A control system for a gas impact testing device
By designing a multi-branch control system with electromagnetic reversing valves in the gas impact testing equipment, the problem of uncontrollable impact effect caused by the fixed volume of the gas storage chamber was solved, realizing the stability and flexibility of impact testing and improving its practicality.
Patent Information
- Application Number
- CN202311118083.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-31
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-08-31
AI Technical Summary
Existing impact control methods are not very practical because the volume of the gas storage chamber is fixed, which makes it difficult to flexibly control the impact effect.
By designing a control system that includes a gas cylinder, a filling gas path, an electromagnetic reversing valve, and a gas impact testing device, the first and second branches are used to control the gas flow rate and the filling volume respectively. Combined with the electromagnetic reversing valve to adjust the gas flow rate, precise control and flexible adjustment of the impact effect are achieved.
This enables stability and flexibility control of impact tests, improving the practicality of impact control.
Smart Images

Figure CN117309552B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of impact testing technology, and in particular to a control system for a gas impact testing device. Background Technology
[0002] In impact environment testing simulations, pressurized gas is used as a power source to propel a projectile. The projectile then impacts the test specimen, completing the impact action. Therefore, gas pressure control is a crucial component in achieving this impact. Existing impact pressure control technology generally involves: opening a high-pressure gas source, setting the gas pressure, opening the gas passage, maintaining the pressure in the storage chamber until it reaches the set value, opening the exhaust valve to release the gas instantaneously, and using the gas to propel the projectile, thus completing the impact action between the projectile and the test specimen. However, because the volume of the storage chamber is fixed, the impact effect cannot be flexibly controlled, resulting in poor practicality. Summary of the Invention
[0003] In view of this, the purpose of this application is to propose a control system for a gas impact testing device to solve the problem that existing impact control methods cannot flexibly control the impact effect due to the fixed volume of the gas storage chamber, resulting in poor practicality.
[0004] To achieve the above objectives, this application provides a control system for a gas impact testing device, comprising a gas cylinder, a gas filling circuit, an electromagnetic reversing valve, and a gas impact testing device connected in sequence.
[0005] The inflation circuit includes a first branch and a second branch. The first branch includes a first control valve group. One end of the first control valve group is connected to the gas cylinder, and the other end is connected to the electromagnetic reversing valve.
[0006] The second branch includes a second control valve group, a gas storage chamber, and a solenoid directional valve that are connected to each other. The second control valve group is connected to the gas cylinder, and the gas storage chamber is connected to the solenoid directional valve.
[0007] Optionally, a first pressure reducing valve is provided between the gas cylinder and the filling gas line.
[0008] Optionally, a filter is provided between the gas cylinder and the filling air passage.
[0009] Optionally, the first control valve assembly includes a first solenoid shut-off valve and a safety valve connected in sequence. One end of the first solenoid shut-off valve is connected to the gas cylinder, and the safety valve is connected to the solenoid directional valve.
[0010] Optionally, the safety valve is provided with a first vent.
[0011] Optionally, the first control valve assembly further includes a first pressure sensor, which is disposed on the pipeline between the safety valve and the solenoid directional valve.
[0012] Optionally, the second control valve group includes a second pressure reducing valve, an automatic pressure regulating valve, and a second solenoid shut-off valve connected in sequence. One end of the second pressure reducing valve is connected to the gas cylinder, and the second solenoid shut-off valve is connected to the gas storage chamber.
[0013] Optionally, a third electromagnetic shut-off valve is connected to the pipeline between the second pressure reducing valve and the automatic pressure regulating valve, and the third electromagnetic shut-off valve is provided with a second exhaust port.
[0014] Optionally, a fourth electromagnetic shut-off valve is connected between the second electromagnetic shut-off valve and the gas storage chamber, and the fourth electromagnetic shut-off valve is provided with a third exhaust port.
[0015] Optionally, the second control valve assembly further includes a second pressure sensor and a third pressure sensor. The second pressure sensor is disposed on the pipeline between the second electromagnetic shut-off valve and the gas storage chamber, and the third pressure sensor is disposed on the pipeline between the second pressure reducing valve and the automatic pressure regulating valve.
[0016] As can be seen from the above, the gas impact testing equipment control system provided in this application charges the gas in the gas cylinder into the gas storage chamber via a second branch, and controls the opening and closing of the solenoid valve via the first branch to control the gas flow rate through the gas storage chamber to charge the gas impact testing equipment, thus conducting the impact test. By charging the gas impact testing equipment via the second branch and controlling the opening and closing of the solenoid valve via the first branch, the amount of gas charged from the gas storage chamber to the gas impact testing equipment can be precisely controlled, ensuring the stability of the impact test. Furthermore, by controlling the gas flow rate in the gas storage chamber to charge the gas impact testing equipment via the solenoid reversing valve, the gas flow rate to the gas impact testing equipment can be controlled, allowing for adjustment of the impact effect and making the impact control more flexible and practical. Attached Figure Description
[0017] To more clearly illustrate the technical solutions in this application or related technologies, the drawings used in the description of the embodiments or related technologies will be briefly introduced below. Obviously, the drawings described below are only embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0018] Figure 1 This is a schematic diagram of the control system structure of a gas impact testing equipment according to an embodiment of this application;
[0019] Figure 2This is a schematic diagram of the gas path of a gas impact testing equipment control system according to an embodiment of this application;
[0020] Figure 3 This is a schematic diagram of the gas path of a gas impact testing equipment control system according to another embodiment of this application.
[0021] In the attached image:
[0022] 01. Gas cylinder; 02. Gas impact testing equipment; 03. Automatic pressure regulating control system; 04. Automatic pressure regulating controller; 1. First branch; 2. Second branch; 3. First purge line; 4. Second purge line; 5. Third purge line; 10. Gas filling line; 11. First control valve group; 21. Second control valve group; 22. Gas storage chamber; JYF1. First pressure reducing valve; JYF2. Second pressure reducing valve; JYF3. Automatic pressure regulating valve; DF1. First solenoid shut-off valve; DF2. Second solenoid shut-off valve; DF3. Third solenoid shut-off valve; DF4. Fourth solenoid shut-off valve; GL1. Filter; AQF1. Safety valve; DHF1. Solenoid directional valve; P1. First pressure sensor; P2. Second pressure sensor; P3. Third pressure sensor. Detailed Implementation
[0023] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with specific embodiments and the accompanying drawings.
[0024] It should be noted that, unless otherwise defined, the technical or scientific terms used in the embodiments of this application should have the ordinary meaning understood by one of ordinary skill in the art to which this application pertains. The terms "first," "second," and similar terms used in the embodiments of this application do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Terms such as "comprising" or "including" mean that the element or object preceding the word encompasses the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Terms such as "connected" or "linked" are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. Terms such as "upper," "lower," "left," and "right" are only used to indicate relative positional relationships; when the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0025] The embodiments of this application will be described in detail below with reference to the accompanying drawings.
[0026] Reference Figure 1 This application provides a gas impact testing equipment control system, including a gas cylinder 01, a gas filling circuit 10, an electromagnetic reversing DHF1 and a gas impact testing equipment 02 connected in sequence.
[0027] The inflation circuit 10 includes a first branch 1 and a second branch 2. The first branch 1 includes a first control valve group 11. One end of the first control valve group 11 is connected to the gas cylinder 01, and the other end is connected to the electromagnetic reversing DHF1.
[0028] The second branch 2 includes a second control valve group 21 and a gas storage chamber 22 connected together. The second control valve group 21 is connected to the gas cylinder 01, and the gas storage chamber 22 is connected to the electromagnetic reversing valve DHF1 and the gas impact test equipment 02.
[0029] Specifically, the gas impact testing equipment 02 exemplarily employs a gas cannon launcher. The gas cannon launcher's inflation end is connected to the electromagnetic reversing valve DHF1. The gas cannon launcher contains a projectile, which is launched by inflating the gas cannon launcher with gas cylinder 01, thus achieving the impact test. The first control valve group 11, the second control valve group 21, and the electromagnetic reversing valve DHF1 are all controlled by an automatic pressure regulating controller 04 to automatically control each control valve. The automatic pressure regulating controller 04 is controlled by an automatic pressure regulating control system 13, which is specifically a PLC controller; exemplarily, the PLC is an S7-1500 model.
[0030] Furthermore, the gas cylinder 01 can be exemplarily a gas cylinder group. An impact test is conducted by filling the gas cylinder 01 with gas via the first branch 1 or the second branch 2 to the gas impact testing device 02; an impact test is conducted by filling the gas cylinder 01 with gas via the second branch 2 to the gas storage chamber 22, and controlling the solenoid valve switch via the first branch 1 to control the gas flow rate through the gas storage chamber 22 to the gas impact testing device 02; precise control of the gas volume supplied to the gas impact testing device 02 via the second branch 2 and the solenoid valve switch via the first branch 1 can be achieved to ensure the stability of the impact test; furthermore, the gas flow rate in the gas storage chamber 22 is controlled by the solenoid reversing valve DHF1 to supply gas to the gas impact testing device 02, thereby controlling the gas flow rate and adjusting the impact effect, making the impact control more flexible and practical.
[0031] In some embodiments, refer to Figure 2 A first pressure reducing valve JYF1 is provided between the gas cylinder 01 and the gas filling passage 10.
[0032] Specifically, for example, the first pressure reducing valve JYF1 can also be installed at the outlet of the gas cylinder 01. One end of the first pressure reducing valve JYF1 is connected to the outlet of the gas cylinder 01, and the other end is connected to the first branch 1 and the second branch 2 respectively. The first pressure reducing valve JYF1 is used to regulate the higher pressure gas output from the gas cylinder 01 to achieve stable gas output.
[0033] In some embodiments, refer to Figure 2 A filter GL1 is provided between the gas cylinder 01 and the gas filling passage 10.
[0034] Specifically, one end of filter GL1 is connected to the first pressure reducing valve JYF1, and the other end is connected to the first branch 1 and the second branch 2 respectively. Filter GL1 is used to filter the gas output from gas cylinder 01 to ensure that pure gas enters the first branch 1, the second branch 2 and the gas impact test equipment 02 in sequence, so as to avoid the problem that the branches and the gas impact test equipment 02 will be contaminated and unusable due to impurities in the gas.
[0035] In some embodiments, refer to Figure 2 The first control valve group 11 includes a first electromagnetic shut-off valve DF1 and a safety valve AQF1 connected in sequence. One end of the first electromagnetic shut-off valve DF1 is connected to the gas cylinder 01, and the safety valve AQF1 is connected to the electromagnetic reversing valve DHF1.
[0036] Specifically, one end of the first solenoid shut-off valve DF1 is connected to the filter GL1, and the other end is connected to one end of the safety valve AQF1. The other end of the safety valve AQF1 is connected to the solenoid directional valve DHF1. The first solenoid shut-off valve DF1 controls the opening and closing of the first branch 1. When the pressure value in the first branch 1 exceeds the lower limit of the pressure limit, the safety valve AQF1 automatically opens to release air. When the pressure value drops to the upper limit of the pressure limit, the safety valve AQF1 automatically closes, ensuring the safety of the pipeline and the gas impact testing equipment 02.
[0037] In this embodiment, refer to Figure 2 The safety valve AQF1 is provided with a first vent.
[0038] Specifically, when the pressure value in the first branch 1 exceeds the lower limit of the limit, the safety valve AQF1 automatically opens and exhausts the air through the first exhaust port.
[0039] In this embodiment, refer to Figure 3The first pressure reducing valve JYF1, filter GL1, and first control valve group 11 are opened sequentially, all valves in the second branch 2 are closed, and gas cylinder 01 is opened, allowing gas to pass sequentially through the first pressure reducing valve JYF1, filter GL1, and first control valve group 11, and be discharged through the first exhaust port. This purging process purges the first branch 1, ensuring the cleanliness of the pipeline within it. The first purging pipeline 3 is formed by gas cylinder 01, the first pressure reducing valve JYF1, filter GL1, the first solenoid shut-off valve DF1, and the safety valve AQF1.
[0040] In some embodiments, refer to Figure 2 The first control valve group 11 further includes a first pressure sensor P1, which is disposed on the pipeline between the safety valve AQF1 and the gas impact test equipment 02.
[0041] Specifically, the first pressure sensor P1 is used to monitor the pressure of the first branch 1. After receiving the pressure value transmitted by the first pressure sensor P1, the automatic pressure regulation control system 13 compares it with the lower limit of the pressure limit value of the first branch 1. Based on the comparison result, it controls the opening and closing of the safety valve AQF1, thereby ensuring the safety of the pipeline and the gas impact test equipment 02.
[0042] In some embodiments, refer to Figure 2 The second control valve group 21 includes a second pressure reducing valve JYF2, an automatic pressure regulating valve JYF3, and a second electromagnetic shut-off valve DF2 connected in sequence. One end of the second pressure reducing valve JYF2 is connected to the gas cylinder 01, and the second electromagnetic shut-off valve DF2 is connected to the gas storage chamber 22.
[0043] Specifically, one end of the second pressure reducing valve JYF2 is connected to the filter GL1, and the other end is connected to one end of the automatic pressure regulating valve JYF3. The other end of the automatic pressure regulating valve JYF3 is connected to one end of the second electromagnetic shut-off valve DF2. The other end of the second electromagnetic shut-off valve DF2 is connected to the first air hole of the gas storage chamber 22 (wherein, the first air hole is the air inlet of the gas storage chamber 22 when the gas impact test equipment 02 is being filled with air, and is the air outlet when the gas storage chamber 22 needs to be vented). The second air hole of the gas storage chamber 22 (wherein, the second air hole is the air outlet of the gas storage chamber 22 when the gas impact test equipment 02 is being filled with air) is connected to one end of the electromagnetic reversing valve DHF1, and the other end of the electromagnetic reversing valve DHF1 is connected to the gas impact test equipment 02.
[0044] The second pressure reducing valve JYF2 is used to regulate the higher pressure gas output from gas cylinder 01 to achieve stable gas output. The automatic pressure regulating valve JYF3 can automatically adjust according to the gas pressure value of the second branch 2. For example, when the pressure value in the second branch 2 exceeds the lower limit of the pressure limit, the automatic pressure regulating valve JYF3 lowers the pressure value in the second branch 2; when the pressure value drops to the upper limit of the pressure limit, the automatic pressure regulating valve JYF3 raises the pressure value in the second branch 2, ensuring the safety of the pipeline and the gas impact testing equipment 02. The second electromagnetic shut-off valve DF2 is used to control the opening and closing of the second branch 2. Through the second pressure reducing valve JYF2, the automatic pressure regulating valve JYF3, and the second electromagnetic shut-off valve DF2, the filling of gas into the gas storage chamber 22 by the second branch 2 can be safely controlled, ensuring the safety of the second branch 2 and the gas storage chamber 22. Furthermore, when the gas storage chamber 22 is filled with gas to the gas impact test equipment 02, the gas flow rate of the gas storage chamber 22 can be controlled by the electromagnetic reversing valve DHF1, which can adjust the impact effect and make the impact control more flexible and practical.
[0045] In some embodiments, refer to Figure 2 A third electromagnetic shut-off valve DF3 is connected to the pipeline between the second pressure reducing valve JYF2 and the automatic pressure regulating valve JYF3, and the third electromagnetic shut-off valve DF3 is provided with a second exhaust port.
[0046] Specifically, refer to Figure 3 The first pressure reducing valve JYF1, filter GL1, and second pressure reducing valve JYF2 are opened sequentially. The automatic pressure regulating valve JYF3 of the first branch 1 and the second branch 2 is closed. Gas cylinder 01 is opened, allowing gas to pass sequentially through the first pressure reducing valve JYF1, filter GL1, and second pressure reducing valve JYF2, and be discharged through the second exhaust port, thus purging the front part of the second branch 2. Gas cylinder 01, the first pressure reducing valve JYF1, filter GL1, the second pressure reducing valve JYF2, and safety valve AQF1 constitute the second purging pipeline 4.
[0047] In some embodiments, refer to Figure 2 The second electromagnetic shut-off valve DF2 is connected to the gas storage chamber 22 by a fourth electromagnetic shut-off valve DF4, and the fourth electromagnetic shut-off valve DF4 is provided with a third exhaust port.
[0048] Specifically, refer to Figure 3The first pressure reducing valve JYF1, filter GL1, second pressure reducing valve JYF2, automatic pressure regulating valve JYF3, second shut-off valve, and fourth shut-off valve are opened sequentially. The third solenoid shut-off valve DF3 of the first branch 1 and the second branch 2 is closed. Gas cylinder 01 is opened, allowing gas to pass sequentially through the first pressure reducing valve JYF1, filter GL1, second pressure reducing valve JYF2, automatic pressure regulating valve JYF3, second shut-off valve, and fourth shut-off valve, and then be discharged through the third exhaust port. This purging of the pipeline in the second branch 2 ensures the cleanliness of the pipeline within the second branch 2. The third purging pipeline 5 is formed by gas cylinder 01, first pressure reducing valve JYF1, filter GL1, second pressure reducing valve JYF2, automatic pressure regulating valve JYF3, second shut-off valve, fourth shut-off valve, and third exhaust port.
[0049] In some embodiments, refer to Figure 2 The second control valve group 21 further includes a second pressure sensor P2 and a third pressure sensor P3. The second pressure sensor P2 is disposed on the pipeline between the second electromagnetic shut-off valve DF2 and the gas storage chamber 22, and the third pressure sensor P3 is disposed on the pipeline between the second pressure reducing valve JYF2 and the automatic pressure regulating valve JYF3.
[0050] Specifically, the second pressure sensor P2 and the third pressure sensor P3 are used to monitor the pressure of the second branch 2. After receiving the pressure values transmitted by the second pressure sensor P2 and the third pressure sensor P3, the automatic pressure regulation control system 13 compares them with the lower limit of the pressure limit value of the first branch 1. Based on the comparison result, it controls the opening and closing of the safety valve AQF1, thereby ensuring the safety of the pipeline and the gas impact test equipment 02.
[0051] It should be noted that the embodiments of this application can also be further described in the following ways:
[0052] When the first branch 1 needs to be filled with gas to the gas impact testing equipment 02, the gas cylinder 01 is opened, and the first electromagnetic shut-off valve DF1 is opened. The gas in the gas cylinder 01 is depressurized by the first pressure reducing valve JYF1, and then filtered by the filter GL1. The filtered gas then passes through the first electromagnetic shut-off valve DF1, the safety valve AQF1, and the first pressure sensor P1 in sequence. The first pressure sensor P1 monitors the pressure of the first branch 1 and transmits the monitored data to the automatic pressure regulating control system 13. After receiving the data, the automatic pressure regulating control system 13 compares it with the lower limit of the pressure limit of the first branch 1, and controls the opening and closing of the safety valve AQF1 according to the comparison result to ensure that the pressure of the first branch 1 reaches the set value, thereby filling the gas impact testing equipment 02 with gas to launch the projectile inside the gas impact testing equipment 02 and complete the impact action.
[0053] When the first branch 1 needs to be purged, the first pressure reducing valve JYF1, filter GL1 and the first control valve group 11 are opened in sequence, all valves of the second branch 2 are closed, the gas cylinder 01 is opened, and the gas passes through the first pressure reducing valve JYF1, filter GL1 and the first control valve group 11 in sequence, and is discharged through the first exhaust port, thus completing the purging of the first branch.
[0054] When the second branch 2 needs to fill the gas impact testing equipment 02, after the gas cylinder 01 is opened, the second electromagnetic shut-off valve DF2 is opened. The gas in the gas cylinder 01 has its pressure reduced by the first pressure reducing valve JYF1, and then filtered by the filter GL1. The filtered gas is further depressurized by the second pressure reducing valve JYF2 to prevent excessive pressure from affecting the gas storage chamber 22. After the second depressurization, the gas passes sequentially through the third pressure sensor P3, the automatic pressure regulating valve JYF3, the second electromagnetic shut-off valve DF2, and the fourth pressure sensor. The third pressure sensor P3 and the second pressure sensor P2 monitor the pressure of the second branch 2 and transmit the monitored data to the automatic pressure regulating valve DF2. The automatic pressure regulating control system 13 receives data and compares it with the lower limit of the pressure limit value of the second branch 2. When the pressure value in the second branch 2 exceeds the lower limit, the automatic pressure regulating control system 13 controls the automatic pressure regulating valve JYF3 to lower the pressure value in the second branch 2. When the pressure value drops to the upper limit of the pressure limit value, the automatic pressure regulating valve JYF3 raises the pressure value in the second branch 2, ensuring that the air pressure in the second branch 2 is within the set range, safely filling the gas storage chamber 22. The gas in the gas storage chamber 22 is used to fill the gas impact test equipment 02 through the flow rate controlled by the electromagnetic reversing valve DHF1, causing the projectile to be ejected and completing the impact action. When the gas pressure in the gas storage chamber 22 is too high, the second electromagnetic shut-off valve DF2 is closed and the fourth electromagnetic shut-off valve DF4 is opened, and the pressure in the gas storage chamber 22 is released through the third exhaust port.
[0055] When the second branch 2 needs to be purged, open the first pressure reducing valve JYF1, filter GL1 and the second pressure reducing valve JYF2 in sequence, close the automatic pressure regulating valve JYF3 of the first branch 1 and the second branch 2, open the gas cylinder 01, so that the gas passes through the first pressure reducing valve JYF1, filter GL1 and the second pressure reducing valve JYF2 in sequence, and is discharged through the second exhaust port, thus completing the purging of the first half of the second branch 2.
[0056] Open the first pressure reducing valve JYF1, filter GL1, second pressure reducing valve JYF2, automatic pressure regulating valve JYF3, second shut-off valve and fourth shut-off valve in sequence, close the third solenoid shut-off valve DF3 of the first branch 1 and the second branch 2, open the gas cylinder 01, and let the gas pass through the first pressure reducing valve JYF1, filter GL1, second pressure reducing valve JYF2, automatic pressure regulating valve JYF3, second shut-off valve and fourth shut-off valve in sequence, and be discharged through the third exhaust port to complete the purging of the second branch 2.
[0057] It should be noted that the above description describes some embodiments of this application. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in a different order than that shown in the above embodiments and still achieve the desired result. Furthermore, the processes depicted in the drawings do not necessarily require a specific or sequential order to achieve the desired result. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0058] Those skilled in the art should understand that the discussion of any of the above embodiments is merely exemplary and is not intended to imply that the scope of this application (including the claims) is limited to these examples; within the framework of this application, the technical features of the above embodiments or different embodiments can also be combined, the steps can be implemented in any order, and there are many other variations of different aspects of the embodiments of this application as described above, which are not provided in the details for the sake of brevity.
[0059] The embodiments of this application are intended to cover all such substitutions, modifications, and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the embodiments of this application should be included within the protection scope of this application.
Claims
1. A control system for a gas impact testing device, characterized in that: It includes a gas cylinder (01), a gas filling circuit (10), an electromagnetic reversing valve (DHF1), and a gas impact testing device (02) connected in sequence; The inflation circuit (10) includes a first branch (1) and a second branch (2). The first branch (1) includes a first control valve group (11). One end of the first control valve group (11) is connected to the gas cylinder (01), and the other end is connected to the electromagnetic reversing valve (DHF1). The second branch (2) includes a second control valve group (21) and a gas storage chamber (22) connected to each other. The second control valve group (21) is connected to the gas cylinder (01), and the gas storage chamber (22) is connected to the electromagnetic reversing valve (DHF1). The first control valve group (11) includes a first electromagnetic shut-off valve (DF1) and a safety valve (AQF1) connected in sequence, and also includes a first pressure sensor (P1), which is disposed on the pipeline between the safety valve (AQF1) and the electromagnetic reversing valve (DHF1). The second control valve group (21) includes a second pressure reducing valve (JYF2), an automatic pressure regulating valve (JYF3), and a second solenoid shut-off valve (DF2) connected in sequence. It also includes a second pressure sensor (P2) and a third pressure sensor (P3). The second pressure sensor (P2) is installed on the pipeline between the second solenoid shut-off valve (DF2) and the gas storage chamber (22). The third pressure sensor (P3) is installed on the pipeline between the second pressure reducing valve (JYF2) and the automatic pressure regulating valve (JYF3). By filling the gas storage chamber (22) with gas from the gas cylinder (01) through the second branch (2), and controlling the solenoid valve switch through the first branch (1), the amount of gas filling the gas storage chamber (22) into the gas impact test equipment (02) is controlled.
2. The control system for a gas impact testing device according to claim 1, characterized in that, A first pressure reducing valve (JYF1) is provided between the gas cylinder (01) and the gas filling passage (10).
3. The control system for a gas impact testing device according to claim 1, characterized in that, A filter (GL1) is provided between the gas cylinder (01) and the gas filling passage (10).
4. The control system for a gas impact testing device according to claim 1, characterized in that, One end of the first electromagnetic shut-off valve (DF1) is connected to the gas cylinder (01), and the safety valve (AQF1) is connected to the electromagnetic reversing valve (DHF1).
5. The control system for a gas impact testing device according to claim 4, characterized in that, The safety valve (AQF1) is provided with a first vent.
6. The control system for a gas impact testing device according to claim 1, characterized in that, One end of the second pressure reducing valve (JYF2) is connected to the gas cylinder (01), and the second electromagnetic shut-off valve (DF2) is connected to the gas storage chamber (22).
7. The control system for a gas impact testing device according to claim 6, characterized in that, A third electromagnetic shut-off valve (DF3) is connected to the pipeline between the second pressure reducing valve (JYF2) and the automatic pressure regulating valve (JYF3), and the third electromagnetic shut-off valve (DF3) is provided with a second exhaust port.
8. The control system for a gas impact testing device according to claim 6, characterized in that, The second electromagnetic shut-off valve (DF2) is connected to the gas storage chamber (22) by a fourth electromagnetic shut-off valve (DF4), and the fourth electromagnetic shut-off valve (DF4) is provided with a third exhaust port.
Citation Information
Patent Citations
Gas storage cylinder set system and gas supply device comprising same
CN108150824A
Valve impact performance test pipeline and system
CN112903280A
