Method and system for producing concrete sleepers by spike-anchoring method

Through the anchoring method of the lane first, the anchor rod is used in the sleeper steel mold, which realizes efficient production and mass production of concrete sleepers, solves the problems of low anchoring efficiency and high cost in the existing technology, and improves the laying speed of railway tracks and Productivity.

CN117549399BActive Publication Date: 2024-12-20RUZHOU ZHENGTIE SANJIA CEMENT PROD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311743991.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-12-20
Estimated Expiration
2043-12-19

AI Technical Summary

Technical Problem

The existing concrete sleeper production methods are inefficient, costly, complex environment and greatly affected by the climate during the anchoring process, and cannot achieve mass production, affecting the progress of railway track laying.

Method used

The anchoring method is adopted to make and install the anchor rod in the sleeper steel mold. The nail is combined with the anchoring agent through the mold to form an anchor rod, and then the concrete sleeper is produced to achieve flow-through operations and mass production.

Benefits of technology

It improves the efficiency and accuracy of nail anchoring, reduces labor and equipment investment, reduces construction costs, simplifies the operating environment, and achieves continuous production without being affected by the climate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117549399B_ABST
    Figure CN117549399B_ABST
Patent Text Reader

Abstract

A method and production system for producing concrete sleepers by the spike-anchor method, the production method comprising the following steps: (1) making an anchor rod: combining an anchoring agent with a spike, and completing the production of the anchor rod after the anchoring agent solidifies; (2) installing the prepared anchor rod in the reserved hole of the concrete sleeper steel mold; (3) pouring concrete slurry into the steel mold, and demoulding after curing, to complete the production of the concrete sleeper. The method first combines the spike and the anchoring agent to make an anchor rod, and then inserts the anchor rod into the sleeper steel mold to produce the concrete sleeper. The sleeper obtained is an anchor sleeper. After the sleeper is manufactured, it can be directly transported to the laying site for laying and installing the rails, providing a basis for accelerating the laying speed of railway tracks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of concrete sleeper production, and in particular to a method and a production system for producing concrete sleepers using a spike-anchoring method. Background Art

[0002] Concrete sleepers are usually produced by the pedestal method and the assembly line method. The pedestal method is that the production processes such as the molding, curing, and demoulding of the sleepers are all carried out at the same place on the pedestal. The assembly line method is produced in the workshop. The entire workshop is divided into several sections according to the requirements of the production process. Each section is equipped with corresponding heat and machinery equipment. The production processes such as the molding, curing, and demoulding of the sleepers are completed in sequence in the corresponding sections. The assembly line method has higher production efficiency than the pedestal method and a higher degree of mechanization. It is currently the commonly used sleeper production method.

[0003] The sleepers play the role of supporting the rails and keeping the position of the rails stable. Therefore, in the construction of railway tracks, it is necessary to anchor the spikes to fix the rails on the sleepers so that the rails and the sleepers are connected as a whole. At present, the sleepers produced by the above two methods are all reserved with anchor holes for the spikes on the sleepers, and are generally transported to the site for laying before anchoring. During anchoring, the anchoring agent is poured into the reserved hole, and then the positioner is used to insert the spikes into the reserved hole. After the anchoring agent solidifies and hardens, the positioner is removed to complete the anchoring construction of the spikes. This method can only anchor the spikes on one side of the sleeper in the rail groove at a time, and cannot be constructed in batches, the efficiency is low, the construction site environment is complex, and it is greatly affected by the climate. Moreover, the anchoring material is easy to flow on the sleepers, pollute the sleepers, and affect the appearance quality of the sleepers. In addition, the laying site anchoring needs to wait for the anchoring agent to solidify and harden before the next step of construction can be carried out, which seriously affects the laying progress of the railway track.

[0004] In order to increase the speed of laying railway tracks and enable the rails to be fixed after the sleepers are transported to the site for laying, some manufacturers will reserve a special site at the sleeper manufacturing base for spike anchoring operations. After the spikes are anchored, they are directly transported to the laying site for laying, saving the time required for on-site construction and waiting for the anchoring agent to solidify. When anchoring, the spike anchoring construction can be carried out layer by layer in the order of the sleeper stack from top to bottom. This method saves space. When there is enough space, the sleepers can be spread out first, and then stacked neatly after the spikes are anchored. Both of these site construction methods require the bottom of the reserved hole for the sleepers to be blocked first. After blocking the bottom of the hole, the anchoring agent is poured into the reserved hole, and the spikes are inserted using a locator. After the anchoring agent solidifies, the locator is removed. Moreover, operations such as dispersing, transporting, and stacking all require manual and mechanical methods to complete, which requires a large workload, requires a lot of equipment, and has high construction costs. Due to the manual blocking of the bottom of the hole, the blocking depth cannot be guaranteed, and the quality cannot be controlled. The spike anchoring construction method is also a scattered method of anchoring the single-side rail groove, which is inefficient. Therefore, a new concrete sleeper production method is urgently needed, which can not only convert scattered sleeper anchoring into mass production, but also ensure the speed of spike anchoring and sleeper production, provide a basis for accelerating the laying of railway tracks, save manpower, and reduce construction costs. Summary of the invention

[0005] The present invention provides a method for producing concrete sleepers by the spike-first anchoring method. The method is used to produce concrete sleepers. The prepared sleepers are firstly anchored with spikes on the sleepers. The sleepers can be directly transported to the laying site for laying and installing rails, thereby providing a basis for accelerating the laying speed of railway tracks.

[0006] The present invention also provides a production system for producing concrete sleepers by the spike-anchoring method, which can realize streamlined operations such as spike anchoring, sleeper molding, and demoulding, convert scattered sleeper anchoring into batch production, and reduce production costs.

[0007] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:

[0008] A method for producing concrete sleepers by a spike-anchoring method, characterized in that it comprises the following steps:

[0009] (1) Making anchor rods: combining anchoring agent with spikes, and completing the production of anchor rods after the anchoring agent solidifies; (2) installing the prepared anchor rods in the reserved holes of the concrete sleeper steel mold; (3) pouring concrete slurry into the steel mold and demoulding after curing to complete the production of concrete sleepers. This method first combines spikes and anchoring agent to make anchor rods, and then inserts the anchor rods into the sleeper steel mold to produce concrete sleepers. The prepared anchor sleepers have spikes anchored on them. After the sleepers are manufactured, they can be directly transported to the laying site for laying and installing rails, providing a basis for accelerating the laying of railway tracks. In addition, the spike anchoring and sleeper forming are combined into one production line. The spikes can be anchored by a simple method, which can realize mass production and improve production efficiency. Compared with the method of producing sleepers first and then anchoring the spikes in the prior art, the sleeper spreading, transportation, and stacking operations are omitted, which greatly reduces the labor, saves manpower, reduces labor intensity, reduces equipment investment, and saves construction costs. In addition, the operating environment is simple, the floor space is small, it is not affected by the climate, and continuous production is possible. This production method provides a new idea for sleeper prefabrication and can promote the development of concrete sleeper production and rail transit construction technology.

[0010] Preferably, in step (1), the anchor rod is made by using a forming mold, the forming mold has a mold cavity for forming the anchor rod, and a plurality of grooves arranged at intervals are provided in the mold cavity. The grooves are provided in the mold cavity so that the anchor rod made by using the forming mold has outward protrusions, which improves its bonding strength with concrete, improves its pull-out resistance, and ensures stability and durability.

[0011] Preferably, the forming mold includes two modules arranged opposite to each other, each of which is provided with a mold groove, and the mold grooves on the two modules are closed to form the mold cavity. The forming mold is designed as a split structure, which is convenient for processing the grooves therein, and for spraying a demoulding machine into the mold cavity, which is also convenient for demoulding.

[0012] Furthermore, the production of the anchor rod using the molding die includes the following steps: (1.1) spraying a mold release agent into the mold grooves of the two separated modules; (1.2) installing a spike into the mold cavity; (1.3) moving the module so that the mold grooves on the two modules are closed to form the mold cavity; (1.4) pouring an anchoring agent into the mold cavity; (1.5) after the anchoring machine solidifies and hardens, moving one of the modules away from the other module, taking the anchor rod out of the mold groove, and completing the production of the anchor rod. The operation is simple, the process flow is short, and the spike anchoring is performed with the help of a mold without polluting the appearance of the sleeper.

[0013] The present invention also provides a production system for producing concrete sleepers by the spike-anchor method, which is used in the above-mentioned method for producing concrete sleepers by the spike-anchor method, and the prefabricated anchor rods are used in the production of concrete sleepers. The production system includes: an anchor rod forming station, which is provided with a spike anchoring forming mold for anchoring the spikes into anchor rods; a sleeper forming station, which is provided with a sleeper steel mold; a steaming station; a demoulding station, which is provided with a demoulding machine for demoulding the sleeper in the sleeper steel mold; and a transportation system, including a transportation trolley and a transportation track arranged between adjacent stations. The production system will be able to realize streamlined operations such as spike anchoring, sleeper forming, and demoulding, and convert scattered sleeper anchoring into mass production, reducing production costs, and occupying a small area, saving site construction costs.

[0014] The molding die comprises: at least two modules arranged opposite to each other, one of which is a fixed module and the other is a movable module. A mold groove is arranged on the side of each module close to another module. When the two modules arranged opposite to each other are closed, the mold grooves thereon constitute a mold cavity.

[0015] A positioning groove is provided at the center of the bottom of the mold groove, and a receiving groove is provided at the center of the bottom of the positioning groove. The diameters of the mold groove, the positioning groove and the receiving groove are successively reduced to form a step shape. When installing the road spike in the mold cavity, the flange of the middle part of the road spike is placed in the positioning groove, the head of the road spike is located in the mold groove, and the tail is located in the receiving groove. After the two relatively arranged modules are closed, the flange on the road spike is located in the positioning groove and blocks the positioning groove. With such a design, during operation, a positioner is not used, and the road spike is directly installed in the mold groove, and there is no need to use additional materials to block the mold cavity. The construction is simple, the operation steps are shortened, the construction difficulty is reduced, and the anchoring depth of the road spike can be increased to ensure the quality.

[0016] The bottom end of the receiving groove passes through the bottom surface of the module, and its depth is less than the length of the tail of the spike. Since the tail of the spike is located outside the mold, it is easy to demould.

[0017] Compared with the prior art, the present invention has the following technical effects:

[0018] 1. The method for producing concrete sleepers by the spike-anchoring method of the present invention is to anchor the spikes and then install them into steel molds to produce concrete sleepers. The anchored sleepers produced by the method can be directly installed with rails after laying, replacing manual anchoring, realizing assembly line operation, greatly improving the anchoring efficiency and anchoring accuracy of the spikes. Compared with the method of producing sleepers first and then anchoring the spikes in the prior art, the intermediate links of sleeper scattering, transportation, and stacking are omitted, which greatly reduces the labor of workers, reduces labor intensity, reduces equipment investment, saves construction costs, and improves production efficiency. In addition, the operating environment is simple, easy to operate, and occupies a small area.

[0019] 2. The method of producing concrete sleepers by the spike-first anchoring method of the present invention provides a new method for producing concrete sleepers and a new idea for prefabrication of concrete sleepers. It not only transforms scattered sleeper anchoring into mass industrialized production, fills the gap in the automated construction of spike anchoring, significantly increases construction efficiency, but also can promote the development of concrete sleeper production and rail transit construction technology;

[0020] 3. The sleeper production method of the present invention can be operated in a workshop, is not affected by the climate, can be continuously produced, and ensures the production speed;

[0021] 4. The production system of the present invention integrates the spike anchoring into the sleeper production line, and realizes assembly line operation, and realizes assembly line operation of operations such as spike anchoring, sleeper forming, and demoulding. It can carry out factory operation management, and transform scattered sleeper anchoring into batch industrial production. It has a high degree of mechanization, greatly reduces the labor workload of workers, and improves work efficiency, filling the gap in the automated construction of spike anchoring. The production system is used to produce concrete sleepers, which provides a new idea and new method for the prefabrication of sleepers, and is of great significance to promoting the production of concrete sleepers and rail transit construction technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The accompanying drawings, which constitute a part of this specification and are used to further understand the present invention, illustrate preferred embodiments of the present invention and are used together with the specification to explain the principle and structure of the present invention. In the drawings:

[0023] Figure 1 It is a structural schematic diagram of the mold cavity (after pouring the anchoring agent) of the method for producing concrete sleepers by the spike-anchoring method of the present invention;

[0024] Figure 2 It is a schematic diagram of the top view of the forming mold (module separation state) of the method for producing concrete sleepers by the spike anchoring method of the present invention;

[0025] Figure 3 It is a schematic diagram of the top view of the forming mold (module closed state) of the method for producing concrete sleepers by the spike anchoring method of the present invention;

[0026] Figure 4 It is a schematic diagram of the plan layout of a production system for producing concrete sleepers by the spike-anchoring method of the present invention;

[0027] Figure 5 The invention discloses a schematic diagram of the connection relationship between the forming mold, the demoulding device and the bracket of the production system for producing concrete sleepers by the spike-anchoring method.

[0028] The numbers in the figure are: 1 is a mold cavity, 2 is an anchor rod, 3 is a groove, 4 is a module, 5 is a mold groove, 6 is a spike, 7 is a positioning groove, 8 is a receiving groove, 9 is a bracket, 10 is a guide rail, 11 is a driving cylinder, 12 is a demoulding module, and 13 is a demoulding cylinder; among them, 401 is a fixed module, and 402 is a moving module;

[0029] 100 is the anchor rod forming station, 200 is the sleeper forming station, 300 is the demoulding station, 400 is the transportation system, and 500 is the auxiliary station. DETAILED DESCRIPTION

[0030] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.

[0031] Embodiment 1: The method for producing concrete sleepers by the spike-anchor method of the present invention comprises the following steps: (1) Anchor rod molding: combining the anchoring agent with the spike, and completing the molding of the anchor rod after the anchoring agent solidifies and hardens; (2) Installing the molded anchor rod into the reserved hole of the sleeper steel mold; (3) Pouring concrete slurry into the sleeper steel mold, and demoulding the concrete sleeper after curing, thereby completing the production of the concrete sleeper. Before step (2), the following steps are required: (a) Spraying a demoulding agent; (b) Installing sleeve stirrups into the steel mold; (c) Inserting steel bars into the mold; (d) Installing accessories; After the above steps are completed, the steel mold is placed on a vibration table, concrete slurry is poured into the steel mold and vibrated, and demoulding is performed using a demoulding machine after slag removal, edge cleaning and curing. In step (2), the anchor rod can be installed in the steel mold by a bolt locking assembly.

[0032] In step (1), an anchor rod is made using a molding die, such as Figure 1 As shown, the forming mold has a mold cavity 1 for forming an anchor rod 2, and a plurality of grooves 3 arranged at intervals are provided in the mold cavity 1. The grooves 3 are provided in the mold cavity 1 so that the anchor rod 2 produced by the forming mold has an outward protrusion, which improves the bonding force between the anchor rod 2 and the concrete, improves the pull-out resistance, and ensures stability and durability.

[0033] like Figure 2 As shown, the molding die includes two modules 4 arranged opposite to each other, each of which is provided with a die groove 5, and the die grooves 5 on the two modules 4 are closed to form a mold cavity 1 (as shown in FIG. Figure 3As shown), in this embodiment, two mold grooves 5 are respectively provided on each module 4. In other embodiments, the number of mold grooves can also be designed according to actual demand. The molding mold is designed as a split structure, which is convenient for processing the grooves therein, and it is convenient to spray the demoulding machine into the mold groove, which is also convenient for demoulding. The depth of the mold groove 5 in this embodiment is consistent with the anchoring depth of the anchor rod 2. In other embodiments not shown in the figure, in order to facilitate the closure of the two modules, a positioning hole is set on one of the modules 4, and a frustum matching the positioning hole is set on the other module 4. In this embodiment, the mold grooves 5 on the two modules 4 form a mold cavity 1 after closing, and the bottom of the groove is naturally blocked after the mold groove 5 is closed to prevent leakage of slurry.

[0034] In this embodiment, see Figures 1 to 3 The manufacturing of the anchor rod using the molding mold includes the following steps: (1.1) spraying a mold release agent into the mold grooves 5 of the two separated modules 4; (1.2) installing a spike 6 into the mold cavity 1; (1.3) moving the modules 4 so that the mold grooves on the two modules 4 are closed to form a mold cavity 1; (1.4) pouring an anchoring agent into the mold cavity 1; (1.5) after the anchoring machine solidifies and hardens, move one of the modules 4 so that the module is away from the other module, take the anchor rod 2 out of the mold groove, and complete the manufacturing of the anchor rod 2. The operation is simple, the process flow is short, and the spike anchoring is performed with the help of a mold without contaminating the sleeper.

[0035] The method of producing concrete sleepers by the spike-first anchoring method of the present invention first anchors the spikes, so that the spikes can be anchored in the production workshop. The spikes are directly anchored in the sleepers produced by the method. Compared with the prior art method of first making sleepers, taking out the stacked sleepers from top to bottom for anchoring, or transporting the sleepers to the construction site for laying and then anchoring the spikes, the scattered sleeper anchoring is converted into mass industrial production, which greatly reduces the labor of workers, reduces labor intensity, improves production efficiency, and has a simple operating environment and a small footprint. In addition, since the sleeper production method is carried out indoors, it is not affected by weather and can be operated continuously.

[0036] In other embodiments, Figure 1As shown, a positioning groove 7 is provided at the center of the bottom of the mold groove 5, and a receiving groove 8 is provided at the center of the bottom of the positioning groove 7. The diameters of the mold groove 5, the positioning groove 7 and the receiving groove 8 are successively reduced to form a step shape. When installing the spike 6 into the mold cavity 1, the flange of the middle part of the spike 6 is placed in the positioning groove 7, the head of the spike 6 is located in the mold groove 5, and the tail is located in the receiving groove 8. After the two modules 4 arranged oppositely are closed, the flange on the spike 6 is located in the positioning groove 7 and blocks the positioning groove 7. With the mold cavity 1 of this structure, during operation, no positioner is used, and the spike 6 is directly installed in the mold groove 5. Compared with the prior art, no additional material is needed to block the mold cavity. The construction is simple, the operation steps are shortened, the construction difficulty is reduced, and the anchoring depth of the spike can be increased to ensure the quality. In order to facilitate demoulding, the bottom end of the receiving groove 7 passes through the bottom surface of the module 4, and its depth is less than the length of the tail of the spike 6. Since the tail of the spike is located outside the mold, demoulding is convenient.

[0037] Example 2: Figure 4 As shown, this embodiment provides a production system for producing concrete sleepers by the spike-first anchoring method, which is used in the method for producing concrete sleepers by the spike-first anchoring method of Example 1, such as Figure 4 As shown, the production system includes an anchor rod forming station 100 , a sleeper forming station 200 , a demoulding station 300 and a transportation system 400 .

[0038] The anchor rod forming station 200 is provided with a spike anchor forming mold for forming the anchor rod by anchoring the spike, the sleeper forming station 200 is provided with a sleeper steel mold, the demoulding station 300 is provided with a demoulding machine for demoulding the sleeper in the steel mold, and a steaming station (not shown in the figure) is also provided between the demoulding station 300 and the sleeper forming station 200, and the transportation system 400 includes a transportation trolley and a transportation track provided between adjacent stations, and can also be a conveying roller. The transportation trolley and the transportation track are provided in the anchor rod forming station 200 to transport the finished anchor rod to the sleeper steel mold for use; the transportation trolley and the transportation track are provided between the sleeper forming station 200 and the demoulding station 300 to facilitate the transportation of the sleeper cured steel mold to the demoulding machine for demoulding, and the transportation trolley is a prior art and will not be described in detail here.

[0039] like Figure 3 and 5 As shown, the molding die of this embodiment includes two modules 4 arranged opposite to each other, one of which is a fixed module 401 and the other is a movable module 402. A mold groove 5 is arranged on the side of the fixed module 401 / moving module 402 close to the movable module 402 / fixed module 401. After the two modules 4 arranged opposite to each other are closed, the mold groove 5 thereon forms a mold cavity 1. For details, see Figure 5The fixed module 401 is fixed on the bracket 9, the movable module 402 is set on the slide rail 10 through a slider fixed at the bottom thereof, the slide rail 10 is fixed on the bracket 9, and the side of the movable slider 402 away from the fixed slider 401 is fixedly connected to the cylinder rod of the driving cylinder, and the driving cylinder is installed on the bracket 9.

[0040] In other embodiments not shown in the figures, multiple modules are provided, wherein mold grooves are opened on both sides of the movable module, and the number of mold grooves can be determined according to production requirements. Deformable connecting parts are provided between each module to ensure the opening and closing of each module.

[0041] A plurality of grooves 3 arranged at intervals are provided in the mold groove 5. After the mold groove 5 is closed to form a mold cavity, the grooves 3 in the mold grooves 5 on adjacent modules 4 form a ring shape.

[0042] The demoulding of step (1.6) is performed automatically by using an automatic demoulding device for anchor rods. During construction, the material frame is placed under the frame of the automatic railroad spike anchoring machine 1, and the anchor rods demoulded by the automatic demoulding device fall into the material frame. A transport trolley is provided under the material frame to transport the anchor rods to the rail sleeper forming station. The demoulding device (such as Figure 5 As shown in the figure, a demoulding module driven by a cylinder or a hydraulic cylinder can be used. The demoulding module 12 is a rectangular block, which is arranged below the anchor rod forming mold. The demoulding cylinder is fixed on the bracket 9. The demoulding module 12 is connected to the telescopic end of the demoulding cylinder. When the two modules 4 are opened, the demoulding cylinder drives the demoulding module 5 to move forward and collide with the tail of the spike, so that the anchor rod is separated from the mold groove 5 to realize dynamic demoulding. The demoulding device has a simple structure and a reasonable design, and can easily demould the formed anchor rod. This embodiment can automatically demould, has a high degree of automation, and has high production efficiency.

[0043] A positioning groove 7 is provided at the center of the bottom of the mold groove 5, and a receiving groove 8 is provided at the center of the bottom of the positioning groove 7. The diameters of the mold groove 5, the positioning groove 7 and the receiving groove 8 are successively reduced to form a step shape. When installing the road spike 6 into the mold cavity 1, the flange of the middle part of the road spike 6 is placed in the positioning groove 7, the head of the road spike 6 is located in the mold groove 5, and the tail is located in the receiving groove 8. After the two relatively arranged modules 4 are closed, the flange on the road spike 6 is located in the positioning groove 7 and blocks the positioning groove 7. With the mold cavity 1 of this structure, during operation, no positioner is used, and the road spike 6 is directly installed in the mold groove 5. Compared with the prior art, no additional material is needed to block the mold cavity, which is simple to construct, shortens the operation steps, reduces the construction difficulty, and can also ensure the anchoring depth of the road spike and quality.

[0044] In this embodiment, an auxiliary station 500 is also provided before the sleeper forming station 200 to spray a demoulding machine into the sleeper steel mold, install sleeve stirrups, place the steel truss into the mold, install accessories, etc. The steel truss can be placed into the mold using an automatic grouping device for prestressed steel wires for sleepers with application number 202211667984X. After the construction of the auxiliary station is completed, the steel mold is moved to a vibration platform using a transport trolley or a crane for pouring concrete slurry.

[0045] In other embodiments, in order to improve the degree of automation of the present invention and save labor, a concrete pouring device or a concrete distributor is provided above the vibration platform to automatically pour concrete slurry into the steel mold, and the spraying demoulding machine can utilize the automatic spraying machine of the sleeper demoulding machine to spray the release agent into the steel mold. The above-mentioned concrete pouring device, concrete distributor and automatic spraying machine of the sleeper demoulding machine are all prior arts, and their specific structures are not described in detail here.

[0046] The concrete sleeper production line of this embodiment is used to produce concrete sleepers. The spikes are automatically anchored by using an automatic spike anchoring machine. The spike anchoring is integrated into the production line, and assembly line operation can be carried out. Factory operation management can be carried out, and scattered sleeper anchoring is converted into batch industrial production, which greatly reduces the labor workload of workers and improves work efficiency. It fills the gap in the automated construction of spike anchoring. The production of concrete sleepers using the concrete sleeper production line provides a new idea and a new method for the prefabrication of sleepers, which is of great significance to promoting the production of concrete sleepers and rail transit construction technology.

[0047] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for producing concrete sleepers by the spike-anchor method, characterized in that: The following steps are involved: (1) Making anchor rods: Combine the anchoring agent with the road spikes, and after the anchoring agent solidifies, the anchor rods are made; (2) Install the prepared anchor rods in the reserved holes of the concrete sleeper steel formwork; (3) Pour concrete slurry into the steel mold and remove it from the mold after curing to complete the production of concrete sleepers; In step (1), an anchor rod is manufactured by a molding die, wherein the molding die has a mold cavity for molding the anchor rod, and a plurality of grooves arranged at intervals are provided in the mold cavity. The molding die comprises two modules arranged opposite to each other, and mold grooves are provided on both modules. The mold grooves on the two modules are closed to form the mold cavity. A positioning groove is provided at the center of the groove bottom of the mold groove, and a receiving groove is provided at the center of the groove bottom of the positioning groove. When installing a road spike into the mold cavity, a flange in the middle of the road spike is placed in the positioning groove, and the head of the road spike is located in the mold groove, and the tail is located in the receiving groove. After the two modules are closed, the flange of the road spike blocks the positioning groove.

2. The method for producing concrete sleepers by the spike-anchor method according to claim 1, characterized in that: The process of making an anchor rod using a forming mold includes the following steps: (1.1) Spraying a release agent into the mold cavities of the two separated modules; (1.2) Installing spikes into the mold cavity; (1.3) moving the modules so that the mold grooves on the two modules are closed to form the mold cavity; (1.4) Pouring anchoring agent into the mold cavity; (1.5) After the anchoring machine solidifies, one of the modules is moved away from the other module, and the anchoring rod is taken out of the forming groove, thereby completing the production of the anchoring rod.

3. A production system for producing concrete sleepers by the spike-anchor method, used in the method for producing concrete sleepers by the spike-anchor method as claimed in claim 1 or 2, wherein prefabricated anchor rods are used in the production of concrete sleepers, characterized in that: include: An anchor rod forming station is provided with a road spike anchor forming mold for anchoring the road spike into an anchor rod; The sleeper forming station is equipped with sleeper steel molds; Steaming station; A demoulding station is provided with a demoulding machine for demoulding the sleepers in the sleeper steel mold; and The transport system includes a transport trolley and a transport track arranged between adjacent workstations; The molding die comprises at least two modules arranged opposite to each other, one of which is a fixed module and the other is a movable module. A mold groove is arranged on the side of each module close to the other module. After the two modules arranged opposite to each other are closed, the mold grooves thereon constitute a mold cavity. A positioning groove is arranged at the center of the bottom of the mold groove, and a receiving groove is arranged at the center of the bottom of the positioning groove. The diameters of the mold groove, the positioning groove and the receiving groove are successively reduced to form a step shape.

4. The production system for producing concrete sleepers by the spike-anchor method according to claim 3 is characterized in that: The bottom end of the accommodating groove passes through the bottom surface of the module, and the depth thereof is less than the tail length of the spike.

Citation Information

Patent Citations

  • High-strength bolt

    CN202273960U

  • Electrically insulating fastening element

    DE3320429A1

  • Casting process of reinforced concrete railway ties with embedded anchor bolts

    EP3753697A1

  • Rail fastening device

    JP2000328501A