Blasting mining methods to ensure the stability of filling bodies

By employing a blasting method with fan-shaped boreholes and shaped charge structures, the instability of backfill and roof overhang issues in metal mining were resolved, achieving stability of the backfill and efficient ore crushing, thus improving mining efficiency and safety.

CN117231219BActive Publication Date: 2026-11-10UNIV OF SCI & TECH BEIJING
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311377254.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-23
Publication Date
2026-11-10
Estimated Expiration
2043-10-23

AI Technical Summary

Technical Problem

Traditional blasting mining methods in metal mining lead to instability of the backfill, resulting in increased dilution rate, increased safety factor, and failure to effectively solve the problem of overhanging roof, thus affecting mining efficiency and safety.

Method used

By adopting a fan-shaped borehole layout and a shaped charge structure, the shaped charge with circumferential arc and axial strip cuts guides the explosive stress wave, controls the energy release direction, protects the filling body, forms a smooth slip surface and explosive cracks, and improves the ore crushing efficiency.

Benefits of technology

It effectively protects the stability of the backfill, avoids overhanging phenomena, improves mining efficiency and ore recovery rate, and reduces the unsafety factor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117231219B_ABST
    Figure CN117231219B_ABST
Patent Text Reader

Abstract

This invention provides a blasting mining method to ensure the stability of the backfill body, relating to the field of metal mining technology. It includes: S30, detonating a first shaped charge in the side holes on both sides, using an arc-shaped cut to guide the release of explosive stress energy to the side of the first ore body to be blasted to break the rock, and using the other side opposite to the arc-shaped cut to protect the ore body and backfill body on that side; and using a strip-shaped cut to guide the release of explosive stress wave energy to form a jet to the side of the first ore body to be blasted to break the ore body and protect that side of the ore body; after a first predetermined time following the detonation of the side holes on both sides, detonating the central hole and two adjacent blast holes from one end near the arc-shaped cut, using the arc-shaped cut to guide the release of explosive stress wave energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock, and using the other side opposite to the arc-shaped cut to protect that side of the ore body; detonating the blast holes adjacent to the central hole to the remaining blast holes on both sides can improve the efficiency of metal mining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of metal mining technology, and in particular to a safe and efficient blasting mining method that ensures the stability of the backfill body. Background Technology

[0002] Traditional blasting-based mining of metal mines can cause overlying rock to collapse and break, damaging underground water-bearing rock systems, triggering surface subsidence and cracks, endangering surface buildings, and causing water resource loss and ecological damage.

[0003] To adapt to the concept of building green mines, backfill mining is receiving increasing attention from technical personnel in related fields. Backfill mining generally involves introducing backfill material into the goaf within a stope or block as the mining face advances. This serves to manage ground pressure, control rockfall and surface movement, and mining is then carried out on or under the protection of the resulting backfill body. Ensuring the stability of the backfill body is a crucial prerequisite for implementing the backfill method.

[0004] In the process of developing this invention, the inventors discovered that existing metal ore backfilling mining schemes are mostly based on blasting caving mining. During the mining process, the blasting load inevitably affects the stability of the backfill body. Large-scale collapse and spalling of the backfill body can easily lead to increased dilution rate and increased safety factor. Furthermore, the failure to address the overhanging roof problem is one of the important reasons for reduced mining efficiency and increased safety factor. To better implement the concept of building green mines, the above-mentioned problems encountered in metal ore backfilling mining urgently need to be solved. Summary of the Invention

[0005] In view of this, embodiments of the present invention provide a blasting mining method that ensures the stability of the backfill body, so as to at least solve one of the above-mentioned technical problems existing in the existing backfilling method for mining metal ores, thereby improving the efficiency of metal mining.

[0006] In a first aspect, embodiments of the present invention provide a blasting mining method for ensuring the stability of the filling body, characterized by comprising the following steps: S10, perforation: Along the direction of the tunnel extension, a row of fan-shaped blast holes are drilled upwards at a certain angle from the top of the tunnel. The fan-shaped blast holes include multiple blast holes, which are arranged in a fan shape to form a fan-shaped blast hole. S20, Explosive loading: A single shaped charge structure is prepared. The shaped charge structure is of two types. The first type includes a tube body with circumferential arc-shaped slits and axial strip-shaped slits on its sidewalls, the arc-shaped slits and the strip-shaped slits being spaced apart. The second type includes a tube body with circumferential arc-shaped slits on its sidewalls. A shaped charge roll is loaded into the tube to form a first shaped charge pack and a second shaped charge pack. The first shaped charge pack corresponds to a first type of shaped charge structure, and the second shaped charge pack corresponds to a second type of shaped charge structure. First shaped charge charges are inserted into the side holes on both sides of the fan-shaped blast hole. The section of the first shaped charge charge with an arc-shaped slit is inserted towards the bottom of the blast hole, and the arc-shaped slit is positioned towards the ore body of the first rock tunnel section to be blasted, while the strip-shaped slit is positioned towards the direction of the rock tunnel's extension; and... A second shaped charge is inserted into the middle blast hole between the side holes on both sides of the fan-shaped blast hole. The tube section of the second shaped charge with an arc-shaped cut is set towards the bottom of the hole, and the arc-shaped cut is oriented towards the inner wall of the ore body near the middle blast hole. S30, detonation: First, the first shaped charge in the side holes on both sides is detonated. The first shaped charge is detonated at the end near the arc-shaped cut. The arc-shaped cut of the first shaped charge in the hole guides the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The other side of the first shaped charge opposite to the arc-shaped cut protects the ore body and filling material on that side. Then, the strip-shaped cut of the first shaped charge guides the explosive stress wave to release energy from the strip-shaped cut to form a jet to the side of the first ore body to be blasted to break the ore body and form explosive cracks on the ore body. The other side of the first shaped charge opposite to the strip-shaped cut protects the ore body and filling material on that side. Secondly, after the first predetermined time of detonation of the side holes on both sides, the detonation center hole and the two blast holes adjacent to the center hole are detonated from one end of the second shaped charge near the arc-shaped cut. The arc-shaped cut of the second shaped charge guides the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The other side of the second shaped charge opposite to the arc-shaped cut protects the ore body on that side. Finally, after the second predetermined time for detonation of the central hole and the two adjacent blast holes, the remaining blast holes from the adjacent blast hole to the two side holes are detonated. The arc-shaped cut of the second shaped charge in the blast hole is used to guide the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The ore body on the other side opposite to the arc-shaped cut is protected by the second shaped charge.

[0007] Optionally, in step S30, the method further includes: after the detonation, the explosive stress wave is guided by the arc-shaped cut of the first shaped charge in the borehole to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock; the ore body and filling material on the other side opposite to the arc-shaped cut is protected by the first shaped charge; and the explosive stress wave is guided by the strip-shaped cut of the first shaped charge to release energy from the strip-shaped cut to form a jet to the side of the first ore body to be blasted to break the ore body and form explosive cracks on the ore body. In the process of protecting the ore body and filling material on the other side opposite to the strip-shaped cut by the first shaped charge, the method further includes: after the current detonation, the explosive energy of the first shaped charge is concentrated along the arc-shaped cut and the strip-shaped cut, and the concentrated energy is released to the ore body side in a predetermined direction. The energy released from the strip-shaped cut extends along the tunnel to cut the ore body, forming a smooth slip surface for ore recovery; and, explosive cracks are formed on the ore body corresponding to the strip-shaped cut, providing multiple free surfaces for subsequent blasting and crushing. During the final detonation process, the reflected tensile waves from multiple free surfaces are used to increase the blasting energy on the free surfaces, which fully breaks the ore on the predetermined ore body side, causing the ore body to flake off. By utilizing the explosive cracks formed on the ore body near the filling body, some of the explosive stress waves are absorbed and impeded, reducing the blasting energy transmitted to the filling body and protecting the filling body on the adjacent side.

[0008] Optionally, in step S30, the first blast hole to be detonated is detonated using a single-stage detonator, the second blast hole to be detonated is detonated using a three-stage detonator, and the last blast hole to be detonated is detonated using a five-stage detonator.

[0009] Optionally, in step S20, the two side holes are loaded with uncoupled interval charges, the bottom of the two side holes is installed with a first shaped charge, the borehole between the two side holes is loaded with continuous charges, and the bottom of the borehole is installed with a second shaped charge. The remaining parts of each borehole are installed with ordinary charges or other shaped charge. In step S30, the arc-shaped cut of the first shaped charge installed at the bottom of the hole guides the diffusion of the constrained explosive stress wave, so that the shaped charge jet is released to the predetermined side ore body. By utilizing the air wedge effect of the jet, the ore body perpendicular to the jet axis is squeezed to both sides, and the explosive stress wave forms a "wedge" that is driven into the ore body to cut annular explosive cracks in the ore body near the bottom of the blast hole.

[0010] Optionally, the diameter of the blast hole is 70-120mm, the depth of the blast hole is 8-20m, the distance between the openings of two adjacent holes is 400-700mm, the distance between the bottoms of the holes is 1.5-2.5m, the depth of the blast hole is 10-30m, and the inclination angle of the side holes is 40-60° outward.

[0011] Optionally, the width of the arc-shaped slit is 1cm-3cm.

[0012] Optionally, the air segment of the uncoupled spacer charge is filled with bamboo sticks, and the length of the air segment is 50cm.

[0013] Optionally, the fan-shaped blast hole includes nine blast holes, which are numbered 1 to 9 sequentially from the first side hole to the other side; The side holes are No. 1 and No. 9, which are detonated first; the delay time for holes 4-6 is set to 25ms-75ms, and the delay time for holes 2-3 and 7-8 is set to 50ms-100ms. The detonation time of hole 4-6 is 25ms-50ms earlier than that of holes 2-3 and 7-8.

[0014] The blasting mining method for ensuring the stability of the backfill body provided in this embodiment of the invention, through steps S10 to S30, utilizes the prepared circumferential arc-shaped cuts and axial strip-shaped cuts to be installed into the blast hole according to a predetermined layout. During the detonation process, the shaped cuts of the first and second shaped charge packages guide the explosive stress wave to be released toward a predetermined side to cut the ore body, fully crush the ore, improve mining efficiency, and effectively protect the ore body and adjacent backfill body on the uncut side of the pipe body.

[0015] In addition, by installing the circumferential arc-shaped cut end at the bottom of the blast hole and making the arc-shaped cut face the side of the ore body to be blasted for focused blasting, the direction of energy diffusion can be controlled, avoiding the phenomenon of a reverse slope-like suspended roof during the ore falling process, thus solving the "suspended roof" problem in metal ore falling. Attached Figure Description

[0016] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0017] Figure 1 This is a diagram showing the layout of blast holes in a blasting mining face to ensure the stability of the filling body, according to an embodiment of the present invention. Figure 2 for Figure 1 A schematic diagram of the fan-shaped blast hole structure deployed in the middle; Figure 3 This is a schematic diagram of a first type of shaped charge structure in one embodiment of the present invention; Figure 4 This is a schematic diagram of the second type of shaped charge structure applied in a ore borehole according to one embodiment of the present invention; Figure 5This is a schematic diagram of a decoupled charge structure using the first type of shaped charge structure for the side holes. Detailed Implementation

[0018] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings.

[0019] It should be understood that numerous technical details are described in the following specific embodiments to more clearly illustrate the present invention. Those skilled in the art should understand that the present invention can be implemented even without some of these details. Furthermore, to highlight the main points of the present invention, some methods, means, components, and applications well-known to those skilled in the art are not described in detail; however, this does not affect the implementation of the present invention. The embodiments described herein are merely some embodiments of the present invention, not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.

[0020] See Figures 1 to 5 As shown, the blasting mining method for ensuring the stability of the backfill body provided by the embodiments of the present invention is applicable to metal mining engineering, and is particularly applicable to metal mining scenarios using the backfill mining method.

[0021] Figure 1 In the mining area, the ore body 1 and the backfill body 2 are adjacent. It should be understood that in conventional blasting mining, the blasting load will inevitably have a certain impact on the adjacent backfill body during the ore mining process. Large-scale collapse and fragmentation of the backfill body can easily lead to an increase in the dilution rate and the increase in the safety factor. Moreover, the occurrence of the overhang problem is one of the important reasons for reducing mining efficiency and increasing the safety factor.

[0022] To ensure the stability of the filling body and solve the problem of ore body collapse and roof hanging, the blasting mining method provided in this embodiment for ensuring the stability of the filling body achieves efficient and rational use of energy by improving the charge structure, detonation time, and detonation method, thereby improving the stability of the filling body, efficiently crushing ore, and avoiding the problem of roof hanging.

[0023] The method includes the following steps: S10, perforation: Along the extension direction of tunnel 3, a row of fan-shaped blast holes 4 are drilled upwards at a certain angle from the top of the tunnel. These fan-shaped blast holes comprise multiple blast holes arranged in a fan shape to form a fan-shaped blast hole configuration. Figure 1 and Figure 2 As shown.

[0024] The fan-shaped blast hole includes nine blast holes, which are numbered 1 to 9 sequentially from the first side hole to the other side.

[0025] S20, Explosive loading: A single shaped charge structure is prepared. The shaped charge structure is of two types. The first type includes a tube body 100. The sidewall of the tube body 100 has a circumferential arc-shaped slit 101 and an axial strip-shaped slit 102. The arc-shaped slit and the strip-shaped slit are spaced apart, with an interval distance L2 representing the distance between them. Figure 3 As shown. The second type includes: a tube body 200, the sidewall of which has a circumferential arc-shaped slit 201, as shown. Figure 4 As shown, the tube body of the shaped charge structure is made of materials such as PVC pipe.

[0026] A shaped charge roll is loaded into the tube to form a first shaped charge pack and a second shaped charge pack. The first shaped charge pack corresponds to a first type of shaped charge structure, and the second shaped charge pack corresponds to a second type of shaped charge structure. First shaped charge charges are inserted into the side holes on both sides of the fan-shaped blast hole. The section of the first shaped charge charge with an arc-shaped slit is inserted towards the bottom of the blast hole, and the arc-shaped slit is positioned towards the ore body of the first rock tunnel section to be blasted, while the strip-shaped slit is positioned towards the direction of the rock tunnel's extension; and... A second shaped charge is inserted into the middle blast hole between the side holes on both sides of the fan-shaped blast hole. The tube section of the second shaped charge with an arc-shaped cut is set towards the bottom of the hole, and the arc-shaped cut is oriented towards the inner wall of the ore body near the side of the middle blast hole.

[0027] The first type of shaped charge structure used in the side holes involves cutting three sets of semi-circular arc-shaped shaped charge slits along one end of the shaped charge tube, while simultaneously cutting symmetrical elongated shaped charge slits along the tube axis. The second type of shaped charge structure used at the bottom of the remaining boreholes employs a similar material with three sets of semi-circular arc-shaped slits cut along one end of a tube of a specific length to enhance the circumferential cutting effect.

[0028] The fan-shaped holes were detonated using an inter-hole delayed detonation method, and the detonation process will be described in detail below.

[0029] S30, detonation: First, the first shaped charge in the side holes on both sides is detonated. The first shaped charge is detonated at the end near the arc-shaped cut. The arc-shaped cut of the first shaped charge in the hole guides the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The other side of the first shaped charge opposite to the arc-shaped cut protects the ore body and filling material on that side. Then, the strip-shaped cut of the first shaped charge guides the explosive stress wave to release energy from the strip-shaped cut to form a jet to the side of the first ore body to be blasted to break the ore body and form explosive cracks on the ore body. The other side of the first shaped charge opposite to the strip-shaped cut protects the ore body and filling material on that side. Secondly, after the first predetermined time of detonation of the side holes on both sides, the detonation center hole and the two blast holes adjacent to the center hole are detonated from one end of the second shaped charge near the arc-shaped cut. The arc-shaped cut of the second shaped charge guides the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The other side of the second shaped charge opposite to the arc-shaped cut protects the ore body on that side. Finally, after the second predetermined time for detonation of the central hole and the two adjacent blast holes, the remaining blast holes from the adjacent blast hole to the two side holes are detonated. The arc-shaped cut of the second shaped charge in the blast hole is used to guide the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The ore body on the other side opposite to the arc-shaped cut is protected by the second shaped charge.

[0030] In some embodiments, the two side holes are No. 1 and No. 9, which are detonated first; the delay time for holes 4-6 is set to 25ms-75ms, and the delay time for holes 2-3 and 7-8 is set to 50ms-100ms. The detonation time of hole 4-6 is 25ms-50ms earlier than that of holes 2-3 and 7-8.

[0031] The diameter of the blast hole is 70-120mm, the depth of the blast hole is 8-20m, the distance between the openings of two adjacent holes is 400-700mm, the distance between the bottoms of the holes is 1.5-2.5m, the depth of the blast hole is 10-30m, and the inclination angle of the side holes 1 and 9 is 40-60° outward.

[0032] In some embodiments, in step S30, the method further includes: after the detonation, the explosive stress wave is guided by the arc-shaped cut of the first shaped charge in the borehole to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock; the ore body and filling material on the other side opposite to the arc-shaped cut is protected by the first shaped charge; and the explosive stress wave is guided by the strip-shaped cut of the first shaped charge to release energy from the strip-shaped cut to form a jet to the side of the first ore body to be blasted to break the ore body and form explosive cracks on the ore body. In the process of protecting the ore body and filling material on the other side opposite to the strip-shaped cut by the first shaped charge, the method further includes: after the current detonation, the explosive energy of the first shaped charge is concentrated along the arc-shaped cut and the strip-shaped cut, and the concentrated energy is released to the ore body side in a predetermined direction. The energy released from the strip cut extends along the tunnel to cut the ore body, forming a smooth slip surface for ore recovery; In addition, explosive cracks are formed on the ore body with corresponding strip-shaped cuts, and the explosive cracks provide multiple free surfaces for subsequent explosive crushing of ore; During the final detonation process, the reflected tensile waves from multiple free surfaces are used to increase the blasting energy on the free surfaces, which fully breaks the ore on the predetermined ore body side, causing the ore body to flake off. In addition, the explosive cracks formed on the ore body near the filling body absorb and impede part of the explosive stress wave, reducing the blasting energy transmitted to the filling body, so as to protect the filling body on the adjacent side.

[0033] like Figure 1 As shown, air-gap charges are installed at side holes 1 and 9. Each charge section adopts a semi-circular and axial shaped charge structure, i.e., the first type of shaped charge structure, with the linear shaped charge direction set along the roadway extension direction. This charging structure has several advantages: First, it creates a smooth slip surface, which facilitates ore recovery and increases the ore recovery rate. Second, it creates explosive cracks, providing a free surface for subsequent borehole blasting, fully utilizing the reflection and stretching effect of the explosive stress wave to improve energy utilization during ore crushing and thoroughly break the ore. Third, the absorption and obstruction effect of the explosive cracks on the explosive stress wave forms a barrier for the stress wave generated after subsequent borehole blasting, fully protecting the adjacent side filling body, improving the stability of the filling body, efficiently crushing the ore, and avoiding the problem of roof overhang.

[0034] In some embodiments, in step S30, the first blast hole to be detonated is detonated using a single-stage detonator, the second blast hole to be detonated is detonated using a three-stage detonator, and the last blast hole to be detonated is detonated using a five-stage detonator.

[0035] like Figure 5 As shown, in step S20, the side holes on both sides are loaded with decoupled spaced explosives. Figure 5 The direction indicated by the middle arrow is the bottom of the hole. The bottom of the two side holes is equipped with the first shaped charge. The borehole between the two side holes is continuously charged and the bottom of the borehole is equipped with the second shaped charge. The rest of each borehole is equipped with ordinary charge or other shaped charge. In step S30, the method further includes: using the arc-shaped cut of the first shaped charge installed at the bottom of the hole to guide the diffusion of the constrained explosive stress wave, so that the shaped charge jet is released to the predetermined side ore body; By utilizing the air wedge effect of the jet, the ore body perpendicular to the jet axis is squeezed to both sides, and the explosive stress wave forms a "wedge" that is driven into the ore body to cut annular explosive cracks in the ore body near the bottom of the blast hole.

[0036] In some embodiments, the width of the arc-shaped slit is 1cm-3cm.

[0037] In this design, the air sections of the non-coupled interval charge are filled with bamboo sticks, and the length of each air section is 50cm. By setting air interval charges in the side holes and using bamboo sticks to block the charge sections, the amount of charge per charge is reduced. At the same time, the semi-circular + axial shaped charge structure of each charge section can effectively protect the surrounding rock, thereby controlling the random diffusion of energy and protecting the filling body.

[0038] As can be seen from the above description, the blasting mining method for ensuring the stability of the filling body provided in the embodiments of the present invention, through steps S10 to S30, utilizes the prepared circumferential arc-shaped cuts and axial strip-shaped cuts to be installed into the blast hole according to a predetermined arrangement. During the detonation process, the shaped cuts of the first and second shaped charge packages guide the explosive stress wave to be released toward a predetermined side to cut the ore body, fully crush the ore, improve mining efficiency, and utilize the uncut side of the tube to effectively protect the ore body on that side and the adjacent filling body, ensuring the stability of the filling body.

[0039] In addition, by installing the circumferential arc-shaped cut end at the bottom of the blast hole and making the arc-shaped cut face the side of the ore body to be blasted for focused blasting, the direction of energy diffusion can be controlled, avoiding the phenomenon of a reverse slope-like suspended roof during the ore falling process, thus solving the "suspended roof" problem in metal ore falling.

[0040] In this embodiment, a new blasting method, "CLB-R," is proposed to address the problems existing in the backfilling mining method. "C" stands for Cut, meaning the side holes use a semi-circular + axial shaped charge structure (the first type of charge structure) to detonate first and create a free surface. "L" stands for Loose, meaning the middle holes detonate second, utilizing the reflection and stretching effect of multiple free surfaces to improve blasting efficiency. "B" stands for Blast, meaning the remaining holes detonate last to fully break the ore body. "R" stands for Ring, meaning the bottom of the holes uses a novel semi-circular shaped charge structure (the second type of shaped charge structure) to solve the problem of ore collapse and overhang.

[0041] The above are merely specific embodiments of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A blasting mining method to ensure the stability of the filling body, characterized in that, Including the following steps: S10, perforation: Along the direction of the tunnel extension, a row of fan-shaped blast holes are drilled upwards at a certain angle from the top of the tunnel. The fan-shaped blast holes include multiple blast holes, which are arranged in a fan shape to form a fan-shaped blast hole. S20, Explosive loading: A single shaped charge structure is prepared. The shaped charge structure is of two types. The first type includes a tube body with circumferential arc-shaped slits and axial strip-shaped slits on its sidewalls, the arc-shaped slits and the strip-shaped slits being spaced apart. The second type includes a tube body with circumferential arc-shaped slits on its sidewalls. A shaped charge roll is loaded into the tube to form a first shaped charge pack and a second shaped charge pack. The first shaped charge pack corresponds to a first type of shaped charge structure, and the second shaped charge pack corresponds to a second type of shaped charge structure. First shaped charge charges are inserted into the side holes on both sides of the fan-shaped blast hole. The section of the first shaped charge charge with an arc-shaped slit is inserted towards the bottom of the blast hole, and the arc-shaped slit is positioned towards the ore body of the first rock tunnel section to be blasted, while the strip-shaped slit is positioned towards the direction of the rock tunnel's extension; and... A second shaped charge is inserted into the middle blast hole between the side holes on both sides of the fan-shaped blast hole. The tube section of the second shaped charge with an arc-shaped cut is set towards the bottom of the hole, and the arc-shaped cut is oriented towards the inner wall of the ore body near the middle blast hole. S30, detonation: First, the first shaped charge in the side holes on both sides is detonated. The first shaped charge is detonated at the end near the arc-shaped cut. The arc-shaped cut of the first shaped charge in the hole guides the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The other side of the first shaped charge opposite to the arc-shaped cut protects the ore body and filling material on that side. Then, the strip-shaped cut of the first shaped charge guides the explosive stress wave to release energy from the strip-shaped cut to form a jet to the side of the first ore body to be blasted to break the ore body and form explosive cracks on the ore body. The other side of the first shaped charge opposite to the strip-shaped cut protects the ore body and filling material on that side. Secondly, after the first predetermined time of detonation of the side holes on both sides, the detonation center hole and the two blast holes adjacent to the center hole are detonated from one end of the second shaped charge near the arc-shaped cut. The arc-shaped cut of the second shaped charge guides the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The other side of the second shaped charge opposite to the arc-shaped cut protects the ore body on that side. Finally, after the second predetermined time for detonation of the central hole and the two adjacent blast holes, the remaining blast holes from the adjacent blast hole to the two side holes are detonated. The arc-shaped cut of the second shaped charge in the blast hole is used to guide the explosive stress wave to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock. The ore body on the other side opposite to the arc-shaped cut is protected by the second shaped charge.

2. The method according to claim 1, characterized in that, In step S30, the method further includes: after detonation, the explosive stress wave is guided by the arc-shaped cut of the first shaped charge in the borehole to release energy from the arc-shaped cut to the side of the first ore body to be blasted to break the rock; the ore body and filling material on the other side opposite to the arc-shaped cut is protected by the first shaped charge; and the explosive stress wave is guided by the strip-shaped cut of the first shaped charge to release energy from the strip-shaped cut to form a jet to the side of the first ore body to be blasted to break the ore body and form explosive cracks on the ore body. In the process of protecting the ore body and filling material on the other side opposite to the strip-shaped cut by the first shaped charge, the method further includes: after the current detonation, the explosive energy of the first shaped charge is concentrated along the arc-shaped cut and the strip-shaped cut, and the concentrated energy is released to the ore body side in a predetermined direction. The energy released from the strip cut extends along the tunnel to cut the ore body, forming a smooth slip surface for ore recovery; In addition, explosive cracks are formed on the ore body with corresponding strip-shaped cuts, and the explosive cracks provide multiple free surfaces for subsequent explosive crushing of ore; During the final detonation process, the reflected tensile waves from multiple free surfaces are used to increase the blasting energy on the free surfaces, which fully breaks the ore on the predetermined ore body side, causing the ore body to flake off. In addition, the explosive cracks formed on the ore body near the filling body absorb and impede part of the explosive stress wave, reducing the blasting energy transmitted to the filling body, so as to protect the filling body on the adjacent side.

3. The method according to claim 1 or 2, characterized in that, In step S30, the first blast hole to be detonated is detonated using a single-stage detonator, the second blast hole to be detonated is detonated using a three-stage detonator, and the last blast hole to be detonated is detonated using a five-stage detonator.

4. The method according to claim 1, characterized in that, In step S20, the side holes on both sides are loaded with uncoupled interval charges, and the bottom of the side holes on both sides is equipped with a first shaped charge. The borehole between the side holes on both sides is loaded with continuous charges, and the bottom of the borehole is equipped with a second shaped charge. The remaining parts of each borehole are equipped with ordinary charges or other shaped charge. In step S30, the method further includes: using the arc-shaped cut of the first shaped charge installed at the bottom of the hole to guide the diffusion of the constrained explosive stress wave, so that the shaped charge jet is released to the predetermined side ore body; By utilizing the air wedge effect of the jet, the ore body perpendicular to the jet axis is squeezed to both sides, and the explosive stress wave forms a "wedge" that is driven into the ore body to cut annular explosive cracks in the ore body near the bottom of the blast hole.

5. The method according to claim 1, characterized in that, The diameter of the blast hole is 70-120mm, the depth of the blast hole is 8-20m, the distance between the openings of two adjacent holes is 400-700mm, the distance between the bottoms of the holes is 1.5-2.5m, the depth of the blast hole is 10-30m, and the inclination angle of the side holes is 40-60° outward.

6. The method according to claim 1, characterized in that, The width of the arc-shaped cut is 1cm-3cm.

7. The method according to claim 4, characterized in that, The air segment of the uncoupled spaced charge is filled with bamboo sticks, and the length of the air segment is 50cm.

8. The method according to claim 1, characterized in that, The fan-shaped blast hole includes 9 blast holes, which are numbered 1 to 9 sequentially from the first side hole to the other side; The side holes are No. 1 and No. 9, which are detonated first; the delay time for holes 4-6 is set to 25ms-75ms, and the delay time for holes 2-3 and 7-8 is set to 50ms-100ms. The detonation time of hole 4-6 is 25ms-50ms earlier than that of holes 2-3 and 7-8.

Citation Information

Patent Citations

  • A Flexible Energy-Gathered Blasting Cutting Pipe Device and Its Application Method

    AU2020101246A4

  • Forced roof caving method for hugely-thick hard roof in deep coal mine

    CN106643355A