Boosting system and boosting method for large launch vehicle
By arranging a heater in the cold helium bottle of a large launch vehicle to directly heat the cold helium to achieve pressurization of liquid oxygen, it solves the development difficulties and weight increase problems caused by pressurization and heating of propellants in large rockets, and simplifies structure, reducing rocket weight and helium requirements.
Patent Information
- Application Number
- CN202311356282.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-19
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-10-19
AI Technical Summary
During the flight of large rockets, due to propellant pressurization and heating, it is difficult to develop the engine, the engine structure is heavy, and the rocket weight increases.
A pressurization system for a large launch vehicle is used, including a first-level cold helium cylinder located in a first-level oxygen tank, a cold helium cylinder main pipe and an oxygen energy dissipator, and a cylinder heater is installed in the cold helium cylinder , heating the helium gas through the power supply to achieve pressurization, heating directly in the cold helium cylinder, simplifying the structure and reducing weight.
The cylinder heater is used to increase the helium pressure in the cold helium cylinder to achieve complete pressurization of liquid oxygen, which reduces the difficulty of engine development and the overall weight of the rocket, saves helium demand, and simplifies the structure of the pressurization system.
Smart Images

Figure CN117307356B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of large rockets, and in particular to a pressurization system and a pressurization method for a large launch vehicle. Background Art
[0002] In recent years, with the significant progress made in my country's aerospace field, the increasing demand for large carrying capacity and the control of low cost have made liquid oxygen-methane propellants with high energy density and high specific impulse rate an inevitable choice. This type of rocket propulsion system uses low-temperature cold helium increase technology, which stores high-pressure helium in liquid oxygen temperature range cylinders, and uses the characteristics of small molecular weight of helium, high density of helium at high pressure and low temperature, and small heat exchange with liquid oxygen medium to pressurize the liquid oxygen and methane tanks, so that the pressure of the liquid oxygen and methane tanks is maintained within a certain range, thereby ensuring the inlet pressure requirements of the engine turbo pump.
[0003] In the process of implementing the present invention, the applicant discovered that there are at least the following problems in the prior art:
[0004] The cold helium heating and pressurization of liquid oxygen and methane tanks is achieved by immersing the cold helium cylinder in the liquid oxygen propellant tank. When in use, the cold helium gas is introduced into the engine helium heater for heating, and the heated helium is sent to the oxygen tank and methane tank. Although the cold helium pressurization system has significant benefits in reducing the temperature rise of the propellant, the development of the engine helium heater is difficult. In the case of a large number of large rocket engines, each liquid oxygen and methane engine is equipped with two helium heaters, which greatly increases the difficulty of developing the engine helium heater. The large number of liquid oxygen and methane large rocket engines results in a large number of helium heaters, a large structural weight, and an increase in the structural weight of the engine and the weight of the rocket. Summary of the invention
[0005] The embodiments of the present invention provide a pressurization system and a pressurization method for a large launch vehicle, which solve the technical problems in the prior art of the difficulty in developing engines, the heavy structural weight of the engine, and the heavy weight of the rocket caused by the pressurization and heating of propellants during the flight of large rockets.
[0006] To achieve the above-mentioned purpose, on the one hand, an embodiment of the present invention provides a pressurization system for a large launch vehicle, the large launch vehicle comprises a first-stage engine, a first-stage oxygen tank connected to the first-stage engine by a pipeline to provide liquid oxygen for the first-stage engine, and the pressurization system of the large launch vehicle comprises a first-stage cold helium bottle arranged in the first-stage oxygen tank, a cold helium bottle main pipe and an oxygen energy dissipator;
[0007] The first-stage cold helium gas cylinder has a cold helium gas cylinder venting interface;
[0008] One end of the cold helium cylinder main pipe is connected to the first-level cold helium cylinder through the cold helium cylinder venting interface, and the other end of the cold helium cylinder main pipe enters the first-level oxygen box. The oxygen energy dissipator is arranged in the first-level oxygen box, and the oxygen energy dissipator is connected to the other end of the cold helium cylinder main pipe;
[0009] The pressurization system of the large launch vehicle also includes a gas cylinder heater arranged in the first-stage cold helium gas cylinder. The gas cylinder heater includes a connecting end, and the connecting end is connected to the inner wall of the first-stage cold helium gas cylinder.
[0010] On the other hand, an embodiment of the present invention provides a method for pressurizing a large launch vehicle, comprising:
[0011] At the start of the first stage flight phase of the large launch vehicle, the first heating power supply is turned on by closing the first power switch, and the first heating power supply is used to power and heat the cylinder heater in the first stage cold helium cylinder; wherein the first stage cold helium cylinder is arranged in the first stage oxygen box;
[0012] During the first stage flight of a large launch vehicle, the cryogenic helium in the first stage cold helium cylinder is heated and pressurized by the cylinder heater;
[0013] At the same time, the low-temperature helium in the first-stage cold helium cylinder is introduced into the cold helium cylinder main pipe through the cold helium cylinder interface, and the low-temperature helium is transported to the oxygen box energy dissipator arranged in the first-stage oxygen box and connected to the cold helium cylinder main pipe; the low-temperature helium is sprayed into the first-stage oxygen box through the oxygen box energy dissipator to pressurize the liquid oxygen in the first-stage oxygen box;
[0014] During the first-stage flight of a large launch vehicle, as the flight progresses, the power of the first heating power supply is reduced by gradually lowering the opening of the power regulator; until the first-stage flight phase ends, the first heating power supply is stopped from supplying power to the gas cylinder heater for heating.
[0015] In a third aspect, an embodiment of the present invention provides a cold helium cylinder device, comprising a first-stage cold helium cylinder and a cylinder heater disposed in the first-stage cold helium cylinder, the cylinder heater comprising a connecting end, the connecting end being connected to the inner wall of the first-stage cold helium cylinder, and the first-stage cold helium cylinder having a cold helium cylinder venting interface;
[0016] The cold helium cylinder device also includes a first cable and a first heating power source. The first heating power source is connected to the first cable. The first cable is connected to the cylinder heater through a connecting end to supply power and heat the cylinder heater.
[0017] The above technical scheme has the following beneficial effects: in the first stage of flight of a large rocket, the low-temperature helium gas in the first stage cold helium cylinder is heated by the cylinder heater, so that the temperature of the helium in the first stage cold helium cylinder rises, the gas pressure in the first stage cold helium cylinder is increased, and the helium in the first stage cold helium cylinder can be discharged more thoroughly to realize the liquid oxygen pressurization of the first stage oxygen box. A cylinder heater is directly arranged in the first stage cold helium cylinder. During the first stage flight of a large launch vehicle, the low-temperature helium in the first stage cold helium cylinder is directly heated and pressurized by the cylinder heater, which has a simple structure and limited weight increase. The prior art does not adopt the configuration of a helium heater for each first stage engine, which reduces the difficulty of engine development, and also reduces the supporting devices and control systems between the first stage cold helium cylinder and the first stage engine, thereby reducing the weight of the large launch vehicle. The helium in the first stage cold helium cylinder is discharged more thoroughly, which will make full use of the helium in the first stage cold helium cylinder, avoid the residual helium and set up more first stage cold helium cylinders, and indirectly reduce the overall weight of the large rocket. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 A structural diagram of a pressurization system of a first large launch vehicle according to an embodiment of the present invention;
[0020] Figure 2 A structural diagram of a pressurization system of a second large launch vehicle according to an embodiment of the present invention;
[0021] Figure 3 It is a three-dimensional structural schematic diagram of a primary cold helium gas cylinder 9 and a gas cylinder heater 8 according to an embodiment of the present invention;
[0022] Figure 4 It is a three-dimensional structural schematic diagram of the first-level cold helium gas cylinder 9 connected to the cold helium gas cylinder main pipe 12 according to an embodiment of the present invention;
[0023] Figure 5 A three-dimensional structural diagram of the first pipeline heater 171 and the second pipeline heater 172 according to an embodiment of the present invention;
[0024] Figure 6 A flow chart of a pressurization method for a large launch vehicle according to an embodiment of the present invention;
[0025] Figure 7The pressure control band diagram of K5, K6, K7, and K8 of the embodiment of the present invention, and the opening pressure and closing pressure curve diagram of the oxygen tank safety valve 29;
[0026] Figure 8 This is a control logic diagram of K5, K6, K7, and K8 of an embodiment of the present invention;
[0027] Fig. 9 The diagram of the pressure control bands of K1, K2, K3, and K4 in the embodiment of the present invention, and the curve diagram of the opening pressure and closing pressure of the methane tank safety valve 22;
[0028] Fig.10 This is a control logic diagram of K1, K2, K3, and K4 in an embodiment of the present invention;
[0029] Fig.11 It is a gas pressure curve diagram in the first-stage cold helium gas cylinder 9 corresponding to when the gas cylinder heater 8 of the embodiment of the present invention is working and not working;
[0030] Fig.12 It is a gas temperature curve diagram in the first-stage cold helium gas cylinder 9 when the gas cylinder heater 8 of the embodiment of the present invention is working and not working;
[0031] Fig.13 It is a gas mass curve diagram in the first-stage cold helium gas cylinder 9 when the gas cylinder heater 8 of the embodiment of the present invention is working and not working;
[0032] Fig.14 It is a turn-on / off curve diagram of the first power switch 5, the second power switch 191 and the third power switch 192 according to an embodiment of the present invention;
[0033] Fig.15 It is a curve diagram of the change of the power adjustment opening degree of the power regulator 6 according to the embodiment of the present invention over time.
[0034] The reference numerals are:
[0035] 1. First-stage oxygen box; 3. First-stage engine; 2. First-stage methane box; 4. First heating power supply; 5. First power switch; 6. Power regulator; 7. First cable; 8. Cylinder heater; 9. First-stage cold helium cylinder; 10. Cold helium cylinder venting interface; 11. Cold helium cylinder branch pipe; 12. Cold helium cylinder main pipe; 13. Tee; 14. Second filter; 21. Methane box energy dissipator; 22. Methane box safety valve; 23. Methane box air pillow pressure sensor; 24 , methane tank boost controller; 25, first filter; 28, oxygen energy dissipator; 29, oxygen tank safety valve; 30, oxygen tank air pillow pressure sensor; 31, oxygen tank boost controller; 33, boost branch pipe; 51, first control circuit; 52, second control circuit; 53, third control circuit; 54, fourth control circuit; 55, fifth control circuit; 56, sixth control circuit; 57, seventh control circuit; 58, eighth control circuit; 81, connection end;
[0036] 151, second main boost solenoid valve; 152, second auxiliary boost solenoid valve; 153, third backup boost solenoid valve; 154, fourth backup boost solenoid valve; 161, fifth orifice plate; 162, sixth orifice plate; 163, seventh orifice plate; 164, eighth orifice plate;
[0037] 171, first pipeline heater; 172, second pipeline heater; 181, second heating power supply; 182, third heating power supply; 191, second power switch; 192, third power switch; 201, second cable; 202, third cable;
[0038] 261, the first main line boost solenoid valve; 262, the first auxiliary line boost solenoid valve; 263, the first backup boost solenoid valve; 264, the second backup boost solenoid valve; 271, the first orifice plate; 272, the second orifice plate; 273, the third orifice plate; 274, the fourth orifice plate. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] like Figure 1As shown, in combination with an embodiment of the present invention, a pressurization system for a large launch vehicle is provided, the large launch vehicle includes a first-stage engine 3, a first-stage oxygen tank 1 connected to the first-stage engine 3 by a pipeline to provide liquid oxygen for the first-stage engine 3, the pressurization system of the large launch vehicle includes a first-stage cold helium cylinder 9, a cold helium cylinder main pipe 12 and an oxygen energy dissipator 28 arranged in the first-stage oxygen tank 1; the first-stage cold helium cylinder 9 has a cold helium cylinder venting interface 10; one end of the cold helium cylinder main pipe 12 is connected to the first-stage cold helium cylinder 9 through the cold helium cylinder venting interface 10, and the other end of the cold helium cylinder main pipe 12 enters the first-stage oxygen tank 1, the oxygen energy dissipator 28 is arranged in the first-stage oxygen tank 1, and the oxygen energy dissipator 28 is connected to the other end of the cold helium cylinder main pipe 12; the pressurization system of the large launch vehicle also includes a cylinder heater 8 arranged in the first-stage cold helium cylinder 9, the cylinder heater 8 includes a connecting end 81, and the connecting end 81 is connected to the inner wall of the first-stage cold helium cylinder 9.
[0041] At the start of the first stage of the flight of the large launch vehicle, the first heating power source 4 is turned on by closing the first power switch 5, and the gas cylinder heater 8 in the first stage cold helium gas cylinder 9 is powered and heated by the first heating power source 4; before the first stage of the large launch vehicle is ignited, the first power switch 5 is in an off state, at which time the gas cylinder heater 8 is not powered on, so the gas cylinder heater 8 does not work; the first stage cold helium gas cylinder 9 is arranged in the first stage oxygen tank 1, and the first stage oxygen tank 1 provides liquid oxygen for the first stage engine 3; Fig.14 The figure shows the opening and closing curve of the first power switch 5. During the first stage flight of a large launch vehicle, the cryogenic helium in the first stage cold helium cylinder 9 is heated and pressurized by the cylinder heater 8. The cryogenic helium in the first stage cold helium cylinder 9 is introduced into the cold helium cylinder main pipe 12 through the cold helium cylinder interface 10, and the cryogenic helium is transported to the oxygen box energy dissipator 28 provided in the first stage oxygen box 1 and connected to the cold helium cylinder main pipe 12; the cryogenic helium is sprayed into the first stage oxygen box 1 through the oxygen box energy dissipator 28 to pressurize the liquid oxygen in the first stage oxygen box 1. During the first stage flight of a large launch vehicle, as the flight advances, the power of the first heating power supply 4 is reduced by gradually reducing the opening of the power regulator 6; until the first stage flight phase ends, the first heating power supply 4 is stopped from supplying power to the cylinder heater 8 for heating.
[0042] In the embodiment of the present invention, during the first stage of flight of a large rocket, the cryogenic helium gas in the first stage cold helium cylinder 9 is heated by the cylinder heater 8, so that the temperature of the helium in the first stage cold helium cylinder 9 rises, the gas pressure in the first stage cold helium cylinder 9 is increased, and the helium in the first stage cold helium cylinder 9 can be discharged more thoroughly, so as to realize the liquid oxygen pressurization of the first stage oxygen tank 1. A cylinder heater 8 is directly provided in the first stage cold helium cylinder 9. During the first stage of flight of a large launch vehicle, the cryogenic helium in the first stage cold helium cylinder 9 is directly heated and pressurized by the cylinder heater 8. The structure is simple and the weight increase is limited. The prior art of configuring two helium heaters for each first stage engine is not adopted, which reduces the difficulty of engine development, and also reduces the supporting devices and control systems between the first stage cold helium cylinder 9 and the first stage engine, thereby reducing the weight of the large launch vehicle. The helium in the first stage cold helium cylinder 9 is discharged more thoroughly, which can make full use of the helium in the first stage cold helium cylinder 9, avoid the residual helium and set up more first stage cold helium cylinders 9, and indirectly reduce the overall weight of the large rocket. Preferably, as Figure 2 As shown, the booster system of a large launch vehicle also includes a first cable 7 and a first heating power source 4, the first heating power source 4 is connected to the first cable 7, and the first cable 7 is connected to the gas cylinder heater 8 through the connection end 81 to provide power and heating for the gas cylinder heater 8; the booster system of the large launch vehicle also includes a first power switch 5 and a power regulator 6 arranged outside the first-stage oxygen box 1, the first power switch 5 and the power regulator 6 are respectively connected to the first cable 7, and the first power switch 5 and the power regulator 6 are sequentially arranged between the first heating power source 4 and the connection end 81 of the gas cylinder heater 8. Fig.15 As shown, it is a curve diagram of the power adjustment opening of the power regulator 6 changing with time, 0s represents the start time of the first stage flight ignition of the large rocket core, t1s represents the time when the opening of the power regulator 6 is adjusted from 1 to 0.5, and t2s represents the end time of the first stage flight of the large rocket core. The power adjustment opening of the power regulator 6 is predetermined and belongs to open control. After the large rocket is ignited, it is in the first-stage flight stage, the first power switch 5 is in the off state, and the power regulator 6 is working. During the period from 0s to t1s of the first-stage flight stage, the mass of the low-temperature helium in the first-stage cold helium cylinder 9 is large, and the energy required is large. Therefore, the opening of the power regulator 6 is adjusted to 1 to ensure that the cylinder heater 8 works at full power; during the period from t1s to t2s of the first-stage flight stage, the mass of the low-temperature helium in the first-stage cold helium cylinder 9 is small, and the energy required is small. Therefore, at t1s, the opening of the power regulator 6 is adjusted to 0.5 to ensure that the cylinder heater 8 works at 0.5 times the full power, so that the helium temperature in the first-stage cold helium cylinder 9 is not greater than 300K, thereby ensuring the safety of the first-stage cold helium cylinder 9 during operation.
[0043] like Figure 3As shown, the gas cylinder heater 8 includes a spiral metal wire which is wide in the middle and narrow at both ends. The first cable 7 is connected to one of the narrow ends of the spiral metal wire through the connecting end 81. The spiral metal wire has a fast heating speed, is easy to manufacture, has a simple structure, adds little weight, and has limited increase in the overall weight of a large rocket.
[0044] Preferably, if Figure 2 As shown, the booster system of a large launch vehicle further includes: a first pipeline heater 171, a second heating power supply 181, a second power switch 191 and a second cable 201; the first pipeline heater 171 is arranged on the cold helium cylinder main pipe 12, the second heating power supply 181 is connected to the first pipeline heater 171 through the second cable 201 to supply power and heat the first pipeline heater 171, the second power switch 191 is connected to the second cable 201, and the second power switch 191 is arranged between the second heating power supply 181 and the first pipeline heater 171. Figure 5 As shown, the first pipeline heater 171 includes a spiral metal wire, which has a fast heating speed, is easy to manufacture, has a simple structure, adds little weight, and has limited increase in the overall weight of a large rocket.
[0045] At the beginning of the first stage of flight of a large launch vehicle, the second heating power supply 181 is turned on by closing the second power switch 191, and the first pipeline heater 171 provided on the cold helium gas bottle main pipe 12 is powered and heated by the second heating power supply 181, and the low-temperature helium gas in the cold helium gas bottle main pipe 12 is heated and pressurized by the first pipeline heater 171; until the first stage of flight is finished, the second heating power supply 181 is stopped from powering and heating the first pipeline heater 171. The second heating power supply 181 is connected to the first pipeline heater 171 through the second cable 201 to power and heat the first pipeline heater 171, the second power switch 191 is connected to the second cable 201, and the second power switch 191 is provided between the second heating power supply 181 and the first pipeline heater 171. Fig.14 It is a turn-on and turn-off curve diagram of the second power switch 191.
[0046] The low-temperature helium gas is heated again by the first pipeline heater 171 on the cold helium cylinder main pipe 12, so that the gas temperature in the first-stage cold helium cylinder 9 rises again, thereby increasing the helium pressure. When the helium enters the first-stage oxygen tank 1 through the oxygen tank energy dissipator 28, the pressure amplitude of the liquid oxygen in the first-stage oxygen tank 1 increases further to meet the inlet pressure of the liquid oxygen entering the first-stage engine 3.
[0047] Preferably, if Figure 2As shown, on the cold helium gas bottle main pipe 12, from the end of the first-stage cold helium gas bottle 9, there are arranged in sequence: a first filter 25, a first control circuit 51, a second control circuit 52, a third control circuit 53 and a fourth control circuit 54 connected in parallel; during the first-stage flight of the large launch vehicle, the low-temperature helium gas in the cold helium gas bottle main pipe 12 is filtered for impurities through the first filter 25 to prevent the cold helium gas bottle main pipe 12 from being blocked or thinned to reduce the delivery of the low-temperature helium gas.
[0048] The first control circuit 51 includes a first main boost solenoid valve 261 and a first orifice plate 271 connected in series, the second control circuit 52 includes a first auxiliary boost solenoid valve 262 and a second orifice plate 272 connected in series, the third control circuit 53 includes a first backup boost solenoid valve 263 and a third orifice plate 273 connected in series, the fourth control circuit 54 includes a second backup boost solenoid valve 264 and a fourth orifice plate 274 connected in series, the first main boost solenoid valve 261, the first auxiliary boost solenoid valve 262, the first backup boost solenoid valve 264 and the fourth orifice plate 274 connected in series, The pressure solenoid valve 263 and the second standby boost solenoid valve 264 are located near the first filter 25; the boost system of the large launch vehicle also includes an oxygen box air pillow pressure sensor 30 and an oxygen box boost controller 31. The oxygen box air pillow pressure sensor 30 is connected to the first-stage oxygen box 1, and the oxygen box boost controller 31 is electrically connected to the oxygen box air pillow pressure sensor 30. The oxygen box boost controller 31 is also respectively connected to the first auxiliary boost solenoid valve 262, the first standby boost solenoid valve 263 and the second standby boost solenoid valve 264.
[0049] The first main boost solenoid valve 261 is referred to as K5, the first auxiliary boost solenoid valve 262 is referred to as K6, the first backup boost solenoid valve 263 is referred to as K7, and the second backup boost solenoid valve 264 is referred to as K8. Figure 7 As shown, it is the pressure control band diagram of K5, K6, K7, and K8, P Ymin is the minimum oxygen tank air cushion pressure required by the first stage engine 3, P Y1 is the opening threshold of K7 and K8, P Y2 is the opening threshold of K6, P Y3 is the closing threshold of K7 and K8, P Y4 is the shutdown threshold of K6; Figure 8 Shown is the control logic diagram of K5, K6, K7, and K8.
[0050] The main control unit controls the first main circuit boost solenoid valve 261 (K5) to be in a normally open state;
[0051] The air pillow pressure sensor 30 senses the air pillow pressure of the first-stage oxygen tank 1, and the air pillow pressure data P of the first-stage oxygen tank 1 is converted into Y0 The oxygen box pressure controller 31 is electrically connected to the oxygen box air pillow pressure sensor 30. The oxygen box pressure controller 31 is based on the air pillow pressure P of the first oxygen box 1.Y0 Calculate and make a decision, and according to the decision, the oxygen box boost controller 31 controls the opening and closing of the first auxiliary boost solenoid valve 262, the first backup boost solenoid valve 263 and the second backup boost solenoid valve 264 to achieve the air pillow pressure P of the first oxygen box 1. Y0 Precise control of the system. Specifically including:
[0052] When P Y0 Does not satisfy P Y0 ≥P Y1 When , K6, K7, and K8 are opened through the oxygen box boost controller 31;
[0053] When P Y0 Satisfy P Y2 >P Y0 >P Y1 When , K7 and K8 both keep the previous state, and K6 is opened through the oxygen box boost controller 31;
[0054] When P Y0 Satisfy P Y3 >P Y0 ≥P Y2 When , K6, K7 and K8 all maintain the previous state;
[0055] When P Y0 Satisfy P Y4 ≥P Y0 ≥P Y3 When K6 is in the previous state, K7 and K8 are closed through the oxygen box boost controller 31;
[0056] When P Y0 Satisfy P Y0 >P Y4 When the oxygen tank pressure controller 31 is used to close K6, K7 and K8.
[0057] The pressurization system of the large launch vehicle also includes an oxygen tank safety valve 29 connected to the first-stage oxygen tank 1, and the oxygen tank safety valve 29 is electrically connected to the master control unit. During the first-stage flight of the large launch vehicle, the air pillow pressure of the first-stage oxygen tank 1 is sensed through the oxygen tank safety valve 29. When the air pillow pressure of the first-stage oxygen tank 1 is greater than the opening pressure of the oxygen tank safety valve 29, the oxygen tank safety valve 29 is opened through the master control unit. When the air pillow pressure of the first-stage oxygen tank 1 is lower than the closing pressure of the oxygen tank safety valve 29, the oxygen tank safety valve 29 is closed, thereby ensuring the safety of the first-stage oxygen tank 1.
[0058] Preferably, if Figure 4As shown, when multiple first-stage cold helium cylinders 9 are arranged in the first-stage oxygen box 1, the low-temperature helium first enters the cold helium cylinder branch pipe 11 through the cold helium cylinder interface 10, and then is collected to the cold helium cylinder main pipe 12 through the cold helium cylinder branch pipe 11, and then the first-stage oxygen box 1 is pressurized according to the above steps.
[0059] Preferably, if Figure 2 As shown, the large launch vehicle includes a first-stage methane tank 2, and the boosting system of the large launch vehicle also includes a boosting branch pipe 33 and a methane tank energy dissipator 21. One end of the boosting branch pipe 33 is connected to the cold helium gas bottle main pipe 12 through a tee 13; the other end of the boosting branch pipe 33 enters the first-stage methane tank 2, and the methane tank energy dissipator 21 is arranged in the first-stage methane tank 2, and the methane tank energy dissipator 21 is connected to the other end of the boosting branch pipe 33. During the first-stage flight of the large launch vehicle, the low-temperature helium in the cold helium gas bottle main pipe 12 is introduced into the boosting branch pipe 33 through the tee 13; the low-temperature helium in the boosting branch pipe 33 is transported to the methane tank energy dissipator 21 arranged in the first-stage methane tank 2 and connected to the boosting branch pipe 33, and the low-temperature helium is sprayed into the first-stage methane tank 2 through the methane tank energy dissipator 21 to boost the liquid methane in the first-stage methane tank 2 to meet the inlet pressure of the liquid methane entering the first-stage engine 3.
[0060] Preferably, if Figure 2 As shown, the booster system of the large launch vehicle also includes: a second pipeline heater 172, a third heating power supply 182, a third power switch 192 and a third cable 202; the second pipeline heater 172 is arranged on the booster branch pipe 33, the third heating power supply 182 is connected to the second pipeline heater 172 through the third cable 202 to supply power and heat the second pipeline heater 172, the third power switch 192 is connected to the third cable 202, and the third power switch 192 is arranged between the third heating power supply 182 and the third heating power supply 182. Figure 5 As shown, the second pipeline heater 172 includes a spiral metal wire, which has a fast heating speed, is easy to manufacture, has a simple structure, adds little weight, and has limited increase in the overall weight of a large rocket.
[0061] At the beginning of the first stage of the large launch vehicle's flight, the third power switch 192 is opened and closed to turn on the third heating power source 182, and the second pipeline heater 172 provided on the boost branch pipe 33 is powered and heated by the third heating power source 182, and the low-temperature helium in the boost branch pipe 33 is heated and pressurized by the second pipeline heater 172. Fig.14The graph of the on-off curve of the third power switch 192 is shown. When the first stage flight is over, the third heating power supply 182 is stopped to supply power to the second pipeline heater 172 for heating. The second pipeline heater 172 on the boost branch pipe 33 heats the low-temperature helium gas, so that the temperature of the low-temperature helium gas rises, thereby increasing the helium pressure. When the helium gas is sprayed into the first-stage methane tank 2 through the methane tank energy dissipater 21, the pressure amplitude of the liquid methane in the first-stage methane tank 2 increases further to meet the inlet pressure of the liquid methane entering the first-stage engine 3.
[0062] Preferably, if Figure 2 As shown, on the boost branch pipe 33, from the proximal end of the first-stage cold helium cylinder 9, there are arranged in sequence: a second filter 14, a fifth control circuit 55, a sixth control circuit 56, a seventh control circuit 57 and an eighth control circuit 58 in parallel; wherein the fifth control circuit 55 includes a second main boost solenoid valve 151 and a fifth orifice plate 161 connected in series, the sixth control circuit 56 includes a second auxiliary boost solenoid valve 152 and a sixth orifice plate 162 connected in series, the seventh control circuit 57 includes a third backup boost solenoid valve 153 and a seventh orifice plate 163 connected in series, the eighth control circuit 58 includes a fourth backup boost solenoid valve 154 and an eighth orifice plate connected in series. Plate 164, the second main boost solenoid valve 151, the second auxiliary boost solenoid valve 152, the third backup boost solenoid valve 153 and the fourth backup boost solenoid valve 154 are located near the second filter 14; the boost system of the large launch vehicle also includes a methane tank air pillow pressure sensor 23 and a methane tank boost controller 24, the methane tank air pillow pressure sensor 23 is connected to the first-stage methane tank 2, the methane tank boost controller 24 is electrically connected to the methane tank air pillow pressure sensor 23, and the methane tank boost controller 24 is also respectively connected to the second auxiliary boost solenoid valve 152, the third backup boost solenoid valve 153 and the fourth backup boost solenoid valve 154.
[0063] The second main boost solenoid valve 151 is referred to as K1, the second auxiliary boost solenoid valve 152 is referred to as K2, the third backup boost solenoid valve 153 is referred to as K3, and the fourth backup boost solenoid valve 154 is referred to as K4. Fig. 9 The figure shows the pressure control band diagram of K1, K2, K3, and K4. Rmin is the minimum methane tank air cushion pressure required for the first stage engine 3, P R1 is the opening threshold of K3 and K4, P R2 is the opening threshold of K2, P R3 is the closing threshold of K3 and K4, P R4 is the closing threshold of K2; Fig.10 Shown is the control logic diagram of K1, K2, K3, and K4.
[0064] During the first stage flight of a large launch vehicle, the master control unit controls the second main path boost solenoid valve 151 to be in a normally open state;
[0065] The gas pillow pressure P of the first-stage methane tank 2 is sensed by the methane tank pressure sensor 23. R0 , the air pillow pressure P of the first-stage methane tank 2 R0 The methane tank boost controller 24 performs calculations, and controls the second auxiliary boost solenoid valve 152, the third backup boost solenoid valve 153, and the fourth backup boost solenoid valve 154 to open or close according to the calculation results, so as to achieve precise control of the air pillow pressure of the first-stage methane tank 2, specifically including:
[0066] When P R0 Does not satisfy P R0 ≥P R1 When , K2, K3 and K4 are opened through the methane tank boost controller 24;
[0067] When P R0 Satisfy P R2 >P R0 >P R1 , K3 and K4 both maintain the previous state, and K2 is opened through the methane tank boost controller 24;
[0068] When P R0 Satisfy P R3 >P R0 ≥P R2 , K2, K3 and K4 all maintain the previous state;
[0069] When P R0 Satisfy P R4 ≥P R0 ≥P R3 , K2 maintains the previous state, and K3 and K4 are closed through the methane tank boost controller 24;
[0070] When P R0 Satisfy P R0 >P R4 When the methane tank boost controller 24 is used, K2, K3 and K4 are closed.
[0071] The pressurization system of the large launch vehicle also includes a methane tank safety valve 22 connected to the first-stage methane tank 2, and the methane tank safety valve 22 is electrically connected to the master control unit. During the first-stage flight of the large launch vehicle, the air pillow pressure of the first-stage methane tank 2 is sensed through the methane tank safety valve 22. When the air pillow pressure of the first-stage methane tank 2 is greater than the opening pressure of the methane tank safety valve 22, the methane tank safety valve 22 is opened through the master control unit. When the air pillow pressure of the first-stage methane tank 2 is lower than the closing pressure of the methane tank safety valve 22, the methane tank safety valve 22 is closed to ensure the safety of the first-stage methane tank 2.
[0072] like Figure 6 As shown, in combination with an embodiment of the present invention, a method for pressurizing a large launch vehicle is provided, comprising:
[0073] S101: At the start of the first stage of the flight of the large launch vehicle, the first heating power source 4 is turned on by closing the first power switch 5, and the gas cylinder heater 8 in the first stage cold helium gas cylinder 9 is powered and heated by the first heating power source 4; wherein, before the first stage of the large launch vehicle is ignited, the first power switch 5 is in an off state, at which time the gas cylinder heater 8 is not powered on, and therefore the gas cylinder heater 8 does not work; the first stage cold helium gas cylinder 9 is arranged in the first stage oxygen tank 1, and the first stage oxygen tank 1 provides liquid oxygen for the first stage engine 3; Fig.14 Shown is a turn-on and turn-off curve diagram of the first power switch 5;
[0074] S102: During the first stage flight of the large launch vehicle, the low-temperature helium gas in the first stage cold helium gas cylinder 9 is heated and pressurized by the gas cylinder heater 8;
[0075] S103: introducing the low-temperature helium in the first-stage cold helium cylinder 9 into the cold helium cylinder main pipe 12 through the cold helium cylinder interface 10, and delivering the low-temperature helium to the oxygen box energy dissipator 28 provided in the first-stage oxygen box 1 and connected to the cold helium cylinder main pipe 12; spraying the low-temperature helium into the first-stage oxygen box 1 through the oxygen box energy dissipator 28 to pressurize the liquid oxygen in the first-stage oxygen box 1;
[0076] S104: During the first-stage flight of a large launch vehicle, as the flight progresses, the power of the first heating power supply 4 is reduced by gradually reducing the opening of the power regulator 6; until the first-stage flight phase ends, the first heating power supply 4 is stopped from supplying power and heating to the gas cylinder heater 8.
[0077] In the embodiment of the present invention, during the first stage flight of a large rocket, the low-temperature helium gas in the first stage cold helium cylinder 9 is heated by the cylinder heater 8, so that the temperature of the helium in the first stage cold helium cylinder 9 rises, the gas pressure in the first stage cold helium cylinder 9 is increased, and the helium in the first stage cold helium cylinder 9 can be discharged more thoroughly to realize the liquid oxygen pressurization of the first stage oxygen tank 1. The cylinder heater 8 is directly provided in the first stage cold helium cylinder 9. During the first stage flight of the large launch vehicle, the low-temperature helium in the first stage cold helium cylinder 9 is directly heated and pressurized by the cylinder heater 8. The structure is simple and the weight increase is limited. The prior art does not adopt the configuration of two helium heaters for each first stage engine, which reduces the difficulty of engine development, and also reduces the supporting devices and control systems between the first stage cold helium cylinder 9 and the first stage engine, thereby reducing the weight of the large launch vehicle. The helium in the first stage cold helium cylinder 9 is discharged more thoroughly, which will make full use of the helium in the first stage cold helium cylinder 9, avoid the residual helium and set up more first stage cold helium cylinders 9, and indirectly reduce the overall weight of the large rocket.
[0078] Preferably, if Fig.15 As shown, it is a curve diagram of the power adjustment opening of the power regulator 6 changing with time, 0s represents the start time of the first stage flight ignition of the large rocket core, t1s represents the time when the opening of the power regulator 6 is adjusted from 1 to 0.5, and t2s represents the end time of the first stage flight of the large rocket core. The power adjustment opening of the power regulator 6 is predetermined and belongs to open control.
[0079] After the large rocket is ignited, it is in the first-stage flight stage, the first power switch 5 is in the off state, and the power regulator 6 is working. During the period from 0s to t1s of the first-stage flight stage, the mass of the low-temperature helium in the first-stage cold helium cylinder 9 is large, and the energy required is large. Therefore, the opening of the power regulator 6 is adjusted to 1 to ensure that the cylinder heater 8 works at full power; during the period from t1s to t2s of the first-stage flight stage, the mass of the low-temperature helium in the first-stage cold helium cylinder 9 is small, and the energy required is small. Therefore, at t1s, the opening of the power regulator 6 is adjusted to 0.5 to ensure that the cylinder heater 8 works at 0.5 times the full power, so that the helium temperature in the first-stage cold helium cylinder 9 is not greater than 300K, thereby ensuring the safety of the first-stage cold helium cylinder 9 during operation.
[0080] Preferably, the pressurization method for a large launch vehicle further comprises:
[0081] S105: At the start of the first stage of flight of a large launch vehicle, the second heating power supply 181 is turned on by closing the second power switch 191, and the first pipeline heater 171 provided on the cold helium gas bottle main pipe 12 is powered and heated by the second heating power supply 181, and the low-temperature helium gas in the cold helium gas bottle main pipe 12 is heated and pressurized by the first pipeline heater 171; until the first stage of flight is completed, the second heating power supply 181 is stopped from powering and heating the first pipeline heater 171. The second heating power supply 181 is connected to the first pipeline heater 171 through the second cable 201 to power and heat the first pipeline heater 171, the second power switch 191 is connected to the second cable 201, and the second power switch 191 is provided between the second heating power supply 181 and the first pipeline heater 171. Fig.14 It is a turn-on and turn-off curve diagram of the second power switch 191.
[0082] The low-temperature helium gas is heated again by the first pipeline heater 171 on the cold helium cylinder main pipe 12, so that the gas temperature in the first-stage cold helium cylinder 9 rises again, thereby increasing the helium pressure. When the helium enters the first-stage oxygen tank 1 through the oxygen tank energy dissipator 28, the pressure amplitude of the liquid oxygen in the first-stage oxygen tank 1 increases further to meet the inlet pressure of the liquid oxygen entering the first-stage engine 3.
[0083] Preferably, the pressurization method for a large launch vehicle further comprises:
[0084] S106: During the first stage flight of the large launch vehicle, the low-temperature helium in the cold helium bottle main pipe 12 is filtered for impurities through the first filter 25 to prevent the cold helium bottle main pipe 12 from being blocked or thinned to reduce the delivery of the low-temperature helium.
[0085] S107: During the first stage flight of a large launch vehicle, the first control circuit 51 is in a normally open state, that is, the master control unit controls the first main circuit boost solenoid valve 261 to be in a normally open state; the air pillow pressure of the first stage oxygen box 1 is sensed by the oxygen box air pillow pressure sensor 30 connected to the first stage oxygen box 1, and the air pillow pressure data of the first stage oxygen box 1 is transmitted to the oxygen box boost controller 31 electrically connected to the oxygen box air pillow pressure sensor 30, and the oxygen box boost controller 31 calculates according to the air pillow pressure of the first stage oxygen box 1 to determine whether the second control circuit 52, the third control circuit 53 and the fourth control circuit 54 connected in parallel with the first control circuit 51 are opened, closed or maintained in the previous state; wherein, the first control circuit 51, the second control circuit 53 and the fourth control circuit 54 are opened, closed or maintained in the previous state; wherein, the first control circuit 51, the second control circuit 53 and the fourth control circuit 54 are opened, closed or maintained in the previous state; 52, the third control circuit 53 and the fourth control circuit 54 are arranged on the cold helium cylinder main pipe 12 after the first filter 25; the first control circuit 51 includes a first main boost solenoid valve 261 and a first orifice plate 271 connected in series, the second control circuit 52 includes a first auxiliary boost solenoid valve 262 and a second orifice plate 272 connected in series, the third control circuit 53 includes a first backup boost solenoid valve 263 and a third orifice plate 273 connected in series, the fourth control circuit 54 includes a second backup boost solenoid valve 264 and a fourth orifice plate 274 connected in series, the first main boost solenoid valve 261, the first auxiliary boost solenoid valve 262, the first backup boost solenoid valve 263 and the second backup boost solenoid valve 264 are located near the first filter 25.
[0086] The first main boost solenoid valve 261 is referred to as K5, the first auxiliary boost solenoid valve 262 is referred to as K6, the first backup boost solenoid valve 263 is referred to as K7, and the second backup boost solenoid valve 264 is referred to as K8. Figure 7 As shown in the figure, it is the pressure control band diagram of K5, K6, K7 and K8; Figure 8 Shown is the control logic diagram of K5, K6, K7, and K8.
[0087] The oxygen box boost controller 31 calculates according to the air pillow pressure of the first-level oxygen box 1 to determine whether the second control circuit 52, the third control circuit 53 and the fourth control circuit 54 connected in parallel with the first control circuit 51 are opened, closed or maintained in the previous state, specifically including:
[0088] S1071: When P Y0 Does not satisfy P Y0 ≥P Y1 When , K6, K7, and K8 are opened through the oxygen box boost controller 31;
[0089] S1072: When P Y0 Satisfy P Y2 >P Y0 >P Y1 When , K7 and K8 both keep the previous state, and K6 is opened through the oxygen box boost controller 31;
[0090] S1073: When P Y0 Satisfy P Y3 >P Y0 ≥P Y2 When , K6, K7 and K8 all maintain the previous state;
[0091] S1074: When P Y0 Satisfy P Y4 ≥P Y0 ≥P Y3 When K6 is in the previous state, K7 and K8 are closed through the oxygen box boost controller 31;
[0092] S1075: When P Y0 Satisfy P Y0 >P Y4 When the oxygen tank pressure controller 31 is used to close K6, K7 and K8.
[0093] The air pillow pressure of the first-stage oxygen box 1 is sensed by the oxygen box air pillow pressure sensor 30, and the air pillow pressure data of the first-stage oxygen box 1 is transmitted to the oxygen box boost controller 31 electrically connected to the oxygen box air pillow pressure sensor 30. The oxygen box boost controller 31 calculates and makes a decision based on the air pillow pressure of the first-stage oxygen box 1, and controls the opening and closing of the first auxiliary boost solenoid valve 262, the first backup boost solenoid valve 263 and the second backup boost solenoid valve 264 based on the decision, so as to realize precise control of the air pillow pressure of the first-stage oxygen box 1.
[0094] During the first-stage flight of a large carrier rocket, the air pressure of the first-stage oxygen tank 1 is sensed through the oxygen tank safety valve 29. When the air pressure of the first-stage oxygen tank 1 is greater than the opening pressure of the oxygen tank safety valve 29, the oxygen tank safety valve 29 is opened through the main control unit. When the air pressure of the first-stage oxygen tank 1 is lower than the closing pressure of the oxygen tank safety valve 29, the oxygen tank safety valve 29 is closed, thereby ensuring the safety of the first-stage oxygen tank 1.
[0095] Preferably, when multiple first-level cold helium cylinders 9 are provided in the first-level oxygen box 1, the low-temperature helium first enters the cold helium cylinder branch pipe 11 through the cold helium cylinder interface 10, and then is collected to the cold helium cylinder main pipe 12 through the cold helium cylinder branch pipe 11, and then the first-level oxygen box 1 is pressurized according to the above steps.
[0096] Preferably, the pressurization method for a large launch vehicle further comprises:
[0097] S108: During the first-stage flight of a large carrier rocket, the low-temperature helium in the cold helium bottle main pipe 12 is introduced into the boost branch pipe 33 through the tee 13; the low-temperature helium in the boost branch pipe 33 is transported to the methane tank energy absorber 21 which is arranged in the first-stage methane tank 2 and connected to the boost branch pipe 33, and the low-temperature helium is sprayed into the first-stage methane tank 2 through the methane tank energy absorber 21 to boost the liquid methane in the first-stage methane tank 2 to meet the inlet pressure of the liquid methane entering the first-stage engine 3.
[0098] Preferably, the pressurization method for a large launch vehicle further comprises:
[0099] S109: At the start of the first stage of the large launch vehicle, the third power switch 192 is closed to turn on the third heating power source 182, and the second pipe heater 172 provided on the boost branch pipe 33 is powered and heated by the third heating power source 182, and the low-temperature helium in the boost branch pipe 33 is heated and pressurized by the second pipe heater 172. Fig.14 The graph shows the on / off curve of the third power switch 192 .
[0100] S110: until the first-stage flight ends, stop the third heating power source 182 from supplying power to the second pipeline heater 172 for heating.
[0101] The low-temperature helium gas is heated by the second pipe heater 172 on the boost branch pipe 33, so that the temperature of the low-temperature helium rises, thereby increasing the helium pressure. When the helium is sprayed into the first-stage methane tank 2 through the methane tank energy absorber 21, the pressure amplitude of the liquid methane in the first-stage methane tank 2 increases further to meet the inlet pressure of the liquid methane entering the first-stage engine 3.
[0102] Preferably, the pressurization method for a large launch vehicle further comprises:
[0103] S120: During the first stage flight of the large launch vehicle, the low-temperature helium in the boost branch pipe 33 is filtered for impurities by the second filter 14 to prevent the boost branch pipe 33 from being blocked or thinned, thereby reducing the delivery of the low-temperature helium;
[0104] S130: During the first stage flight of the large launch vehicle, the fifth control circuit 55 is in the open state, that is, the second main circuit boost solenoid valve 151 is in the normally open state; the air pillow pressure of the first stage methane tank 2 is sensed by the methane tank air pillow pressure sensor 23 connected to the first stage methane tank 2, and the air pillow pressure data of the first stage methane tank 2 is transmitted to the methane tank boost controller 24 electrically connected to the methane tank air pillow pressure sensor 23. The methane tank boost controller 24 calculates according to the air pillow pressure of the first stage methane tank 2 to determine whether the sixth control circuit 56, the seventh control circuit 57 and the eighth control circuit 58 connected in parallel with the fifth control circuit 55 are opened, closed or maintained in the previous state; wherein, the fifth control circuit 55, the sixth control circuit 57 and the eighth control circuit 58 are connected in parallel with the fifth control circuit 55. The fifth control circuit 55 includes a second main boost solenoid valve 151 and a fifth orifice plate 161 connected in series, the sixth control circuit 56 includes a second auxiliary boost solenoid valve 152 and a sixth orifice plate 162 connected in series, the seventh control circuit 57 includes a third backup boost solenoid valve 153 and a seventh orifice plate 163 connected in series, the eighth control circuit 58 includes a fourth backup boost solenoid valve 154 and an eighth orifice plate 164 connected in series, the second main boost solenoid valve 151, the second auxiliary boost solenoid valve 152, the third backup boost solenoid valve 153 and the fourth backup boost solenoid valve 154 are located near the second filter 14.
[0105] The second main boost solenoid valve 151 is referred to as K1, the second auxiliary boost solenoid valve 152 is referred to as K2, the third backup boost solenoid valve 153 is referred to as K3, and the fourth backup boost solenoid valve 154 is referred to as K4. Fig. 9 The following is the pressure control band diagram of K1, K2, K3, and K4; Fig.10 Shown is the control logic diagram of K1, K2, K3, and K4.
[0106] The methane tank boost controller 24 calculates according to the air pillow pressure of the primary methane tank 2 to determine whether the sixth control circuit 56, the seventh control circuit 57 and the eighth control circuit 58 connected in parallel with the fifth control circuit 55 are opened, closed or maintained in the previous state, specifically including:
[0107] S1301: When P R0 Does not satisfy P R0 ≥P R1 When , K2, K3 and K4 are opened through the methane tank boost controller 24;
[0108] S1302: When P R0 Satisfy P R2 >P R0 >P R1 , K3 and K4 both maintain the previous state, and K2 is opened through the methane tank boost controller 24;
[0109] S1303: When P R0 Satisfy P R3 >P R0 ≥P R2 , K2, K3 and K4 all maintain the previous state;
[0110] S1304: When P R0 Satisfy P R4 ≥P R0 ≥P R3 , K2 maintains the previous state, and K3 and K4 are closed through the methane tank boost controller 24;
[0111] S1305: When P R0 Satisfy P R0 >P R4 When the methane tank boost controller 24 is used, K2, K3 and K4 are closed.
[0112] During the first-stage flight of a large carrier rocket, the air pillow pressure of the first-stage methane tank 2 is sensed by the methane tank pressure sensor 23, and the air pillow pressure of the first-stage methane tank 2 is transmitted to the methane tank boost controller 24. The methane tank boost controller 24 performs calculations, and controls the second auxiliary boost solenoid valve 152, the third backup boost solenoid valve 153 and the fourth backup boost solenoid valve 154 to be opened or closed according to the calculation results, so as to achieve precise control of the air pillow pressure of the first-stage methane tank 2.
[0113] During the first-stage flight of a large carrier rocket, the air pillow pressure of the first-stage methane tank 2 is sensed through the methane tank safety valve 22. When the air pillow pressure of the first-stage methane tank 2 is greater than the opening pressure of the methane tank safety valve 22, the methane tank safety valve 22 is opened through the main control unit. When the air pillow pressure of the first-stage methane tank 2 is lower than the closing pressure of the methane tank safety valve 22, the methane tank safety valve 22 is closed to ensure the safety of the first-stage methane tank 2.
[0114] like Figure 4 As shown, in combination with an embodiment of the present invention, a cold helium cylinder device is provided, comprising a first-stage cold helium cylinder 9 and a cylinder heater 8 arranged in the first-stage cold helium cylinder 9, the cylinder heater 8 comprises a connecting end 81, the connecting end 81 is connected to the inner wall of the first-stage cold helium cylinder 9, and the first-stage cold helium cylinder 9 has a cold helium cylinder venting interface 10;
[0115] The cold helium cylinder device also includes a first cable 7 and a first heating power source 4. The first heating power source 4 is connected to the first cable 7. The first cable 7 is connected to the cylinder heater 8 via a connecting end 81 to supply power and heat the cylinder heater 8.
[0116] In the embodiment of the present invention, during the first stage of flight of a large rocket, the low-temperature helium gas in the first stage cold helium cylinder 9 is heated by the cylinder heater 8, so that the temperature of the helium in the first stage cold helium cylinder 9 rises, the gas pressure in the first stage cold helium cylinder 9 is increased, and the helium in the first stage cold helium cylinder 9 can be discharged more thoroughly to achieve the liquid oxygen pressurization of the first stage oxygen tank 1. The cylinder heater 8 is directly provided in the first stage cold helium cylinder 9, and during the first stage of flight of a large launch vehicle, the low-temperature helium in the first stage cold helium cylinder 9 is directly heated and pressurized by the cylinder heater 8, which has a simple structure and limited weight increase.
[0117] Preferably, the cold helium cylinder device further comprises a first power switch 5 and a power regulator 6, the first power switch 5 and the power regulator 6 are respectively connected to the first cable 7, and the first power switch 5 and the power regulator 6 are sequentially arranged between the first heating power source 4 and the connection end 81 of the cylinder heater 8. Fig.15 As shown, it is a curve diagram of the power adjustment opening of the power regulator 6 changing with time. In the first stage of the large rocket flight, 0s represents the start time of the first stage flight ignition of the large rocket core, t1s represents the time when the opening of the power regulator 6 is adjusted from 1 to 0.5, and t2s represents the end time of the first stage flight of the large rocket core. The power adjustment opening of the power regulator 6 is predetermined and belongs to open control.
[0118] After the large rocket is ignited, it is in the first-stage flight stage, the first power switch 5 is in the off state, and the power regulator 6 is working. During the period from 0s to t1s of the first-stage flight stage, the mass of the low-temperature helium in the first-stage cold helium cylinder 9 is large, and the energy required is large. Therefore, the opening of the power regulator 6 is adjusted to 1 to ensure that the cylinder heater 8 works at full power; during the period from t1s to t2s of the first-stage flight stage, the mass of the low-temperature helium in the first-stage cold helium cylinder 9 is small, and the energy required is small. Therefore, at t1s, the opening of the power regulator 6 is adjusted to 0.5 to ensure that the cylinder heater 8 works at 0.5 times the full power, so that the helium temperature in the first-stage cold helium cylinder 9 is not greater than 300K, thereby ensuring the safety of the first-stage cold helium cylinder 9 during operation.
[0119] Preferably, the gas cylinder heater 8 comprises a spiral metal wire with a spiral diameter that is wide in the middle and narrow at both ends, and the first cable 7 is connected to one of the narrow ends of the spiral metal wire through the connecting end 81. Alternatively, the gas cylinder heater 8 comprises a spiral metal wire with a constant spiral diameter, and the first cable 7 is connected to one end of the spiral metal wire through the connecting end 81. The spiral metal wire has a fast heating speed, is easy to manufacture, has a simple structure, and has a small added weight, and has a limited increase in the overall weight of a large rocket.
[0120] The beneficial technical effects achieved by the embodiments of the present invention are as follows:
[0121] 1. In the embodiment of the present invention, a gas cylinder heater 8 is added to the first-stage cold helium gas cylinder 9. When the gas cylinder heater 8 is working, it can increase the temperature of the cold helium gas to about 270K, so as to increase the gas pressure of the first-stage cold helium gas cylinder 9, so that the helium gas in the first-stage cold helium gas cylinder 9 can be deflated more completely, thereby reducing the helium demand. When the gas cylinder heater 8 is not working, the temperature of the low-temperature helium gas in the first-stage cold helium gas cylinder 9 decreases during the working deflation stage, and the temperature of the low-temperature helium gas decreases to about 49K, so the density of the low-temperature helium gas increases, making the cold helium gas incompletely cooled and deflated. Fig.12 As shown, it is a gas temperature curve diagram in the first-stage cold helium cylinder 8 when the cylinder heater 8 in the first-stage cold helium cylinder 9 is working and not working.
[0122] 2. In the embodiment of the present invention, a gas cylinder heater 8 is added to the first-stage cold helium gas cylinder 9. When the gas cylinder heater 8 is working, the volume of the first-stage cold helium gas cylinder 9 is 2120L (23MPa), which can meet the requirements of the first-stage oxygen box 1 and the first-stage methane box 2 for heating and pressurizing the cold helium; without the gas cylinder heater 8, the volume of the cold helium gas cylinder is 5520L (23MPa), which can meet the requirements of the first-stage oxygen box 1 and the first-stage methane box 2 for heating and pressurizing the cold helium. Fig.11 As shown, it is a gas pressure curve diagram in the first-stage cold helium cylinder 9 when the cylinder heater 8 in the first-stage cold helium cylinder 9 is working and not working.
[0123] 3. In the embodiment of the present invention, a cylinder heater 8 is added to the first-level cold helium cylinder 9. Compared with the case where there is no cylinder heater 8, the helium mass of the cold helium cylinder is 550.5 kg to meet the cold helium heating and pressurization of the first-level oxygen box 1 and the first-level methane box 2. When the cylinder heater 8 is working, the helium mass of the first-level cold helium cylinder 9 is 211.4 kg to meet the cold helium heating and pressurization of the first-level oxygen box 1 and the first-level methane box 2. Therefore, the cylinder heater 8 saves 339.1 kg of helium and reduces the helium demand by 160.4%. Fig.13 As shown, it is a gas quality curve diagram in the first-stage cold helium cylinder 9 when the cylinder heater 8 in the first-stage cold helium cylinder 9 is working and not working.
[0124] 4. Compared with the working condition without the gas cylinder heater 8, the working condition of the gas cylinder heater 8 saves 3400L of helium cylinder, the mass of the first-stage cold helium cylinder 9 is reduced by about 894kg, and the total mass of the pressurization system is reduced by about 1233.1kg.
[0125] 5. The models of the power switch, heating power supply, pipeline heater, solenoid valve, and pipeline used are the same and the quantity is small, so the research and development difficulty is low and the processing and production cycle is short.
[0126] 6. The helium heating and pressurization method of the embodiment of the present invention replaces the original engine helium heater to heat the pipeline helium; the engine helium heater is omitted, the difficulty of engine development is reduced, and the huge number of engines avoids the number of helium heaters increasing the weight of large rockets; at the same time, it also avoids the pressurization pipeline of the first-stage cold helium cylinder 9 passing through the engine and then returning to the pressurization port of the first-stage oxygen box 1 and the pressurization port of the first-stage methane box 2 after coming out of the first-stage cold helium cylinder 9, so that the pressurization pipeline of the first-stage cold helium cylinder 9 can be directly connected to the pressurization port of the first-stage oxygen box 1 and the pressurization port of the first-stage methane box 2 after coming out of the first-stage cold helium cylinder 9. The layout, development difficulty and length of the pressurization pipeline are reduced, and the number and weight of the brackets and clamps of the pressurization pipeline are reduced. The weight of the pressurization pipeline and the corresponding fixing device of the rocket core are reduced, and the carrying capacity of large rockets is improved. The production and processing costs of installing a large number of cold helium heaters in the first-stage engine are reduced; the structural weight of the first stage of a large rocket is reduced, and the carrying capacity of a large rocket is increased.
[0127] It should be understood that the specific order or hierarchy of steps in the disclosed process is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process can be rearranged without departing from the scope of protection of the present disclosure. The attached method claims present the elements of the various steps in an exemplary order and are not intended to be limited to the specific order or hierarchy described.
[0128] In the above detailed description, various features are grouped together in a single embodiment to simplify the disclosure. This method of disclosure should not be interpreted as reflecting an intention that the embodiments of the claimed subject matter require more features than are clearly stated in each claim. On the contrary, as reflected in the appended claims, the invention is in a state of having less than all the features of the disclosed individual embodiments. Therefore, the appended claims are hereby expressly incorporated into the detailed description, with each claim standing on its own as a separate preferred embodiment of the invention.
[0129] The disclosed embodiments are described above to enable any person skilled in the art to implement or use the present invention. Various modifications of these embodiments are obvious to those skilled in the art, and the general principles defined herein may also be applied to other embodiments without departing from the spirit and scope of the present disclosure. Therefore, the present disclosure is not limited to the embodiments given herein, but is consistent with the broadest scope of the principles and novel features disclosed in this application.
[0130] The above description includes examples of one or more embodiments. Of course, it is impossible to describe all possible combinations of components or methods for the purpose of describing the above embodiments, but it should be recognized by those skilled in the art that the various embodiments may be further combined and arranged. Therefore, the embodiments described herein are intended to cover all such changes, modifications and variations that fall within the scope of protection of the appended claims. In addition, with respect to the term "comprising" used in the specification or claims, the word is covered in a manner similar to the term "including", just as "including," is explained as a transitional word in the claims. In addition, any term "or" used in the specification of the claims is intended to mean "non-exclusive or".
[0131] Those skilled in the art may also understand that the various illustrative logical blocks, units, and steps listed in the embodiments of the present invention may be implemented by electronic hardware, computer software, or a combination of the two. In order to clearly demonstrate the interchangeability of hardware and software, the various illustrative components, units, and steps described above have generally described their functions. Whether such functions are implemented by hardware or software depends on the specific application and the design requirements of the entire system. Those skilled in the art may use various methods to implement the described functions for each specific application, but such implementation should not be understood as exceeding the scope of protection of the embodiments of the present invention.
[0132] The various illustrative logic blocks or units described in the embodiments of the present invention can be implemented or operated by a general-purpose processor, a digital signal processor, an application-specific integrated circuit (ASIC), a field programmable gate array or other programmable logic device, a discrete gate or transistor logic, a discrete hardware component, or any combination of the above. The general-purpose processor can be a microprocessor, and optionally, the general-purpose processor can also be any conventional processor, controller, microcontroller or state machine. The processor can also be implemented by a combination of computing devices, such as a digital signal processor and a microprocessor, a plurality of microprocessors, one or more microprocessors combined with a digital signal processor core, or any other similar configuration.
[0133] The steps of the method or algorithm described in the embodiments of the present invention can be directly embedded in hardware, a software module executed by a processor, or a combination of the two. The software module can be stored in a RAM memory, a flash memory, a ROM memory, an EPROM memory, an EEPROM memory, a register, a hard disk, a removable disk, a CD-ROM, or other storage media of any form in the art. Exemplarily, the storage medium can be connected to the processor so that the processor can read information from the storage medium and can write information to the storage medium. Optionally, the storage medium can also be integrated into the processor. The processor and the storage medium can be arranged in an ASIC, and the ASIC can be arranged in a user terminal. Optionally, the processor and the storage medium can also be arranged in different components in the user terminal.
[0134] In one or more exemplary designs, the above functions described in the embodiments of the present invention can be implemented in hardware, software, firmware or any combination of the three. If implemented in software, these functions can be stored on a computer-readable medium, or transmitted in the form of one or more instructions or codes on a computer-readable medium. Computer-readable media include computer storage media and communication media that facilitate the transfer of computer programs from one place to another. The storage medium can be any available medium that can be accessed by any general or special computer. For example, such computer-readable media can include but are not limited to RAM, ROM, EEPROM, CD-ROM or other optical disk storage, disk storage or other magnetic storage devices, or any other medium that can be used to carry or store program codes in the form of instructions or data structures and other forms that can be read by general or special computers, or general or special processors. In addition, any connection can be appropriately defined as a computer-readable medium, for example, if the software is transmitted from a website site, server or other remote resource through a coaxial cable, fiber optic cable, twisted pair, digital subscriber line (DSL) or wirelessly, such as infrared, wireless and microwave, it is also included in the defined computer-readable medium. The disk and disc include compact disk, laser disk, optical disk, DVD, floppy disk and blue-ray disk. Disks usually copy data magnetically, while discs usually copy data optically with lasers. The above combination can also be included in computer readable media.
[0135] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A pressurization system for a large launch vehicle, the large launch vehicle comprising a first stage engine (3), a first stage oxygen tank (1) connected to the first stage engine (3) through a pipeline to provide liquid oxygen for the first stage engine (3), characterized in that: The pressurization system of the large launch vehicle comprises a first-stage cold helium gas bottle (9) arranged in the first-stage oxygen box (1), a cold helium gas bottle main pipe (12) and an oxygen energy dissipator (28); The first-level cold helium gas cylinder (9) has a cold helium gas cylinder venting interface (10); One end of the cold helium gas cylinder main pipe (12) is connected to the first-level cold helium gas cylinder (9) through the cold helium gas cylinder venting interface (10), and the other end of the cold helium gas cylinder main pipe (12) enters the first-level oxygen box (1), and the oxygen energy dissipator (28) is arranged in the first-level oxygen box (1), and the oxygen energy dissipator (28) is connected to the other end of the cold helium gas cylinder main pipe (12); The pressurization system of the large launch vehicle further comprises a gas cylinder heater (8) arranged in the first-stage cold helium gas cylinder (9), wherein the gas cylinder heater (8) comprises a connecting end (81), and the connecting end (81) is connected to the inner wall of the first-stage cold helium gas cylinder (9); On the cold helium gas bottle main pipe (12), arranged in sequence from the end of the first-stage cold helium gas bottle (9): a first filter (25), a first control circuit (51) connected in parallel, a second control circuit (52), a third control circuit (53) and a fourth control circuit (54); wherein the first control circuit (51) comprises a first main circuit boosting solenoid valve (261) and a first orifice plate (271) connected in series, and the second control circuit (52) comprises a first auxiliary circuit boosting solenoid valve (262) and a second orifice plate connected in series. (272), the third control circuit (53) includes a first backup boost solenoid valve (263) and a third orifice plate (273) connected in series, the fourth control circuit (54) includes a second backup boost solenoid valve (264) and a fourth orifice plate (274) connected in series, the first main boost solenoid valve (261), the first auxiliary boost solenoid valve (262), the first backup boost solenoid valve (263) and the second backup boost solenoid valve (264) are located near the first filter (25); The boosting system of the large launch vehicle further comprises an oxygen box air pillow pressure sensor (30) and an oxygen box boosting controller (31), wherein the oxygen box air pillow pressure sensor (30) is connected to the first-stage oxygen box (1), and the oxygen box boosting controller (31) is electrically connected to the oxygen box air pillow pressure sensor (30), and the oxygen box boosting controller (31) is also respectively connected to the first auxiliary boosting solenoid valve (262), the first standby boosting solenoid valve (263) and the second standby boosting solenoid valve (264).
2. The booster system for a large launch vehicle according to claim 1, characterized in that: It also includes a first cable (7) and a first heating power source (4), wherein the first heating power source (4) is connected to the first cable (7), and the first cable (7) is connected to the gas cylinder heater (8) through the connecting end (81) to supply power and heat the gas cylinder heater (8); The booster system of the large launch vehicle further comprises a first power switch (5) and a power regulator (6) arranged outside the first-stage oxygen box (1), wherein the first power switch (5) and the power regulator (6) are respectively connected to the first cable (7), and the first power switch (5) and the power regulator (6) are sequentially arranged between the first heating power source (4) and the connection end (81) of the gas cylinder heater (8); The gas cylinder heater (8) comprises a spiral metal wire which is wide in the middle and narrow at both ends, and the first cable (7) is connected to one of the narrow ends of the spiral metal wire via the connecting end (81).
3. The booster system for a large launch vehicle according to claim 1, characterized in that: Also includes: A first pipeline heater (171), a second heating power source (181), a second power switch (191) and a second cable (201); The first pipeline heater (171) is arranged on the cold helium cylinder main pipe (12); the second heating power source (181) is connected to the first pipeline heater (171) via the second cable (201) to supply power and heat the first pipeline heater (171); the second power switch (191) is connected to the second cable (201), and the second power switch (191) is arranged between the second heating power source (181) and the first pipeline heater (171).
4. The booster system for a large launch vehicle according to claim 3, characterized in that: It also includes an oxygen tank safety valve (29) connected to the primary oxygen tank (1), and the oxygen tank safety valve (29) is electrically connected to the main control unit.
5. The pressurization system of a large launch vehicle according to claim 1, wherein the large launch vehicle comprises a first-stage methane tank (2), characterized in that: The boosting system of the large launch vehicle further comprises a boosting branch pipe (33) and a methane tank energy dissipator (21), one end of the boosting branch pipe (33) being connected to the cold helium cylinder main pipe (12) via a tee (13); The other end of the boost branch pipe (33) enters into the primary methane tank (2), the methane tank energy dissipator (21) is arranged in the primary methane tank (2), and the methane tank energy dissipator (21) is connected to the other end of the boost branch pipe (33).
6. The booster system for a large launch vehicle according to claim 5, characterized in that: Also includes: A second pipeline heater (172), a third heating power source (182), a third power switch (192) and a third cable (202); The second pipeline heater (172) is arranged on the boost branch pipe (33), the third heating power supply (182) is connected to the second pipeline heater (172) through the third cable (202) to supply power and heating to the second pipeline heater (172), the third power switch (192) is connected to the third cable (202), and the third power switch (192) is arranged between the third heating power supply (182) and the third heating power supply (182).
7. The booster system for a large launch vehicle according to claim 5, characterized in that: The boost branch pipe (33) is provided with: a second filter (14), a fifth control circuit (55), a sixth control circuit (56), a seventh control circuit (57) and an eighth control circuit (58) connected in parallel in sequence from the proximal end of the first-stage cold helium gas cylinder (9); wherein the fifth control circuit (55) comprises a second main boost solenoid valve (151) and a fifth orifice plate (161) connected in series, and the sixth control circuit (56) comprises a second auxiliary boost solenoid valve (152) and a sixth orifice plate connected in series. (162), the seventh control circuit (57) includes a third backup boost solenoid valve (153) and a seventh orifice plate (163) connected in series, the eighth control circuit (58) includes a fourth backup boost solenoid valve (154) and an eighth orifice plate (164) connected in series, and the second main boost solenoid valve (151), the second auxiliary boost solenoid valve (152), the third backup boost solenoid valve (153) and the fourth backup boost solenoid valve (154) are located near the second filter (14); The boosting system of the large launch vehicle further comprises a methane tank air pillow pressure sensor (23) and a methane tank boosting controller (24), wherein the methane tank air pillow pressure sensor (23) is connected to the first-stage methane tank (2), the methane tank boosting controller (24) is electrically connected to the methane tank air pillow pressure sensor (23), and the methane tank boosting controller (24) is also respectively connected to the second auxiliary boosting solenoid valve (152), the third backup boosting solenoid valve (153) and the fourth backup boosting solenoid valve (154); The pressurization system of the large launch vehicle further comprises a methane tank safety valve (22) connected to the first-stage methane tank (2), and the methane tank safety valve (22) is electrically connected to the master control unit.
8. A method for pressurizing a large launch vehicle, characterized in that: The pressurization system of the large launch vehicle according to claim 7 is implemented, and the pressurization method of the large launch vehicle comprises: At the start of the first stage flight phase of a large launch vehicle, the first heating power source (4) is turned on by closing the first power switch (5), and the first heating power source (4) is used to supply power and heat a gas cylinder heater (8) in a first stage cold helium gas cylinder (9); wherein the first stage cold helium gas cylinder (9) is arranged in a first stage oxygen box (1); During the first stage flight of a large launch vehicle, the low-temperature helium gas in the first stage cold helium gas cylinder (9) is heated and pressurized by the gas cylinder heater (8); At the same time, the low-temperature helium in the first-stage cold helium gas bottle (9) is introduced into the cold helium gas bottle main pipe (12) through the cold helium gas bottle interface (10), and the low-temperature helium is transported to the oxygen box energy dissipator (28) arranged in the first-stage oxygen box (1) and connected to the cold helium gas bottle main pipe (12); the low-temperature helium is sprayed into the first-stage oxygen box (1) through the oxygen box energy dissipator (28) to increase the pressure of liquid oxygen in the first-stage oxygen box (1); During the first stage flight of a large launch vehicle, as the flight progresses, the power of the first heating power source (4) is reduced by gradually reducing the opening of the power regulator (6); until the first stage flight phase ends, the first heating power source (4) is stopped from supplying power to the gas cylinder heater (8) for heating; The pressurization method for a large launch vehicle further comprises: During the first stage flight of a large launch vehicle, the low-temperature helium in the cold helium bottle main pipe (12) is filtered for impurities through a first filter (25); During the first stage flight of a large launch vehicle, the first control circuit (51) is in an open state; the air pillow pressure of the first stage oxygen box (1) is sensed by an oxygen box air pillow pressure sensor (30) connected to the first stage oxygen box (1), and the air pillow pressure of the first stage oxygen box (1) is transmitted to an oxygen box pressure boost controller (31) electrically connected to the oxygen box air pillow pressure sensor (30); the oxygen box pressure boost controller (31) performs calculations based on the air pillow pressure of the first stage oxygen box (1) to determine whether the second control circuit (52), the third control circuit (53) and the fourth control circuit (54) connected in parallel with the first control circuit (51) are opened, closed or maintained in the previous state; During the first-stage flight of a large launch vehicle, the air pillow pressure of the first-stage oxygen tank (1) is sensed through the oxygen tank safety valve (29); when the air pillow pressure of the first-stage oxygen tank (1) is greater than the opening pressure of the oxygen tank safety valve (29), the oxygen tank safety valve (29) is opened through the main control unit; when the air pillow pressure of the first-stage oxygen tank (1) is lower than the closing pressure of the oxygen tank safety valve (29), the oxygen tank safety valve (29) is closed.
9. The method for pressurizing a large launch vehicle according to claim 8, characterized in that: Also includes: At the start of the first stage flight phase of the large launch vehicle, the second heating power source (181) is turned on by closing the second power switch (191), the first pipeline heater (171) provided on the cold helium gas bottle main pipe (12) is powered and heated by the second heating power source (181), and the low-temperature helium gas in the cold helium gas bottle main pipe (12) is heated and pressurized by the first pipeline heater (171); When the first stage of flight is finished, the second heating power source (181) is stopped from supplying power for heating the first pipeline heater (171).
10. The method for pressurizing a large launch vehicle according to claim 8, characterized in that: Also includes: During the first stage flight of a large launch vehicle, the low-temperature helium in the cold helium bottle main pipe (12) is introduced into the boost branch pipe (33) through the three-way (13); The low-temperature helium in the pressurizing branch pipe (33) is transported to a methane tank energy dissipator (21) disposed in the primary methane tank (2) and connected to the pressurizing branch pipe (33), and the low-temperature helium is sprayed into the primary methane tank (2) through the methane tank energy dissipator (21) to pressurize the liquid methane in the primary methane tank (2).
11. The method for pressurizing a large launch vehicle according to claim 10, characterized in that: Also includes: At the start of the first stage flight phase of the large launch vehicle, the third heating power source (182) is turned on by closing the third power switch (192), the second pipeline heater (172) provided on the boost branch pipe (33) is powered and heated by the third heating power source (182), and the low-temperature helium gas in the boost branch pipe (33) is heated and pressurized by the second pipeline heater (172); Until the first stage of flight ends, the third heating power source (182) is stopped from supplying power for heating the second pipeline heater (172).
12. The method for pressurizing a large launch vehicle according to claim 10, characterized in that: Also includes: During the first stage flight of a large launch vehicle, the low-temperature helium gas in the boost branch pipe (33) is filtered for impurities by a second filter (14); During the first stage flight of a large launch vehicle, the fifth control circuit (55) is in an open state; the air pillow pressure of the first stage methane tank (2) is sensed by a methane tank air pillow pressure sensor (23) connected to the first stage methane tank (2), and the air pillow pressure of the first stage methane tank (2) is transmitted to a methane tank boost controller (24) electrically connected to the methane tank air pillow pressure sensor (23); the methane tank boost controller (24) performs calculations based on the air pillow pressure of the first stage methane tank (2) to determine whether the sixth control circuit (56), the seventh control circuit (57) and the eighth control circuit (58) connected in parallel with the fifth control circuit (55) are opened, closed or maintained in the previous state; The fifth control line (55), the sixth control line (56), the seventh control line (57) and the eighth control line (58) are arranged on the boost branch pipe (33) after the second filter (14); the fifth control line (55) comprises a second main boost solenoid valve (151) and a fifth orifice plate (161) connected in series, and the sixth control line (56) comprises a second auxiliary boost solenoid valve (152) and a sixth orifice plate (162) connected in series. The seventh control circuit (57) comprises a third backup boost solenoid valve (153) and a seventh orifice plate (163) connected in series, the eighth control circuit (58) comprises a fourth backup boost solenoid valve (154) and an eighth orifice plate (164) connected in series, and the second main boost solenoid valve (151), the second auxiliary boost solenoid valve (152), the third backup boost solenoid valve (153) and the fourth backup boost solenoid valve (154) are located near the second filter (14); During the first-stage flight of a large launch vehicle, the air pillow pressure of the first-stage methane tank (2) is sensed through the methane tank safety valve (22); when the air pillow pressure of the first-stage methane tank (2) is greater than the opening pressure of the methane tank safety valve (22), the methane tank safety valve (22) is opened through the main control unit; when the air pillow pressure of the first-stage methane tank (2) is lower than the closing pressure of the methane tank safety valve (22), the methane tank safety valve (22) is closed.
