A simulation-monitoring integrated method for early warning of scaffolding safety risks

By using a simulation-monitoring fusion approach, a model is established based on the structural characteristics of scaffolding. Numerical simulation analysis and sensor deployment are then conducted to provide real-time early warnings and optimizations. This approach solves the problems of low monitoring efficiency and poor reliability in existing technologies, and enables scientific and effective early warning of scaffolding safety risks.

CN117521408BActive Publication Date: 2026-11-17THREE GORGES JINSHAJIANG CHUANYUN HYDROPOWER DEV CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311635979.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-01
Publication Date
2026-11-17
Estimated Expiration
2043-12-01

AI Technical Summary

Technical Problem

Existing scaffolding monitoring and management technologies are inefficient and unreliable, mainly because the selection of monitoring locations and risk assessment are greatly influenced by subjective factors, resulting in insufficient safety measures.

Method used

By adopting a simulation-monitoring fusion approach, a scientific and effective scaffolding safety risk early warning system is established by creating a typical structural model, conducting numerical simulation analysis, selecting sensor deployment points, performing real-time quantitative early warning, and carrying out dynamic feedback optimization.

Benefits of technology

This improved the objectivity, stability, and accuracy of the scaffolding safety risk early warning system, and significantly enhanced monitoring efficiency and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117521408B_ABST
    Figure CN117521408B_ABST
Patent Text Reader

Abstract

This invention discloses a simulation-monitoring integrated method for early warning of scaffolding safety risks, comprising: establishing a typical structural model, numerical simulation analysis, establishing a structural failure early warning model, selecting and deploying sensor points, real-time quantitative early warning prompts, and a dynamic feedback optimization process. The method of this invention comprehensively considers the structural stress mechanism, the degree of influence of multiple factors, the quantitative monitoring and early warning model, and the feedback optimization of the dynamic early warning model, achieving an organic integration of simulation analysis, monitoring design, and dynamic early warning models. This invention features objectivity, stability, and accuracy, greatly improving the efficiency and reliability of the scaffolding safety risk early warning system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to a risk warning system, specifically to a simulation-monitoring fusion method for early warning of scaffolding safety risks. Background Technology

[0002] Scaffolding is widely used in industrial production, but its working conditions are complex, and safety measures and means are extremely limited, leading to frequent accidents. Current monitoring and management technologies typically rely on subjective judgment to directly select monitoring locations and assess risks. This not only results in low monitoring efficiency but also makes the monitoring results highly susceptible to subjective influence, leading to poor reliability.

[0003] Therefore, there is an urgent need for a scientific and effective scaffolding safety risk early warning system and method that provides timely and reasonable warnings to solve this problem and improve the safety assurance rate during scaffolding construction. Summary of the Invention

[0004] The purpose of this invention is to overcome the shortcomings of the prior art and provide a scientific and effective method for early warning of scaffolding safety risks based on simulation-monitoring fusion.

[0005] The present invention is implemented as follows:

[0006] A simulation-monitoring integrated method for early warning of scaffolding safety risks includes:

[0007] The process includes establishing a typical structural model, numerical simulation analysis, establishing a structural failure early warning model, selecting and deploying sensors, providing real-time quantitative early warning prompts, and dynamic feedback optimization.

[0008] A further step is:

[0009] The establishment of a typical structural model involves creating a minimum basic repeating unit sub-model based on the structural characteristics of the scaffold itself. On this basis, a typical structural model that can be modified and combined as needed is established by arraying the sub-model, removing duplicate elements, and merging nodes, for use in numerical simulation analysis.

[0010] A further step is:

[0011] Numerical simulation analysis involves analyzing scaffolding usage scenarios, selecting i typical working conditions, and conducting numerical simulation analysis on each typical working condition. Typical working conditions should at least include: erection process simulation condition, centralized operation condition, decentralized operation condition, wind load condition, and structural failure condition.

[0012] Simulation of the erection process: Using the "ModelChange / Birth and Death" function of the numerical simulation analysis software, the process of erecting the scaffolding structure layer by layer is simulated.

[0013] Concentrated work scenario: This simulates a situation where multiple workers are operating in the same area. Sensitivity analysis is required for this scenario, focusing on the differences in structural safety risks at different work locations. The sensitivity analysis should at least include the top end of the scaffolding and the mid-span of the top scaffolding.

[0014] Dispersed work scenario: This simulates a work situation where multiple workers are operating in different areas. Sensitivity analysis is required for this scenario, considering the combination of worker numbers and work locations, to identify differences in structural safety risks under different combinations of worker numbers and locations. The sensitivity analysis for worker numbers should include at least two-person and three-person combinations. The sensitivity analysis for work location combinations should include at least the combinations at both ends of the top layer of the scaffold and the mid-span of the top layer of the scaffold.

[0015] Wind load conditions: Simulate the effects of wind loads under strong winds to obtain information on the safety risks of scaffolding structures during windy weather.

[0016] Structural failure conditions: Simulate failure in parts of the structure, including at least fastener failure, scaffolding failure, and shear brace failure.

[0017] Taking into account the probability of each working condition and relevant regulations, initial weights β1 to β2 are set for each working condition. i .

[0018] The initial weights for the simulation conditions during the erection process are β1 = 1, β2 = 5 for the centralized operation condition, β3 = 5 for the decentralized operation condition, β4 = 3 for the wind load condition, and β5 = 1 for the structural failure condition.

[0019] A further step is:

[0020] The structural failure early warning model is established based on the results of numerical simulation analysis of various typical working conditions. Statistical methods are used to analyze the high-risk points of structural failure under each typical working condition. Based on this, mixed working condition calculations are performed, and a quantitative early warning model for structural failure is established.

[0021] After the simulation analysis is completed, the displacements and stresses of the structure in all directions are extracted from each working condition. Based on this, the change in nodal tilt angle is calculated according to the changes in nodal displacements before and after the load is applied. For example, if the change in nodal displacement is ΔS and the nodal elevation is h, then the change in nodal tilt angle is...

[0022] Statistical analysis was performed on stress concentration regions, displacement peak regions, and tilt peak nodes under various working conditions. Nodes with high recurrence rates within these regions under different working conditions were selected as characteristic points. For a given characteristic point, the parameters extracted and calculated through simulation analysis under various working conditions are called the failure characteristic parameters at that characteristic point, denoted as δ1~δ i .

[0023] Under mixed working conditions, the initial partial factors for the characteristic loads corresponding to each working condition are as follows: Based on the above partial coefficients, a mixed working condition simulation analysis is carried out. The failure characteristic parameters extracted and calculated by the mixed working condition simulation analysis are the early warning indicators for this location.

[0024] A further step is:

[0025] Sensor placement involves deploying appropriate sensors at high-risk locations of structural failure based on the structural failure early warning model.

[0026] A further step is:

[0027] Real-time quantitative early warning is achieved by comparing sensor data with a structural failure quantitative early warning model.

[0028] A further step is:

[0029] Dynamic feedback optimization involves dynamically optimizing the quantitative early warning model based on feedback during use, with the weights of each operating condition dynamically adjusted to β1'~β. i ', then the initial partial factors of the characteristic loads corresponding to each working condition under the mixed working condition are dynamically adjusted to Ψ1'~Ψ i This will continuously improve the efficiency and reliability of the scaffolding safety risk early warning system.

[0030] The method of this invention comprehensively considers the structural stress mechanism, the degree of influence of multiple factors, quantitative monitoring and early warning models, and dynamic early warning model feedback optimization, achieving an organic integration of simulation analysis, monitoring design, and dynamic early warning models. This invention features objectivity, stability, and accuracy, significantly improving the efficiency and reliability of scaffolding safety risk early warning systems. Attached Figure Description

[0031] Figure 1 This is a flowchart of one embodiment of the present invention;

[0032] Figure 2 This is a schematic diagram of the minimum basic repeating unit sub-model of scaffolding according to an embodiment of the present invention;

[0033] Figure 3 This is a schematic diagram of cell deduplication and node fusion according to an embodiment of the present invention. Detailed Implementation

[0034] The present invention will be further described in detail below with reference to specific embodiments.

[0035] In one specific embodiment of the present invention, a simulation-monitoring fusion method for early warning of scaffolding safety risks is provided, as shown in the appendix. Figure 1 As shown, the operation process is as follows: S1. Conduct preliminary analysis of the scaffolding structure and establish a numerical analysis model for typical steps; S2. Perform numerical calculation analysis on typical working conditions based on the model established in S1; S3. Statistically analyze the high-risk points of structural failure under each typical working condition, and on this basis, perform mixed working condition calculations to establish a quantitative early warning model for structural failure; S4. Deploy corresponding sensors for high-risk points of structural failure; S5. Real-time early warning prompts are achieved by comparing sensor data with the quantitative early warning model for structural failure; S6. During use, the quantitative early warning model is dynamically optimized based on feedback from the usage process to further improve its reliability.

[0036] The specific details of each step are as follows:

[0037] In S1, the establishment of a numerical analysis model for typical steps.

[0038] Based on the structural characteristics of the scaffolding itself, a minimum basic repeating unit sub-model is established. On this basis, by arraying, deduplicating units, and merging nodes of the sub-model, a typical structural model that can be modified and combined as needed is established for numerical simulation analysis.

[0039] The minimum basic repeating unit sub-model of scaffolding is attached. Figure 2 As shown, the minimum basic repeating unit sub-model of scaffolding generally includes the scaffolding located on the foundation 1. The scaffolding includes multiple layers of scaffold boards 2 and scaffolding steel pipes 3 supporting the scaffold boards. It also includes scissor braces 4 located on both sides of the scaffolding to support the scaffolding steel pipes. The element deduplication and node fusion are shown in the attached figure. Figure 3 As shown by the arrow in the middle, when merging multiple scaffolding minimum basic repeating unit sub-models, the nodes between adjacent scaffolding minimum basic repeating unit sub-models are merged with each other.

[0040] In S2, numerical calculation and analysis include:

[0041] By analyzing scaffolding usage scenarios, i typical working conditions were selected, and numerical simulation analysis was carried out for each typical working condition. For example, the typical working conditions selected are as follows: erection process simulation condition, centralized operation condition, decentralized operation condition, wind load condition, and structural failure condition.

[0042] Simulation of the erection process: Using the "ModelChange / Birth and Death" function of the numerical simulation analysis software, the process of erecting the scaffolding structure layer by layer is simulated.

[0043] Concentrated work scenario: This simulates a situation where multiple workers are operating in the same area. Sensitivity analysis is required for this scenario, focusing on the differences in structural safety risks at different work locations. The sensitivity analysis should at least include the top end of the scaffolding and the mid-span of the top scaffolding.

[0044] Dispersed work scenario: This simulates a work situation where multiple workers are operating in different areas. Sensitivity analysis is required for this scenario, considering the combination of worker numbers and work locations, to identify differences in structural safety risks under different combinations of worker numbers and locations. The sensitivity analysis for worker numbers should include at least two-person and three-person combinations. The sensitivity analysis for work location combinations should include at least the combinations at both ends of the top layer of the scaffold and the mid-span of the top layer of the scaffold.

[0045] Wind load conditions: Simulate the effects of wind loads under strong winds to obtain information on the safety risks of scaffolding structures during windy weather.

[0046] Structural failure conditions: Simulate failure in parts of the structure, including at least fastener failure, scaffolding failure, and shear brace failure.

[0047] Taking into account the probability of each working condition and relevant regulations, initial weights β1 to β2 are set for each working condition. i .

[0048] The initial weights for the simulation conditions during the erection process are β1 = 1, β2 = 5 for the centralized operation condition, β3 = 5 for the decentralized operation condition, β4 = 3 for the wind load condition, and β5 = 1 for the structural failure condition.

[0049] In S3, the establishment of the structural failure quantification early warning model includes:

[0050] Based on the results of numerical simulation analysis under various typical working conditions, statistical methods are used to analyze the high-risk locations of structural failure under each typical working condition. On this basis, mixed working condition calculations are performed, and a quantitative early warning model for structural failure is established.

[0051] After the simulation analysis is completed, the displacements and stresses of the structure in all directions are extracted from each working condition. Based on this, the change in nodal tilt angle is calculated according to the changes in nodal displacements before and after the load is applied. For example, if the change in nodal displacement is ΔS and the nodal elevation is h, then the change in nodal tilt angle is...

[0052] Statistical analysis was performed on stress concentration regions, displacement peak regions, and tilt peak nodes under various working conditions. Nodes with high recurrence rates within these regions under different working conditions were selected as characteristic points. For a given characteristic point, the parameters extracted and calculated through simulation analysis under various working conditions are called the failure characteristic parameters at that characteristic point, denoted as δ1~δ i .

[0053] Under mixed working conditions, the initial partial factors for the characteristic loads corresponding to each working condition are as follows: Based on the above partial coefficients, a mixed working condition simulation analysis is carried out. The failure characteristic parameters extracted and calculated through the mixed working condition simulation analysis are the early warning indicators for that location.

[0054] For example:

[0055] There are 5 typical working conditions in a certain scaffolding usage scenario: working condition 1 to working condition 5.

[0056] The initial weights β1 to β5 for each working condition are 1, 5, 5, 3, and 1, respectively.

[0057] The failure characteristic parameters obtained from simulation analysis under various working conditions include multiple physical quantities, such as displacement, stress, and tilt angle. Here, displacement is used as an example. For instance, the displacement failure characteristic parameters δ1 to δ5 for a certain feature point under various working conditions are 3cm, 4cm, 2cm, 2cm, and 2cm, respectively.

[0058] The initial partial factors for the characteristic loads corresponding to each working condition under the mixed working conditions are as follows:

[0059]

[0060]

[0061]

[0062]

[0063]

[0064] Based on the above partial coefficients, a mixed working condition simulation analysis is carried out. The failure characteristic parameters extracted and calculated through the mixed working condition simulation analysis are the early warning indicators for that location.

[0065] In S4, sensor point deployment

[0066] Based on the structural failure early warning model, corresponding sensors are deployed at high-risk locations for structural failure.

[0067] In S5, real-time quantitative early warning prompts

[0068] Real-time early warning prompts are achieved by comparing sensor data with structural failure quantification early warning models.

[0069] In S6, dynamic feedback optimization

[0070] During use, based on feedback from the usage process, the quantitative early warning model is dynamically optimized, and the weights of each operating condition are dynamically adjusted to β1'~β. i ', then the initial partial factors of the characteristic loads corresponding to each working condition under the mixed working condition are dynamically adjusted to Ψ1'~Ψ i This will continuously improve the efficiency and reliability of the scaffolding safety risk early warning system.

[0071] For example, during the application of a scaffolding structure, it was found that under wind load conditions, the sensor monitoring value at a high-risk failure point of a certain structure was consistently significantly lower than the early warning index for that point obtained from simulation analysis. In this case, the peak value of the measuring point can be used to replace the failure characteristic parameter δ4 obtained from simulation analysis, and the partial factor Ψ4' of wind load in the mixed load condition can be recalculated. Based on this, a mixed load condition simulation analysis can be conducted to obtain an optimized early warning index for that point.

[0072] Although the present invention has been described herein with reference to illustrative embodiments, the above embodiments are merely preferred embodiments of the present invention, and the implementation of the present invention is not limited to the above embodiments. It should be understood that those skilled in the art can devise many other modifications and implementations, which will fall within the scope and spirit of the principles disclosed in this application.

Claims

1. A simulation-monitoring integrated method for early warning of scaffolding safety risks, characterized in that... include: Typical structural model establishment, numerical simulation analysis, structural failure early warning model establishment, sensor point selection and deployment, real-time quantitative early warning prompts and dynamic feedback optimization process; Numerical simulation analysis involves analyzing scaffolding usage scenarios, selecting i typical working conditions, and conducting numerical simulation analysis on each typical working condition. Based on the probability of each working condition occurring, set the initial weights β1~β2 for each working condition. i ; The structural failure early warning model is established based on the results of numerical simulation analysis of various typical working conditions. Statistical methods are used to analyze the high-risk points of structural failure under various typical working conditions. Based on this, mixed working condition calculations are performed, and a structural failure quantification and early warning model is established; The typical working conditions include at least: erection process simulation working conditions, centralized operation working conditions, decentralized operation working conditions, wind load working conditions, and structural failure working conditions; After the simulation analysis is completed, the displacements and stresses of the structure in all directions are extracted from each working condition. Based on this, the change in the nodal inclination angle is calculated according to the change in nodal displacement before and after the load is applied. Statistical analysis was performed on stress concentration regions, displacement peak regions, and tilt angle peak nodes under various working conditions. Nodes with high recurrence rates within these regions under different working conditions were selected as characteristic points. For a given characteristic point, the parameters extracted and calculated through simulation analysis under various working conditions are called the failure characteristic parameters at that characteristic point, denoted as δ1~δ2. i ; Under mixed working conditions, the initial partial factors for the characteristic loads corresponding to each working condition are as follows: Where j represents the sequence number of the current working condition, j=1,2,…,i; k represents the summation variable, k=1,2,…,i; i represents the total number of typical working conditions; based on the above partial coefficients, a mixed working condition simulation analysis is carried out, and the failure characteristic parameters extracted and calculated by the mixed working condition simulation analysis are the early warning indicators for this point.

2. The scaffolding safety risk early warning method based on simulation-monitoring fusion according to claim 1, characterized in that: The establishment of a typical structural model involves creating a minimum basic repeating unit sub-model based on the structural characteristics of the scaffold itself. On this basis, a typical structural model that can be modified and combined as needed is established by arraying the sub-model, removing duplicate elements, and merging nodes, for use in numerical simulation analysis.

3. The scaffolding safety risk early warning method integrating simulation and monitoring according to claim 1, characterized in that: Simulation of the erection process: Using the element birth and death function of numerical simulation analysis software, the process of erecting the scaffolding structure layer by layer is simulated; Concentrated work conditions: This simulates a work situation where multiple workers are working in the same area; this condition requires sensitivity analysis based on the work location to obtain the differences in structural safety risks when working in different locations; The sensitivity analysis of the work location should include at least the end position of the top layer of the scaffolding and the mid-span position of the top layer of the scaffolding; Dispersed work scenario: Simulates multiple workers working in different areas; this scenario requires sensitivity analysis based on the number of workers and the combination of work locations to obtain the differences in structural safety risks under different combinations of the number of workers and work locations. Sensitivity analysis of the number of workers should include at least combinations of 2 and 3 workers; sensitivity analysis of the combination of work locations should include at least combinations of the two ends of the top layer of the scaffolding and the mid-span of the top layer of the scaffolding. Wind load case: Simulate the wind load under strong winds to obtain the safety risk of scaffolding structure under strong winds; Structural failure conditions: Simulate failure in parts of the structure, including at least fastener failure, scaffolding failure, and shear brace failure.

4. The scaffolding safety risk early warning method integrating simulation and monitoring according to claim 1, characterized in that: Sensor placement involves deploying appropriate sensors at high-risk locations of structural failure based on the structural failure early warning model.

5. The scaffolding safety risk early warning method integrating simulation and monitoring according to claim 4, characterized in that: Real-time quantitative early warning is achieved by comparing sensor data with a structural failure quantitative early warning model.

6. The scaffolding safety risk early warning method based on simulation-monitoring fusion according to claim 5, characterized in that: Dynamic feedback optimization involves dynamically optimizing the quantitative early warning model based on feedback during usage, with the weights of each operating condition dynamically adjusted to β1'~β. i ', then the initial partial factors of the characteristic loads corresponding to each working condition under the mixed working condition are dynamically adjusted to Ψ1'~Ψ i This will continuously improve the efficiency and reliability of the scaffolding safety risk early warning system.

Citation Information

Patent Citations

  • Safety monitoring method and system based on BIM scaffolding

    CN110864661A