Modular assembly type steel structure building connecting system
By using a connection assembly consisting of a first wedge plate, a second wedge plate, and a cross brace plate in prefabricated buildings, combined with a diagonal bracing mechanism and a filling mechanism, the problem of low connection efficiency between beams and columns is solved, achieving a fast and stable connection effect and enhancing tensile strength.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CCCC FOURTH HIGHWAY ENG CO LTD
- Filing Date
- 2023-10-17
- Publication Date
- 2026-07-24
AI Technical Summary
In existing prefabricated buildings, the connection between beams and columns requires multiple bolts after being secured by connecting sleeves, resulting in low efficiency.
The connecting assembly, which includes a first wedge plate, a second wedge plate, and a cross brace plate, is combined with a diagonal tension mechanism and a filling mechanism. The stability of the connecting sleeve is increased by the cooperation of the second connecting column and the straight brace plate, and the gaps are filled with sealant to improve the stability and tensile strength of the connection.
This design enables a rapid and stable connection between the beams and columns, improving connection efficiency, enhancing connection stability and tensile strength, while reducing the space occupied under the beams.
Smart Images

Figure CN117306719B_ABST