists of a locking pin 7-1, a rotating body 7-3, and an extension arm 7-5. The locking pin 7-1 and the rotating body 7-3 at one end of the extension arm 7-5 are connected by a rotating shaft 7-2. The rotating body 7-3 has a screw hole 7-4, and the rotating shaft 6-7 of the commutator 6 is inserted into the screw hole 7-4. The other end of the extension arm 7-5 is provided with a connecting hole.

[0023] The push-pull rod 9 consists of a connecting plate 9-1, a locking platform 9-2, and an operating rod connector 9-3. The connecting plate 9-1 has a hole at its end, which is connected to the connecting hole on the connecting rod 7 by bolts 36. There is a locking platform 9-2 on each side of the connecting plate 9-1. The locking platform has a 120° curved step in the middle to limit the rotation angle of the extension arm 7-5 on the locking platform 9-2. One end of the operating rod connector 9-3 is connected to the connecting plate 9-1, and the other end is connected to the insulated operating rod 14.

[0024] The suction rod device has a cylindrical magnet installed inside its housing. Its function is to remove or insert the anti-vibration hammer screw by means of the magnetic attraction. The magnet is equipped with a suction head for protection to prevent damage to the magnet from impact at the moment of contact with the anti-vibration hammer screw. The housing and the rotary joint are welded together.

[0025] The toothed structure of rotary joint 11-4 and rotary joint 12-4 consists of a cylindrical body with slots 33 and multiple trapezoidal protrusions 34 on its sides. Gaps 35 are left between the trapezoidal protrusions, forming a toothed structure. The slots 33 facilitate bolt assembly. The toothed structures mesh together, and bolts are passed through the central slots 33 for connection, thus changing direction.

[0026] The threaded joint 12-3 of the magnetic pull rod 12 is connected to the insulated operating link 31, extending the rotating arm.

[0027] The rotary joint 11-4 of the suction rod 11 and the rotary joint 12-4 of the magnetic pull rod 12 are indirectly connected by a portal corner joint 13 to accommodate different rotation angles. The portal corner joint 13 includes a portal rod 13-2, a short rod rotary joint 13-1 and a long rod rotary joint 13-3. The two ends of the portal rod 13-2 are respectively connected to the short rod rotary joint 13-1 and the long rod rotary joint 13-3. The short rod rotary joint 13-1 is connected to the rotary joint 11-4 on the suction rod 11 by bolt 8, and the long rod rotary joint 13-3 is connected to the rotary joint 12-4 on the magnetic pull rod 12 by bolt 32. In actual work, the anti-vibration hammer screw 10 may be installed on the inside of the conductor 3 or on the outside of the conductor 3. If the anti-vibration hammer screw is on the outside of the conductor, the rotary joint 11-4 of the suction rod 11 and the rotary joint 12-4 of the magnetic pull rod 12 are connected by the gate-type corner bracket 13 for easy operation.

[0028] The short rod rotary joint 13-1, long rod rotary joint 13-3, rotary joint one 11-4 and rotary joint two 12-4 have the same structure and can be matched with each other.

[0029] The lower part of the mounting plate 16 is provided with a boss, and the adjusting plate 17 is provided with a matching groove. The mounting plate 16 and the adjusting plate 17 are positioned by the boss matching the groove and are connected by locking screws.

[0030] The adjustment plate 17 and the insulating hook 18 are connected by a locking screw.

[0031] The rope hole 15 of the hanging plate 16 is matched with the insulating rope 20. The insulating rope can pass through the rope hole 15. Its function is to allow the operator to apply force to the hanging plate through the insulating rope, so as to move and raise the conductor vibration damper.

[0032] The length of the adjustment plate can be adjusted or replaced by unscrewing the locking screws to suit various models of conductor vibration dampers, depending on the actual situation.

[0033] The two insulating hooks are used to hook the steel strands in the middle of both ends of the conductor vibration damper, thereby supporting the entire conductor vibration damper.

[0034] A method for replacing or resetting the ground potential of a vibration damper for a transmission line conductor while it is energized, comprising: Remove the conductor vibration damper: Loosen the vibration damper nut using the bolt tightening device and remove the vibration damper nut; remove the vibration damper screw using the screw removal or insertion device; remove the conductor vibration damper clamp and conductor vibration damper under ground potential energized environment using the vibration damper removal or installation device. Replace or reset the conductor vibration damper: Reset the conductor vibration damper using the vibration damper removal or installation device; insert the vibration damper screw using the screw removal or insertion device; tighten the vibration damper nut using the bolt tightening device to complete the installation of the conductor vibration damper in an environment with ground potential.

[0035] The specific operating steps include the following: ① The operator stands at a suitable position on the tower, assembles the bolt tightening device, adjusts the angle of the adapter and commutator, connects the insulating operating rod to the operating rod connector, operates the device through the insulating operating rod, puts the sleeve on the bolt-type anti-vibration hammer nut that needs to be replaced or reset, and pushes or pulls the insulating operating rod back and forth to loosen the anti-vibration hammer nut on the anti-vibration hammer until the anti-vibration hammer nut falls off and is retracted together with the device; ②Assemble the screw removal or insertion device by connecting the threaded joint on the insulated operating link and the magnetic pull rod. Operate the device through the insulated operating link and slowly bring the suction rod of the device close to the anti-vibration hammer screw. Under the attraction of the magnet, the anti-vibration hammer screw will come out of the screw hole of the anti-vibration hammer until it is finally detached and retracted together with the device. ③ To remove the vibration damper or assemble the installation device, pass one end of the insulating rope through the rope hole of the device and tie a knot, and pass the other end through the pulley. Place the pulley on the conductor or ground wire above the vibration damper, pull the insulating rope to drive the device to hook the steel strand between the two ends of the conductor vibration damper, rotate the angle until the vibration damper is detached from the conductor, and then pull the pulley and the device back. Finally, if the safe distance is met, retrieve the damaged vibration damper, or place the displaced vibration damper back to the initial position and then retrieve the device. ④ If the damaged vibration damper is to be replaced, place the new vibration damper on the insulating hook, push the pulley to move slowly upwards to the installation position of the vibration damper, and after reaching the position, slowly loosen the insulating rope at the pulley end until the clamp of the vibration damper clamps the wire, and then take the device and pulley back together. ⑤ After replacing the vibration damper or placing the displaced vibration damper back to its initial position, the operator uses the screw removal or insertion device to attach the vibration damper screw to the suction rod device. The vibration damper screw is then pushed to the screw hole position and inserted through the insulated operating rod. The angle of contact between the suction rod device and the vibration damper screw should not be consistent with the direction of the screw hole. The insulated operating rod is pulled forcefully until the suction rod device and the vibration damper screw separate, and then the device is retracted. ⑥ Finally, use the bolt tightening device again. First, put the sleeve over the anti-vibration hammer nut. Operate the device through the insulated operating rod. After aligning the anti-vibration hammer nut in the sleeve with the anti-vibration hammer screw, push or pull the insulated operating rod back and forth to tighten the anti-vibration hammer nut until it is firmly tightened onto the anti-vibration hammer screw. Then, retract the device to finish the work.

[0036] Step 1: As Figure 1 and Figure 2The diagram shows the operation structure of the vibration damper nut 2 of the conductor vibration damper, which is loosened by using a bolt tightening device when it is inside or outside the conductor 3. The live-line worker stands at a suitable position on the pole, first selecting a suitable sleeve 4 according to the model of the vibration damper nut 2, and installing the sleeve connector 5-1 of the adapter 5 at the bottom of the sleeve 4. Then, pressure is applied to the pressing column 6-3 of the commutator 6, causing the steel ball 6-2 to indent. Depending on the required operating angle, the steel ball 6-2 on the adapter connector 6-1 is pushed into the groove on the appropriate surface of the anti-disengagement groove 5-5. When the steel ball 6-2 reaches the groove, the pressure on the pressing column 6-3 is released, and the anti-disengagement groove 5-5 will firmly lock the adapter connector 6-1. The connecting rod 7 is connected to the gate post 6-6 of the commutator 6 via the rotating shaft 6-7 inserted into the rotating body 7-3. For ease of operation, the connecting rod 7 and the commutator 6 can be rotated to a suitable angle via the rotating shaft 6-7. The hole on the connecting plate 9-1 of the push-pull rod 9 and the last connecting hole of the extension arm 7-5 on the connecting rod 7 are connected by the bolt 36. Loosening the bolt 36 appropriately allows the extension arm 7-5 to rotate back and forth in the middle of the clamping table 9-2. Finally, connect the insulating operating rod 14 to the operating rod connector 9-3, and further adjust the angles of the adapter 5 and the commutator 6. The operator operates the device through the insulating operating rod 14. Put the sleeve 4 on the anti-vibration hammer nut 2, and push or pull the insulating operating rod 14 to loosen or tighten the anti-vibration hammer nut 2. When the extension arm 7-5 is rotated to one end of the clamping table 9-2, move the insulating operating rod 14 to move the sleeve 4 of the device away from the anti-vibration hammer nut 2 by an appropriate distance. Push or pull the insulating operating rod to rotate the extension arm 7-5 to the other end of the clamping table 9-2, and then put the sleeve 4 on the anti-vibration hammer nut 2. Push or pull the insulating operating rod 14, and repeat this operation to loosen the anti-vibration hammer nut 2 until the anti-vibration hammer nut falls off and is retracted together with the device.

[0037] Step 2: As Figure 8 and Figure 9The diagrams show the operation structure for removing the anti-vibration hammer screw 10 from the inside and outside of the conductor 3 using a screw removal or insertion device. The live-line worker first selects a suitable angle according to the operational needs, engages the rotary joint 11-4 on the suction rod 11 and the rotary joint 12-4 on the magnetic pull rod 12, passes the bolt 8 through the slot between the two rotary joints and tightens it securely. Then, the threaded joint 12-3 on the magnetic pull rod 12 is connected to the insulated operating rod 31. When removing the anti-vibration hammer screw 10, the operator uses the insulated operating linkage 31 to slowly move the suction device 11 of the device closer to the anti-vibration hammer screw 10. The housing 11-1 of the suction device 11 contains a magnet 11-3. Under the attraction of the magnet 11-3, the anti-vibration hammer screw 10 will suddenly enter the housing 11-1 of the suction device 11 just before contact. The magnet 11-3 has a suction head 11-2 for anti-collision protection. Then, the angle of contact between the suction device 11 and the anti-vibration hammer screw 10 is adjusted, and force is applied in the direction of screw removal. The conductor anti-vibration hammer 1 itself is relatively heavy and is less affected by the attraction of the magnet 11-3, while the anti-vibration hammer screw 10 is relatively light. Under the attraction, it will come out of the screw hole of the conductor anti-vibration hammer 1 until it is detached and retracted together with the device. When the conductor vibration damper screw 10 is on the outside of the conductor 3, a gate-type corner device 13 needs to be connected between the suction rod 11 and the magnetic pull rod 12 of the device. The operation method is the same as when it is on the inside of the conductor.

[0038] Step 3: As Figure 14 The diagram shows the operation structure for removing the conductor vibration damper 1 using the vibration damper installation or removal device. The operator selects a suitable adjustment plate 17 based on the model of the conductor vibration damper 1 and tightens it with locking screws 19, hanging plates 16, and insulating hooks 18. One end of the insulating rope 20 is passed through the rope hole 15 of the device and tied in a knot. The other end is passed through the pulley, and the pulley is placed on the conductor or ground wire above the conductor vibration damper 1. The insulating rope 20 is pulled at the pulley end, moving the device until it reaches directly above the conductor vibration damper 1. The insulating rope 20 is then lowered slightly, and the position is adjusted until the insulating hook 18 hooks the steel strand between the two ends of the conductor vibration damper 1. At this point, the insulating rope 20 is pulled upwards slightly, causing the device and the clamping plate 21 of the conductor vibration damper 1 to slowly rotate at a certain angle until the clamping plate 21 detaches from the conductor 3. The insulating rope 20 is then pulled to a suitable position, and the pulley and the device are pulled back. Finally, the damaged vibration damper is retrieved while maintaining a safe distance.

[0039] Step 4: The operator places the new vibration damper on the insulating hook 18 in the vibration damper installation or removal device. Another operator holds the insulating rope 20 and pushes the pulley to slowly move it upwards towards the vibration damper installation position. After reaching the position, slowly release the insulating rope 20. Since there are no bolts on the conductor vibration damper 1 at this time, the clamp 21 can rotate. Adjust the opening angle of the clamp 21 by pulling the insulating rope 20 back and forth until the conductor 3 can enter the clamp 21. Then, remove the vibration damper installation or removal device and the pulley together.

[0040] Step 5: The operator uses the screw removal or insertion device again to insert the anti-vibration hammer screw 10. First, the anti-vibration hammer screw is attracted to the suction rod 11 of the device. Then, the anti-vibration hammer screw 10 is slowly pushed to the screw hole position of the conductor anti-vibration hammer 1 through the insulated operating rod 31. The angle of the anti-vibration hammer screw 10 is adjusted and inserted in the direction of the screw hole. Finally, the angle of contact between the suction rod 11 and the anti-vibration hammer screw 10 is not consistent with the direction of the screw hole. The operator pulls the insulated operating rod 31 forcefully. At this time, the anti-vibration hammer screw is firmly stuck in the screw hole of the conductor anti-vibration hammer 1. When the force applied by the operator is greater than the attraction force of the magnet 11-3, the suction rod 11 and the anti-vibration hammer screw 10 separate, and the screw removal or insertion device is retracted.

[0041] Step 6: Finally, tighten the vibration damper nut again using the bolt tightening device. First, put the sleeve over the vibration damper nut. Operate the device using the insulated operating rod, in the same way as in Step 1. Align the vibration damper nut in the sleeve with the vibration damper screw, and push or pull the insulated operating rod back and forth to tighten the vibration damper nut until it is firmly tightened onto the vibration damper screw. Then, retract the bolt tightening device to complete the work.

[0042] Step 1: The operation method is the same as Step 1 in Example 1. Use the bolt tightening device to loosen the vibration damper nut of the displaced conductor vibration damper.

[0043] Step 2: The operation method is the same as in Step 2 of Example 1. Use the screw removal or insertion device to remove the anti-vibration hammer screw on the conductor anti-vibration hammer.

[0044] Step 3: The operation method is basically the same as Step 3 in Example 1. Use the anti-vibration hammer installation or removal device to remove the anti-vibration hammer from its current position. Do not retract it at this time.

[0045] Step 4: The operator grasps the insulating rope 20 and pushes the pulley to slowly move it above the position where the vibration damper will be reinstalled. After reaching the position, the operator slowly releases the insulating rope 20. Since there are no bolts on the conductor vibration damper 1 at this time, the clamp 21 can rotate. The operator adjusts the opening angle of the clamp 21 by pulling the insulating rope 20 back and forth until the conductor 3 can enter the clamp 21. Then, the vibration damper installation or removal device and the pulley are taken back together.

[0046] Step 5: The operation method is the same as in Step 5 of Example 1. Use the screw removal or insertion device to re-insert the anti-vibration hammer screw on the conductor anti-vibration hammer.

[0047] Step 6: The operation method is the same as in Step 6 of Example 1. Use the bolt tightening device to tighten the anti-vibration hammer nut until it is secure. Then retract the device and the work is finished.

Claims

1. A combination device for live-line replacement or reset of ground potential of a conductor vibration damper, characterized in that: It includes a bolt tightening device, a screw removal or insertion device, and a vibration damper removal or installation device; the bolt tightening device is used to loosen or tighten the vibration damper nut of the vibration damper while the conductor is energized, and includes a sleeve (4), an adapter (5), a commutator (6), a connecting rod (7), and a push-pull rod (9); one end of the sleeve (4) matches the vibration damper nut (2), and the other end of the sleeve (4) has a groove and is connected to the commutator (6) through the adapter (5); one end of the connecting rod (7) is hinged to the commutator (6), and the other end is connected to the push-pull rod (9); the adapter The device (5) consists of a sleeve connector (5-1), a door post (5-3), and an anti-detachment groove (5-5). A spring ball (5-2) on the sleeve connector (5-1) is pressed into the groove inside the sleeve (4) to hold the sleeve (4). The door post (5-3) and the anti-detachment groove (5-5) are connected by a rotating shaft (5-4). The anti-detachment groove (5-5) can rotate 180° around the rotating shaft (5-4) inside the door post (5-3) to change direction. The anti-detachment groove (5-5) has a square slot inside, and each of the four sides of the square slot has a groove. The screw removal or insertion device is used to remove or insert the screw of the anti-vibration hammer while it is energized. It includes a suction rod (11) and a magnetic pull rod (12). The suction rod (11) includes a housing (11-1) and a rotary joint (11-4). The housing is cylindrical, and one end of the cylinder is a hollow groove with a magnet (11-3) installed inside. The magnet is equipped with a suction head (11-2), and the magnet and suction head match the anti-vibration hammer screw (10) on the bolt-type anti-vibration hammer. The other end of the cylinder is provided with a rotary joint (11-4). The suction rod (11) The rotary joint one (11-4) is directly or indirectly connected to the magnetic pull rod (12); the magnetic pull rod (12) includes a rotary joint two (12-4), an insulating tube (12-2) and a threaded joint (12-3). The rotary joint two (12-4) and the threaded joint (12-3) are respectively fixed to the two ends of the insulating tube (12-2) by their respective fixing pins (12-1); the rotary joint one (11-4) and the rotary joint two (12-4) have the same structure, both being annularly arranged toothed structures that match each other and are connected by bolts; The device for removing or installing the anti-vibration hammer is used to remove or install the anti-vibration hammer of the conductor while it is energized. It includes a hanging plate (16), an adjusting plate (17), and an insulating hook (18). The top of the hanging plate (16) is provided with a rope hole (15), and the bottom is connected to the adjusting plate (17). The two sides of the adjusting plate (17) are respectively provided with insulating hooks (18). The distance between the two insulating hooks (18) is greater than the width of the clamping plate (21) on the conductor anti-vibration hammer (1) and less than the minimum distance between the two hammer bodies on the conductor anti-vibration hammer (1). The two insulating hooks (18) hook and lift the steel strand (22) of the conductor anti-vibration hammer (1). The commutator (6) consists of a converter connector (6-1), a second gatepost (6-6), and a second rotating shaft (6-7). A steel ball (6-2) is provided on one side of the square column of the converter connector (6-1), which matches the groove inside the anti-disengagement slot (5-5) of the converter (5), and can lock the converter connector (6-1) in any direction according to the different operating angles of the personnel.

2. The combined device for replacing or resetting the ground potential of a conductor vibration damper according to claim 1, characterized in that: The connecting rod (7) consists of a locking pin (7-1), a rotating body (7-3), and an extension arm (7-5). The locking pin (7-1) and the rotating body (7-3) at one end of the extension arm (7-5) are connected by a rotating shaft (7-2). The rotating body (7-3) has a screw hole (7-4), and the rotating shaft (6-7) of the commutator (6) is inserted into the screw hole (7-4). The other end of the extension arm (7-5) is provided with a connecting hole.

3. A combination device for live-line replacement or reset of ground potential of a conductor vibration damper according to claim 1 or 2, characterized in that: The push-pull rod (9) consists of a connecting plate (9-1), a locking platform (9-2), and an operating rod connector (9-3). The connecting plate (9-1) has a hole at its end, which is connected to the connecting hole on the connecting rod (7) by bolts (36). There is a locking platform (9-2) on each side of the connecting plate (9-1). The locking platform has a 120° curved step in the middle, which limits the rotation angle of the extension arm (7-5) on the locking platform (9-2). One end of the operating rod connector (9-3) is connected to the connecting plate (9-1), and the other end is connected to the insulating operating rod (14).

4. A combination device for live-line replacement or reset of ground potential of a conductor vibration damper according to claim 1 or 2, characterized in that: The threaded joint (12-3) of the magnetic pull rod (12) is connected to the insulated operating link (31) to extend the rotating arm.

5. The combined device for live-line replacement or reset of ground potential of a conductor vibration damper according to claim 1, characterized in that: The first rotating joint (11-4) of the suction rod (11) and the second rotating joint (12-4) of the magnetic pull rod (12) are indirectly connected by a portal corner device (13) to accommodate different rotation angles. The portal corner device (13) includes a portal rod (13-2), a short rod rotating joint (13-1) and a long rod rotating joint (13-3). The two ends of the portal rod (13-2) are connected to the short rod rotating joint (13-1) and the long rod rotating joint (13-3) respectively. The short rod rotating joint (13-1) is connected to the first rotating joint (11-4) on the suction rod (11) by a bolt (8). The long rod rotating joint (13-3) is connected to the second rotating joint (12-4) on the magnetic pull rod (12) by a bolt (32).

6. The combined device for live-line replacement or reset of ground potential of a conductor vibration damper according to claim 1, characterized in that: The lower part of the mounting plate (16) is provided with a boss, and the adjusting plate (17) is provided with a matching groove. The mounting plate (16) and the adjusting plate (17) are positioned by the boss matching the groove and are connected by locking screws.

Citation Information

Patent Citations

  • Novel tool for replacing wire side bolt on overhead transmission line in electrified mode

    CN108879473A

  • Distance locator for live installation of stockbridge damper

    CN114976994A