A flight change processing method and device, electronic equipment and storage medium

CN117271542BActive Publication Date: 2026-10-09TRAVELSKY TECHNOLOGY LIMITED
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202311246121.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-25
Publication Date
2026-10-09
Estimated Expiration
2043-09-25

AI Technical Summary

Technical Problem

[0003]有鉴于此,本发明实施例提供一种航班变更处理方法、装置、电子设备及存储介质,以解决现有技术中存在的影响航司的处理效率的问题

Benefits of technology

[0038]Based on the above embodiments of the present invention, a flight change processing method, apparatus, electronic device, and storage medium are provided. The method includes: receiving a flight schedule change request for a target flight, the flight schedule change request carrying first flight schedule change information to be changed within a preset time period; querying a flight database based on the first flight schedule change information to be changed within the preset time period to determine whether there is corresponding linkage information and/or non-linkage information; if linkage information and non-linkage information exist, separating the linkage information and non-linkage information related to the first flight schedule change information; changing the corresponding flight schedule information in the reservation system and departure system based on the linkage information and the flight schedule change request; and changing the corresponding flight schedule information in the reservation system and departure system respectively based on the flight schedule change request and non-linkage information. In this embodiment of the invention, the existence of linkage information is determined by the first flight schedule change information to identify the flight to be processed; and all information in the reservation system and departure system is changed based on the linkage information and the flight schedule change request. This method enables rapid flight schedule changes, allowing the reservation system and departure system to be changed synchronously, thereby improving the airline's processing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117271542B_ABST
    Figure CN117271542B_ABST
Patent Text Reader

Abstract

The application provides a flight change processing method and device, electronic equipment and a storage medium. The method comprises the following steps: receiving a flight plan change request of a target flight; querying a flight database based on first flight plan change information that needs to be changed within a preset time period to determine whether corresponding linkage information and / or non-linkage information exist; if the linkage information and the non-linkage information exist, splitting the linkage information and the non-linkage information related to the first flight plan change information; changing corresponding flight plan information in a booking system and a departure system based on the linkage information and the flight plan change request; and changing corresponding flight plan information in the booking system and the departure system based on the flight plan change request and the non-linkage information. In this way, the flight plan can be changed quickly, the booking system and the departure system can be changed synchronously, and the processing efficiency of the airline can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of data processing technology, and in particular to a method, apparatus, electronic device, and storage medium for processing flight changes. Background Technology

[0002] In traditional flight schedule change processes, the reservation system and departure system are two independent systems. The data for flight schedule changes is not synchronized between the two systems, meaning flight schedule control personnel need to make changes separately in each. This increases the complexity for users and the time required for flight schedule changes. For urgent changes, this can impact both airlines and passengers. Furthermore, making changes separately in the reservation and departure systems can lead to data inconsistencies between the two systems, thus affecting the airline's processing efficiency. Summary of the Invention

[0003] In view of this, embodiments of the present invention provide a flight change processing method, apparatus, electronic device, and storage medium to solve the problem of affecting the processing efficiency of airlines in the prior art.

[0004] To achieve the above objectives, the embodiments of the present invention provide the following technical solutions:

[0005] A first aspect of the present invention discloses a method for processing flight changes, the method comprising:

[0006] Receive a flight schedule change request, the flight schedule change request carrying information on the first flight schedule change that needs to be changed within a preset time period;

[0007] Based on the first flight schedule change information that needs to be changed within the preset time period, query the flight database to determine whether there is corresponding linkage information and / or non-linkage information;

[0008] If there is linked information and non-linked information, the linked information and non-linked information related to the first flight plan change information will be separated.

[0009] Based on the aforementioned linkage information and flight plan change request, the corresponding flight plan information in the reservation system and departure system is modified;

[0010] Based on the flight plan change request and non-linked information, the corresponding flight plan information in the reservation system and departure system is modified respectively.

[0011] Optional, also includes:

[0012] Upon receiving a request to change a flight schedule, the system verifies the permission to change the flight schedule and the correctness of the data.

[0013] Optionally, the step of querying the flight database based on the first flight schedule change information that needs to be changed within the preset time period to determine whether there is corresponding linked information and / or non-linked information includes:

[0014] Based on the first flight schedule change information that needs to be changed within the preset time period, query the flight database to determine the flights for which the flight schedule information needs to be changed.

[0015] For each flight that needs to change its flight schedule information, the linkage database is queried based on the flight schedule information of the flight to determine whether there is a corresponding linkage operation;

[0016] If they exist, the flight schedule information that involves linkage operations will be combined to generate linkage information;

[0017] If not, flight schedule information that does not have a linkage operation will be combined to generate non-linked information.

[0018] Optionally, the modification of the corresponding flight plan information in the reservation system and departure system based on the linkage information and flight plan change request includes:

[0019] Based on the aforementioned linkage information, flight schedule information that can be linked for operation is determined;

[0020] Based on the first flight plan change information, the flight plan information that can be linked in the reservation system and departure system is modified in a coordinated manner, so as to simultaneously update the flight plan information that can be linked in the reservation system and departure system.

[0021] Optional, also includes:

[0022] Obtain a flight schedule change request from the target airline, wherein the flight schedule change request carries second flight schedule change information for the target flight;

[0023] When it is determined that there is corresponding linkage information for the target flight, the flight plan information corresponding to the target flight in the reservation system and departure system is changed based on the linkage information and the second target flight plan information.

[0024] Optional, also includes:

[0025] Obtain current meteorological parameters and equipment parameters;

[0026] Based on the meteorological parameters, it is determined whether the current weather conditions are within a preset time period, wherein the preset time period is determined based on the flight departure time;

[0027] Determine whether the parameters of the machine body equipment are abnormal within a preset time period;

[0028] If it is determined that the weather conditions for a certain flight are within the target operating conditions during a preset time period, or if the aircraft equipment parameters of the flight are abnormal during the preset time period, a flight schedule change request from the target airline is obtained.

[0029] Optional, also includes:

[0030] Receive the instruction for the flight schedule change to take effect;

[0031] The flight schedule change order takes effect based on the flight schedule information modified in the reservation system and departure system.

[0032] A second aspect of the present invention discloses a flight change processing apparatus, the apparatus comprising:

[0033] The receiving unit is used to receive a flight schedule change request for the target flight, wherein the flight schedule change request carries first flight schedule change information;

[0034] The processing unit is used to query the database based on the first flight plan change information of the flight plan change instruction to determine whether there is corresponding linkage information; if so, the linkage information and non-linkage information related to the first flight plan change information are separated.

[0035] The modification unit is used to modify the corresponding flight plan information in the reservation system and departure system based on the linkage information and flight plan change request; and to modify the corresponding flight plan information in the reservation system and departure system based on the flight plan change request and non-linkage information respectively.

[0036] A third aspect of the present invention discloses an electronic device for running a program, wherein the program executes the flight change processing method as shown in the first aspect of the present invention.

[0037] A fourth aspect of the present invention discloses a storage medium including a stored program, wherein, when the program is executed, it controls the device where the storage medium is located to perform the flight change processing method as shown in the first aspect of the present invention.

[0038] Based on the above embodiments of the present invention, a flight change processing method, apparatus, electronic device, and storage medium are provided. The method includes: receiving a flight schedule change request for a target flight, the flight schedule change request carrying first flight schedule change information to be changed within a preset time period; querying a flight database based on the first flight schedule change information to be changed within the preset time period to determine whether there is corresponding linkage information and / or non-linkage information; if linkage information and non-linkage information exist, separating the linkage information and non-linkage information related to the first flight schedule change information; changing the corresponding flight schedule information in the reservation system and departure system based on the linkage information and the flight schedule change request; and changing the corresponding flight schedule information in the reservation system and departure system respectively based on the flight schedule change request and non-linkage information. In this embodiment of the invention, the existence of linkage information is determined by the first flight schedule change information to identify the flight to be processed; and all information in the reservation system and departure system is changed based on the linkage information and the flight schedule change request. This method enables rapid flight schedule changes, allowing the reservation system and departure system to be changed synchronously, thereby improving the airline's processing efficiency. Attached Figure Description

[0039] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0040] Figure 1 This is a schematic diagram of the flight change processing architecture shown in an embodiment of the present invention;

[0041] Figure 2 This is a specific architecture diagram of the processor shown in an embodiment of the present invention;

[0042] Figure 3 This is a schematic flowchart illustrating a flight change processing method according to an embodiment of the present invention;

[0043] Figure 4 This is a schematic flowchart illustrating a flight change processing method according to an embodiment of the present invention;

[0044] Figure 5 This is a schematic diagram of the structure of a flight change processing device according to an embodiment of the present invention;

[0045] Figure 6 This is a schematic diagram of another flight change processing device according to an embodiment of the present invention. Detailed Implementation

[0046] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0047] The terms “first,” “second,” “third,” “fourth,” etc. (if present) in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a particular order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments described herein can be implemented in a sequence other than that illustrated or described herein. Furthermore, the terms “comprising” and “having,” and any variations thereof, are intended to cover a non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.

[0048] It should be noted that the descriptions involving "first," "second," etc., in this invention are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of that feature. Furthermore, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. If the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.

[0049] In this application, the terms "comprising," "including," or any other variations thereof are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0050] See Figure 1 This is a schematic diagram of the flight change processing architecture shown in an embodiment of the present invention;

[0051] The flight change processing architecture includes a reservation system 10, a departure system 20, and a processor 30;

[0052] The processor 30 is connected to the reservation system 10 and the departure system 20 respectively.

[0053] Processor 30 includes a reservation flight plan management module and a departure flight plan management module, such as Figure 2 As shown.

[0054] The reservation flight plan management module is connected to the reservation front-end of the reservation system, and the departure flight plan management module is connected to the departure front-end. The reservation flight plan management module is used to manage the basic data and rules of the reservation system, change flight plans, and activate flight plans; the departure flight plan management module is used to manage the basic data and rules of the departure system, change flight plans, and activate flight plans.

[0055] The processor 30 receives a flight schedule change request, which carries first flight schedule change information that needs to be changed within a preset time period; based on the first flight schedule change information that needs to be changed within the preset time period, it queries the flight database to determine whether there is corresponding linkage information and / or non-linkage information; if linkage information and non-linkage information exist, the linkage information and non-linkage information related to the first flight schedule change information are separated; based on the linkage information and the flight schedule change request, the corresponding flight schedule information in the reservation system and departure system is changed;

[0056] Based on the flight plan change request and non-linked information, the corresponding flight plan information in the reservation system and departure system is modified respectively.

[0057] In this embodiment of the invention, the existence of linkage information is determined by the first flight schedule change information to identify the flights that need to be processed; and all information in the reservation system and departure system is modified based on the linkage information and the flight schedule change request. This method enables rapid flight schedule changes, allowing the reservation system and departure system to be updated synchronously, thereby improving the airline's processing efficiency.

[0058] See Figure 3 This is a flowchart illustrating a flight change processing method according to an embodiment of the present invention. The method includes:

[0059] Step S301: Receive flight schedule change request.

[0060] In step S301, the flight schedule change request carries the first flight schedule change information that needs to be changed within a preset time period.

[0061] In the specific implementation of step S301, in response to the first change operation for all flights within a preset time period, a flight plan change request is generated based on the first change operation to determine the first flight plan change information that needs to be changed for all flights within the preset time period, so that the processor can receive it.

[0062] It should be noted that the preset time period is entered by the technicians when generating the flight schedule change request, and it can generally be several months.

[0063] Flight schedule change requests can also be initiated in the form of messages, such as standard ASM / SSM messages, the front end of the reservation system, or the front end of the departure system.

[0064] The first flight schedule change information refers to the first flight schedule change information of all flights that need to be changed within the preset time period. Specifically, it includes the airline, start flight number, change flight number, end flight number, flight number suffix, start date, and end date, as shown in Table (1). The fields of airline, start flight number, end flight number, flight number suffix, start date, and end date are formatted, with examples and explanations.

[0065] Table (1):

[0066]

[0067] Optionally, the method further includes: upon receiving a flight schedule change request, verifying the change permissions and data correctness of the flight schedule change request.

[0068] Specifically, it is determined whether the data in the flight schedule change request is complete, i.e. correct, and whether the technical personnel who submitted the flight schedule change request have the authority to change the flight schedule. If both are verified.

[0069] Step S302: Based on the first flight plan change information that needs to be changed within the preset time period, query the flight database to determine whether there is corresponding linkage information and / or non-linkage information. If there is linkage information and non-linkage information, proceed to steps S303 to S304. If there is only linkage information, proceed to step S303. If there is only non-linkage information, proceed to step S304.

[0070] It should be noted that the specific implementation process of step S302 includes the following steps:

[0071] Step S11: Based on the first flight plan change information that needs to be changed within the preset time period, query the flight database to determine the flights whose flight plan information needs to be changed.

[0072] It should be noted that the flight database stores flight plan information for which initial flight planning has been carried out. The flight plan information includes flight number, flight date and flight section, as shown in Table (2). Table (2) formats the fields of flight number, flight date and flight section, with examples and explanations.

[0073] A flight segment refers to a flight segment, such as a flight from Beijing to Shanghai.

[0074] Table (2):

[0075]

[0076] In the specific implementation of step S11, flights whose flight dates fall within a preset time period are identified from the flight database and are designated as flights for which flight schedule information needs to be changed.

[0077] Step S12: For each flight whose flight schedule information needs to be changed, query the linkage database based on the flight schedule information of the flight to determine whether there is a corresponding linkage operation. If there is, proceed to step S13; otherwise, proceed to step S14.

[0078] It should be noted that the linked database refers to the pre-set data linkage between the flight number and the reservation system and departure system. In other words, by linking the flight schedule information corresponding to the flight number in the reservation system and departure system, the data can be modified simultaneously.

[0079] In the specific implementation of step S12, for each flight that needs to change its flight schedule information, the flight schedule information of the flight is obtained, and the linkage database is queried based on the flight number in the flight schedule information to determine whether there is a corresponding linkage operation for the flight. If there is, step S13 is executed; if not, step S14 is executed.

[0080] Step S13: Generate linkage information from flight schedule information that involves linkage operations;

[0081] Step S14: Generate non-linked information from flight plan information that does not have a linkage operation.

[0082] Step S303: Modify the corresponding flight plan information in the reservation system and departure system based on the linkage information and flight plan change request.

[0083] It should be noted that the specific implementation process of step S303 includes:

[0084] Step S21: Based on the linkage information, determine the flight schedule information that can be linked.

[0085] In the specific implementation of step S21, flight plan information that can be linked is obtained from the linkage information.

[0086] Step S22: Based on the first flight plan change information, modify the flight plan information that can be linked in the reservation system and departure system to update the flight plan information that can be linked in both the reservation system and departure system simultaneously.

[0087] In the specific implementation of step S22, the flight plan information that can be linked in the reservation system and departure system is modified in conjunction with the first flight plan change information, so that the reservation system and departure system can update the flight plan information that can be linked in conjunction at the same time.

[0088] It should be noted that the flight date and flight number in the flight schedule information can be modified.

[0089] Step S304: Modify the corresponding flight plan information in the reservation system and departure system based on the flight plan change request and non-linkage information.

[0090] In the specific implementation of step S304, the flight plan information in the non-linked information of the reservation system is modified using the first flight plan change information, and the modification completion message is sent to the departure system so as to modify the flight plan information in the non-linked information of the departure system.

[0091] Optionally, after modifying the flight schedule information that can be linked, the departure system synchronizes the content of the first flight schedule change information with the DCS system and other downstream departure system software. At the same time, the departure system locks the flight, meaning that users are not allowed to make any further changes at this time. Once the synchronization is complete, the new information is sent to the reservation system.

[0092] The reservation system will also synchronize the changes with the downstream reservation system software. If a flight is canceled, the system will notify the inventory management system to lock the inventory and notify the passenger protection system to calculate the passenger protection plan. After the notification is completed, the flight status will be marked as pending.

[0093] Furthermore, this also includes: the reservation system needs to activate passenger protection for passengers who have already purchased tickets, that is, calculate passenger compensation plans. Users can view, modify, and confirm passenger compensation plans through the front end of the reservation system, and notify the reservation flight plan management module that the plan has been confirmed.

[0094] In this embodiment of the invention, the existence of linkage information is determined by the first flight schedule change information to identify the flights that need to be processed; and all information in the reservation system and departure system is modified based on the linkage information and the flight schedule change request. This method enables rapid flight schedule changes, allowing the reservation system and departure system to be updated synchronously, thereby improving the airline's processing efficiency.

[0095] Optionally, based on the flight change processing method shown in the above embodiments of the present invention, the method further includes the following steps:

[0096] Step S31: Receive the flight change activation instruction;

[0097] Step S32: Apply the flight schedule change effective instruction to the reservation system and departure system to modify the flight schedule information.

[0098] In the specific implementation of steps S31 and S32, the flight schedule change can be automatically activated or triggered by the user. Flights in the pending activation state can be selected for change activation. The reservation system generates a batch of flights to be activated, determines the activation priority (the batch of linked flights takes precedence over the batch of non-linked flights), and activates the changes of each flight in order of priority.

[0099] The reservation system first notifies the departure system to take effect, so that the departure system can initiate the departure passenger protection measures and the flight schedule change is implemented in the departure control system (DCS).

[0100] The reservation system completes the reservation activation process for the flight control system (ICS) and other systems. Once activated, it synchronizes the flight schedule changes with downstream systems.

[0101] In this embodiment of the invention, the existence of linkage information is determined by the first flight schedule change information to identify the flights requiring processing; and all information in the reservation system and departure system is modified based on the linkage information and the flight schedule change request. This method enables rapid flight schedule changes, allowing the reservation system and departure system to update synchronously and receive flight change activation instructions; the modified flight schedule information in the reservation system and departure system is then activated based on the flight schedule change activation instructions. This improves the airline's processing efficiency.

[0102] Optionally, based on the flight change processing method shown in the above embodiments of the present invention, the present invention also shows a flowchart of another flight change processing method, such as... Figure 4 As shown, the method includes:

[0103] Step S401: Obtain current meteorological parameters and equipment parameters;

[0104] In the specific implementation of step S401, the current meteorological parameters of the flight's departure location and the airframe equipment parameters of the aircraft corresponding to the current flight are determined.

[0105] Step S402: Based on the meteorological parameters, determine whether the current weather is the target operating condition within a preset time period. If it is determined that the weather for a certain flight is the target operating condition within the preset time period, then proceed to step S404; otherwise, proceed to step S403.

[0106] In step S402, the preset time period is determined based on the flight departure time. Specifically, the time period corresponding to 2 hours before and after the flight departure time can be set as the preset time period.

[0107] In the specific implementation of step S402, based on the meteorological parameters, it is determined whether the current weather will affect the flight of the aircraft within a preset time period. If so, it is determined that the meteorological parameters indicate that the current weather is the target operating condition within the preset time period, and step S404 is executed. If not, it is determined that the meteorological parameters indicate that the current weather is not the target operating condition within the preset time period, and step S403 is executed.

[0108] Step S403: Determine whether the aircraft equipment parameters are abnormal before the flight's departure time. If the aircraft equipment parameters are abnormal, proceed to step S404. Otherwise, return to step S401 or confirm in the departure system that the aircraft can proceed with takeoff preparations.

[0109] In the specific implementation of step S403, the corresponding aircraft equipment parameters are obtained through the monitoring device on the aircraft. It is determined whether the aircraft equipment parameters are consistent with the standard parameters before the flight departure time. If they are inconsistent, it indicates that there is an abnormality in the aircraft equipment parameters of the flight. Then step S404 is executed. If they are consistent, it indicates that the aircraft equipment parameters of the flight are normal, and the process returns to step S401 or confirms in the departure system that the aircraft can proceed with takeoff preparations.

[0110] It should be noted that the specific implementation processes of steps S402 and S403 can be executed simultaneously, or they can be executed in the order of steps S402 to S403, or steps S403 can be executed first and then steps S402. This embodiment of the invention does not limit this.

[0111] Step S404: Obtain the flight schedule change request from the target airline.

[0112] In step S404, the flight schedule change request carries second flight schedule change information for the target flight;

[0113] Step S405: Based on the target flight, query the flight database to determine whether there is corresponding linkage information; if linkage information exists, proceed to step S406; if not, proceed to step S407.

[0114] In the specific implementation of step S405, it is determined whether there is linkage information corresponding to the target flight in the flight database. If there is, step S406 is executed; if not, step S407 is executed.

[0115] Step S406: Based on the linkage information and target flight plan information, change the flight plan information corresponding to the target flight in the reservation system and departure system.

[0116] Step S407: Modify the corresponding flight plan information in the reservation system and departure system based on the target flight plan information and non-linkage information.

[0117] It should be noted that the specific implementation process of steps S406 to S407 is the same as that of steps S303 to S304 above, and they can be referred to each other.

[0118] In this embodiment of the invention, the existence of linkage information is determined by the second flight schedule change information to identify the flights that need to be processed; and all information in the reservation system and departure system is modified based on the linkage information and the flight schedule change request. This method enables rapid flight schedule changes, allowing the reservation system and departure system to be updated synchronously, thereby improving the airline's processing efficiency.

[0119] Based on the flight change processing method shown in the above embodiments of the present invention, correspondingly, the present invention also discloses a flight change processing device, such as... Figure 5 As shown, the device includes:

[0120] The receiving unit 501 is used to receive a flight schedule change request for the target flight, wherein the flight schedule change request carries first flight schedule change information;

[0121] Processing unit 502 is used to query the database based on the first flight plan change information of the flight plan change instruction to determine whether there is corresponding linkage information; if so, it separates the linkage information and non-linkage information related to the first flight plan change information.

[0122] The modification unit 503 is used to modify the corresponding flight plan information in the reservation system and departure system based on the linkage information and flight plan change request; and to modify the corresponding flight plan information in the reservation system and departure system based on the flight plan change request and non-linkage information respectively.

[0123] It should be noted that the specific principles and execution processes of each unit in the flight change processing method apparatus disclosed in the above embodiments of the present invention are the same as those of the flight change processing method shown in the above embodiments of the present invention. Please refer to the corresponding parts of the flight change processing method disclosed in the above embodiments of the present invention, and they will not be repeated here.

[0124] In this embodiment of the invention, the existence of linkage information is determined by the first flight schedule change information to identify the flights that need to be processed; and all information in the reservation system and departure system is modified based on the linkage information and the flight schedule change request. This method enables rapid flight schedule changes, allowing the reservation system and departure system to be updated synchronously, thereby improving the airline's processing efficiency.

[0125] Optionally, based on the flight change processing device shown in the above embodiments of the present invention, combined with Figure 5 See Figure 6 The device further includes:

[0126] The verification unit 601 is used to verify the modification authority and data correctness of the flight schedule change request when a flight schedule change request for the target flight is received.

[0127] The effective unit 602 is also used for: receiving flight schedule change effective instructions;

[0128] The flight schedule change order takes effect based on the flight schedule information modified in the reservation system and departure system.

[0129] Optionally, based on the flight change processing apparatus shown in the above embodiments of the present invention, the processing unit 502, which queries the flight database based on the first flight schedule change information that needs to be changed within the preset time period to determine whether there is corresponding linkage information and / or non-linkage information, is further configured to:

[0130] Based on the first flight schedule change information that needs to be changed within the preset time period, query the flight database to determine the flights for which the flight schedule information needs to be changed.

[0131] For each flight that needs to change its flight schedule information, the linkage database is queried based on the flight schedule information of the flight to determine whether there is a corresponding linkage operation;

[0132] If they exist, the flight schedule information that involves linkage operations will be combined to generate linkage information;

[0133] If not, flight schedule information that does not have a linkage operation will be combined to generate non-linked information.

[0134] Optionally, based on the flight change processing apparatus shown in the above embodiments of the present invention, the modification unit 503 for modifying the corresponding flight plan information in the reservation system and departure system based on the linkage information and flight plan change request is specifically used for:

[0135] Based on the aforementioned linkage information, flight schedule information that can be linked for operation is determined;

[0136] Based on the first flight plan change information, the flight plan information that can be linked in the reservation system and departure system is modified in a coordinated manner, so as to simultaneously update the flight plan information that can be linked in the reservation system and departure system.

[0137] Optionally, based on the flight change processing apparatus shown in the above embodiments of the present invention, the processing unit 502 is further configured to: obtain a flight schedule change request from a target airline, wherein the flight schedule change request carries second flight schedule change information of the target airline;

[0138] When it is determined that there is corresponding linkage information for the target flight, the flight plan information corresponding to the target flight in the reservation system and departure system is changed based on the linkage information and the second target flight plan information.

[0139] Optionally, based on the flight change processing apparatus shown in the above embodiments of the present invention, the processing unit 502 is further configured to: acquire current meteorological parameters and aircraft equipment parameters;

[0140] Based on the meteorological parameters, it is determined whether the current weather conditions are within a preset time period, wherein the preset time period is determined based on the flight departure time;

[0141] Determine whether the parameters of the machine body equipment are abnormal within a preset time period;

[0142] If it is determined that the weather conditions for a certain flight are within the target operating conditions during a preset time period, or if the aircraft equipment parameters of the flight are abnormal during the preset time period, a second flight plan change request is generated based on the initial flight plan information and the second flight plan change information of the target flight.

[0143] This invention also discloses an electronic device for running database stored procedures, wherein running the database stored procedures involves executing the above-described... Figures 2 to 4 The publicly disclosed procedures for handling flight changes.

[0144] This invention also discloses a computer storage medium, the storage medium including a stored database procedure, wherein, during the execution of the stored database procedure, the device where the storage medium is located is controlled to execute the above-mentioned... Figures 2 to 4 The publicly disclosed procedures for handling flight changes.

[0145] In the context of this disclosure, a machine-readable medium can be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, apparatus, or device. A machine-readable medium can be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium can be, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination of the foregoing. More specific examples of machine-readable storage media include electrical connections based on one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.

[0146] The various embodiments in this specification are described in a progressive manner. Similar or identical parts between embodiments can be referred to mutually. Each embodiment focuses on describing the differences from other embodiments. In particular, for system or system embodiments, since they are basically similar to method embodiments, the description is relatively simple, and relevant parts can be referred to the descriptions in the method embodiments. The systems and system embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Those skilled in the art can understand and implement this without creative effort.

[0147] Those skilled in the art will further recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of both. To clearly illustrate the interchangeability of hardware and software, the components and steps of the various examples have been generally described in terms of functionality in the foregoing description. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementations should not be considered beyond the scope of this invention.

[0148] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for processing flight changes, characterized in that, The method includes: Receive a flight schedule change request, the flight schedule change request carrying information on the first flight schedule change that needs to be changed within a preset time period; Based on the first flight schedule change information that needs to be changed within the preset time period, the flight database is queried to determine whether there is corresponding linked information and / or non-linked information; wherein, linked information refers to flight schedule information that needs to be changed simultaneously in the reservation system and departure system; non-linked information refers to flight schedule information that does not need to be changed simultaneously in the reservation system and departure system. If there is linked information and non-linked information, the linked information and non-linked information related to the first flight plan change information will be separated. Based on the aforementioned linkage information and flight plan change requests, the corresponding flight plan information in the reservation system and departure system is synchronously modified. Based on the flight plan change request and non-linkage information, the corresponding flight plan information in the reservation system and departure system are modified respectively; The step of querying the flight database based on the first flight schedule change information that needs to be changed within the preset time period to determine whether there is corresponding linked information and / or non-linked information includes: Based on the first flight schedule change information that needs to be changed within the preset time period, query the flight database to determine the flights for which the flight schedule information needs to be changed. For each flight that needs to change its flight schedule information, the linkage database is queried based on the flight schedule information of the flight to determine whether there is a corresponding linkage operation; If they exist, the flight schedule information that involves linkage operations will be combined to generate linkage information; If not, flight schedule information that does not have a linkage operation will be combined to generate non-linked information.

2. The method according to claim 1, characterized in that, Also includes: Upon receiving a flight schedule change request, the system verifies the permission for the change and the correctness of the data in the request.

3. The method according to claim 1, characterized in that, The synchronous modification of corresponding flight schedule information in the reservation system and departure system based on the linkage information and flight schedule change request includes: Based on the aforementioned linkage information, flight schedule information that can be linked for operation is determined; Based on the first flight plan change information, the flight plan information that can be linked in the reservation system and departure system is modified in a coordinated manner, so as to simultaneously update the flight plan information that can be linked in the reservation system and departure system.

4. The method according to claim 1, characterized in that, Also includes: Obtain a flight schedule change request for the target flight, wherein the flight schedule change request carries second flight schedule change information for the target flight; When it is determined that there is corresponding linkage information for the target flight, the flight plan information corresponding to the target flight in the reservation system and departure system is changed based on the linkage information and the second target flight plan information.

5. The method according to claim 4, characterized in that, Also includes: Obtain current meteorological parameters and equipment parameters; Based on the meteorological parameters, it is determined whether the current weather conditions are within a preset time period, wherein the preset time period is determined based on the flight departure time; Determine whether the parameters of the machine body equipment are abnormal within a preset time period; If it is determined that the weather conditions for a certain flight are within the target operating conditions during a preset time period, or if the aircraft equipment parameters of the flight are abnormal during the preset time period, a flight schedule change request from the target airline is obtained.

6. The method according to claim 1, characterized in that, Also includes: Receive the instruction for the flight schedule change to take effect; The flight schedule change order takes effect based on the flight schedule information modified in the reservation system and departure system.

7. A flight change processing device, characterized in that, The device includes: The receiving unit is used to receive a flight schedule change request for the target flight, wherein the flight schedule change request carries the first flight schedule change information that needs to be changed within a preset time period; The processing unit is configured to query the database based on the first flight plan change information of the flight plan change request to determine whether there is corresponding linkage information; if so, the linkage information and non-linkage information related to the first flight plan change information are separated; wherein, linkage information refers to flight plan information that needs to be changed simultaneously in the reservation system and departure system; non-linkage information refers to flight plan information that does not need to be changed simultaneously in the reservation system and departure system. The modification unit is used to synchronously modify the corresponding flight plan information in the reservation system and departure system based on the linkage information and flight plan change request; and to modify the corresponding flight plan information in the reservation system and departure system based on the flight plan change request and non-linkage information respectively. The step of querying the flight database based on the first flight schedule change information in the flight schedule change request to determine whether there is corresponding linked information and / or non-linked information includes: Based on the first flight schedule change information that needs to be changed within the preset time period, query the flight database to determine the flights for which the flight schedule information needs to be changed. For each flight that needs to change its flight schedule information, the linkage database is queried based on the flight schedule information of the flight to determine whether there is a corresponding linkage operation; If they exist, the flight schedule information that involves linkage operations will be combined to generate linkage information; If not, flight schedule information that does not have a linkage operation will be combined to generate non-linked information.

8. An electronic device, characterized in that, The electronic device is used to run a program, wherein the program executes the flight change processing method as described in any one of claims 1-6.

9. A storage medium, characterized in that, The storage medium includes a stored program, wherein, when the program is running, it controls the device where the storage medium is located to execute the flight change processing method as described in any one of claims 1-6.

Citation Information

Patent Citations

  • Additional flight plan generation method and device

    CN112201081A

  • Corrected departure time issuing method, system and device and storage medium

    CN116304464A