A flood prevention and emergency warning system based on 5G and BeiDou technology
By combining 5G and Beidou technology in the flood prevention and rescue early warning system to conduct real-time monitoring of water level and water surface profiles, the problem of lag in the flood prevention early warning system in the existing technology is solved, and timely warning of flood prevention status is achieved.
Patent Information
- Application Number
- CN202310601434.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-25
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2043-05-25
AI Technical Summary
The existing flood prevention and rescue early warning system has lag in the analysis and judgment process, especially in the case of water boundaries that have not been set in advance, making it difficult to conduct early warnings in a timely manner.
Adopt flood prevention and rescue early warning system based on 5G and Beidou technology, and through the water level monitoring module, water conservancy parameter monitoring module and satellite image acquisition module, combined with 5G technology, the predicted water level value and satellite image information are analyzed to realize real-time monitoring of water level and water surface profile. and early warning.
When the water level or other monitoring parameters have not reached the warning threshold, it can be promptly warned, which improves the timeliness of early warning of flood prevention states.
Smart Images

Figure CN117133097B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of flood prevention and early warning technology, and specifically to a flood prevention and emergency warning system based on 5G and BeiDou technologies. Background Art
[0002] During the flood season, areas along rivers need to be warned of real-time flood control status, relocate residents in advance, and reduce the loss of people’s lives and property. Therefore, the accuracy and timeliness of flood control warnings are crucial.
[0003] The existing flood prevention and emergency warning system will make analysis and judgment based on a variety of factors, including but not limited to water level status, flow status, dam deformation status, etc. Among them, when one or more of the above parameters reach the corresponding warning, it is judged that there is a risk, and a flood prevention warning is issued, and personnel in the area are transferred in advance; among them, the deformation status of the dam body mainly relies on the deformation sensors pre-installed inside the dam body to realize the deformation status monitoring process, which has a high degree of accuracy.
[0004] For water boundaries that are not pre-set, their real-time status can be obtained by obtaining relatively high-definition images through Beidou technology, and their abnormal status can be judged by analyzing the acquired images. However, the analysis and judgment process will be affected by many factors. Therefore, early warning can only be issued when more obvious problems occur. Obviously, the early warning system has a certain lag at this time. Summary of the invention
[0005] The purpose of the present invention is to provide a flood prevention and emergency warning system based on 5G and Beidou technology to solve the following technical problems:
[0006] How to improve the timeliness of flood prevention and emergency warnings based on Beidou technology and 5G.
[0007] The purpose of the present invention can be achieved through the following technical solutions:
[0008] A flood prevention and emergency warning system based on 5G and BeiDou technology, the system comprising:
[0009] A water level monitoring module is set at a preset monitoring point, including a Beidou positioning component, and is used to obtain the water level value of the preset monitoring point;
[0010] Water conservancy parameter monitoring module, used to monitor upstream drainage flow information, downstream drainage flow information, rainfall information and environmental parameters;
[0011] Satellite image acquisition module, used to obtain satellite image information of preset monitoring points;
[0012] The early warning analysis module is connected to the hydraulic parameter monitoring module and several groups of water level monitoring modules based on 5G technology, and is used to obtain predicted water level values based on upstream drainage flow information, downstream drainage flow information, rainfall information and environmental parameters; it performs early warning analysis based on the satellite image information of the preset monitoring points, the predicted water level values and the water level values obtained by the water level monitoring module, and determines whether to issue an early warning based on the results of the early warning analysis.
[0013] In one embodiment, the process of obtaining the predicted water level value includes:
[0014] By formula H pre (t)=H(t1)+f H (H(t1),Q add (t)) Calculate the predicted water level value H at time t pre (t);
[0015] Wherein, t1 is a historical moment, t is the current moment, t-t1=Δt, Δt is a preset fixed period; H(t1) is the water level monitoring value at time t1, f H is the water level model function of the water area; Q add (t) is the predicted water volume increase; N is the number of upstream water inlets, i∈[1, N]; Q Ui (t) is the real-time flow rate of the i-th upstream inlet; M is the number of downstream outlets, j∈[1,M]; Q Dj (t) is the real-time flow of the jth downstream outlet; w(t1) is the soil moisture in the environmental data at time t1; f w is the adjustment coefficient function, r(t) is the real-time rainfall.
[0016] In one embodiment, the early warning analysis process includes:
[0017] Obtain satellite images of the water area at time t1 and time t, identify and analyze the satellite images, and obtain the water surface contours of the area at time t1 and time t respectively;
[0018] The predicted water surface contour at time t is obtained according to the water surface contour at time t1 and the water level value at time t;
[0019] The warning value is obtained by comparing the water level value monitored at time t with the predicted water level value and the water surface contour identified at time t with the predicted water surface contour;
[0020] Determine whether to issue an early warning based on the size of the early warning value.
[0021] In one embodiment, the process of obtaining the predicted water surface contour at time t includes:
[0022] Get the water surface contour at time t1 and the water level value at time t;
[0023] Obtain the reference water surface profile through the reference water surface profile corresponding to the water level value at time t in the historical data;
[0024] Compare the water surface contour at time t1 with the reference water surface contour corresponding to the water level value at time t1 for coincidence, and obtain the abnormal area;
[0025] For each abnormal area, adjust the amount U k =f H (H(t1),Q add (t))*tanθ k Adjust when U k > 0, the water level contour of the abnormal area is extended outward by a distance U in a direction perpendicular to the water level contour. k ; when U k When <0, the water level contour of the abnormal area is reduced inward in a direction perpendicular to the water level contour. k |; The adjusted contour is used to replace the contour at the corresponding position in the reference water surface contour, and the predicted water surface contour is formed after fitting.
[0026] In one embodiment, the calculation process of the warning value includes:
[0027] Warn by formula E (t) = S g (|H(t)-H pre (t)|)+x*Sh(|S(t)-S pre (t)|)*F(t) calculates the warning value Warn at time t E (t);
[0028] Among them, H(t) is the mean water level value of several preset monitoring points at time t; Sg is a piecewise function, H1, H2, H3 are preset depth thresholds; δ, μ are preset adjustment coefficients; S(t) is the water surface contour area at time t; S pre (t) is the predicted water surface contour area at time t; Sh is the area anomaly function; x is the weight adjustment coefficient; F(t) is the contour anomaly value;
[0029] According to the warning value Warn at time t E (t) Size determines whether to issue an early warning.
[0030] In one embodiment, the process of obtaining the contour outlier value F(t) includes:
[0031] Compare the predicted water surface contour at time t with the water surface area identified at time t to obtain the area where the water surface area exceeds the predicted water surface contour;
[0032] By formula Calculate the xth contour outlier value F x (t);
[0033] pass Calculate and obtain the contour outlier value F(t);
[0034] Where V is the number of water surface areas beyond the predicted water surface contour, x∈[1,V]; S ex is the area of the x-th region contour, L ex is the water level contour length corresponding to the x-th region contour; L xmax is the maximum value of the normal line of the water level in the contour of the xth region, α1 and α2 are the preset weight coefficients; τ is the preset correction coefficient; max{F x (t)} is the F x (t)Max.
[0035] In one embodiment, the process of determining whether to issue an early warning according to the early warning value is as follows:
[0036] Set the warning value to Warn E (t) Compare with the preset threshold interval [W1, W2]:
[0037] If Warn E (t)>W2, then an early warning is issued;
[0038] If Warn E (t)<W1, no warning is issued;
[0039] If Warn E (t)∈[W1,W2], a single analysis is performed and whether to issue an early warning is determined based on the results of the single analysis.
[0040] In one embodiment, the single item analysis process includes:
[0041] |H(t)-H pre (t)|,|S(t)-S pre (t)| and F(t) and the corresponding preset reference value H RT , S RT and F RT To compare:
[0042] If |H(t)-H is not satisfied pre (t)|>H RT 、|S(t)-S pre (t)|>S RT And F(t)>F RT When an alarm occurs, an early warning is issued.
[0043] A flood control and emergency warning method based on 5G and BeiDou technology, wherein the method performs flood control and emergency warning through the flood control and emergency warning system based on 5G and BeiDou technology.
[0044] Beneficial effects of the present invention:
[0045] (1) The present invention compares and judges the predicted water level value of the preset monitoring point with the water level value obtained by the water level monitoring module, and then performs early warning analysis in combination with the obtained satellite image information. It can perform the early warning process when the water level or other monitoring parameters do not reach the early warning critical value, thereby achieving the timeliness of the early warning of the flood control status. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] The present invention will be further described below in conjunction with the accompanying drawings.
[0047] Figure 1 It is a logic block diagram of the flood prevention and emergency warning system of the present invention. DETAILED DESCRIPTION
[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] See also Figure 1 As shown, in one embodiment, a flood prevention and emergency warning system based on 5G and Beidou technology is provided, and the system includes:
[0050] A water level monitoring module is set at a preset monitoring point, including a Beidou positioning component, and is used to obtain the water level value of the preset monitoring point;
[0051] Water conservancy parameter monitoring module, used to monitor upstream drainage flow information, downstream drainage flow information, rainfall information and environmental parameters;
[0052] Satellite image acquisition module, used to obtain satellite image information of preset monitoring points;
[0053] The early warning analysis module is connected to the hydraulic parameter monitoring module and several groups of water level monitoring modules based on 5G technology, and is used to obtain predicted water level values based on upstream drainage flow information, downstream drainage flow information, rainfall information and environmental parameters; it performs early warning analysis based on the satellite image information of the preset monitoring points, the predicted water level values and the water level values obtained by the water level monitoring module, and determines whether to issue an early warning based on the results of the early warning analysis.
[0054] Through the above-mentioned technical scheme, this embodiment is based on Beidou positioning technology and satellite image acquisition technology. By integrating Beidou positioning components on the water level monitoring module, the water level of the predicted monitoring point is obtained, and then sent to the early warning analysis module synchronously based on 5G technology; the satellite image information of the preset monitoring point is obtained through the satellite image acquisition module, and the upstream drainage flow information, downstream drainage flow information, rainfall information and environmental parameters are monitored through the water conservancy parameter monitoring module; then, the predicted water level value is obtained according to the upstream drainage flow information, downstream drainage flow information, rainfall information and environmental parameters, and the predicted water level value of the preset monitoring point is compared and judged with the water level value obtained by the water level monitoring module, and then the early warning analysis is performed in combination with the obtained satellite image information. The early warning process can be performed when the water level or other monitoring parameters do not reach the early warning critical value, thereby realizing the timeliness of the early warning of the flood control status.
[0055] It should be noted that the water conservancy parameter monitoring module obtains the upstream drainage flow information and downstream drainage flow information of the corresponding water area by connecting with the water conservancy department website data; and obtains the rainfall information and environmental parameters of the current area by connecting with the meteorological website API interface. No further details are given here.
[0056] As an implementation mode of the present invention, the process of obtaining the predicted water level value includes:
[0057] By formula H pre (t)=H(t1)+f H (H(t1),Q add (t)) Calculate the predicted water level value H at time t pre (t);
[0058] Wherein, t1 is a historical moment, t is the current moment, t-t1=Δt, Δt is a preset fixed period; H(t1) is the water level monitoring value at time t1, f H is the water level model function of the water area; Q add (t) is the predicted water volume increase; N is the number of upstream water inlets, i∈[1, N]; Q Ui (t) is the real-time flow rate of the i-th upstream inlet; M is the number of downstream outlets, j∈[1,M]; Q Dj (t) is the real-time flow of the jth downstream outlet; w(t1) is the soil moisture in the environmental data at time t1; f w is the adjustment coefficient function, r(t) is the real-time rainfall.
[0059] Through the above technical solution, this embodiment provides a method for predicting water level. This method predicts by using the incremental method. First, the monitored water level value at the historical moment t1 is obtained. The historical moment t1 is separated from the current moment t by a preset fixed period Δt. The data is set according to empirical data. According to the influence of the water volume increase, water volume decrease and rainfall influence in the preset fixed period, the predicted water volume increase value Q is obtained. add (t), where the adjustment coefficient function f w And the water level model function f H The predicted water volume increase value is obtained by adjusting the rainfall according to the soil state, and then judging the value of the water level adjustment through the water level model function, and then combining the monitored water level value H(t1) at t1 to calculate the predicted water level value H pre (t).
[0060] As an implementation mode of the present invention, the process of early warning analysis includes:
[0061] Obtain satellite images of the water area at time t1 and time t, identify and analyze the satellite images, and obtain the water surface contours of the area at time t1 and time t respectively;
[0062] The predicted water surface contour at time t is obtained according to the water surface contour at time t1 and the water level value at time t;
[0063] The warning value is obtained by comparing the water level value monitored at time t with the predicted water level value and the water surface contour identified at time t with the predicted water surface contour;
[0064] Determine whether to issue an early warning based on the size of the early warning value.
[0065] Through the above technical scheme, this embodiment provides a specific process of early warning analysis. First, satellite images of the water area at time t1 and time t are obtained and the satellite images are identified and analyzed to obtain the water surface contours of the area at time t1 and time t respectively; then, the predicted water surface contour at time t is obtained based on the water surface contour at time t1 and the water level value at time t. Since the water surface contour at time t1 is historical data that has been confirmed and verified, the obtained predicted water surface contour can reflect the ideal state within a preset fixed period of time, and then by comparing it with the water surface contour actually monitored and identified at time t, the abnormal state of the contour can be determined; in addition, the comparison structure of the water level value monitored at time t and the predicted water level value is combined to obtain the early warning value, and whether to issue an early warning is determined according to the size of the early warning value, thereby realizing the early warning process of the flood control status.
[0066] It should be noted that the process of water surface contour recognition is implemented based on a convolutional neural network recognition algorithm commonly used in the prior art and is not limited here.
[0067] As an implementation mode of the present invention, the process of obtaining the predicted water surface profile at time t includes:
[0068] Get the water surface contour at time t1 and the water level value at time t;
[0069] Obtain the reference water surface profile through the reference water surface profile corresponding to the water level value at time t in the historical data;
[0070] Compare the water surface contour at time t1 with the reference water surface contour corresponding to the water level value at time t1 for coincidence, and obtain the abnormal area;
[0071] For each abnormal area, adjust the amount U k =f H (H(t1),Q add (t))*tanθ k Adjust when U k > 0, the water level contour of the abnormal area is extended outward by a distance U in a direction perpendicular to the water level contour. k ; when U k When <0, the water level contour of the abnormal area is reduced inward in a direction perpendicular to the water level contour. k |; The adjusted contour is used to replace the contour at the corresponding position in the reference water surface contour, and the predicted water surface contour is formed after fitting.
[0072] Through the above technical solution, this embodiment provides a process for obtaining the predicted water surface contour at time t. Specifically, first, a reference water surface contour is obtained according to a reference water surface contour corresponding to a water level value at time t, and then the reference water surface contour is adjusted according to the water surface contour at time t1 and the water level value at time t. In the specific adjustment process, the water surface contour at time t1 is compared with the reference water surface contour corresponding to the water level value at time t1 for coincidence, so as to obtain an abnormal area; and each abnormal area is adjusted according to the adjustment amount U k =f H (H(t1),Q add (t))*tanθ k Adjust when U k > 0, the water level contour of the abnormal area is extended outward by a distance U in a direction perpendicular to the water level contour. k ; when U k When <0, the water level contour of the abnormal area is reduced inward in a direction perpendicular to the water level contour. k |; The adjusted contour replaces the contour of the corresponding position in the reference water surface contour, and the predicted water surface contour is formed after fitting; therefore, through the above process, the water surface contour state at time t can be predicted based on the historical state information at time t1, and then the prediction and judgment process can be carried out in time through comparison.
[0073] As an implementation manner of the present invention, the calculation process of the warning value includes:
[0074] Warn by formula E (t) = Sg(|H(t)-H pre (t)|)+x*Sh(|S(t)-S pre (t)|)*F(t) calculates the warning value Warn at time t E (t);
[0075] Among them, H(t) is the mean water level value of several preset monitoring points at time t; Sg is a piecewise function, H1, H2, H3 are preset depth thresholds; δ, μ are preset adjustment coefficients; S(t) is the water surface contour area at time t; S pre (t) is the predicted water surface contour area at time t; Sh is the area anomaly function; x is the weight adjustment coefficient; F(t) is the contour anomaly value;
[0076] According to the warning value Warn at time t E (t) Size determines whether to issue an early warning.
[0077] The process of obtaining the contour outlier value F(t) includes:
[0078] Compare the predicted water surface contour at time t with the water surface area identified at time t to obtain the area where the water surface area exceeds the predicted water surface contour;
[0079] By formula Calculate the xth contour outlier value F x (t);
[0080] pass Calculate and obtain the contour outlier value F(t);
[0081] Where V is the number of water surface areas beyond the predicted water surface contour, x∈[1,V]; S ex is the area of the x-th region contour, L ex is the water level contour length corresponding to the x-th region contour; L xmax is the maximum value of the normal line of the water level in the contour of the xth region, α1 and α2 are the preset weight coefficients; τ is the preset correction coefficient; max{F x (t)} is the F x (t)Max.
[0082] Through the above technical solution, this embodiment provides a specific process of early warning analysis. E (t) = Sg(|H(t)-H pre(t)|)+x*Sh(|S(t)-S pre (t)|)*F(t) to obtain the warning value, where the warning value is comprehensively judged according to the water level difference state and the contour state, where the comparison of the contour state includes the comparison of the contour area and the comparison of the contour features. Specifically, the comparison of the contour features is reflected by the contour anomaly value. The judgment process of the contour anomaly value first compares the predicted water surface contour at time t with the water surface area identified at time t to obtain the area where the water surface area exceeds the predicted water surface contour, and then determines the anomaly value according to each contour, and then combines the total anomaly value to obtain the xth contour anomaly value. It makes a comprehensive judgment based on the average extension distance and the maximum extension distance of the contour, and the preset weight coefficients α1 and α2 are set according to the empirical data fitting. Therefore, F x (t) can reflect the abnormal condition of the xth contour, and then The preset correction coefficient τ is obtained by fitting empirical data. Therefore, the average and extreme conditions of all contours and constants are combined to realize the judgment process of the abnormal state of the overall contour through F(t). When obtaining the warning value, |H(t)-H pre (t)| is substituted into the piecewise function, and the value is determined according to its range. The preset depth thresholds H1, H2, and H3 are set according to the empirical error data. Therefore, when |H(t)-H pre When (t)|∈[0, H1], it is within the normal error range, so Sg(|H(t)-H pre (t)|)=0; Similarly, in |H(t)-H pre When the value of (t)| is large, the corresponding Sg(|H(t)-H pre (t)|) value will increase, and then through Sg(|H(t)-H pre (t)|) to obtain the part of the water level difference corresponding to the warning value; then combined with the abnormal state of the water surface contour Sh(|S(t)-S pre (t)|)*F(t), thereby realizing the process of obtaining the warning value.
[0083] It should be noted that the preset adjustment coefficients δ and μ in the above technical solution are obtained after simulation based on test data, and the weight adjustment coefficient is selected and set based on the numerical range after fitting the test data, which will not be described in detail here.
[0084] As an implementation mode of the present invention, the process of determining whether to issue an early warning according to the size of the early warning value is as follows:
[0085] Set the warning value to Warn E (t) Compare with the preset threshold interval [W1, W2]:
[0086] If Warn E(t)>W2, then an early warning is issued;
[0087] If Warn E (t)<W1, no warning is given;
[0088] If Warn E (t)∈[W1, W2], a single analysis is performed and whether to issue an early warning is determined based on the results of the single analysis.
[0089] The process of single item analysis includes:
[0090] |H(t)-H pre (t)|,|S(t)-S pre (t)| and F(t) and the corresponding preset reference value H RT , S RT and F RT To compare:
[0091] If |H(t)-H is not satisfied pre (t)|>H RT 、|S(t)-S pre (t)|>S RT And F(t)>F RT When an alarm occurs, an early warning is issued.
[0092] Through the above technical solution, this embodiment provides a method for warning according to the size of the warning value. Specifically, firstly, the warning value is compared with the preset threshold interval. E When (t)>W2, it means that the warning value is obviously too large, so it indicates that there is an abnormality, and then a warning is issued; when Warn E When (t)<W1, it means that all parameters are in a low range, so the overall state is normal and no warning is issued; when Warn E When (t)∈[W1, W2], a single analysis is required, that is, |H(t)-H pre (t)|,|S(t)-S pre (t)| and F(t) and the corresponding preset reference value H RT , S RT and F RT For comparison, the preset reference values are determined according to the median of the numerical range of each value under normal conditions. Therefore, when |H(t)-H pre (t)|>H RT 、|S(t)-S pre (t)|>S RT And F(t)>F RT , it means that the overall values of each value are larger than the reference value. E(t)∈[W1, W2], indicating that no single value deviates greatly from the reference value, and no warning is issued. On the contrary, if |H(t)-H pre (t)|>H RT 、|S(t)-S pre (t)|>S RT And F(t)>F RT When , it means that there is a certain value that deviates greatly from the reference value, so an early warning is issued. Through the above judgment process, the judgment process of the early warning can be adaptively realized according to the overall state and the state of the single value, and flood prevention and emergency warning can be carried out in time.
[0093] In one embodiment, a flood control and emergency warning method based on 5G and Beidou technology is provided, and the method performs flood control and emergency warning through the flood control and emergency warning system in the above embodiment.
[0094] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A flood prevention and emergency warning system based on 5G and Beidou technology, characterized in that: The system comprises: A water level monitoring module is set at a preset monitoring point, including a Beidou positioning component, and is used to obtain the water level value of the preset monitoring point; Water conservancy parameter monitoring module, used to monitor upstream drainage flow information, downstream drainage flow information, rainfall information and environmental parameters; Satellite image acquisition module, used to obtain satellite image information of preset monitoring points; The early warning analysis module is connected to the hydraulic parameter monitoring module and several groups of water level monitoring modules based on 5G technology, and is used to obtain the predicted water level value based on the upstream drainage flow information, downstream drainage flow information, rainfall information and environmental parameters; perform early warning analysis based on the satellite image information of the preset monitoring point and the predicted water level value and the water level value obtained by the water level monitoring module, and determine whether to issue an early warning based on the early warning analysis results; The process of obtaining the predicted water level value includes: By formula H pre (t)=H(t1)+f H (H(t1),Q add (t)) Calculate the predicted water level value H at time t pre (t); Where t1 is the historical moment, t is the current moment, t-t1=Δt, Δt is the preset fixed period; H(t1) is the water level monitoring value at t1, f H is the water level model function of the water area; Among them, Q add (t) is the predicted water volume increase; N is the number of upstream water inlets, i∈[1, N]; Q Ui (t) is the real-time flow rate of the i-th upstream inlet; M is the number of downstream outlets, j∈[1,M]; Q Dj (t) is the real-time flow of the jth downstream outlet; w(t1) is the soil moisture in the environmental data at time t1; f w is the adjustment coefficient function, r(t) is the real-time rainfall; The process of early warning analysis includes: Obtain satellite images of the water area at time t1 and time t, identify and analyze the satellite images, and obtain the water surface contours of the water area at time t1 and time t respectively; The predicted water surface contour at time t is obtained according to the water surface contour at time t1 and the water level value at time t; The warning value is obtained by comparing the water level value monitored at time t with the predicted water level value and the water surface contour identified at time t with the predicted water surface contour; Determine whether to issue an early warning based on the size of the early warning value; The process of obtaining the predicted water surface profile at time t includes: Get the water surface contour at time t1 and the water level value at time t; Obtain the reference water surface profile through the reference water surface profile corresponding to the water level value at time t in the historical data; Compare the water surface contour at time t1 with the reference water surface contour corresponding to the water level value at time t1 for coincidence, and obtain the abnormal area; For each abnormal area, adjust the amount U k =f H (H(t1),Q add (t))*tanθ k Make adjustments when U k > 0, the water level contour of the abnormal area is extended outward by a distance U perpendicular to the water level contour. k ; when U k When <0, the water level contour of the abnormal area is reduced inward in a direction perpendicular to the water level contour. k |; The adjusted contour is used to replace the contour at the corresponding position in the reference water surface contour, and the predicted water surface contour is formed after fitting.
2. According to claim 1, a flood prevention and emergency warning system based on 5G and Beidou technology is characterized in that: The calculation process of the warning value includes: Warn by formula E (t) = Sg(|H(t)-H pre (t)|)+x*Sh(|S(t)-S pre (t)|)*F(t) calculates the warning value Warn at time t E (t); Among them, H(t) is the mean water level value of several preset monitoring points at time t; Sg is a piecewise function, H1, H2, H3 are preset depth thresholds; δ, μ are preset adjustment coefficients; S(t) is the water surface contour area at time t; S pre (t) is the predicted water surface contour area at time t; Sh is the area anomaly function; x is the weight adjustment coefficient; F(t) is the contour anomaly value; According to the warning value Warn at time t E (t) Size determines whether to issue an early warning.
3. The flood prevention and emergency warning system based on 5G and Beidou technology according to claim 2 is characterized in that: The process of obtaining the contour outlier value F(t) includes: Compare the predicted water surface contour at time t with the water surface area identified at time t to obtain the area where the water surface area exceeds the predicted water surface contour; By formula Calculate the xth contour outlier value F x (t); pass Calculate and obtain the contour outlier value F(t); Where V is the number of water surface areas beyond the predicted water surface contour, x∈[1,V]; S ex is the area of the x-th region contour, L ex is the water level contour length corresponding to the x-th region contour; L xmax is the maximum value of the normal line of the water level in the contour of the xth region, α1 and α2 are the preset weight coefficients; τ is the preset correction coefficient; max{F x (t)} is the F x (t)Max.
4. The flood prevention and emergency warning system based on 5G and Beidou technology according to claim 3 is characterized in that: The process of judging whether to issue an early warning based on the size of the early warning value is as follows: Set the warning value to Warn E (t) Compare with the preset threshold interval [W1, W2]: If Warn E (t)>W2, then an early warning is issued; If Warn E (t)<W1, no warning is issued; If Warn E (t)∈[W1,W2], a single analysis is performed and whether to issue an early warning is determined based on the results of the single analysis.
5. The flood prevention and emergency warning system based on 5G and Beidou technology according to claim 4 is characterized in that: The process of single item analysis includes: |H(t)-H pre (t)|,|S(t)-S pre (t)| and F(t) and the corresponding preset reference value H RT , S RT and F RT To compare: If |H(t)-H is not satisfied pre (t)|>H RT 、|S(t)-S pre (t)|>S RT And F(t)>F RT When an alarm occurs, an early warning is issued.
6. A flood prevention and emergency warning method based on 5G and Beidou technology, characterized in that: The method performs flood prevention and emergency warning by using a flood prevention and emergency warning system based on 5G and Beidou technology as described in any one of claims 1 to 5.
Citation Information
Patent Citations
Urban storm flood monitoring and traffic controlling and guiding system and method
CN103345815A
Outside-station water level monitoring and flood prevention early warning method based on machine vision
CN115661438A
Water conservancy project safety monitoring system based on 5G and Beidou technologies
CN115792994A
Intelligent reservoir water level monitoring gate opening control method and system
CN115826484A
BIM (Building Information Modeling)-based river channel safety early warning method, device and equipment
CN115909664A