Equipment and Method for Hot-Melt Sealing and Demolding of New Energy Flow Batteries

By designing a hot-melt sealing and demolding device for new energy flow batteries, automated assembly from parts to finished products has been achieved, solving the problem of low production efficiency of flow batteries and meeting the needs of large-scale production.

CN117219822BActive Publication Date: 2026-11-17CSIC PRIDE (NANJING) INTELLIGENT EQUIP SYST CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311206176.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-18
Publication Date
2026-11-17
Estimated Expiration
2043-09-18

AI Technical Summary

Technical Problem

The current technology for producing flow batteries lacks fully automated and efficient production equipment, making it difficult to meet production demands.

Method used

A hot-melt sealing and demolding device for new energy flow batteries was designed, which includes multiple workstations to realize the automated assembly of the battery stack from components to finished products, including automatic stacking, automatic pressing, automatic hot melting and automatic demolding. The automatic feeding and transfer of components are carried out by robots and AGV systems.

Benefits of technology

It has enabled fully automated production of flow batteries, improved production efficiency, and met the needs of large-scale production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117219822B_ABST
    Figure CN117219822B_ABST
Patent Text Reader

Abstract

This invention proposes a hot-melt sealing and demolding device and method for new energy liquid batteries, realizing automatic stacking, automatic pressing, automatic hot melting, and automatic demolding of the battery stack. It includes a tooling plate loading station, a robot loading station, a servo loading station, a pressing station, a front hot melting station, a side hot melting station, a demolding and unloading station, and a lifting and transferring station. This invention automatically completes the processes of tooling plate loading, robot loading, servo loading, automatic pressing, automatic hot melting, automatic demolding, automatic cavity clearing, and automatic edge trimming in the production of flow batteries. The operation is fast and efficient, with comprehensive process detection and reliable quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of new energy flow battery manufacturing equipment, and particularly relates to a hot melt sealing and demolding device and method for new energy flow batteries. Background Technology

[0002] Flow batteries are a large-scale, high-efficiency electrochemical energy storage technology with broad application prospects. With these promising future applications, there will inevitably be a huge demand for flow batteries. Therefore, achieving fully automated, high-efficiency production of flow batteries is one of the challenges currently facing the technology. Summary of the Invention

[0003] The purpose of this invention is to provide a hot-melt sealing and demolding device and method for new energy flow batteries, which can realize automatic stacking, automatic pressing, automatic hot melting, and automatic demolding.

[0004] A heat-sealing and demolding device for a new energy flow battery includes: The tooling plate online station 10 is used to realize the tooling plate online and position transfer, and its output end is connected to the input end of the servo loading station 30; the output end of the servo loading station 30 is connected to the input end of the pressing station 40. The robot loading station 20 is used to automatically load and stack the components of the flow battery stack. It includes a robot 4-2 and an AGV docking system 4-1. The output end of the robot 4-2 is equipped with a gripper mechanism 4-3 for adsorbing the components. The AGV docking system 4-1 is used to receive the components on the AGV transfer vehicle. The servo loading station 30 provides a workstation for stacking the various components; Pressing station 40, used to press the stacked fuel cells to a specified height, includes: The upper frame assembly 10-3 is used to drive the front alignment assembly 10-7 to move along the Z direction and the side alignment assembly 10-6 to move along the Y direction. It includes a vertical lifting cylinder 13-8 for driving the front alignment assembly 10-7 and a horizontal pushing cylinder 13-4 for driving the side alignment assembly 10-6. The front alignment component 10-7 is used to clamp the stacked battery pack along the X direction. It can move along the upper frame component 10-3 in the Z direction and can move along the X direction under the action of its own driving structure. The side alignment assembly 10-6 is used to clamp the stacked electric stacks along the Y direction. It is mounted on the upper frame assembly 10-3 and connected to the output end of the flat push cylinder 13-4. The servo pressing mechanism 10-4 is used to pressurize the clamped fuel cell stack. It is installed on the upper frame assembly 10-3, and its output end can move along the Z direction under the action of the servo pressing mechanism 10-4's own drive structure. The front-side heat-melting station 50 is used to pressurize the press-fitted fuel cell stack again along the Y direction and complete the heat-melting of the two wide sides of the fuel cell stack. It includes: Front hot-melt upper frame assembly 18-2; The front hot melt feeding mechanism 18-3 is installed on the front hot melt upper frame assembly 18-2. Its output end is the hot melt plate 21-4. The front hot melt feeding mechanism 18-3 can move along the slide rail Y direction on the front hot melt upper frame assembly 18-2 so that the distance between the hot melt plate 21-4 and the wide surface of the fuel cell stack can be adjusted. The front hot melt servo pressing mechanism 18-4 is installed on the front hot melt upper frame assembly 18-2. Its output end can move along the Z direction under the action of its own driving structure. The side heat-melting station 60 is used to pressurize the fuel cell stack that has been pressurized and whose wide side has been heat-melted again along the Y direction and to complete the heating and heat-melting of the two narrow sides of the fuel cell stack. Demolding and unloading station 70 is used to separate the hot-melted fuel cell stack from the tooling plate, and place the separated fuel cell stack onto the lifting arm 33-8 of the lifting station 80 via guide gripper component 28-4. Among them, the guide gripper component 28-4 can move along the Y direction along the elevator station 80, and the lifting arm 33-8 can move along the Z direction; And the elevator workstation 80, used to transfer the separated fuel cell stack from a high place to the AGV transfer vehicle at the lower end of the elevator.

[0005] Preferably, the pressing station 40 further includes: a prying mechanism 10-5, which is used to pry open the pins on the pressure plate assembly to lock the stack height, ensuring that the stack height does not change after the servo pressing mechanism 10-4 is withdrawn, and includes: Mounting bracket 15-3 is fixed to the cross brace 13-5 of the upper frame assembly 10-3; Cylinder 4 15-4 is fixed to mounting base 15-3, and its output end is fixed to cylinder body of pneumatic finger 15-2. Cylinder 4 15-4 is used to change the distance between pneumatic finger 15-2 and pressure plate assembly. Positioning posts are set on the tooling plate on the conveyor line. The positioning posts pass through the fuel cell stack and the pressure plate assembly from the bottom of the fuel cell stack and extend out of the pressure plate assembly. A pin assembly is installed between adjacent positioning posts. The pin assembly includes a plate supported on a pressure plate assembly. A strip is installed on the plate to engage with the corresponding positioning post. The strip can move along the cavity on the plate under the vibration of the pneumatic finger 15-2. When the strip moves to the point where one end extends out of the cavity and engages with the corresponding positioning post, a locked state of the stack height is formed. The output end of the pneumatic finger is fixed to a toggle block, and the moving direction of the toggle block is perpendicular to the extension and retraction direction of the cylinder 15-4.

[0006] Preferably, the servo pressing mechanism 10-4 in the pressing station 40 includes: a servo electric cylinder 14-1, whose cylinder body is fixed to the upper frame assembly 10-3, and whose output end is connected to the pressure plate 14-3.

[0007] Preferably, the side alignment assembly 10-6 in the press-fitting station 40 includes: A connecting plate, the lower end of which is fixed to mounting plate 3 16-3, which can move along the Y direction in the upper frame assembly 10-3; The clamping shaft 16-1 is clamped on the side of the connecting plate 16-2 facing the fuel cell stack.

[0008] Among them, the front alignment component 10-7 includes: The lifting plate 17-3 can move along the Z direction on the upper frame assembly 10-3. The cylinder 17-8 is installed on it. The output end of the cylinder 17-8 is fixed to the transition plate. The pressure shaft 17-1 is clamped on the side of the transition plate facing the fuel cell stack. One end of the guide rod 17-2 passes through the lifting plate 17-3 and is fixed to the transition plate, and the other end is fixed to the locking block 17-7. When the cylinder 17-8 drives the guide rod 17-2 to move to the point where the guide rod 17-2 is in contact with the fuel cell stack, the locking block 17-7 engages with the locking slider 17-6 to achieve positioning. Cylinder 5 17-5, its cylinder body is fixed to the lifting plate 17-3, its output shaft can move along the linear guide rail 2 17-4 on the lifting plate 17-3, and the end of its output shaft is fixed to the locking slider 17-6.

[0009] Preferably, the front hot-melt servo pressing mechanism 18-4 in the front hot-melt station 50 includes: Servo electric cylinder 4 22-1, the end of which is fixed to pressure plate 2 22-3; The pneumatic gripper 22-4 is fixed to the pressure plate 22-3, and its output end is fixed to the lever 22-5. When the pneumatic gripper 22-4 closes, it drives the corresponding insert to move, thereby unlocking the pin assembly on the pressure plate assembly. One end of the guide rod is fixed to the second pressure plate, and the other end passes through the front hot-melt upper frame assembly and is fixed to a limiting block.

[0010] Preferably, the front hot-melt feeding mechanism 18-3 in the front hot-melt station 50 includes: Servo motor 1, reducer 1, coupling 1 and rotating shaft 1 are connected in sequence, and coupling 1 is fixedly installed; Gear 21-8 and rack 21-9 mesh with each other. Gear 21-8 is formed at the end of shaft 21-6. Rack 21-9 extends perpendicular to the wide face of the fuel cell and is fixed to the rear end of hot melt plate 21-4. Hot melt plate 21-4 can move along linear guide rail 21-7 extending in the Y direction.

[0011] Preferably, the servo loading station 30 includes: The upper cover plate gripper 6-3 is fixed to the welding frame assembly 6-1. The welding frame assembly 6-1 includes a fixed welding frame 7-1 and an X-axis moving component. The X-axis moving component can drive the upper cover plate gripper 6-3 to move along the welding frame 7-1. The upper cover plate clamp 6-3 includes: The system includes a base, a gripper 9-1, and a cylinder 9-3. The cylinder 9-3 is fixed to the base, and its output end is connected to the gripper 9-1. The gripper 9-1 passes through the base, and its gripping end is located below the base. Linear guide rail 9-2 is used to allow the gripper 9-1 to move along the X direction, and it is fixed to the base; The lifting platform 6-2 is used to detach the tooling plate from the conveyor line on the servo loading station 30 and adjust the lifting height, and includes: The receiving plate 8-7 can move along the Z-axis with the servo electric cylinder 8-1 to adjust the height of the tooling plate; Lifting plate 8-6 and lifting cylinder 8-3, the lifting cylinder 8-3 is installed at the bottom of the top platform mounting plate 8-5, and its output end is fixed to the lifting plate 8-6; the lifting cylinder 8-3 extends so that the lifting plate 8-6 receives the tooling plate on the conveyor line, thereby separating the tooling plate conveyor line and the tooling plate thereon. The servo electric cylinder 8-1 has a fixed cylinder body, and its output end is fixed to the receiving plate 8-7. It extends to match the height of the upper cover plate clamp 6-3 to realize the separation of the pressure plate assembly and the tooling plate on the conveyor line.

[0012] Preferably, the side hot-melt station 60 includes: Side hot-melt upper frame assembly 24-2, which includes: The frame and cylinder are 26-1. The cylinder is fixed to the top plate 26-3 of the frame, and its output end is fixed to the pressure plate 26-6. Cross brace 5 26-4 and cross brace 6 26-5 are fixed to the frame and used to install coupling 27-3 of the side hot melt feed mechanism 24-3; The side hot-melt feed mechanism 24-3 is installed on the side hot-melt upper frame assembly 24-2. Its output end is the hot-melt plate 27-4, and the distance between it and the narrow face of the fuel cell stack is adjustable. Specifically, it includes: The motor, reducer 2, coupling 2 and shaft 27-8 are connected in sequence, and coupling 27-3 is fixedly installed.

[0013] Gear 3 27-6 and rack 3 27-7 mesh with each other. Gear 3 27-6 is formed at the end of shaft 2 27-8. Rack 3 27-7 extends perpendicularly to the narrow face of the fuel cell and is fixedly installed at the rear end of hot melt plate 2 27-4.

[0014] Preferably, the guide gripper component 28-4 of the demolding and unmolding station 70 includes: The transplanting clamp frame mates with the linear guide rail 31-3 of the demolding line station 70. A reducer 32-2 is installed on the reducer. The input end of the reducer 32-2 is connected to the servo motor 32-1, and its output end is connected to the gear 4 32-3. The gear 4 32-3 meshes with the rack 4 31-4 of the demolding line station 70. The transplant clamp frame is open on one side of the side hot-melt station 60 to allow the hot-melted fuel cell stack to enter. Cylinder 14 32-4, connecting joint 32-5, pull rod 32-6 and drag 32-7 are hinged in sequence. The cylinder body of cylinder 14 32-4 and connecting joint 32-5 are both hinged to the inner wall of the transplanting clamp frame, and drag 32-7 is hinged to the front end of the inner wall of the transplanting clamp frame. The connecting joint 32-5 is rotatable; One end of the drag gripper 32-7 is located on the outer wall of the transplanting clamp frame. When the cylinder fourteen 32-4 extends, the drag gripper 32-7 drags the heat-fused electric stack. During the retraction of the cylinder fourteen 32-4, the drag gripper 32-7 drags the heat-fused electric stack into the transplanting clamp frame. Linear bearing 2 is used to limit the tie rod 32-6. Its outer ring is fixed to the inner wall of the transplant clamp frame, and its inner ring is for the tie rod to pass through.

[0015] A method for hot-melt sealing and demolding of a new energy flow battery includes the following steps: Step 1: Tooling plate online: Step 2, Stacking of fuel cells: Robot 4-2 picks up each component of the fuel cell stack in the specified order and places them on the tooling plate 3-1 of the servo loading station, which has reached the working position; Step 3: Press the stacked fuel cells to the specified height: Step 3A: The side alignment component 10-6 reaches the side limit position of the fuel cell stack under the action of the horizontal thrust cylinder 13-4; at the same time, the front alignment component 10-7 descends into place under the action of the vertical lifting cylinder 13-8. Step 3B: The servo pressing mechanism 10-4 drives the pressure plate to pressurize the fuel cell stack; Step 4: Pressurize the assembled fuel cell stack again and complete the heat-melting of the two wide sides of the fuel cell stack: Step 4A: The front hot melt feeding mechanism 18-3 is activated, causing the hot melt plate 21-4 to contact the fuel cell stack; Step 4B: The front hot melt servo pressing mechanism 18-4 drives the pressure plate 22-3 to pressurize the fuel cell stack; Step 5: Pressurize the fuel cell stack again after the wide side has been heat-fused and complete the heat-fusion of the two narrow sides of the fuel cell stack. Step 5A: The side hot melt feeding mechanism 24-3 is activated, causing the hot melt plate two to contact the fuel cell stack; Step 5B: The cylinder 26-1 on the side hot-melt upper frame assembly 24-2 drives the pressure plate 26-6 to pressurize the fuel cell stack; Step 6: Demolding and unloading station 70 feeds the hot-melted electrode stack into guide gripper component 28-4, separating the hot-melted electrode stack from the tooling plate conveyor line, and then places the separated electrode stack onto the lifting arm of elevator station 80 through guide gripper component 28-4. Step 7: Transfer the separated fuel cell stack from the high position to the AGV transfer vehicle at the lower end of the elevator workstation.

[0016] Compared with existing technologies, the advantages of this invention are: it includes multiple different workstations, which are interconnected to realize the automated assembly of fuel cell stacks from components to finished products. It can achieve automatic connection, transfer, and loading of tooling plates; automatic connection, transfer, and stacking of fuel cell stack components; automatic pressing of the fuel cell stack; automatic front heat sealing of the fuel cell stack; automatic side heat sealing of the fuel cell stack; automatic demolding and unloading of the fuel cell stack; and lifting and transporting of the fuel cell stack. Attached Figure Description

[0017] Figure 1 This shows the composition and arrangement of the various workstations in this invention.

[0018] Figure 2 This is a schematic diagram of the overall structure of the tooling plate online workstation of the present invention.

[0019] Figure 3 This is a schematic diagram of the robot loading station mechanism of the present invention.

[0020] Figure 4 This is a schematic diagram of the gripper mechanism of the robot loading station of the present invention.

[0021] Figure 5 This is a schematic diagram of the servo-driven feeding station mechanism of the present invention.

[0022] Figure 6 This is a schematic diagram of the welding frame assembly mechanism of the servo feeding station of the present invention.

[0023] Figure 7 This is a schematic diagram of the lifting platform mechanism of the servo-driven feeding station of the present invention. Figure 8This is a schematic diagram of the gripper mechanism for the upper cover plate of the servo-driven feeding station of the present invention. Figure 9 This is a schematic diagram of the press-loading station mechanism in this invention.

[0024] Figure 10 This is a schematic diagram of the welding frame assembly mechanism of the press-fitting station in this invention.

[0025] Figure 11 This is a schematic diagram of the load-bearing lifting platform mechanism of the press loading station in this invention.

[0026] Figure 12 This is a schematic diagram of the frame assembly mechanism of the press-fitting station in this invention.

[0027] Figure 13 This is a schematic diagram of the servo pressing mechanism of the press station in this invention.

[0028] Figure 14 This is a schematic diagram of the pressure loading station's disassembly mechanism in this invention.

[0029] Figure 15 This is a schematic diagram of the side alignment component mechanism of the press-fitting station in this invention.

[0030] Figure 16 This is a schematic diagram of the front alignment component mechanism of the press-fitting station in this invention.

[0031] Figure 17 This is a schematic diagram of the frontal hot melt station mechanism in this invention.

[0032] Figure 18 This is a schematic diagram of the welding frame assembly mechanism of the front hot melt station in this invention.

[0033] Figure 19 This is a schematic diagram of the frame component mechanism of the front hot melt station in this invention.

[0034] Figure 20 This is a schematic diagram of the two orientations of the front hot melt station feeding mechanism in this invention.

[0035] Figure 21 This is a schematic diagram of the servo pressing mechanism of the front hot melt station in this invention.

[0036] Figure 22 This is a schematic diagram of the load-bearing lifting platform mechanism of the front hot-melt station in this invention.

[0037] Figure 23 This is a schematic diagram of the side-mounted hot-melt station mechanism in this invention.

[0038] Figure 24 This is a schematic diagram of the side hot-melt welding frame assembly mechanism of the side hot-melt station in this invention.

[0039] Figure 25This is a schematic diagram of the side hot-melt frame assembly mechanism of the side hot-melt station in this invention.

[0040] Figure 26 This is a schematic diagram of the side hot-melting feed mechanism of the side hot-melting station in this invention.

[0041] Figure 27 This is a schematic diagram of the demolding and unloading station mechanism in this invention.

[0042] Figure 28 This is a schematic diagram of the demolding base mechanism of the demolding and unmolding station in this invention.

[0043] Figure 29 This is a schematic diagram of the demolding top platform mechanism in the demolding and unmolding station of the present invention.

[0044] Figure 30 This is a schematic diagram of the demolding and transfer mechanism at the demolding and off-line workstation in this invention.

[0045] Figure 31 This is a schematic diagram of the guide gripper structure of the demolding and unloading station in this invention.

[0046] Figure 32 This is a schematic diagram of the elevator workstation mechanism in this invention; Figure 33 This is a structural diagram of the AGV docking system; Figure 34 A diagram showing the positional relationship between the pin components on the disengaging mechanism and the pressure plate assembly; Figure 35 This diagram shows the positional relationship between the load-bearing lifting platform mechanism and the pin assembly on the pressure plate assembly of the front hot melt station.

[0047] Among them, 10. Tooling plate online workstation, 3-1, Tooling plate; 3-2, Tooling plate conveyor line; 3-3, AGV transfer mechanism. 20. Robotic loading station 4-1. AGV docking system; 4-2. Robot. 4-3. Gripper mechanism; 5-1. Mounting plate 1; 5-2. Vacuum generator; 5-3. Connecting flange; 5-4. Vacuum suction cup; 5-5. Mounting bracket. 30. Servo-driven loading station 6-1 Welding frame assembly 1, 7-1 Welding frame 1, 7-2 Table 1, 7-3 Cylinder 1, 7-4 Cable chain, 7-5 Welding column; 6-2. Lifting platform; 8-1. Servo electric cylinder 1; 8-2. Electric cylinder guide rod; 8-3. Lifting cylinder; 8-4. Adjusting plate; 8-5. Top platform mounting plate; 8-6. Lifting plate 1; 8-7. Receiving plate; 8-8. Pad plate; 8-9. Cylindrical pin; 8-10. Linear bearing 1; 8-11. Cylinder guide rod. 6-3. Upper cover plate gripper; 9-1. Gripper; 9-2. Linear guide rail one; 9-3. Cylinder two; 9-4. Rack one; 9-5. Gear one; 9-6. Limit wheel; 40. Pressing station 10-1 Welding frame assembly two; 11-1 Table two; 11-2 Welding frame; 10-2, Load-bearing lifting platform; 12-1, Servo electric cylinder II; 12-2, Guide rod I; 12-3, Mounting plate II; 12-4, Cylinder III; 12-5, Load-bearing block; 12-6, Top plate I. 10-3. Upper frame assembly; 13-1. Column; 13-2. Horizontal brace one; 13-3. Horizontal short guide rail; 13-4. Horizontal push cylinder; 13-5. Horizontal brace two; 13-6. Vertical long guide rail; 13-7. Top plate one; 13-8. Vertical lifting cylinder. 10-4. Servo pressing mechanism; 14-1. Servo electric cylinder three; 14-2. Guide rod two; 14-3. Pressure plate one; 10-5. Disengagement mechanism; 15-1. Actuating block; 15-2. Pneumatic finger; 15-3. Mounting base; 15-4. Cylinder four; 10-6, Side Alignment Assembly; 16-1, Clamping Shaft One; 16-2, Connecting Plate; 16-3, Mounting Plate Three; 10-7. Front alignment assembly; 17-1. Pressing shaft two; 17-2. Guide rod three; 17-3. Lifting plate; 17-4. Linear guide rail two; 17-5. Cylinder five; 17-6. Locking slider; 17-7. Locking block; 17-8. Cylinder six. 50. Frontal hot melt station, 18-1, Front hot-melt welded frame assembly; 19-1, Platform 3; 19-2, Welded frame 2; 18-2, Front hot-melt upper frame assembly; 20-1, Top plate two; 20-2, Horizontal brace three; 20-3, Thin support shaft; 20-4, Thick support shaft; 20-5, Horizontal brace four; 18-3. Front hot melt feed mechanism; 21-1. Servo motor 1; 21-2. Reducer 1; 21-3. Coupling 1; 21-4. Hot melt plate 1; 21-5. Cylinder 7; 21-6. Rotary shaft 1; 21-7. Linear guide rail 3; 21-8. Gear 2; 21-9. Rack 2; 18-4. Front hot melt servo pressing mechanism; 22-1. Servo electric cylinder four; 22-2. Guide rod one; 22-3. Pressure plate two; 22-4. Pneumatic gripper; 22-5. Lever. 18-5. Front hot-melt load-bearing lifting platform; 23-1. Upper top plate 2; 23-2. Cylinder 8; 23-3. Top platform mounting plate; 23-4. Linear guide rail 4; 23-5. Cylinder 9; 23-6. Guide rod 2; 23-7. Upper pressure block; 23-8. Lower pressure block. 60. Side-mounted hot melt station, 24-1, Side hot-melt welded frame assembly; 25-1, Welded frame three; 25-2, Platform four; 24-2, Side hot-melt upper frame assembly; 26-1, Cylinder 10; 26-2, Guide rod 3; 26-3, Top plate 3; 26-4, Horizontal brace 5; 26-5, Horizontal brace 6; 26-6, Pressure plate 3; 24-3. Side hot-melt feed mechanism; 27-1. Motor; 27-2. Reducer II; 27-3. Coupling II; 27-4. Hot-melt plate II; 27-5. Cylinder eleven; 27-6. Gear III; 27-7. Rack III; 27-8. Rotating shaft II. 70. Demolding and unloading station. 28-1, Demolding base; 29-1, Welding base frame; 29-2, Cylinder 12; 28-2, Demolding lifting platform; 30-1, Servo electric cylinder five; 30-2, Servo electric cylinder guide rod; 30-3, Demolding platform; 30-4, Cylinder thirteen; 30-5, Lifting plate two; 30-6, Top plate three; 28-3, Demulching and Transplanting; 31-1, Welding Support; 31-2, Nylon Buffer Block; 31-3, Linear Guide Rail Five; 31-4, Rack Four; 28-4. Guide gripper assembly; 32-1. Servo motor II; 32-2. Reducer III; 32-3. Gear IV; 32-4. Cylinder XIV; 32-5. Connecting joint; 32-6. Pull rod; 32-7. Towing gripper; 32-8. Roller; 32-9. Linear bearing II; 80. Lifting station, 33-1. Servo motor 3, 33-2. Reducer 4, 33-3. Synchronous pulley, 33-4. Synchronous belt 1, 33-5. Linear guide rail 6, 33-6. Synchronous belt 2, 33-7. Counterweight device, 33-8. Lifting arm, 33-9. Synchronous belt tensioning device, 33-10. Transfer trolley. Detailed Implementation

[0048] The following is a more detailed description of the heat-sealing and demolding equipment and method for new energy flow batteries according to the present invention, with reference to the schematic diagrams, which illustrate preferred embodiments of the invention. It should be understood that those skilled in the art can modify the invention described herein while still achieving the advantageous effects of the invention. Therefore, the following description should be understood as being of general knowledge to those skilled in the art and is not intended to limit the invention.

[0049] like Figures 1-35 A heat-sealing and demolding device for new energy flow batteries, comprising: The tooling board loading station 10 is the initial input terminal of the entire equipment, used to realize the loading and position transfer of tooling boards. Its output terminal is connected to the input terminal of the servo loading station 30. Specifically, the AGV moves the tooling board to the transfer conveyor belt at the tooling board loading station 10. The transfer conveyor belt transports the tooling board towards the servo loading station 30, transferring the tooling board onto the double-speed chain conveyor (conveyor line) of the servo loading station 30, and then transferring the tooling board to station 30 via the double-speed chain conveyor belt. Figure 1 The aforementioned conveyor belt on the tooling plate online workstation 10 is perpendicular to the conveyor line on the servo loading workstation 30. The output end of the conveyor belt faces the servo loading workstation 30.

[0050] The output of the servo loading station 30 is connected to the input of the pressing station 40. Specifically, it includes tooling plate 3-1, tooling plate conveyor line 3-2, and AGV transfer mechanism 3-3.

[0051] Tooling plate conveyor line 3-2 is existing technology, including body profile, intermediate drive mechanism, end transmission sprocket, etc.

[0052] The AGV transfer mechanism 3-3 includes: AGV transfer vehicle, welding support, mounting plate, positioning plate, etc.

[0053] Tooling plate 3-1 includes: pressure plate assembly, base plate, clamping ring, spring, buffer column, release plate, anti-rotation plate, etc., and all components are fixed on the base plate.

[0054] The robot loading station 20 is used for the automatic loading and stacking of various components of the flow battery stack. It includes a robot 4-2 and an AGV docking system 4-1. The output end of the robot 4-2 is equipped with a gripper mechanism 4-3 for adsorbing the various components. The AGV docking system 4-1 is used to receive components from the AGV transport vehicle, enabling automatic docking and transfer of the various components of the stack. The AGV docking system 4-1... Figure 33 As shown.

[0055] Robot 4-2 is a six-axis robot, ensuring sufficient degrees of freedom to pick up materials from different directions and place them onto the tooling plate.

[0056] In the gripper mechanism 4-3, the mounting plate 5-1 is fixed to the moving end of the robot 4-2 via the connecting flange 5-3, the mounting bracket 5-5 is fixed to the mounting plate 5-1, and vacuum suction cups 5-4 are set on its edge. The vacuum generator 5-2 is mounted on the mounting bracket 5-5 and connected to each vacuum suction cup 5-4.

[0057] The servo loading station 30 provides a workstation for stacking the various component parts. After the tooling plate is lifted to the working position, it automatically removes the pressure plate assembly of the tooling plate. It automatically adjusts the lifting height according to the robot's loading status and returns the pressure plate assembly of the tooling plate after stacking is complete. Specifically, the servo loading station 30 includes: The welding frame assembly 6-1 includes a fixed welding frame 7-1 and an X-axis moving component, which can drive the upper cover plate gripper 6-3 to move along the welding frame 7-1.

[0058] The X-axis moving components include a platform 7-2, a cylinder 7-3, a drag chain 7-4, and a welded column 7-5.

[0059] The platform 7-2 is fixedly mounted on the welding frame 7-1, and a cylinder 7-3 is mounted on it. The cylinder 7-3 can extend and retract along the X direction, and its output end is connected to the welding column 7-5. The welding column 7-5 moves along the guide rail on the platform 7-2.

[0060] The lifting platform 6-2 is used to detach the tooling plate from the conveyor line on the servo loading station 30 and adjust the lifting height. It includes: The top mounting plate 8-5 can move along the Z-direction with the servo electric cylinder 8-1 to adjust the height of the tooling plate. Lifting plate 8-6 and lifting cylinder 8-3 are installed at the bottom of the top mounting plate 8-5, and its output end is fixed to lifting plate 8-6. Lifting cylinder 8-3 extends to receive the tooling plate on the tooling plate conveyor line, thereby separating the tooling plate conveyor line and the tooling plate on it. Lifting plate 8-6 receives tooling plate 3-1.

[0061] Servo electric cylinder 8-1 has a fixed cylinder body and its output end is fixed to the top mounting plate 8-5. It extends to match the height of the upper cover plate clamp 6-3 (the clamp 9-1 of the upper cover plate clamp 6-3 is lowered, and the top mounting plate 8-5 is raised), so as to realize the separation of the pressure plate assembly and the tooling plate on the conveyor line.

[0062] Furthermore, a receiving plate 8-7 and a pad 8-8 are provided on the lifting plate 8-6.

[0063] An electric cylinder guide rod 8-2 is installed between the top platform mounting plate 8-5 and the lifting plate 8-6.

[0064] An adjustment plate 8-4 is installed at the bottom of the top mounting plate 8-5, and the adjustment plate 8-4 is fixedly installed.

[0065] The cylinder guide rod 8-11 is limited to the top mounting plate 8-5 by the linear bearing 8-10.

[0066] Cylindrical pins 8-9 are inserted into the two locating pin holes of the tooling plate when the lifting mechanism lifts the tooling plate and is in close contact with the top limit screw, so as to keep it stable and not deviate.

[0067] The upper cover plate gripper 6-3 is used to grip the pressure plate assembly, which is fixed to the welding column 7-5 of the welding frame assembly 6-1. Specifically, the upper cover plate gripper 6-3 includes: Base; The gripper 9-1 and cylinder 9-3 are fixed to the base. The output end of cylinder 9-3 is connected to gripper 9-1. Gripper 9-1 passes through the base and its gripping end is located below the base.

[0068] Linear guide rail 9-2 is used to allow the gripper 9-1 to move along the X direction, and it is fixed to the base.

[0069] Rack 9-4 and gear 9-5 mesh with each other to maintain the synchronization of the two grippers 9-1.

[0070] Rack 9-4 and gripper 9-1 are respectively set and fixed on it, and both racks 9-4 mesh externally with gear 9-5; the shaft of gear 9-5 is fixed to the base.

[0071] The limiting wheel 9-6 is correspondingly set to the rack 9-4 to limit the movement distance of the rack 9-4, and it can roll along the limiting groove on the rack 9-4.

[0072] Pressing station 40, used to press the stacked fuel cells to a specified height, includes: Welding frame assembly 2 10-1 includes welding frame 11-2, on which platform 2 11-1 is mounted.

[0073] The load-bearing lifting platform 10-2, installed on platform 11-1, is used to support the weight of the fuel cell stack, and specifically includes: Mounting plate 2 12-3 and top plate 1 12-6 are mounted on the platform 2 11-1. Mounting plate 2 12-3 is fixedly mounted on the platform, and servo electric cylinder 2 12-1 and cylinder 3 12-4 are mounted on it. Top plate 1 12-6 is fixed to the output end of servo electric cylinder 2 12-1. Guide rod 1 12-2 passes through mounting plate 2 12-3 and top plate 1 12-6.

[0074] The bottom surface of the top plate 12-6 is fixed with a load-bearing block 12-5, and the output end of cylinder 3 12-4 is connected to the load-bearing block 12-5.

[0075] Servo cylinder 2 12-1 is used to lift the upper top plate 1 12-6 to the pressing position. The upper top plate 1 12-6 supports the fuel cell stack. Cylinder 3 12-4 is used to drive the load-bearing block 12-5 on it to move below the load-bearing block 12-5 on the upper top plate 1 12-6 and make the upper and lower load-bearing blocks abut against each other.

[0076] The upper frame assembly 10-3, used to drive the front alignment assembly 10-7 to move along the Z-axis and the side alignment assembly 10-6 to move along the Y-axis, includes a vertical lifting cylinder 13-8 for driving the front alignment assembly 10-7 and a horizontal pushing cylinder 13-4 for driving the side alignment assembly 10-6. Specifically, it includes: The cross brace 13-2 is fixed to the platform 11-1 via the column 13-1, and a horizontal short guide rail 13-3 is installed on it. The horizontal short guide rail 13-3 is used for sliding the side alignment assembly 10-6.

[0077] The second cross brace 13-5 is fixed to the frame of the upper frame assembly 10-3, and a flat push cylinder 13-4 is installed on the plate between it and the first cross brace 13-2.

[0078] The vertical long guide rail 13-6 is installed on the frame of the upper frame assembly 10-3 as a moving track for the front alignment assembly 10-7.

[0079] The top plate 13-7 is fixed to the top of the frame of the upper frame assembly 10-3, and the vertical lifting cylinder 13-8 and the servo electric cylinder 14-1 are installed on it.

[0080] The front alignment assembly 10-7 is used to clamp the stacked battery packs along the X-direction, and it can move along the vertical long guide rail 13-6 of the upper frame assembly 10-3; wherein, the front alignment assembly 10-7 includes: The lifting plate 17-3 can move along the Z direction on the vertical long guide rail 13-6 of the upper frame assembly 10-3. The cylinder 17-8 is installed on it. The output end of the cylinder 17-8 is fixed to the transition plate. The pressure shaft 17-1 is clamped on the side of the transition plate facing the fuel cell stack. One end of the guide rod 17-2 passes through the lifting plate 17-3 and is fixed to the transition plate, and the other end is fixed to the locking block 17-7. When the cylinder 17-8 drives the guide rod 17-2 to the point where the guide rod 17-2 is in contact with the fuel cell stack, the locking block 17-7 engages with the locking slider 17-6 to achieve positioning. Cylinder 5 17-5, its cylinder body is fixed to the lifting plate 17-3, its output shaft can move along the linear guide rail 2 17-4 on the lifting plate 17-3, and the end of its output shaft is fixed to the locking slider 17-6.

[0081] The side alignment assembly 10-6, used to clamp the stacked fuel cells along the Y direction, is mounted on the upper frame assembly 10-3 and connected to the output end of the horizontal thrust cylinder 13-4 on the upper frame assembly 10-3. The side alignment assembly 10-6 includes: Connecting plate 16-2, the lower end of which is fixed to mounting plate 16-3, mounting plate 16-3 can move along the Y direction of upper frame assembly 10-3; The clamping shaft 16-1 is clamped on the side of the connecting plate 16-2 facing the fuel cell stack.

[0082] The servo pressing mechanism 10-4 is used to pressurize the clamped fuel cell stack. It is mounted on the upper frame assembly 10-3 via a plate component, and its output end can move along the Z-axis. Specifically, it includes a servo electric cylinder 14-1, whose cylinder body is fixed to the upper frame assembly 10-3, and whose output end is connected to the pressure plate 14-3. A guide rod 14-2 is provided between the pressure plate 14-3 and the plate component.

[0083] The disengaging mechanism 10-5 is used to actuate the pins on the pressure plate assembly to lock the stack height, ensuring that the stack height does not change after the pressing mechanism is removed. It includes: Mounting bracket 15-3 is fixed to the cross brace 13-5 of the upper frame assembly 10-3; Cylinder 4 15-4 is fixed to mounting base 15-3, and its output end is fixed to the cylinder body of pneumatic finger 15-2. Cylinder 4 15-4 is used to change the distance between pneumatic finger 15-2 and pressure plate assembly. Positioning posts are set on the tooling plate on the conveyor line. The positioning posts pass through the fuel cell stack and the pressure plate assembly from the bottom of the fuel cell stack and extend out of the pressure plate assembly.

[0084] A pin assembly is installed between adjacent positioning posts. The pin assembly includes a plate that is supported (placed) on the pressure plate assembly. A strip that engages with the corresponding positioning post is installed on the plate. The strip can move along the cavity on the plate under the vibration of the pneumatic finger 15-2. When the strip moves to the point where one end extends out of the cavity and engages with the corresponding positioning post, a locked state of the stack height is formed.

[0085] The output end of the pneumatic finger 15-2 is fixed to a toggle block 15-1, and the moving direction of the toggle block 15-1 is perpendicular to the extension and retraction direction of the cylinder 15-4.

[0086] Among them, the fuel cell stack on the pressing station 40 is transferred from the output end docking platform to the AGV vehicle, and then transferred to the front hot melt station 50 after the AGV vehicle rotates 90 degrees.

[0087] The front-side heat-melting station 50 is used to pressurize the press-fitted fuel cell stack again along the Y direction and complete the heating and heat-melting of the two wide sides of the fuel cell stack. It includes: The front hot-melt welded frame assembly 18-1 includes a second welded frame 19-2, and a third platform 19-1 fixed to the second welded frame 19-2.

[0088] Front hot-melt upper frame assembly 18-2 includes: A front hot-melt feeding mechanism 18-3 is installed between cross braces 3 20-2 and cross braces 4 20-5.

[0089] The frame is fixed to the platform 319-1 by the thick support shaft 20-4.

[0090] Top plate 20-1, fixed to the top of the frame, is used to install the front hot melt servo pressing mechanism 18-4.

[0091] A front-side hot-melt feed mechanism 18-3 is mounted on the front-side hot-melt upper frame assembly 18-2. Its output end is a hot-melt plate 21-4. The front-side hot-melt feed mechanism 18-3 can move along a slide rail in the Y direction on the front-side hot-melt upper frame assembly 18-2, allowing the distance between the hot-melt plate 21-4 and the wide surface of the fuel cell stack to be adjustable. The front-side hot-melt feed mechanism 18-3 includes: Servo motor 21-1, reducer 21-2, coupling 21-3 and shaft 21-6 are connected in sequence, with coupling 21-3 fixedly installed; Gear 21-8 and rack 21-9 mesh with each other. Gear 21-8 is formed at the end of shaft 21-6. Rack 21-9 extends perpendicular to the wide face of the fuel cell and is fixed to the rear end of hot melt plate 21-4. Hot melt plate 21-4 can move along linear guide rail 21-7 extending in the Y direction.

[0092] Cylinder 7 21-5 is hinged between the rear end of hot melt plate 1 21-4 and the shaft of limiting plate 1. Limiting plate 1 is hinged to the front end of hot melt plate 1 21-4. Limiting plate 1 is arc-shaped and has a scraper 1 at the front end. The scraper is used to smooth the weld that appears on the wide surface of the fuel cell after welding with a glass fiber mesh.

[0093] A front-side hot-melt servo pressing mechanism 18-4 is mounted on the front-side hot-melt upper frame assembly 18-2, and its output end is movable along the Z-axis. The front-side hot-melt servo pressing mechanism 18-4 includes: Servo electric cylinder 4 22-1, the end of which is fixed to pressure plate 2 22-3; The pneumatic gripper 22-4 is fixed to the pressure plate 22-3, and its output end is fixed to the lever 22-5. When the pneumatic gripper 22-4 closes, it drives the corresponding insert to move, thereby unlocking the pin assembly on the pressure plate assembly. Guide rod 22-2, one end is fixed to pressure plate 22-3, and the other end passes through the front hot melt upper frame assembly 18-2 and is fixed to a limiting block.

[0094] The front hot-melt load-bearing lifting platform 18-5 has the same load-bearing principle as the load-bearing lifting platform 10-2. It is installed on platform three 19-1 and includes: The top mounting plate 23-3 and the upper top plate 23-1 are fixedly mounted on the platform 3 19-1, on which cylinder 9 23-5 and cylinder 8 23-2 are mounted. The upper top plate 23-1 is fixed to the output end of cylinder 9 23-5. The guide rod 23-6 passes through the top mounting plate 23-3 and the upper top plate 23-1.

[0095] The upper pressure block 23-7 is fixed to the bottom surface of the upper top plate 23-1, and the output end of the cylinder 8 23-2 is connected to the lower pressure block 23-8. The lower pressure block 23-8 can move with the linear guide rail 23-4 on the top platform mounting plate 23-3.

[0096] The side heat-melting station 60 is used to pressurize the press-fitted fuel cell stack, whose wide side has already been heat-melted, again along the Y direction and to complete the heating and heat-melting of the two narrow sides of the fuel cell stack. The working principle of the side heat-melting station 60 is the same as that of the front heat-melting station 50. Specifically, the fuel cell stack on the front heat-melting station 50 is transferred from the output end docking platform to the AGV vehicle, and after the AGV vehicle rotates 90 degrees, it is transferred to the side heat-melting station 60.

[0097] The side hot melt station 60 specifically includes: The side hot-melt welded frame assembly 24-1 includes a welded frame three 25-1 and a platform four 25-2 installed on the welded frame three 25-1.

[0098] Side hot-melt upper frame assembly 24-2, which includes: Frame; Cylinder 26-1, the cylinder body is fixed to the upper top plate 26-3 of the frame, and its output end is fixed to the pressure plate 26-6; Cross brace 5 26-4 and cross brace 6 26-5 are fixed to the frame and used to install coupling 27-3 of the side hot melt feed mechanism 24-3; Guide rod 3 26-2 is fixed to pressure plate 3 26-6 and passes through upper top plate 3 26-3.

[0099] The side hot-melt feed mechanism 24-3 is installed on the side hot-melt upper frame assembly 24-2. Its output end is the hot-melt plate 27-4, and the distance between it and the narrow face of the fuel cell stack is adjustable. Specifically, it includes: Motor 27-1, reducer 27-2, coupling 27-3 and shaft 27-8 are connected in sequence, with coupling 27-3 fixedly installed; Gear 3 27-6 and rack 3 27-7 mesh with each other. Gear 3 27-6 is formed at the end of shaft 2 27-8. Rack 3 27-7 extends perpendicular to the narrow face of the fuel cell and is fixedly installed at the rear end of hot melt plate 2 27-4.

[0100] Cylinder 11 27-5 is connected between the rear end of hot melt plate 27-4 and the shaft of limiting plate 2. Limiting plate 2 is hinged to the front end of hot melt plate 27-4. Limiting plate 2 is arc-shaped and has scraper 2 at the front end. The scraper is used to smooth the weld on the narrow surface of the electrode stack after welding with fiberglass mesh.

[0101] The load-bearing lifting platform on the side hot-melt station 60 has the same structure as the front hot-melt load-bearing lifting platform 18-5.

[0102] Demolding and unloading station 70 is used to separate the hot-melted fuel cell stack from the tooling plate, and place the separated fuel cell stack onto the lifting arm 33-8 of the lifting station 80 via guide gripper component 28-4. Demolding and unloading station 70 includes: The demolding base 28-1 includes a welded base frame 29-1 on which a cylinder 12 29-2 is mounted. The output end of the cylinder 12 29-2 is fixed to the tooling plate conveyor line of the demolding line station 70 for adjusting the height of the line.

[0103] Demolding lifting platform 28-2 includes: The demolding table 30-3 is fixedly mounted on the welding base frame 29-1.

[0104] Servo electric cylinder 5 30-1 is fixed to demolding table 30-3, and its output end is connected to top plate 3 30-6.

[0105] Servo electric cylinder 5 30-1 is used to lift the battery stack to a specified height so that the battery stack can smoothly enter the guide gripper component 28-4; cylinder 13 30-4 is used to lift the tooling plate to the demolding height (so that the tooling plate below can be separated from the line).

[0106] Specifically, lifting plate 2 30-5 is located outside of lifting plate 3 30-6, and the output end of cylinder 13 30-4 is connected to lifting plate 2 30-5. Initially, lifting plate 3 30-6 and lifting plate 2 30-5 are supported by the tooling plate that previously moved with the production line, and then lifting plate 3 30-6 supports the tooling plate.

[0107] The demolding lifting platform 28-2 also includes a servo electric cylinder guide rod 30-2.

[0108] The guide gripper component 28-4 is movable along the lifting station 80, and the lifting arm 33-8 is movable along the Z-axis. The guide gripper component 28-4 in the demolding and unloading station 70 includes: The transplanting clamp frame mates with the linear guide rail 31-3 of the demolding line station 70. A reducer 32-2 is installed on the reducer. The input end of the reducer 32-2 is connected to the servo motor 32-1, and its output end is connected to the gear 4 32-3. The gear 4 32-3 meshes with the rack 4 31-4 of the demolding line station 70. The side of the transplanting clamp frame facing the side hot-melt station 60 is open to allow the hot-melted fuel cell stack to enter. Cylinder 14 32-4, connecting joint 32-5, pull rod 32-6 and drag 32-7 are hinged in sequence. The cylinder body of cylinder 14 32-4 and connecting joint 32-5 are both hinged to the inner wall of the moving frame, and drag 32-7 is hinged to the front end of the inner wall of the moving frame. The connecting joint 32-5 is rotatable; one end of the dragging grab 32-7 is located on the outer wall of the transplanting clamp frame; when the cylinder fourteen 32-4 extends, the dragging grab 32-7 drags the hot-melted electric stack into the transplanting clamp frame. Linear bearing 32-9 is used to limit the pull rod 32-6. Its outer ring is fixed to the inner wall of the transplant clamp frame, and its inner ring is through which the pull rod 32-6 passes.

[0109] Rollers 32-8 are used to adapt to the height of the fuel cell stack and are rotatably mounted on the inner wall of the transfer clamp frame via supports. Rollers 32-8 are floatable.

[0110] The demolding and transplanting 28-3 also includes a welding bracket 31-1, on which a linear guide rail 31-3 and a rack 31-4 are mounted. A nylon buffer block 31-2 is mounted on the welding bracket 31-1 to buffer the guide gripper component 28-4.

[0111] The elevator workstation 80 is used to transfer the separated fuel cell stack from a high position to an AGV transfer vehicle at the lower end of the elevator, specifically including: Servo motor 33-1 and reducer 43-2 provide lifting power. The output end of servo motor 33-1 is connected to the input end of reducer 43-2. ​​The output end of reducer 43-2 is connected to pulley drive mechanism 1 and pulley drive mechanism 2.

[0112] The first belt drive mechanism includes a synchronous pulley 33-3 and a synchronous belt 33-4, while the second belt drive mechanism has a synchronous pulley 33-3 mounted on its shaft.

[0113] The pulley drive mechanism includes a timing belt 33-6, with a lifting arm 33-8 fixed on one side and a counterweight device 33-7 connected to the other side. A linear guide rail 33-5 allows the lifting arm 33-8 to move. It also includes a timing belt tensioning device 33-9 (prior art) and a transfer trolley 33-10, i.e., an AGV transfer vehicle.

[0114] Working principle: Tooling plate online workstation ( Figure 2 ): The tooling plates are placed onto the production line through the cooperation of AGV transfer vehicles and the docking station at the tooling plate loading station.

[0115] Specifically: The trolley moves to the receiving platform, and its lifting mechanism rises, lifting the tooling plate on the platform. After transporting the tooling plate above the tooling plate conveyor line, the lifting mechanism descends, causing the tooling plate to fall onto the line. Figure 2 In the process, the fuel cell stack does not actually exist on the tooling plate at the online workstation. Figure 2 The fuel cell stack shown is only used as a schematic illustration of its position on the tooling plate.

[0116] Subsequently, the tooling plate is transported to the servo loading station by the intermediate drive component of the production line. Figure 5 ).

[0117] Robotic loading station ( Figure 3 : An AGV transport vehicle carrying various components of the fuel cell stack arrives at a designated location in advance. Robot 4-2 drives the gripper mechanism 4-3 to grab the various components of the fuel cell stack in a specified order using the vacuum suction cup 5-4 on the gripper mechanism, and place them into the servo loading station. Figure 5 The components of the fuel cell stack are automatically stacked on the tooling plate 3-1 that has reached the working position.

[0118] Servo loading station ( Figure 5 After the tooling plate reaches above the lifting platform 6-2, the lifting cylinder 8-3 extends, and the lifting plate 8-6 rises, separating the tooling plate from the production line.

[0119] Subsequently, servo cylinder 8-1 extends, receiving plate 8-7 rises, and after the tooling plate is raised to a certain height, cylinder 7-3 extends to drive the upper cover plate gripper mechanism 6-3 to move above the lifted tooling plate.

[0120] Then, cylinder 2 9-3 extends, and through rack 1 9-4 and gear 1 9-5, it drives gripper 9-1 to clamp the pressure plate assembly of the tooling plate on the conveyor line. Subsequently, servo electric cylinder 1 8-1 descends to a certain height, causing the pressure plate assembly to detach from the tooling plate on the conveyor line. Then, cylinder 1 7-3 retracts to make room for robot loading. After loading is completed, the pressure plate assembly is placed back on top of the stack.

[0121] Finally, the lifting cylinder 8-3 retracts, returning the lifting platform 6-2 (lifting plate 8-6) to its original position. The tooling plate on the lifting platform 6-2 is then placed back onto the production line, and the stacked fuel cell stack moves toward the pressing station along with the production line.

[0122] Pressing station ( Figure 9After the tooling plate carrying the completed stacked fuel cells reaches the position above the load-bearing lifting platform 10-2, the servo electric cylinder 12-1 extends into place, separating the tooling plate from the production line.

[0123] Cylinder 3 12-4 extends, causing the upper and lower load-bearing blocks 12-5 to come into contact.

[0124] Then the side alignment mechanism ( Figure 15 ) in the upper frame component ( Figure 12 Driven by the horizontal thrust cylinder 13-4, it reaches the side limit position of the fuel cell stack; Simultaneously, the front alignment mechanism ( Figure 16 ) in the upper frame component ( Figure 12 The vertical lifting cylinder 13-8 descends and, once in position, cylinder six 17-8 extends, followed by cylinder five 17-5. The locking slider 17-6 contacts the locking block 17-7, locking the position. At this point, the tooling plate carrying the fuel cell stack has been lifted to the pressing position, with limits set around it, and the lifting platform is ready to bear the load.

[0125] Then the servo pressing mechanism ( Figure 13 The servo cylinder 14-1 extends, driving the pressure plate 14-3 to pressurize the fuel cell stack. After pressurization, the pneumatic finger of the disengaging mechanism 10-5 drives the actuating block, pushing the pin assembly on the pressure plate assembly (the pins are spaced apart, with one end of the pin extending out of the cavity of the pin assembly to engage with the positioning post) to lock the fuel cell stack height. Specifically, the pin assembly consists of two parts: a post and a plate fixed on the post. The plate is located in the cavity, and the post extends from the slot on the upper end face of the cavity. The actuating block moves the post of the pin.

[0126] Finally, servo electric cylinder 12-1 and pneumatic cylinder 12-4 return to their positions, and the load-bearing lifting platform 10-2 (upper top plate 12-6) returns to its original position. The tooling plate on the load-bearing lifting platform 10-2 is then placed back onto the production line. The pressed fuel cell stack moves along the production line towards the output end of the pressing station. The tooling plate is then picked up from the production line by an AGV transfer vehicle and transported to the front hot melt station.

[0127] Frontal hot melt station ( Figure 17 After the tooling plate, which has been pressed, reaches the position above the lifting platform, cylinder nine 23-5 of the front hot melt load-bearing lifting platform 18-5 extends, causing the tooling plate to detach from the line and reach the hot melt position. Then cylinder eight 23-2 extends, and the upper pressure block 23-7 and the lower pressure block 23-8 come into contact, ready to bear pressure.

[0128] Then, the front hot melt feeding mechanism 18-3 drives the gear 21-8 and rack 21-9 to rotate via the servo motor 21-1 and the shaft 21-6, so that the hot melt plate 1 contacts the fuel cell stack. Then, the cylinder 7 21-5 extends and drives the baffle to limit the fuel cell stack offset.

[0129] Then the front hot melt servo pressing mechanism ( Figure 21 Servo cylinder 4 22-1 extends, driving pressure plate 2 22-3 to pressurize the fuel cell stack.

[0130] At this point, all preparations are complete, and the hot melt plate is heated to seal the fuel cell stack.

[0131] After the sealing process is complete, the pneumatic gripper 22-4 drives the lever 22-5 to release the locking of the tooling plate pin. Specifically, the hook of the lever 22-5 actuates the pin of the insert. Figure 35 As shown.

[0132] Finally, cylinders 9 (23-5) and 8 (23-2) return to their positions, and the front hot-melt support lifting platform 18-5 (upper top plate 2 (23-1)) returns to its original position. The tooling plate on the front hot-melt support lifting platform 18-5 is then placed back onto the production line. The fuel cell stack that has completed front hot-melt processing moves along the production line towards the output end of the side hot-melt station. The tooling plate is then picked up from the production line by an AGV transfer vehicle and transported to the side hot-melt station.

[0133] Side hot melt station ( Figure 23 After the front hot melt is completed, the tooling plate carrying the fuel cell stack reaches the lifting position (above the lifting platform), and the tooling plate is removed from the line and reaches the hot melt position to prepare for pressure bearing. The principle is the same as that of the side hot melt load-bearing lifting platform and the front hot melt load-bearing lifting platform 18-5 in terms of structure and operation principle.

[0134] Then, the motor 27-1 of the side hot melt feeding mechanism 24-3 drives the gear 27-6 and rack 27-7 via the rotating shaft 27-8 to push the hot melt plate 27-4 to contact the side of the fuel cell stack. Subsequently, the cylinder 11 27-5 extends and drives the baffle to limit the offset of the fuel cell stack.

[0135] Subsequently, cylinder 26-1 on the side hot-melt upper frame assembly 24-2 drives pressure plate 26-6 to pressurize the fuel cell stack; at this time, the side hot-melt preparation work is completed, and the hot-melt plate heats up to perform hot-melt sealing on the side of the fuel cell stack.

[0136] Similarly, the outermost hot-melt support lifting platform returns to its position, and the tooling plate on it is placed back onto the production line. The electrode stack with completed side hot-melt moves along the production line towards the output end of the demolding station. An AGV transfer vehicle picks up the tooling plate from the production line and transports it to the demolding station.

[0137] That is, all tooling plate transfers across workstations are completed by AGV transfer vehicles.

[0138] Demolding and unloading station 70 ( Figure 27After the tooling plate carrying the completed hot-melt sealing electrode stack is placed on the line of this station by the AGV transfer vehicle, the cylinder 12 29-2 on the demolding base 28-1 extends to adjust the height of the line to match the height of the demolding lifting platform 28-2.

[0139] Once the tooling plate reaches the lifting position (above the demolding lifting platform 28-2), cylinder 13 30-4 of the demolding lifting platform 28-2 extends, causing the tooling plate to reach the demolding height. During this process, the bottom of the tooling plate contacts the demolding height adjusting bolt. The height adjusting bolt is to ensure that the lifting electric cylinder can push the electric stack out of the tooling plate. A hard limit is provided here for the tooling to handle the reaction force.

[0140] The pressure plate assembly on top of the battery stack is removed manually.

[0141] Subsequently, servo cylinder 5 30-1 extends, and top plate 30-6 receives the fuel cell stack, lifting it to a designated height and detaching it from the line to match the height of the guide gripper. Specifically, servo cylinder 5 30-1 pushes the fuel cell stack out from the tooling plate (the bottom of the tooling is hollow) along the direction of the four positioning posts, thus separating the fuel cell stack from the tooling plate.

[0142] Then guide the gripper ( Figure 31 The cylinder 32-4 extends and, through the connecting joint 32-5, the pull rod 32-6, and the linear bearing 32-9, drives the grabber to catch the fuel cell stack that has been lifted into place.

[0143] Guide gripper ( Figure 31 The rollers 32-8 are adjustable and can float to accommodate the width of the fuel cell stack. Specifically, the roller shaft is not fixed; both ends are limited by retaining springs in the slots of the side supports. A central opening on the shaft allows it to fit onto a spring-loaded rod (perpendicular to the shaft). The roller shaft, under the force of the spring, can float back and forth along the direction of the rod. One end of the rod is fixed to the inner wall of the slot away from the shaft, and the other end is fitted into the opening on the shaft.

[0144] Guide gripper ( Figure 31 After receiving the fuel cell stack, servo motor 2 32-1 drives the entire guide gripper mechanism via gear 4 32-3 and rack 4 31-4. Figure 31 Move towards the elevator station.

[0145] Elevator workstation ( Figure 32 The lifting arm 33-8 is pre-positioned at the upper working position, waiting for the guide gripper ( Figure 31 Place the battery stack on top; after placement, the servo motor 33-1 drives the synchronous pulley 33-3, synchronous belt 1 33-4, and synchronous belt 2 33-6 to place the battery stack onto the AGV transfer vehicle that has been parked at the lower end of the elevator.

[0146] The above are merely preferred embodiments of the present invention and do not constitute any limitation on the present invention. Any equivalent substitutions or modifications made by those skilled in the art to the technical solutions and content disclosed in the present invention without departing from the scope of the present invention shall be deemed to have remained within the protection scope of the present invention.

Claims

1. A heat-sealing and demolding device for a new energy flow battery, characterized in that, include: The tooling plate online station (10) is used to realize the tooling plate online and position transfer. Its output end is connected to the input end of the servo loading station (30); the output end of the servo loading station (30) is connected to the input end of the pressing station (40); The robot loading station (20) is used to automatically load and stack the components of the flow battery stack. It includes a robot (4-2) and an AGV docking system (4-1). The output end of the robot (4-2) is equipped with a gripper mechanism (4-3) for adsorbing the components. The AGV docking system (4-1) is used to receive the components on the AGV transfer vehicle. The servo loading station (30) provides a workstation for stacking the various components; Pressing station (40), used to press the stacked electric stacks to a specified height, includes: The upper frame assembly (10-3) is used to drive the front alignment assembly (10-7) to move along the Z direction and the side alignment assembly (10-6) to move along the Y direction. It includes a vertical lifting cylinder (13-8) for driving the front alignment assembly (10-7) and a horizontal pushing cylinder (13-4) for driving the side alignment assembly (10-6). The front alignment component (10-7) is used to clamp the stacked battery pack along the X direction. It can move along the upper frame component (10-3) in the Z direction and can move along the X direction under the action of its own driving structure. The side alignment assembly (10-6) is used to clamp the stacked electric stacks along the Y direction. It is mounted on the upper frame assembly (10-3) and connected to the output end of the push cylinder (13-4). The servo pressing mechanism (10-4) is used to pressurize the clamped fuel cell stack. It is installed on the upper frame assembly (10-3), and its output end can move along the Z direction under the action of the servo pressing mechanism (10-4) itself. The front-side heat-melting station (50) is used to pressurize the press-fitted fuel cell stack again along the Y direction and complete the heating and heat-melting of the two wide sides of the fuel cell stack. It includes: Front hot-melt upper frame assembly (18-2); The front hot melt feeding mechanism (18-3) is installed on the front hot melt upper frame assembly (18-2), and its output end is the hot melt plate one (21-4). The front hot melt feeding mechanism (18-3) can move along the slide rail on the front hot melt upper frame assembly (18-2) in the Y direction so that the distance between the hot melt plate one (21-4) and the wide surface of the fuel cell stack can be adjusted. The front hot melt servo pressing mechanism (18-4) is installed on the front hot melt upper frame assembly (18-2). Its output end can move along the Z direction under the action of its own drive structure. The side heat-melting station (60) is used to pressurize the fuel cell stack that has been pressurized and whose wide side has been heat-melted again along the Y direction and to complete the heating and heat-melting of the two narrow sides of the fuel cell stack. The demolding and unloading station (70) is used to separate the hot-melted fuel cell stack and the tooling plate, and to place the separated fuel cell stack onto the lifting arm (33-8) of the lifting station (80) through the guide gripper component (28-4). Among them, the guide gripper component (28-4) can move along the Y direction along the elevator station (80), and the lifting arm (33-8) can move along the Z direction; And the elevator station (80) is used to transfer the separated fuel cell stack from a high place to the AGV transfer vehicle at the lower end of the elevator.

2. The heat-sealing and demolding equipment for new energy flow batteries according to claim 1, characterized in that, The pressing station (40) also includes: a prying mechanism (10-5) for actuating a pin on the pressure plate assembly to lock the stack height, ensuring that the stack height does not change after the servo pressing mechanism (10-4) is withdrawn, comprising: Mounting bracket (15-3) is fixed to the second cross brace (13-5) of the upper frame assembly (10-3). Cylinder 4 (15-4) is fixed to mounting base (15-3), and its output end is fixed to cylinder body of pneumatic finger (15-2). Cylinder 4 (15-4) is used to change the distance between pneumatic finger (15-2) and pressure plate assembly. Positioning posts are set on the tooling plate on the conveyor line. The positioning posts pass through the fuel cell stack and the pressure plate assembly from the bottom of the fuel cell stack and extend out of the pressure plate assembly. A pin assembly is installed between adjacent positioning posts. The pin assembly includes a plate supported on a pressure plate assembly. A strip is installed on the plate to engage with the corresponding positioning post. The strip can move along the cavity on the plate under the action of a pneumatic finger (15-2). When the strip moves to the point where one end extends out of the cavity and engages with the corresponding positioning post, a locked state of the stack height is formed. The output end of the pneumatic finger (15-2) is fixed to a toggle block (15-1), and the moving direction of the toggle block (15-1) is perpendicular to the extension and retraction direction of the cylinder (15-4).

3. The heat-sealing and demolding equipment for new energy flow batteries according to claim 2, characterized in that, The servo pressing mechanism (10-4) in the press station (40) includes: servo electric cylinder three (14-1), whose cylinder body is fixed to the upper frame assembly (10-3), and whose output end is connected to pressure plate one (14-3).

4. The heat-sealing and demolding equipment for new energy flow batteries according to claim 2, characterized in that, The side alignment assembly (10-6) in the press-fitting station (40) includes: The connecting plate (16-2) has its lower end fixed to the mounting plate three (16-3), and the mounting plate three (16-3) can move along the Y direction in the upper frame assembly (10-3); The clamping shaft (16-1) is clamped on the side of the connecting plate (16-2) facing the fuel cell stack; Among them, the front alignment component (10-7) includes: The lifting plate (17-3) can move along the Z direction on the upper frame assembly (10-3), and cylinder six (17-8) is installed on it. The output end of cylinder six (17-8) is fixed to the transition plate, and the clamping shaft two (17-1) is clamped on one side of the transition plate facing the fuel cell stack. One end of the guide rod (17-2) passes through the lifting plate (17-3) and is fixed to the transition plate, while the other end is fixed to the locking block (17-7). When the cylinder (17-8) drives the guide rod (17-2) to move to the point where the guide rod (17-2) is in contact with the fuel cell stack, the locking block (17-7) engages with the locking slider (17-6) to achieve positioning. Cylinder 5 (17-5) has its cylinder body fixed to the lifting plate (17-3), and its output shaft can move along the linear guide rail 2 (17-4) on the lifting plate (17-3). The end of its output shaft is fixed to the locking slider (17-6).

5. The heat-sealing and demolding equipment for new energy flow batteries according to claim 2, characterized in that, The front hot melt servo pressing mechanism (18-4) in the front hot melt station (50) includes: Servo electric cylinder four (22-1), the end of which is fixed to pressure plate two (22-3). The pneumatic gripper (22-4) is fixed to the second pressure plate (22-3), and its output end is fixed to the lever (22-5); when the pneumatic gripper (22-4) closes, it drives the corresponding insert to move, thereby unlocking the pin assembly on the pressure plate assembly; Guide rod one (22-2) is fixed at one end to pressure plate two (22-3), and the other end passes through the front hot melt upper frame assembly (18-2) and is fixed to a limiting block.

6. The heat-sealing and demolding equipment for new energy flow batteries according to claim 1, characterized in that, The front hot-melting feed mechanism (18-3) in the front hot-melting station (50) includes: Servo motor 1 (21-1), reducer 1 (21-2), coupling 1 (21-3), and shaft 1 (21-6) are connected in sequence, and coupling 1 (21-3) is fixedly installed; Gear 2 (21-8) and rack 2 (21-9) mesh with each other. Gear 2 (21-8) is formed at the end of shaft 1 (21-6). Rack 2 (21-9) extends perpendicularly to the wide face of the fuel cell and is fixed to the rear end of hot melt plate 1 (21-4). Hot melt plate 1 (21-4) can move along linear guide rail 3 (21-7) extending in the Y direction.

7. The heat-sealing and demolding equipment for new energy flow batteries according to claim 1, characterized in that, The servo loading station (30) includes: The upper cover plate gripper (6-3) is fixed to the welding frame assembly (6-1). The welding frame assembly (6-1) includes a fixed welding frame (7-1) and an X-axis moving component. The X-axis moving component can drive the upper cover plate gripper (6-3) to move along the welding frame (7-1). The upper cover plate gripper (6-3) includes: Base; The gripper (9-1) and cylinder two (9-3) are fixed to the base. The output end of cylinder two (9-3) is connected to gripper (9-1). Gripper (9-1) passes through the base and its gripping end is located below the base. Linear guide rail 1 (9-2) is used to allow the gripper (9-1) to move along the X direction, and it is fixed to the base; and a lifting platform (6-2), used to detach the tooling plate from the conveyor line on the servo loading station (30) and adjust the lifting height, comprising: The receiving plate (8-7) can move along the Z direction with the servo electric cylinder (8-1) to adjust the height of the tooling plate; Lifting plate 1 (8-6) and lifting cylinder (8-3). Lifting cylinder (8-3) is installed at the bottom of the top mounting plate (8-5), and its output end is fixed to lifting plate 1 (8-6). Lifting cylinder (8-3) extends so that lifting plate 1 (8-6) receives tooling plate on the conveyor line, thereby separating tooling plate conveyor line and tooling plate on it. The servo electric cylinder (8-1) has a fixed cylinder body and its output end is fixed to the receiving plate (8-7). It extends to match the height of the upper cover plate clamp (6-3) to realize the separation of the pressure plate assembly and the tooling plate on the conveyor line.

8. The heat-sealing and demolding equipment for new energy flow batteries according to claim 1, characterized in that, The side hot melt station (60) includes: The side-mounted hot-melt upper frame assembly (24-2) includes: Frame; Cylinder 10 (26-1), the cylinder body is fixed to the upper top plate 3 (26-3) of the frame, and its output end is fixed to the pressure plate 3 (26-6). Cross brace five (26-4) and cross brace six (26-5) are fixed to the frame and are used to install coupling two (27-3) for the side hot melt feeding mechanism (24-3). The side hot-melt feed mechanism (24-3) is installed on the side hot-melt upper frame assembly (24-2). Its output end is the second hot-melt plate (27-4), and the distance between it and the narrow face of the fuel cell stack is adjustable. Specifically, it includes: The motor (27-1), reducer 2 (27-2), coupling 2 (27-3), and shaft 2 (27-8) are connected in sequence, and the coupling 2 (27-3) is fixedly installed; Gear three (27-6) and rack three (27-7) mesh with each other. Gear three (27-6) is formed at the end of shaft two (27-8). Rack three (27-7) extends perpendicular to the narrow face of the fuel cell and is fixedly installed at the rear end of hot melt plate two (27-4).

9. The heat-sealing and demolding equipment for new energy flow batteries according to claim 1, characterized in that, The guide gripper component (28-4) in the demolding and unmolding station (70) includes: The transplanting clamp frame is matched with the linear guide rail five (31-3) of the demolding and unloading station (70), and the reducer three (32-2) is installed on it. The input end of the reducer three (32-2) is connected to the servo motor two (32-1), and its output end is connected to the gear four (32-3). The gear four (32-3) meshes with the rack four (31-4) of the demolding and unloading station (70). The transplant clamp frame is open on one side facing the side hot-melt station (60) to allow the hot-melted fuel cell stack to enter; Cylinder 14 (32-4), connecting joint (32-5), pull rod (32-6) and drag gripper (32-7) are hinged in sequence. The cylinder body of cylinder 14 (32-4) and connecting joint (32-5) are both hinged to the inner wall of the transplanting clamp frame, and the drag gripper (32-7) is hinged to the front end of the inner wall of the transplanting clamp frame. The connecting joint (32-5) is rotatable; One end of the drag gripper (32-7) is located on the outer wall of the transplanting clamp frame. When cylinder fourteen (32-4) extends, the drag gripper (32-7) drags the heat-fused electric stack. During the retraction process of cylinder fourteen (32-4), the drag gripper (32-7) drags the heat-fused electric stack into the transplanting clamp frame. Linear bearing 2 (32-9) is used to limit the tie rod (32-6). Its outer ring is fixed to the inner wall of the transplant clamp frame, and its inner ring is through which the tie rod (32-6) passes.

10. A method for hot-melt sealing and demolding of a new energy flow battery, based on the hot-melt sealing and demolding equipment for a new energy flow battery according to any one of claims 1-9, characterized in that, Includes the following steps: Step 1: Tooling plate online; Step 2, Stacking of fuel cells: The robot (4-2) picks up each component of the fuel cell stack in the specified order and places them on the tooling plate (3-1) of the servo loading station, which has reached the working position; Step 3: Press the stacked fuel cells to the specified height: Step 3A: The side alignment assembly (10-6) reaches the side limit position of the fuel cell stack under the action of the horizontal thrust cylinder (13-4); at the same time, the front alignment assembly (10-7) is lowered into place by the action of the vertical lifting cylinder (13-8). Step 3B: The servo pressing mechanism (10-4) drives the pressure plate to pressurize the fuel cell stack; Step 4: Pressurize the assembled fuel cell stack again and complete the heat-melting of the two wide sides of the fuel cell stack: Step 4A: The front hot melt feeding mechanism (18-3) is activated, causing the hot melt plate (21-4) to contact the fuel cell stack; Step 4B: The front hot melt servo pressing mechanism (18-4) drives the second pressure plate (22-3) to pressurize the fuel cell stack; Step 5: Pressurize the fuel cell stack again after the wide side has been heat-fused and complete the heat-fusion of the two narrow sides of the fuel cell stack. Step 5A: The side hot melt feeding mechanism (24-3) is activated, causing the hot melt plate two to contact the fuel cell stack; Step 5B: The cylinder ten (26-1) on the side hot-melt upper frame assembly (24-2) drives the pressure plate three (26-6) to pressurize the fuel cell stack; Step 6: Demolding and unloading station (70) sends the hot-melted electric stack into the guide gripper component (28-4), separates the hot-melted electric stack from the tooling plate conveyor line, and places the separated electric stack onto the lifting arm (33-8) of the lifting station (80) through the guide gripper component (28-4); Step 7: Transfer the separated fuel cell stack from the high position to the AGV transfer vehicle at the lower end of the elevator workstation.

Citation Information

Patent Citations

  • Flow frame structure of flow battery and side surface packaging method thereof

    CN113540495A

  • Tandem type cell stack automatic stacking production line and process method thereof

    CN114447389A